Loading...
HomeMy WebLinkAboutSW3200403_197663 - Waxhaw - PC Stormwater Application-April 2020_Compiled_5/6/202013 BLACK&VEATCH April 20, 2020 Ms. Annette Lucas, PE North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources 512 N. Salisbury Street Archdale Building - 91h Floor Raleigh, NC 27604 Attention: Ms. Annette Lucas, PE BLACK & VEATCH INTERNATIONAL COMPANY 10725 DAVID TAYLOR DRIVE, SUITE 280 CHARLOTTE, NC 28262 USA +1 704-510-8410 1 COLLINSZ@BV.COM B&V Project 197663 B&V File 30.2002 Subject: Post -Construction Stormwater Management Permit Application for the Waxhaw Gravity Interceptor, Pump Station and Force Main Project On behalf of Union County Public Works (UCPW), we are submitting the enclosed stormwater management submittal package for the aforementioned project. The following documents are included in this package: • Two copies of Stormwater Management Permit Application Form (original and one copy, original bound separately) • Permit Application Processing Fee • One copy of Stormwater Management Narrative • One copy of USGS Topographical Quadrangle Map • One copy of USGS Vicinity Map • One copy of USGS Site Map • One copy of Stormwater and Drainage Area Calculations • Two copies of Project Drawings (two copies enclosed separately, 2204) • One copy of Stormwater and Drainage Area Calculations • One copy of New Built Upon Area Drawings • One copy of Drainage Area Delineation Drawings • One copy of Geotechnical Report • One copy of MRCS County Soils Map • One copy of Property Deed If you have any questions or need further information, please contact me at 704-510-8420 (email: ShyJR@bv.com). We will respond immediately to any of your concerns or questions. Very truly yours, BLACK & VEATCH INTERNATIONAL COMPANY Jva- Zachary Collins, P.E. Engineering Manager cc: Grant Moore, UCPW Invoice Date Invoice Number Description Invoice Amount 03/31/2020 03.31.20 PC STORMWATER $505.00 Vendor No. Vendor Name Check No. Check Date Check Amount 4571 NCDEQ 1 00496880 1 04/02/2020 505.00 Remove this portion Branch Banking and Trus County of Union t Company 4571 04/02/2020 00496880 66f1 z 500 North Main Street 'this disbursement has been approved as required by the local Government Budget and Fiscal Control Act Monroe, North Carolina 28112 VOID 60 DAYS FROM DATE OF ISSUE $505.00 Pay Five Hundred Five Dollars and 00 cents ***** w MP NCDEQ an Bo d of missio To The 610 EAST CENTER AVENUE a OrderOt MOOREVILLE NC 28115 P interim Finance Director Table of Contents 1 Application 1.1 Stormwater Management Permit Application Form 2 Narrative 2.1 Stormwater Management Narrative 3 Attachment A 3.1 USGS Quadrangle Map 3.2 USGS Topographical Map 4 Attachment B 4.1 Drainage Areas and Calculations 4.2 Delineated Drainage Area Drawings 4.3 New Built Upon Area Drawings 5 Attachment C 5.1 NRCS Soils Map 5.2 Geotechnical Report 6 Drawings, Printed Separately, Not in Binder 0 BLACK&VEATCH 1 - PERMIT APPLICATION DOCUMENTS • Stormwater Management Permit Application Form • Property Deed 13 BLACK&VEATCH DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Waxhaw Gravity Interceptor, Pump Station & Force Main 2. Location of Project (street address): Rehobeth Rd,1,580 ft SW of High Rock Dr City:Waxhaw County:NC Zip:28173 3. Directions to project (from nearest major intersection): Travel southwest down Rehobeth Rd from the intersection of W South Main St 3,700 ft, property is on the east side of the road. 4. Latitude:34° 54' 50" N Longitude:-80° 45' 7" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New []Modification ❑ Renewal w/ Modificationt tRenezoals with modifications also requires SWU-102 - Renezoal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:11 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://12ortal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page] of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Union County Signing Official & Titlejohn Shutak, CIP Program Manager b. Contact information for person listed in item 1a above: Street Address:500 N. Main St., Ste 600 City:Mo_nroe, NC State:NC Zip:28112 Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( ) Email: State: Zip: State: Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: 4. Local jurisdiction for building permits: Union Count' Fax: ( ) Point of Contact:Terry Griffin Phone #: (704 ) 283-3643 Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The project will utilize vegetated conveyance to the maximum extent possible. Concrete culvert pipes will transmit water under the proposed gravel access road as shown on the drawins, where it will be dispersed onto vegetated surfaces. Runoff will travel a minimum of 100 ft across vegetated surface prior to reaching Rone Branch. Infiltration to the pervious vegetates surface will be the treatment method for stormwater runoff generated by the new built upon area. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Catawba 4. Total Property Area: 2.92 acres River basin. 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:2.92 acres + Total project area shall be calculated to exclude the follozvin : the normal pool of int ounded strnchtres, the area betzveen the banks of streams and rivers, the area belozv the Normal High Water (NM line or Mean High Water (MHW) line, and coastal zvetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal zoetlands landward of the NHW (or MHW) line "nay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 23.5 %n 9. How many drainage areas does the project have?1 (For high densihj, count 1 for each proposed engineered stormzater BMP. For lozv densihj and other projects, use 1 for the whole properhj area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version Oct. 31, 2013 Page 3 of Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area Receiving Stream Name Rone Branch Stream Class * C Stream Index Number * 11-138-4 Total Drainage Area (so 1,242,353 On -site Drainage Area (so 127,000 Off -site Drainage Area (so 1,115,353 Proposed Impervious Area** (so 29,840 Impervious Area** total 23% Impervious— Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 1,335 On -site Streets (so On -site Parking (so On -site Sidewalks (so Other on -site (so 28,505 Future (so Off -site (so 200,000 Existing BUA*** (so Total (so: 229,840 * Stream Class and Index Nimtber can be determined at: http://portal.ticdettr.org/`tvebhvq&s/cszi/classifications hnppervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be rentoved and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. USGS Topographic maps and aerial imagery. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornwater requirements as per I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athgp://12ortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following, required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hgp:/ /12ortal.ncdenr.ore/web/wq/ws/su/statesw/`forms_docs. In' 'als 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants a A Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M 'YJA agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hgp://www.envhelp.org/pages/onestopexpress.htlul for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Form SWU-101 Version Oct. 31, 2013 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatme t management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/ Project name. c� b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). �� 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: N /l 11. For corporations and limited liability corporations (LLC): Provide documentation from the NCB Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / /www.secretary.state.nc.us/ Corporations / CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from ht!p:Hl2ortal.ncdenr.org/web/lr/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Form SWU-101 Version Oct. 31, 2013 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Zachary Collins, P.E. Consulting Firm: Black & Veatch Mailing Address:10925 David Taylor Drive, Suite 280 City:Charlotte State:NC Phone: (704 ) 510-8410 Fax: Email:collinsz®bv.com Zip:28262 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item 1a) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of County of do hereby certify that -- personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires, Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item 1a) Tohn Shutak , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: Date: I, G o /J a Notary Public for the State of County of & Vim- do hereby certify that personally appeared before me this day of A PK-1- a 010 ,and acknowledge thq dije execution of the application for a stormwate .ysxw46,,Witness my hand and official seal, r W o •°°°.°o•0 -,% Iv'• d�'.p �XOTARk I. ftSOP OUN `�,�� 41119"100 SEAL My commission expires [_ ` AC? - a Pao Form SWU-101 Version Oct. 31, 2013 Page 7 of 7 2 - STORMWATER NARRATIVE 13 BLACK&VEATCH WAXHAW GRAVITY INTERCEPTOR, PUMP STATION AND FORCE MAIN union Lounty r-uum. vvorKS B&V PROJECT NO. 197663 STORMWATER CONTROL NARRATIVE 13 BLACK&VEATCH STORMWATER CONTROL NARRATIVE WAXHAW GRAVITY INTERCEPTOR, PUMP STATION AND FORCE MAIN Project Description The Project being submitted for review is the Waxhaw Gravity Interceptor, Pump Station and Force Main (GI, PS & FM) Project. The new gravity interceptor will intercept flow from the existing sanitary sewer station and convey to the new pump station wetwell. The pump station will pump the sewage through the proposed force main to the existing Blythe Creek collection system where it will be conveyed to the existing twelve -mile treatment plan. The Pump station site includes a gravel access road, precast wetwell, valve and meter vaults, pre -fabricated concrete electrical building, emergency engine generator, concrete slab for future chemical storage and associated site appurtenances. The project also includes new gravity sewer and forcemain, however these do not require post -construction stormwater approval and are not included in the subject application. Site Description The driveway to the pump station site is located on Rehobeth Rd, 1,580 ft south of High Rock Drive, in Waxhaw, NC. The site elevation ranges from approximately 565 to 587, generally moderately sloping from northeast to southwest, draining to the adjacent Rone Branch (a.k.a. Rhone Branch). Rone Branch (stream index 11-138-4) is classified as a class C stream in the Catawba River basin