Loading...
HomeMy WebLinkAboutSW4191201_17-116 - Stormwater Narrative_3rd submittal_3/26/2020 CONTENTS Design Narrative Supporting Calculations SSSSTORMWATTORMWATTORMWATTORMWATER MAER MAER MAER MANANANANAGEMENTGEMENTGEMENTGEMENT PLANPLANPLANPLAN LewisLewisLewisLewisvillvillvillville Middlee Middlee Middlee Middle SchoolSchoolSchoolSchool LeLeLeLewiswiswiswisvilvilvilvillelelele----Vienna RoadVienna RoadVienna RoadVienna Road LewisvilleLewisvilleLewisvilleLewisville,,,, NCNCNCNC CLH Project No: 17-116 PROJECT DESCRIPTION:PROJECT DESCRIPTION:PROJECT DESCRIPTION:PROJECT DESCRIPTION: Lewisville Middle School is a new school that is being constructed on five tracts located southeast of the intersection of Lewisville-Vienna Road and Robinhood Road near the northern limits of Lewisville. The middle school project area is approximately 79 acres. This proposed project consists of constructing a new school with parking, sidewalks, play fields, utilities and stormwater control measures. The construction limits of the project contain approximately 30 acres. The stormwater runoff from the project site discharges easterly to a tributary of Tomahawk Creek (Classification: C). Streams with 30-foot Town of Lewisville stream buffers are on site, as well as floodway and floodplains as indicated on FEMA FIRM #3710588600J dated January 2, 2009. Soils on the site consist predominately of Hiwasse with minor concentrations of Wahadkee along streams in low areas of site. STORMATESTORMATESTORMATESTORMATER MANR MANR MANR MANAGAGAGAGEMENT:EMENT:EMENT:EMENT: This site is divided and under the stormwater jurisdiction of the Town of Lewisville and NCDEQ for stormwater review. Stormwater design has taken into consideration both Town and State requirements and was design to the most stringent of requirements. This site drainages to three major drainage points. Drainage point A encompasses the majority of drainage area and is located along the midpoint of the eastern property boundary. Drainage point B is located at the southeastern property corner. Drainage point C is located west of drainage point B, along the southern property boundary. Please refer to the stormwater drainage map for additional information. This site is high-density and employs a stormwater network to convey runoff and two ponds to treat. A wet pond treats the majority of the site’s runoff and the wetland treats the bus-loop driveway. Per the Town of Lewisville’s stormwater management manual, stormwater control measures were designed to control and treat runoff from the 25-year, 6-hour storm leaving the site. The majority of the site has a hydrological soil rating of HSG B and, therefore, storm calculations will reflect constants relating to HSG B type soils. Calculations were performed with Hydraflow software by Autocad 2017 which utilizes the TR-55 Hydrograph method. Additional modeling information has been provided, as requested by the state. This includes a model of the stage storage for the main pool and for the forebay. These were requested and shall be used only as verification with our calculations. There is a 0.2% discrepancy between the wet pond sizing calculations and the hydraflow model of the stage storage as a result of slightly different methodologies for calculating storage volume. This discrepancy should be acceptable per email conversation with Hannah Banks and Jim Farkas. SUPPORTING CALCULATIONS WET POND SIZING DATE 8/15/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL SCM 1 Drainage Area, (DA) =18.65 ac Impervious Area c=0.95 8.00 ac Includes 0.20 AC Future Pervious Area c= 0.30 10.65 ac Cc =0.58 % Impervious =42.90 % Soil Type: Hiwasse (Type B) Temporary Water Quality Pool Design Storm Rainfall 1.00 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.44 in/in Required Volume (design rainfall)(Rv)(DA) = 29,521 cf Main Pool Volume Required, Vmp = 71,913 cf Main Pool Volume: Main Pool Max. Depth = 3.50 ft Area of Pond Bottom (Above PSS) = 20,780 sf Area at Bottom of Shelf = 27,620 sf Area of Permanent Pool = 30,040 sf Area at Top of Shelf = 32,530 sf Perm. Pool Volume Provided =87,015 cf > 71,913 cf Surface Area at 1" Storage Volume = 33,800 sf 1" Storage Volume Provided =32,225 cf > 29,521 OK Temp. Storage Depth above Dewatering Hole = 1.00 ft Diameter of Dewatering Hole = 2.50 in Detention (Draw-Down) Time =3.8 days (2-5 days Required) T days=(Temp. Storage Vol Req / (0.6 * A * (2*g*(h))^1/2) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Max Drawdow Rate=0.16 cfs Main Pool Volume=87,015 cf > 71,913 OK Forebay Volume: Forebay Max. Depth = 4.50 ft Area of Forebay Bottom (Above PSS) = 1,540 sf Area at Bottom of Shelf = 4,400 sf Area of Permanent Pool = 5,330 sf Forebay Volume Required = 13,052 - 17,403 Forebay Volume Provided =14,313 cf 16.45 %= 15-20 OK s:\1319\0001\calcs\17-116 - PondSize-Wet Pond-MDC-Piedmont and Mountain-HRT.XLSprinted: 12/3/2019 9:51 AM Page 1 of 1 WETLAND SIZING DATE 8/15/19 PROJECT NAME PROJECT NO Lewisville MS 17-116 LOCATION BY Forsyth County, NC KAL WETLAND 2 Drainage Area, (DA) =2.05 ac Impervious Area c=0.95 0.75 ac Includes 0.06 AC Future Pervious Area c= 0.30 1.30 ac Cc =0.54 Wetland Surface Area & Volume % Impervious =37 % Design Storm Rainfall 1.00 in Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.38 in/in Required Volume (design rainfall)(Rv)(DA) = 2,822 cf Depth of Temporary Pool (Dplants) = 12 in (15-in max) Approx. Ave. Surface Area for Design = 2,822 sf Surface Area at Permanent Pool= 2,610 sf @ 0.0 in. ponding Surface Area at 1/2 Depth= 3,970 sf @ 6.0 in. ponding Surface Area at Temporary Pool= 4,670 sf @ 12.0 in. ponding Temporary Ponding Volume Provided=3,805 cf >OK Temp. Storage Depth above Dewatering Hole = 1.00 ft Diameter of Dewatering Hole = 1.00 in Detention (Draw-Down) Time =2.2 days T days=(Req. Temp. Storage Vol / (0.6 * A * (2*g*(h))^1/2) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Wetland Zones Required Forebay Surface Area (10-15%) = 467 - 701 sf Non-Forebay Deep Pools (5-15%) = 234 - 701 sf Shallow Water Zone (35-45%) = 1635 - 2102 sf Temp. Inundation Zone (30-45%) = 1401 - 2102 sf Wetland Zones Provided Forebay Surface Area =680 sf OK Non-Forebay Deep Pools =590 sf OK Shallow Water Zone =1,690 sf OK Temporary Inundation Zone =1,710 sf OK 15% 13% 36% 37% 2,822 cf s:\1319\0001\calcs\17-116 - PondSize-Wetland-2017-MDC.XLS printed: 12/3/2019 9:51 AM Page 1 of 1 Hydraflow Table of Contents 17-116 Pond Routing.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hydrograph Return Period Recap............................................................................. 1 1 - Year Summary Report......................................................................................................................... 2 Hydrograph Reports................................................................................................................... 3 Hydrograph No. 1, SCS Runoff, Area A - Pre........................................................................... 3 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................... 4 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................... 5 Hydrograph No. 7, SCS Runoff, Area to SCM 1....................................................................... 6 Hydrograph No. 8, Reservoir, Route SCM 1............................................................................ 7 Pond Report - SCM 1.......................................................................................................... 8 Hydrograph No. 10, SCS Runoff, Area to SCM 2..................................................................... 9 Hydrograph No. 11, Reservoir, Route SCM 2........................................................................ 10 Pond Report - SCM 2........................................................................................................ 11 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs.............................................. 12 Hydrograph No. 15, Combine, Total Area A - Post Dev......................................................... 13 2 - Year Summary Report....................................................................................................................... 