Loading...
HomeMy WebLinkAboutSW6200403_1389-Supplemental form_4/30/2020SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 Project Name Fayetteville Clinton Road Dollar General 2 Project Area (ac)2.44 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? 10 Is streambank stabilization proposed on this project? 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED 27 Name and Title: Scott Brown, PE - Vice President 28 Organization: 4D Site Solutions, Inc. 29 Street address: 409 Chicago Drive, Suite 112 30 City, State, Zip: Fayetteville, NC 28306 31 Phone number(s): 910-426-6777 32 Email:sbrown@4dsitesolutions.com Certification Statement: Designer ______________________________________________ Signature of Designer 10-Apr-20 Date I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. PROJECT INFORMATION NUMBER AND TYPE OF SCMs: DESIGNER CERTIFICATION COMPLIANCE WITH 02H .1003(4) Seal DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED Entire Site 1 4Type of SCM Wet pond 5 Total BUA in project (sq ft)37797 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft)37797 sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft)28792 sf - Sidewalk (sq ft) - Roof (sq ft)9005 sf - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 52% 17 Design storm (inches)1 in 18 Design volume of SCM (cu ft)3146 cf 19 Calculation method for design volume Simple 20 Entire Site 1 4 Type of SCM N/A Wet Pond 5 Total BUA from project (sq ft)37797 sf 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft)37797 sf 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches)1 in DRAINAGE AREA INFORMATION DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION Please use this space to provide any additional information about the drainage area(s): 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: - Parking (sq ft)28792 sf - Sidewalk (sq ft) - Roof (sq ft)9005 sf - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement outside of subdivided lots (sq ft) 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 52% 19 Design volume of SCM (cu ft)3146 cf 20 Calculation method for design volume Simple 21 Please use this space to provide any additional information about the drainage area(s): ADDITIONAL INFORMATION WET POND 1 Drainage area number 1 2 Design volume of SCM (cu ft) 3146 cf 3 Is the SCM sized to treat the SW from all surfaces at build-out?Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes 18 Method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 127.10 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 128.10 22 Elevation of the bottom of the vegetated shelf (fmsl) 132.60 23 Elevation of the permanent pool (fmsl) 133.10 24 Elevation of the top of the vegetated shelf (fmsl) 133.60 25 Elevation of the temporary pool (fmsl) 133.71 26 Surface area of the main permanent pool (square feet) 4174:1 27 Volume of the main permanent pool (cubic feet) 12372 cf 28 Average depth of the main pool (feet) 3.00 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 1995 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean-out depth for forebay (inches) 60 in 35 Design volume of SCM (cu ft) 20924 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 1 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 3.3 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 84 in 44 Depth of forebay at exit (inches) 72 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes 55 Please use this space to provide any additional information about the wet pond(s): WET POND MDC FROM 02H .1053 GENERAL MDC FROM 02H .1050 ADDITIONAL INFORMATION Wet Pond 1 7:45 AM 4/30/2020