and is not located within a water supply watershed area. The pump station will be located on a 200'x200' parcel purchased by Union County with permanent access easement connecting to Rehobeth Road. The area of the pump station parcel and access easements encompasses approximately 3 acres. For calculation purposes, the entire 3-acre area was assumed to be disturbed. The majority of the existing site is wooded or grassed, which will be cleared as necessary for the proposed improvements. Temporary erosion and sediment control measures will be required during construction. At the pump station property these measures primarily consist of diversion ditches, sediment traps, silt fence, inlet protection and other means as described herein. Soil types found at the site were identified based on information obtained from the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS). The pump station property is comprised primarily of Georgeville Silty Clay loam (GfB2) and Tarrus gravelly silty clay loam (TbB2). Stormwater Management The proposed project will add 1,335 square feet of new impervious Built Upon Area ("BUA") consisting of a precast concrete wetwell, meter vault, valve vault, prefabricated concrete electrical building, equipment pad and sewer manholes, which equates to 1.05% of the total site area. The project will also add approximately 28,505 square feet of area which will be counted as impervious for calculation purposes. Gravel and concrete area combined equate to 23.5% of the site area, which is below the 24% low density threshold. All runoff from the disturbed area and new BUA areas will flow via vegetated overland runoff to Rone Branch to the south west. Portions of runoff will be conveyed across the new access road via concrete pipe culvert, with outlet rip -rap flow dissipation and vegetate overland runoff. This project will utilize overland runoff over landscaped areas as the primary runoff management approach. There is a minimum of 100 feet of overland vegetated surface between any new surface and Rone Branch. BLACK & VEATCH I Stormwater Narrative 3 - ATTACHMENT A MAPS • USGS Quadrangle Map • USGS Topographical Map 13 BLACK&VEATCH �(�(�(� U.S. DEPARTMENT OF THE INTERIOR /. IRn CATAWBA NE QUADRANGLE sneneemaeJgyi1re]�Jr U.S. GEOLOGICAL SURVEY 0696topo —TN C]SOAYNUTESEAIESROLINA sza x13"E xl4 xl5 xIA T xl7 Y is1B s20 Ri s 522 r Or9 s: § C 1\ l I ro� - o o OEEs ma � D TT so IF CIA, Am --" �< Rk a ON *nl "B" � eo-sz xl2 zwomo rte7 ix� xl3 Paced be ml mares xl4 x15 � xIA xl� xIB • SCALE I'24000 n�a 520s"2',0y yam morfe7 irvc�, +22m.E eo-as �I am.ena benares�meisasG�'goc -rsaw� PfYS sm u mo tb' �mrvrmry Osu — n Amimm ere r * n m��ea�a nae e,�a� Ye meuaaumeirn me .......... �• 1... we�i,m, m..1 wn ma ®mom xwrtxzxmiury vexTrw�uruxar ivea "' n�re®e mes area mm a�, paaWr�,aan.erso�anir CUae 67a a c,-) _o. CATAWBA NE, SC -NC avam�. aN .17 Cl+' rim 4 V ^. � p Imo: < a y, Q ✓5 LJ ❑ y,r J W v ) p �- CL - � 4 LL I..L • S ri:tn �V %7. f s s s s s s s 4 - ATTACHMENT B DRAINAGE AREAS AND CALCULATIONS • Drainage Areas and Calculations • Delineated Drainage Areas 13 BLACK&VEATCH UNION COUNTY PUBLIC WORKS WAXHAW GRAVITY INTERCEPTOR, PUMP STATION & FORCE MAIN ENGINEERING CALCULATIONS - STORMWA TER CALCULATIONS CA R ES 046071 9 FNGINE�� WO APRIL 2020 B&V Project 197663 BLACK & VEATCH International Company Business License F-0794 10925 David Taylor Drive, Suite 280 Charlotte, North Carolina 28262 0 BLACK&VEATCH Excel Calculation Record Cover Sheet Client Name: UNION COUNTY PUBLIC WORKS Project Name: WAXHAW GI, PS & FM Calculation Title: STORM CULVERT PIPE SIZING Calculation No./File No.: Page: 1 of 18 Project/Phase No. 197663 Verification Method: El Check and Review Alternate Calculations Objective: DETERMINE PIPE SIZES NEEDED TO CCONVEY STORMWATER RUNOFF ACROSS ACCESS ROAD. Unverified Assumptions Requiring Subsequent Verification AT Assumption Verified By Date For additional assumptions, refer to Page: This Section Used for B&V Standard Computer -Aided Calculations Program Name/Number: Version: B&V Standard Computer -Aided Calculation Used? I IYes x No If yes, Verification only requires checking the accuracy of inputs and reviewing reasonableness of outputs. If no, Verification requires (1) checking of the actual formulas used in the calculation along with the accuracy of inputs, (2) Alternate Calculations created by the Verifier and reviewed by the Preparer, or (3) an approved deviation permit outlining Verification method used and attach approved deviation permit with number listed below. Review and Approval Rev Prepared By Date Verified By Date Approved By Date 0 Z.L. COLLINS 3/30/2020 #REF! STORM DRAIN - SC-01 Total Drainage Area Drainage Area C Value n Value N Value CN Value Grass 0.35 0.030 0.4 50 Asphalt/Concrete 0.95 0.016 0.02 95 Forested 0.25 0.150 0.6 60 Gravel 0.75 0.023 0.3 75 Cumulative C Cumulative n Cumulative N Cumulative CN Design Storm [yr] Highest EL [ft] Lowest EL [ft] L [ft] Slope (ft/ft) P2 [in] Time of Concentration SCS TR-55 Kerby Method FAA Equation SCS Lag Equation Average Time of Concentration (5 min. min.) 25 yr Rainfall Intensity (using NOAA tables) 15 minute duration 90,000 sf 2.07 ac of Area 20% 75% 5% 0% 0.795 0.026 0.125 84.250 25 yr 618 ft 590 ft 700 ft 0.04 ft/ft 3.56 in tc = N/A - L too large min tc = 14.24 min tc = 9.15 min tc = 7.57 min 10.32 min 5.67 in/hr Rational Method Projected Flow - Q 9.31 cfs Pipeline Designation: SC-01 Mannings Equation: Q. - 1.49/n A R2/3 S'/2 Vf/s - 1.49/n R2/3 S1/2 - A = Wetted Area (see values based on D below) R = Hydraulic Radius (see values based on D below) X.XX Input Cell X.XX Results Gravity Pipe Capacities based on Size, Mannings n, & Slope: Diameter D = 24 inches Mannings n n = 0.013 Full Velocity in V = 2.0 Us (1) Slope min Smin = 0.08% (minimum slope required to attain minimum full velocity selected above) Slopeseiected S = 1.00% (select slope to maintain minimum full velocity or enter actual slope) Capacity full (2) Qfuii= 22.7 cfs = 10,180 19113M Capacitym. Q@0.95= 24.4 cfs = 10,937 gpm Use a minimum of 2.0 f/s to achieve scouring if flows are expected to exceed 0.35D regularly. Use a minimum of 2.3 f/s full velocity to achieve scouring if flows are expected to remain around 0.2D for extended periods, such as sewers that are designed for future conditions that may not occur for years. Capacities are based on Selected Slope, not Minimum Slope. Slopes greater than minimum may be selected. Q25 From Runoff Calculations (cfs) 9.30 Partial Depth Velocity & Flow for Pipe Characteristics above: SC-01 24 - inch Dia d/D A/D ISCO Tables R/D ISCO Tables A fT R ft Velocity 'is Flow cfs Flow gpm 0.05 0.0147 0.0326 0.059 0.065 1.86 0.11 49 0.10 0.0409 0.0635 0.164 0.127 2.90 0.47 213 0.15 0.0739 0.0929 0.296 0.186 3.73 1.10 495 0.20 0.1118 0.1206 0.447 0.241 4.44 1.99 891 0.25 0.1535 0.1466 0.614 0.293 5.06 3.11 1394 0.30 0.1982 0.1709 0.793 0.342 5.60 4.44 1994 0.35 0.2450 0.1935 0.980 0.387 6.09 5.96 2677 0.40 0.2934 0.2142 1.174 0.428 6.51 7.64 3431 0.45 0.3428 0.2331 1.371 0.466 6.89 9.45 4241 0.50 0.3927 0.2500 1.571 0.500 7.22 11.34 5090 0.55 0.4426 0.2649 1.770 0.530 7.50 13.29 5963 0.60 0.4920 0.2776 1.968 0.555 7.74 15.24 6838 0.65 0.5404 0.2881 2.162 0.576 7.94 17.16 7699 0.70 0.5872 0.2962 2.349 0.592 8.08 18.99 8522 0.90 0.77 0.32 3.06 0.64 8.41 25.75 11557 0.75 0.6318 0.3017 2.527 0.603 8.18 20.68 9283 0.80 0.6736 0.3042 2.694 0.608 8.23 22.17 9951 0.81 0.6815 0.3044 2.726 0.609 8.23 22.44 10073 0.85 0.7115 0.3033 2.846 0.607 8.21 23.37 10491 0.90 0.7445 0.2980 2.978 0.596 8.12 24.17 10849 0.95 0.7707 0.2864 3.083 0.573 7.91 24.37 10937 1.00 1 0.7854 0.2500 3.142 0.500 7.22 22.68 10180 User Input Data Calculated Value Reference Data Designed By: Z. Collins Date: 3/30/2020 Checked By: Date: Company: Black & Veatch International Company Project Name: Waxhah GI, PS & FM Project No.: 197663 Site Location (City/Town) Waxhaw Culvert Designation SC-01 Culvert Id. SC-01 Total Drainage Area (acres) 2.07 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classified niuiizntun tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise Outlet pipe diameter, Do (in.) 24 Tailwater depth (in.) 6.00 d/D = 0.25 Minimum/Maximum tailwater? Min TW (Fig. 8.06a) 0.25*24"= 6.00 Discharge (cfs) 9.30 Velocity (ft./s) 7 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine d;a riprap size and minimum apron length (L). The d. size is the median stone size in a well -graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step ?. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 0.67 1.5 Minimum apron length, La (ft.) 16 14 Apron width at pipe outlet (ft.) 6 6 Apron shape Flat Trapezoid Apron width at outlet end (ft.) 12.40 11.60 Step 4. DeterliMic the inaximiun stone diameter d,,.3�= 1.5xde.o Minimum TW Max Stone Diameter, dmax (ft.) 1.005 Step 5. Deteninne the apron thickness: Apron thickness = 1.5 x dr13, Apron Thickness(ft.) Maximum TW 2.25 Minimum TW Maximum TW 1.5075 3.375 Step 6. Fit the riprap apron to the site by making it level for the m;nsn, length, Ld, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured_ Keep the apron as straight as possible and align it with the flow of the recer,-ing stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability_ It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (Appendix 8.05). Where overfalls exist at pipe outlets or flows are excessive, a phrnge pool should be considered, see page 8-06.8. STORM CULVERT 02 Total Drainage Area Drainage Area C Value n Value N Value CN Value Grass 0.35 0.030 0.4 61 Asphalt/Concrete 0.95 0.016 0.02 95 Forested 0.25 0.150 0.6 60 Gravel 0.75 0.023 0.3 75 Cumulative C Cumulative n Cumulative N Cumulative CN Design Storm [yr] Highest EL [ft] Lowest EL [ft] L [ft] Slope (ft/ft) P2 [in] Time of Concentration SCS TR-55 Kerby Method FAA Equation SCS Lag Equation Average Time of Concentration (5 min. min.) 25 yr Rainfall Intensity (using NOAA tables) 30 minute duration 666,294 sf 15.30 ac of Area 35% 18% 46% 0% 0.414 0.083 0.423 66.795 25 yr 618 ft 590 ft 2155 ft 0.13 ft/ft 3.56 in tc = N/A - L too large min tc = 32.02 min tc = 24.14 min tc = 16.98 min 24.38 min 4.20 in/hr Rational Method Projected Flow - Q 26.60 cfs Pipeline Designation: SC-02 Mannings Equation: Q. - 1.49/n A R2/3 S'/2 Vf/s - 1.49/n R2/3 S1/2 - A = Wetted Area (see values based on D below) R = Hydraulic Radius (see values based on D below) X.XX Input