14 Hydrograph Reports................................................................................................................. 15 Hydrograph No. 1, SCS Runoff, Area A - Pre......................................................................... 15 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................. 16 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 17 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 18 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 19 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 20 Hydrograph No. 11, Reservoir, Route SCM 2........................................................................ 21 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs.............................................. 22 Hydrograph No. 15, Combine, Total Area A - Post Dev......................................................... 23 10 - Year Summary Report....................................................................................................................... 24 Hydrograph Reports................................................................................................................. 25 Hydrograph No. 1, SCS Runoff, Area A - Pre......................................................................... 25 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................. 26 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 27 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 28 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 29 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 30 Hydrograph No. 11, Reservoir, Route SCM 2........................................................................ 31 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs.............................................. 32 Hydrograph No. 15, Combine, Total Area A - Post Dev......................................................... 33 25 - Year Summary Report....................................................................................................................... 34 Hydrograph Reports................................................................................................................. 35 Hydrograph No. 1, SCS Runoff, Area A - Pre......................................................................... 35 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................. 36 Contents continued...17-116 Pond Routing.gpw Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 37 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 38 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 39 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 40 Hydrograph No. 11, Reservoir, Route SCM 2........................................................................ 41 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs.............................................. 42 Hydrograph No. 15, Combine, Total Area A - Post Dev......................................................... 43 100 - Year Summary Report....................................................................................................................... 44 Hydrograph Reports................................................................................................................. 45 Hydrograph No. 1, SCS Runoff, Area A - Pre......................................................................... 45 Hydrograph No. 2, SCS Runoff, Area B - Pre & Post............................................................. 46 Hydrograph No. 3, SCS Runoff, Area C - Pre & Post............................................................. 47 Hydrograph No. 7, SCS Runoff, Area to SCM 1..................................................................... 48 Hydrograph No. 8, Reservoir, Route SCM 1.......................................................................... 49 Hydrograph No. 10, SCS Runoff, Area to SCM 2................................................................... 50 Hydrograph No. 11, Reservoir, Route SCM 2........................................................................ 51 Hydrograph No. 13, SCS Runoff, Area A that bypasses SCMs.............................................. 52 Hydrograph No. 15, Combine, Total Area A - Post Dev......................................................... 53 IDF Report.................................................................................................................. 54 Hydrograph Return Period Recap 1 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 3.011 9.441 ------- ------- 43.34 71.95 ------- 127.39 Area A - Pre 2 SCS Runoff ------ 0.147 0.883 ------- ------- 4.334 6.951 ------- 11.83 Area B - Pre & Post 3 SCS Runoff ------ 0.048 0.290 ------- ------- 1.424 2.284 ------- 3.887 Area C - Pre & Post 7 SCS Runoff ------ 27.41 39.89 ------- ------- 76.87 100.80 ------- 141.27 Area to SCM 1 8 Reservoir 7 0.188 0.273 ------- ------- 2.316 6.856 ------- 45.29 Route SCM 1 10 SCS Runoff ------ 2.885 4.272 ------- ------- 8.379 11.10 ------- 15.72 Area to SCM 2 11 Reservoir 10 0.066 0.223 ------- ------- 2.390 5.997 ------- 11.66 Route SCM 2 13 SCS Runoff ------ 2.558 7.646 ------- ------- 33.24 54.48 ------- 95.18 Area A that bypasses SCMs 15 Combine 8, 11, 13, 2.713 7.949 ------- ------- 35.62 61.41 ------- 127.77 Total Area A - Post Dev Proj. file: 17-116 Pond Routing.gpw Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Summary Report 2 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.011 2 762 46,894 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.147 2 722 1,393 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.048 2 722 458 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 27.41 2 720 63,288 ------ ------ ------ Area to SCM 1 8 Reservoir 0.188 2 1446 45,170 7 827.91 55,703 Route SCM 1 10 SCS Runoff 2.885 2 718 5,808 ------ ------ ------ Area to SCM 2 11 Reservoir 0.066 2 1020 4,644 10 813.03 4,120 Route SCM 2 13 SCS Runoff 2.558 2 760 36,954 ------ ------ ------ Area A that bypasses SCMs 15 Combine 2.713 2 760 86,768 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 1 Year Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 3.011 cfs Storm frequency = 1 yrs Time to peak = 12.70 hrs Time interval = 2 min Hyd. volume = 46,894 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 3 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Area A - Pre Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 0.147 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 1,393 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (hrs) Area B - Pre & Post Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 0.048 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 458 cuft Drainage area = 0.930 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 0.05 0.05 0.06 0.06 0.07 0.07 0.08 0.08 0.09 0.09 0.10 0.10 Q (cfs) Time (hrs) Area C - Pre & Post Hyd. No. 3 -- 1 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 27.41 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 63,288 cuft Drainage area = 18.650 ac Curve number = 77* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.650 x 61) + (8.000 x 98)] / 18.650 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Area to SCM 1 Hyd. No. 7 -- 1 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge = 0.188 cfs Storm frequency = 1 yrs Time to peak = 24.10 hrs Time interval = 2 min Hyd. volume = 45,170 cuft Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation = 827.91 ft Reservoir name = SCM 1 Max. Storage = 55,703 cuft Storage Indication method used. 7 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Route SCM 1 Hyd. No. 8 -- 1 Year Hyd No. 8 Hyd No. 7 Total storage used = 55,703 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 826.