Loading...
HomeMy WebLinkAboutNCC201157_ESC Approval Submitted (3)_202003201 2 3 4 5 DRAWING INDEX LOCATION MAP SCALE: 1 "=2,000' Dewberr.y GENERAL TO.01 COVER SHEET CIVIL E CO.01 GENERAL NOTES CO.02 NC-GO1 DETAILS CO.03 ALTA/NSPS LAND TITLE SURVEY (1 OF 3) CO.04 ALTA/NSPS LAND TITLE SURVEY (2 OF 3) CO.05 ALTA/NSPS LAND TITLE SURVEY (3 OF 3) CO.06 TOPOGRAPHIC SURVEY C1.01 DEMOLITION PLAN C2.01 PHASE I EROSION CONTROL PLAN C2.02 PHASE II EROSION CONTROL PLAN C3.01 OVERALL SITE PLAN C3.02 SITE PLAN C4.01 GRADING AND STORM WATER PLAN C4.02 ROADWAY PROFILES (SHEET 1 OF 2) C4.03 ROADWAY PROFILES (SHEET 2 OF 2) C5.01 STORM DRAINAGE PROFILES (SHEET 1 OF 2) C5.02 STORM DRAINAGE PROFILES (SHEET 2 OF 2) C6.01 EROSION CONTROL DETAILS (SHEET 1 OF 4) C6.02 EROSION CONTROL DETAILS (SHEET 2 OF 4) C6.03 EROSION CONTROL DETAILS (SHEET 3 OF 4) C6.04 EROSION CONTROL DETAILS (SHEET 4 OF 4) C7.01 CONSTRUCTION DETAILS (SHEET 1 OF 5) C7.02 CONSTRUCTION DETAILS (SHEET 2 OF 5) C7.03 CONSTRUCTION DETAILS (SHEET 3 OF 5) C7.04 CONSTRUCTION DETAILS (SHEET 4 OF 5) C7.05 BMP DETAILS (SHEET 1 OF 2) C7.06 BMP DETAILS (SHEET 2 OF 2) C8.01 LANDSCAPING PLAN ZONING, FLOODPLAIN & WATERSHED INFORMATION TAX PARCEL ID: 007-47-101, 007-47-113 ZONED: APPROVED AS TND OVERLAY DISTRICT, 2012; CURRENTLY NEIGHBORHOOD GENERAL PERMITTED USE: SINGLE FAMILY RESIDENTIAL NUMBER OF UNITS: 36 SITE ACREAGE: 7.20 ACRES OPEN SPACE REQUIRED: 0.72 ACRES = 7.20 x 10% OPEN SPACE PROVIDED: 4.405 ACRES SETBACKS: SINGLE FAMILY TOWNHOMES FRONT: 0 FEET (MIN.), 25 FEET (MAX.) REAR: 5 FEET (MIN.), 5 FEET (MAX.) SIDE: 0 FEET (MIN.), 40 FEET (MAX.) C (TND-OVERLAY IS A SUBSET OF THE RURAL ZONING DESIGNATION) SETBACKS: SINGLE FAMILY HOMES FRONT: 10 FEET (MIN.), N/A (MAX.) REAR: 20 FEET (MIN.), N/A (MAX) SIDE: 3 FEET (MIN.), N/A (MAX) (TND-OVERLAY IS A SUBSET OF THE RURAL ZONING DESIGNATION) MAX HEIGHT: 3 STORIES PARKING 1 SPACE (MIN) 2 SPACE (MAX) SIDEWALK: 5' MINIMUM SITE LOCATION ETJ AREA: CHARLOTTE HISTORIC DISTRICT: CHARLOTTE 6/30/11 ANNEXATION AREA: CENSUS TRACT #: WATER QUALITY BUFFERS PARCEL INSIDE WATER QUALITY BUFFER: POST CONSTRUCTION DISTRICTS JURISDICTION: B DISTRICT: FEMA AND COMMUNITY FLOODPLAIN FEMA PANEL #: FEMA PANEL DATE: FEMA FLOOD ZONE: COMMUNITY FLOOD ZONE: 0 WATERSHED PROTECTION DISTRICTS WATERSHED NAME: CONTACTS DEVELOPER: BLUE HEEL DEVELOPMENT MATT GALLAGHER 442 SOUTH MAIN STREET, SUITE 100 Davidson, NC 28036 PH. (704) 634-5140 MATT@BLUEHEELDEVELOPMENT. COM DAVIDSON N/A N/A 64.01 (FIPS: 37119006401) NO DAVIDSON YADKIN 4672 11 /16/2018 ZONE X TOWN OF DAVIDSON ROCKY RIVER ENGINEER: DEWBERRY ENGINEERS INC. BRIAN LAFRANCHI, P.E. 9300 HARRIS CORNERS PARKWAY, SUITE 220 CHARLOTTE, NC 28269 PH. (704) 631-5206 FAX (704) 509-9937 BLAFRANCHI @DEWBERRY.COM SUBMITTAL SET NUMBER ❑ PRELIMINARY ❑ CONSTRUCTION ■ APPROVAL ❑ REVISION ❑ BIDDING ❑ RECORD ANTICIPATED CONSTRUCTION TIMELINE: BEGIN CONSTRUCTION : SEPTEMBER 2019 COMPLETED CONSTRUCTION: SEPTEMBER 2021 SUMMERS WALK - PHASE 6A & B 100% CONSTRUCTION DOCUMENTS DAVIDSON, NORTH CAROLINA EPM # 393235 (MASTER PLAN) EPM # 397173 (CONSTRUCTION PLAN) LEGEND EXISTING MAJOR CONTOURS - - - EXISTING PROPERTY LINE SIP EXISTING GATE VALVE OEIP EXISTING IRON PIPE w EXISTING WATER MAIN G EXISTING UNDERGROUND GAS --UGE- EXISTING UNDERGROUND ELECTRIC EXISTING COMMUNICATIONS LINE XWV EXISTING GAS VALVE ❑WM EXISTING WATER METER EXISTING TREE LINE - EXISTING FLOOD LINE PROPOSED PROPERTY LINE PROPOSED R/W -- PROPOSED CONCRETE SIDEWALK PROPOSED ASPHALT GREENWAY LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED BAFFLE PROPOSED INLET PROTECTION T P PROPOSED TREE PROTECTION TS PROPOSED TEMPORARY SEEDING �S PROPOSED PERMANENT SEEDING PROPOSED MULCH ---743 - EXISTING MINOR CONTOURS SS - EXISTING SANITARY SEWER - - -Sp EXISTING STORM DRAIN EXISTING SANITARY MANHOLE O EXISTING SANITARY CLEANOUT - - - - EXISTING STREAM DPP EXISTING POWER POLE DTP EXISTING TELEPHONE POLE ® EXISTING TRANSMISSION TOWER EXISTING CONCRETE SIDEWALK EXISTING CURB INLET PROPOSED SETBACK LINE SS PROPOSED SANITARY SEWER w PROPOSED WATER LINE PROPOSED EDGE OF PAVEMENT TEMPORARY DIVERSION DITCH PROPOSED STORM SEWER mPROPOSED STORM INLET • PROPOSED STORM MANHOLE PROPOSED SANITARY MANHOLE PROPOSED OPENN SPACE ZONE -745 PROPOSED MAJOR CONTOURS •743 PROPOSED MINOR CONTOURS PROPOSED GATEVALVE PROPOSED FIRE HYDRANT ASSEMBLY PROPOSED CHECK DAM a Know what's below. Call before you dig. Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 U) C� ~ z W Lu � z � JmZ) O Z z J a 0 z cr Cn Q� O O oQ 0_ rr Cr� r w 1 V U a= Z) m p z w�J Q LJJ two Y �, C� G = w z w �o Z)0-= W O U J m O O T SEAL 5 AL 40016 z 4 'U:z GIN KEY KEY PLAN SCALE: 1 " =100' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 COVER SHEET PROJECT NO. 501 04981 T0m01 1 2 GENERAL NOTES 1. THE DISTURBANCE AREA FOR THIS PROJECT IS APPROXIMATELY 6.95f AC. THE PROPOSED IMPROVEMENTS WILL PRODUCE A NET IMPERVIOUS AREA OF APPROXIMATELY 6.95 AC. 2. BASE DATA FROM MECKLENBURG COUNTY GIS AND BOUNDARY AND TOPOGRAPHIC SURVEY PROVIDED TO DEWBERRY ENGINEERS INC. BY BLUE HEEL DEVELOPMENT. 3. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO EXISTING UNDERGROUND FACILITIES AT, OR CONTIGUOUS TO, THE SITE IS BASED ON INFORMATION AND DATA FURNISHED TO THE ENGINEER BY CAROLINA SURVEYORS, INC.. THE OWNER AND ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF ANY SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR REVIEWING AND CHECKING ALL SUCH INFORMATION AND DATA (PRIOR TO CONSTRUCTION) FOR LOCATING ALL UNDERGROUND FACILITIES SHOWN OR INDICATED; FOR COORDINATION OF THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES E DURING CONSTRUCTION; AND FOR THE SAFETY AND PROTECTION THEREOF RESULTING FROM THE WORK; ALL OF WHICH WILL BE AT NO ADDITIONAL COST TO THE OWNER. 4. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, FENCES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. THE CONTRACTOR SHALL HAND EXCAVATE WITHIN 5' OF ALL BUILDINGS, WALLS, AND STRUCTURES. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 5. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE ENGINEER. 6. THE LOCATION OF ALL EXISTING UTILITIES ACROSS THE LINES OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS, AND WHERE SHOWN ARE ONLY APPROXIMATE. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL LOCATE ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. 7. WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE TOWN OF DAVIDSON CODE OF ORDINANCES, MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 8. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS. 9. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY DEPTHS OF ALL UTILITY CROSSINGS. 10. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SIGNS. 11. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, STORM SEWER, WATERLINES, SANITARY LINES, ETC. 16. MATERIAL LAYDOWN AND STORAGE SHALL BE WITHIN PROJECT AREA. 17. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ON ADJACENT PROPERTIES BEYOND WHAT IS SHOWN. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 18. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK, AND OTHER ACCUMULATIONS. 19. ANY CONSTRUCTION OR USE WITHIN THE AREAS DELINEATED AS COMMUNITY ENCROACHMENT (0.1') FLOODWAY ENCROACHMENT AREA IS SUBJECT TO RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF MECKLENBURG COUNTY. D 20. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. 21. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. 22. HANDRAILS MAY BE REQUIRED BY A REPRESENTATIVE OF THE COUNTY, IF WARRANTED BY FIELD CONDTIONS (MCLDS 50.04A,B). 23. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. 24. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 25. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SIDE) IS TO PROVIDE STORM WATER CONVEYANCE. BUILDINGS ARE NOT PERMITTED IN THE EASEMENT AREA. ANY OTHER OBJECTS WHICH IMPEDE STORM WATER FLOW OR SYSTEM MAINTENANCE ARE ALSO PROHIBITED. 26. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATIONS SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE TOWN/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. 27. ALL ROAD IMPROVEMENTS ARE TO BE COORDINATED WITH THE TOWN OR COUNTY LUESA PRIOR TO CONSTRUCTION. 28. DEVELOPER WILL PROVIDE STREET NAME SIGNS PER MCLDS# 50.05 (9" SIGNS ONLY). 29. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. 30. RETAINING WALLS SHALL BE A MAXIMUM OF 6-FEET (BEHIND THE FRONT BUILDING LINE) AND 3-FEET IN FRONT OF THE BUILDING LINE. TALLER RETAINING WALLS MAY BE TIERED, WITH A MINIMUM 2-FOOT SEPARATION BETWEEN WALLS. THE ENGINEER OF RECORD FOR THE RETAINING WALL(S) MUST CERTIFY THAT THE WALL(S) IS (ARE) CONSTRUCTED TO SPECIFICATIONS PRIOR TO ISSUANCE OF C.O. 31. CONSTRUCTION OF RETAINING WALL(S) CANNOT BEGIN UNTIL ALL NECESSARY PERMITS ARE ACQUIRED. 32. "AS -BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE SUBDIVISION ORDINANCE. C 33. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE TOWN/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. 34. PRIOR TO PLAT RECORDATION, OFFSITE R/W AND/OR CONSTRUCTION EASEMENTS ARE REQUIRED TO BE OBTAINED ACCORDING TO THE GUIDELINES OF THE "OFFSITE R/W ACQUISITION PROCESS". THESE NEEDED R/W AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN ON THE ROADWAY IMPROVEMENT PLAN. STREET LIGHTING NOTE 1. TYPE: PEDESTRIAN -SCALE STREET LIGHTING THAT IS NO MORE THAN 18 FEET IN HEIGHT SHALL BE PROVIDED USING DECORATIVE LIGHTING FIXTURES, AS APPROVED BY THE PLANNING DIRECTOR. SUCH LIGHTING SHALL BE PRIORITIZED OVER AUTOMOBILE LIGHTING IN ALL DISTRICTS. EXAMPLES OF PERMITTED PEDESTRIAN LIGHTING FIXTURES (IMAGE SOURCE: DUKE ENERGY) 2. LOCATION: THE PLACEMENT OF STREET LIGHTING FIXTURES IN RESIDENTIAL AREAS SHALL BE AT 160 TO 200 FOOT INTERVALS (300 TO 500 FOOT INTERVALS IN THE RURAL PLANNING AREA), AND AT EACH INTERSECTION UNLESS: • THE ROADWAY LENGTH IS LESS THAN 200 FEET, A STREET LIGHT IS PLACED AT THE INTERSECTION, AND NO NATURAL FEATURES OBSTRUCT THE LIGHT SOURCE, IN WHICH CASE A STREET LIGHT WILL NOT BE REQUIRED AT THE END OF THE STREET; OR • THE VERTICAL AND HORIZONTAL STREET ALIGNMENT OR NATURAL FEATURES NECESSITATE SHORTER SPACING INTERVALS. 3. SHADOWS: PEDESTRIAN LIGHTING SHALL BE PLACED TO MINIMIZE SHADOWS ON SIDEWALKS. 4. MAINTENANCE: THE TOWN WILL ACCEPT RESPONSIBILITY OF THE LIGHTS AT THE TIME STREETS ARE ACCEPTED FOR MAINTENANCE AND ONE-TIME DECORATIVE FEES HAVE BEEN PAID TO THE TOWN OR LIGHT PROVIDER, WITH THE EXCEPTION OF ANY LIGHTING THAT IS EIGHT FEET OR LESS IN HEIGHT. SUCH LIGHTS SHALL BE MAINTAINED BY HOA. FLOODPLAIN NOTES 1. THE COMMUNITY ENCROACHMENT LINE MUST BE CLEARLY MARKED PRIOR TO ANY GRADING AND THE MARKED LINE MUST BE MAINTAINED ON SITE UNTIL FINAL GRADING IS COMPLETED. TRASNPORTATION IMPACT ANALYSIS 1. TIA COMPLETED PREVIOUSLY AS PART OF THE OVERALL SUMMERS WALK DEVELOPMENT. AFFORDABLE HOUSING 1, THE DEVELOPER HAS A TOTAL ❑BLIGATI❑N OF $344,500 OF AFFORDABLE H❑USING FEES DUE TO THE TOWN OF DAVIDSON ON SUMMERS WALK PHASE 6, THE DEVELOPER WILL BUILD THE AFFORDABLE H❑USING UNITS, OR MAKE PAYMENT -IN -LIEU, AS DESCRIBED IN THE AFFORDABLE H❑USING PLAN APPROVED BY THE DAVIDSON BOARD OF C❑MMISSI❑NERS ON JUNE 11, 2019. FIRE NOTES 1, FIRE APPARATUS ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMP❑SED LOADS OF FIRE APPARATUS OF 80,000 POUNDS, LANDSCAPING 1, STREET TREES AND LANDSCAPING OF SUMMERS WALK PHASE 6 SHALL BE IN ACCORDANCE WITH THE TOWN OF DAVIDSON'S PLANNING ❑RDINANCE. SEE STREET CR❑SS-SECTI❑NS FOR PLANTING STRIP L❑CATI❑N AND TOWN OF DAVIDSON PLANNING ❑RDINANCE FOR TREE SPACING/DENSITY. MECHANICAL SCREENING NOTES 1. LOADING FACILITIES, LOADING DOCKS, SERVICE DOORS, AND OTHER SERVICE AREAS SHALL NOT BE LOCATED ALONG A PRIMARY A STREET -FACING FACADE, NOR VISIBLE FROM A PARK OR PUBLIC OPEN SPACE. 2. MECHANICAL EQUIPMENT (EXCEPT SMALL ITEMS SUCH AS FANS AND VENTS), UTILITY METERS, STORAGE AREAS, SOLID WASTE CONTAINERS (INCLUDING DUMPSTERS, COMPACTORS, RECYCLING CONTAINERS, AND SOLID WASTE AND RECYCLING HANDLING AREAS), TRANSFORMERS, GENERATORS, HVAC UNITS AND SIMILAR FEATURES, OR OTHER UTILITY HARDWARE ON THE BUILDING, ROOF, OR GROUND SHALL BE SCREENED FROM PUBLIC VIEW WITH MATERIALS SIMILAR TO THE STRUCTURE; OR THEY SHALL BE SO LOCATED AS NOT TO BE VISIBLE FROM A PRIMARY FRONTING PUBLIC STREET. THIS REQUIREMENT MAY BE WAIVED FOR PHOTOVOLTAIC PANELS WHERE SUCH PANELS MUST BE LOCATED WITHIN VIEW OF A PUBLIC STREET IN ORDER TO MAXIMIZE SOLAR EXPOSURE. 3. SCREENING IS NOT REQUIRED FOR ELECTRONIC VEHICLE CHARGING STATIONS. 4. OFF-STREET PARKING SHALL NOT BE LOCATED FORWARD OF THE FRONT FACADE OF THE BUILDING UNLESS ON A CORNER LOT. ON A CORNER LOT, PARKING MAY NOT BE LOCATED IN FRONT OF THE FACADE ON THE PRIMARY STREET. SEE SECTION 8 FOR MORE INFORMATION ON PARKING. 5. UNDERGROUND UTILITIES: ALL UTILITIES MUST BE UNDERGROUND FROM THE POINT OF CONNECTION. SEE DAVIDSON MUNICIPAL CODE FOR RIGHT-OF-WAY RESTRICTIONS. 3 EROSION AND SEDIMENT CONTROL NOTES 1. ALL "STD" NUMBERS REFER TO THE MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS MANUAL AND THE NCDOT STANDARDS APPROVED FOR USE IN THE TOWN OF DAVIDSON AND MECKLENBURG COUNTY. 2. ON SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 5. SOIL STABILIZATION SHALL BE REQUIRED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE SCHEDULE ON SHEET C6.01. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE COUNTY. 7. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING [MCLDS #30.16]. SOILS ENGINEER TO VERIFY STABILITY OF SLOPES GREATER THAN 2:1. 8. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES BEYOND WHAT IS SHOWN. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 9. ALL EMBANKMENTS MUST BE CONSTRUCTED PER SECTION 4.0.6 EMBANKMENT REQUIREMENTS IN THE BMP DESIGN MANUAL. 10. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. 11. APPROXIMATE CONSTRUCTION COMPLETION TIMEFRAME IS 1 YEAR. 12. ALL EROSION CONTROL MEASURES SHALL CONFORM TO THOSE SET FORTH IN THE STATE OF NORTH CAROLINA EROSION CONTROL PLANNING AND DESIGN MANUAL, COUNTY ORDINANCE, OR THE MOST RESTRICTIVE OF ANY STANDARDS THAT CONFLICT. 13. THE ANGLE OF THE GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE WHICH CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED SHALL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 14. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY 7 DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS 1 2 INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY. 15. AFTER CONSTRUCTION IS COMPLETED AND SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES AND PERMANENTLY VEGETATE ALL REMAINING DISTURBED AREAS THAT WERE COVERED BY TEMPORARY MEASURES. 16. POLYACRYLAMIDES (PAM) SHALL BE USED TO REDUCE TURBIDITY AND SUSPENDED SOLIDS WHENEVER A SEDIMENT TRAP, BASIN, PIT, HOLE, OR BUILDING FOUNDATION IS BEING PUMPED OUT TO REMOVE SEDIMENT LADEN WATER. PAM IS NOT REQUIRED WHEN ANY OF THE ABOVE IS BEING PUMPED TO AN APPROVED SEDIMENT BASIN ON SITE. THIS ACTIVITY MUST BE INSPECTED AND APPROVED BY THE MECKLENBURG COUNTY EROSION CONTROL INSPECTOR. 17. DOUBLE SILT FENCE SHALL BE USED ALONG WETLANDS, STREAMS, LAKES OR OTHER SURFACE WATER BODIES AS WELL AS ADJACENT TO ALL S.W.I.M. OR OTHER WATER QUALITY BUFFERS. HIGH HAZARD SILT FENCE WITH WIRE BACKING AND WASHED STONE WILL BE INSTALLED AS DETERMINED NECESSARY BY THE COUNTY ENGINEER OR FIELD INSPECTOR. 18. A 10-FOOT UNDISTURBED BUFFER SHALL BE PROVIDED AROUND THE OUTSIDE EDGE OF DRAINAGE FEATURES SUCH AS INTERMITTENT AND PERENNIAL STREAMS, PONDS, AND WETLANDS. INCIDENTAL DRAINAGE IMPROVEMENTS OR REPAIRS WILL BE PERMITTED WITHIN THE BUFFER AS APPROVED BY COUNTY STAFF. 19. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE LUESA WATER QUALITY INSPECTOR AT LEAST 48 HOURS IN ADVANCE TO STARTING CONSTRUCTION ON ANY BMP. CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS FROM GOVERNMENT AGENCIES. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE FOLLOWING DEPARTMENTS: LUESA EROSION CONTROL INSPECTOR, LAND DEVELOPMENT INSPECTOR AND ZONING INSPECTOR. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS SUBJECT TO FINE. 3. INSTALL SILT FENCE, INLET PROTECTION, STONE OUTLETS IN SILT FENCE, DIVERSION DITCHES, TEMPORARY SEDIMENT BASIN, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING MAY BEGIN. 5. REMOVE ALL EXISTING IMPROVEMENTS AS OUTLINED IN THE DEMOLITION/PHASE 1 EROSION CONTROL PLAN. 6. UPON STABILIZING A PORTION OF THE AREAS DRAINING TO THE SKIMMER BASINS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH PHASE 2. 7. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, TOWN OF DAVIDSON EROSION CONTROL ORDINANCE, AND THE MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS (MCLDS). 8. BEGIN CURB/GUTTER/SIDEWALK INSTALLATION AND GRADING OPERATIONS. 9. CONSTRUCT STORM DRAINAGE SYSTEM. 10. TEMPORARILY SEED ALL DISTURBED AREAS THAT ARE TO REMAIN INACTIVE FOR MORE THAN 5 WORKING DAYS. 11. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 12. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE/STAGE OF EROSION CONTROL MEASURES. 13. THE LAND DEVELOPMENT INSPECTOR SHALL BE CALLED TO CONDUCT INSPECTION ON STORM DRAINAGE, SIDEWALKS, DRIVEWAY IMPROVEMENTS, AND ALL ASPECTS OF ROAD CONSTRUCTION. 14. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 15. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 16. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, MECKLENBURG COUNTY EROSION CONTROL ORDINANCE, AND THE CHARLOTTE-MECKLENBURG LAND DEVELOPMENT STANDARDS. OWNERSHIP OF PARKS & OPEN SPACE NOTES 1. PERMITTED OWNERSHIP ENTITIES: PARKS AND OPEN SPACE SHALL BE SEPARATELY DEEDED TO ONE OF THE FOLLOWING: 1. THE TOWN OF DAVIDSON (UPON ACCEPTANCE BY THE BOARD OF COMMISSIONERS), 2. MECKLENBURG COUNTY, 3. A NON-PROFIT LAND TRUST OR CONSERVANCY, 4. A HOMEOWNER'S ASSOCIATION, OR 5. A PRIVATE OWNER. 2. OWNERSHIP CONDITIONS • NON-PUBLIC OWNERSHIP STRATEGIES (I.E., OWNERSHIP BY NON-PROFIT LAND TRUST OR CONSERVANCY, A HOMEOWNER'S ASSOCIATION, OR A PRIVATE OWNER) MUST BE ACCOMPANIED BY A LONG-TERM MAINTENANCE PLAN. MANAGEMENT PLANS MUST BE CONSISTENT WITH LTA STANDARDS & PRACTICES AND DEEMED TO BE FINANCIALLY VIABLE BY THE TOWN ATTORNEY OR THEIR DESIGNATED ADMINISTRATOR. PLANS MUST BE APPROVED AND CONTRACTS, EASEMENTS, FUNDS, ETC. ESTABLISHED PRIOR TO ISSUANCE OF ANY FINAL PLAT APPROVAL BY THE TOWN OF DAVIDSON. *OWNERSHIP BY A NON-PROFIT LAND TRUST OR CONSERVANCY MUST BE RECORDED BY CONTRACT IN A FORM APPROVED BY THE TOWN • OWNERSHIP BY A HOMEOWNER'S ASSOCIATION OR PRIVATE OWNER MUST BE ACCOMPANIED BY A PERMANENT CONVERSATION EASEMENT PLACED UPON THE LAND. EACH CONSERVATION EASEMENT MUST BE ACCOMPANIED BY A STEWARDSHIP ENDOWMENT PROPERLY FUNDED BY THE DEVELOPER, CONSISTENT WITH THE LAND TRUST ALLIANCE (LTA) STANDARDS, AND HELD BY THE CONSERVATION EASEMENT HOLDER. AT A MINIMUM THE ENDOWMENT MUST COVER ANNUAL MONITORING, REPORTING, AND MAINTENANCE COSTS TO ACHIEVE LEVEL I STEWARDSHIP COSTS CONSISTENT WITH LTA STANDARDS AND PRACTICES. SEE THE LTA'S DETERMINING STEWARDSHIP COSTS MANUAL AND LTA'S STANDARDS & PRACTICES FOR FURTHER INFORMATION. • THE TOWN RESERVES THE RIGHT TO DESIGNATE A THIRD PARTY TO MAINTAIN, MANAGE, AND/OR HOLD OWNERSHIP OF ANY PARKS AND OPEN SPACE LAND DEDICATED TO THE TOWN. 3. PROPERTY DESCRIPTION: A METES AND BOUNDS DESCRIPTION OF THE PARK OR OPEN SPACE AND LIMITS ON ITS USE SHALL BE RECORDED ON THE DEVELOPMENT PLAN, IN HOMEOWNER COVENANTS, AND ON INDIVIDUAL DEEDS WHEN OPEN SPACE LANDS ARE NOT HELD ENTIRELY IN COMMON. H.O.A. NOTES 1. THE HOA COVENANTS OF THE EXISTING SUMMERS WALK PHASE 1-5 SUBDIVISION WILL APPLY TO THE COMPLETED DEVELOPMENT. 