Cell X.XX Results Gravity Pipe Capacities based on Size, Mannings n, & Slope: Diameter D = 36 inches Mannings n n = 0.013 Full Velocity in V = 2.0 Us (1) Slope min Smin = 0.04% (minimum slope required to attain minimum full velocity selected above) Slopeseiected S = 1.00% (select slope to maintain minimum full velocity or enter actual slope) Capacity full (2) Qfuii= 66.9 cfs = 30,015 19113M Capacitym. Q@0.95= 71.9 cfs = 32,247 gpm Use a minimum of 2.0 f/s to achieve scouring if flows are expected to exceed 0.35D regularly. Use a minimum of 2.3 f/s full velocity to achieve scouring if flows are expected to remain around 0.2D for extended periods, such as sewers that are designed for future conditions that may not occur for years. Capacities are based on Selected Slope, not Minimum Slope. Slopes greater than minimum may be selected. Q25 From Runoff Calculations (cfs) 26.60 Partial Depth Velocity & Flow for Pipe Characteristics above: SC-02 36 - inch Dia d/D A/D ISCO Tables R/D ISCO Tables A fT R ft Velocity f/s Flow cfs Flow gpm 0.05 0.0147 0.0326 0.132 0.098 2.43 0.32 144 0.10 0.0409 0.0635 0.368 0.191 3.79 1.40 627 0.15 0.0739 0.0929 0.665 0.279 4.89 3.25 1460 0.20 0.1118 0.1206 1.006 0.362 5.82 5.86 2628 0.25 0.1535 0.1466 1.382 0.440 6.63 9.16 4110 0.30 0.1982 0.1709 1.784 0.513 7.34 13.10 5878 0.35 0.2450 0.1935 2.205 0.581 7.98 17.59 7893 0.40 0.2934 0.2142 2.641 0.643 8.53 22.54 10115 0.45 0.3428 0.2331 3.085 0.699 9.03 27.86 12503 0.50 0.3927 0.2500 3.534 0.750 9.46 33.44 15007 0.55 0.4426 0.2649 3.983 0.795 9.83 39.17 17580 0.60 0.4920 0.2776 4.428 0.833 10.15 44.92 20162 0.65 0.5404 0.2881 4.864 0.864 10.40 50.58 22700 0.70 0.5872 0.2962 5.285 0.889 10.59 55.99 25126 0.40 0.32 0.26 2.86 0.79 9.02 25.75 11557 0.75 0.6318 0.3017 5.686 0.905 10.72 60.98 27368 0.80 0.6736 0.3042 6.062 0.913 10.78 65.37 29340 0.81 0.6815 0.3044 6.134 0.913 10.79 66.17 29697 0.85 0.7115 0.3033 6.404 0.910 10.76 68.92 30930 0.90 0.7445 0.2980 6.701 0.894 10.64 71.27 31986 0.95 0.7707 0.2864 6.936 0.859 10.36 71.85 32247 1.00 1 0.7854 0.2500 7.069 0.750 9.46 66.88 30015 User Input Data Calculated Value Reference Data Designed By: Z. Collins Date: 3/30/2020 Checked By: Date: Company: Black & Veatch International Company Project Name: Waxhah GI, PS & FM Project No.: 197663 Site Location (City/Town) Waxhaw Culvert Designation SC-02 Culvert Id. SC-02 Total Drainage Area (acres) 15.30 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classified niuiimtun tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise Outlet pipe diameter, Do (in.) 24 Tailwater depth (in.) 6.00 d/D = 0.25 Minimum/Maximum tailwater? Min TW (Fig. 8.06a) 0.25*24"= 6.00 Discharge (cfs) 9.30 Velocity (ft./s) 7 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine d;a riprap size and minimum apron length (L). The d. size is the median stone size in a well -graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step ?. Riprap d50, (ft.) Minimum TW Figure 8.06a 0.67 Minimum apron length, La (ft.) 16 Apron width at pipe outlet (ft.) 6 Apron shape Flat Apron width at outlet end (ft.) 12.40 Step 4. Determine the inaximiun stone diameter Maximum TW Figure 8.06b 1.5 14 6 11.60 d,,.3�= 1.5xde.o Minimum TW Max Stone Diameter, dmax (ft.) 1.005 Step 5. Deteninne the apron thickness: Apron thickness = 1.5 x dr13, Apron Thickness(ft.) Maximum TW 2.25 Minimum TW Maximum TW 1.5075 3.375 Step 6. Fit the riprap apron to the site by making it level for the m;nsn, length, Ld, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured_ Keep the apron as straight as possible and align it with the flow of the recer,-ing stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability_ It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (Appendix 8.05). Where overfalls exist at pipe outlets or flows are excessive, a phrnge pool should be considered, see page 8-06.8. STORM DRAIN - SC-03 Total Drainage Area 597,652 sf Drainage Area 13.72 ac C Value n Value N Value CN Value % of Area Grass 0.35 0.030 0.4 50 54% Asphalt/Concrete 0.95 0.016 0.02 95 11% Forested 0.25 0.150 0.6 60 35% Gravel 0.75 0.023 0.3 75 0% Cumulative C 0.381 Cumulative n 0.070 Cumulative N 0.428 Cumulative CN 58.433 Design Storm [yr] 25 yr Highest EL [ft] 621 ft Lowest EL [ft] 574 ft L [ft] 1000 ft Slope (ft/ft) 0.05 ft/ft P2 [in] 3.56 in Time of Concentration SCS TR-55 tc = N/A - L too large min Kerby Method tc = 28.78 min FAA Equation tc = 24.44 min SCS Lag Equation tc = 19.22 min Average Time of Concentration 24.15 min 25 yr Rainfall Intensity (using NOAA tables) 30 minute duration 4.20 in/hr Rational Method Projected Flow - Q 21.94 cfs Pipeline Designation: SC-03 Mannings Equation: Q. - 1.49/n A R2/3 S'/2 Vf/s - 1.49/n R2/3 S1/2 - A = Wetted Area (see values based on D below) R = Hydraulic Radius (see values based on D below) X.XX Input Cell X.XX Results Gravity Pipe Capacities based on Size, Mannings n, & Slope: Diameter D = 24 inches Mannings n n = 0.013 Full Velocity in V = 2.0 Us (1) Slope min Smin = 0.08% (minimum slope required to attain minimum full velocity selected above) Slopeseiected S = 2.22% (select slope to maintain minimum full velocity or enter actual slope) Capacity full (2) Qfuii= 33.8 cfs = 15,168 19113M Capacitym. Q@0.95= 36.3 cfs = 16,296 gpm Use a minimum of 2.0 f/s to achieve scouring if flows are expected to exceed 0.35D regularly. Use a minimum of 2.3 f/s full velocity to achieve scouring if flows are expected to remain around 0.2D for extended periods, such as sewers that are designed for future conditions that may not occur for years. Capacities are based on Selected Slope, not Minimum Slope. Slopes greater than minimum may be selected. Q25 From Runoff Calculations (cfs) 21.94 Partial Depth Velocity & Flow for Pipe Characteristics above: SC-03 24 - inch Dia d/D A/D ISCO Tables R/D ISCO Tables A fT R ft Velocity 'is Flow cfs Flow gpm 0.05 0.0147 0.0326 0.059 0.065 2.77 0.16 73 0.10 0.0409 0.0635 0.164 0.127 4.31 0.71 317 0.15 0.0739 0.0929 0.296 0.186 5.56 1.64 738 0.20 0.1118 0.1206 0.447 0.241 6.62 2.96 1328 0.25 0.1535 0.1466 0.614 0.293 7.54 4.63 2077 0.30 0.1982 0.1709 0.793 0.342 8.35 6.62 2970 0.35 0.2450 0.1935 0.980 0.387 9.07 8.89 3989 0.40 0.2934 0.2142 1.174 0.428 9.70 11.39 5112 0.45 0.3428 0.2331 1.371 0.466 10.27 14.08 6319 0.50 0.3927 0.2500 1.571 0.500 10.76 16.90 7584 0.55 0.4426 0.2649 1.770 0.530 11.18 19.80 8884 0.60 0.4920 0.2776 1.968 0.555 11.54 22.70 10189 0.65 0.5404 0.2881 2.162 0.576 11.83 25.56 11472 0.70 0.5872 0.2962 2.349 0.592 12.05 28.29 12698 0.65 0.54 0.29 2.17 0.58 11.87 25.75 11557 0.75 0.6318 0.3017 2.527 0.603 12.19 30.82 13831 0.80 0.6736 0.3042 2.694 0.608 12.26 33.04 14827 0.81 0.6815 0.3044 2.726 0.609 12.27 33.44 15008 0.85 0.7115 0.3033 2.846 0.607 12.24 34.83 15631 0.90 0.7445 0.2980 2.978 0.596 12.09 36.02 16164 0.95 0.7707 0.2864 3.083 0.573 11.78 36.31 16296 1.00 1 0.7854 0.2500 3.142 0.500 10.76 33.80 15168 User Input Data Calculated Value Reference Data Designed By: Z. Collins Date: 3/30/2020 Checked By: Date: Company: Black & Veatch International Company Project Name: Waxhah GI, PS & FM Project No.: 197663 Site Location (City/Town) Waxhaw Culvert Designation SC-03 Culvert Id. SC-03 Total Drainage Area (acres) 13.72 Step 1. Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classified niuiizutun tailwater condition. If it is greater than half the pipe diameter, it is classified maximum condition_ Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter, Do (in.) 24 Tailwater depth (in.) 6.00 d/D = 0.25 Minimum/Maximum tailwater? Min TW (Fig. 8.06a) 0.25*24"= 6.00 Discharge (cfs) 21.94 Velocity (ft./s) 11 Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b. and determine d;a riprap size and minimum apron length (L). The d. size is the median stone size in a well -graded riprap apron. Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step ?. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 0.67 1.5 Minimum apron length, La (ft.) 14 14 Apron width at pipe outlet (ft.) 6 6 Apron shape Flat Trapezoid Apron width at outlet end (ft.) 15.32 15.32 Step 4. Deterriiine the inaximiun stone diameter: d,,.3�= 1.5xde.o Minimum TW Max Stone Diameter, dmax (ft.) 1.005 Step 5. Deteninne the apron thickness: Apron thickness = 1.5 x dr13, Apron Thickness(ft.) Maximum TW 2.25 Minimum TW Maximum TW 1.5075 3.375 Step 6. Fit the riprap apron to the site by making it level for the m;nsn, length, Ld, from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured_ Keep the apron as straight as possible and align it with the flow of the recer,-ing stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability_ It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (Appendix 8.05). Where overfalls exist at pipe outlets or flows are excessive, a phrnge pool should be considered, see page 8-06.8. Time series type: Annual Maximum Project area: CHARLOTTE, NC Latitude (decimal degrees): 35.2796 Longitude (decimal degrees):-81.0012 Reference https://hdsc.nws.noaa.gov/hdsc/pfds/pfds map cont.html?bkmrk=nc PRECIPITATION INTENSITY ESTIMATES (in/hr) Storm Frequency (yr) 2 5 10 25 50 100 Duration (min) 5-min 5.95 6.9 7.61 8.42 10-min 4.76 5.53 6.08 6.71 15-min 3.98 4.66 5.13 5.67 30-min 2.75 3.31 3.72 4.2 60-min 1.73 2.12 2.42 2.8 2-hr 1 1.24 1.42 1.66 3-hr 0.706 0.88 1.02 1.2 6-hr 0.425 0.53 0.613 0.727 12-hr 0.249 0.312 0.363 0.434 24-hr 0.148 0.186 0.216 0.259 PRECIPITATION DEPTH ESTIMATES (in) Storm Frequency (yr) 2 5 10 25 50 100 Duration (min) 5-min 0.496 0.634 0.702 10-min 0.793 1.01 1.12 15-min 0.996 1.28 1.42 30-min 1.38 1.86 2.1 60-min 1.73 2.42 2.8 2-hr 2 2.85 3.33 3-hr 2.12 3.05 3.61 6-hr 2.54 3.67 4.35 12-hr 3.01 4.38 5.23 24-hr 3.56 5.2 6.22 WIN FW • 1 1 I w fr r • • glllill�il • • 1 F.J.till •� - 11 • �li, 1ll�or,v,, V 11 {IIIIII III IIIIr III! t r i Il.ui: rI%1811ItlNtilllnu 11111111111E: 1 mnuNln�lnl! oil Ili 11� /'5!' 1111111 I!i!iii1il iI i lion. I I II • 1 % � 1 11OPINION llO' A�I,P"'ulli�iry I n•����ii�il 1� f ~ In I �I 1 aIr] I IIIIII 1 � fr•�irn / 1 III II IIIII I ■ '�.�' � 'I�lil ��■ ■ ;Aill�l/pi /ll !1l�ill'llllilM��111 i siLttM�~ti ! IIIII�I��IllllllIt ;l!i!�� ��f� :•�'' �,�I 11, IIIII�INMNM1��I� �I ���fj� 6 ��IIIIii, 111111111 ��M�i1.11� IIII II . �r�� _ 1 �iI11111 IR iil MINI11I I■■ ,. �� �•- r �1� IIIIII�Ip ��M��iilllll 111 IIII ��■, �� , •• �� 1luiuu IIIIIIIIIIIggqgqqlU MMI I�Elllllllli�■■■ ,dal, �i.