Loading...
HomeMy WebLinkAboutNCG030686_MONITORING INFO_20180413STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. �V �� 0507 p D DOC TYPE. ❑ HISTORICAL FILE '2� MONITORING REPORTS DOC DATE ❑ l7 n YYYYMMDD N C6- D30 (o 0& Street and CORNINGCoordinator Sr.EHSTechnol gy Centering f828-901-5665 PO Box 489 sleve.slreet@corning.com Hickory, NC 28603 w .corning.com April 9'h, 2018 A < 9A 0^ G,, 0-P m oa 0 North Carolina Department of Environmental Quality`' Division of Energy, Mineral, and Land Resources Mooresville Regional Office Attn: Mr. James Moore 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Dear Moore: Please find enclosed the Stormwater Discharge Monitoring Report for Corning Optical Communications, LLC — Hickory Manufacturing and "technology Center (I-IMTC) located in Hickory, Catawba County, North Carolina. The stormwater samples were collected on 3/06/2018 for the permitted outfalls and represent the quarterly sample as specified in the requirements set forth by NCDEQ for I-IMTC. The results reflect HMTC to be outside the benchmark value for the following parameters: Copper — Stormwater Outfall 3 and 5 Zinc — Stormwater Outfall 3 and 5 Please contact me at 828-901-6695 should you have any questions. Sincerely, Stephen L Street Senior Environmental, Health and Safety Coordinator attachments © 2018 Corning Incorporated. Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted: 04/09/2018 CERTIFICATE OF COVERAGE No. NCG030000 SAMPLE COLLECTION YEAR: 2018 FACILITY NAME: Hickory Manufacturing and Technology Center ^ SAMPLE PERIOD ❑ Jan -June ❑July -Dec COUNTY: Catawba l or O Monthly' Quarterly — 1st PERSON COLLECTING SAMPLES: Steve Street 9A� ��DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY: Water Tech Labs Lab Cent. q 50 �[]zero-flow ❑Water Supply []SA Comments on sample collection or analysis: ¢o !,2, O� Iv' , []Other e ,.. >'r J o�s�O�p'/F?>� O� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Part A: Stormwater Benchmarks and Monitoring Results n No discharge this period?2 - Non -Polar O&G/ Total Toxic Outfall No. Date Sample 24-hour rainfall Total Suspended Solids PH, Standard units Copper Lead Zinc THydrPetroleumcbonsOrganicss Collected' amount, Hydrocarbons (mo/dd/yr) Inches3 Benchmarks =__> - - 100 mg/L or So mg/L' 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 3 03/06/18 .5" 39.0 mg/I 7.03 .014 mg/I .005 mg/I .803 mg/I <5.6 mg/I N/A 5 1 03/06/18 1 .51,1 38.0 mg/I 6.69 .012 mg/I <.005 mg/I .177 mg/I <5.6 mg/I N/A Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 © 2018 Corning Incorporated. SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. see General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L' 6.0 — 9.0 SU N/A N/A N/A N/A N/A N/A Footnotes from Part A also apply to this Part B © 2018 Corning Incorporated. ` See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES XR NOD IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: HMTC's latest site review was completed by Mr. James Moore with the Mooresville regional office on 6/28/17. Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 �g lot I2018 (Date) © 2018 Corning Incorporated. SWU-245, last revised 10/25/2012 Page 3 of 3