4 5 f Dewberr Y TRAFFIC CONTROL NOTES 1. STREET SPACE IS AT A MINIMUM SO NO MORE SPACE SHOULD BE USED FOR CONSTRUCTION OR MAINTENANCE WORK THAN IS ABSOLUTELY NECESSARY. THROUGH BARRICADING AND CHANNELIZATION, THE REMAINING STREET SPACE IS TO BE USED TO CARRY THE TRAFFIC AROUND THE WORK AREA IN THE BEST WAY POSSIBLE UNDER PREVAILING CONDITIONS. 2. TRAFFIC CONTROL DEVICES SHALL BE SET UP PRIOR TO THE START OF CONSTRUCTION OR MAINTENANCE OPERATIONS, AND SHALL BE REMOVED OR DewberryEngineers Inc. RELOCATED AS THE WORK IS FINISHED OR WORK CONDITIONS CHANGE. THE AGENCY DOING THE WORK SHALL PATROL THE WORK SITE AS REQUIRED g TO ENSURE THAT ALL TRAFFIC CONTROL DEVICES ARE IN PLACE AND OPERATING AT ALL TIMES. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 3. ALL TRAFFIC CONTROL SIGNS FOR THE WORK AREA SHALL BE REFLECTORIZED. THE REFLECTIVE MATERIALS USED SHALL BE EQUAL TO OR BETTER Phone:704.509.9918 THAN TYPE III, VII, VIII, OR IX RETROREFLECTIVE SHEETING REQUIREMENTS IN SECTION 633 OF THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF Fax:704.509.9937 .00m www.dewberrROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03). NCBELS #F-09 NCBELS #F-0929 4. AT NIGHT, ADEQUATE BARRICADES WITH REFLECTORIZED MATERIAL AND LIGHTS ARE REQUIRED TO CALL ATTENTION TO AND TO INDICATE THE ACTUAL LOCATION OF OBSTRUCTIONS AND HAZARDS. 5. WHEN NOT IN USE DURING WORK HOURS OR CONSTRUCTION INACTIVITY, EQUIPMENT SHALL BE PARKED A MINIMUM OF 10' AWAY FROM THE TRAVEL LANE IN SUCH A MANNER AS TO NOT CREATE A SIGHT DISTANCE PROBLEM FOR MOTORISTS. 6. THE MINIMUM WIDTH FOR TEMPORARY TRAVEL LANES IS 10' (11' FOR STATE MAINTAINED ROADS); HOWEVER, A 12' LANE IS ADVISABLE AND SHOULD BE PROVIDED WHENEVER POSSIBLE. U) 7. WHENEVER TRAFFIC MUST BE ROUTED ACROSS THE CENTERLINE, THE TWO DIRECTIONS OF TRAFFIC MUST BE PHYSICALLY SEPARATED. TRAFFIC CONES ^ V J z CAN BE EFFECTIVELY USED FOR THIS PURPOSE DURING DAYLIGHT HOURS; RETROREFLECTORIZED DRUMS MUST BE USED AT NIGHT. W W 8. TRAFFIC SHALL NOT BE ROUTED ACROSS CENTERLINE WITH CONES OR DRUMS DURING NON -WORKING HOURS. CONTRACTOR MUST BE ON SITE OR CHANGE PAVEMENT MARKING APPROPRIATELY. Z) 9. GENERALLY, THE PEAK FLOW OF TRAFFIC OCCURS IN MECKLENBURG COUNTY BETWEEN THE HOURS OF 7-9 A.M. AND 4-6 P.M., MONDAY THROUGH y z FRIDAY. DURING THESE HOURS, CONSTRUCTION ACTIVITY THAT INVOLVES A LANE CLOSURE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT J O Z IN EMERGENCY SITUATIONS OR WITH APPROVAL FROM THE TOWN PUBLIC WORKS AND/OR NCDOT. A� 5 Z J 0 W 10. THE AGENCY DOING THE WORK SHALL PROVIDE FLAGGERS AND/OR POLICE CONTROL WHEN REQUIRED. CONTRACTOR MAY ALSO BE REQUIRED TO ` Z) OOC PROVIDE A UNIFORMED OFFICER TO CONTROL TRAFFIC WHEN WORKING IN AND AROUND A SIGNALIZED INTERSECTION. < z 0 U 11. EVERY ATTEMPT SHALL BE MADE TO SCHEDULE AND EXPEDITE THE WORK TO CAUSE THE LEAST INCONVENIENCE TO THE TRAVELING PUBLIC. C� O (� O m D 12. IN SITUATIONS NOT COVERED IN THIS DESIGN, THE PROTECTION OF THE TRAVELING PUBLIC AND THE PROTECTION OF THE WORKERS ON SITE WILL O W U U m z DICTATE THE MEASURES TO BE TAKEN CONSISTENT WITH THE CITY OF CHARLOTTE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH). W U)W Z 13. THE CONTRACTOR, UTILITY COMPANY, OR GOVERNMENTAL AGENCY INVOLVED IN THE WORK SHALL NOTIFY MECKLENBURG COUNTY LAND DEVELOPMENT < �J 1 O AND/OR NCDOT OF THE CONSTRUCTION START DATE AND ANY MAJOR WORK WHERE THE NUMBER OF TRAVEL LANES ARE REDUCED FROM NORMAL LJJ CONDITIONS OR THE STREET IS REQUIRED TO BE CLOSED. EXCEPT IN EMERGENCIES, THE FOLLOWING NOTIFICATION IS REQUIRED: = W W • CONSTRUCTION START DATE: 5 WORKING DAYS IN ADVANCE ^ U) Q L•� z • CLOSING 1 OR MORE TRAVEL LANES DURING PEAK TRAVEL TIMES: 5 WORKING DAYS PRIOR TO THE SCHEDULED WORK V J `+/ Uj O *CLOSING A STREET: 10 WORKING DAYS PRIOR TO THE SCHEDULED WORK. U E)J THIS LEAD-TIME IS NECESSARY FOR PLANNING AND NOTIFYING THE PUBLIC OF EXPECTED CHANGES IN THE NORMAL TRAFFIC CONDITIONS. 14. THE COUNTY ENGINEER OR NCDOT OR THEIR REPRESENTATIVES ARE AUTHORIZED TO STOP ANY CONSTRUCTION OR MAINTENANCE ACTIVITY WHICH IS NOT W 0 PROPERLY SIGNED AND BARRICADED AS REQUIRED BY THIS STANDARD, THE WATCH, AND/OR THE MUTCD UNTIL SUCH REQUIREMENTS ARE MET. 0 15. THIS DESIGN STANDARD CANNOT BE USED FOR ALL ROADWAY CONSTRUCTION SITUATIONS. IT IS INTENDED ONLY TO BE USED AS A GUIDELINE. T SPECIFIC SITUATIONS MAY REQUIRE ENGINEERING JUDGMENT IN THE PLACEMENT OF TRAFFIC CONTROL DEVICES BECAUSE OF LIMITED VERTICAL AND/OR HORIZONTAL SIGHT DISTANCE. 16. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 2' OF THE EDGE OF AN OPEN TRAVEL LANE (5' ON STATE MAINTAINED ROADS), THE CONTRACTOR SHALL REFER TO THE WATCH FOR PROPER LANE CLOSURE. 17. OPERATIONAL SIGNS ARE GENERALLY MOUNTED ON PORTABLE SUPPORTS. THESE ARE USUALLY USED FOR SHORT-TERM OPERATIONS TO WARN AND GUIDE TRAFFIC. ADVANCED WARNING SIGNS (CONSTRUCTION AHEAD) SHALL BE MOUNTED ON STATIONARY SUPPORTS SEVEN DAYS PRIOR TO THE SEAL BEGINNING OF CONSTRUCTION OF THE ROADWAY. 18. ALL DRUMS SHALL BE BALLASTED IN SUCH A MANNER THAT THEY WILL BE STABLE UNDER WIND AND VEHICLE ACTION. BALLASTING SHALL BE DONE WITH SANDBAGS OR OTHER YIELDING MATERIAL SITUATED IN THE BASE OF THE DRUMS. p�QpF*E8 19. CONSTRUCTION WORK SHALL NOT BE ALLOWED ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA, UNLESS THE ROADWAY IS 5 AL ' MEDIAN DIVIDED. 40016 20. AT THE END OF EACH WORK DAY THE CONTRACTOR SHALL BACKFILL UP TO THE EDGE AND ELEVATION OF THE EXISTING PAVEMENT AREAS WITHIN 2 . 7� • •' U . 4 FEET OF AN OPEN TRAVEL LANE THAT INCLUDE A DROP OFF OF MORE THAN 3 INCHES IN ACCORDANCE WITH THE WATCH (SEE FIGURE 1). 21. PAVEMENT MARKINGS ARE TO BE INSTALLED BY THE CONTRACTOR. PRE -LINES MUST BE APPROVED BY THE COUNTY OR NCDOT PRIOR TO PLACEMENT �1j,�1 taf���=v-�{'! 1 OF THE PAVEMENT MARKINGS. SWIM / PCO BUFFER NOTES 1. BUFFER WIDTHS ARE SHOWN AND LABELED ON PLANS AND ARE CORRECT BASED ON POLARIS. 2. PLANS INDICATE THAT ALL ENGINEERED CHANNELS, PIPED OUTFALLS, AND RIP RAP APRONS END OUTSIDE OF THE BUFFER. 3. DRAINAGE OUTFALLS MUST BE DESIGNED TO ALLOW WATER TO SHEET FLOW ACROSS THE BUFFER TO FILTER OUT POLLUTANTS. 4. ENERGY DISSIPATORS, DIVERSION DEVICES OR WETLAND FLOW MUST BE USED TO SPREAD CONCENTRATED FLOWS AND MUST BE LOCATED OUTSIDE THE BUFFER AREA. ADEQUATE VEGETATIVE COVER MUST BE RETAINED OR RE-ESTABLISHED BELOW ENERGY DISSIPATORS TO PREVENT EROSION. 5. NO OUTLET DRAINS MORE THAN 10 ACRES DRAINAGE AREA TO ANY ONE POINT IN A STREAM BUFFER. 6. WHERE DISTURBANCE TO THE BUFFER IS SHOWN, A LETTER FROM WATER QUALITY IS REQUIRED STATING THAT THE DISTURBANCE SHOWN IS ALLOWABLE OR WHETHER A MITIGATION PLAN HAS BEEN APPROVED. 7. ALL TEMPORARY SEDIMENT BASINS AND ALL OTHER EROSION CONTROL DEVICES ARE LOCATED OUTSIDE OF THE MINIMUM BUFFER WIDTH. 8. BUFFER DELINEATION: • BUFFER AREA IS CLEARLY IDENTIFIED ON PLANS IN BOLD, CLEAR TYPE AS "SWIM / PCO STREAM BUFFER". • THE OUTSIDE BOUNDARY OF EACH BUFFER ZONE IS CLEARLY MARKED AND LABELED ON PLANS (STREAM SIDE, MANAGED USE, UPLAND). • FIELD LOCATED TOP OF BANK FROM WHERE THE BUFFER WIDTH IS MEASURED IS LABELED ON PLANS. • SHOW ORANGE FABRIC FENCING ON GRADING AND EROSION CONTROL PLANS. • STREAMS AND BUFFER BOUNDARIES INCLUDING THE DELINEATION OF EACH ZONE AND A DIMENSION FROM A SPECIFIC LOCATION ARE SHOWN ON ALL SURVEYS AND RECORD PLATS, INCLUDING INDIVIDUAL RECORD PLATS FOR ANY LOTS AFFECTED. • WHERE APPLICABLE FOR 100' BUFFERS/50% ADDITIONAL WIDTH: PROVIDE CALCULATIONS FOR 50% ADDITIONAL WIDTH BASED ON THE AREA BETWEEN THE CURRENT 100-YEAR FEMA FRINGE BOUNDARY TO THE 100' SWIM BUFFER OR THE 0.1 FLUM ENCROACHMENT LINE, WHICHEVER IS LESS. 9. THE STREAMSIDE ZONE OF THE BUFFER MUST BE LEFT COMPLETELY UNDISTURBED. IN THE MANAGED USE ZONE, A LIMITED NUMBER OF TREES CAN BE REMOVED PROVIDED THAT THE TREE DENSITY REMAINING IS A MINIMUM OF 8 HEALTHY TREES OF A MINIMUM 6-INCH CALIPER PER 1,000 SQUARE FEET. REMOVAL OF EXISTING VEGETATION MUST BE PERFORMED IN SUCH A MANNER AS TO PREVENT DAMAGE TO THE ROOTS OF REMAINING TREES. 10. PLANS CLEARLY INDICATE THAT NO FILL MATERIAL IS TO BE BROUGHT INTO THE BUFFER AND THAT NO STRUCTURES ARE ALLOWED WITHIN ANY OF THE BUFFER AREAS (EXCEPT NON-COMMERCIAL OUT BUILDINGS NOT EXCEEDING 150 SQUARE FEET). 11. GRADING AND OTHER LAND -DISTURBING ACTIVITIES ARE ALLOWED ONLY IN THE UPLAND ZONE; HOWEVER, THESE ACTIVITIES MUST BE PERFORMED IN SUCH A MANNER AS TO PREVENT DAMAGE TO THE ROOTS OF REMAINING TREES. GRASS OR OTHER SUITABLE GROUND COVER CAN BE APPLIED TO THE UPLAND ZONE. 12. THE OUTSIDE BOUNDARY OF THE BUFFER MUST BE CLEARLY MARKED WITH ORANGE FABRIC FENCING PRIOR TO ANY LAND -DISTURBING ACTIVITIES (GRADING, TREE -CUTTING OR STUMPING, ETC.) AT THE SITE AND THIS FENCING MUST BE CALLED OUT ON THE PLANS. 13. THE OUTSIDE BOUNDARY OF THE STREAM BUFFER MUST BE PERMANENTLY MARKED WITH AN IRON PIN OR OTHER ACCEPTABLE PROPERTY CORNER MARKER AT STREET CROSSINGS AND THIS MARKER MUST BE CALLED OUT ON THE PLANS. 14. ANY ACTIVITY IN THE BUFFER MUST ALSO COMPLY WITH THE APPLICABLE ZONING ORDINANCE. 15. STREAM BUFFERS MUST BE SURVEYED AND CLEARLY MARKED IN THE FIELD PRIOR TO THE PRE -CONSTRUCTION MEETING WITH THE WATER EROSION CONTROL & WATER QUALITY INSPECTOR: CHANELL HATCH (980) 505-5775 LAND DEVELOPMENT INSPECTOR: TOMMY KEZIAH (704) 635-6753 ZONING INSPECTOR: BRIAN SIFFORD (980) 721-0924 KEY PLAN QUALITY STAFF. 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY CHECKED BY DATE TITLE BML BML MAY 31, 2019 GENERAL NOTES PROJECT NO. 501 04981 C0001 1 3 0 5 Dewberry E C GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last [and disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled sized and laced appropriately for the needs of site p 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA Environmental Quality ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER k0. `r"' FARV,ue.T� IETEMO M NLl ^II�� �l`arxET w� ara ImN OCVa Wrlm•' IOU E M OOZR WOOIR E M �2 V�OOR f1O1131OFi OWL i11rL'IIRT OWL = IOIIrMED t IIVIrNO MOII M lO® NOM MOt M lAY MON OLOI OLO OJOO TO{ V M iIOC11Rt r�/ 1M0 �n< ELM amonc WOWr mnCfuz Imr m E &M rc MFi v nOE1O11R ar..r W.o ,•W aw•a rorac rav¢ arcane v�van sn�enrz BELOW GRAB& WASHBUT STRUCTURE ABOVE GRADE 46MUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If Iota[ standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at [east 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at [east one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. � NCGO 1 GROUND STABILIZATION AND MATERIALS HANDLING I EFFECTIVE: 04/01/19 1 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&sC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevztions and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendardays, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendardays, a report that includes an evaluation of the 122.41(m)(3)] quality and effect ofthe bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendardays, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. +<r1 NORTH CAROLINA ll Environmental Quality 15 rI NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 EROSION CONTROL & WATER QUALITY INSPECTOR: CHANELL HATCH (980) 505-5775 LAND DEVELOPMENT INSPECTOR: TOMMY KEZIAH (704) 634-6753 ZONING INSPECTOR: BRIAN SIFFORD (980) 721-0924 Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 Cn W H J m Z) 06 O WWU � 2 w 00 W J m SEAL KEY PLAN U) Z UJ G U 0 0 Z 0 U U) Z 0 U 0, O 0 T Q Z_ Z J O Ov (D = CC ~ m0 Z W Z O w � 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 NC-GO1 DETAILS PROJECT NO. 501 04981 COmO2 LEGAL DESCRIPTION ALTA COMMITMENT CHICAGO TITLE INSURANCE COMPANY File Number: 17-2806 SCHEDULE B - SECTION II EXCEPTIONS Arv s comments are in brackets]. AS TO PARCEL. 1 ONLY: 8. Easement(s) to Duke Power Company recorded in Book 1025, Page 6, Book 938, Page 632, Book 938, Page 634 and Book 3128, Page 434, Mecklenburg County Registry. [These are all "blanket" easements and give no indication, other than the grantor's name, as to where the encumbered property is located. No determination can be made), 9. Easement(s) to Southern Bell Telephone and Telegraph Company recorded in Book 1121, Page 596, Mecklenburg County Registry. [The width of the easement is illegible, and the location of the encumbered property is indeterminable]. 10. Right of Way Easements to Colonial Pipeline Company recorded in Book 2365, Page O1 405 and Book 2365, Page 411, Mecklenburgn County Registry. [Book 2365, Page 405 affects Tract 3 as shown hereon. Book 2365, Page 411 does not affect any of Parcel 1 or 2 and is not shown hereon.] 11. Right of Way Easements to Colonial Pipeline Company recorded in Book 321, Page 397 [contains an erroneous reference to Cabarrus County], Book 330, Page 529 [corrects the previously mentioned error], Book 324, Page 489 [describes a 75' wide easement], and Book 484, Page 419 [presumably intends to change the 75' width Omentioned previously to 70' wide, upon the same property], Cabarrus County Registry, 1 1 [As DB 321 Pg 397 contains an error, it is not referenced on the survey. DB 330 Pg 529 affects a northern portion of Tract 1 as shown hereon. As there is no other evidence to support the existence of a 75' wide easement, DB 324 pg 489 is not referenced on the survey. DB 484 Pg 419 affects the Tract 1 as shown hereon. Please note - The surveyor has no evidence of an easement deed that covers the gasline at the southern "triangular tip" of Tract 1.1 12, Right of Way and Easement to Water and Sewer Authroity of Cabarrus County 1 2 recorded in Book 2126, Page 84, Cabarrus County Registry. [Affects a portion of Tract 1 as shown hereon]. 13. Grant of Sewer Easement recorded in Book 5041, Page 244, Cabarrus County 13 Registry. [Affects a portion of Tract 1 as shown hereon]. 14, Easement Agreements in favor of the City of Charlotte recorded in Book 17752, 14 Page 421 and Book 19176, Page 1, Mecklenburg County Registry. [DS 17752 Pg 421 is a water line easement and affects Tract 3 as shown hereon. DB 19176 Pg 1 affects Tract 2 and Tract 3 as shown hereon]. 15. Right of Way Agreement in favor of Duke Power Company LLC d.b.a. Duke Energy Carolinas, LLC recorded in Book 21338, Page 826, Mecklenburg County Registry. [Affects the Mecklenburg County portions of all Tracts, and is a "blanket" easement, and cannot be plotted]. 16. Easement Agreements in favor of the City of Charlotte recorded in Book 22537, 16 Page 367, Mecklenburg County Registry. [Affects Tract 2 as shown hereon]. 17. Right of Way Agreement in favor of Duke Power Company LLC d.b.a, Duke Energy Carolinas, LLC recorded in Book 22858, Page 247, Mecklenburg County Registry. [Affects the Mecklenburg County portions of all Tracts, and is a "blanket" easement, and cannot be plotted]. 18. Grant of Easements in favor of Time Warner Entertainment - Advance/Newhouse Parthership recorded in Book 23353, Page 720, Mecklenburg County Registry, [Affects the Mecklenburg County portions of all Tracts, and is a "blanket" easement, and cannot be plotted]. 19. Grant of Easements in favor of Time Warner Entertainment - Advance/Newhouse Parthership recorded in Book 8300, Page 258, Cabarrus County Registry. [Affects the Cabarrus County portions of Tracts 1 and 2, and is a "blanket" easement, and cannot be plotted]. 20. Driveway Easement in favor of The Summers Family Holding Company, LLC 20 recorded in Book 25880, Page B03, Mecklenburg County Registry. [Affects Tract 4 as shown hereon]. 21. Right of Way Agreement in favor of Duke Energy Carolina, LLC recorred in Book 27247, Page 814, Mecklenburg County Registry. [To the best of the surveyor's determine this affects Lot number 89 as recorded in Map Book 48, Page 197 which is not a part of the land described in this commitment]. 22. Building restruction lines, easements and other matters shown on plat recorded in 22 Map Book 52, Page 963, Mecklenburg County Registry. [Affects Tract 4 as shown hereon]. 23, Building restriction lines, easements and other matters shown on plat recorded in 23 Map Book 61, Page 30, Cabarrus County Registry. [The only matter of note is the gas line easement which is previously mentioned in exception 11]. 24, Grant of Easement in favor of Piedmont Natural Gas Company, Inc, recorded in 24 Book 10202, Page 97, Cabarrus County Registry. [Affects Tract 1 as shown hereon]. 25. Access to Parcel 1, Tract 1 is only available over Parcel 1, Tract 2. [In the surveyor's opinion, following the same logic, access is apparently likewise available over Parcel 2 unless there is a specific unknown reason to the contrary]. AS TO PARCEL 2 ONLY: 27. Right of Way Agreement to Board of Transportation recorded in Book 437, Page(s) 234 and 236, Cabarrus County Registry. [Does not affect subject parcel (deed describes property in another township)]. O28. Building restriction lines, easements and other matters shown on plat recorded in 2g Map 51, Page 109, Cabarrus County Registry, [Said plat shows a future 20' sanitary sewer R/W, but there are no related dimensions. There is no existing sanitary sewer on the subject property. No matters shown hereon]. 29. Easements to North Carolina Department of Transportation recorded in Book 2693, Page(s) 321, Book 476, Page 264, Book 476, Page 265 and Book 483, Page 244, Cabarrus County Registry. [Does not affect subject parcel (deed describes property in another township)]. 30. Right of Way Agreement to Duke Energy recorded in Book 6306, Page 90, Cabarrus County Registry. [Is a "blanket" easement and cannot be plotted]. 31. Easement(s) to CTC Exchange Services, Inc. recorded in Book 6473, Page 296, Cabarrus County Registry. [Is a "blanket" easement and cannot be plotted]. 32. Easement(s) to Duke Energy Corporation recorded in Book 7526, Page 191, Cabarrus County Registry. [Is a "blanket" easement and cannot be plotted]. 