��� rjjj� ���1�1 B IU � 11 RN �Inlil'Ip pr' ! �i�Ilillllllllllllll� ,: 1��f�f1��II i l lI Il IIpIIII � i�i� ,� 1 1 IIIIIIIIII IIIII 11�����#I:I�IY�� -• �iif►.5�!� i, jj III NII IIII11�+ I 1 IIIII IIIII — I%���� .•saiii�i��l� �IIIII•IIIIllilll�l���lllll IIIII IIIII �������� ;A 1 1 11 IIII i 1 II IIIII IIIII / � • 11 11 11.! Discharge (tt3/sec Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T. < 0.5 diameter). Rev.12,13 8.06.3 Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) 3Do Outlet 4v= Do + 0.4La pipe diameter (Db) �_ La 5Do 80 ..� c\ �P4 70 mcAr 80 4.' 1 �..:_50 - 1 so 100 Discharge (Asec) Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full. maximum taifwater Bondi ion (T., > 0.5 rliameler). 8.06.4 Rev. I ZM3 EQUATIONS Tc or Tt= time of concentration (hr, unless otherwise specified) n = Manning's roughness C = rational method coefficient S = slope (ft/ft, unless otherwise specified) L = length (ft) i = rainfall intensity (in/hr) CN = SCS curve number A = area (AC) P2 = 2 yr, 24 hr rainfall (in) Q = flowrate (cfs) Time of Concentration SCS TR-55 - Manning's Kinematic Solution https://www.hydrocad.net/pdf/TR-55%2OChapter%203. d_P 07 (n L`)" S *for len the less than 300 ft Sheet Flow: Tt = p 5 p.q g p2 } S L Shallow Concentrated Flow: T= t 3600 Channel Flow - Manning's Equation R = hydraulic radius V = velocity (ft/s) Q= 1.49 *A * R* S A= area (sft) n t = time of concentration (s) L = channel length (ft) t=A*L/Q SCS Lag Equation L 1-.8 (S+1)-.z Tc = --- where L _ ----------------- .6 1900 Y".5 IQOU and S = - 10 CN FAA Equation FAA equation: t = G (I A - c) L'-' / (100 )1 - Kerby Method to.. = (L X 1V)0.467 0.235 httDS://www.hvdrocad.net/understandine.htr I = hydraulic length of waterhsed (ft) Y = slope (%) S = potential maximum retention (in) L = lag time (hr) G = 1.8 tc = time of concentration (min) tov = time of concentration for overland flow I L = overland flow length N = retardance coefficient Runoff Flowrates Rational Method Q = C * i * A SCS Runoff Equation (P-. 2S) Q=----------- P +. S where (Q=o if P<.2S) 1000 S=------- - 10 C Q=Precipitation excess (runoff) [inches] P=Cumulative precipitation [inches] S=Potential maximum retention [inches] CN =SCS Curve Number https://www.hydrocad.net/understanding.htr https://www.hydrocad.net/understanding.htr Qflowrate (cfs) = Q * Area (sf) /12 C/) CL � � O (D « z! g)f ° t(3} K�! a ° \)/ 22/ f{/ \\f ° �§\)\ )i\ oLO /\)f 0 0 -%«§ )5)) IC) 0 0 )~me r _ U f 0 ± w k _ § 2 § q I L U) / b b b A ƒ ƒ a- k � 2 - ¢ �rc tiati z z�m 3¢i�i 3PHOHd ONV NV7d OVO2l SS300V hoel8 NOIlV1S ONIdvind M O leuollewalul 4�lean'8 IINOl311S �, � NIVW EMOA Q NOIld1S diNnd o o H�lvana�I�v�a ?JOld3Ob31Nl lllnV2i J MHHXVM S>i2jom onend .11NnOO NOW tl 25 m H a� H rc O 0 � m o 0 o p$< z 3 o a w `a °_ i 'o a o o v 25 - - v 3 5 - ATTACHMENT C SOILS REPORTS • NRCS Soils Map • Geotechnical Report and Boring Log 13 BLACK&VEATCH 0 Z /W V W J a O O � U O O U y N U O O O) E O_ O (U U (u C C U) E US y y O O O O C U) (U () O- o c U (U = a) y E y > o o a) C > Q O a) _0 -O U) 6 > Q N U N E O-a) m N o m EN O C N N y U a) m E o) C E C N O N y i 2 7 Q N N U) a) m m wE UU)) O U) () O > O U U) y m N Z a) -o y O a) 0 m a) Q 7 a) y U) o N E U — N o_ N — U a) 0 I� N a) a) 7 O O U) a U U)(U N fOA O a) y 00 N a) O Z m O jp U U) 'O O_ U) IL � a) O au)) a) U) 7 m Q U N 2i O '6 O > a) E U W a7 (U O a) co (6 N O O L y - O_ (`U O Q Z O_ C U) � 0 < m a) o = s= o U o a) 0 a) U 0 o rn o o_'— vi m m E c O O a) o aa)).� � U� o_ E? m y a) '� a) N O-a O O_ a) N E N US N U � a) 7 u) U O N U) O_'O .O w 'O 'O a) V O N U) � a) U3 E U).� a) U)O 0 a) N -0 U � 3 N_ O ) c Q U) O 70 O a)C-0o a) Z E '03 a) o_ O c a) a) rn o > � m 0) m -O aim a) a, E 0 0 (D C y O_ N j, a) E N N 7 ,U) C N Q U) (6 O 'O O_ O a) >' g U m m U .o Q m 0 m s� (n E E a) (n O E (U 3 O 0 O a) a) a) 7 to O a) a) E Q 7 O_ O a) O I- C N = '6 O U) U) O C U y U > O_ a) U) a) m O E O y O N N o a a) o)y� a) a) o a>) O M O n-2 L — O 7 — o O N ° N a) E m 55 O y � y Q 4 (i O U R L L Q Q >. a) 2 y a -yo O L d Q 0 CL Z U) ° m E m y 0 O ° O R a m o O U) (n N > L_ O U) aR y (n � O a) U S a Q * R a R � C � R 4 R5 F R m y C O y 0 .� O Q U) a° a° N c N a CL O U a 0y >C >C Q >C a) y C) Q 3 Q o a w Q O O FL O ° O � 0` �Q LU , oY Q o a) O- R —oo 3 O w>> aRaoc oo o ao Q 0 n n 0 n o m O ' a) a O m m U) R U) o U) in U) U) w a R yp�pyp�� `¢ ` 11F U) Q y U) Z Soil Map —Union County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CeB2 Cecil gravelly sandy clay loam, 86.9 37.6% 2 to 8 percent slopes, moderately eroded CeC2 Cecil gravelly sandy clay loam, 21.6 9.3% 8 to 15 percent slopes, moderately eroded ChA Chewacla silt loam, 0 to 2 29.6 12.8% percent slopes, frequently flooded GfB2 Georgeville silty clay loam, 2 to 6.0 2.6% 8 percent slopes, moderately eroded PaE2 Pacolet sandy clay loam, 15 to 6.5 2.8% 40 percent slopes, moderately eroded TbB2 Tarrus gravelly silty clay loam, 7.3 3.2% 2 to 8 percent slopes, moderately eroded TbC2 Tarrus gravelly silty clay loam, 68.6 29.7% 8 to 15 percent slopes, moderately eroded W Water 0.0 0.0% WyB Wynott gravelly loam, 2 to 8 4.5 1.9% percent slopes Totals for Area of Interest 231.0 100.0% USDA Natural Resources Web Soil Survey 3/31/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 + ESP SUBSURFACE EXPLORATION DATA REPORT WAXHAW FORCED MAIN AND PUMPING STATION UNION COUNTY, NORTH CAROLINA ESP Project No. E413-HP38.300 Prepared For: Black & Veatch International Company 10715 David Taylor Drive, Suite 240 Union County, North Carolina 28262 Prepared By: ESP Associates, Inc. 7144 Weddington Rd. Suite 110 Concord, North Carolina 28027 April 9, 2020 ESP April 8, 2020 Black & Veatch International Company 10715 David Taylor Drive, Suite 240 Charlotte, North Carolina 28262 Attention: Mr. Zachary Collins, PE Reference: SUBSURFACE EXPLORATION APO Waxhaw Forced Main and Pumpi Sta Union County, North Carolina ESP Project No. HP38.300 (DraftReport) Dear Mr. Collins: ESP Associates, Inc. (ESP) has pleted the s urface exploration for the proposed forced main and pumping station in Union County Noftarolina. This exploration was performed in general accordance with our P osa o. E4B-19997, dated November 27, 2019. Authorization to proceed with this study as provid �d b written execution of our proposal by Mr. Jeffery Loggins with Black & Veatch Intlational Company on January 9, 2020. The purpose of the exploration was to provide test data information for the subsurface conditions that may be encountered during construction of the proposed pump station and forced main alignment areas. This data report presents our findings of our field and applicable laboratory testing services. ESP Associates, Inc. 7144 Weddington Road NW, Suite 110 • Concord, NC 28027 704.793.9855 • fax 704.793.9865 www.espassociates.com Subsurface Exploration Data Report Waxhaw Forced Main and Pumping Station ESP Project No. HP38.300 April 9, 2020 ESP appreciates the opportunity to assist you during this phase of the project. If you should have any questions concerning this data report, or if we may be of further assistance, please contact us. Sincerely, ESP Associates, Inc. Daniel M. Harborth, PE NC Registration No. 44060 D. Chad Sherman, PE Department Manag( DMH/DCS/ea Copies Submitted 4 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 SITE AND PROJECT DESCRIPTION ............................................... 1.2 PURPOSE OF SERVICES................................................................... 2.0 EXPLORATION PROCEDURES............................................................. 2.1 FIELD..................................................................................................... 2.2 LABORATORY.................................................................................... 3.0 SUBSURFACE CONDITIONS.................................................................. 3.1 PHYSIOGRAPHY AND AREA GEOLOGY .................................... 3.2 SUBSURFACE.......................................................... ....................... 3.3 SUBSURFACE WATER ..................................... ........................ 4.0 LIMITATIONS OF REPORT .......................... ................ .................. APPENDIX 14 FIELD EXPLORATION PROCEDURES LABORATORY PROCEDURES BORING LOCATION PLAN WITH SITE VICINITY MAP, FIGURE 1 LEGEND TO SOIL CLASSIFI TION AND SYMBOLS TEST BORING RECORDS (B-1 OUGH B-18) TABLE 1 - SUMMARY OF L RY TESTING STANDARD MOISTURE — DE LATIONSHIP (S-1 and S-2) JJQ 2 2 2 3 4 4 5 6 Subsurface Exploration Data Report ESP Project No. HP38.300 Waxhaw Forced Main and Pumping Station April 9, 2020 1.0 INTRODUCTION 1.1 SITE AND PROJECT DESCRIPTION The project site extends east to west starting at the intersection of Waxhaw Farms Road and Old Waxhaw-Monroe Road and ending at Rehobeth Road in Union County, North Carolina (reference "Site Vicinity Map" Figure 1). The majority of the proposed alignment is currently undeveloped. However, the proposed forced main will extend across two exist ng gravel roads, Bishop Lane, Old Waxhaw-Monroe Road and existing driveways located orth of Waxhaw Farms Road. Vegetation within the proposed pump station and alignment are' consists of grass, weeds, brush and small to large trees. The proposed forced /dwitil ll exten cross two streams/drainage features. During our field services, water was obsethe strea s/drainage features. Based on visual observations, the topography al o the project limits consisted of rolling hills, with approximate relief on the order of 20 to 4 e �ie Vp station area is undeveloped with vegetation consisting of grass and pump station area slopes feet of relief. We understand plans Union County. The along Waxhaw Farms Road on visual observations, the proposed to the southwest with approximately 10 pump station, forced main and gravel access road for from the proposed pump station east of Rehobeth Road Old Waxhaw-Monroe Road. The access road will be constructed with exposed aggregate base course. The pump station area with consist of a wet well, prefabricated electrical building, chemical storage tanks and a radio tower. A drawing titled "BV-C-PROP-SITE-BORE_LOCATIONS" dated January 21, 2020 provided by Black & Veatch illustrated the approximate predetermined boring locations. No other detailed information has been provided at this time. 1 Subsurface Exploration Data Report ESP Project No. HP38.300 Waxhaw Forced Main and Pumping Station April 9, 2020 1.2 PURPOSE OF SERVICES The purpose of the