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 826.50 35,380 0 0 0.50 827.00 38,870 18,554 18,554 1.00 827.50 40,680 19,884 38,438 1.50 828.00 42,820 20,871 59,308 3.50 830.00 48,600 91,350 150,658 5.50 832.00 54,620 103,151 253,809 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 30.00 2.50 0.00 0.00 Span (in)= 30.00 2.50 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 823.50 826.50 0.00 0.00 Length (ft)= 62.00 0.50 0.00 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 19.00 10.00 1.00 0.00 Crest El. (ft)= 829.50 830.00 828.50 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad Rect --- Multi-Stage = Yes No Yes No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 Stage (ft) 0.00 826.50 1.00 827.50 2.00 828.50 3.00 829.50 4.00 830.50 5.00 831.50 6.00 832.50 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 2.885 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 5,808 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Area to SCM 2 Hyd. No. 10 -- 1 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 0.066 cfs Storm frequency = 1 yrs Time to peak = 17.00 hrs Time interval = 2 min Hyd. volume = 4,644 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 813.03 ft Reservoir name = SCM 2 Max. Storage = 4,120 cuft Storage Indication method used. 10 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Route SCM 2 Hyd. No. 11 -- 1 Year Hyd No. 11 Hyd No. 10 Total storage used = 4,120 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Pond No. 2 - SCM 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 812.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 812.00 2,610 0 0 2.00 814.00 5,540 7,968 7,968 4.00 816.00 7,460 12,951 20,919 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 15.00 0.75 0.00 0.00 Span (in)= 15.00 0.75 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 809.50 812.00 0.00 0.00 Length (ft)= 54.00 0.50 0.00 0.00 Slope (%)= 2.78 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 11.00 8.00 1.00 0.00 Crest El. (ft)= 814.00 815.00 813.00 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad Rect --- Multi-Stage = Yes No Yes No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Stage (ft) 0.00 812.00 1.00 813.00 2.00 814.00 3.00 815.00 4.00 816.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 2.558 cfs Storm frequency = 1 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 36,954 cuft Drainage area = 52.920 ac Curve number = 57.1* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 2.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 12 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Area A that bypasses SCMs Hyd. No. 13 -- 1 Year Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 2.713 cfs Storm frequency = 1 yrs Time to peak = 12.67 hrs Time interval = 2 min Hyd. volume = 86,768 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac 13 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Total Area A - Post Dev Hyd. No. 15 -- 1 Year Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydrograph Summary Report 14 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.441 2 748 95,225 ------ ------ ------ Area A - Pre 2 SCS Runoff 0.883 2 720 2,978 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 0.290 2 720 979 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 39.89 2 720 91,349 ------ ------ ------ Area to SCM 1 8 Reservoir 0.273 2 1446 57,989 7 828.49 81,735 Route SCM 1 10 SCS Runoff 4.272 2 718 8,543 ------ ------ ------ Area to SCM 2 11 Reservoir 0.223 2 794 7,373 10 813.14 4,539 Route SCM 2 13 SCS Runoff 7.646 2 746 73,447 ------ ------ ------ Area A that bypasses SCMs 15 Combine 7.949 2 748 138,808 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 2 Year Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 9.441 cfs Storm frequency = 2 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 95,225 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 15 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Area A - Pre Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 0.883 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 2,978 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 16 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (hrs) Area B - Pre & Post Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 0.290 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 979 cuft Drainage area = 0.930 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 17 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (hrs) Area C - Pre & Post Hyd. No. 3 -- 2 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 39.89 cfs Storm frequency = 2 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 91,349 cuft Drainage area = 18.650 ac Curve number = 77* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.650 x 61) + (8.000 x 98)] / 18.650 18 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Area to SCM 1 Hyd. No. 7 -- 2 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge = 0.273 cfs Storm frequency = 2 yrs Time to peak = 24.10 hrs Time interval = 2 min Hyd. volume = 57,989 cuft Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation = 828.49 ft Reservoir name = SCM 1 Max. Storage = 81,735 cuft Storage Indication method used. 19 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Route SCM 1 Hyd. No. 8 -- 2 Year Hyd No. 8 Hyd No. 7 Total storage used = 81,735 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 4.272 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 8,543 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Area to SCM 2 Hyd. No. 10 -- 2 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 0.223 cfs Storm frequency = 2 yrs Time to peak = 13.23 hrs Time interval = 2 min Hyd. volume = 7,373 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 813.14 ft Reservoir name = SCM 2 Max. Storage = 4,539 cuft Storage Indication method used. 21 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Route SCM 2 Hyd. No. 11 -- 2 Year Hyd No. 11 Hyd No. 10 Total storage used = 4,539 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 7.646 cfs Storm frequency = 2 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 73,447 cuft Drainage area = 52.920 ac Curve number = 57.1* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 3.39 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) Area A that bypasses SCMs Hyd. No. 13 -- 2 Year Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 7.949 cfs Storm frequency = 2 yrs Time to peak = 12.47 hrs Time interval = 2 min Hyd. volume = 138,808 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac 23 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (hrs) Total Area A - Post Dev Hyd. No. 15 -- 2 Year Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydrograph Summary Report 24 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 43.34 2 742 282,010 ------ ------ ------ Area A - Pre 2 SCS Runoff 4.334 2 718 9,293 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 1.424 2 718 3,054 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 76.87 2 718 175,877 ------ ------ ------ Area to SCM 1 8 Reservoir 2.316 2 896 136,704 7 829.22 115,144 Route SCM 1 10 SCS Runoff 8.379 2 716 16,918 ------ ------ ------ Area to SCM 2 11 Reservoir 2.390 2 724 15,737 10 813.80 7,159 Route SCM 2 13 SCS Runoff 33.24 2 742 212,341 ------ ------ ------ Area A that bypasses SCMs 15 Combine 35.62 2 742 364,782 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 10 Year Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 43.34 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 282,010 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 25 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Area A - Pre Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 4.334 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 9,293 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 26 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Area B - Pre & Post Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 1.424 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 3,054 cuft Drainage area = 0.930 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 27 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Area C - Pre & Post Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 76.87 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 175,877 cuft Drainage area = 18.650 ac Curve number = 77* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.650 x 61) + (8.000 x 98)] / 18.650 28 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Area to SCM 1 Hyd. No. 7 -- 10 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge = 2.316 cfs Storm frequency = 10 yrs Time to peak = 14.93 hrs Time interval = 2 min Hyd. volume = 136,704 cuft Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation = 829.22 ft Reservoir name = SCM 1 Max. Storage = 115,144 cuft Storage Indication method used. 29 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Route SCM 1 Hyd. No. 8 -- 10 Year Hyd No. 8 Hyd No. 7 Total storage used = 115,144 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 8.379 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 16,918 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 30 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Area to SCM 2 Hyd. No. 10 -- 10 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 2.390 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 15,737 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 813.80 ft Reservoir name = SCM 2 Max. Storage = 7,159 cuft Storage Indication method used. 31 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Route SCM 2 Hyd. No. 11 -- 10 Year Hyd No. 11 Hyd No. 10 Total storage used = 7,159 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 33.24 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 212,341 cuft Drainage area = 52.920 ac Curve number = 57.1* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 32 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Area A that bypasses SCMs Hyd. No. 13 -- 10 Year Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 35.62 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 364,782 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac 33 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Total Area A - Post Dev Hyd. No. 15 -- 10 Year Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydrograph Summary Report 34 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 71.95 2 740 425,708 ------ ------ ------ Area A - Pre 2 SCS Runoff 6.951 2 718 14,232 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 2.284 2 718 4,677 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 100.80 2 718 231,398 ------ ------ ------ Area to SCM 1 8 Reservoir 6.856 2 770 191,785 7 829.62 133,086 Route SCM 1 10 SCS Runoff 11.10 2 716 22,481 ------ ------ ------ Area to SCM 2 11 Reservoir 5.997 2 722 21,296 10 814.13 8,760 Route SCM 2 13 SCS Runoff 54.48 2 740 318,383 ------ ------ ------ Area A that bypasses SCMs 15 Combine 61.41 2 742 531,464 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 25 Year Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 71.95 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 425,708 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 35 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Area A - Pre Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 6.951 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 14,232 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 36 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Area B - Pre & Post Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 2.284 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 4,677 cuft Drainage area = 0.930 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 37 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Area C - Pre & Post Hyd. No. 3 -- 25 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 100.80 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 231,398 cuft Drainage area = 18.650 ac Curve number = 77* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.650 x 61) + (8.000 x 98)] / 18.650 38 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Area to SCM 1 Hyd. No. 7 -- 25 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge = 6.856 cfs Storm frequency = 25 yrs Time to peak = 12.83 hrs Time interval = 2 min Hyd. volume = 191,785 cuft Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation = 829.62 ft Reservoir name = SCM 1 Max. Storage = 133,086 cuft Storage Indication method used. 39 0 10 20 30 40 50 60 70 80 90 100 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Route SCM 1 Hyd. No. 8 -- 25 Year Hyd No. 8 Hyd No. 7 Total storage used = 133,086 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 11.10 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 22,481 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 40 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Area to SCM 2 Hyd. No. 10 -- 25 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 5.997 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 21,296 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 814.13 ft Reservoir name = SCM 2 Max. Storage = 8,760 cuft Storage Indication method used. 41 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Route SCM 2 Hyd. No. 11 -- 25 Year Hyd No. 11 Hyd No. 10 Total storage used = 8,760 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 54.48 cfs Storm frequency = 25 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 318,383 cuft Drainage area = 52.920 ac Curve number = 57.1* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 5.93 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 42 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Area A that bypasses SCMs Hyd. No. 13 -- 25 Year Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 61.41 cfs Storm frequency = 25 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 531,464 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac 43 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) Total Area A - Post Dev Hyd. No. 15 -- 25 Year Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydrograph Summary Report 44 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 127.39 2 740 698,793 ------ ------ ------ Area A - Pre 2 SCS Runoff 11.83 2 718 23,703 ------ ------ ------ Area B - Pre & Post 3 SCS Runoff 3.887 2 718 7,789 ------ ------ ------ Area C - Pre & Post 7 SCS Runoff 141.27 2 718 327,391 ------ ------ ------ Area to SCM 1 8 Reservoir 45.29 2 728 287,330 7 830.18 160,013 Route SCM 1 10 SCS Runoff 15.72 2 716 32,166 ------ ------ ------ Area to SCM 2 11 Reservoir 11.66 2 720 30,976 10 814.40 10,505 Route SCM 2 13 SCS Runoff 95.18 2 740 519,017 ------ ------ ------ Area A that bypasses SCMs 15 Combine 127.77 2 738 837,322 8, 11, 13, ------ ------ Total Area A - Post Dev 17-116 Pond Routing.gpw Return Period: 100 Year Monday, 03 / 23 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 1 Area A - Pre Hydrograph type = SCS Runoff Peak discharge = 127.39 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 698,793 cuft Drainage area = 73.220 ac Curve number = 56.4* Basin Slope = 1.8 % Hydraulic length = 9400 ft Tc method = KIRPICH Time of conc. (Tc) = 41.99 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.320 x 98) + (64.000 x 55) + (7.900 x 61)] / 73.220 45 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Area A - Pre Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 2 Area B - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 11.83 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 23,703 cuft Drainage area = 2.830 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 46 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Area B - Pre & Post Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 3 Area C - Pre & Post Hydrograph type = SCS Runoff Peak discharge = 3.887 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 7,789 cuft Drainage area = 0.930 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 47 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Area C - Pre & Post Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 7 Area to SCM 1 Hydrograph type = SCS Runoff Peak discharge = 141.27 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 327,391 cuft Drainage area = 18.650 ac Curve number = 77* Basin Slope = 4.0 % Hydraulic length = 1830 ft Tc method = KIRPICH Time of conc. (Tc) = 8.76 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.650 x 61) + (8.000 x 98)] / 18.650 48 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) Area to SCM 1 Hyd. No. 7 -- 100 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 8 Route SCM 1 Hydrograph type = Reservoir Peak discharge = 45.29 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 287,330 cuft Inflow hyd. No. = 7 - Area to SCM 1 Max. Elevation = 830.18 ft Reservoir name = SCM 1 Max. Storage = 160,013 cuft Storage Indication method used. 49 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) Route SCM 1 Hyd. No. 8 -- 100 Year Hyd No. 8 Hyd No. 7 Total