33. Grant of Easements in favor of Time Warner Entertainment - Advance/Newhouse Parthership recorded in Book 7818, Page 49, Cabarrus County Registry, [Is a "blanket" easement, and cannot be plotted]. Parcel 1, part of Tract 1 Cabarrus County Tax Parcel - 46723522890000 COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N: 621467.07' E: 1469790.62'; thence, South 63°42'41" East 102.02' to "PIPE" having coordinates N: 621012.21' E: 1470711.42', thence, N39°05'09"E 3962.07' to an existing #5 rebar, the POINT OF BEGINNING, in the line of Ragan Cummings LTD as recorded In the Cabarrus County Registry DB 4009 Pg 337, and In the Mecklenburg County Registry in DB 11839 Pg 661; thence with Ragan Cummings the following two calls: (1) N14°43'42"W 502.52' to an existing #6 rebar; (2) N87°39'15"W 368.71' to an existing stone; thence N85°21'13"W 42.24' to a point on the Cabarrus and Mecklenburg County line; thence with the Cabarrus and Mecklenburg County line N20'13'53"W, passing through an existing concrete monument on the Cabarrus and Mecklenburg County line at 103.27', the northeast corner of MF Summers Walk Investments, LLC. , DB 27770 Pg 231 (Mecklenburg County), thence continuing along the Cabarrus and Mecklenburg County for a distance of 1414.48' for a total distance of 1517.75' to a point in the centerline of West Branch of Rocky River; thence following the centerline of the river the following five calls: (1) S81°30'00"E 357.66' to a point; (2) S74°23'24"E 704.04' to a point; (3) N58'57'44"E 345.92' to a point; (4) N74°58'23"E 529.44' to a point; (5) S80°49'36"E 183.92' to a point; thence with the line of Robert Glenn Hill Sr. as recorded in DB 596 Pg 229, S00°07'56"E, crossing an existing #5 rebar at 43.00', for a total distance of 853.57 to an existing axle; thence with the lines of Robert Glenn Hill, Sr., Robert Hill Glenn, Jr as recorded in DB 4089 Pg 171, 503°02'24"E, passing through a 3/4" existing iron pipe at 379.58', the northwest corner of MF Summers Walk Investments, LLC, DB 10770 Pg 123 (Cabarrus County) a total distance of 391.36 to an existing #6 rebar; thence with MF Summers Walk Investments, LLC, DB 10770 Pg 123 (Cabarrus County) S03"02'57"E 212.18' to an existing #4 rebar, the northeast corner of James Wallace Ranson as recorded in PB 61 Pg 30; thence with the boundary defined in PB 61 Pg 30 the following ten calls: (1) N65'05'20"W 6.72' to an existing #4 rebar; (2) a curve to the o„ left Navin a radius of 280.00 and a chard bearing and distance of N76 12 35 W i3 g 108.01' to an existing #4 rebar; (3) N87°19'49"W 45.46' to an existing #4 rebar; (4) a curve to the right having a radius of 217.00' and a chord bearing and distance of N70°23'17"W 126.47' to an existing #4 rebar; (5) N53°26'45"W 26.91' to an existing #4 rebar; (6) a curve to the left having a radius of 30.00' and a chord bearing and distance of S85`33'24"W 39.36' to an existing #4 rebar; (7) a curve to the right having a radius of 180.00' and a chord bearing and distance of 565'41'09"W 129,76' to an existing #4 rebar; (8) S03°02'30"W 144.47' to an existing #4 rebar; (9) N86"56'30"W 191.10' to an existing #4 rebar; (10) 534°50'22"W 562.79' to the POINT OF BEGINNING, containing 58.130 acres, as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., and sealed by Jeffrey C. Allen, PLS (L-3810). LEGAL DESCRIPTION Parcel 1, part of Tract 1 Mecklenburg County Tax Parcel - 00747110 COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N: 621467.07' E: 1469790.62'; thence, South 63°42'41" East 1027.02' to "PIPE" having coordinates N: 621012.21' E: 1470711.42'; thence, N39"05'09"E 3962.07' to an existing #5 rebar in the line of Ragan Cummings LTD as recorded In the Cabarrus County Registry DB 4009 Pg 337, and in the Mecklenburg County Registry in DB 11839 Pg 661; thence with Ragan Cummings the following two calls: (1) N14°43'42"W 502,52' to an existing #6 rebar; (2) N87°39'15"W 368,71'to an existing stone; thence N85°21'13"W 42.24' to a point on the Cabarrus and Mecklenburg County line, THE POINT OF BEGINNING; thence N85°21'13"E 140.27' to an existing stone, thence N16'54'18"W 17.28' to an existing #4 rebar, thence N57"41'28"E 129.11' to an existing concrete monument on the Cabarrus and Mecklenburg County line; thence, 520°13'53"E 103.27' to the POINT OF BEGINNING, containing 0.176 acres, as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., and sealed by Jeffrey C. Allen, PLS (L-3810). LEGAL DESCRIPTION Parcel 2 Cabarrus County Tax Parcel - 46724437100000 LEGAL DESCRIPTION Parcel 1, part of Tract 2 Mecklenburg County Tax Parcel - 00747199 COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N: 621467.07' E: 1469790.62'; thence, South 63°42'41" East 1027.02' to "PIPE" having coordinates N: 621012.21' E: 1470711.42'; thence, N39°05'09"E 3962.07' to an existing #5 rebar in the line of Ragan Cummings LTD as recorded in the Cabarrus County Registry DB 4009 Pg 337, and in the Mecklenburg County Registry in DB 11839 Pg 661; thence with Ragan Cummings the following two calls: (1) N14'43'42"W 502.52' to an existing #6 rebar; (2) N87'39'15"W 368.71' to an existing stone; thence N85°21'13"W 42.24' to a point on the Cabarrus and Mecklenburg County line, THE POINT OF BEGINNING; thence S20°13'53"E 74.48' to a point on the Cabarrus and Mecklenburg County line; thence with Ragan Cummings crossing the County Line, S13°48'53"W 66.12' to an existing #5 rebar, the northeast corner of Lot 128 as recorded in MB 48 Pg 199 Mecklenburg County; thence with the northerly boundary lines of Lots 122-128, MB 48 Pg 199, S72"25'17"W 541.15' to an existing #4 rebar; thence continuing with the northerly line of Lot 122 and Lot 121, MB 48 Pg 199, and with the northerly line of Lot 120 as recorded in MB 53 Pg 894, S65'32'06"W 89.42' to a northern corner of Lot 120; thence with Lot 120 the following two calls: (1) 533°45'41"W 66.78' to an existing #4 rebar; (2) S06°07'40"E 48.63' to an existing #4 rebar, the northeast corner of Lot 119 as recorded in Map Book 48 Page 199; thence with Lot 119, N77°50'49"W 135.4l' to an existing #4 rebar, the northwest corner of Lot 119, and the eastern Right -of -Way of Summers Walk Boulevard; thence along the Right -of -Way a curve to the right having a radius of 320.00' and a chord bearing and distance of N14°11'27"E 22.76 to an existing #4 rebar; thence along a line with the existing terminus of Summers Walk Boulevard, Lot 118A as recorded in MB 53 Pg 288, and a COS lot as recorded in MB 48 Pg 197, N73°46'17"W 196.50' to an existing #4 rebar in the line of a nature preserve owned by Mecklenburg County as recorded in MB 51 Pg 334; thence with the nature preserve the following seven calls: (1) N34°29'11"E 329.67' to an existing #4 rebar; (2) N56°33'36"E 79.61 to an existing #4 rebar; (3) S27°49'50"E 140.11' to an existing #4 rebar; (4) a curve to the right having a radius of 380.00' and a chord bearing and distance of N67°17'42"E 67.91' to an existing #4 rebar; (5) N72°25'17"E 358.16' to an existing #4 rebar; (6) a curve to the left having a radius of 200.00' and a chord bearing and distance of N65"03'23"E 51,28' to an existing #4 rebar; (7) N57°41'28"E 24.58' to a #4 rebar set; thence, 516"54'18"E 17.28' to an existing stone, thence S85°21'13"E 140.27' to the POINT OF BEGINNING, containing 4.569 acres, , as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., and sealed by Jeffrey C. Allen, PLS (L-3810). Parcel 1, part of Tract 2 Cabarrus County Tax Parcel - 46722465960000 COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N: 621467.07' E: 1469790.62'; thence, South 63`42'41" East 1027.02' to "PIPE" having coordinates N: 621012.21' E: 1470711.42'; thence, N39°05'09"E 3962.07' to an existing #5 rebar in the line of Ragan Cummings LTD as recorded in the Cabarrus County Registry DB 4009 Pg 337, and in the Mecklenburg County Registry in DB 11839 Pg 661; thence with Ragan Cummings the following two calls: (1) N14"43'42"W 502.52' to an existing #6 rebar; (2) N87°39'15"W 368.7l' to an existing stone, THE POINT OF BEGINNING; thence S8513°48'53"W 68.44' to a point on the Cabarrus and Mecklenburg County line, thence with the Cabarrus and Mecklenburg County line N20'13'53"E 74.48' to a point on the Cabarrus and Mecklenburg County line, thence N85°21'13"W 42.24' to the POINT OF BEGINNING, containing 0.033 acres, as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., and sealed by Jeffrey C. Allen, PLS (L-3810). COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N: 621467.07' E: 1469790.62'; thence, South 63°42'41" East 102.02' to "PIPE" having coordinates N: 621012.21' E: 1470711.42'; thence, N39'05'09"E 3962.07' to an existing #5 rebar in the line of Ragan Cummings LTD as recorded in the Cabarrus County Registry DB 4009 Pg 337, and in the Mecklenburg County Registry in DB 11839 Pg 661; and the corner of Ranson, DB 2720 Pg 66 (Cabarrus County), thence with the line of Ranson and Ramsey, DB 5428 Pg 004 (Cabarrus County) N34°50'22"W 562.79' to an existing #4 rebar, thence with line of Ramsey, DB 5428 Pg 004 (Cabarrus County), S86°56'30"E 191.10' to an existing #4 rebar, thence with the lines of Barber, DB 9049 Pg 144 (Cabarrus County) and Ranson DB 2720 Pg 66 S86°56'30"E 470.31' to an existing #6 rebar, the POINT OF BEGINNING, and the southwest corner of subject property, thence with Ranson and MF Summers Walk Investments, LLC (DB 10224 Pg21), N 03°02'57" W, passing through an existing #4 rebar at 136.85', for a total distance of 349.03' to an existing #6 rebar; thence N 03°02'24" W 11.78' to an existing 3/4" iron pipe, the southwest corner of Hill (DB 4089 Pg 171); thence S 89°46'11" E 358.48' at an existing #5 rebar at the northeast corner of the subject tract, thence with the west lines of Lots 8 through 11, Shiloh Village subdivision Plat Book 51 Page 109 of the Cabarrus County Registry; S 22°56'04" W, passing through an existing #4 rebar at 149.74', an existing #4 rebar at 343.46', an existing #4 rebar at 443.54', for a total distance of 468.55' to an existing #5 rebar in the line of Ransom (DB 2720 Pg 66); thence with Ranson, N 65°07'33" W 172.73'to the POINT OF BEGINNING, containing 2.411 acres, as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., signed and sealed by Jeffrey C. Allen, PLS (L-3810). To M/I Homes of Charlotte, LLC and Morehead Title Company: LEGAL DESCRIPTION Parcel 1, Tract 3 Mecklenburg County Tax Parcel - 00747101 COMMENCING at North Carolina Geodetic Survey monument "MAC" having coordinates N:621,467.07' E: 1,469,790.62'; thence, South 63°42'41" East 1,027.02'to "PIPE" having coordinates N: 621,012.21' E: 1,470,711.42'; thence, N39°59'25"E 748.25' to an existing #5 rebar, the POINT OF BEGINNING, and the southeast corner of Lot 8 as recorded in Map Book 49 Page 637; thence with Lot 8, N37'08'04"E 160.10' to an existing #4 rebar, the corner of Lot 8 and COS; thence with the COS lot, N36°12'30"E 588.45' to an existing #4 rebar, the southern corner of a Common Open Space and the Right -of -Way of Bradford Walk Lane as recorded in MB 49 Pg 659; thence with the COS, N40°39'50"E, crossing a #4 rebar set at 134.50', for a total distance of 154.50' to a point in the centerline of a creek and the corner of a COS as recorded in MB 48 Pg 201; thence with the COS and crossing a 70' gasline easement, N77°36'14"E, crossing a #4 rebar set at 20.00', for a total distance of 107.85' to an existing #5 rebar, the southwest corner of Lot 63 as recorded in MB 48 Pg 201; thence with Lots 63 through 59 as recorded in MB 48 Pg 201 the following three calls: (1) S40'32'27"E 130.85' to an existing #5 rebar; (2) 556°29'46"E 152.98' to an existing #4 rebar; (3) S69°57'43"E 82.23' to an existing #5 rebar in the line of EGC Holdings, LLC as recorded in DB 21571 Pg 723; thence with EGC Holdings, S20'02'17"W 836.70' to an existing 1" iron pipe, the northwest corner of Milsaps as recorded in DB 4887 Pg 809; thence with Milsaps, S20'19'39"W 676.13' to an existing #4 rebar on the Right -of -Way of NC Highway 73, a.k.a. Davidson Concord Road; thence with Hwy 73, N66'29'09"W 278.63' to an existing masonry nail; thence with the Right -of -Way of Summers Walk Boulevard as recorded in MB 49 Pg 637 the following eight calls: (1) a curve to the right having a radius of 20.00' and a chord bearing and distance of N21°29'09"W 28.28' to an existing #4 rebar; (2) N23°30'51"E 90.01' to an existing #4 rebar; (3) a curve to the left having a radius of 486.00' and a chord bearing and distance of N20'46'11"E 46.54' to an existing #4 rebar; (4) a curve to the left having a radius of 423.40' and a chord bearing and distance of N08°06'57"E 126.20' to an existing #4 rebar; (5) N00°09'57"W 36.05' to an existing #4 rebar; (6) a curve to the left having a radius of 475.04' and a chord bearing and distance of N07°04'48"W 97.49' to an existing #4 rebar; (7) a curve to the left having a radius of 480.00' and a chord bearing and distance of N23°35'11"W 177.64' to an existing #4 rebar; (8) N34°15'00"W 248.32' to the POINT OF BEGINNING, containing 17,501 acres, as shown on a survey, dated December xx, 2017, by Allen Geomatics, P.C., and sealed by Jeffrey C. Allen, PLS (L-3810). Parcel 1, Tract 4 Mecklenburg County Tax Parcels - 00747112 and 00747113 Being all of that certain 0.929-acre tract of land designated as COS "Dog park" and that certain 1.444-acre tract designated as Parcel "A" on plat entitled "Minor Subdivislon Final Plat Summers Walk Part of Phase 1, Map 1" recorded in the Office of the Register of Deeds of Mecklenburg County in Map Book 52, Page 963. This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for ALTA/NSPS land Title Survey, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 4, 6, 8, 1 1 , 16, & 19 of Table "A" thereof. the fieldwork was completed on 1 1 /28/ 17. Date of Plat of Map: 11/29/17 Jeffrey C. flan, rofessional Land Surveyor , fitA CA,`0 '% <L�OF S 31 ON SEAL = L-3810 - �''v���'NO SURD'. �''''�►, r C'r+++ Page 1 of 3 ALTA/NSPS Land Title Survey M/1 Homes of Charlotte, LLC Cabarrus County and Mecklenburg County NORTH CAROLINA xxxx' 0 xx' xx' xx' C0003 The Farm at Riverpointe c Homl eowners Assoe ation . . / ' ¢ Wayne Patrick Holdings LLC 20' sanitary PIN: 467236g3510000 William Jason Brumley r n Partnership y Sewer Easement . 8 17 1. 8 Rive Run P rs p LTD �, PIN: 4672z85183ob00 \ ,/ D$ 4 PG 2 nd Sybil Brumley PIP: 0074g106 �+�d'�a ; DB 8782 PG 132 PS 52 PG46, `COS, PO 52 PG 46, "The Farm PIN: 46724653410000 DB 6245 PG 690 ''' Cabarrus County , at River^ ointe Phase 2 Ma 3 • ; ; o'� ; ; ; ; ; ; ; 1 ; ; Wayne Patrick Holdings LLC ; ; :\ ; 1 ; p � p ; G 26 Wayne Patrick Holdings LLC PIN' 46723640360000 PB 5626 P P1N: 4ro722671310000 ' DB 8782 PG 132 DB 8782 PG 132 . ; ; ; ; Common Area, Pia 61 PG 55 / ION. 2' 80.4936`E' ' "The Farm at Riverpointe,r;v+X 183.g2: ' PT Phase 4A Map V' . ' ; ; ; r- • �` + :rN ,' ,: �:S ;., ; ; ; : : ; : : : ; ; 20 aSsaenmteanrty West ewerB�7CDB 5041P244/_ ; #5EIR 8130OfROCky iv .-.66' 10"r S `1' • . �' {5EIR / 24 d \• ; 1150ut '�' ofr� ; ; ; /• �r . ; jam. �. S ; ; , Tpe74.E 55 , /; \ Z Sanitary 704 Q j `�.; Sewer pump �• 04� r ; vault . I Z 1 _ -~ SS ��'��`v� -�' !' . SPECIAL FLOOD WIZARD AREA . ' • \ \ \. 1 SS; - ',�' i� 'i C1 SUBJECT TO INUNDATION BY THE 1% ANNUAL CHANCE FLOOD EVENT \ . �. rI `�: ; ; ; ; ; ; ,� 5 G� ZONE; AE �, �; ZbQ FEMA - FLOOD INSURANCE RATE MAP ' f% 1 �' 1` �. ' _ _c`; - Tj•� 1 5g ; . 12 •� p6'L� PANEL 4672 MAP NUMBER; 3710467200K 0 : ; �- SS :� : ' ~� 5y, DATED; March 2, 2009 SPECIAL FLOOD HAZARD AREA �CID SUBJECT TO INUNDATION BY THE 196 ; ; ; ; 1 ; ; I. ANNUAL CHANCE FLOOD EVENT �- ,� ; ; ; OD l , ; ZONE; AE ` FEMA - FLOOD INSURANCE RATE MAP v PANEL 4672 �, Fw MAP NUMBER; 3710467200IC ; ; N DATED: March 2, 2009 Robert Glenn Hill, Sr PIN: 4672455433C000 r, SUBJECT TO INUNDATION BY THE 0.2% q" P13 5476 PG =4 0 ANNUAL CHANCE FLOOD EVENT SUBJECT TO INUNDATION BY THE D.2°5 Mecklenburg County ; : l ~ ANNUAL CHANCE FLOOD EVENT ZONE: X (SHADED) ; ,�• ; ; ; ; PIP: 007471 q 8 ` ZONE: x (SHADED) ^o DB 2422 8 PG 3 q0 + �, I ,• : ; MB 51. PC 334 "West Branch Nature Preserve '� ' For Mecklenburg County" Na I I 1 1 Q�° / EAX /CAq I � I PIN 467235228 g0000 PS 10224 PG 21 / I(Cabarrus County) / u, Call / Curve Table Course Bearing Distance L1 N 65'05 20 W 6.72 L2 Rod: 280.00 Chd: N 7612'35" W Arc: 108.69 108.01' L3 N 8719 49 W 45.46 L4 Rod: 217.00 Chd: N 70'23'17" W Arc: 128.33 126.47' L5 N 53'26 45 W 26.91 L6 Rod- 30.00 Chd: S 85'33'24" W Arc: 42.93 39.36' L7 Rod: 180.00 Chd: S 65'41'09" W Arc: 132.74 129.76' L8 S 33'45 41 W 66.78 L9 S 06'07 40 E 48.63 L10 Rod: 320.00 Chd: N 14'11'27" E Arc: 22.76 22.76' L11 Rod: 380.00 Chd: N 67'17'42" E 68.00 67.91' L 12 N 20' 13 53 W 50.00 L13 I N 85'21 13 W 42.24 L14 N 85'21 13 W 140,27 L15 N 16*5418 W 17.28 I 58.13U Acres Parcel 1, Tract 1 1 23 w \ Robert Glenn Hill, Jr C j and Melinda Hill \ � / PIN: 46724540330000 PB 408 q PG 1-71. no4EIR ` t on subject \ \ / property tine) / 4.66` Tie lin73'Tie IimE e g S 8W46' 11 "E 358.48' (#4EIR to #5EIR) N 03'02'24"W - 11.78' #6EIR 5EIR N 14°07'56" E Open Space \ \ / Parcel 2 J line PB 51 PG 10q Tie Tie lin / /•��,�, _e � "Shiloh Village" \ ` z PB 51 Pg 10q �� 5EIR N 0 PIN 46 72443 7100000 / ,.d+ i Parcel 1, \ \ / N DB 10770 PG 123 Tract 1 \ \ / 14EIR (Cabarrus County} / 4EIR \ ram�r.. 4EIR B d / � � I o, PI D 00747110 \ \ ��+� tiA �S N In fog .'T 11 A G ��s14 p 1 _�W DO 27770 PG 231 '� \ / a' ' \ t> �a Clark Street .5' \ Q� v� 1-'1 L¢ o Fens is 1�/est Q' 4 , (PA AG fpi (Mecklenburg county}� ,�y ECM 24 a+aa �� 4EIR #4EIR L3 4EIR w of th� rbperty �"f ---Rl� �o O� L2 line 15� t this 1\ 0.176 Acres 5T �'� �'� ti� 1 #40 ( 4EIR / poi nt� James Wallace Ranson , 4E4 �r 4EIR Lf4 ' 11 fo PIN:46724402340000 i 28 ` \ { 4EI u` Ll3 STN o PO 2720 PG 66 J 5WT % #4EIR r = ` N 87'39 15 368.716EIR w 4EIR CI~'� / Mecklenburg County h��� �� s 355-A N 65'03'23"E / #4EIR 4EIR +s PIP: 007471g8 1Q' to .��"E t�rw �!N 46722465g6000O N 86'5630 191.10 4EIR 5 t 51.28 �-. D13 10224 PG 21 ReWest�g � PT N86°$6'30"W 470.31� � �` �- is West o the 660, 4 1R P133 24228 PG 3qO :r N R Arc 51.42 6EIR property N Oqs \ 4EIR 5 R� 'S �. s r) (Cabarrus County} Tie lineI ne 1.49 . MS 51 PG 334 �, U so+++� 37 pG S5 Rod 200.fl0 ;� c,� b at this poi t, 4g. r' 0.033 Acres I ss• r w l20 0) P� <ot a �; (�43 Gs West Branch Nature Preserve � 4EIR � � 55 � m` Patrick Sheldon Barber 3 for Mecklenburg County 55 3 PIP 0074719q .�3 4EIR'S�� S`2 p`z-z � �� �J 4EI / PB z7770 PG 231 James Wallace Ranson 2• rr� A 4 #_ � S. {�SEI •- Parcel 1 `� PIN., 723484730000 l� � `in' 1a ��� •�� 4EIR �o SS �, {Mecklenburg County} r� DB 904q PG 144 PrN: 46724402340000 3 5EIR i//4 9 moo• �����VN N 1`d+1 � / \ M. DO 2720 PG 66 se�� ,�'•e�� �4 Q1 Tract 2 �` / Dennis Lee Ramsey Page 3 of ,P� $`'�`er'4�.�j�,• 4.569 Acres ' $ Z ova and Jean P- Ramsey s��.•si �, r �2� Xi a Lot 128 Ra an Cummi s 7D ALTA NSPS Land Title Survey /0 4' `� k1 • l+n g ng L � a � � PIN: 46723463050000 \ � Y ti �j FEs Parcel 1 �.I St P o arty ( y) Oc,1f ^� PS 542 8 PG 004 "W r P a Cabarrus Count •►. s -I� uth g,d kit PIN• 467223gg670000 ^� / ��'M/I HomesTract 2 DB400gPC337 of Charlotte, LLCa�STMH / �e"`Lots 121 - 128 c� 23 Towns of Kannapolis and Davidson, Caborrus & Mecklenburg Counties i�N ►>9 914 // a0A1 4EI MB 48 PG 1qq / 3$ N / NORTH CAROLINA '� - , �y45 "Summers Walk, 1 i1 •c T q v< 4 �`'"`^r(ps^!'ter ' 4EIR 653 Phase ,Map " d�P� B -o N / `' 100' 50' 0 100' 200' 300' N r�r�r j 51 1 �� ; 73 Lot 121 d'j s* � 46 17 ' l -o.n3� /' 'a' we SCALE DATE JOB DRAWN ar ` o a� N �tirn++ i ij 1 =100 1 1 29 17 0260 JCA MCF n ` r 19 s0, 4EIR { 4EIR e -q �-a O L •G� �I r•� �t 3 H a ` ri I is 4EIR 1g 4 V �W - ' - 1 6` o rp CC[ �.00 3 a� 1 N 7Tg0.4a'iN }4EIR lie oa ni 00 it Ln aai 9 4 1 / James Wallace Ranson OD `� a • Lot 1.20 O r? 1 / PIN: 46724402340000 _ SAL ics yLot 11q MII s3 PG Sq4 DB 2720 PG 66-3810 sL ajo 5EIR e { M13 48 PG 1qg FC Summers NCGS Monument N: 624087.58' ` 'x `a ,� "MAC" 1 473,209.44' �.,��: ' • 4 SUR'�` "Summers Walk, Walk, LLC srrd� , 4 � '� LAND SURVEYING Phase 2, Ma 2" '� a+�drst ' a �''� ���`� Allen Geomatics, p E. 6 469 �so.762 0� a3e a �,� �,4 / Y C C ) e '1 ��rr+ii+i+ii� P.C. C-3191 NAD 83%2011 l0 �qZ„ ,� NCGS Monument NAfl 83/2011 PO Box 89, Advance, NC 27006 Combio� Factor-,ned Grid �TOz•(nt��// N: I621,fl12.21' Factor: ned Grid (336) 998-0218 www.AllenGeomatics.com C0005 0.99984702 E: 1,470,711.42 0.99984668 "Ye ne DN ° NC GR`D EiaO Holdings. LLC get. PIP.- 00747108 NO �1 DO 21571 PG 723 EGi3 Holdings, LLC � �o,� � SITE PIP: 00747107 DI3 29422 PG 61R IR son onoo ° -—; .,::`;;•::,,::::....::, I ( / t VICINITY MAP NTS MO 48tPC.r 201 Sq co J 111f 1 f Ile I 1 \ \ s zo•o2' 17"w 83s.7o' - "rsummers Walk, Phase 2, Map 31" IIII 1� L / /~ — . ♦ ///// // // / \ Lot 60 4EIR / MIS 40 PG 201 l;' r r r ` ='F�--��'� r� _�� _ _ = ` �w , / Jr I; , `-few'- _ // L f 30 cie i i 1 1 I I 1 1 1 r 11 i 11 ` ` �i 6T6:13 \ Summers Walk, f/ // I f \ r �� — �/ /� / -- j /- 1, /) Jill r r l f 1 1 I r I 1 11 t t b \ Phase 2, Map 3 — V ` \ 1 x11 4EIR ~ 6LL f \ \ of P f Q Lot61 MD48Pawl. � . /i / /,� F �— \\ i\ �� // /r�� /i�✓r —i//_ `f�-. \f1 // /�5 IIII \\ '"Summers Walk o� / / / 1'to °a�i/� \� — j '/� // / // _ `�?/ / r —� / /i r \ i Ji`r / r—r -� / ` L ` " \ 1\\ \ \\ -- \ 75' 6 ~ ~ \ \ \ f 1 i \ 80' Phase2,Map 3" �N / / �o �.