exploration was to provide general data of the anticipated subsurface conditions that may be encountered during construction of the proposed pump station and forced main alignment areas. This data report contains a brief description of the field and applicable laboratory testing procedures performed for this report and a discussion of the soil conditions encountered at the site. 2.0 EXPLORATION PROCEDAS 2.1 FIELD Eighteen soil test borings (Borings B-1 shown on the attached "Boring Location Plan, located in the field by an ESP Clearing by a skid -steer various boring locations. The soil 7.5 to 49 feet below carrier. Hollow -stem, Standard Penetration Tests 18) were performed at the approximate locations The predetermined boring locations were held global positioning system (GPS). was required to gain limited access to extended to depths ranging from approximately using a Diedrich D50 drill rig mounted on an ATV ugers were used to advance the borings into the ground. performed at designated intervals in the soil test borings in general accordance with ASTM D 1586 in order to obtain data for estimating soil strength and consistency. In conjunction with the penetration testing, split -spoon soil samples were recovered for soil classification and potential laboratory testing. Relatively undisturbed samples were obtained from borings in general accordance with ASTM D 1587 in order to facilitate quantitative laboratory testing. A bulk sample was obtained during drilling operations at Boring B-14. The bulk sample is a homogeneous mixture of the soils encountered from the existing ground surface to an approximate depth of 10 feet. 4 Subsurface Exploration Data Report ESP Project No. HP38.300 Waxhaw Forced Main and Pumping Station April 9, 2020 Water level measurements were attempted at, and up to 15 days after, the termination of drilling. Temporary PVC standpipes with locking covers were installed in Borings B-5, B-8, B-10 and B- 17 to obtain subsequent water level readings. A brief description of the field testing procedures is included in the Appendix. Borings B-8 and B-9 was advanced into auger refusal material using rock core drilling techniques. Diamond core drilling procedures were performed in general accordance with ASTM D 2113 to obtain core samples of the material encountered in the boring. Approximately 44.5 feet of coring was executed. The results of the diamond core drilling are indi d on the appropriate Test Boring Record. While in the field, a geotechnical engineering prkession#visuall�examined each sample to evaluate the type of soil encountered, soil plaNtestres ture condition, organic content, presence of lenses and seams, colors and apparent Ngin. The results of the visual soil classifications for the borings, as well as fies, are presented on the individual "Test Boring Records," included in t Appendix. Similar soils were grouped into strata on the logs. The strata lines represent a*rox mate boundaries between the soil types; however, the actual �S' transition between soil pes i�the field may be gradual in both the horizontal and vertical directions. 2.2 LABORATORY Select samples of the on -site soils obtained during the field testing program were tested in the laboratory. Tests performed included Natural Moisture Contents, Atterberg Limits, Grain Size Distributions and Standard Proctor Compaction tests. The results of the soil tests performed for this data report, along with a brief description of the laboratory procedures used, are presented in the Appendix. 3 Subsurface Exploration Data Report Waxhaw Forced Main and Pumping Station 3.0 SUBSURFACE CONDITIONS 3.1 PHYSIOGRAPHY AND AREA GEOLOGY ESP Project No. HP38.300 April 9, 2020 The referenced property is located in Union County, North Carolina which is in the Piedmont Physiographic Province. The Piedmont Province generally consists of hills and ridges which are intertwined with an established system of draws and streams. The Piedmont Province is predominately underlain by igneous rock (formed from molten aterial) and metamorphic rock (formed by heat, pressure and/or chemical action), which re initially formed during the Precambrian and Paleozoic eras. The virgin soils encountered in this area are the residual *uct of in -place chemical weathering of rock which was similar to the rock present underlying the site. In areas not altered by erosion or disturbed by the activities of man, the type al resi uah soil profile consists of clayey soils near the surface, where soil weathering is e advan a erlain by sandy silts and silty sands. The boundary between soil and roc not rply fined. This transitional zone termed "partially weathered rock" is normaltL fou erlykg the parent bedrock. Partially weathered rock is defined, for engineer excess of 100 blows less resistant rock ty is quite irregular and material with Standard Penetration Resistances in acilitated by fractures, joints and by the presence of rofile of the partially weathered rock and hard rock irizontal distances. Also, it is common to find lenses and boulders of hard rock and zones of partially weathered rock within the soil mantle, well above the general bedrock level. M Subsurface Exploration Data Report Waxhaw Forced Main and Pumping Station 3.2 SUBSURFACE ESP Project No. HP38.300 April 9, 2020 Subsurface conditions as indicated by the borings generally consist of topsoil, topsoil/rootmat or topsoil/grassmat, underlain by residual soils and partially weathered rock. The residual soils have formed from the weathering of the parent bedrock. The residual soils generally transition with depth into partially weathered rock. The generalized subsurface conditions at the site are described. For more detailed soil descriptions and stratifications at a particular boring location, the respective "Test Boring Record" should be reviewed. The Te t Boring Records are included in the Appendix. Surface: A topsoil, topsoil/grassmat or tol was encountered at each boring location. Fill: Underlying the topsoil in Boring B-1 approximately 2 to 6 inches thick encountered. The fill consists of firm to stiff high plasticity clay w?oot Nt(bDpff)*. Vard Penetration Resistances (N-values) in the fill ranged from 7 to 14 blows p The fill extends to an approximate depth of 8.5 feet below the existing ground surface. IqW Residuum: Beneath the topsoil, topsoil/grassmat or topsoil/rootmat in Borings B-1 through B-9 and B-11 through B-18 Na underlying the fill in Boring B-10, residual soils were encountered. The residuum generally consists of very soft to very hard sandy silt, elastic silt, clay, clay with sand, sandy clay, high plasticity clay, high plasticity clay with sand and sandy high plasticity clay, and medium dense to very dense silty sand with gravel and silty sand. N-values in the residuum varied between 2 and 95 bp£ The residuum extends to depths ranging from approximately 6 to 24.5 feet. Soil Test Borings B-1, B-2, B-7 and B-10 through 18 were terminated in the residual soils at depths ranging from approximately 7.5 to 25 feet. Auger refusal was encountered at Boring B-9 at an approximate depth of 6 feet. E Subsurface Exploration Data Report ESP Project No. HP38.300 Waxhaw Forced Main and Pumping Station April 9, 2020 Partially Weathered Rock: Underlying the residuum in Borings B-3 through B-6 and B-8, partially weathered rock (PWR) was encountered. PWR is defined as residual soils exhibiting N- values in excess of 100 bp£ When sampled, the PWR generally breaks down into sandy silts and silty sands with rock fragments. Borings B-2 through B-6 were terminated in the PWR at depths ranging between 23.8 and 49 feet. Auger refusal was encountered at Boring B-8 at an approximate depth of 9.5 feet. Auger Refusal: Auger refusal was encountered in Borings B-8 a B-9 at approximate depths of 6 and 9.5 feet. Auger refusal is defined as material that cot ld be penetrated with the drill rig equipment used on the project. Auger refusal material mayqPonsis of large boulders, rock ledges, lenses, seams or the top of parent bedrock. Rock: Diamond core drilling techniques were used to tend Borings B-8 and B-9 an additional 20.5 to 24 feet below the refusal depth, respectivel he ulting cores indicate that the bedrock underlying the residual soils and PWR enerally co fists of Metamorphosed Dacltic. Core recoveries ranged from 26 to 100 percent ith r quantity designations (RQD) of 0 to 88 percent. 3.3 SUBSURFACE WATER I%k 41� Subsurface water levels were mpted at each boring location at the termination of drilling operations and up to 15 day after the termination of drilling operations. The approximate measured water depths are provided below in Table 1. Hole cave-in depths ranged from approximately 3 to 43 feet below the existing ground surface. The bore -holes were backfilled with auger cuttings after water depth measurements were taken or a temporary monitoring well was installed. Temporary monitoring wells were installed at Borings B-5, B-8, B-10 and B-17 to observe subsequently water depths over an extended period of time. on Subsurface Exploration Data Report Waxhaw Forced Main and Pumping Station Table 1 — Subsurface Water Measurements ESP Project No. HP38.300 April 9, 2020 Boring Number TOW) Water Depth (feet) AL Subsequent Water Depth at time of bore- hole backfill (feet) Subsequent Water Depth on February 25, 2020 (feet) Subsequent Water Depth on March 30, 2020 (feet) B-1 1.3 2 --- --- B-2 Dry Dry --- --- B-3 37 16 --- --- B-4 21.3 7.5 --- --- B-5 * 10 --- 3 5 B-6 11.6 2.8 --- --- B-7 Dry 2.3 --- --- B-8 * 6 --- 4.7 10.3 B-9 5 2.6 --- --- B-10* Dry Dry 6 12 B-11 Dry Dry --- --- B-12 Dry Dry --- --- B-13 Dry Dry --- --- B-14 3.3 3 --- --- B-15 Dry Dry --- --- B-16 Dry Dry --- --- B-17* Dry Dry Dry Dry B-18 Dry Dry --- --- 1. Termination of Boring. 