storage used = 160,013 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 10 Area to SCM 2 Hydrograph type = SCS Runoff Peak discharge = 15.72 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 32,166 cuft Drainage area = 2.050 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.300 x 61) + (0.750 x 98)] / 2.050 50 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Area to SCM 2 Hyd. No. 10 -- 100 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 11 Route SCM 2 Hydrograph type = Reservoir Peak discharge = 11.66 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 30,976 cuft Inflow hyd. No. = 10 - Area to SCM 2 Max. Elevation = 814.40 ft Reservoir name = SCM 2 Max. Storage = 10,505 cuft Storage Indication method used. 51 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Route SCM 2 Hyd. No. 11 -- 100 Year Hyd No. 11 Hyd No. 10 Total storage used = 10,505 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 13 Area A that bypasses SCMs Hydrograph type = SCS Runoff Peak discharge = 95.18 cfs Storm frequency = 100 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 519,017 cuft Drainage area = 52.920 ac Curve number = 57.1* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 42.00 min Total precip. = 7.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.610 x 98) + (38.000 x 55) + (14.310 x 61)] / 52.920 52 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) Area A that bypasses SCMs Hyd. No. 13 -- 100 Year Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Hyd. No. 15 Total Area A - Post Dev Hydrograph type = Combine Peak discharge = 127.77 cfs Storm frequency = 100 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 837,322 cuft Inflow hyds. = 8, 11, 13 Contrib. drain. area = 52.920 ac 53 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Total Area A - Post Dev Hyd. No. 15 -- 100 Year Hyd No. 15 Hyd No. 8 Hyd No. 11 Hyd No. 13 Hydraflow Rainfall Report 54 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 03 / 23 / 2020 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 0.0000 0.0000 0.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 0.0000 0.0000 0.0000 -------- 25 0.0000 0.0000 0.0000 -------- 50 0.0000 0.0000 0.0000 -------- 100 0.0000 0.0000 0.0000 -------- File name: Sample.idf Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) Precip. file name: Sample.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.80 3.39 0.00 3.30 4.97 5.93 6.80 7.52 SCS 6-Hr 1.93 2.34 0.00 3.38 3.41 4.04 4.57 5.07 Huff-1st 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 2.75 0.00 0.00 6.50 0.00 Custom 0.00 0.00 0.00 2.80 0.00 0.00 6.00 0.00 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 26 / 2020 Pond No. 3 - Main Pool Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 823.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 823.00 20,780 0 0 1.00 824.00 22,990 21,874 21,874 3.00 826.00 27,620 50,534 72,408 3.50 826.50 30,040 14,409 86,817 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 0.00 0.00 0.00 0.00 Span (in)= 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft)= 0.00 0.00 0.00 0.00 Length (ft)= 0.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a No No No Crest Len (ft)= 0.00 0.00 1000.00 0.00 Crest El. (ft)= 0.00 0.00 826.50 0.00 Weir Coeff.= 3.33 3.33 2.60 3.33 Weir Type = --- --- Broad --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 823.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.10 2,187 823.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.20 4,375 823.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.30 6,562 823.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.40 8,749 823.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.50 10,937 823.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.60 13,124 823.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.70 15,311 823.70 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.80 17,499 823.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.90 19,686 823.90 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.00 21,874 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.20 26,927 824.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.40 31,980 824.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.60 37,034 824.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.80 42,087 824.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.00 47,141 825.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.20 52,194 825.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.40 57,247 825.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.60 62,301 825.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.80 67,354 825.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.00 72,408 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.05 73,849 826.05 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.10 75,290 826.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.15 76,731 826.15 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.20 78,171 826.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.25 79,612 826.25 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.30 81,053 826.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.35 82,494 826.35 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.40 83,935 826.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.45 85,376 826.45 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.50 86,817 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 26 / 2020 Pond No. 4 - Forebay Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 822.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 822.00 1,540 0 0 2.00 824.00 2,800 4,277 4,277 4.00 826.00 4,400 7,139 11,417 4.50 826.50 5,330 2,429 13,845 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 0.00 0.00 0.00 0.00 Span (in)= 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft)= 0.00 0.00 0.00 0.00 Length (ft)= 0.00 0.00 0.00 0.00 Slope (%)= 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a No No No Crest Len (ft)= 0.00 0.00 1000.00 0.00 Crest El. (ft)= 0.00 0.00 826.50 0.00 Weir Coeff.= 3.33 3.33 2.60 3.33 Weir Type = --- --- Broad --- Multi-Stage = No No No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 822.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.20 428 822.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.40 855 822.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.60 1,283 822.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 0.80 1,711 822.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.00 2,139 823.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.20 2,566 823.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.40 2,994 823.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.60 3,422 823.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 1.80 3,850 823.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.00 4,277 824.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.20 4,991 824.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.40 5,705 824.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.60 6,419 824.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 2.80 7,133 824.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.00 7,847 825.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.20 8,561 825.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.40 9,275 825.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.60 9,989 825.60 --- --- --- --- --- --- 0.00 --- --- --- 0.000 3.80 10,703 825.80 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.00 11,417 826.00 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.05 11,659 826.05 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.10 11,902 826.10 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.15 12,145 826.15 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.20 12,388 826.20 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.25 12,631 826.25 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.30 12,874 826.30 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.35 13,117 826.35 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.40 13,359 826.40 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.45 13,602 826.45 --- --- --- --- --- --- 0.00 --- --- --- 0.000 4.50 13,845 826.50 --- --- --- --- --- --- 0.00 --- --- --- 0.000 STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-n= 0.013 STORM DRAINAGE SCHEDULE CONTINUEDg= 192 h= 23I= 6.86INLETTc I CcINLET INLET Cc INLET TOTAL INLET PIPE TIME RUNOFFFROM TO AREA AREA IMPERVIOUS RUNOFF DISCHARGE AREAS TIME TIME OF CONC. INTENSITY COEFF.(SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MIN) (MIN) (IN/HR)A1 A2 46,680 1.07 60 0.69 5.07 1.07 5.00 0.00 5.00 6.86 0.69A2 A3 46,680 1.07 60 0.69 5.07 2.14 5.00 0.01 5.01 6.85 0.69A3 A4 18,700 0.43 80 0.82 2.41 2.57 5.00 0.05 5.05 6.85 0.71A4 A5 6,750 0.15 0 0.30 0.32 2.73 5.00 0.73 5.73 6.68 0.69A5 A6 11,150 0.26 40 0.56 0.98 2.98 5.00 0.89 5.89 6.65 0.68A6 A7 9,580 0.22 40 0.56 0.84 3.20 5.00 1.13 6.13 6.59 0.67A7 A8 10,810 0.25 0 0.30 0.51 3.45 5.00 1.34 6.34 6.54 0.64A8 A9 7,280 0.17 10 0.37 0.42 3.62 5.00 1.54 6.54 6.50 0.63A9 A10 19,910 0.46 95 0.92 2.88 4.08 5.00 1.72 6.72 6.46 0.66A10 A11 2,420 0.06 95 0.92 0.35 4.13 5.00 1.83 6.83 6.44 0.67A11 A12 11,070 0.25 95 0.92 1.60 4.39 5.00 1.88 6.88 6.43 0.68A50 A51 10,980 0.25 30 0.50 0.86 0.25 5.00 0.00 5.00 6.86 0.50A51 A52 13,120 0.30 30 0.50 1.02 0.55 5.00 0.37 5.37 6.77 0.50A52 A53 13,830 0.32 30 0.50 1.08 0.87 5.00 0.69 5.69 6.69 0.50A53 A5 12,720 0.29 30 0.50 0.99 1.16 5.00 1.01 6.01 6.62 0.50A510 A51 5,160 0.12 0 0.30 0.24 0.12 5.00 0.00 5.00 6.86 0.30A520 A52 6,420 0.15 0 0.30 0.30 0.15 5.00 0.00 5.00 6.86 0.30A530 A53 5,530 0.13 0 0.30 0.26 0.13 5.00 0.00 5.00 6.86 0.30A80 A8 12,130 0.28 40 0.56 1.07 0.28 5.00 0.00 5.00 6.86 0.56A90 A91 27,750 0.64 50 0.63 2.73 0.64 5.00 0.00 5.00 6.86 0.63A91 A92 57,450 1.32 30 0.50 4.48 1.96 5.00 0.13 5.13 6.83 0.54A92 A93 9,290 0.21 50 0.63 0.91 2.17 5.00 0.44 5.44 6.75 0.55A93 A94 8,370 0.19 90 0.89 1.17 2.36 5.00 0.60 5.60 6.71 0.5717-116-STRM-1-INVERTS.XLSSTORM Page 1 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1 A2A2 A3A3 A4A4 A5A5 A6A6 A7A7 A8A8 A9A9 A10A10 A11A11 A12A50 A51A51 A52A52 A53A53 A5A510 A51A520 A52A530 A53A80 A8A90 A91A91 A92A92 A93A93 A94STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- STORM DRAINAGE SCHEDULE - CONTINUED Q QUPSTREAMSIDE-CAPACITY SEGMENT UPPER LOWER TOP PIPEDISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER(CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT)5.07 0.00 0.0167 18 13.6 7.7 6 0.01 833.20 833.10 837.30 2.4610.14 0.00 0.0143 18 12.6 7.1 14 0.03 833.00 832.80 837.30 2.6612.53 0.00 0.0058 24 17.2 5.5 224 0.68 832.70 831.40 838.10 3.2212.55 0.00 0.0069 24 18.8 6.0 58 0.16 831.50 831.10 850.00 16.3218.054.620.0070 30 34.3 7.0 100 0.24 831.00 830.30 849.40 15.6718.75 0.00 0.0076 30 35.8 7.3 92 0.21 830.20 829.50 849.40 16.4719.14 0.00 0.0071 30 34.7 7.1 84 0.20 829.40 828.80 850.00 17.8720.501.070.0075 30 35.5 7.2 80 0.18 828.70 828.10 850.00 18.5759.7236.600.0071 42 85.0 8.8 56 0.11 828.00 827.60 852.70 20.8865.025.030.0071 42 85.0 8.8 28 0.05 827.50 827.30 851.05 19.7366.49 0.00 0.0076 42 87.8 9.1 92 0.17 827.20 826.50 851.05 20.030.86 0.00 0.0106 12 3.7 4.7 104 0.37 845.90 844.80 849.40 2.412.100.240.0100 15 6.5 5.3 100 0.32 844.70 843.70 849.40 3.343.430.300.0100 15 6.5 5.3 100 0.32 843.60 842.60 849.40 4.444.620.260.0913 15 19.5 15.9 104 0.11 841.00 831.50 849.40 7.040.24 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.910.30 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.910.26 0.00 0.0104 12 3.6 4.6 48 0.17 847.00 846.50 850.00 1.911.07 0.00 0.0196 12 5.0 6.3 56 0.15 846.40 845.30 849.40 1.912.73 0.00 0.0100 15 6.5 5.3 40 0.13 867.00 866.60 870.50 2.147.17 0.00 0.0500 15 14.4 11.8 224 0.32 866.50 855.30 870.50 2.648.890.900.0380 18 20.5 11.6 108 0.16 855.20 851.10 859.20 2.369.99 0.00 0.0136 18 12.3 6.9 22 0.05 851.00 850.70 855.00 2.3617-116-STRM-1-INVERTS.XLSSTORM Page 2 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1 A2A2 A3A3 A4A4 A5A5 A6A6 A7A7 A8A8 A9A9 A10A10 A11A11 A12A50 A51A51 A52A52 A53A53 A5A510 A51A520 A52A530 A53A80 A8A90 A91A91 A92A92 A93A93 A94STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- HYDRAULIC GRADE LINE CONTINUEDBEND LOSS K's90° = 0.70 70° = 0.61 50° = 0.47 30° = 0.28 20° = 0.1680° = 0.66 60° = 0.55 40° = 0.38 25° = 0.22 15° = 0.10PIPE HYDRAULIC SIDESTREAM HEAD LOSSBEND FRICTION FRICTIONAREA RADIUS SUMMATION Hf Hc He Hb Ht LOSS SLOPE VELOCITY(FT) (FT) (CFS)K (FT/FT) (FPS)1.7671 0.3750 0.00 0.01 0.03 0.00 0.00 0.05 0.00 0.0023 2.861.7671 0.3750 0.00 0.13 0.13 0.04 0.00 0.30 0.00 0.0093 5.713.1416 0.5000 0.00 0.68 0.06 0.18 0.31 1.23 0.61 0.0030 3.973.1416 0.5000 0.00 0.18 0.06 0.09 0.13 0.46 0.55 0.0031 3.974.9087 0.6250 4.62 0.19 0.05 0.09 0.07 0.40 0.28 0.0019 3.654.9087 0.6250 4.62 0.19 0.06 0.07 0.03 0.35 0.16 0.0021 3.804.9087 0.6250 4.62 0.18 0.06 0.08 0.12 0.44 0.55 0.0022 3.884.9087 0.6250 5.69 0.20 0.07 0.08 0.07 0.41 0.28 0.0025 4.159.6211 0.8750 42.29 0.20 0.15 0.09 0.07 0.51 0.28 0.0035 6.169.6211 0.8750 47.32 0.12 0.17 0.21 0.32 0.82 0.55 0.0041 6.719.6211 0.8750 47.32 0.40 0.18 0.24 0.38 1.21 0.55 0.0043 6.860.7854 0.2500 0.00 0.06 0.00 0.00 0.00 0.06 0.00 0.0006 1.091.2272 0.3125 0.24 0.10 0.01 0.01 0.00 0.12 0.10 0.0010 1.701.2272 0.3125 0.55 0.28 0.03 0.02 0.00 0.33 0.00 0.0028 2.791.2272 0.3125 0.81 0.53 0.05 0.04 0.01 0.64 0.10 0.0051 3.750.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 0.310.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0001 0.380.7854 0.2500 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0001 0.330.7854 0.2500 0.00 0.05 0.01 0.00 0.00 0.06 0.00 0.0009 1.361.2272 0.3125 0.00 0.07 0.02 0.00 0.00 0.09 0.00 0.0018 2.221.2272 0.3125 0.00 2.75 0.13 0.03 0.05 2.96 0.70 0.0123 5.821.7671 0.3750 0.90 0.77 0.10 0.18 0.00 1.05 0.00 0.0071 5.011.7671 0.3750 0.90 0.20 0.12 0.14 0.27 0.73 0.70 0.0090 5.6317-116-STRM-1-INVERTS.XLSSTORM Page 3 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1 A2A2 A3A3 A4A4 A5A5 A6A6 A7A7 A8A8 A9A9 A10A10 A11A11 A12A50 A51A51 A52A52 A53A53 A5A510 A51A520 A52A530 A53A80 A8A90 A91A91 A92A92 A93A93 A94STORM DRAINAGE / HYDRAULIC GRADE LINEDATE DESIGN PHASEANALYSISPRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBY RECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-DESIGN CRITERIA: HYDRAULIC GRADE LINE - CONTINUED 1. DESIGN FOR THE 10 YR STORM2. ASSUME TIME OF CONCENTRATION TOAN INDIVIDUAL INLET = 5 MIN.INLET W.S. ELEV.3. INTENSITY = g/(h+T), FOR 10 YR STORMOUTLET OUTLET INLET USE FLOW FREE- UPSTREAM4. MANNINGS "n" FACTOR= .013W.S. ELEV CONTOL CONTROL CONDITION BOARD INLET COMMENTS5. RATIONAL METHOD: C= .30 GRASS, C= .95 PAVEMENT(FT) (FT) (FT) (FT) CONTROL (FT) TYPE835.93 835.98 834.31 835.98 OUTLET 0.82 CB OK835.63 835.93 835.17 835.93 OUTLET 0.87 CB OK834.40 835.63 834.39 835.63 OUTLET 1.97 CB OK833.95 834.40 833.19 834.40 OUTLET 15.60 DI OK833.55 833.95 832.83 833.95 OUTLET 15.45 DI OK833.20 833.55 832.08 833.55 OUTLET 15.85 DI OK832.75 833.20 831.31 833.20 OUTLET 16.80 DI OK832.34 832.75 830.70 832.75 OUTLET 17.25 DI OK831.83 832.34 831.41 832.34 OUTLET 19.86 CB OK831.01 831.83 831.22 831.83 OUTLET 18.72 CB OK829.30 830.51 831.01 831.01 INLET 19.54 CB OKTailwater Elev=829.30845.45 845.52 846.45 846.45 INLET 2.95 DI OK844.56 844.69 845.45 845.45 INLET 3.95 DI OK842.60 842.93 844.56 844.56 INLET 4.84 DI OK833.95 834.58 842.24 842.24 INLET 7.16 DI OKTailwater Elev= 833.95847.30 847.30 847.50 847.50 INLET 2.50 DI OKTailwater Elev=847.30847.30 847.30 847.51 847.51 INLET 2.49 DI OKTailwater Elev=847.30847.30 847.30 847.50 847.50 INLET 2.50 DI OKTailwater Elev=847.30846.10 846.16 846.98 846.98 INLET 2.42 DI OKTailwater Elev=846.10868.60 868.69 867.84 868.69 OUTLET 1.31 CB OK857.04 860.00 868.60 868.60 INLET 1.40 CB OK853.13 854.18 857.04 857.04 INLET 1.66 CB OK852.24 852.97 853.13 853.13 INLET 1.37 CB OK8/19/1917-116-STRM-1-INVERTS.XLSSTORM Page 4 of 12 STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-n= 0.013 STORM DRAINAGE SCHEDULE CONTINUEDg= 192 h= 23I= 6.86INLETTc I CcINLET INLET Cc INLET TOTAL INLET PIPE TIME RUNOFFFROM TO AREA AREA IMPERVIOUS RUNOFF DISCHARGE AREAS TIME TIME OF CONC. INTENSITY COEFF.(SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MIN) (MIN) (IN/HR)A94 A95 8,010 0.18 90 0.89 1.12 2.55 5.00 0.65 5.65 6.70 0.60A95 A96 25,860 0.59 0 0.30 1.22 3.14 5.00 0.73 5.73 6.68 0.54A96 A97 9,200 0.21 0 0.30 0.43 3.35 5.00 1.24 6.24 6.57 0.52A97 A98 8,350 0.19 90 0.89 1.16 3.54 5.00 1.52 6.52 6.50 0.54A98 A99 8,740 0.20 85 0.85 1.17 3.74 5.00 1.75 6.75 6.45 0.56A99 A100 11,020 0.25 90 0.89 1.54 4.00 5.00 2.00 7.00 6.40 0.58A100 A101 16,920 0.39 55 0.66 1.75 4.38 5.00 2.15 7.15 6.37 0.59A101 A102 5,050 0.12 0 0.30 0.24 4.50 5.00 2.41 7.41 6.31 0.58A102 A103 3,800 0.09 0 0.30 0.18 4.59 5.00 2.69 7.69 6.26 0.58A103 A9 5,850 0.13 0 0.30 0.28 4.72 5.00 2.94 7.94 6.21 0.57A920 A92 6,700 0.15 85 0.85 0.90 0.15 5.00 0.00 5.00 6.86 0.85A950 A95 21,250 0.49 75 0.79 2.63 0.49 5.00 0.00 5.00 6.86 0.79A960 A961 9,000 0.21 50 0.63 0.89 0.21 5.00 0.00 5.00 6.86 0.63A961 A962 4,750 0.11 80 0.82 0.61 0.32 5.00 0.44 5.44 6.75 0.69A962 A963 27,220 0.62 90 0.89 3.79 0.94 5.00 0.52 5.52 6.73 0.82A963 A96 9,990 0.23 90 0.89 1.39 1.17 5.00 0.60 5.60 6.71 0.83A990 A991 15,430 0.35 75 0.79 1.91 0.35 5.00 0.00 5.00 6.86 0.79A991 A99 15,430 0.35 75 0.79 1.91 0.71 5.00 0.01 5.01 6.86 0.79A1000 A1001 9,910 0.23 30 0.50 0.77 0.23 5.00 0.00 5.00 6.86 0.50A1001 A1002 11,890 0.27 40 0.56 1.05 0.50 5.00 0.36 5.36 6.77 0.53A1002 A1003 12,960 0.30 30 0.50 1.01 0.80 5.00 0.73 5.73 6.68 0.52A1003 A1004 13,790 0.32 30 0.50 1.07 1.11 5.00 1.10 6.10 6.60 0.51A1004 A1005 12,830 0.29 30 0.50 1.00 1.41 5.00 1.41 6.41 6.53 0.51A1005 A1006 5,060 0.12 10 0.37 0.29 1.53 5.00 1.56 6.56 6.49 0.50A1006 A10 3,010 0.07 0 0.30 0.14 1.59 5.00 1.69 6.69 6.47 0.4917-116-STRM-1-INVERTS.XLSSTORM Page 5 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA94 A95A95 A96A96 A97A97 A98A98 A99A99 A100A100 A101A101 A102A102 A103A103 A9A920 A92A950 A95A960 A961A961 A962A962 A963A963 A96A990 A991A991 A99A1000 A1001A1001 A1002A1002 A1003A1003 A1004A1004 A1005A1005 A1006A1006 A10STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- STORM DRAINAGE SCHEDULE - CONTINUED Q QUPSTREAMSIDE-CAPACITY SEGMENT UPPER LOWER TOP PIPEDISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER(CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT)11.06 0.00 0.0111 24 23.8 7.6 36 0.08 850.20 849.80 855.00 2.6214.862.630.0104 24 23.0 7.3 222 0.51 849.70 847.40 854.50 2.6221.626.540.0100 30 41.0 8.3 140 0.28 846.90 845.50 859.00 9.3722.62 0.00 0.0102 30 41.4 8.4 118 0.23 845.40 844.20 861.40 13.2723.62 0.00 0.0102 30 41.3 8.4 128 0.25 844.10 842.80 859.70 12.8728.773.820.0108 30 42.6 8.7 74 0.14 842.70 841.90 858.30 12.8733.012.690.0100 30 41.0 8.3 130 0.26 841.80 840.50 857.50 12.9733.09 0.00 0.0100 30 41.0 8.3 140 0.28 840.40 839.00 857.50 14.3734.691.580.0106 30 42.2 8.6 132 0.26 838.90 837.50 859.10 17.4736.60 1.80 0.0704 30 108.8 22.1 98 0.07 837.40 830.50 856.00 15.870.90 0.00 0.0100 15 6.5 5.3 40 0.13 855.70 855.30 859.20 2.142.63 0.00 0.0100 15 6.5 5.3 20 0.06 851.80 851.60 855.30 2.140.89 0.00 0.0100 15 6.5 5.3 140 0.44 856.00 854.60 859.50 2.141.48 0.00 0.0115 15 6.9 5.6 26 0.08 854.50 854.20 859.50 3.645.19 0.00 0.0758 15 17.8 14.5 66 0.08 854.10 849.10 860.00 4.546.54 0.00 0.0722 15 17.4 14.1 18 0.02 849.50 848.20 858.90 8.041.91 0.00 0.0250 15 10.2 8.3 4 0.01 851.90 851.80 855.40 2.143.82 0.00 0.0755 15 17.7 14.4 102 0.12 851.70 844.00 855.40 2.340.77 0.00 0.0102 12 3.6 4.6 98 0.36 846.40 845.40 849.40 1.911.80 0.00 0.0106 12 3.7 4.7 104 0.37 845.30 844.20 849.40 3.012.76 0.00 0.0100 12 3.6 4.5 100 0.37 844.10 843.10 849.40 4.213.76 0.00 0.0100 15 6.5 5.3 100 0.32 843.00 842.00 849.40 5.044.67 0.00 0.0104 15 6.6 5.4 48 0.15 841.90 841.40 849.40 6.144.92 0.00 0.0100 15 6.5 5.3 40 0.13 841.30 840.90 850.00 7.345.03 0.00 0.0111 15 6.8 5.5 36 0.11 840.80 840.40 849.50 7.3417-116-STRM-1-INVERTS.XLSSTORM Page 6 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA94 A95A95 A96A96 A97A97 A98A98 A99A99 A100A100 A101A101 A102A102 A103A103 A9A920 A92A950 A95A960 A961A961 A962A962 A963A963 A96A990 A991A991 A99A1000 A1001A1001 A1002A1002 A1003A1003 A1004A1004 A1005A1005 A1006A1006 A10STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- HYDRAULIC GRADE LINE CONTINUEDBEND LOSS K's90° = 0.70 70° = 0.61 50° = 0.47 30° = 0.28 20° = 0.1680° = 0.66 60° = 0.55 40° = 0.38 25° = 0.22 15° = 0.10PIPE HYDRAULIC SIDESTREAM HEAD LOSSBEND FRICTION FRICTIONAREA RADIUS SUMMATION Hf Hc He Hb Ht LOSS SLOPE VELOCITY(FT) (FT) (CFS)K (FT/FT) (FPS)3.1416 0.5000 0.90 0.09 0.05 0.17 0.27 0.58 0.55 0.0024 3.503.1416 0.5000 3.53 0.95 0.09 0.07 0.05 1.16 0.28 0.0043 4.714.9087 0.6250 10.08 0.39 0.07 0.12 0.10 0.68 0.28 0.0028 4.384.9087 0.6250 10.08 0.36 0.08 0.10 0.03 0.57 0.10 0.0030 4.584.9087 0.6250 10.08 0.42 0.09 0.11 0.18 0.80 0.55 0.0033 4.784.9087 0.6250 13.90 0.36 0.13 0.12 0.10 0.72 0.28 0.0049 5.834.9087 0.6250 16.59 0.83 0.17 0.18 0.00 1.19 0.00 0.0064 6.694.9087 0.6250 16.59 0.90 0.17 0.24 0.49 1.81 0.70 0.0064 6.704.9087 0.6250 18.17 0.94 0.19 0.24 0.20 1.57 0.28 0.0071 7.024.9087 0.6250 19.97 0.77 0.21 0.27 0.42 1.68 0.55 0.0079 7.411.2272 0.3125 0.00 0.01 0.00 0.00 0.00 0.01 0.00 0.0002 0.731.2272 0.3125 0.00 0.03 0.02 0.00 0.00 0.05 0.00 0.0017 2.141.2272 0.3125 0.00 0.03 0.00 0.00 0.00 0.03 0.00 0.0002 0.721.2272 0.3125 0.00 0.01 0.01 0.00 0.01 0.03 0.70 0.0005 1.201.2272 0.3125 0.00 0.42 0.07 0.01 0.02 0.52 0.70 0.0064 4.221.2272 0.3125 0.00 0.18 0.11 0.10 0.00 0.39 0.00 0.0102 5.311.2272 0.3125 0.00 0.00 0.01 0.00 0.00 0.01 0.00 0.0009 1.551.2272 0.3125 0.00 0.36 0.04 0.01 0.02 0.43 0.61 0.0035 3.110.7854 0.2500 0.00 0.05 0.00 0.00 0.00 0.05 0.00 0.0005 0.980.7854 0.2500 0.00 0.26 0.02 0.01 0.01 0.30 0.55 0.0025 2.280.7854 0.2500 0.00 0.60 0.05 0.03 0.01 0.68 0.10 0.0060 3.501.2272 0.3125 0.00 0.34 0.04 0.07 0.00 0.44 0.00 0.0034 3.051.2272 0.3125 0.00 0.25 0.06 0.05 0.10 0.46 0.70 0.0052 3.791.2272 0.3125 0.00 0.23 0.06 0.08 0.00 0.37 0.00 0.0058 4.001.2272 0.3125 0.00 0.22 0.06 0.09 0.00 0.37 0.00 0.0060 4.0917-116-STRM-1-INVERTS.XLSSTORM Page 7 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA94 A95A95 A96A96 A97A97 A98A98 A99A99 A100A100 A101A101 A102A102 A103A103 A9A920 A92A950 A95A960 A961A961 A962A962 A963A963 A96A990 A991A991 A99A1000 A1001A1001 A1002A1002 A1003A1003 A1004A1004 A1005A1005 A1006A1006 A10STORM DRAINAGE / HYDRAULIC GRADE LINEDATE DESIGN PHASEANALYSISPRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBY RECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-DESIGN CRITERIA: HYDRAULIC GRADE LINE - CONTINUED 1. DESIGN FOR THE 10 YR STORM2. ASSUME TIME OF CONCENTRATION TOAN INDIVIDUAL INLET = 5 MIN.INLET W.S. ELEV.3. INTENSITY = g/(h+T), FOR 10 YR STORMOUTLET OUTLET INLET USE FLOW FREE- UPSTREAM4. MANNINGS "n" FACTOR= .013W.S. ELEV CONTOL CONTROL CONDITION BOARD INLET COMMENTS5. RATIONAL METHOD: C= .30 GRASS, C= .95 PAVEMENT(FT) (FT) (FT) (FT) CONTROL (FT) TYPE8/19/19851.67 852.24 851.74 852.24 OUTLET 2.26 CB OK848.99 850.14 851.67 851.67 INLET 2.83 DI OK847.70 848.38 848.99 848.99 INLET 10.01 DI OK847.13 847.70 847.57 847.70 OUTLET 13.20 CB OK846.33 847.13 846.35 847.13 OUTLET 12.07 CB OK845.61 846.33 845.43 846.33 OUTLET 11.47 CB OK844.42 845.61 845.00 845.61 OUTLET 11.89 DI OK842.61 844.42 843.61 844.42 OUTLET 13.08 DI OK841.05 842.61 842.30 842.61 OUTLET 16.49 DI OK832.50 834.18 841.05 841.05 INLET 14.95 DI OKTailwater Elev=832.50856.30 856.31 856.35 856.35 INLET 2.35 CB OKTailwater Elev=856.30852.60 852.65 852.62 852.65 OUTLET 2.15 CB OKTailwater Elev=852.60855.53 855.55 856.65 856.65 INLET 2.85 DI OK855.50 855.53 855.19 855.53 OUTLET 3.97 DI OK851.35 851.87 855.50 855.50 INLET 4.50 DI OK849.20 849.59 851.35 851.35 INLET 7.05 CB OKTailwater Elev=849.20852.74 852.76 852.63 852.76 OUTLET 2.14 CB OK845.00 845.43 852.74 852.74 INLET 2.16 CB OKTailwater Elev=845.00846.03 846.08 846.94 846.94 INLET 2.46 DI OK845.13 845.43 846.03 846.03 INLET 3.37 DI OK844.03 844.71 845.13 845.13 INLET 4.27 DI OK843.15 843.59 844.03 844.03 INLET 5.37 DI OK842.62 843.08 843.15 843.15 INLET 6.25 DI OK842.15 842.52 842.62 842.62 INLET 7.38 DI OK841.40 841.77 842.15 842.15 INLET 7.35 DI OK17-116-STRM-1-INVERTS.XLSSTORM Page 8 of 12 STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-n= 0.013 STORM DRAINAGE SCHEDULE CONTINUEDg= 192 h= 23I= 6.86INLETTc I CcINLET INLET Cc INLET TOTAL INLET PIPE TIME RUNOFFFROM TO AREA AREA IMPERVIOUS RUNOFF DISCHARGE AREAS TIME TIME OF CONC. INTENSITY COEFF.