✓^ __--r-'lrli / ! r-J� // //r ///j/�� \�\I� !f i� _ter/ Lam_` _ —� \ \ \\\ \ \ �\ \\ w��1 \ 0».n9)\ "Its \ r / — — \ \ 1 / 1 \\\\ \ \\ \ �% + I Lot 62 MS 48 PG 201 / /% �`� / / r _ j / / — >rr �� J // / r // / / �� f \ "rSummer5 Walk, / / _ ,✓ ,/' / / / / / / / / i % / — f - = i / / / / / /r ~ w� �� �� J� r `J \\\ \ 0 \ \\ \ \ M / / / / // /11�11 _ _ /�_ _ / _ \\ >\. \ 31� \ \ \ \ \ \ \ \ \ \ rc 5 / / / // r— \ \ \ \ \\-- \ \ \ \ \ I I• Phase 2, Map 3 � � / r r I / / r �_ � / r / _ y // '�"���•--_.—., � III / —� j\ �. r=��•�� \\ \ �� \\ Lot63 / / / / / // / / / / �� /� / 1— — I I �\ __--r , \ \\ \ \ I I \ l J.•,::'...,. / / // l ~ r / / / / // 40 J / -- — ! � r / -/ ' � r r / / i � ' � 1 / ✓ / ./ ` \ \ \ \ \ � ` 1 / 1 � \\ \ \ J i / / I i r r �r�•, � iS � MO 48 PG 201 -r / / / / / r /' // / — -- — / \ \ — f 1 1 \ \ r I �''t:,:::• / / / / / / r �� / //r/r it / I r \�"�-- \ C l ,/\ �� \ ~~ `� / ✓ \ 1 C 1 r �"' Summers Walk ,r l / / 1 r J Phase 2,map 3 n % �'' / » \ / / / / / / / ✓ � ,� ~ � �r_ � / � / / r �, � // / / / / r �% ar �t�� �� 1 \ \ � \\\ �. =� -� 4 / � ^ \ � � � �~ � \ i '-' / l / L �•�,��-�`.���`�`'/AL.I Gi \ \ \\\ ( i= // r �`_ , `� \ \ / 1 ' / I r9' » 1 �! j CQ Ile »/ / �` �E.i / / / 1 �' Jr0 �quac� f \ COS-gia�El i',ti1 / /f%� r / —y 7��r \ �1�~i —_�� _ ��� 1 ter— l 1 �l ram`/— \\ \1// r/ / �J\�_\tZ317t MB 48 PG ,�,/ — =�. \`\\ r / -+ . \ \ r —' / / / �- \ ""Summers W kr�r1�� —>>> ` / I I J Jr�— �� \\\\\\\\ / / 4»/� �— =�\\\� _\ f,7 - \ \ \ I r / Phasc3,.�+1-3 /\\ f v= I / / \ \\ ' ' ' i i/�`� �,\\�\\\/ / 1 i I 1 1 �I ! 1 I \\\�\ chl46s4 4 K / 7` �.�-- �' 1 r — ��\\\ \ \ J I 1 J / + I J\ \\\\ 11JJ I \ �— / / / /\ _~ —\ = ;,— • _ �� �sr. I 1 // /�� / / �� / / / �-"- _ � � /t •—�`\\\ \\ f \ l I 1 J } \ \ \\�}1 l�Jl / _ J \ � / / / /' \ — — � � 1 ��� -t'•' ., cv �.�� wM q / 1 °n` -t/—_ // �✓ \\\\\\\��\\ 1 \\ I I J 1 \\`i II\ _/f \ ~ 'ssMH r 0 0 I / _ r — _ �/ \\ ��� \Ili _ Aim 739.42' _ r / ♦ G`O� — 1 ./ / / / / / \��\�� — \\ / / i �y` l 111 / / — — r / / _ CI / N 21'2�b9"W / , V / /�+. / �� / ��-� ,� -- l 1 \ ` J l I / i Jill �1 _ / \� rnv�►r:�r2��T , .F / p �( J Rocr 20.00' M 48/PG 195 �' /i / — 1 / Inv out 72 0 In u T34.77' I Ch 8.28 �-:IvI r / \ ) I / —�/ In out 734.7�rrn�'�lPhha9e 2,r / / �� — • �•� \ / I 1 \ \ \ 11 / 1 1 1 " \`'1 li / / I l / -- — 4 N s 20. 3' 1 1 I SSMH S B 30 51 Rim 747.28 . \ _, Inv out 735.03 / 90.0 / COS r d 20.0 ' MO 44 PG 634 =% \ \\ \` / - \\ \ ` `� �. r � Nr 1 1 I I I I r J I 1 I i / 1 1 / i / / . Top 1fC 73849\ / r rl Summers WalkDI \�\� \\ \ °'► �� / 1 1 / 1 t / / r / / / // Inv YyL•733.54' �4 I I r J J 1 / / r l / , Phase I, MA 'r p `` \ d. I J 1 j I J l r I E 733.7V- I ; i ,�, r �� \ � f / /�/ � / r r \ N 8'29 09 -inv out 73 .35' / / / off: 52.oa / / // / ♦ /� �� - w L a4 I 1 ! I i / / / / I 1 / / / 1 r �' DI -j / � /op BC739.1' r� r/ +' y `� _. / / / dl g ! 1 / / \ i / / , / / / / / / / Inv = 73gd9 ' / r S op 7491� ' p /- 55M ` �fr ` / r �' ! .- �v� M9. 0' /2 Epp r^� J Rim714.54' / f/ /� / / / \ / Inv in = 709.24' / / Inv out - 709.04 404-t � �`rrrr`/r // // ,/ //�fr1.4� A t'eS/// �"~-- +�9� — 'Sfl / 47 Will �. — r �` \ 95MH / / T 35 A'18Rim741.19/ afiEp rq Inv in = A6.84'�- / Inv outer 726!49' \� \ \\���\\ ' \\\\ a•� — r`'`�� r _jam / \" cor6 �41/ \1 / COS j \ IR _ "7 1 I C�ofner / \ /� M3 44 PG 639 � / The Summers Family y Holding Group, LLC / "Summers Walk, I \ \ H� �r� / ��. / / PIP: 00747106 SSMH Phase I, Map Lot 8 �, DO 25371. PG 5 59 � I � I / Rim 692.38` Inv = 671.13' .. � \ MS44 PG 637 �eQ 1p "Summers Walk, Phase I, Map I" Lot g � 1 � / MO 4,? PC 639\ / \ \ "Summers Walk, Lot 10 Phase I, Map I" / / / MO 49 PG 639 7 15' , iv To 81DE 8 65 "Summers Walk, \ 1 1 \ x 4 ! Phase I, Map I" \ \ / r, � of i \ \ x �' \ \ • \ $ \ u\ of \ \+ Top BC 736.04' it �\\ Inv = 731.19 / / "rri' \ \ \ 4 \ \ 0.929 A rII \ \ I certify that this map was drawn under my direct and responsible charge from an actual ground survey made under my supervision; LEGEND /� �� �/� \ \ \ \ \ \ \ \ thak this ground survey was performed at the 95 percent confidence 4. 1 1 \ ` \ \ \ \ level to meet Federal Geographic Data Committee Standards: that EIR EXISTING IRON REBAR / /// // \ +\ \ 1 the original data was obtained 06 29 15 to 08 05 19• that all EPK EXISTING MASONRY NAIL / \\\\\ \ I \ \ 1 \ \ \ \ 1 elevations are based on NAVD88; that the boundary survey references IRS IRON REBAR SET C �/� i / //i //i/ — 1 r �1 I ^\ �` \ \ \ \ \ 1 15 8" E�R 1 ,the deed description recorded in Book 27770 and Page 331; /, / / /// / //i 1 I 11 ` ` \ \ \ \ \ \ \ `l that the ratio of recision does not exceed 1:10 000• TP TELEPHONE PEDESTAL C ntrgl �. �' that this map meets the requirements of The Standards of Practice ✓✓✓ //r ////' ~ _ \ \ ` \ \ \ ` \ \°e1� 1 for Land Surveying in North Carolina Title 21 NCAC 56.1600 R/W RIGHT OF WAY / // l } \ ��' \ \ \ \ 1 Y 9 � ). PID PARCEL IDENTIFICATION NUMBER NCGS NORTH CAROLINA GEODETIC SURVEY I— Ile Witness m or final signature, registration number Boundary and Topographic Surve NAD NORTH AMERICAN DATUM / /// �IJ� ~ , — g g• rYY / / /// //� � .' .^' / // j � 1 1 i I �1 \ ~ �� \ �\ ` \ \\ � and seal his Oth day of November, 2015. '/ /i /i --mod III 1 1 �\ �_� --/ / — — /� \ ._ EB ELECTRIC BOX / , / — — J / i I !I 1 1 _ �/ _ / \ IDS is or��{iJ. HeIW►S Summers Walk Phase 6 KITS NOT TO SCALE %/♦ / / 1 / l �`I 1 \Ill rr � / / � ♦ r 111 i 1 \ \ � n � it i` i /��— RlDi 1 746101 COS COMMON OPEN SPACE / / / 1 \ } .. /////% —ter/�1 7331 PG 257 Deweese Township, Mecklenburg County / \ / /'//� ~ i��r /f` \\ PROFESSION YSURVEYOR L-3810 NORTH CAROLINA WM WATER METER / / / / l l \a\ \L �\ \ / \ l JI ( Q _\.��` /�� / \ ` ` 60' 30' 0 fi0' 120' 180, SDE STORM DRAIN EASEMENT'_ / \ SE SIGHT EASEMENT (TRIANGLE} ICV IRRIGATION CONTROL VALVE / / �C \\� \ ~ \\\i/// / �``�/$ ~ 1� \ \ _ tti iiC�ri,, PH FIRE HYDRANT TREE LEGEND /�r\ _,\�` �/ /�� ` `\ ��5, \ 1 1 l \ \ ``�p��QF Essig .�/''.. 1 \ \ \ � I , \ \ _ .Q� ti��. SGALE� DATE JOB # DRAWN WMH WATER MANHOLE POPLAR TREE r\ \ — 1 �� r1 I�/>>` ` ~\ I l I A 1 = 1 _60 1 1 /20/15 0667 JCA/MCF NOTES' _ \ SSMH SANITARY SEWER MANHOLE ' DECIDUOUS TREE I Q - SEAL DI DROP INLET 1. Tax Parcel Identification Number: 00747101, 00747113, 00747122 �_. \ Cr CURB INLET Current Owner: PC SUMMERS WALK, LLC OAK TREE j // — �7\\\11 f? / ((l i i y L-3810 FES FLARED END SECTION 2. Deed Reference; A portion of Deed Book 27770 Page 331 MAPLE TREE �i / _ Q5=- �L ? v ' . c� -X- FENCE 3. Plat Reference: MB 49 PG 637, MB 52 Page 963 PINE TREE / / — — — _ 1 \ �11 '%. . �o SUR`i UTILITY POLE 4. Zoned; RPA Q CEDAR TREE / / ~ / _� '����'"'err rrCi�����;��`` 1VA7 LIGHT POLE S. SDE, SE, and SIDEWALK EASEMENTS are recorded in MB 49 PG 637 PECAN TREE LAMPPOST ELM TREE / 1��r ��� L A N 0 S U R V E Y I N G ` matics, P.C. (C•-3191) WATER VALVE / / ' r -W- WATER LINE Allen Geo PO Box 89, Advance, NC 27006 (336) 998-0218 C0006 www.AllenGeomatics.com 2 1 3 4 E Z2 A IV 0 GENERAL NOTES: 1. EXISTING CONDITION INFO PROVIDED BY & SURVEY TITLED "M/I HOMES OF CHARLOTTE, LLC." BY ALLEN GEOMATICS LAND SURVEYING, DATED NOVEMBER 29TH 2O17, PROVIDED BY BLUE HEEL DEVELOPMENT 2. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF ALL EXISTING UTILITIES. 3. THIS MAP IS NOT INTENDED TO BE A BOUNDARY SURVEY. 4. THIS PROPERTY IS ZONED NEIGHBORHOOD GENERAL. 5. CONTRACTOR SHALL COORDINATE DEMOLITION AND CONSTRUCTION ACTIVITIES AS NECESSARY TO MAINTAIN ACCESS AND FUNCTION OF EXISTING UTILITIES (INCLUDING STORMWATER) THROUGHOUT CONSTRUCTION. 6. CONTRACTOR TO SAWCUT AT LIMITS OF PAVING/CURB & GUTTER REMOVAL D13 � 733 >�6rli, s pq IN,\ \ �p \ ties\\\\ \ \ \ / yO/9e�s Fad! I I I I \ \ \\o \� \� \ \\ \\ \ \\\\\\ \, 11 D� ,29� o�� �� LLB I� O a \ Ah s \ \ \ \ REMOVE APPROXIMATELY 26 LF OF EXISTING 2' CURB AND GUTTER / REMOVE EXISTING GRAVEL DRIVEWAY. COORDINATE WITH PROPERTY OWNER TO MAINTAIN PROPERTY / ACCESS THROUGHOUT CONSTRUCTION Tle Sir Pa P,D: o�iy ,yO1a' D� '2s3 0 �� >Z�9 �r �z Pq s 6 P, Z_Z_C S9 00 1all— N, \ / EXISTING ROAD RIGHT-OF-WAY (TYP.) brimp OEM / --- 705' / \ FUTURE PROJECT LIMITS \ \ p OF DISTURBANCE (TYP.) I \\ \\l0\ \ \ NP "\ \ \ \I III✓ " ,I�13/ 6�/�S3 No \ \ \ \\ \ \\ \ may_ 25 \ 7 _—_— low / PROJECT LIMITS OF DISTURBANCE (TYP.) REMOVE APPROXIMATELY REMOVE APPROXIMATELY 31 LF OF EXISTING 2' CURB AND 26 LF OF EXISTING 2' CURB AND ,t GUTTER GUTTER \ \\\\ / I •. i / `OG / y du M� 1 REMOVE APPROXIMATELY_r \ SG(/,, ,�/ 6,509 SF OF FULL DEPTH ASPHALT ` DEMOLISH APPROXIMATELY / �I / / \ \\ \ /' \ / " XD. y`hla j, 9 153 SF OF EXISTING CONCRETE SIDEWALK \� \ \ �' i '� // // \ , Mjj `9°t 9 �0 7� �a DEMOLISH APPROXIMATELY 1 g/ / / \ ',.\(° S'�'^ . P/ ` 3,2 150 SF OF EXISTING CONCRETE SIDEWALK — — 750 — — \ \ =OI- _r�= � AIK / / / / ; i'l // // \P/ ""`/" .eI- `/ �03 \ REMOVE APPROXIMATELY / - C>` — — — — — — �'� — / P %1� 3 47 LF OF EXISTING 2' CURB AND / / _ �— — _ - — J ' — — - — 7— — — — ' /' _ _ / J • /' / \\\ / / X\\ \ /D. O i ?-S �V Lql GUTTER / / / — _ . \ ' ' ' /\\ / \ 7� \ / _ \ ' • _ �� p� — CONTRACTOR SHALL REMOVE APPROXIMATELY 23 LF OF EXISTING 2' CURB AND o GUTTER74 REMOVE APPROXIMATELY / \ 58 LF OF EXISTING 2' CURB AND — ? �� _ � � GUTTER ` • / ' _ _ —Cap — — — �� CONTRACTOR SHALL REMOVE \ \ 7 La _ APPROXIMATELY 22 LF OF EXISTING 2'CURB AND GUTTER / .. /' /' / / /� \\\\\ \\\\ / \ / PROTECT EXISTING PEDESTRIAN STREET I caA n I N� \\ \ _ — — \ / — / / \ * / / \ \ ` \\ \\ \ yle` LIGHTING THROUGHOUT CONSTRUCTION I — — / / /' / DEMOLISH APPROXIMATELY 'AIN- N, 9 (TYP.) \ _ — — — — — — — — — — — — — — / / / / 150 SF OF EXISTING CONCRETE SIDEWALK \ \ \\ \\ \\ F M- I ,• . _ - 740 l� PROPOSED TREE PROTECTION (TYP.) / _ —� / � \. / '-' � — — — � � \ \N, \\\\\ \ EXISTING TREE -TO REMAIN (TYP.) / _ ^ — — — — — — — " �� _ \ \\\\ bcU i / O -74$ REMOVE APPROXIMATELY 31 LF OF • QJ� / / / j j // / L t� l I — / — ' EXISTING 2' CURB AND GUTTER 730 �\ / v cJ •/ / REMOVE APPROXIMATELY _ _— — _ -I — — _ 2:— �' — — — — — — — ' 35 LF OF EXISTING 2' CURB AND _ — REMOVE APPROXIMATELY GUTTER \ _ 96 LF OF EXISTING 2' CURB AND = \� — — ' — - — ' I I / / - / / / _ / \_� GUTTER 1 _ _ — REMOVE APPROXIMATELY �-\ � _REMOVE 45 LF OF EXISTING 24" RCP _ 9,830 SF OF FULL DEPTH ASPHALT M / (COORDINATE WITH NEW CONSTRUCTION J j / DEMOLISH APPROXIMATELY / �' / / / / _ — — ^ \ �— TO MAINTAIN SERVICE) EXISTING TREE LINE ' / / / / r 235 SF OF EXISTING \\ — 1 -'30 TO BE REMOVED (TYP.) CONCRETE SIDEWALK / / , / _ — — — — — \ \ \ EXISTING TREE - TO BE REMOVED (TYP.) 77 � /// I / I pI/II o// /\ 'O m//I / /_ O y REMOVE EXISTING RIPRAP \\\ / EXISTING TREE LINE (TYP.) cA IN v ��// / • /� o �\ 1� \ ca�/ / ) \ \ I \ \ \ \ '� \ \ \ \ \ -.,/ /✓ 06) \ \ \ \ \ \ \\ \\ > l —\�\\ \ \ \\\ \\ \\ \ \ 1 �� i/ / — \ / I I II I r\\ �j 730j/ /--X / /I/� I IIlIlI JlIllIlr\\\\ 11 / / ( I \ \ \ �.tm \ ` \\ ` `�\ \ \\ \ \ / 715- \ \ \ \\\ / �K\\\\z r\ \\ \ / o / r�\�\ I \ \ \ \ \ \ \ \ \ \ \ \ I \ \ \\ \ \•'/ — \ � < \ ` \ S / \\\\\\\\ / l \ \ \\ \ \\ s o \\\\a 725 �— / / \ \\r \l I \ \ \ �� \0�\\ �\� _ _ \ \ l` \ \\\ \\ �\ \ ~ — ice-- \ \ = ^ / / No Ali l\I \ /\\\��� EROSION CONTROL & WATER QUALITY INSPECTOR: CHANELL HATCH (980) 505-5775 LAND DEVELOPMENT INSPECTOR: TOMMY KEZIAH (704) 634-6753 ZONING INSPECTOR: BRIAN SIFFORD (980) 721-0924 20 41Iro +III z \\\\ \ %720 �/—_-- _ '� \ \ \ \\ / I I I / // // //// I I I I I / \ �,�►\\ —L_ 715_ -7 Ao� -T=\ \ EXISTING UPLAND ZONE I I ( \ \ \ I / _ SWIM / PCO BUFFER (TYP.) Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 W Z W I— CLu G � z � JmZ) O Q z J Q G z Ir C�a� Om O C7 �LuU::5 V m 0' z SLLI G W Q � 1�1 W LU O z 2 � 2 7 w C) Z) 0- W LLJ O CU J o m O 0 SEAL 5 40016 Uj %'.,�-y,` !�'«;! NEB• �2%: KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 DEMOLITION PLAN PROJECT NO. 50104981 ci 001 1 LEGEND 638 EXISTING MINOR CONTOUR 640 EXISTING MAJOR CONTOUR x X X PROPOSED SILT FENCE - xx xx xx PROPOSED HIGH HAZARD SILT FENCE EPROPOSED DIVERSION DITCH PROPOSED TREE PROTECTION 638 PROPOSED MINOR CONTOUR 640 PROPOSED MAJOR CONTOUR PROPOSED GRAVEL / PROPOSED LIMITS OF DISTURBANCE PROPOSED DRAINAGE AREA BOUNDARY TOTAL DISTURBED AREA: 6.95 ± ACRES / 1A D C IV 0 ' O \ EX, /SSMH / \ RIM: 747,23' / I I IN: h35,35' 1 IN,/ IN ❑UT./ 735,17' / 1 / / 2 3 4 5 EROSION CONTROL CONSTRUCTION SEQUENCE (PHASE 1): \\ \ \ \ \ \ \ \ \ \ I I \ \ \ \ \ \\�� EROSION CONTROL & WATER QUALITY INSPECTOR: 1. OBTAIN GRADING EROSION CONTROL PLAN APPROVAL FROM MECKLENBURG COUNTY LUESA. OBTAIN CHANELL HATCH \ \ \ \ _ � CERTIFICATION OF COVERAGE (COC) FROM NCDEQ. \ \ \ \ \ \ \ \ 0/�_� (980) 505-5775 \ \ \ \ /� / - 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH THE FOLLOWING DEPARTMENTS: LUESA LAND DEVELOPMENT INSPECTOR: , LAND DEVELOPMENT INSPECTOR AND ZONING INSPECTOR. FAILURE TO TOMMY KEZIAH SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS SUBJECT TO FINE. \ \ \ EROSION CONTROL INSPECTOR (704) 634-6753 ` 3. INSTALL CONSTRUCTION ENTRANCES, TIRE WASH LOCATIONS, TREE PROTECTION, SILT FENCE, HIGH HAZARD � \ \ � - � � ��� J / � - - - - ZONING INSPECTOR: SILT FENCE, STONE OUTLETS IN SILT FENCE, TEMPORARY SEDIMENT BASIN, BASIN CONTROL STRUCTURE, BRIAN SIFFORD OUTFALL PIPE, RIP -RAP APRON, DIVERSION DITCHES, ROCK CHECK DAMS, EMBANKMENT MATTING, CATCH (980) 721-0924 BASIN INLET PROTECTION, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO \ \ \ \ INSTALL THESE DEVICES. dI111 1 ✓� 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. I \ \ \ \ \ \ \ \ J/ // // I )/ / � I \ \\ � `• '\ \ �\ l lil ID I I //' 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.�v 6. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. ` 7. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURE. °°�° ° \ \ \ \ \ I \ \ \ \ \ (\ \��� / A%� v v A v V A v v v V A\ I IIIII//I 13 / S %/ 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND �m I\ \ \ \ \ \ \ \ I I I I 11 / / / -? -Z SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, MECKLENBURG COUNTY � \ \ \ \ \ \ \ \ \ \ \ \ I / EROSION CONTROL ORDINANCE, AND THE CHARLOTTE-MECKLENBURG LAND DEVELOPMENT STANDARDS. :_ / 9. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR \ \ \ ■ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \\ \ \ \ \ - , ; ; - , , ; ; ; . _ _ _ _ _ PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. PROPOSED FUTURE LIMITS 10. SEE SHEET C0.01 FOR ADDITIONAL EROSION CONTROL NOTES \ \ \ \\ \ \ \ \ 1 \ \\ \ \ \ \ I 10F DISTURBANCE (TYP.), : i / Tie 8.2s3 7�7Z 9�/b,0� / I \ \ / � I I \ \ \ 1------ � / EX, SSMH PHASE 1 BASIN DA. (OFFSITE): 7� p6 \ / /� I \ \ / WOODS: 0.16 AC. P�j , / / \\ // \ RIM: 735,49' ss / \ \� / / , S INV. IN: 725,02' GRASS (B SOIL): 0.88 AC. 9 INV. OUT: 724.89' / IMPERVIOUS: 0.70 AC. / / \vv // \/�� O� TOTAL: 1.74 AC. / PROPOSED TEMPORARY CONSTRUCTION EXISTING PROPERTY LINE / /r\\\ �� �� �\\ 1 I WIN ENTRANCE (TYP.) -SEE DETAIL ON SHEET (TYP.) / \\� .• / �,' / /• Lot 000 EXISTING SHARED PRIVATE / i / \\ / • . \ /% / , �y�(,�/^w C7 GRAVEL DRIVE (TYP.) / / / / �\ - _ EX CB �LJ • �'le�S 9 • \ \ /RIM: 7�36.04' 0 of pp /so-�Nv,; �KN❑wN � //cam 9 PROPOSED LIMITS OF- "^ , C� DISTURBANCE (TYP.) / / / / / • \ : �� l = / / / �P/� • I Y`' lel^s. 63 \ /--749// / \ M13 y�9�t s pp7� �a/kJ k EX, -- - - - -- - - - - -- �=--' _ 1 ® ^f`Q� \ / \ / / P/D �'t3> \ RI 74§,8 '' _ r - - - / / 1 i•� / ://- IN OJT; /739,90' 745- PROPOSED TREE -744 - - - - - - • / _ PROTECTION FENCE (TYP.) - - - _ - / / EX, �MH / -7 f - SEE DETAIL ON SHEET C6.02 __ _ _ - - - - - - - - J - ' / / �YM1 741,19'- 1 • ' / � _ - V - � � � ' �°� INV, IN;�7 �6,70, � / / � vvv --vvv - � �� � / f 43 _ PROPOSED SILT FENCE (TYP.) - �-•� % . / �' INV, IN- 726,4� P/T Cp SEE DETAIL ON SHEET C6.01 / � �/' / / � D: S r / / _ < M � �'►�l ems \ \ \ \\ \ 13 II I ------ ---------741---- - - - -J/ �9 P 6 EX. CB NZI EX, CB-\--____-__ X, SSMH > / / '13 I / RIM: 739,77' ---__ RIM: 7 ,33' - \ / __-_ �1733- � \ • / INV, OUT: 734.70' - / / INV, I 72�J47' • ' / / / / / - - - - - - - _ _ _ _ \ - \\ \ Lj - _ X. DCB / / / - EXISTING 70, GAS _ \ �\ / \ \ \ // / / � - �_ / INV, � 729,32' / / / - EASEMENT P. �\ - )� �\ / d f / I ' EX, CB RIhT-�8 34 / (N )- RIM: 738.60' INV. INCW).73 INV!❑UT. 732,58' N INV. IN(E): 733.71 '• / - - � INV. OUT:733.35 ��j _ - - PROPOSED SILT FENCE (TYP.) 131' � Q) / / -'/ j _ _ _ w �� i -' - _ - - _ SEE DETAIL ON SHEET C6.01 PROPOSED SILT FENCE ROCK OUTLET (TYP.) / ' • SEE DETAIL ON SHEET C6.01- ni l // / l I / - _ _ _ • �� - - _ _ -EXISTING SAN. SWR. PIPE & r / •/ / / I - �- PROPOSED CONCRET • �- - - n -STRUCTURE TYP. / / � / / / �- E FES_ - \ - WASHOUT (TYP.) _- - - - - II _ j __- _ --_ __--_- PHASE18ASINDA.: / / / �' >� \ I/NVr'b�T; 38.9I7'- / \ - _���--_%%� 35 __----' ��� / IPROPOSEDLIMITSOF / %-J .-'\> / / / - - - _ - - - _ - DENUDED (B SOIL): 0.98 AC. - ® - DISTURBANCE (TYP.) / c �? / / J / / / / PROPOSED TIRE WASH DENUDED (D SOIL): 2.54 AC. - - - _ _ , - LOCATION - SEE DETAILS (TYP.) _ _ _ - -PROPOSED CATCH BASIN INLET IMPERVIOUS: 0.65 AC. cJ •• •'' PROTECTION TYP. - SEE DETAIL PROPOSED TEMP. b / PROPOSED TEMPORARY CLEAN 0 - - - - - (TYP.) TOTAL: 4.17 AC. �� ROCK CHECK / " ✓ / _ -727- - - - _ -ON SHEET C6.03 DAMN (TYP.) WATER DIVERSION DITCH (TYP.) SEE DETAIL ON SHEETC6.Oi/ PROPOSED TEMP. DIVERSION DITCH - / / 17 MIN. 18" DEEP, BERM SHALL HAVE AMIN. 10 / \ I I / / / / � / / / / C) 3 I I I / \ �\ 18" WIDTH, MIN. 2/ SLOPE (TYP.). 7 \ \ I I I / r l ly / / / / / --__- l / \ ( CONTRACTOR SHALL STABILIZE ALL \ , / \ I / / / / Z APROPOSED 69 LF, 15" TEMPORARY SLOPE q I / / / / / DENUDED AREAS AS SOON AS PRACTICABLE_ �\� � \ - �'I3 / �33- - / / / � / � / / PROPOSED TEMP. ROCK \ DRAIN, INV. IN-731.50, INV.OUT- 712.67. / - _ / / / / J °� •� �`�� 1 I �33 \lu CHECK DAMN p. / ' SEE C6.02 FOR SEEDING SCHEDULES (TYP.) �� \ MIN. COVER 1.5', MIN. 4' TOP OF BASIN. I `I I \ \ I / v 1 - \ \ \ PROPOSED NA -GREEN S150BN EMBANKMENT MATTING (TYP.) \ �� v vv vvvv �v �2s _-i- -/ /�I\ Ilr �l PROPOSED 25-LF, 24" TEMPORARY SLOPE\ \ \ \ \ \ 1-1 / EXISTING TREE LINE /' IIII ro / DRAIN, INV. IN-714.50, INV.OUT- 712.88. \ \ \ / (TYP.) 3 \ \ \ \ \ MIN. COVER 1.5', MIN. 4' TOP OF BASIN.- \ \ - \ ' ' / - - - ' /' / \\ \\ \ \ \\ \ \ V A PROPOSED TEMP. SEDIMENT -\ v - \ / / I� b ' \ \ \ \ \3�\ 722 / c�U l l I l l l \ I \ \ \ �v A _ /PIT SUMP AREA (TYP.) cle / / I / IV \\ \V V A\ \ �� ��D� ' 6" PROPOSED �� \ % PROPOSED SILT FENCE (TYP.) ( \ \ \ \ \ 713 !p SEE DETAIL ON SHEET C6.01 1 1 V�( \ �V�\/l \) I \ PROPOSEDTREE PROTECTION FENCE (TYP.) -\ A PROPOSED ROCK FOREBA 'SEE DETAIL ON SHEET C6.02 SEEEMBANKMENT (TYP.) V \I� IIJ 1II/ 1I�II 1I I II1I1II� III IIIIII I II I 111AI�IV\1 \I\I \\ \ 1 i vv / I I I I / l i PROPOSED TREE PROTECTION FENCE DETAIL ON SHEET C6.01 \ PROPOSED HIGH HAZARD �- - - A _ AA\\ VA� AVAA (TYP.) - SEE DETAIL ON SHEET C6.02 S' V A V A V I? j�� / -� V AA \\� / / 1 V \ V - �) \ SILT FENCE TYP. SEE 6\ \ \ \ \ \ \ \ \ \ \ \ - i �; ! l'i / > \ \\\\\ll 11 / \ \ \ \ �6 / \\ \ \ l \\�i%/ I O v ( ) - - - FER\ �j ���v V v - " �i i I PROPOSED DOUBLE ROW OF HIGH HAZARD v v v yl lIl vvv \ \\\ \ iTi �A "\ �� DETAIL ON SHEET C6.03� - \ \ \ \ \ \ \ r'p, SILT FENCE TYP. - SEE DETAIL ON SHEET C6.03 � PROPOSED LIMITS OFF DISTURBANCE (TYP.)�� \ \ � \\ PROPOSED COIR BAFFLES TYP. _ / / IIII SEE DETAIL ON SHEET C6.02 / // I I \ _ 1 \\\ \� L -_- ` \- � PROPOSED 2.5" FAIRCLOTH SKIM-MER WITH 714 1.2" ORIFICE - SEE DETAIL ON SHEET C6.03 PROPOSED 20' STONE EMERGENCY ENCY \ J I I I I / // / / I I \ OVERFLOW WEIR ELEV.: 714.25 'PROPOSED OUTLET CONTROL STRUCTURE (CS-D02) AND -J OUTFALL PIPE TO BE INSTALLED THIS PHASE -SEE DETAILS- -AND STORM PROFILES FOR MORE INFORMATION - - III SEE EMBANKMENT \ - � _/ /- - K` �\ ' 717--_ I PROPOSED ANTI -SEEP COLLARS - SEE- - �\\ CONSTRUCTION - > ON SHEET C4.01 0> BMP DETAIL SHEET FOR MORE INFO. / I I - 1 - PROPOSED FES D01 STORM DRAIN FLARED END - _ - - - - / - - - _ - - - / I\� \ \ \ \ / // / / - /' - / \✓ SECTION (TYP.) SEE STORM PROFILE FOR MORE INFO. PROPOSED _ _ J TC701 '� / / // / I SEE DETAIL ONSHEE.