2. The values presented in this table are approximate. * - Monitoring Well Installed 7 Subsurface Exploration Data Report ESP Project No. HP38.300 Waxhaw Forced Main and Pumping Station April 9, 2020 4.0 LIMITATIONS OF REPORT This data report has been prepared in accordance with generally accepted geotechnical engineering practice with regard to the specific conditions and requirements of this site. No other warranty, expressed or implied, is made. The nature and extent of variations between the borings will not be known until construction is underway. If variations appear evident, then we request the opportunity to re-evaluate the information of this report. In the event that any changes in he ure, or location of the structures are planned, the contents in this report will not be conside�tali nless the changes are reviewed and information modified or verified in writing by ESP. FIELD EXPLORATION PROCEDURES Soil Test Boring: Eighteen (18) soil test borings were drilled at the approximate locations shown on the attached Boring Location Plan, Figure 1. Soil sampling and penetration testing were performed in accordance with ASTM D 1586. The borings were advanced with hollow -stem augers and, at standard intervals, soil samples were obtained with a standard 1.4-inch I.D., 2-inch O.D., split -tube sampler. The sampler was first seated six (6) inches to penetrate any loose cuttings, then driven an additional foot with blows of a 140-pound hammer falling 30 inches. The number of hammer blows is designated the "Standard Penetration Resistance." When properly evaluated, the Standard Penetration Resistances provide an index to soil strength, relative density, and ability to support foundations. Select portions of each soil sample were placed in sealed containers and taken to our office. The samples were examined by a representative of the geotechnical engineer for classification. Test Boring Records are attached showing the soil descripti�W and Standard Penetration Resistances. Undisturbed Sampling: Split -spoon samples obta d d g penetTation testing are suitable for visual examination and classification tests, but are not ciently intact for quantitative laboratory testing. One relatively undisturbed sample was obtain by forcing a section of three-inch (3") O.D., 16 gauge steel tubing into the soil at the des�d sa ing levels. This sample procedure is described by ASTM Designation D-1587. The be, together with the encased soil, was carefully removed from the ground and mad irtight. Temporary PVC Standpipes: pora4standpipes were constructed in Borings B-5, B- 8, B-10 and B-17 to pre ve boring from cc ving by inserting PVC pipe to the desired depths. A closed end, machin tte (0.01 i ch slots) was attached to the bottom of the PVC pipe to allow groundwater to ter the standlVe. Clean sand was backfilled around the standpipe to approximately 3 feet below the existing ground surface. The remainder of the borehole was backfilled with bentonite. , loc g cover was installed over the standpipe. Rock Coring: At several ocations, rock coring procedures were utilized to determine the character and continuity of the refusal materials. Core drilling procedures were carried out in accordance with ASTM Specification D 2113. Initially, casing was set through the overburden soil to keep the hole from collapsing. Refusal materials were then cored with a diamond -studded bit fastened to the end of a hollow double -tube core barrel. The cuttings were brought to the surface during coring by circulating water. Rock core samples of the materials penetrated were protected and retained in a swivel -mounted inner tube. Upon completion of each core run, the core barrel was brought to the surface and the samples removed and placed in boxes. Samples were then taken to the laboratory where the rock was identified and the "Recovery" and Rock Quality Designation (RQD) determined. FIELD EXPLORATION PROCEDURES CONT. The "Recovery" is the ratio of the sample length obtained to the length drilled, expressed as a percent. The RQD is the percentage of the length of the core recovered which has core segments four or more inches long compared to the total length of the run. The RQD value applies to rock cored with either an NX or NQ bit size. The percent recovery and RQD are related to rock soundness and continuity. Deere (Ref.6:13, Sowers and Sowers) denotes rock quality by the RQD value as follows: ROD % ROCK QUALITY 90 to 100 Excellent 75 to 90 Good 50 to 75 Fair 25 to 50 Poor Generalized rock descriptions, percent recovery, and RQD values are shown on the appropriate Test Boring Records. An NQ size bit was used for the coring which Vignates bits which obtain samples 1-7/8 inches in diameter. iVA LABORATORY PROCEDURES Moisture Content: The moisture content of soil samples were determined. The moisture content is the ratio, expressed as a percentage, of the weight of water in a given mass of soil to the weight of the solid particles. This test was conducted in accordance with ASTM Designation D 2216. The test results are presented on the attached Summary of Laboratory Testing sheet. Grain Size Test: Grain size tests were performed to determine the particle size and distribution of the samples tested. The grain size distribution of soils coarser than a No. 200 sieve was determined by passing the samples through a set of nested sieves. The test results are presented on the attached Summary of Laboratory Testing sheet. Soil Plasticity Tests (Atterberg Limits Test): Select samples were identified for Atterberg Limits testing to determine the soil's plasticity characteristi The Plasticity Index (PI) is representative of this characteristic and is determined utili ' the Liquid Limit (LL) and the Plastic Limit (PL). The Liquid Limit is the moisture Conte tN48. h the soil will flow as a heavy viscous fluid and is determined in accordance with Zeplastic The Plastic Limit is the moisture content at which the soil transitions bet arpresented d semi -solid states and is determined in accordance with ASTM D 4318. to esults on the attached Summary of Laboratory Testing sheet. Standard Proctor Compaction Test: Sel cep t sam es the on -site soils were obtained from auger cuttings or a shovel to determ' their inensity relationships. Standard Proctor Compaction Tests (ASTM D 698) re erforn d on these soils to determine their compaction characteristics including maxi dry density and optimum moisture content. The test results are presented on the attached Standard Moistt#e-Density Relationship sheets included in the Appendix. LEGEND TO SOIL CLASSIFICATION AND SYMBOLS o. 0.4 ° . .a ABC Stone Asphalt/Concrete o o 0 Concrete/Brick Debris a ° o ° ° Coquina Shell Base Course Topsoil/Rootmat �,(, ,tilt,, J1 , Topsoil 46 Jb, High Plasticity Clay Clay Elastic Silt Organic Clay Organic Silt and Clay b Poorly Graded Gravel b Poorly Graded Gravel � o � Silty Gravel Well Graded Well Graded Gravel with Clay Poorly Graded Sand Poorly Graded Sand with Silt Well Graded Sand with Clay Partially Weathered Rock x _ ;11rt xx TopsoiUGrassmat �r,u,)lr,, Wood and Roots Moderate Plasticity Clay Clayey Silt Silt Organic Silt Peat �b Poorly Graded Gravel with Silt 1 b Clayey Gravel b Poorly Graded Gravel with Silt and Clay A Well Graded Gravel with Silt Silty Sand Poorly Graded Sand with Clay ' ❑. ' a Well Graded Sand 6 � Well Graded Sand with Silt Cored Rock 4) ESP Page 1 of 2 LEGEND TO SOIL CLASSIFICATION AND SYMBOLS SAMPLER TYPES CONSISTENCY OF COHESIVE SOILS (Shown in Samples Column) STANDARD PENETRATION ' Shelby Tube RESISTANCE CONSISTENCY BLOWS/FOOT Split Spoon Very Soft 0 to 2 Soft 3 to 4 Rock Core Firm 5 to 8 Stiff 9 to 15 No Recovery Very Stiff 16 to 30 Hard 31 to 50 Very Hard Over 50 WATER LEVELS CONSISTENCY OF COHESIONLESS SOILS = Water Level at Boring Termination = Water Level at 1 Day Q = Loss of Drilling Fluid HC = Hole Cave .L I" I� f_QNSISTENC F Very'roose Loose N ium Dense D nse iDense TE S STANDARD PENETRATION RESISTANCE BLOWS/FOOT 0to4 5 to 10 11to30 31to50 Over 50 Standard Penetration Resistance -The numb eNpne ws it —Wes a 1401b. hammer falling 30 in. to drive a 1.4 in I.D. split spoon sampler 1 foot (N-Value) as specified in ASA . Dynamic Cone Penetrometer Test Data - int is driven up to three 1 3/4 inch intervals using a 15-pound weight falling 20 inches. The penetrometer test rest is the average number of blows per interval. The penetrometer test result is similar to the Standard Penetration Resistance (N-Mue), as defined by ASTM D 1586. When properly evaluated, the penetrometer test results provide an index for estimating soil strength and relative density. Kessler Dynamic Cone Penetrometer Test Data — The cone point is driven using a 17.6-pound weight falling 22.6 inches. The total penetration for a given number of blows is measured and recorded in mm/blow as specified in ASTM D 6951. When properly evaluated, the penetrometer test result can be used to describe soil stiffness and estimate an in -situ CBR strength from an appropriate correlation chart. REC - Total length of rock recovered in the core barrel divided by the total length of the core run times 100 (expressed as a percentage). RQD - Total length of sound rock segments recovered that are longer than or equal to 4" (mechanical breaks included) divided by the total length of the core run times 100 (expressed as a percentage). f) ESP_ Page 2 of 2 PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-01 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Robert Barnette BORING DEPTH: 7.5 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/14/20 WATER LEVEL: Sz 1.3 feet @ TOB s 2.0 feet @ 6 days L _ (7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) Lu ^ L STANDARD PENETRATION TEST DATA (Blows/ft)LL a m 10 30 50 7090 5 10 15 20 25 30 Topsoil Rootmat = HC -5.0 -10.0 -15.0 -20.0 25.0 -30.0 4 16 34 RESIDUUM: Soft Reddish Brown with Tan CLAY with sand, with manganese stains, (wet) RESIDUUM: Very Stiff Orangeish Brown and Gray Sandy CLAY, with manganese stains, (moist) RESIDUUM: Dense Orangeish Brown and Tannish White Silty SAND with gravel, moderately micaceous, with clay seams Boring was terminated at 7.5 feet. Cave-in depth at 3.