(SF) (AC) (%) COEFF. (CFS) (AC) (MIN) (MIN) (MIN) (IN/HR)A1010 A100 19,300 0.44 90 0.89 2.69 0.44 5.00 0.00 5.00 6.86 0.89A1020 A1021 11,200 0.26 85 0.85 1.50 0.26 5.00 0.00 5.00 6.86 0.85A1021 A102 1,870 0.04 0 0.30 0.09 0.30 5.00 0.11 5.11 6.83 0.77A1030 A1031 5,680 0.13 5 0.33 0.30 0.13 5.00 0.00 5.00 6.86 0.33A1031 A103 15,330 0.35 50 0.63 1.51 0.48 5.00 0.12 5.12 6.83 0.55B1 B2 10,980 0.25 90 0.89 1.53 0.25 5.00 0.00 5.00 6.86 0.89B2 B3 33,630 0.77 25 0.46 2.45 1.02 5.00 0.09 5.09 6.84 0.57B3 B4 2,650 0.06 90 0.89 0.37 1.08 5.00 0.19 5.19 6.81 0.58B4 B5 6,200 0.14 40 0.56 0.55 1.23 5.00 0.22 5.22 6.80 0.58B30 B3 7,640 0.18 90 0.89 1.06 0.18 5.00 0.00 5.00 6.86 0.89C1 C2 544,600 12.50 5 0.33 28.51 12.50 5.00 0.00 5.00 6.86 0.33C3 C4 3,136,320 72.00 10 0.37 180.21 72.00 10.00 0.00 10.005.450.37D1 D2 42,750 0.98 50 0.63 4.21 0.98 5.00 0.00 5.00 6.86 0.6317-116-STRM-1-INVERTS.XLSSTORM Page 9 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1010 A100A1020 A1021A1021 A102A1030 A1031A1031 A103B1 B2B2 B3B3 B4B4 B5B30 B3C1 C2C3 C4D1 D2STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- STORM DRAINAGE SCHEDULE - CONTINUED Q QUPSTREAMSIDE-CAPACITY SEGMENT UPPER LOWER TOP PIPEDISCHARGE STREAM SLOPE DIA. (FULL) V FULL LENGTH TIME INV. INV. ELEV. COVER(CFS) (CFS) (IN) (CFS) (FPS) (FT) (MIN) (FT) (FT) (FT) (FT)2.69 0.00 0.0634 15 16.3 13.2 142 0.18 854.00 845.00 860.00 4.641.50 0.00 0.0200 15 9.1 7.4 50 0.11 856.00 855.00 860.00 2.641.58 0.00 0.0271 15 10.6 8.7 70 0.13 854.90 853.00 860.00 3.740.30 0.00 0.0250 15 10.2 8.3 60 0.12 856.50 855.00 860.00 2.141.80 0.00 0.0133 15 7.5 6.1 180 0.49 854.90 852.50 858.50 2.241.53 0.00 0.0107 15 6.7 5.4 28 0.09 821.00 820.70 824.50 2.143.97 0.00 0.0278 15 10.8 8.8 54 0.10 820.60 819.10 824.50 2.545.381.060.0906 15 19.4 15.8 32 0.03 819.00 816.10 823.58 3.225.92 0.00 0.0875 15 19.1 15.6 40 0.04 816.00 812.50 824.00 6.641.06 0.00 0.0100 15 6.5 5.3 28 0.09 820.08 819.80 823.58 2.1428.51 0.00 0.0333 36 121.8 17.2 210 0.20 847.00 840.00 856.005.73143.23 0.00 0.0116 54 212.1 13.3 86 0.11 804.00 803.00 822.0013.094.21 0.00 0.0427 15 13.4 10.9 110 0.17 834.50 829.80 836.50 0.6417-116-STRM-1-INVERTS.XLSSTORM Page 10 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1010 A100A1020 A1021A1021 A102A1030 A1031A1031 A103B1 B2B2 B3B3 B4B4 B5B30 B3C1 C2C3 C4D1 D2STORM DRAINAGE / HYDRAULIC GRADE LINEDATEDESIGN PHASEANALYSIS8/19/19PRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBYRECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)- HYDRAULIC GRADE LINE CONTINUEDBEND LOSS K's90° = 0.70 70° = 0.61 50° = 0.47 30° = 0.28 20° = 0.1680° = 0.66 60° = 0.55 40° = 0.38 25° = 0.22 15° = 0.10PIPE HYDRAULIC SIDESTREAM HEAD LOSSBEND FRICTION FRICTIONAREA RADIUS SUMMATION Hf Hc He Hb Ht LOSS SLOPE VELOCITY(FT) (FT) (CFS)K (FT/FT) (FPS)1.2272 0.3125 0.00 0.24 0.02 0.00 0.00 0.26 0.00 0.0017 2.181.2272 0.3125 0.00 0.03 0.01 0.00 0.00 0.03 0.00 0.0005 1.221.2272 0.3125 0.00 0.04 0.01 0.01 0.01 0.06 0.28 0.0006 1.291.2272 0.3125 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 0.241.2272 0.3125 0.00 0.14 0.01 0.00 0.00 0.15 0.61 0.0008 1.461.2272 0.3125 0.00 0.02 0.01 0.00 0.00 0.02 0.00 0.0006 1.241.2272 0.3125 0.00 0.20 0.04 0.01 0.02 0.27 0.70 0.0038 3.221.2272 0.3125 1.06 0.22 0.07 0.06 0.00 0.35 0.00 0.0069 4.371.2272 0.3125 1.06 0.33 0.09 0.10 0.21 0.74 0.70 0.0084 4.811.2272 0.3125 0.00 0.01 0.00 0.00 0.00 0.01 0.00 0.0003 0.867.0686 0.7500 0.00 0.38 0.06 0.00 0.00 0.44 0.00 0.0018 4.0115.9043 1.1250 0.00 0.45 0.31 0.00 0.00 0.76 0.00 0.0052 8.931.2272 0.3125 0.00 0.46 0.05 0.00 0.00 0.51 0.00 0.0042 3.4117-116-STRM-1-INVERTS.XLSSTORM Page 11 of 12 n= 0.013g= 192h= 23I= 6.86FROM TOA1010 A100A1020 A1021A1021 A102A1030 A1031A1031 A103B1 B2B2 B3B3 B4B4 B5B30 B3C1 C2C3 C4D1 D2STORM DRAINAGE / HYDRAULIC GRADE LINEDATE DESIGN PHASEANALYSISPRELIM/x /PROJECT NAMEPROJECT NO CONSTR/ /Lewisville MS17-116REVISION/ /LOCATIONBY RECORD/ /Forsyth County, NCKALOTHER/ /CHECKED BY (SPECIFY)-DESIGN CRITERIA: HYDRAULIC GRADE LINE - CONTINUED 1. DESIGN FOR THE 10 YR STORM2. ASSUME TIME OF CONCENTRATION TOAN INDIVIDUAL INLET = 5 MIN.INLET W.S. ELEV.3. INTENSITY = g/(h+T), FOR 10 YR STORMOUTLET OUTLET INLET USE FLOW FREE- UPSTREAM4. MANNINGS "n" FACTOR= .013W.S. ELEV CONTOL CONTROL CONDITION BOARD INLET COMMENTS5. RATIONAL METHOD: C= .30 GRASS, C= .95 PAVEMENT(FT) (FT) (FT) (FT) CONTROL (FT) TYPE8/19/19Tailwater Elev=841.40846.00 846.26 854.83 854.83 INLET 5.17 DI OKTailwater Elev=846.00855.60 855.63 856.69 856.69 INLET 3.31 DI OK854.00 854.06 855.60 855.60 INLET 4.40 DI OKTailwater Elev=854.00855.62 855.62 857.13 857.13 INLET 2.87 DI OK853.50 853.65 855.62 855.62 INLET 2.88 DI OKTailwater Elev=853.50821.68 821.70 821.69 821.70 OUTLET 2.30 CB OK820.45 820.72 821.68 821.68 INLET 2.32 CB OK817.63 817.98 820.45 820.45 INLET 2.63 CB OK813.50 814.24 817.63 817.63 INLET 5.87 CB OKTailwater Elev=813.50820.80 820.81 820.74 820.81 OUTLET 2.27 CB OKTailwater Elev=820.80842.40 842.84 849.20 849.20 INLET 6.80 FES OKTailwater Elev=842.40806.60 807.36 809.75 809.75 INLET 12.25 HW OKTailwater Elev=806.60830.80 831.31 835.63 835.63 INLET 0.87 PE OKTailwater Elev=830.8017-116-STRM-1-INVERTS.XLSSTORM Page 12 of 12 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 8/19/19 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Lewisville MS 17-116 REVISION / / LOCATION BY RECORD / / Forsyth County, NC KAL OTHER / / CHECKED BY (SPECIFY) - Riprap Apron Outlet Protection FES No.= C2 Q10/Qfull =0.23 Pipe Dia= 36 in V/Vfull = 0.81 Q10 =28.51 cfs V = 13.9 fps Qfull = 121.80 cfs Vfull = 17.20 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2:D50 = 10 in DMAX = 17 in Riprap Class = 1 Apron Thickness = 24 in Apron Length = 24 ft Apron Width = 3xDia = 9 ft Riprap Apron Outlet Protection FES No.= C4 Q10/Qfull =0.68 Pipe Dia= 54 in V/Vfull = 1.07 Q10 =143.23 cfs V = 14.3 fps Qfull = 212.10 cfs Vfull = 13.30 fps From Fig. 8.06.b.1: Zone = 4 From Fig. 8.06.b.2:D50 = 10 in DMAX = 17 in Riprap Class = 1 Apron Thickness = 24 in Apron Length = 36 ft Apron Width = 3xDia = 14 ft OUTLET PROTECTION DATE DESIGN PHASE DESIGN 8/19/19 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Lewisville MS 17-116 REVISION / / LOCATION BY RECORD / / Forsyth County, NC KAL OTHER / / CHECKED BY (SPECIFY) - Riprap Apron Outlet Protection FES No.= D2 Q10/Qfull =0.32 Pipe Dia= 15 in V/Vfull = 0.87 Q10 =4.21 cfs V = 9.3 fps Qfull = 13.10 cfs Vfull = 10.60 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2:D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 8 ft Apron Width = 3xDia = 4 ft OUTLET PROTECTION DATE DESIGN PHASE DESIGN 8/19/19 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Lewisville MS 17-116 REVISION / / LOCATION BY RECORD / / Forsyth County, NC KAL OTHER / / CHECKED BY (SPECIFY) - Riprap Apron Outlet Protection (to Flat Ground) FES No.= A12 Q10/Qfull =0.76 Pipe Dia= 42 in V/Vfull = 1.10 Q10 =66.49 cfs V = 10.0 fps Qfull = 87.80 cfs Vfull = 9.10 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a:D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length (L) = 24 ft Width (W1) = 3xDia = 11 ft Width (W2) = Dia + L = 28 ft Riprap Apron Outlet Protection (to Flat Ground) FES No.= B5 Q10/Qfull =0.31 Pipe Dia= 15 in V/Vfull = 0.87 Q10 =5.92 cfs V = 13.6 fps Qfull = 19.10 cfs Vfull = 15.60 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a:D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length (L) = 16 ft Width (W1) = 3xDia = 4 ft Width (W2) = Dia + L = 18 ft OUTLET PROTECTION DATE DESIGN PHASE DESIGN 8/19/19 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Lewisville MS 17-116 REVISION / / LOCATION BY RECORD / / Forsyth County, NC KAL OTHER / / CHECKED BY (SPECIFY) - Riprap Apron Outlet Protection (to Flat Ground) FES No.= SCM 1 Q10/Qfull =0.02 Pipe Dia= 30 in V/Vfull = 0.32 Q10 =0.46 cfs V = 1.9 fps Qfull = 29.00 cfs Vfull = 5.90 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a:D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length (L) = 16 ft Width (W1) = 3xDia = 8 ft Width (W2) = Dia + L = 19 ft Riprap Apron Outlet Protection (to Flat Ground) FES No.= SCM 2 Q10/Qfull =0.25 Pipe Dia= 15 in V/Vfull = 0.83 Q10 =2.65 cfs V = 7.3 fps Qfull = 10.80 cfs Vfull = 8.80 fps Outlet Conditions: Flat area, no defined channel From Fig. 8.06.a:D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length (L) = 12 ft Width (W1) = 3xDia = 4 ft Width (W2) = Dia + L = 14 ft