�` _/ /--- UlU-� \v/ �`� - - ----- / IIII \ \ - / ' - -- _ 0 220201 Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 V J LU LLI JmZ) Q O Q Z 06 W C C� Q j 0 C� � O z O 0 (� U LU LU C) U � z p "' Q LU zz C G = w W LU O U J o m O O SEAL o� oF�s 40016 4 'U: ` !�'c! NEB• �2�: KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY CHECKED BY DATE TITLE BML BML MAY 31, 2019 PHASE I EROSION AND SEDIMENT CONTROL PROJECT NO. 501 04981 C2001 1 1 2 1 3 1 4 1 5 EROSION CONTROL CONSTRUCTION SEQUENCE (PHASE 2):LEGEND i 638 EXISTING MINOR CONTOUR 640 EXISTING MAJOR CONTOUR X X X PROPOSED SILT FENCE - xx xx xx PROPOSED HIGH HAZARD SILT FENCE E PROPOSED DIVERSION DITCH -----�---� PROPOSED TREE PROTECTION 638 PROPOSED MINOR CONTOUR 640 PROPOSED MAJOR CONTOUR PROPOSED GRAVEL PROPOSED LIMITS OF DISTURBANCE C PROPOSED DRAINAGE AREA BOUNDARY TOTAL DISTURBED AREA: / 10 6.95 ± ACRES 1. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL PHASE 1 EROSION CONTROL DEVICES AND STRUCTURES. 2. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF PHASE 1 EROSION CONTROL MEASURES. 3. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING ' O�% Il) / \ WITH EACH PHASE OF EROSION CONTROL MEASURES. \ \ _ \ \\ �\ \�_ - - \ / / \ -C \ \ _ \���i/�\ 4. INSTALL CURB & GUTTER, STORM DRAINAGE STRUCTURES & PIPES, INLET PROTECTION, EMBANKMENT MATTING, AND OTHER / \ \ \ \ \ o = -\\\ - MEASURES AS SHOWN ON PLANS. PROPOSED FUTURE LIMITS \ " I \ \ \ OF DISTURBANCE (TYP.) I \ \ 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. \ r� r ,• \ 1 \i ' // I \ \ \ \ \ \ \\\w \I\1 \I ,\,1\II- 6. THE LAND DEVELOPMENT INSPECTOR SHOULD BE CALLED TO CONDUCT INSPECTIONS ON STORM DRAINAGE, SIDEWALKS, 1 \ \ \ \ \ \ \ \ \ \ \ \ (� \ \ \ '\ )/// // I I/ , DRIVEWAY ON STORM DRAINAGE, SIDEWALKS, DRIVE WAY IMPROVEMENTS, AND ALL ASPECTS OF ROAD CONSTRUCTION / -7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. I, , V�V / 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, MECKLENBURG COUNTY EROSION CONTROL ORDINANCE, AND THE CHARLOTTE-MECKLEN BURG LAND DEVELOPMENT STANDARDS.60 - / 10. CALL THE WATER QUALITY INSPECTOR TO SET UP A BMP PRE -CONSTRUCTION MEETING PRIOR TO STARTING ANY WORK ON BMPS. THIS MEETING SHOULD TAKE PLACE AT LEAST 48 HOURS PRIOR TO STARTING CONSTRUCTION ON ANY BMP AND SHALL- \ / INCLUDE THE DESIGN ENGINEER TO ENSURE ENGINEER INSPECTIONS ARE PERFORMED AT KEY BMP INSTALLATION PHASES. 11. THE DESIGN ENGINEER MUST VERIFY AND CERTIFY THE DRAINAGE AREA IS PROPERLY STABILIZED; MEASURES ARE IN PLACE TO PREVENT SEDIMENTATION INTO THE BMP, THE STORM DRAINS, INLETS AND PAVEMENT HAVE BEEN PROPERLY CLEANED PRIOR TO COMMENCEMENT OF BMP CONSTRUCTION. 12. SEE SHEET C0.01 FOR ADDITIONAL EROSION CONTROL NOTES. PID L)13 .25� 7� 7z 9 ��1- - - - - / X, SSMH 7z Pq 6 �� i / `�C\\\ /l �/ //� J ' \\ \\\ - - - - - - - - % RIM; 735.49' / INV, IN; 725.02' PHASE 2 BASIN DA. (OFFSITE): S9 �/ / ` / /�`�\ / I - - f \ INV, ❑UT. 724,89' WOODS: 0.16 AC. GRASS (B SOIL): 0.88 AC. IMPERVIOUS: 0.70 AC. / / / / `� �`\, �C) ��� / I WN • •• d 3�3„q TOTAL: 1.74 AC. EXISTING PROPERTY / l / _ ^A Lo t / LINE (TYP.)\EX, CB ,� 000 �751 ✓� / � / / / / �2 � � / RIM; 7 6,04' LPXL)� / 750� / �750- / / 11 �� / ENV,, UI�❑WN \ i�M� 9Ot 9 pp 7� �a � Nc' / PROPOSED LIMITS OF / . /c� / / / \ / • \ ` \� / i / / / \ JT�' �l P� 63 �� - 748 / \ DISTURBANCE (TYP.) U /O L P�U• e`S \ -_ ' A / \ n of O �R / / - -749 _ -748 / / / UC) \ l ` �� l/ \ � N/ � 9 P/g p >� 7� _ - ` _ \ \ l `� fit,^ , y 6 -2.2 / - - - - _10' WIDE COUNTfiY Tl - 746 / A �. \ 1 / / \�� / / ' "'l 7 _ / lk EX. / � __-�__ -_ - I _- - _15 _- -' 1 � J• / ®rf `� / x / P/D- � e,-S- \ / 4 O ' "RCP � RI 749.8� �\ ✓V /- • . w IN OGT: 739,90' - 747- _ _ _ _ J _All - - - - 15"RCP - - - - - y �, �/ ��l p7� 73 /K� \ pr �vlu \ 745 IG �D / ^ _ / • �• � � � `/ / l `� - - � _ i - i �� 15" RCP � 745 745- �O •✓ Q J /��\ (� 1 744 / /, • _ % 1 / �* PROPOSED TREE - -744 - - ' i A8 PROTECT • /�// / `\�� �� \ \ \� ION FENCE (TYP.) vJ - O • • /MH `� _ / 1 EX, /SSMH / - • . / INSTALLED IN PHASE 1 - - _ - - _ - - - /� ',' ��PROPOSED CATCH BASIN -� / 741,19' / � ` > RIM: �47,23' / - - � A302 \ / I �J i i } - - ; �Y� ate_ INLET PROTECTION (TYP.) IN IN; _26,70' cn / I IN �735,35 ,t / 7 \, _ 1 A110 i, it 44 _7 43' - - -SEE DETAIL ON SHEET C6.03 / 0' INV IN: 726,4� �� l IN OUT-/ 73517' / I ' _ - - - - - - ' \ / % / - / / / �\\ ��\ \ \ l PID. c� NZ' - PROPOSED SILT FENCE INSTALLED IN PHASE 1 (TYP.) < ��. / \ \ �� `� 743- A301 �� �A V A113 - - J \ �\ \ P� / . A • • I II 'pC',p 743 - - - - - A7017 41 - -� . / �� V � \ \ \ / / ». / - L_ I ' ' • 15" RCP A601 EX A109 EX. OBE-- ___--"R�; pv - - X, SSMH (T 15" RCP RIM; 739,�7 EX A108 / RIM; 7 33 I �� 1g9 �5� PROPOSED SILT FENCE ROCK OUTLET- \733- \ A105 INV, ❑UT; R34,70 -� i INV, I i 72�,47 A6 6 ° (TYP.) -INSTALLED IN PHASE 1 �� /%� EX Al07 U -- X, DCB INV, >�29,32' 24 A106 EX, CB _ RCP / INV. IN(E)�,7733, 1 --- . •� - - - 18" RIM; 738,60INVi - � ® PROPOSED LIMITS OF - a�/ • . / j �/ / \ - 32,524�-P INV. OUT: 733,35' -PROPOSED SILT FENCE (TYP.) % y� - /INSTALLED IN PHASE 1 DISTURBANCE (TYP.) 31 / / � ,� / •• / / / / _ -_ _ _ _ - - - - - PHASE 2 BASIN DA.: �� / •/ / / / I / / / �( _ 739/ - - - - - - - -738 PROPOSED CATCH BASIN - -736- DENUDED (B SOIL): 0.84 AC. �' •/ / / I _ DENUDED D SOIL): 1.45 AC. 4. -- 24 RCP- _ _ / - �3 _ - ; 738, - - - - - INLET PROTECTION (TYP.) - ��- / _ - - - IMPERVIOUS: 2.38 AC. - � • /• � - - - - SEE DETAIL ON SHEET C6.03 CONTRACTOR SHALL STABILIZE ALL / / - � A104 v - -% _ - - ; _ - - _�_ - - _73s _ -t _ _ TOTAL: 4.67 AC. fP v - �G ,� DENUDED AREAS AS SOON AS PRACTICABLEN / / / SEE C6.02 FOR SEEDING SCHEDULES (TYP.) •• / A201• 15 Rip; 24" RCP _ _ - \ \ \ \ ` - _ _- PROPOSED STORM DRAIN PIPES A501 �3e ® �b A. / / / / / / / / / 24 RCP % 7 / - - _ _ - &STRUCTURES TO BE INSTALLED > / / / / // 727- _ IN THIS PHASE (TYP.) - SEE 73$ A102 _ ,A401 - )fig STORM PROFILE FOR MORE INFO. 15" RCP / I I I // / / / // 1 // ' �Vj� v-'A3� 15" RCP 737 / P7� / / � / // / I/o / / U // / - 1 / // // �0 I ® B3 - A4 / �\ 1 I I / / / // / 24" RCP24 RCP , _ / 735 PROPOSED NA -GREEN - ,334� / 3- / • • / I / \ / 737 AIIOO - \ _-13 - o S150BN EMBANKMENT \ / - - - _ \ \ \ ` ' , J 2 \ 24" / = MATTING (TYP.) A20 RCP"I 728 \ \�\ � \ � \ 1A 726 725 �� / ,A2 8, I / / V A203 1�1 i rn I cryd / / I / I \ \ \ / , - - PROPOSED HIGH HAZARD SILT i v v v v - - - - - - - �- FENCE (TYP.) INSTALLED_ IN PHASE / I / / I V A \ w ce 719 716 > - \i/ I I A l \ \ �� �22 I / �8 EROSION CONTROL & WATER QUALITY INSPECTOR: CHANELL HATCH (980) 505-5775 LAND DEVELOPMENT INSPECTOR: TOMMY KEZIAH (704) 634-6753 ZONING INSPECTOR: BRIAN SIFFORD (980) 721-0924 A \ / I I I I \ 'Oj\ 1 / I I I \ V A �v v 714 I / / I 1 \ V A �. --Al v v v 712v ,� / V�( \�- v V J //// / \ � � � \ > � v � �o v /� v v v v A � v 7 \ \ v� v v I � � / / // III I I � 1 v "/ v v� V PROPOSED RIP -RAP APRON \ �� PROPOSED ROCK FOREBAY EMBANKMENT (TYP.) - VA \ �\ - _ - V A / I �, // �/ �I III1 V I I I / ( \ \ v \ \ \V A TYP. - SEE DETAIL SHEET C7._ e \ SEE DETAIL ON SHEET C6.01- PROPOSED LIMITS OF - - -- DISTURBANCE (TYP.)-PROPOSEDTREE v\vI/ I I I III III I II I1 I / / V PROTECTION FENCE (TYP.) \ INSTALLED IN PHASE 1 PPROPOSED T�REE � ROTECTION FENCE (TYP.) \� INSTALLED I PHASE 1 p 711 / / / 712 \ \ > '�' PROPOSED DOUBLE ROW OF HIGH HAZARD til �.._.. (TYP.) _PHASE SILT FENCE TYP. INSTALLED IN 1\\\ f 714 PROPOSED COIR BAFFLES (TYP.) - - _ _-_ _ _ ----- --- I SEE DETAIL ON SHEET C6.02 - J \ PROPOSED NA -GREEN V-MAX SC250 I I -PROPOSED 20' STONE EMERGENCY - PERMANENT CHANNEL MATTING (TYP.) / / / I I I \ - - - - - / \I II ^ _ \ - - \ v - _ - - j - - _\ =Z� \ \ J / \III \ - OVERFLOW WEIR ELEV.: 714.25 q, \ � / \ / /// /�'�i� i���I ��I ///// / // /////I/l/l /l // / I III� I III I I � ICII ✓ PROPOSED FAtIRC_ LOTH 2.5" SKIMM_ER---I�-�----- - DO 10 I x \(INSTALLED IN PHASE-1) WITH 1.4" 717- �PROPOSED OUTLET' RISER INSTALLED IN PHASE 1 715- PROPOSED SILT FENCE ROCK OUTLETS ~ \ - _ - - - - - \ \ / II \ \ \ \ (TYP.)-INSTALLED INPHASE I`- i�i�- ����ii- 1 Dewberry�19:�' Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 Z W Lu Jm� O Q Z J0 06 5 G 0 ::)z Ir Z 0 (-) < 0 wwv (.C) O fr mZ cr cr J z z O Q = LIJ W W - Z)0= z �o c/) W 0 Z U J m O O SEAL ,'" " 111111%- Y� CAD i. 40016 '.,�-y,` !�'c! NEB• �2�: KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 PHASE II EROSION AND SEDIMENT CONTROL PROJECT NO. 501 04981 C2002 1 2 3 4 5 E C CONTACTS DEVELOPER: BLUE HEEL DEVELOPMENT CONTACT: MATT GALLAGHER 442 SOUTH MAIN STREET, SUITE 100 DAVIDSON, NC 28036 704-634-5140 MATT@BLUEHEELDEVELOPMENT.COM ENGINEER: DEWBERRY ENGINEERS INC. CONTACT: BRIAN LAFRANCHI, PE 9300 HARRIS CORNERS PARKWAY SUITE 220 CHARLOTTE, NC 28269 704-631-5206 BLAFRANCHI@DEWBERRY.COM SITE PLAN DATA TABLE PROJECT NAME: PARCEL NUMBERS: TOTAL ACREAGE: SUMMERS WALK PHASE 6A & B 007-47-101, 007-47-113 7.20 AC. IMPERVIOUS DRAINAGE AREA CALCULATIONS PRE -DEVELOPMENT: POST -DEVELOPMENT: PERVIOUS: 6.0 AC (90.0%) PERVIOUS: 4.29 AC (64.32%) IMPERVIOUS: 0.67 AC (10.0%) IMPERVIOUS: 2.38 AC (35.68%) TOTAL: 6.67 AC TOTAL: 6.67 AC BUILT UPON AREA (BUA) SUMMARY: PROPOSED ROAD BUA: 22,626 SQFT (0.52 ACRES) PROPOSED SIDEWALK BUA: 910 SQFT (0.02 ACRES) EXISTING ROAD & SIDEWALK BUA: 29,185 SQFT (0.67 ACRES) PROPOSED BUA - LOTS 1 - 11 16,060 SQFT (0.36 ACRES) (1,460 SQFT / LOT) PROPOSED BUA - LOT 12 3,500 SQFT (0.07 ACRES) PROPOSED BUA - LOTS 13 - 36 35,040 SQFT (0.81 ACRES) (1,460 SQFT / LOT) EXISTING OFF -SITE BUA: 30,492 SQFT (0.70 ACRES) TOTAL EXISTING BUA (TO BE DETAINED): 59,677 SQFT (1.37 ACRES) TOTAL PROPOSED SITE BUA (PHASE 6A, 613): 115,857 SQFT (2.38 ACRES) LOT SCHEDULE: WIDTH(FT) QTY 21-40 35 >60 1 SETBACK NOTES: COMMENT SINGLE FAMILY TOWN HOMES, LOTS 1-11, 13-36 SINGLE FAMILY HOMES, LOT 12 1. ALL LOTS FOR SINGLE FAMILY TOWNHOMES TO HAVE SETBACKS AS FOLLOWS PER TOWN OF DAVIDSON PLANNING ORDINANCE. FRONT SETACK: 0' MINIMUM, 25MAXIMUM SIDE SETBACK: 0' MINIMUM, 40' MAXIMUM REAR SETBACK: 5' MINIMUM, 5' MAXIMUM (TND-OVERLAY IS A SUBSET OF THE RURAL ZONING DESIGNATION) 2. ALL LOTS FOR SINGLE FAMILY HOMES TO HAVE SETBACKS AS FOLLOWS PER TOWN OF DAVIDSON PLANNING ORDINANCE. FRONT SETACK: 10' MINIMUM, N/A' MAXIMUM SIDE SETBACK: T MINIMUM, N/A' MAXIMUM REAR SETBACK: 20' MINIMUM, N/A' MAXIMUM (TND-OVERLAY IS A SUBSET OF THE RURAL ZONING DESIGNATION) FIRE NOTES FIRE APPARATUS ACCESS ROADS AND TURN AROUNDS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMPOSED LOADS OF FIRE APPARATUS OF 80,000 POUNDS. TOTAL SQUARE FEET. 313,632 SF / PRINCIPAL USES: SINGLE FAMILY RESIDENTIAL EXISTING ZONING DISTRICT: APPROVED AS TND OVERLAY DISTRICT, 2012; / CURRENTLY NEIGHBORHOOD GENERAL / PERCENTAGE OF BUA ALLOWED: N/A PERCENTAGE OF BUA ESTIMATED: 52% Rosevularg W• Helvv's TIME FRAME: 52% pip: 007461D1 p(D: 007472-78 STREAM WATERSHED: ROCKY RIVER Di3 17331 PG zS7 / \ MASTER PROPERTY REGULATED DRINKING WATERSHEDS: YADKIN / a, \ OWNERS ASSOCIATION OF GROSS DENSITY: 5 UNIT PER 1.0-ACRES / SUMMERS WALK U (7.20 AC./36UNITS) / \ p�3 zroa �o PG zip > H.O.A. NOTES THE HOA COVENANTS OF THE EXISTING SUMMERS WALK PHASE 1-5 SUBDIVISION WILL APPLY TO THE COMPLETED DEVELOPMENT. Ine Suw,lnners Favu.ily \ / Lot 1 I T FUTURE Holdivtg Group LLC � Mi3 4g PG q I pip: 00747105 PHASE 6C / j1SU nvv P,rs wall, D13 2-g172- PG 501 / D: 007473z \ dJ_ Lot q \ 4Q) M13 4q PG (03q\ / \ \ • / "Su:er-S walk 007473z2 Pr7o� \ \ Lot 8 / ,P) / \ MS 4q PG 637 "SUWkv%Aers Walk3 ` LOCATION MAP PHASE I: LOTS 1-11 PHASE II: LOTS 13-36 PHASE III: LOT 12 TRANSPORTATION IMPACT ANALYSIS TIA FEE = $500 X 36 = $18,000 AFFORDABLE HOUSING THE DEVELOPER HAS A TOTAL OBLIGATION OF $344,500 OF AFFORDABLE HOUSING FEES DUE TO THE TOWN OF DAVIDSON ON SUMMERS WALK PHASE 6. THE DEVELOPER WILL BUILD THE AFFORDABLE HOUSING UNITS, OR MAKE PAYMENT -IN -LIEU, AS DESCRIBED IN THE AFFORDABLE HOUSING PLAN APPROVED BY THE DAVIDSON BOARD OF COMMISSIONERS ON JUNE 11, 2019. OPEN SPACE SUMMARY: TOTAL SITE AREA (SUMMERS WALK -ALL PHASES): 105.1 AC* TOTAL SITE AREA (PHASE 6A & 613): 7.2 AC TOTAL OPEN SPACE: 27.8 AC* TOTAL SITE MINUS OPEN SPACE: 77.3 AC* TOTAL REQUIRED OPEN SPACE (PHASE 6A, 6B): 0.0 AC* TOTAL PROPOSED OPEN SPACE (PHASE 6A, 613): 4.405 AC *OPEN SPACE TABULATION FROM 2012 MASTER PLAN *OPEN SPACE AND TREE SAVE REQUIREMENTS FULFILLED AS PART OF 2011 RESOLUTION DONATING "WESTBRANCH NATURE PRESERVE" TO MECKLENBURG COUNTY - SEE APPROVED MASTER PLAN TITLED "SUMMERS WALK PHASE 6 BLUE HEEL COMMUNITIES MASTER PLAN" BY DEWBERRY ENGINEERS, INC. DATED: MAY 3RD, 2019. PCO UNDISTURBED OPEN SPACE SUMMARY: TOTAL SITE AREA (SUMMERS WALK - ALL PHASES): 105.1 AC* TOTAL SITE AREA (PHASE 6A & 613): 313,632 SQFT (7.2 AC) TOTAL REQUIRED UNDISTURBED OPEN SPACE (PHASE 6A, 6B): 0 SQFT (0.0 AC)* (17.5%): 313,632(17.5/100) = 54,886 SQFT TOTAL PROPOSED UNDISTURBED OPEN SPACE (PHASE 6A, 613): 62,814 SQFT (1.442 AC) *OPEN SPACE TABULATION FROM 2012 MASTER PLAN *OPEN SPACE AND TREE SAVE REQUIREMENTS FULFILLED AS PART OF 2011 RESOLUTION DONATING "WESTBRANCH NATURE PRESERVE" TO MECKLENBURG COUNTY - SEE APPROVED MASTER PLAN TITLED "SUMMERS WALK PHASE 6 BLUE HEEL COMMUNITIES MASTER PLAN" BY DEWBERRY ENGINEERS, INC. DATED: MAY 3RD, 2019. a, PID: 007473 COS G r7 / �� \ PIP: 007473g8 I / \ / \ / � 11Suvv.vv.ers Walk, Tine SuWllMerS Favvkilg Holdiv'g Group, LLC \ cJ M13 4q PG (03g Q) D: 00747106 PI \\ /�y1 / PIp13 zs371 PG s5q \ 12 ^O P /k Phase Pq 639 �N / \PROP. C.O.S.0.013 AC. 13 PROP. C.O.S. Q) 'N I-- vub\ ZG 2 O / 4 � 14 / / \ \ �� \ \ \ Se \ N DewberrySCALE: 1"=2,000' ,669, _7� i / / �MEPa� 11 / 4 / PG (015.q ° Sa N pUec NSW�S �N\ \ 830 \ \ \\ \ �%/ 10 \ : t 16 M i3 / uvv.v�ner 04 \ 9 17 \ \ \ 8 / 18 TE TE \ \l1\, \ \ IP HAS 6 �� / �\ 'PROP. C.O.S..\ // / / / `�-_ TE `rc� W 00 !Nd S9FZ\ 6A 5 \ 0.041 AC. / \ \ - TES TE TE-fdT • Tic TE �\ / PROP. C.O.S. I I PROP. C.O.S. > r / 19� / /�E� 0.206 AC. cA 3 ow 4 I 0.132 AC. \ ti / -� TES TE TE TES_ II 2 20 J TE T TE T\ 1 Is+ I I \ I\ < O � r � 3 � Q O I v "rj o 3 D 'f JA O � y • r I I I 3 q I hl b . tC I ,08 V ! Cn I r" I I I 0 wd o° NIA a / I / M13 48 PC, qs r alk, '� ID: 0074775z / cos 48,PG�O1 ' / ••Su s alk, Pk Map \ 00747757 \ - - 26 25 PHASE 6D / // / T TE 28 �/ \� \W / / / / / Lot 63 29 M i3 48 PG ;Z01 30 flu / / / / ! �/ / ��Suvv.vuters Walk. 31 \ ��� I T� TF� �� 100, SWIM / PCO / / / / / / / Phase z, Map �� / I \` 32 BUFFER (TYP.) PID: / / / / / / / / 00747747 33 ` ES/ / / 136 35 34 TE T- �' / // // L(cz 3.116 AC. >_ ot PROP. C.O.S. / / / / / / M13 48 PG 2.01 1 / _ 1jSuv,„vvkers Walk, PtAase PIP: z00747746 / PHASE - / / / / / // /� / / / Lot 0 1 / / Mr301 6B Suv�nv�ners Walk, / I _ a EXIST. TOP OF - / / / L P�DSe 0074 7745 BANK (TYP.) ` / l - PG _ zo1 100, UPLAND BUFFER - -C - - - -� � - - _ // � / / � � � Suv�nv�ners Walk, �- � -- Phase Ma 3 2-,p i % ► \ / 75' MANAGED USE BUFFER / - _ PID: 00747744 75'BUFFER /�---5o'SWIM/PCO / BUFFER/ / I \\ Ls7 s4 - / Mt348 PGz 01 / BUFFER �� \ °Suvvwmers Walk, 30' STREAMSIDE BU - - / / I I I \\ PInP Sep 74 p 43 / I ZPlnase�./Map I - PI/' 473gq / / 21 � Y 22 � � � T 23 o t 24 • ;,,-/ \� / rF '� I FUTURE /rF `\ / Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 U) Z ww � � J a�� m D O zo z 0 U) � Z O C) (D U wwv ) Ir zz Q J J p =^W w> Z) 0- = 7 w O Z) U CO O O SEAL �%��-(t� GAR 0 5 AL 40016 Q4 • U '.,�-y,` 4 G I NEB• �2�: KEY PLAN SCALE: 1" =60' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS EN 0. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 OVERALL SITE PLAN PROJECT NO. 501 04981 C3m01 3 1 4 1 5 E C LINE TABLE NUMBER BEARING LENGTH (FT) START POINT END POINT N620946.1141 N620943.0566 L1 S66047'28"E 7.76 E1471375.3490 E1471382.4797 N620937.1803 N620903.2160 L2 S73°23'07"E 118.78 E1471398.7022 E1471512.5254 N620903.2160 N620856.1815 L3 S73°23'07"E 164.49 E1471512.5254 E1471670.1507 L4 N07026'14"E 103.05 N620913.2238 N621015.4065 E1471478.9867 E1471492.3256 N621083.0992 N621125.6276 L5 NO1016'47"W 42.54 E1471495.9665 E1471495.0164 N621422.8861 N621541.0049 L7 N34°15'00"W 142.90 E1471399.7777 E1471319.3533 N621542.0106 N621507.2824 L9 S37°05'15"W 43.53 E1471278.7457 E1471252.4928 N621501.4252 N621493.4920 L10 S52°57'56"W 13.17 E1471246.6302 E1471236.1156 N620963.6171 N620978.1471 L11 N71 °09'48"W 45.00 E1471329.1947 E1471286.6020 N620980.3518 N620986.5870 L12 N77001'12"W 27.76 E1471279.2637 E1471252.2128 N621037.6877 N621351.6517 L13 NO2°43'35"E 314.32 E1471213.4999 E1471228.4504 N621379.1915 N621395.2074 L14 N56°33'18"E 29.06 E1471244.1210 E1471268.3689 P j3 z >3 >�6_ZD r�s \ Pq '2S> I � 1 PID, o p v 'gSI-E& 0 >5t >-2 7 I I I S /�S ASS0 0 P82 8 FUTURE I D QAM& Q4 - p!�' 1 BEOSELECTEDOSED AIL KIOSK BY OWNERFALL BE INSTALLED IN ACCORDANCE WIDN 4'X7'CONCRETE PAD (MIN. 8" THICK), MAIL KIOSK TH THE OWN OF AVIDSON PLANNING ORDINANCE. PHASE 6C o-26�6ps l�vgLkN pF P� 2. PUBLIC AMENITIES & IMPROVEMENTS INCLUDING BUT NOT LIMITED TO STREET LIGHTS & PUBLIC I BENCHES ARE TO BE SELECTED BY OWNER IN ACCORDANCE WITH TOWN OF DAVIDSON PLANNING \ ORDINANCE, OWNER SHALL APPROVE SELECTED IMPROVEMENTS WITH TOWN OF DAVIDSON PRIOR I TO INSTALLATION. \ / Tie g� / hlels P/D a``�`%�y yob I \ DT3.2S oo >.5 >, ��9 q1' \ >z 06 P(q S_ ��� 9 \ L PROP. ASPHALT DRIVEWAY CONNECTION TO EXISTING PARKING AREA - CONTRACTOR SHALLCOORDINA/��a"/ Q� \ /• > LOCATIONTE WITH ADJACENT OWNER FOR FINAL 20' REAR SETBACK ��J�C) L CURVE TABLE NUMBER RADIUS (FT) LENGTH (FT) TANGENT (FT) DELTA CHORD LENGTH (FT) CHORD BEARING C1 150 17.26 8.64 006035'39" 17.25 S70005'17"E C2 446 67.86 33.99 008043'02" 67.79 N03004'43"E C3 550 316.49 162.76 032058'13" 312.14 N17°45'54"W C7 25 47.41 34.83 108039'45" 40.62 N88°34'53"W C8 30 8.31 4.18 015052'41" 8.29 S45°01'35"W C9 50 2.56 1.28 002055'42" 2.56 N75033'21 "W C10 50 69.59 41.77 079044'47" 64.11 N37008'49"W C11 35 32.88 17.77 053°49'43" 31.69 N29°38'26"E PUBLIC AMENITIES & IMPROVEMENTS NOTE: PROP. V RIBBON \ "y / /� C CURB (TYP.) I "'- d ./� / '� \//C' � � 9 %, PXD.�e� q 9 PROP. MIN. 40'PUBLICRIGHT-OF-WAY FOR FUTURE �� I �c/Ir / \ •w A1J3 tl L_o 9>�Sl a PROP. PUBLIC RIGHT-OF-WAY AT 12 YpJ \ / \ �� r 9 Pq d STREET CONNECTION (TYP.) / PROPERTY LINE (TYP.) SEE DETOAIL SHEET C7.01 I • i \ l03 PROP. PUBLIC BENCH - TO BE SELECTED BY 5,145 SFOWNER IN 1� / _ OFF DAVIDSON PLORDANCE ANN NG ORDITH THE NANCE (TOYP) I 0.12 AC ���P j n' ) /MTK `90t 2+ 0 PR 10' WIDE COU ITRYTIME WAY 3+ p�0����6$$/. �Cj� / / \ J�' P� 63 Z •„• O �O OP. VARIABLE �0 MIN. PUBLIC R/W L13 4+00 0 ` �pF� / ®�tl,"� / PAD: p epS ✓V > \ \ • O G 12.37' 9.43' 21.34 24.39' "q /k r4.31-I �7R 5.15' - �' s. 1 1 : ®� PROP. 10' X 35' SIGHT • ^x 5' REAR 1 26.85' 2279' 2z.ss' V r� x \ ti6 SETBACK (TYP.) a� 5' RE25.s3 g6 �'s TRIANGLE TYP. \ / O PROP. C.O.S. S (TYP.) \ • �� 4 � � � SETBACK 5' REAR � O SETBACK (TYP.) r 0.063 AC. PROP. C.O.S. 0.206 AC. o / ROP. 10' X 35' LUI • IGHT TRIANGLE W /'' C1\ , 10 \ • • ' \ N - 9 1,703 Sr- (TYP.) 2 3 PROP. C.O.S. I 1,733SF d • . ,1 4 a 0.132 AC. 0.04 AC • • /o \ o 8 1,936 SF 0.04 AC rn° PROP. .S. / 2,435 SF 2,320 SF ,414 SF ^ /^ °j 6 7 0.04 AC / / \ / 0.06 AC 0.05 AC 0.06 AC V. s 0.013 A + \ 3,172 SF 1 3 -� \ / 2,836 SF 2,820 SF 2,397 SF 3,355 SF \ 0.07 AC 2i ( '°° \ o PID; COS O �fN 0.07 AC PHASE 0.06 AC 0.06 AC 0.08 AC 1 d + ti/O , FF`OZ Q I ° 0 05 AC > " PROP. MAIL KIOSK - / 6A I \ 5 FRO ��P 2 o i �6 G� ° 14 PROP. 20' STORM DRAIN //,S(,f,^ o� OP. A MP (TYP.) SEE NOTE THIS SHEET 1 ��gPC�l21o� tit°� S���P 1 5 ' 1,470 SF /a EASEMENT (TYP.) \ M%�I „leis (SE IL SH 02) o �22\ 4S 5' FRONT I I s '4Ss, ✓/ o° 0.03 AC l ti9°/ 27, ETgq V 3� i 3 11470 SF Q \ Q V b o 02' CK (TYP. 16 0.03 AC \y °6 \ �O 21.00' -os:) 36.E __� R` o° PGA �s _ J / f 24.02' 1.94 9.05' -- \ 17 1 .03 SF ��0 PROP. FULL DEPTH _ zp12 • y \ 0 Ac 1,470 SF �Q 6 O EXISTING SIDEWALK TO „i o 1 8 °° 0.03 AC 2�9 6x PROP. PUBLIC \ \ ASPHALT REPLACEMENT REMAIN (TYP.) °3 1 RIGHT-OF-WAY TYP. \ T 6 (TYP.) 2� s 1,868 SF d (TYP.) PROP. 40' PUBLIC RIGHT-OF-WAY •, �o \ 0.04 AC �% / FOR FUTURE STREET CONNECTION \\ 1 `� / I �• ``•a x PROP. 2'-0" STD. CURB BUMP OUT O j �21 / / (TYP.) \ \ o FOR ON -STREET PARKING (TYP.) �h i� PROP. ASPHALT T -� 21�1 N� P o , 19 0. 