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: PROJECT No.: HP38.300 LOGGED BY: Robert Barnette DATE DRILLED: 02/14/20 :F0 5 10 15 20 25 30 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina LEVATION: DRILLING METHOD: xisting Ground Surface Hollow Stem Auger ORING DEPTH: DRILL RIG: 5 Feet Deidrich D50 IATER LEVEL: Sz Dry @ TOB s Dry @ 6 days SOIL DESCRIPTION Plasticity CLAY, with manganese, and organics Sandy SILT Borina was terminated at 7.5 feet. Cave-in death at 4.8 feet. DRAFT TEST BORING RECORD B-02 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w HC -5.0 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -10.0 -15.0 -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 6 12 40 PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-03 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Robert Barnette BORING DEPTH: 49.0 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/14/20 WATER LEVEL: Sz 37.0 feet @ TOB s 16.0 feet @ 6 days _ (7 a O � J (D SOIL DESCRIPTION w w > Lu J Lu Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) LL a m 10 30 50 7090 5 10 15 20 25 30 ,i Topsoil Rootmat s ® ® ® -5.0 -10.0 -15.0 20.0 -25.0 -30.0 13 20 21 29 50/0.3 50/0.4 50/0.3 50/0.4 50/0.5 RESIDUUM: Stiff To Very Stiff Reddish Brown and Tan Elastic SILT, with manganese stains RESIDUUM: Very Stiff Tan and Grayish White Sandy SILT, with manganese stains RESIDUUM: Very Stiff Orangeish Brown and Grayish White Sandy SILT with gravel PARTIALLY WEATHERED ROCK: When Sampled Becomes Blueish Gray with Grayish Tan Sandy SILT PARTIALLY WEATHERED ROCK: When Sampled Becomes Blueish Gray and Tannish White Silty SAND, fine to medium, with manganese stains, and rock fragments Page 1 of 2 DEPTH MEASUREMENTSARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-03 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Robert Barnette BORING DEPTH: 49.0 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/14/20 WATER LEVEL: Sz 37.0 feet @ TOB s 16.0 feet @ 6 days _ (7 a O � J (D SOIL DESCRIPTION w w > Lu J Lu Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) LL a m 10 30 50 7090 40 45 50 55 60 65 PARTIALLY WEATHERED ROCK: When Sampled Becomes Blueish Gray and Tannish White Silty SAND, fine to medium, with manganese stains, and rock fragments ® ® -40.0 -45.0 -50.0 -55.0 -60.0 -65.0 50/0.1 50/0.2 50/0.5 Boring was terminated at 49.0 feet. Cave-in depth at 37.2 fee Page 2 of 2 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-04 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Robert Barnette BORING DEPTH: 28.0 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/14/20 WATER LEVEL: Sz 21.3 feet @ TOB s 7.5 feet @ 6 days I—= L c7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) L a m 10 30 50 7090 5 10 15 20 25 30 Topsoil Rootmat s HC ® e -5.0 10.0 -15.0 -20.0 -25.0 -30.0 13 16 70 95 50/0.3 50/0.5 50/0.1 50/0 RESIDUUM: Stiff To Very Stiff Orangeish Brown Sandy High Plasticity CLAY RESIDUUM: Very Dense Grayish White and Orangeish Tan Silty SAND, fine to medium, with manganese stains PARTIALLY WEATHERED ROCK: When Sampled Becomes Grayish White and Orangeish Tan Silty SAND, fine to mediu Augrefusal encountered at 28.0 feet. Boring was terminated at er 28.0 feet. Cave-in depth at 19.2 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-05 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Robert Barnette BORING DEPTH: 23.8 Feet DRILL RIG: Deidrich D50 NOTES: Temporary monitoring well with looking cap was installed DATE DRILLED: 02/14/20 WATER LEVEL: Sz 10.0 feet @ TOB s 3.0 feet @ 11 days _ (7 a O � J (D SOIL DESCRIPTION w w > Lu J Lu Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) LL a m 10 30 50 7090 5 10 15 20 25 30 Topsoil Rootmat s SZ HC ® -5.0 -10.0 -15.0 -20.0 -25.0 -30.0 5 7 33 75 50/0.3 50/0.4 50/0.3 RESIDUUM: Firm Orangeish Brown and Gray Sandy SILT, with manganese stains, (wet) RESIDUUM: Firm Gray and Tan Sandy High Plasticity CLAY, with manganese stains RESIDUUM: Hard Blueish Gray with Orangeish Tan Sandy SILT RESIDUUM: Very Dense Blueish Gray with Whiteish Tan Silty SAND, fine to medium PARTIALLY WEATHERED ROCK: When Sampled Becomes Blueish Gray with Whiteish Tan Silty SAND, fine to coarse, wit rock fragments Boring was terminated at 23.8 feet. Cave-in depth at 19.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-06 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Daniel Harborth BORING DEPTH: 24.9 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/04/20 WATER LEVEL: Sz 11.6 feet @ TOB s 2.8 feet @ 15 days L = c7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) Lu ^ L STANDARD PENETRATION TEST DATA (Blows/ft)LL a m 10 30 50 7090 5 10 15 20 25 30 Topsoil s HC 5.0 -10.0 -15.0 -20.0 -25.0 -30.0 4 2 22 37 48 47 50/0.4 RESIDUUM: Soft Orangeish Tan and Gray Sandy SILT RESIDUUM: Very Soft Gray with Tan Sandy SILT RESIDUUM: Medium Dense To Very Dense Blueish Gray and Tan Silty SAND, fine to medium, with manganese stains PARTIALLY WEATHERED ROCK: When Sampled Becomes Blueish Gray and Tan Silty SAND, fine to medium, with manganese stains, and rock fragments Boring was terminated at 24.9 feet. Cave-in depth at 11.2 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B_07 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Daniel Harborth BORING DEPTH: 15.0 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/04/20 WATER LEVEL: Sz Dry @ TOB s 2.3 feet @ 15 days = c7 a O � J (D SOIL DESCRIPTION w w > Lu J Lu Q U) > ^ L L STANDARD PENETRATION TEST DATA (Blows/ft) L a m 10 30 50 7090 5 10 15 20 25 30 Topsoil s FiC -5.0 -10.0 -15.0 -20.0 -25.0 -30.0 12 6 17 43 81 RESIDUUM: Stiff Orangeish Tan and Gray Sandy SILT, with manganese stains, and clay seams RESIDUUM: Firm Orangeish Tan and Whiteish Tan Sandy SILT, with manganese stains RESIDUUM: Very Stiff Orangeish Tan and Gray Sandy SILT, with manganese stains RESIDUUM: Hard To Very Hard Orangeish Gray and Tan SILT with sand, with manganese stains, and rock fragments Boringwas terminated at 15.0 feet. Cave-in de th at 5.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B_08 PROJECT No.: ELEVATION: DRILLING METHOD: AUGER I.D.: DRILLING COMPANY: HP38.300 Existing Ground Surface Hollow Stem Auger 2.25 in I Patriot Drilling LOGGED BY: BORING DEPTH: DRILL RIG: NOTES: Daniel Harborth 30.0 Feet Deidrich D50 Temporary monitoring well with looking cap was installed DATE DRILLED: WATER LEVEL: 02/04/20 sz 6.0 feet @ TOB s 4.7 feet @ 21 days w V 0 _ (9 a- O ry (D SOIL DESCRIPTION w w >a w > J Lu < V w STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 Topsoil 25 RESIDUUM: Very Stiff To Hard Blueish Gray and Orangeish Tan Sandy SILT, with manganese stains 37 5 = -5.0 SZ 50/0.5 PARTIALLY WEATHERED ROCK: When Sampled Becomes Gray and Tan Silty SAND, fine to medium, with rock fragments 40 50/0.4 10 Felsic Metavolcanic Rock: Greenish Gray Metamorphosed Dacitic to Rhyolitic flows and tuffs, with healed fractures. -10.0 100 27 18 Rock Compressive Strength at 14.5 to 15 feet = 20,887 psi. Rock Compressive Strength t 23 to 23.5 feet = 16,882 psi. ` 100 64 60 15 -15.0 88 48 53 20 -20.0 100 44 60 25 -25.0 93 88 44 30 -30.0 Augrefusal encountered at 9.5 feet. Boring was terminated at er 30.0 feet. RECOVERY (%) RQD (%) REC (in) Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ESP ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B_09 PROJECT No.: ELEVATION: DRILLING METHOD: AUGER I.D.: DRILLING COMPANY: HP38.300 Existing Ground Surface Hollow Stem Auger 2.25 in Patriot Drilling LOGGED BY: BORING DEPTH: DRILL RIG: NOTES: Daniel Harborth 30.0 Feet Deidrich D50 DATE DRILLED: WATER LEVEL: 01/30/20 sz 5.0 feet @ TOB s 2.6 feet @ 20 days w V 0 _ (9 a- O ry (D SOIL DESCRIPTION w w >a w > J Lu < V w STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 Topsoil 7 RESIDUUM: Firm Tan and Gray Sandy SILT, moderately micaceous, with manganese stains s HC RESIDUUM: Medium Dense Gray and Tan Silty SAND, fine to medium, with manganese stains 24 5 SZ -5.0 Felsic Metavolcanic Rock - Greenish Gray Metamorphosed Dacitic to Ryyolitic flows and tuffs, with healed fractures. 100 40 12 Rock Compressive Strength t 6 to 6.5 feet = 7,195 psi. 26 16 10 op -10.0 56 34 15 -15.0 58 16 35 20 -20.0 80 48 25 -25.0 37 100 30 30.0 er Augrefusal encountered at 5.9 feet. Boring was terminated at 30.0 feet. Cave-in depth at 3.6 feet. RECOVERY (%) RQD (%) REC (in) Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ESP ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-10 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger / Wreline AUGER I.D.: 4.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Daniel Harborth BORING DEPTH: 15.0 Feet DRILL RIG: Deidrich D50 NOTES: Temporary monitoring well with looking cap was installed DATE DRILLED: 02/03/20 WATER LEVEL: Sz Dry @ TOB s Dry I—= L c7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) L a m 10 30 50 7090 5 10 15 20 25 30 Topsoil -5.0 -10.0 -15.0 -20.0 -25.0 -30.0 7 14 10 7 20 FILL: Firm To Stiff Reddish Brown High Plasticity CLAY with sand, with gravel from 6 to 7.5 feet RESIDUUM: Firm Brown Sandy SILT, with manganese stains RESIDUUM: Firm Reddish Brown and Tan Sandy SILT, with manganese stains Boringwas terminated at 15.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/03/20 :F0 stains 5 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 1 days SOIL DESCRIPTION manganese stains 10 15 20 25 30 , with manganese DRAFT TEST BORING RECORD B-11 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w -5.0 -10.0 HC Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 10 12 14 26 17 PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/03/20 :F0 5 10 15 20 25 30 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 1 days SOIL DESCRIPTION CLAY, slightly micaceous SILT, slightly micaceous, with manganese stains, and rock fragments Borina was terminated at 15.0 feet. Cave-in deoth3t8.4 fe DRAFT TEST BORING RECORD B-12 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w -5.0 HC 4 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -10.0 -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 13 11 10 10 IF-M PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/03/20 :F0 stains 5 10 15 20 25 30 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 2 days SOIL DESCRIPTION DRAFT TEST BORING RECORD B-13 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� �> w �w J Q wV with manganese -5.0 -10.0 HC -15.0 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 11 10 12 13 I19M PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B-14 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 2.25 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Daniel Harborth BORING DEPTH: 25.0 Feet DRILL RIG: Deidrich D50 NOTES: DATE DRILLED: 02/03/20 WATER LEVEL: Sz 3.3 feet @ TOB s 3.0 feet @ 2 days L = c7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) Lu ^ L STANDARD PENETRATION TEST DATA (Blows/ft)LL a m 10 30 50 7090 5 10 15 20 25 30 Topsoil 111, HC -5.0 -10.0 -15.0- -20.0 -25.0 -30.0 10 10 6 3 2 3 4 RESIDUUM: Stiff Tan and Reddish Brown High Plasticity CLAY with sand RESIDUUM: Firm To Soft Orangeish Brown and Tan Sandy SILT, with manganese stains RESIDUUM: Very Soft To Soft Orangeish Tan with Gray San SILT, with manganese stains Boringwas terminated at 25.0 feet. ave-in depth at 16.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/03/20 :F0 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 2 days SOIL DESCRIPTION ray manganese stains 5 RESIDUUM: Firm Orangeish Tan and Gray Sandy SILT, with manganese stains 10 15 20 25 30 DRAFT TEST BORING RECORD B-15 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w -5.0 HC -10.0 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 9 7 8 8 8 PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/03/20 :F0 5 10 15 20 25 30 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 2 days SOIL DESCRIPTION RESIDUUM: Very StiffTo Firm Reddish Brown and Tan Sandy SILT, with manganese stains DRAFT TEST BORING RECORD B-16 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w -5.0 HC -10.0 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 16 21 19 11 7 PROJECT: Waxhaw Force Main and Pumping Station Waxhaw, North Carolina DRAFT TEST BORING RECORD B_1 7 PROJECT No.: HP38.300 ELEVATION: Existing Ground Surface DRILLING METHOD: Hollow Stem Auger AUGER I.D.: 6.00 in DRILLING COMPANY: Patriot Drilling LOGGED BY: Daniel Harborth BORING DEPTH: 15.0 Feet DRILL RIG: Deidrich D50 NOTES: Temporary monitoring well with looking cap was installed DATE DRILLED: 02/04/20 WATER LEVEL: Sz Dry @ TOB s Dry @ 1 days I—= L c7 a O ry J (D SOIL DESCRIPTION w w > Lu J Q U) > ^ Lu L STANDARD PENETRATION TEST DATA (Blows/ft) L a m 10 30 50 7090 5 10 15 20 25 30 To soil/Grassmat -5.0 -10.0 -15.0 -20.0 -25.0 -30.0 16 17 15 16 23 RESIDUUM: Very Stiff Reddish Brown Sandy SILT RESIDUUM: Very Stiff Orangeish Brown Sandy SILT RESIDUUM: Stiff Orangeish Tan and Gray Sandy SILT RESIDUUM: Very Stiff Reddish Brown with Tan Sandy SILT, with manganese stains RESIDUUM: Very Stiff Gray with Orangeish Tan Sandy SILT, with manganese stains Boringwas terminated at 15.0 feet. Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR ESP DETERMINATION OF DISTANCES OR QUANTITIES. PROJECT: PROJECT No.: HP38.300 LOGGED BY: Daniel Harborth DATE DRILLED: 02/04/20 :F0 5 10 15 20 25 30 Waxhaw Force Main and Pumping Station Waxhaw, North Carolina ELEVATION: DRILLING METHOD: Existing Ground Surface Hollow Stem Auger BORING DEPTH: DRILL RIG: 15.0 Feet Deidrich D50 WATER LEVEL: Sz Dry @ TOB s Dry @ 1 days SOIL DESCRIPTION CLAY, with manganese stains RESIDUUM: Stiff Orangeish Brown and Gray Sandy SILT, with manganese stains RESIDUUM: Medium Stiff Orangeish Brown and Tan Sandy SILT, with manganese stains manganese stains DRAFT TEST BORING RECORD B-18 AUGER I.D.: DRILLING COMPANY: 2.25 in Patriot Drilling NOTES w ww a >� Q w J < w -5.0 HC -10.0 Page 1 of 1 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF THE SOIL TYPES ENCOUNTEREDAT THE BOREHOLE LOCATIONS. DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR QUANTITIES. -20.0 -25.0 -30.0 STANDARD PENETRATION TEST DATA (Blows/ft) LL m 10 30 50 7090 ESP 7 13 11 16 17 TABLE 1 - SUMMARY OF LABORATORY TESTING Boring No. Sample Depth (Ft) Sample Type USCS Classification Natural Moisture Content (°/a) % Finer No.200 Atterberg Limits Proctor Data LL PI Marc. Dry Density (pefl Opt. Moisture Content (D/.) B-1 1-2 BAG CL 27.0 80.0 49 26 103.3 21.7 B-2 3.5-5 SS --- 38.5 97.1 53 31 B-3 4-6 LTD MH 34.6 92.8 61 24 B-4 1- 2.5 SS --- 18.5 B-4 6-7.5 SS --- 10.7 B-5 3.5 - 5 SS --- 27.5 B-5 8.5 -10 SS --- 9.0 B-6 3.5 - 5 SS --- 24.5 B-6 8.5 -10 SS --- 13.4 B-7 1-2.5 SS --- ,20.6 B-7 8.5 -10 SS MI, 1 79 28 6 B-10 3.5-5 SS 9 80 49 26 B-10 8.5 -10 SS --- 8.3 B-11 1-2.5 SS --- 29.5 B-11 8.5 -10 SS low22.8 B-12 1-2.5 SS --- 28.2 B-12 6-7.5 S --- 28.8 B-13 1-2.5 SS 20.8 B-13 6-7.5 SS CL 27.8 92.9 49 26 B-14 0-10 BAG CH --- 83.7 55 28 101.6 21.6 B-14 1-2.5 SS --- 22.6 B-14 6-7.5 SS --- 43.7 B-15 3.5 - 5 SS --- 40.6 B-15 8.5 - 10 SS --- 39.5 B-16 1-2.5 SS --- 28.8 B-16 6-7.5 SS CH 33.5 98.6 67 37 Note: SS - Split Spoon Sample (ASTM D-1586) UD - Undisturbed Sample (ASTM D-1587) BAG- Bulk Sample TABLE 1 CONT' D - SUMMARY OF LABORATORY TESTING Boring Sample Sample USCS Natural % Finer Atterberg Proctor Data No. Depth Type Classification Moisture No.200 Limits (Ft) Content (°/a) LL PI Marc. Dry Opt. Moisture Density Content (pcfl (%) B-17 1 —2.5 SS --- 28.2 B-17 6 — 7.5 SS --- 22.2 B-18 3.5 — 5 SS --- 22.0 B-18 8.5 —10 SS 13.8 Note: SS = Split Spoon Sample (ASTM D-1586) UD = Undisturbed Sample (ASTM D-1587) BAG = Bulk Sample 135.0 130.0 125.0 120.0 115.0 100.0 95.0 90.0 85.0 80.0 75.0 0 Sample Type: BILK Location: B-14 Depth : 0 - 10 ft Remarks: }---- }---------- F---- ---- }---- }____�___ F____ ___�__ _�---- F____}---- ---- I_ ---- F____}---- }---- _____F____}____}____}_____ Zero Air Void Curves for GS = 2.6 - 2.8 ____F____}_- }____ _- .__F____ _ ____}- ._F---- }--- _ }---- }---- i----- F---- ---- }---- }---- t---- F____ __ �____ I ____F_ __}____ ________ __________ ________ ____ ____ ---- }---- I ---- - ---- }---- ____ }---- }---- ____ ____ ____ ____ ---- }---- }---------- F____}____ _____ ________ ____ ____ ---- }---- I_ --- - ---- }---- ---- }---- - ---- F____}---- }---- --------- ____ ____ }___ 1 ____�_}---------- }____}____i_____ L ____}____i____t____ ---- }---- }---- i----- F---- ---- }---- i---- t---- }---- ---- }---- t---- }---- }---- }---- t---- F---- ---- }---- t---- F____}---- ---- i----- }---- }---- _____F_ _}____--_ ___ ____F__---- ----- ---- }---- }---- I_ ---- F---- ---- }---- I ---- - ---- }---- ---- }---- - ---- F____}____ }---- }---- i----- F---- ---- }---- }---- t---- F---- ---- }---- t---- F____}--------- i_____F____}____}_ _ _____F____}____}____� ____ ___}_ __.____.____ ____}____}____�_____F____ ---- }---- I --------- }---- ---- }---- t---- F____}____ ____ __________ ____F____ _ ___- __ __ }____}____I ----- F---- ---- i---- t---- }---- ---- }---- t---- }____ 7 ------------- r ---- ---- T ---------- T ----- r ---- i---- t ----- L ---- r---- }---- }---- t---- F---- ---------- T ----- r T ---- ---- i ---- t ----- L I ----- ---- ---- ---- ---- ---- ---- }---- t---- }---- ---------- ---------- ---- i ----- L ---- I ----------- ---- i----- }---- }---------- ---------- L ---- 1 ---- i ---------- }____}____}_____ ---------- T --------- L ---- i ---- i ---- - --------- ____}____}____t____ 7 ------------- ---------- -------- ---- }---- }---- i_____F____ -- - -- N ---- ---- ---- ___�_ _}____ ---- i ---- - ---- L ---- i---- ___}_ _t____}____ }---- _____F____ }---- }---- t---- F____ }---- t---- }---- ---- i----- }---- }---- __________ ____F____}____�____�____ ____}____}____�_____F____ ____}____�____�____}____ ---- }--------- F__ 10 15 20 25 30 35 40 45 Water Content, % A Description: Reddish Brown to Orangish Brown Fat Clay with Sand CH Sample No. S-1 B-14 ethod: ASTM D698 method A Maximum Dry Unit Weight: 101.6 Ib/ft' Plasticity Index: 28 received water content: % Optimum Water Content: 21.6 % Liquid Limit: 55 Plastic Limit: 27 Percent Fines: 83.7 % 7144 Weddington Rd NW STANDARD MOISTURE - DENSITY RELATIONSHIP Address: Suite Concord, NCC 28024 Project: Waxhaw Force Main and Pumping Station ESP Telephone: 704-793-9855 Number: HP38.300 1Lab Technician: rbarnette Pro'ect Manager: Dharborth 5 The test results shown are specific to the specimen/sample numbers tested, as noted above. This report shall not be reproduced, except in full, without the prior written approval of ESP Associates, Inc. 1 of 1 135.0 130.0 125.0 120.0 115.0 100.0 95.0 90.0 85.0 80.0 75.0 0 Sample Type: B Location: B-1 Depth : 1 - 2 ft Remarks: }---- }---------- F---- ---- }---- }____�___ F____ ___�__ _�---- F____}---- ---- I_ ---- F____}---- }---- _____F____}____}____}_____ Zero Air Void Curves for GS = 2.6 - 2.8 ____F____}_- }____ _- .__F____ _ ____}- ._F---- }--- _ }---- }---- i----- F---- ---- }---- }---- t---- F____ __ �____ I ____F_ __}____ ________ __________ ________ ____ ____ ---- }---- I ---- - ---- }---- ____ }---- }---- ____ ____ ____ ____ ---- }---- }---------- F____}____ _____ ________ ____ ____ ---- }---- I_ --- - ---- }---- ---- }---- - ---- F____}---- }---- --------- ____ ____ }___ 1 ____�_}---------- }____}____i_____ L ____}____i____t____ ---- }---- }---- i----- F---- ---- }---- i---- t---- }---- ---- }---- t---- }---- }---- }---- t---- F---- ---- }---- t---- F____}---- ---- i----- F____}---- }---------- F_ _}____'____�_ ___ ____F____}____�____-____ ---- }---- }---- I_ ---- F---- ---- }---- I ---- - ---- }---- ---- }---- - ---- F____}____ }---- i----- F---- ---- }---- }---- t---- F---- ____}____ I T ___}____}____ _____F____}____}____}__ _ __ ___}_ __}-------------- }____}____i_____F____ ---- }---- i---- t---- }---- ---- }---- t---- F____}____ ____ __________ ____F____}____'____� __ __ }---- }____1_____F---- ____}____�____�____}____ ____ }---- }---- i---------- F____}____i____t____ ---- }---- }---- i----- F---- _\--__ ___}_ _�____F____}____ 10 15 20 25 30 35 40 45 Water Content, % A Description: Reddish Brown Lean Clay w/Sand (CL) Sample No. S-2 B-1 ethod: ASTM D698 method A Maximum Dry Unit Weight: 103.3 Ib/ft' Plasticity Index: 26 received water content: % Optimum Water Content: 21.7 % Liquid Limit: 49 Plastic Limit: 23 Percent Fines: 80.0 % 7144 Weddington Rd NW STANDARD MOISTURE - DENSITY RELATIONSHIP Address: Suite Concord, NCC 28024 Project: Waxhaw Force Main and Pumping Station ESP Telephone: 704-793-9855 Number: HP38.300 1Lab Technician: rbarnette Pro'ect Manager: Dharborth 5 The test results shown are specific to the specimen/sample numbers tested, as noted above. This report shall not be reproduced, except in full, without the prior written approval of ESP Associates, Inc. 1 of 1 Raleigh 2200 Gateway Centre Blvd. Suite 216 Morrisville, NC 27560 919.678.1070 Columbia 2711 Alpine Rd. Suite 200 Columbia, SC 29223 803.705.2229 #)ESP ESP Corporate Office 3475 Lakemont Blvd. Fort Mill, SC 29708 803.802.2440 ailing PO 17030 Charlotte, NC 28241 Greensboro Concord 7011 Albert Pick Rd. 7144 Weddington Rd., NW Suite E Suite 110 eensboro, NC 27409 Concord, NC 28027 336.334.7724 704.793.9855 Charleston Wilmington 2154`North Center St. 211 Racine Dr. Suite E-503 Suite 101 North Charleston, SC 29406 Wilmington, NC 28403 843.714.2040 910.313.6648 Lake Norman 20484 Chartwell Center Dr. Suite D Cornelius, NC 28031 704.990.9428 Indianapolis 8673 Bash St. Indianapolis, IN 46256 317.5376979 Bradenton Nashville Pittsburgh 518 13'h Street West 500 Wilson Pike Cir. One Williamsburg PI. Bradenton, FL 34205 Suite 310 Suite G-5, Box 13 941.345.5451 Brentwood, TN 37024 Warrendale, PA 15086 615.760.8300 878.332.2163 800.960.7317 www.espassociates.com