1•C. Ac.s OVERLAY (TYP.) 2F 6� / / \ LEGEND :/ - CONTRACTOR SHALL \ • / / S 20 0.04 AC / \ N PROTECT EXISTING 2\� r . 46, ° \ PEDESTRIAN STREET SO' 2 si - 2, \ w 21 1,478 SF _ ` 21 os 2105' w_ o 0.03 AC PROP. 10' CONC. <u a 2tor 21.01' � � 22 1,477 SF ��o O •/� LIGHTING THROUGHOUT 21.01' 21.0� U' Z cx SIDEWALK 2,.os' 6z zs.5 ' 21.05' 0.03 AC EXISTING ELECTRIC POLE 23 1,479 SF 5' FRONT ) 5' FRONT �0 24 1,482 SF 0.03 AC �(C�P j / CONSTRUCTION (TYP.) (TYP-) N\ of / o U m�U SETBACK (TYP. `' SETBACK 2 m /� 5 ��6. 2,016SF 0.03AC SG �y EXISTING PEDESTRIAN STREET 36 m 25 n\ �P� 01 A LIGHTING 35 cn I 26 � 0.05 AC I •• •• , 2,354 SF M 32 o � 27 N 0.05 AC 21. ° � �� • • '� v� 33 M 29 28 14795 \ ° v cf EXISTING CONCRETE SIDEWALK 0.05 AC 31 D � 30 \ / ®b / M 1,518 SF 1,501 SF 1,498 SF n 1,475 SIF �\ O \ 4 0.03 AC 0.03 AC 1,498 SF 2,345 SFT. 2,306 SF 1,474 SF I'474 SF 0.03 AC o\ 5 RE 0.03 AC 0.03 AC 0.05 AC 0.05 AC 0.03 AC 0.03 AC 0.03 AC ' / �y c \ r� rF � EXISTING CURB AND GUTTER AR / SETBACK 5' REAR SETBACK (T�- ///��� ,s.os' 21 p 5.4 (TYPO 21.01' ,, EXISTING PROPERTY LINE � 21. 18.78' 18.86' 3.68' _ 13.63' 21.04' � � 3+n0 y /� .�� / T E WAY ,1 , / T ® ti 2�3� / T N , 00 N L4 1+ 0 C2 +- -� L52+,00 10' PIRIL OP. 20' PU LIC RIW �� - - E�W\10 \ `� �\ EXISTING R/W ✓ .' ' �� � PROPOSED PROPERTY LINE QE PROP. GUARDRAIL (TYP.) -SEE DETAIL _ �s \ PROPOSED WALKING PATH. 6' �� \ PROPOSED R/W 31 al 31 - 31 31 31 �E WIDE NATURAL MATERIAL. \ �`� �� OR- • • ,�� �y N r ��� SEE DETAIL ON SHEET C7.04 \ - PROPOSED SETBACK LINE _ Ted / � � / PROP. 8' ASPHALT. � \ _ __ SIDEWALK (TYP.) TE TE TE- TE TE- PROP.C.O.s. PROP. 3' WOOD FENCE WITH PROPOSED 20' PUBLIC PROPOSED EDGE OF PAVEMENT �. pF • , � - TE----- - TE- -- ,X \ 3.116AC. WARNING SIGNS (TYP.) WALKING PATH \� m 08 / FUTURE o \ \ \ EASEMENT (TYP.) m PROP. PEDESTRIAN STREET LIGHTING 1 1 b / FIXTURE (TYP.) - TO BE SELECTED BY PROP. ACCESS PROPOSED CURB LINE N OWNER IN ACCORDANCE WITH THE PROP. 20' STORM DRAIN GATE IN FENCE 1 m PHASE 6D TOWN OF DAVIDSON ORDINANCE EASEMENT (TYP.) \ m ILU PROPOSED CONCRETE SIDEWALK J PROP. 5' coNc. ?A �" PROPOSED FULL DEPTH ASPHALT (O SIDEWALK (TYP.) / PHASE m \ r REPLACEMENT 4 11 1: ]5CC< I / PROPOSED TEMPORARY 66 \ m PROPOSED ASPHALT OVERLAY BARRICADE - SEE DETAIL Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z W Lu 7 Jm� O Z Q J Q 06 G z � � 0 C3 = vJ wwv O (D mz = J z z O Q = LU W W j Z)0= z �o c/) W O Z U J m O O SEAL :� ��' •FPS + / 1 40016 '.,�-y,` !�'c! NEB• �2�: KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS ENO. DATE TBY I DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE SITE PLAN PROJECT NO. 501 04981 C3002 1 9 1 d C C G "-mor Dewberry,va Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ �^ V J H Z U-1 Lu I— Jm� O Z Q J 06 5 G z C�a� O c� Lcr O fr CO F— Z U J z z O Q = LU LU w Z) 0 = z o Lu O Z U J m O O T SEAL %10% II10rr4f.* % �N CA A. �,� o� oF�s 1 5 AL 40016 4 'U: '.,�-y,` !�'c! NEB• �2�: KEY PLAN SCALE: 1" =30' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 UTILITY PLAN PROJECT NO. 50104981 C3mO3 E C U 1 2 3 4 5 4.0.6 EMBANKMENT REQUIREMENTS STEP 4: OUTLET PIPE FILL PLACEMENT \ \ \ I I I l h THE FOLLOWING EMBANKMENT SPECIFICATIONS APPLY TO ALL BMPS WITH EMBANKMENTS THAT ARE • FILL OF THE CULVERTS SHALL BE PLACED AND COMPACTED IN 6-INCH THICK LOOSE LIFTS AROUND THE DESIGNED TO HOLD DROP INLETS AND UP TO 2 FEET ABOVE THE CULVERTS. \ WATER, EVEN IF THE EMBANKMENT IS DESIGNED TO HOLD WATER ONLY DURING A STORM EVENT. 0 COMPACTION SHALL BE PERFORMED BY HAND TAMPERS OR SMALL HAND OPERATED COMPACTORS. I I I I I I 1 �/ \ \ \ \ \ \ ) I I I \ \ ` \ • COMPACTION SHALL BE AT A MINIMUM 95 PERCENT OF THE STANDARD PROCTOR (ASTM D698) MAXIMUM I I I ( I I \ I( / \ \ \ \ \ \ \ \ \ 4.0.6.1 EMBANKMENT FILL MATERIALS DRY DENSITY. COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT I I I I t I l ` \ \ \ \ \ \ \ \ ` \ \ \ \ \ / 1 I I \ \ \ \\ \ \ \) I r // < \_ ABOVE THE OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY - _ THE FOLLOWING PARAMETERS APPLY TO MATERIALS USED TO CONSTRUCT EMBANKMENTS: ENGINEER. I I I \ \ \ \ \ \ \ \ \ \ \ \ 2S / /� _ 1 i� / _ _ _ /' _ _ = /� BORROW MATERIAL SHALL BE CLASSIFIED AS ML, MH, SC, SM, CL OR CH SOILS ACCORDING TO THE ADDITIONAL COMPACTION OF LIFTS 2 FEET OR GREATER ABOVE CULVERTS SHALL CONFORM TO THE I I \ \ \\ \\ \ `\ \ \ \ \ \ _ r _—=='/�i/%/ /\�\\ - - '1 1/ j 1 / ✓' - UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D2487) OR ANY MIXTURE OF THESE SOILS. EMBANKMENT FILL PLACEMENT SECTION OF THIS SPECIFICATION J- I i1j, \ \ \ \ / �/ ///BORROW MATERIALS SHALL HAVE A LIQUID LIMIT (LL) BETWEEN 40 AND 60 AND A PLASTICITY INDEX (PI) :TEPABORADTQUALITY ORY TESTCONTROL \ \ \ / \ BETWEEN 15 AND 30 (ASTM D4318). PERFORM LABORATORY MATERIAL TESTS IN ACCORDANCE WITH ASTM D422, ASTM D698, ASTM D2216, l � \ \ \MATERIALS SHALL BE FREE OF TOPSOIL, ORGANIC MATERIAL, ROOTS, STUMPS, BRUSH, ROCKS LARGER THAN AND ASTM D4318.3 •• TEST AT A FREQUENCY OF EVERY 500 CUBIC YARDS OF EMBANKMENT FILL MATERIAL PLACED, WHENIIINCHES, SUBSOIL, DEBRIS, VEGETATION, AND OTHER FOREIGN MATTER. MATERIALS USING FOR EMBANKMENT FILL CHANGE, AND/OR AS DIRECTED BY THE ENGINEER. •• SAMPLE SIZE SHALL BE 50-LB / / I \ � ` I \ \ \ \ \ \ \ \ )I ( \ \ // \ \ I ` \ \ \ \ ALL MATERIAL CLODS WILL BE BROKEN DOWN WITH TILLERS AND/OR DISCS TO PROVIDE A HOMOGENEOUS \ \ \� ` ❑® \ I \ \ \ ` ` \ ` II 1 \ ✓ // \ \ \ SOIL- \ , THAT IS FREE OF CLAY CLODS GREATER THAN 3 INCHES IN DIAMETER. • •• IN PLACE COMP PLAON AND NATURAL CE COMPACTION MOISTURE TESTS IN ACCORDANCE TESTS E WITH ASTM D1556, ASTM D2922, OR ASTM \ \ \ \ I\ \I I I I I 1 \\ \ \\ \ \ \\`\ \ \ \ \ \ \ j I 4.0.6.2 EMBANKMENT CONSTRUCTION D2937 AND NATURAL MOISTURE CONTENT TEST IN ACCORDANCE WITH ASTM D2216. 1 I I \ \ \ \ \ \ cS �S > / / •• FREQUENCY OF COMPACTION/NATURAL MOISTURE CONTENT TESTS: / % 1 \ \ � � \ � \ \ I \ \ \ \ \ \ y \ / ✓V/'� �/� � �` / � / / / - THE FOLLOWING STEPS APPLY TO CONSTRUCTION OF AN EMBANKMENT: •• EMBANKMENT FILL: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 2,500 SQ. FT. I I / \ \ \1�- _ •• PIPE INSTALLATION: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 30 LF OF PIPE. STEP 1: SUBGRADE PREPARATION: I \ \ `\ \ \ ` \ \ \ \ \ \ \ \ \ \ \ \ ` \ \ \ III\`\\ // ��^A� I� i' • COMPACT SUBGRADE TO DENSITY REQUIREMENTS FOR SUBSEQUENT FILL MATERIALS. WHEN TESTS INDICATE WORK DOES NOT MEET SPECIFIED REQUIREMENTS, REMOVE WORK, REPLACE AND \ \ \ \ \ ` \ \ \ \ \ �// ' \ \ \ \ \ \ \ \ \ \ \ \ \ ` \ \ \ \ \ ` \ \ \ 1 I (IIIII///1 T/.7/ • CUT OUT SOFT AREAS OF SUBGRADE NOT CAPABLE OF COMPACTION IN PLACE. RETEST.IIIII 6 • SCARIFY SUBGRADE SURFACE TO DEPTH OF 6 INCHES. \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I I I�\\\ / / Aso • PROOF ROLL SUBGRADE TO IDENTIFY SOFT SPOTS; FILL AND COMPACT TO DENSITY EQUAL TO OR 4.0.6.3 ALLOWABLE VARIANCES \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ GREATER THAN REQUIREMENTS FOR SUBSEQUENT FILL MATERIAL. EMBANKMENT SPECIFICATIONS MAY BE MODIFIED BASED ON SITE SPECIFIC GEOTECHNICAL INVESTIGATION \ \ \ \ \ \ \ \ I ( 1, _ AND \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ ` \ I 717 STEP 2: SEEPAGE KEY PLACEMENT ENGINEERING DESIGN. \\ \ \ • SEEPAGE KEY TRENCH WILL BE LOCATED BETWEEN EMBANKMENT ABUTMENTS. • SEEPAGE KEY SHALL EXTEND TO A MINIMUM DEPTH OF 4 FEET OR AS REQUIRED THROUGH GEOTECHNICAL SEEPAGE ANALYSIS. A MINIMUM BOTTOM TRENCH WIDTH SHALL BE 10 FEET AND THE l \ / \ / I I / I I \ \ \ \ \ \ \ 1 \ \ \ i \ \ �� - i TRENCH SIDEWALLS SHALL BE SLOPED OR BENCHED TO PROMOTE STABILITY AND BONDING BETWEEN l \ 758- `- / / ^ ' \I �) I f / /) I I I I \ I \ \ \ \ \ \ \ 1 \ \ \ \ - _ �_ ' _ THE SIDEWALL SOILS AND SEEPAGE KEY FILL. STEP 3: EMBANKMENT FILL PLACEMENT�e • EMBANKMENT FILL SHALL BE CONSTRUCTED AT 3(HORIZONTAL):1(VERTICAL) OR AS SHOWN ON THE \ \ \ - - - - - -ep• / /\ ) ) / / \ \ \ \ \ \ - DRAWINGS. DRAWINGS. DEMONSTRATION OF APPROPRIATE SAFETY FACTORS AGAINST FAILURE THROUGH - �' \\- \ % \/ % / / / / I \ 1 \ \ \ \ ` - GEOTECHNICAL ANALYSIS SHALL BE REQUIRED FOR SLOPES STEEPER THAN 3(HORIZONTAL):1(VERTICAL). \ \ \ PAD, /I i !L�/ / ,,-,• • FILL SOILS SHALL BE PLACED IN LOOSE LIFTS NOT TO EXCEED 8 INCHES IN THICKNESS AND BE \ \ _ / O/ COMPACTED TO A MINIMUM OF 95 PERCENT OF THE SOILS STANDARD PROCTOR (ASTM D698) MAXIMUM \ \ ` - - - - "- - - - - _ - "/3 ZS � >���/� ��,0 // / / DRY DENSITY, OR AS SPECIFIED ON THE DRAWINGS. \ \ \ 3 > Q6 / 0(xj� , / / / / / / / /� I \ \ - - VIX, SSMH • COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT ABOVE THE \ \ \ P/' / / '�L�� // ' \ \ _ )RIM; 735.49 OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY ENGINEER. \ \ �� / �-755— Y S�` / / / / / /' // // l l / \ - \ / //INV, IN; �25,02' • FILL SOILS SHOULD BE PLACED IN CONTINUOUS, HORIZONTAL LAYERS FROM ABUTMENT TO ABUTMENT. INV, ❑U 724,89' EXISTING SLOPES GREATER THAN 4(HORIZONTAL):1(VERTICAL) SHALL BE BENCHED TO PROMOTE \ /' / / / / / / / / / / / /a'/ \/ I \\ j� /% / BONDING OF NEWLY PLACED FILL WITH EXISTING SOILS. BENCHING SHALL BE PERFORMED AT MAXIMUM \ \ - \ _ _ _ _ / / / / / / / / / / / / / Q) 1 EX. OF 2 FEET VERTICAL INTERVALS AND SHALL EXTEND A MINIMUM OF 4 FEET HORIZONTALLY OR AS \ \ �' - \ - _ _ _ _ -' / / _ / / / , / / / RIM; 738 SPECIFIED ON DRAWINGS. \ \ \ _ - _ `- _754'' / _ - - - \ �' /' / / / / / / / `� d / I WN ci • WITHIN THE UPPER 12 INCHES OF EMBANKMENT, FILL SOILS SHOULD BE COMPACTED TO 100% OF ITS `l \ - r' _ _ - _ _ - - - �' / / �' / / / _ / / A 60 \ \ \ STANDARD PROCTOR (ASTM D698) MAXIMUM DRY DENSITY. r \ \ _ - _ J _ _ -' / / - \ - \ / / / / / / / / / / / / / / �\ J / / I / / d,(\ / - - - \ _. \' l/3 \� • FILL AGAINST SUPPORTED STRUCTURES. DO NOT FILL AGAINST UNSUPPORTED STRUCTURES. Il l / 752- _ _ - - / • PLACE FILL SIMULTANEOUSLY ON EACH SIDE OF UNSUPPORTED STRUCTURES UNTIL SUPPORTS ARE IN -• / / / / / / / / I / •' / / r 1 I \�L('^ , P�J PLACE. L_ J^\ -\__� / / �- ��' \\ //' //' /' / / / / / \ - i� ` 1 e�S • PLACE A MINIMUM OF SIX INCHES OF TOPSOIL ACROSS DAM EMBANKMENT TO PROMOTE VEGETATIVE - / / i / / / -739-1 �X. CB ^ A L, p \ GROWTH. - -� _ - - - \ _ _ _�750�' �-� - - - ` - J/ �' / / / / / / / PROP. 20' STORM DRAIN / // / / /RIM; 7/36.04' / \ 1 ' "/13 1 �Q > \ " ' a I ) I 17 49 / / / / / / / EASEMENT (TYP.) / ,� / / ' �(° t /DNV/ / 11 ( \ S'P� 1 ` \3,� - / I 748 _ 750� , / / / ` ' !' I ^,, I Lot Yo3 I i \ / /1 ----� 74 _DI All 748�DIA10 / / �� / 4�/' ^� '' 7 � ,/ / \ \\ M� of a Op Ir — — _ _\\ \I �' r� /mow,\y►`'/,.Y�9pyP�c�o3 f /' S3 '2 I \ \\ — // // I / / '� / „' •.• EX. DI J / _ - - - - - - - - - 15" RCP —COUNT - - / r ® �� MEG:740.33 / /LJ� "Y� I w /\ \> I \ (\ RIM; 7448� _ / _ _ RY TIME W 15° RCP / DI A901, / /I �� /INV, [YGT 73f,90T - - _ _ _ \s- _ - / / c L - ---- - - - - - 1 � v MATCH EXISTING GRADE AT > I I ✓ I / / / 51 / l q I `� 746 _ _\ 74g DI A9� rs - !� ,�1 �� ��j� CONNECTION TO EXIST. CURB / PVMT.� I I /' // / 745 745 \�C�\�MEc: 740s7 Ln 745 - -_ 744 _-/' -�' \6 DIA302 \ f \ \ // / i • • � - � . 3 -744 DI A8 � �MH ✓ EX. SSMH _ tp ` I MEG. 741.97 741,19, / RIM; 47,23' / ^�^^11 �- - - J I ' I✓ / / / - \ -MEG: 741.96�/ IN IN; .7 � 15" RCP /I INV, IN; 35,37 1 1 DI A110 / o \ / - - - - _ _ "��� , INV. 14T; �.d6,4 \\\ , \ / INV. ❑U� 735,17 / 1 �- - 744 \� J ( 7 �43 / �:'/ / / / / \ \'� �\\ PID: C0S rl/'✓ / /cP, '% / < /'/ DIA301 \ \� 5\� / 'S/a �> I / / \ .• // _' _ c,� , 1 C�,p 743 \ - _ / DI A7/\�1g. DI A701 \ - --6 EX. CB---� _ -- EX. - / ) MEG: 739.95 \ - / •� RIM; 739, 7 MEG: 738.98 _ MH A105 � � - �� RIM; 7, / ff^^ I ^ INV, OUT: 7,34.70' _ _ 15 RCP MEG: 739.00 IN I ; 7 147' s �/ / '�� / ,mil 1. // I / / , j .1$ r MEG: 740.98' \ -JzX, DCB ,13g, INV, 7 9,32 / / / d A // R(✓/j MEG: 740.00 > EX. CB RIhT 9-3$.3S MEG: 738.99 �i \ / / .! 4V �.O / / / ni / l // / /` \ / = 24 RCP b2IM; 738,60' �I INV, IN(W);73 �#�- : ' t DI A5� \\ _ 32,58' INV, IN(E); 733, \ '4 DI A6 / / / /' \ - MEG: 738.94 II V, OUT: -733.35' .�� �/ •/ '/ �/ /"-'//'i/ \ Lam= -i ` a BA1 18"RCP f 740 C c� / / /i// 1 / ► / a� _�Is _ �24 RCP - 1 'l3 \ 13 ��� 738 I = - - - �39- �39 \ \ \ I/NV(-nLJT; 738,9j7' _ CB A201 �� _ 15"FRCP _ ,�� �= _ _ Al 04_- -_ 73 �P`� '� I I / / // // / /� J I / / / _� , / 100 �4, RCP / _ ;� _ — — 28 27 26 DI A4 ' \ ��S CFO DI A103� jl/ �; - \ \ 738 DI A501 738- 738 24"_RCP/ I ~ - _ 15" RCP / ' - DI A101 I DI A401 \ I / / T A � ^ �� / / ' ' � DI A102' / 738 15" RCP \ - / \ \ DI A3 / 737 ' / / U / 736 MH A100 / �O� / �24" RC -- 5/ tG�` \ / ✓� � �� I I l �/ . // ,l" // �� ce / / / l / / r3 24"RCP ?S , l:31—ems � _ W I / •/`/,D �/ T \ 1 \ 15" RCP 24"/�C 734 I o 730 n CB A202 /\ 3 / \\ \ \ /\" 3 ^ MCA 730 Rz 72 \ CB A203 725 72722 7 \ / 723 w \ESB1 \ �j I i ^cV �? I / \ \ \\ \ -713LQ - \ l \ \ 1 I I I I I 1 o �� , / 1 I Il o/'00,/l / r00 Ile 10, Ile \ - -,Ila �C� - PROPOSED 20 WALKING �MH A2/ NL? EASEMENT \ / it, lr\ r / / f J /J ,\ 73p�� ,' /�-//��_-_ J 1 / ` I---/' I I 1111111�\\\\\ IIh\\l ► / I I I III III 1 / \ \ �FES Al 712 1. /A 71AII I \\\���\� / l I\\ ////�f /_-\\ ��\ \ \_ \ \ `\��\\ / I /ii`\\`/ll1 1111 I111 IIIII\\ N / \� II -` \\\�\I 1 1 1\ \ \ / / \\\\\\\\��0��� I 725 / ) \ \\%/ / // \ \ \\\ \&�-1i I� I I I r \ \ \P OP.SANP D 1 D 0 2 \ER\ 70 _ \\ _ 712 \------___ \ / III \ _ / 714 ,�� � _ ` \ - - - � / _ / / A// IIIII\ \ \ \ \ \ \ / / _ _ - J/ /' / / � \`\\\\S`\ \ ` � �`�� �\ \ v /-\ 720-'�� \_--_�__ _ /� //// IIIII 1 \ \`- /- / / \��\\� ���_ \ \ \I IL _ \ _ 714 00, — — — — —' \ \ \III//1 qll \ — _ — \ IN — — / — / / — — _ / / / / / \�\\\�\ \\ \ \� _\mil/� FE_SD01\ \- ,99 �'�, Dewberry 9.001 Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 z W Lu I— Jm� O Z Q J 06 5 G z � � O � _ VJ It �0 frF-- mz wwv "' W z O Q = Ll.l W W j Z) 0- = 7 W W O Z U J m O O SEAL 40016 '.,�-y,` !�'c! NEB• r2�: 4fi 1 iaVl =p-�-l� KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 GRADING & STORMWATER PLAN PROJECT NO. 501 04981 C4001 1 9 1 A E C I� Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ �^ V J Z w w I— J a062 00 O Q Z o �° C) � O z 0 (� U Ir wwv zZ p QJ w J Z ^ w Z LW 0 w 0 Z) U J CO O O T SEAL %10% II10rr4f.* % �oF�s N CA A. �,� o� 5 5 AL 40016 4 'U: :,�-y,` !�'c! NEB• �2�: 1161wdWWTI ► HORIZONTAL SCALE: 1" =40' 0' 20' 40' 80' VERTICAL SCALE: 1" =4' 0' 2' 4' 8' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY CHECKED BY BML BML DATE MAY 31, 2019 TITLE ROADWAY PROFILES (SHEET 1 OF 2) PROJECT NO. 501 04981 C4002 1 9 q d L IN- C G "-mor Dewberry,va Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ �^ V J H Z U-1 w I— Jm� O Z Q J 06 5 G z C�a� O c� Lcr O fr CO F— Z U J z z O Q = LU LU w Z) 0 = z o Lu O Z U J m O O T SEAL %10% II10rr4f.* % �N CA A. �,� o� oF�s 5 5 AL 40016 4 'U: '.,�-y,` !�'c! NEB• �2�: 1161WAWI_1ON HORIZONTAL SCALE: 1" =40' 0' 20' 40' 80, VERTICAL SCALE: 1" =4' 0' 2' 4' 8' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE ROADWAY PROFILES (SHEET 2 OF 2) PROJECT NO. 501 04981 C4mO3 1 9 'q d F I! C G Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ �^ V J Z w w I— J a062 00 O Q Z o �° C) � O z 0 (� U Ir wwv zZ p QJ w J Z ^ w Z LW 0 w 0 Z) U J CO O O T SEAL %10% II10rr4f.* % �oF�s N CA A. �,� o� 5 5 AL 40016 4 'U: :,�-y,` !�'c! NEB• �2�: OwdMilki HORIZONTAL SCALE: 1" =40' 0' 20' 40' 80' VERTICAL SCALE: 1" =4' 0' 2' 4' 8' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY CHECKED BY BML BML DATE MAY 31, 2019 TITLE STORM DRAINAGE PROFILES PROJECT NO. 501 04981 C5mOl 1 9 q A L E C I� Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ �^ V J Z w w I— J a062 00 O Q Z o �° C) � O z 0 (� U Ir wwv zZ p QJ w J Z ^ w Z LW 0 w 0 Z) U J CO O O T SEAL %10% II10rr4f.* % �oF�s N CA A. �,� o� 5 5 AL 40016 4 'U: :,�-y,` !�'c! NEB• �2�: 1161wdWWTI ► HORIZONTAL SCALE: 1" =40' 0' 20' 40' 80' VERTICAL SCALE: 1" =4' 0' 2' 4' 8' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY CHECKED BY BML BML DATE MAY 31, 2019 TITLE STORM DRAINAGE PROFILES (SHEET 2 OF 2) PROJECT NO. 501 04981 C5002 2 3 I 4 5 Dewberry..pi E Ilk C GENERAL NOTES: 1. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 2. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). 3. COIR MATTING SHALL BE SUBSTITUTED FOR EXCELSIOR MATTING IN HIGH FLOW AREAS. 4. INITIALLY APPLY 3.05 OUNCES OF POLYACRYLAMIDE (PAM) TO THE FACE AND TOP OF THE CHECK DAM AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. 5. ONLY PAMs THAT PASS THE CHRONIC TOXICITY TESTING REQUIREMENTS, ESTABLISHED BY NCDWQ, MAY BE USED. 6. A SEDIMENT BASIN OR SIMILAR STRUCTURE BETWEEN THE APPLICATION POINT OF PAMs AND SURFACE WATERS IS REQUIRED. 7. SUPPLIER TO DETERMINE APPROPRIATE PAM BASED ON SOIL TYPE. r III_II_III_III�II_IIIA� MAXIMUM SPACING _ B - = Is111=111_III_III_111_III_ = L-111_lll_III=III=III=11L A AND B ARE AT EQUAL ELEVATIONS APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS EXCELSIOR OR COIR MATTING 2 1 CLASS B RIP 6' )R MATTING 4' TO 6' ANCHOR MATTING CROSS SECTION H • CD PLAN NOT TO SCALE TEMPORARY ROCK CHECK DAM WITH MATTING AND OPTIONAL PAM STD. N0. REV. 30.1 OBI GENERAL NOTES: 1. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 2. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). CLASS B RIP MAXIMUM SPACING B A --III�II_III_ - - _=III_III_111_III_III_IIL s I_III_II[Ill_III_ FILTER CLOTH III_III_ A AND B ARE AT EQUAL ELEVATIONS APPROVED DATE: 02/2007 MECKLENBURG COUNTY ° Z LAND DEVELOPMENT STANDARDS STEEL POST WIRE FI (IF APF WOVEN FILTER 4' MAX. 1'I a MIN. STONE AX JTER I a iU ° I r � CROSS-SECTION rH PLAN NOT TO SCALE TEMPORARY ROCK CHECK DAM STD. N0. I REV. 30.1 OA STEEL POST HARDWARE CLOTH WASHED STONE (NCDOT #5 OR #57) � FLOW 4" ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL GENERAL NOTES: MAINTENANCE NOTES: 1. SEDIMENT FILTER OUTLET AND HARDWARE CLOTH SHALL BE 16 INCHES HIGH BUT NO 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR TALLER THAN 18 INCHES. HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED IN A MINIMUM OF 12 INCHES 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED IN LENGTH AND BACKFILLED PROPERLY AS SHOWN IN ABOVE DETAIL. HARDWARE CLOTH TO OR REMOVED IT. BE SAME AS STD. #30.09 (19 GAUGE, 1/4" SPACING). 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE GRADE, PREPARED AND SEEDED. DIRECTION OF THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. NOT TO SCALE 8' MAX. JIC WIRE FENCING WOVEN FILTER FABRIC 0 (V GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 6" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 7. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 8. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 9. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 10. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. NBVwC\ STEEL POST WIRE FENCING Z FILTER FABRIC s #5 WASHED STONE `roe i(' MIN. 12" WIDE m a FLOW 4• \- ANCHOR SKIRT; EXCAVATE TRENCH AND BACKFILL WITH STONE MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY E FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSIT EACH HALF THE IGHT THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN E FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO H EXIS FE fRA PREPARED AND SEEDED. MECKLENBURG COUNTY ��'. „�°�i I --I G H HAZARD LAND DEVELOPMENT ��<I STANDARDS �/ TEMPORARY SILT FENCE �r„ Aao 6' MAX. WOVEN FILTER FABRIC 0 I N STEEL POST FILTER FABRIC z W _JV M �m N� FLOW OPE 4, ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL NOT TO SCALE GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. MAINTENANCE NOTES: 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY TYPE. OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 4. TURN SILT FENCE UP SLOPE AT ENDS. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END 5. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER FABRIC SHALL BE REPLACED PROMPTLY. GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE 6. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONF 0 THE EXISTING GRADE, PREPARED AND SEEDED. 7. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 8. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. NO 0 SCALE MECKLENBURG COUNTY LAND DEVELOPMENT f'J' .pw. STANDARDS z H spa APPROVED DATE: 02/2007 TEMPORARY SILT FENCE NOTE: 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1 %. 2. SILT FENCE MAY BE REQUIRED BEHIND BERM ANGLE IRON o °0°0°0 0 0 0 0 0 0 0 0 0 0 0 000 0 o o o o 0 0 0 0 0 0 o 0 0 0 0 c Ono O O O O O Z O O O O O O O O 0 0 0 0 0 0 0 O O O O O O O z O 000000000000000 O O O O O 3" TUBE STEEL- 0 III -I I -III -I 11= _I I- I �-III=1 I --III- I C I=1 I I -III III -I � 1-1 III -1 I I I I I I I I i I I I-1 I I- < NOTE: MAY BE USED WHERE EXTENSIVE HAULING WILL BE DONE. 2"-3" WASHED STONE- STD. 30.11 A APPROVED DATE: 02/2007 MIN 6" PVC PIPE TO SEDIMENT TRAP 1 •II•ly•ly•I�I•ly•y•i•-• • �1� -•I.•ly•y•-•N•N•F• •r•M•M• •N•y•y• . . •M•ly• . •MI•M•Ir• • • • • • • • • • • . • • • • • • • • . • • • •rl• •M•rl•r•r• • • • • • • • • • • . . • •ly•M•rl•r•r•r• • . • • • • • • • . • • •r• • • •Irl•ly•Irl• • • • • • • • • • • • . • •M•r•ly• • •ly•I • • • • • . • • • • • • •M•Ir•M•r•r•M•Irl• • • •r•r•r•M•Ir•Ir• • • • • • • • • • • • . . • • • • • • • • • ew° MECKLENBURG COUNTY LAND DEVELOPMENT _:q .Fr STANDARDS SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN. LENGTH TO WIDTH RATIO 2:1 MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 435 SURFACE (SQ. FT. AREA PER CFS REQUIRED Q10) DATA BLOCK PLAN VIEW rkomoo • WATER SUPPLY O CONSTRUCTION ENTRANCE TIRE WASH AVERAGE AREA- DEWATERIN WIDTH W = � DEVICE * AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY ■ CROSS-SECTION VIEW SEE NOTE #3 1' FREEBOARD INFLOW 1' MIN. INVERT ELEVATION STRUCTURE OF EMERGENCY SPILLWAY PRIMARY SPILLWAY (RISER) ' MIN. DEWATERING ZONE H=2' FILTER FABRIC SEDIMENT STORAGE ZONE BAFFLE WASHED STONE ).11A NOT TO SCALE 30.1 1 B 3RD BAFFLE: HARDWARE CLOTH SURROUNDING SKIMMER NOTES: 1. REFER TO NCESCPDM SECTION #6.61 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SEDIMENT BASINS. 2. REFER TO STD. #30.19 FOR BAFFLE SPACING RISER AND INSTALLATION. 3. FIRST BAFFLE IS TO BE CONSTRUCTED OF RIP -RAP AND #5 WASHED STONE, WITH A 01 MIN. HEIGHT OF 3' AND MIN. TOPWIDTH OF 2'. 4. FLASHBOARD RISER IS NOT PERMITTED. W EMBANKMENT rT z - EMERGENCY SPILLWAY 1 ANTI -SEEP COLLAR NOT TO SCALE BASIN NO. WATER SUPPLY O CONSTRUCTION ENTRANCE TIRE WASH AVERAGE AREA- DEWATERIN WIDTH W = � DEVICE * AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY ■ CROSS-SECTION VIEW SEE NOTE #3 1' FREEBOARD INFLOW 1' MIN. INVERT ELEVATION STRUCTURE OF EMERGENCY SPILLWAY PRIMARY SPILLWAY (RISER) ' MIN. DEWATERING ZONE H=2' FILTER FABRIC SEDIMENT STORAGE ZONE BAFFLE WASHED STONE ).11A NOT TO SCALE 30.1 1 B 3RD BAFFLE: HARDWARE CLOTH SURROUNDING SKIMMER NOTES: 1. REFER TO NCESCPDM SECTION #6.61 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SEDIMENT BASINS. 2. REFER TO STD. #30.19 FOR BAFFLE SPACING RISER AND INSTALLATION. 3. FIRST BAFFLE IS TO BE CONSTRUCTED OF RIP -RAP AND #5 WASHED STONE, WITH A 01 MIN. HEIGHT OF 3' AND MIN. TOPWIDTH OF 2'. 4. FLASHBOARD RISER IS NOT PERMITTED. W EMBANKMENT rT z - EMERGENCY SPILLWAY 1 ANTI -SEEP COLLAR NOT TO SCALE BASIN NO. DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q„ BASIN VOLUME BASIN SURFACE AREA CLEANOUT DEPTH H/2 (FT.) (FEET) (FEET) (FEET) (FEET) (FEET) SKIMMER PIPE DIAMETER SKIMMER ORIFICE DIAMETER REQUIRED (C.F.) PROVIDED (C.F.) REQUIRED (C.F.) PROVIDED (C.F.) 1 6.67 4.67 26.7 8,406 22,412 11,631 12,255 2.25 4.50 20 1.25 10 5.75 2.5 1.2, 1.4 MECKLENBURG COUNTY LAND DEVELOPMENT STD. NO. I REV. 1 J aid 30.06AI STANDARDS NOT TO SCALE SEDIMENT BASIN 30.03 Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 V) z W Lu I- Z JmZ) O Q Z >� 06 C Q j cc rn V / Q (0O 5c ` z O O U a U � Uj ~ U m ° z CW G (� "� < J w W J Z 0 5 L = w W Z) 0- = Z 0 W O U CO O O T SEAL ,'%r,11111111, %% _N CAR �,� o� oF�s 5 AL 40016 Q4 • U ` 4 (31 NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE EROSION CONTROL DETAILS (SHEET 1 OF 4) PROJECT NO. 501 04981 MECKLENBURG COUNTY LAND DEVELOPMENT t `''' SILT FENCE OUTLET OPTION 2 STD. N0. STANDARDS °�.h , �? 30.06D MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS 1 , O' th • TEMPORARY SILT DITCH 30.05 C6m01 2 3 4 I 5 Dewberry 1. E 2. 3. 4. 5. C 0 2 m 1 1111118ym t m.r 1 ' 1 • ' fJ���1'=Ciw1, NOTES: A MINIMUM OF 24" FROM OUTSIDE DIAMETER OF PIPE TO SIDE OF TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED 6". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. ALL BACKFILL MATERIAL SHALL HAVE AN IN PLACE COMPACTED DENSITY OF 95%. STANDARD PROCTOR. THE FINAL 2' BELOW FINISHED GRADE SHALL BE 100%. ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS. BACKFILL MATERIAL BENEATH ROADWAY SHALL BE SELECT BACKFILL MATERIAL. NOTES: 1. THIS TREE BUMPER DETAIL SHALL BE USED WHEN WORKING WITHIN 10' OF AN EXISTING TREE TO BE PROTECTED. 2. ALL TREES SHALL BE SAVED UNLESS NOTED OTHERWISE ON THE PLANS OR DIRECTED BY THE ENGINEER. 3, LUMBER, WIRE AND SANDBAGS MAY BE REUSED FOR OTHER TREES. 4. THE INTENT OF THIS DETAIL IS TO PROTECT EXISTING TREES FROM DAMAGE DURING CONSTRUCTION ESPECIALLY FROM BACKHOE ARM SWING. AN ALTERNATE APPROACH MAY BE USED IF APPROVED IN WRITING BY THE ENGINEER AFTER CONSULTATION WITH THE TOWN ARBORIST OR HIS DULY AUTHORIZED REPRESENTATIVE. PIPE SHALL BE PLACED ON SUITABLE MATERIAL TRENCH DETAIL FOR STORM DRAIN SCRAP 2" X 4" LUMBER MAY BE USED TO SUPPORT WIRE ON BACK SIDE OF TREE * SPACING AS NEEDED TO SUPPORT WIRE �- WITHOUT CUTTING TREE BARK 1 6" 6" TYP. 2" X 4" X 6' LUMBER, (TYP.) ELEVATION VIEW FLOW / o Eq N / RT 6 ?IERM 4'-0" MAX. SPACING \ X - X In (T'PIrAI 1 MECKLENBURG COUNTY " LAND DEVELOPMENT STD. NO. REV, 20.25 STANDARDS�.a STEEL WIRE TO TIE LUMBER TO TREE USE A COMBINATION OF EXTENDED 2X4's AND SAND BAGS TO PROTECT THE BUTTRESS SAND BAGS ® BUTTRESS ROOTS, (TYP.) APPROVED DATE: 02/2007 MECKLENBURG COUNTY W " 2 LAND DEVELOPMENT TEMPORARY TREE PROTECTION DETAIL STD. N0. STANDARDS z °qr� ° �'? 40.12 JtL Art'KUVtU PRESERVATION P REQUIRED RADIU OF TREE BARRIE PLAN VIEW OF ROOT ZONE ONE FOOT FC TRUNK DI THAN 10" FOR PRUNING SEE TREE WHICHI INTERNATIONAL SOCIETY OF ARBORICULTURE SPECS. DEAD TREES AND SCRUB OR Ul' GROWTH SHALL BE CUT FLUSH ADJACENT GRADE. NO GRUBBIN ALLOWED UNDER DRIP LINE. 2"x4" STANDARDS + 1 "x4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT .� STANDARDS NOTES: 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2. LANDSCAPING PLANS SHALL SHOW THE LOCATIONS OF ALL TREE PROTECTION FENCES. 3. REFER TO CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 01000 FOR GENERAL SPECIFICATION REGARDING TREE PROTECTION. TREE PROTECTION RK MULCH, PLACE BARK i AT AREAS NOT CTED BY BARRIER. 40.02 POROUS MATERIAL (COMBINED JUTE MESH AND NAG C125 5 COCONUT LINER OR EQUIVALENT). 8" X 6" TRENCH BACKFILL AND COMPACT FENCE AND FABRIC BURIED IN TRENCH X GENERAL NOTES: 1. DRIVE 5' STEEL POST AT LEAST 24" INTO SOLID GROUND. 2. USE STAPLES 1' APART HORIZONTALLY AND VERTICALLY TO ATTACH THE POROUS MATERIAL TO THE WIRE FENCE. 3. MINIMUM BAFFLE SPACING IS 10'. 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. 5. REFER TO NCESCPDM SECTION #6.65 FOR ADDITIONAL SPECIFIATIONS. 00 \ 0 I BAFFLE INSTALLATION NOT TO SCALE 30.19 SECTION MECKLENBURG COUNTY /e"e LAND DEVELOPMENT STANDARDS rH NOTES 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING TOWN OR NCDOT ROADS. GRATE 1" REBAR FOR BA REMOVAL FROM INLET FILTER E DUMP LC CATCH BASIN APPROVED DATE: 02/2007 DEFLECTOR I' \ OUTLET \\�( 4 I p INSTALLATION NOT TO SCALE CATCH BASIN INLET PROTECTION NOTES: 1. A STABILIZED ENTRANCE PAD OF 2"-3" WASHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B. 6. COUNTY MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. EXISTING GROUND APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT f y STANDARDS , SOIL STABILIZATION FABRIC = UNDER 2"-3" WASHED STONE PUBLIC STREET Ld Ld 0_ V) U J m 30.15 NOT TO SCALE STABILIZED CONSTRUCTION ENTRANCE 30.1 1 A Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, INC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ rn ww I- JmZ) O Q z C Q j 0 C� G O Z O OU C'3 U zz 0 wwv Q J w -1z = w W5; Z) 0 2 7 Lu O U J \ m O O T SEAL S AL 40016 Q!4 • NEB• 2C.) KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 EROSION CONTROL DETAILS (SHEET 2 OF 4) PROJECT NO. 501 04981 C6mO2 2 3 4 I 5 tionel" Dewberry 8' MAX. JIC WIRE FENCING WOVEN FILTER FABRIC E 0 I (V GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 6" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 7. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 8. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 9. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 10. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. aR STEEL POST WIRE FENCING Z FILTER FABRIC s #5 WASHED STONE MIN. 12" WIDE m FLOW ()PE 4 ANCHOR SKIRT; EXCAVATE TRENCH AND BACKFILL WITH STONE MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. MECKLENBURG COUNTY;, HIGH HAZARD D LAND DEVELOPMENT <I STANDARDS TEMPORARY SILT FENCE jCPRO C STAKES #5 WASHED STONE 2 1 MIN. 1 2' MAX. Qp WOOD STAKES (1/4" TO 1/2" GRID OPENING) WIRE MESH CONCRETE BLOCK DROP INLET WITH GRATE SPECIFIC APPLICATION: THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS LENGTH AS NECESSARY TO GO THRU DIKE 4' MIN. PIPE 1.5' MIN. _ _11f FLEXIBLE PIPE TIE DOWN 10' MAX. SPACING TIE DOWN AT END 7\ 4' (MIN)* * AT LESS THAN 1% SLOPE DIAMETER (D) PROFILE EXTEND TO EDGE OF BLOCK AND GRAVEL INLET PROTECTION NOT TO SCALE I P NOT TO SCALE 30.07 SEDIMENT PIT NOT REQUIRED IF BASIN IS LOCATED DOWNSTREAM OF PIPE OUTLET. (VOLUME PER MCLDS 30.12) SPECIFICATIONS: 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE HAND TAMPED IN 4" LIFTS TO THE TOP OF THE EARTH DIKE. 5. FOLLOW-UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT. 6. OUTLET PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE. APPROVED DATE: 02/2007 NOT TO SCALE MECKLENBURG COUNTY LAND DEVELOPMENT E 'V' FLEXIBLE PIPE SLOPE DRAIN STD. NO. REV. t STANDARDS °+>� ° 30.04 CONSTRUCTION 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1.5 FEET HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE. 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE. 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF EMPTYING INTO A DISTURBED AREA. GENERAL NOTES: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP NCDOT #5 OR #57 OF THE WIRE MESH UNDER THE WASHED STONE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES - AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE NCDOT #5 OR #5) ACCUMULATED SEDIMENT, AND WASHED STONE ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER. MECKLENBURG COUNTY Ns R LAND DEVELOPMENT _:C' hI,Lv ' STANDARDS °R» pa 4' MAX. --19-GAUGE HARDWARE CLOTH 2' 1 FILTERED HARDWARE CLOTH AND GRAVEL INLET PROTECTION 2.5" Fairc%th Skimmer° Surface Drain Cut Sheet J. W. Faircloth & Son, Inc. Skimmer shown in www.FairclothSkimmer.com floating position 4" Sch 40 coupling connection 1 I 1 1/2" Vent with Green tip 2 1/2" pvc float I / 1 1/2" hose, ss clamps 2 1/2" inlet 2" threaded male fitting extension 4 on outlet end Patent #: 5,820,751 2.5" HEAD on center of inlet and orifice Aluminum straps suspending inlet 29" 2 29" Inlet 5 Orifice PLATE for inlet 1. Skimmer can be attached to a straight 4" sch 40 pipe through the dam but the pipe may need to be anchored to the bottom at the connection so it is secure. Coupling can be removed and hose attached to outlet using the threaded 2" fitting. Typical methods used: on a metal structure a steel stubout welded on the side at the bottom with a 2" threaded coupling or reducers; on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant: grout a 4" pvc pipe in a hole in the concrete to connect the skimmer. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel (solid, not foam core pipe) should be 1.4 times the depth of water with a minimum length of 6' so the inlet can be pulled to the side for maintenance. If more than 8' long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from 2 1/2" maximum inlet to a 11/2" barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice can be reduced using the plug and cutter provided to control the outflow rate. 5. Inlet is 5" pipe between the straps with aluminum screen door for access to the 21/2" inlet and orifice inside. 6. Capacity 6,234 cubic feet per day maximum with 21/2" inlet and 2.5 head. Inlet can be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. 2-5inchCut 1-15-19 January 15, 2019 MEDIA (SEE NOTE 2) SILT FENCE AS NEEDED VEGETATIVE BUFFER NOTE: 1. PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE PROVIDED TO THE EROSION CONTROL INSPECTOR FOR APPROVAL AND USE. DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. 4. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. NOT TO SCALE APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT STD. NO. REV. 30.09 STANDARDS POINT EROSION CONTROL- DEWATERING ��X X TEMPORARY SILT FENCE (TYP) I I I I DRAINAGE SWALE DRAINAGE SWALE HOUSE HOUSE PAD PAD CONSTRUCTION v ENTRANCE CONSTRUCTION O M ENTRANCE RIGHT OF WAY i �: PHASE 3 FRONT DRAINAGE PHASE 3 REAR DRAINAGE RIGHT OF WAY PATTERN TEMPORARY SILT PATTERN FENCE (TYP) X X �I TEMPORARY SILT FENCE (TYP) DRAINAGE SWALE CONSTRUCTION SEQUENCE: PHASE 3 1. SEE EROSION AND SEDIMENT CONTROL PLAN PHASE 1 AND 2, FOR CONSTRUCTION SEQUENCE PRIOR TO HOUSE CONSTRUCTION OPERATIONS. 2. INSTALL SILT SACKS IN ALL CATCH BASINS. 3. INSTALL CONSTRUCTION ENTRANCES, SILT FENCE, AND SILT FENCE OUTLETS FOR HOUSE CONSTRUCTION. 4. SEED AND MULCH PER SEEDING SCHEDULE. 5. NO EROSION CONTROL MEASURES IN PHASE 1, 2, OR 3 WILL BE REMOVED UNTIL THE AREAS DRAINING TO SUCH MEASURES HAVE BEEN TOTALLY STABILIZED AND PERMISSION RECEIVED FROM EROSION CONTROL INSPECTOR. RIGHT OF WAY CONSTRUCTION PHASE 3 COMBINATION DRAINAGE ENTRANCE PATTERN INDIVIDUAL LOT GRADING Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F 0929 WATER LEVEL V ) r n ww I- Jm� O Z K 06 C C� Q j CC z O 0 U C� O (� ::) wwv MZ Q QJ w Lu J Z ° = w W5; NOT TO SCALE _ U) Z o � w O STD. N0. REV. E) U 30.13 J ED O O T SEAL ,%%% o� oF�s 1 5 AL 40016 Q!4 • NEB• 2C.) KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE EROSION CONTROL DETAILS (SHEET 3 OF 4) PROJECT NO. 501 04981 C6mO3 1 9 'q A L C G Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 vJ ��/^� VJ W LU 1— 75 G Z Z) JmZ) a O Q Z 06 p z ° C� � O Z O OU (� U cr LU � z p z G ` w zZ O 5 G = w U) W LL 2 7 �Z) vJ LU O U J 0" m o 0 T SEAL %10% II10rr4f.* % �N CA A. �,� o� oF�s 1 5 AL 40016 4 •U: '.,�-y,` !�'c! NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 EROSION CONTROL DETAILS (SHEET 4 OF 4) PROJECT NO. 501 04981 C6mO4 2 3 4 I 5 Dewberry..pi E ALTERNATE WALL CONFIGURATION / w \ C B L = LENGTH PLAN N:V SCOpE a o �+ 0 T SECTION 1 -6 SEE STD. 20.23 AND 20.24 I O 4" : I DTI- E IT END END VIEW APPROVED DATE: 02/2007 MECKLENBURG COUNTY FLARED END SECTION D LAND DEVELOPMENT STANDARDS4W 12" T H R U 7 2" PIPE C NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. 2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL OR CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR DESIGN DATA. RIP RAP SUMMARY CHART OUTLET La W1 W2 T* H A-1 19, 28.0' 9.0' 1.5' 2.0' B-1 13' 19.0' 6.0' 1.0' 1.67' D-01 13' 19.0' 6.0' 1.0' 1.67' NATURAL GRADE W2 END OF FLARED SECTION PLAN ELEVATION TABLE OF DIMENSIONS D T A B C E L H:V WT. 12" 2-1/4" 4" 2'-0" 4'-1" 2'-0" 6'-1" 3:1 730 15" 2-1/4" 6" 2'-3" 3'-10" 2'-0" 6'-1" 3:1 730 18" 2-1/2" 9" 2'-3" 3'-10" 3'-0" C-1" 3:1 1190 24" 3" 10" 3'-8" 2'-6" 4'-0" 6'-2" 3:1 1770 30" 3-1/2" V-0" 4'-6" 1'-8" 5'-0" 6'-2" 3:1 2380 36" 4" 1 V-3" 5'-3" 2'-11" 6'-0" 8'-2" 3:1 1 5320 42" 4-1/2" V-9" 5'-3" 2'-11" 6'-6" 8'-2" 3:1 5920 48" 5" 2'-0" 6'-0" 2'-2" 7'-0" 8'-2" 3:1 7470 54" 5-1/2" 2'-3" 5'-6" 2'-10" 7'-6" 8'-4" 3:1 8810 60" 6" 2'-6" 5'-0" 3'-3" 8'-0" 8'-3" 3:1 11180 66" 6-1/2" 3'-0" 6'-0" 2'-3" 8'-6" 8'-3" 3:1 12530 72" 7" 3'-0" 6'-6" V-9" 9'-0" 8'-3" 3:1 13980 GENERAL NOTES: 1. SEE FORMER NCDOT STANDARD 310.01 FOR DETAILS. 2. REINFORCEMENT SHALL CONFORM TO THE REQUIREMENTS OF REINFORCED CONCRETE PIPE OF LIKE DIAMENTER PER AASHTO M170, TABLE 2, WALL B. 3• ALL CONCRETE TO BE 4000 P.S.I COMPRESSIVE STRENGTH. 4. PROVIDE TONGUE OR SPIGOT JOINT AT INLET END SECTION. 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 6. THE DIMENSIONS FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE TABLE. MINOR VARIATIONS WILL BE PERMITTED BASED ON THE MANUFACTURER'S STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USED IN NCDOT MAINTAINED RIGHT OF WAY. NOT TO SCALE (IF NEEDED) V RIP RAP L ;.r: w .... 7 111q NOTE: _LAYER OF FILTER FABRIC MINIMUM H=2/3 PIPE DIAMETER + d50 (see fig 8.06 aft"NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 APPROVED DATE: 02/2007 SECTION B-B T = 1.5 X dmax. MECKLENBURG COUNTY RIP RAP APRON AT PIPE OUTFALLS LAND DEVELOPMENT OTHER THAN AT SWIM STANDARDS ° 'C CORNELIUS 6 NOTES: 1. SEE THE LATEST EDITION OF THE TOWN OF CORNELIUS LAND DEVELOPMENT CODE 1 1/2" SF9.5A ASPHALT (FINAL CONSTRUCTION) 2. CONTACT: TOWN PLANNER (704) 896-2461 TACK COAT (PLACE JUST PRIOR TO FINAL 1 1/2" S9.5B ASPHALT 3. REFER TO TOWN ORDINANCE FOR WHEN FINAL 1 1/2" SURFACE COURSE) (INITIAL CONSTRUCTION) LIFT OF ASPHALT IS TO BE APPLIED. s" COMPACTED AGGREGATE BASE COURSE, OR 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.OB DAVIDSON _ COMPACTED SUBGRADE NOTES: TYPICAL PAVEMENT SECTION 1. SEE DAVIDSON PLANNING ORDINACE SECTION 11.2 NOT TO SCALE STREET REGULATIONS (FOR USE IN CORNELIUS AND DAVIDSON) 2. CONTACT: TOWN PLANNER (704) 892-7591 3. REFER TO TOWN ORDINANCE FOR WHEN FINAL LIFT OF ASPHALT IS TO BE APPLIED. HUNTERSVILLE NOTES: 1. SEE THE TOWN OF HUNTERSVILLE ENGINEERING STANDARDS FOR TYPICAL SECTION (STD. 219.1) A 2. CONTACT: TOWN PLANNER (704) 875-7000 REVISIONS 3. REFER TO TOWN ORDINANCE FOR WHEN FINAL LIFT OF ASPHALT IS TO 1 DATE DESCRIPTION 1 5/09 REVISED TITLE BE APPLIED. 2 7/10 CHANGED HUNTERSVILLE APPROVED DATE 02/2007 3 11 16 REV. TYP. SECT. & NOTE #3 FOR HUNT., CORN., DAV. MECKLENBURG COUNTY CORNELIUS, DAVIDSON AND HUNTERSVILLE LAND DEVELOPMENT STANDARDS TYPICAL SECTION RESIDENTIAL STREET STD. N0. REV. IL 1 1.50 13, 20.23A T (THICKNESS) 20.23 MIN. I LANE WIDTH (L) LANE WIDTH (L) LANE WIDTH (L) LANE WIDTH (L) L/2 L/2 L/2 L/2 L/2 L/2 (TYP) NOTES: 1. PER MUTCD STANDARDS, WHEN CROSSWALK LINES ARE USED THEY SHALL CONSIST OF SOLID WHITE LINES THAT MARK THE CROSSWALK. THEY SHALL BE NOT LESS THAN 150 MM (6 IN) NOR GREATER THAN 600 MM (24 IN) IN WIDTH. 2. IF TRANSVERSE LINES ARE USED TO MARK A CROSSWALK, THE GAP BETWEEN THE LINES SHOULD NOT BE LESS THAN 1.8 M (6 FT). IF DIAGONAL OR LONGITUDINAL LINES ARE USED WITHOUT TRANSVERSE LINES TO MARK A CROSSWALK, THE CROSSWALK SHOULD NOT BE LESS THAN 1.8 M (6 FT) WIDE. 3. IF USED, THE DIAGONAL OR LONGITUDINAL LINES SHOULD BE 300 TO 600 MM (12 TO 24 IN) WIDE AND SPACED 300 TO 1500 MM (12 TO 60 IN) APART. THE MARKING DESIGN SHOULD AVOID THE WHEEL PATHS, AND THE SPACING SHOULD NOT EXCEED 2.5 TIMES THE LINE WIDTH. ■ill 1 . ■ 1 ra'�M �- 1/8" RADIUS • d. • d.. 1/8" TO 1 /4" . ,♦d.., .,d.. JOINT FILLER �1/2" TRANSVERSE EXPANSION JOINT IN SIDEWALK APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT y _.n r11 STANDARDS ao�` PIANO -STYLE CROSSWALK IDTH ALK, R IS NOT v 1' OF 1MP) 50.14 1 9 GENERAL NOTES: 1. A GROOVE JOINT 1" DEEP WITH 1/8" RADII SHALL BE REQUIRED IN THE CONCRETE SIDEWALK AT 5' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 45' INTERVALS NOT TO EXCEED 50' AND MATCHING EXPANSION/CONSTRUCTION JOINT IN ADJACENT CURB. A SEALED 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. 2. SIDEWALK AT DRIVEWAY ENTRANCES TO BE 6" THICK. 3. WIDTH OF SIDEWALK ON THOROUGHFARE STREETS SHALL BE A MINIMUM OF 5'. 4. WIDTH OF SIDEWALKS ON NON -THOROUGHFARE STREETS SHALL BE A MINIMUM OF 5'. 5. SIDEWALK TO BE POURED TO END OF RADIUS AT INTERSECTING STREETS. 6. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 PSI. IN 28 DAYS. 7. ZONING CONDITIONS MAY REQUIRE ADDITIONAL WIDTH SIDEWALKS WHICH SHALL SUPERSEDE THESE STANDARD DIMENSIONS SHOWN. 1/2" EXPANSION JOINT PROPOSED CURB & GUTTER PROPOSED 4" CONCRETE SIDEWALK DETAILS SHOWING EXPANSION JOINTS FOR CONCRETE SIDEWALK NOT TO SCALE CONCRETE SIDEWALKS 10.22 NOTE: TRUNCATED DOMES COLORED PER STD. NO. 10.35E BACK OF WALK EXP. JOINT m BACK OF CURB EXP. JOINT SIDEWALK m D � m W W W FACE OF CURB PLANTING STRIP- W Ai fA ir FLOWLINE CONTINUE JOINT AT 6'-0" 4'-0" 6'-O" GUTTER LIP BACK OF CURB FRONT OF WALK PLAN VIEW -PARALLEL RAMP SLOPE "A" 22:1 WITH PLANTING STRIP SLOPE "B" 1/4"/FT BACK OF WALK SLOPE "D" 4FIRONT OF WALK SIDEWALK m� BACK OF CURB EXP. JOINT`BD AF'l CE OF CURB PLANTING STRIP+ " OWLINE W GUTTER LIP CONTINUE JOINT AT 6 NOTE: BACK OF CURB _p 4'-p" 6 �0 TRUNCATED DOMES COLORED PER STD. NO. 10.356 DIMENSIONS AT BACK OF CURB APPROVED DATE: 02/2007 PLAN VIEW -DIAGONAL RAMP WITH PLANTING STRIP NOT TO SCALE MECKLENBURG COUNTY ACCESSIBLE RAMP STANDARD WITH LAND DEVELOPMENT , „ STD. NO. REV. STANDARDS PLANTING STRIP 2 -0 CURB AND GUTTER 10.31A , JOINT SEALER 1/8" RADIUS (TYPICAL) JOINT FILLER J TRANSVERSE EXPANSION JOINT NOTES: 1. CONTRACTION JOINTS SHALL BE SPACED AT 10-FOOT INTERVALS. FOR VALLEY GUTTER, A 10-FOOT SPACING MAY BE USED WHEN A MACHINE IS USED. JOINT SPACING MAY BE ALTERED BY THE COUNTY ENGINEER TO PREVENT UNCONTROLLED CRACKING. 2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1/2" SHALL BE OBTAINED. 3. ALL EXPANSION JOINTS SHALL BE SPACED AT 90-FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. JOINTS SHALL MATCH LOCATIONS WITH JOINTS IN ABUTTING SIDEWALK. 4. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 P.S.I. IN 28 DAYS. 5. CURB SHALL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS. 6. TOP 6" OF SUBGRADE BENEATH THE CURB AND GUTTER SHALL BE COMPACTED TO 100% STANDARD PROCTOR DENSITY. APPROVED DATE: 02/2007 MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS °RrN cpao,� 1/2 RA �6' V-6" 3" RADIUS dd c. N d 4� d d d d -. 2'-0' 2'-0" 2'-0" STANDARD CURB & GUTTER Mi A '4101.11 dy:RYyCti NOT TO SCALE CONCRETE CONTRACTION JOINT STD. NO. I REV. 1/8" RADIUS 1/2" RADIUS 6" 3" RADIUS 10.17C V-6" STANDARD CURB AND GUTTER 1 -6" 3" RADIUS . -dd. - .02 FT/FT N d m d (ate. d d d e. d < d - .03 FT/FT SLOPE FOR VARIABLE SUPERELEVATION RATES STANDARD CURB AND GUTTER E LEVATI O N .03 FT/FT NOT TO SCALE EXISTING WALK 1/4" PER FOOT ACCESSIBLE RAMP SLOPE NOT TO EXCEED 12:1 I N I 1/4" PER FOOT N a .. "d . d." . 1 M -- _ d ♦ .. 4'-0" OR 5'-0" WALK 4'-0" 9" 1'-9" CURB GUTTER TYPICAL RAMP SECTION . m 0 061vi m 0A 07-111 1 0Ml J 10.17A NOT TO SCALE ACCESSIBLE RAMP SECTIONS WITH STD. NO. PLANTING STRIP 2-0" CURB AND GUTTER 110.31B Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 0VJ ww JmZ) O Q Z 06 C c� Q j cc C� O z O (3 U Ir � zz Q wwv QJ w J Z = w W5; � � 0- z o w O U J 0 m O O T SEAL o� oF�s 1 5 AL 40016 '.,�-y,` !�'c! NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE CONSTRUCTION DETAILS (SHEET 1 OF 5) PROJECT NO. 50104981 C7m01 1 1 2 3 1 4 5 tionef" Dewberry..pi E Ilk FLOW DIVERSION UNDERDRAIN STRUCTURE COLLECTION BYPASS SYSTEM / SDE SDE SDE SDE SDE SDE SDE SDE SDE N ti m m -III-III-� -PRETREATMENT- OUT OW SEDIMENTATION STORM m ❑ _ CHAMBER DRAINAGE -III-III-� m (SIDE) T_�ENERGY m SDE SDE SDE SDE SDE SDE SDE SDE PLAN VIEW FILTER BED OVERFLOW DISSIPATION SPILLWAY STRUCTURE C NOTES: PERFORATED FLOW DIVERSION STANDPIPE 1. ALL SAND FILTERS SHALL HAVE A MINIMUM STRUCTURE DETENTION 20 FOOT ACCESS EASEMENT CONNECTING STRUCTURE TO A DEDICATED PUBLIC RIGHT OF WAY. ACCESS ROAD SHALL HAVE MIN. 12' STABILIZED WIDTH, MAX. LONG. GRADE OF 15%, MAX. CROSS -SLOPE 5%. IN ADDITION, A 10-FOOT WIDE PERMANENT MAINTENANCE ACCESS EASEMENT MUST BE I-� FILTER BED OVERFLOW PROVIDED AROUND THE PERIMETER OF INFLOW I -I I- WQ SPILLWAY ALL BMPS TO ALLOW FOR ADEQUATE I -I I -III-III- V - MAINTENANCE AND REPAIR. 2. ALL DRAINAGE AREAS TO A SAND FILTER - PRETREATMENT - - - - WW III-III- =1 I=1 1= FACILITY ARE TO BE STABILIZED PRIOR III=III=III- ; - - - OUTFLOW TO INSTALLATION OF SAND. 3. CLEAN OUTS IN THE UNDERDRAIN I I -I I -I SYSTEM ARE TO BE PROVIDED EVERY 50' AND AS DETERMINED BY THE COUNTY REVIEWER. CLEAN OUTS SHALL HAVE WATER TIGHT, VANDAL PROOF CAPS AND PROFILE VIEW UNDERDRAIN EXTEND 6" ABOVE THE SURFACE. COLLECTION SYSTEM MECKLENBURG COUNTY r`"•�•° LAND DEVELOPMENT f `' SURFACE SAND FILTER STD. NO. I REV. STANDARDS >� , °�? 21 .24 9" OR 10" f1 1/8" B 5/16y 3/16" 1 5/16" ♦-1 1/4- V-9" APPROX. 12'-5" MAX.�j. SPLICE BOLT 5/8" NC-2 2" FOR POST BOLT PLAN DETAIL OF BOLT 5/8" DIA. x POST BOLT -12 1/2" 4 4 ICE BOLT 4 1/4 REQUIRED 4 14^2 " 15 16" DIA. x BEAM TYPE GUARD RAIL f2^ 1 16"+DEEP RECESS--►15/8" TERMINAL a SECTION M 0, ' N POST POS MAX. 12-6" CENTER TO CENTER OF POSTS T DETAIL OF NUT TYPICAL ELEVATION 113/16" MIN. _I f DIA. HOLE 4 -3 1 /4"- W 6 x 8.5 ER-1 SEE STD. 1 1/6 1 17/32 ~I I`4^ -I r2.1 SLOPE (MIN. 3') �NO. 50.08A It STEEL GUARD RAIL -----PROPERTY LINE 2 5%16" s� DIA. 116" MIN. T + \ 12" DIA. HOLE EDGE OF PAVEMENT 3 1+ 4" GROUND 1 TO BE FILLED io NEUTRAL AXIS WITH CONC. � / 3/4" x 2 1/2" POST N maw - BOLT SLOT z 0) DEAD-END STREET BARRICADE } I 3 1/4" %11. SPLICE BOLT �n 1 SLOT NOTE I2 5/1 " 29/32" x 1 1/8" : A 1. THIS DETAIL IS NOT A GUARDRAIL DETAIL. FOR SPLICE BOLT SLOT " ROADSIDE GUARDRAIL, SEE NCDOT STANDARD \ `• ° DRAWINGS 862.01-862.03 SECTION THRU RAIL ELEMENT DETAIL OF POST T 2. END OF STREET SHALL HAVE 3VX1.5' SIGN "THE STREET WILL BE EXTENDED WHEN THE APPROVED DATE ADJACENT PROPERTY DEVELOPS" APPROVED DATE: 02/2007 NOT TO SCALE MECKLENBURG COUNTY ' c LAND DEVELOPMENT DEAD END STREET BARRICADEIL STD. NO. I REV. STANDARDS 50.07A BACK OF CURB DETECTABLE WARNING W i SEE DETAIL 10.35E Y i i W W i W R6,W W W W W W Wy.y.�WWWy. W W A 2% off 12:1 A AX °°° MATCH 2' SIDEWALK WIDTH R6" RADIUS W y�W VARIES " W CONCRETE SIDEWALK W 12:1 SLOPE (INCLUDES DETECTABLE WARNING) VARIES R6" ­, 0-5' ,� M VARIES 0-6" �y II 2% MAX. PERSPECTIVE TOP OF CONCRETE CURB VARIES 0 TO 6" l- yl VARIES I 12 6" TO 5.5' 6" DETECTABLE WARNING SEE CURB DETAIL BELOW SECTION A -A 1 /2" EXPANSION JOINT I 1 /2" EXPANSION JOINT (TYP,) } CONSTRUCTION JOINT (TYP.) 7 6 r R6" 1 CURB DETAIL NOTES: 1. USE THIS DETAIL ONLY UNDER THE FOLLOWING CIRCUMSTANCES: • 5-FOOT SIDEWALKS WITH CURB RADII OF 35 FEET OR GREATER • 6-FOOT SIDEWALKS WITH CURB RADII BETWEEN 35 FT. AND 30 FT. • 8-FOOT SIDEWALKS WITH CURB RADII OF 30 FEET OR LESS 2. DIRECTIONAL RAMPS MAY BE USED WHEN AN 8-FOOT PLANTING STRIP IS PROVIDED. DO NOT USE THIS DETAIL IF THERE IS HARDSCAPE INSTEAD OF A PLANTING STRIP. 3. ALL CONCRETE SHALL BE AT LEAST 3600 PSI. MECKLENBURG COUNTY Wrv"e� LAND DEVELOPMENT STANDARDS ELEVATION GENERAL NOTES: USE PIPE COLLAR FOR EXTENDING EXISTING CONCRETE PIPE CULVERTS AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. THIS INCLUDES EXTENDING EXISTING PIPES WITH PIPES OF DIFFERENT MATERIALS. CONSTRUCT THE PIPE COLLAR WITH CLASS "B" OR BETTER CONCRETE. OBSERVE ALL REQUIREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. * USE 12 INCH DIAMETER VALUES FOR PIPE DIAMETERS LESS THAN 12 INCH. NOT TO SCALE APPROVED DATE: 02/2007 MECKLENBURG COUNTY DIRECTIONAL ACCESSIBLE RAMP C STD. NO. I REV. LAND DEVELOPMENT 10.40 STANDARDS /---- - - - - - - II I � V EXIST. PIPE I I- - - - - - - - - - SIDE ELEVATION D E F CU. YD. 12" 12" 12" 0.3528 15" 12" 12" 0.3990 18" 12" 12" 0.4465 24" 12" 12" 0.5526 30" 12" 12" 0.6560 36" 12" 12" 0.7640 42" 12" 12" 0.8856 48" 12" 12" 1.0126 54" 18" 18" 2.5793 60" 18" 18" 2.8506 66" 18" 18" 3.1307 72" 18" 18" 3.4176 z O co HQ Q LLJa- = 00U)= LU LL. = Q U O H U- LL oC0 U) CC z . > °� H o_ LU HEET 1 OF 1 840.72 GENERAL NOTES: 1. STEEL BEAM TYPE GUARD RAILS SHALL BE INSTALLED AT THE END OF ALL DEAD-END STREETS, EXCEPT CUL-DE-SAC STREETS WHICH HAVE BEEN IMPROVED WITH A PERMANENT TURN -AROUND. 2. FOR STREETS 26' IN WIDTH THE GUARD RAIL SHALL CONSIST OF TWO(2) 12'-6" SECTIONS OR ONE(1) 25' SECTION, THREE (3) STEEL POSTS, AND TWO (2) TERMINAL SECTIONS. FOR STREETS GREATER THAN 25' IN WIDTH THE GUARD RAIL SHALL SPAN THE ENTIRE WIDTH OF THE STREET. 3. GUARD RAIL SHALL CONSIST OF RAIL ELEMENTS FABRICATED TO DEVELOP CONTINUOUS BEAM STRENGTH AND INSTALLED AS SHOWN. 4. MINIMUM THICKNESS OF GUARD RAIL SHALL BE 12 GAGE U.S. STANDARD. THE RAIL ELEMENT INCLUDING SPLICES, SHALL HAVE A MINIMUM ULTIMATE TENSILE STRENGTH OF 80,000 LBS. GUARD RAIL PARTS FURNISHED SHALL BE INTERCHANGEABLE WITH SIMILAR PARTS REGARDLESS OF THE SOURCE OF MANUFACTURER. THE HOLES FOR CONNECTING BOLTS SHALL BE PUNCHED OF DRILLED, BURNING WILL NOT BE PERMITTED. 5, THE GUARD, BOLTS, NUTS, STEEL POSTS. AND ALL OTHER METAL PARTS SHALL BE GALVANIZED TO CONFORM TO THE REQUIREMENTS FOR THE COATING CLASS, (2.50 OUNCES PER SQUARE FOOT) OF THE CURRENT SPECIFICATIONS FOR ZINC -COATED (GALVANIZED) IRON, AND STEEL SHEETS, COILS, AND CUT LENGTHS, IN ACCORDANCE WITH ASTM 123A. 6. IF THE AVERAGE SPELTER COATING AS DETERMINED FROM THE REQUIRED SAMPLES IS LESS THAN TWO (2) OUNCES OF SPELTER PER SQUARE FOOT, OR IF ANY ONE SPECIMEN HAS LESS THAN 1.8 ONCES OF SPELTER PER SQUARE FOOT OF DOUBLE EXPOSED SURFACE, THE LOT SAMPLED SHALL BE REJECTED, THE FINISHED SHEETS SHALL BE OF FIRST CLASS COMMERCIAL QUALITY, FREE FROM INJURIOUS DEFECTS, SUCH AS BLISTERS, FLUX, AND UNCOATED SPOTS. 7. THE GUARD RAIL SHALL BE INSPECTED TO DETERMINE THAT THE MATERIAL, DIMENSIONS, AND WORKMANSHIP ARE IN ACCORDANCE WITH THIS PLAN. 8. WHERE A DEAD-END STREET REQUIRES GUARD RAIL, END OF ROADWAY MARKER SIGNS SHALL ALSO BE REQUIRED. (SEE STD. 50.08A & 50.08B) (ER-1). APPROVED DATE: 02/2007 NOT TO SCALE MECKLENBURG COUNTY R° �� ;��°z DEAD END STREET BARRICADE LAND DEVELOPMENT STANDARDS eX�a GENERAL NOTES 50 GENERAL REV; NOTES: 1. A MINIMUM OF 24" FROM OUTSIDE DIAMETER OF PIPE TO SIDE OF TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED 6". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. 2. ALL BACKFILL MATERIAL SHALL HAVE AN IN PLACE COMPACTED DENSITY OF 95%. 3. STANDARD PROCTOR. THE FINAL 2' BELOW FINISHED GRADE SHALL BE 100%. 4. ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS. 5. BACKFILL MATERIAL BENEATH ROADWAY SHALL BE SELECT BACKFILL MATERIAL. RECOMMENDED 10 w I U n<. m PARKING ANGLE 90° o 0 (TWO WAY OPERATION ONLY) O O U I ( I I 18'-6" 26'-0" 18'-6" CL co PARKING ANGLE 60' �o U p O (ONE WAY OPERATION ONLY) < w a o w J 3 20'-6" 16'-0" 18'-6" m I N w U m IL Of U) U PARKING ANGLE 45° p o (ONE WAY OPERATION ONLY) < w J � 3L\ I 19'-6" 12'-0" 16'-6" APPROVED DATE: 02/2007 uqc MECKLENBURG COUNTY LAND DEVELOPMENT I�l» ' 2 STANDARDS e ADDITIONAL PARKING BAYS AND <� CHAMFERS/REVERSE CURVES AS APPROPRIATE. PIPE SHALL BE PLACED ON SUITABLE MATERIAL TRENCH DETAIL FOR STORM DRAIN MINIMUM 1� w U 00 d � m � U of w U 18'-6" 23'-0" 17'-0" 0, Li (n I U o I o < w 0 Q o J 3 18'-0" 16'-0" 16'-6" 0 1 I w 1 N <X m a � U ow < X0 0: w o Q J 3 17'-6"12'-0" 16'-0" z_ I� NOTES: 1. CHAMFERS/REVERSE CURVES NOT NECESSARY IF ADEQUATE DRAINAGE CAN BE PROVIDED THAT WILL ENSURE THAT SEDIMENT, WATER, DEBRIS, ETC., DOES NOl COLLECT IN 90-DEGREE CORNERS. 2. PARALLEL ACCESSIBLE SPACES AND LOADING ZONES TO BE REVIEWED ON A CASE -BY -CASE BASIS. 3. FOR PARKING BAYS THAT ARE 8 FEET IN WIDTH OR GREATER, THE PAVEMENT MARKINGS SHALL BE SET AT ONE (1) FOOT LESS THAN THE STALL WIDTH. 4. GREATER SEPARATION FROM INTERVENING STREETS THAN THE DISTANCES PROVIDED IN THE MATRIX MAY BE REQUIRED AT TOWN OR COLINTY'S DISCRETION. 5. POSITIVE DRAINAGE SHALL BE PROVIDED EITHER BY INSTALLATION OF APPROPRIATE DRAINAGE STRUCTURES OR SLOPE PARKING AREA TO STREET FLOW LINE. MECKLENBURG COUNTY LAND DEVELOPMENT STANDARDS r1`o y_caa Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 WVJ ww I- Z Jm� Q O Q z 0 C 0 j cc G z O 0 U W cr (.0 O (� wwv zz O QJ w Uj 1 z =w w5; NOT TO SCALE Z) 0 = z W w O STD. N0. REV. U 20.25 J o CID O O T COMPACT w � }n m In of � U Of !i LE 16'-0" 21'-0" 15,-0" 1. FOR ACCESSIBLE PARKING 6 STAN DARDS/S IGNAGE SEE STDS. 50.1OA, B, AND C. w 2. PAVEMENT MARKINGS SHALL BE 4" WHITE PAINT. V) I U o I o 3. ALTERNATIVE PARKING ANGLES, < 1 AISLE WIDTHS, AND OPERATION o I (TWO-WAY ANGLED PARKING OR J REVERSE -ANGLE PARKING) WILL 3 BE CONSIDERED ON A CASE -BY -CASE BASIS. 15'-0" 14'-0" 14'-0" X , / Q 40 m I K U) O p U < 0 0 w 1 J � 3 14'-0"12'-0" 13'-O-' PARKING STANDARDS NOT TO SCALE 50.09A 2'-6" STANDARD CURB & GUTTER PROVIDE CATCH BASIN OR SLOPE PARKING AREA TOWARD STREET FLOW LINE. 4' R ® PC PT cy9�T FQ 0 F PARALLEL -PARKING NSF 7' R PAVEMENT MARKINGS CL PER MUTCD (TYP.) PC ELF MEASURE DISTANCE TO NEXT INTERVENING STREET => FROM THIS POINT OR FROM PT. (SEE MATRIX BELOW) STREET z_ z MINIMUM DISTANCE TO NEXT INTERVENING STREET YO D_ Q0 J Q O JO J J DRIVEWAY LOCAL COLLECTOR TH'FARE LOCAL/COLLECTOR 20' 20' 20' THOROUGHFARE 20' 20' 50' a- m APPROVED DATE: 02/2007 NOT TO SCALE PARALLEL PARKING STANDARDS STD NO I RFV SEAL ,% 11111oil I, o� oF�s 5 AL 40016 r 4 •U - - GINEB•�2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE CONSTRUCTION DETAILS (SHEET 2 OF 5) PROJECT NO. 501 04981 I C7002 1 I 2 I 3 I 4 I 5 E �J C M/ v m GENERAL NOTES < USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. ri z D H O 0 FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS r O m CA ACCORDANCE WITH AASHTO M199. z = D 1_4 --IASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" = O D C.)m FROM THE TOP TO THE BOTTOM OF THE MANHOLE. m z � WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT z = -o O Om THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM 1--I r OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. • p O F-1 O DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF D > D (�!1 F-1 THE MIN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE D W T As Z ON INTERNAL MIN. MIN. MIN. CIRCUMFERENTIAL H Q DIAMETER WALL TOP/BOTTOM AREA OF STEEL (FT.) THICKNESS SLAB THICKNESS PER VERTICAL FT. (IN.) (IN.) (SQ. IN.) z OW OJ N =cc WQQW= 4 4 6 0.12 QU=O(D 5 5 8 0.15 F-= ~ Z W 6 6 8 0.18 Cl) LL ONQ Z ,j= �F-1 d 0 z THINNEST PORTION OF THE TOP/BOTTOM SLAB. ALTERNATE CONE SECTION H '-0" ' W N GRADE RING I p * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS v MIN. AREA OF STEEL A DISTINGUISHABLE TOP AND BOTTOM. :� ° IS 0.07 in .2 ECCENTRIC CONE 2 'W' W m n a 1" MIN. ADDITIONAL #4 REBAR CA CLR. s . 0,• a e' a Z Li ,T, Io 1 MIN. USE MIN. AREA OF STEEL IN TOP r CLR. SLAB OF #4'S @ B" CTS. Z 1•-1 EACHWAY/EACH FACE *. ro = FLAT TOP SLAB rIm =ma = Z ADDITIONAL #4 EACH DO � v SIDE OF OPENING (1" D CLEAR OF BOTTOM FACE = PLACE BARS DIAGONAL coUl O TO CORNERS (TYP.) FRAME AND GRATES STD. NO. TRAFFIC BEARING 840.37 NONTRAFFIC BEARING: 840.22 840.24 840.20 840.29 840.33 6 MAX. PACING W LOCATE WALL REINFORCEMENT OF CIRCUM. R/F IN MIDDLE THIRD OF WALL o ADDITIONAL #4 EACH SIDE OF OPENING (1" CLEAR OF BOTTOM FACE) v -0Zao - _ - -0 v �, i FRAME & GRATE i I IIr _-_JL m `� `� 7-� m SHEET 1 OF 1 GRATED INLET OPTION MANHOLE OPTION 840.52 v vm I --I a < --Iz 70000 r n Cl) mZ =� =-nDDm 2 O O 0 z F1 r _1 O O Fi nDy> C/) ~ O - z m O Z O � Z F-1 j \A / _ N � =Cp mU) = m z _ c C� D m - v D H to m N 0 ~ m Z O 840.02 v vm H -1 <' z m0j 0 0 mm0-1�to 1-1Z=D =-nZDm = CD 0 0 z 1� 0 -n o ODDD O O 1;1 Z C) z O 0 CD j _ N m -mom D �mz c v vD v C C V v H M Z z r� m o _ 840.14 z BACK OF CURB X Y ---- m :a.. '.o'.'. PLAN X SECTION Y-Y RISER HT. VARIES - 6„ WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES 0' A O O WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION I Y_ PLAN WITH GRATE & FRAME REMOVED SECTION X-X SECTION X-X SEE WEEP HOLES ""T" -OPING(INCIDENTAL) M ELEVATION 840.16 FRAME - iATE 6" (SEE NOTE) N O ° LL STEP STD. C, NO. 840.66 As Z " 0 d (CIRCUMFERENTIAL Z REINFORCEMENT) d Q LONGITUDINAL REINFORCEMENT U-) co p RISER cc m a -v p = � w' 1W, W J O Cy SEE STD. 840.54 2 = FOR MANHOLE RING AND COVER z BASE Cl)H Z •+ J Q Z ti r rU • REINFORCED GONG. W e .' -� FTG. (SEE STD. y ;:i?' ,•p;:i?'..: O':r?',..•O,:r?',..•<' 1525.01 IF USE MIN. AREA OF STEEL 1 REQUIRED) ~ I IN BASE SLAB OF _ 1 I------0.12 in PER LINEAR______, W FOOT EACH WAY Q CL TYPICAL MANHOLE SECTION GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. '2' VD T SECTION J-J WHERE 30" TO 36" PIPE IS USED PLAN WHERE 42" TO 54" PIPE IS USED z• .. ! A p '. 1 O' LL PLAN GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. ELL #4 BAR B 6" N 0 I "6- I DOWEL MAX. PIPE THIS SIDE SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. TTAL CONCRETE FOR MINIMUM HEIGHT H C.M. R.C. 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" 2'-3" 0.648 0.023 0.036 18" 2'-6' 0.703 0.033 0.049 24" 3'-0" 0.814 0.059 0.085 30" 3'-0" 2'-0" 3'-6" 0.222 0.222 0.925 0.092 0.127 840.52 z 0C/) �a Q FZ•1�0C.i LLJ�I--IZ o0vx = z Q U O 0 I- CAW HOJ O0 z > Ir I- 1--1 CL 0 I W C3 c 0 Z LL 1--I CD CO 3 m a Fi CC m a LO V Z) Q W = I- H C/3 W - 1 N C/5 T Fi -j J O CD z W 840.02 z 00 H Qa Fz-1 0~C O C� LL _j a- " z 00i= = Z Q 01O F=.D H CAHWOJ 0 0 CC/) Z • > 1 d~ � Q O O LL W cs J Z Z W CL Q ~ 1--I = CL CC � CC o m z W = U) W_ _ N In Q T �Z J O z 0 W 840.14 v v m IC -I z D H 0 0CC DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. 2'-113i" „ 2 11/2" 1 Z O r ~a Q z _ B1 mom­� F-1z�=D LLJ(L 0002 _ z m TYPE "G" TYPE "E" TYPE 'IF" A A 1'IT Ij9T18fr v Wo 0 = Cn 0 0 z�O�_1 VIIA 1111 Em 19 Q " D cAHWOJ F-I O _ y -� WATER FLOW -� SAG -�- WATER FLOW - - T I 9�8„ z o---------------------------------- z B w o - -11/211 MR SECTION B-B ----------------------------'------ 1 21/,I L z zWATER FLOW -� SAG -� WATER FLOWO O Q r- SECTION A -A LL = m m m Fi z V = TYPE "F" TYPE "E" TYPE v = Q Cl)Q Cn y >az °C Q U p ^p P RAISED FLOW ARROW 1 II 2g/II /s HIGH 4 z - y y 0 RAISED FLOW ARROW %s" HIGH 234" -� D c '1 c cc W Q Z v" O \\ C T� r Q CC Q' f'-^ VJ DZ� _11O N 1/2„ \ =� n T 1�2 _ �Oz I••I = v z [D O TI O "�` 1 II /8 T a O =C\1 �� 1/811 c% 13 Ir = .10 Cl) W W D O O �' ly 11/2 " \ F� C.�3 �,�y z H v �° z II 1 %2 II 13/ Ir 1/8 2'- 2'-113/4" T 2'-11�" II 1 �2 R li W LL LL 1/2 " ^�" SECTION A -A 1 /2 � f`- � I 7 J TYPE - F TYPE G r SECTION A -A SHEET 2 OF 2 SHEET 2 OF 2 840.03 840.03 m O Z O � Z F-1 j \A / _ N � cn =mZ C:0 D =nv D H � W H m CA0 H m Z p 840.02 S� 6" E�•j #4 BARS "V" 6" 6" @ EQUAL SPACES 1" 1y1„ 3" R R _ LU LU U Q Q EL OL 2 N CC m J¢ w ma LL vd ao ac w w ih a 00 Q S PLAN OF TOP SLAB SECTION S-S 6" E #8 "W" BARS #4 BAR #4 BARS n n CV @ EQUAL SPACES 4 f11/2 SECTION R-R DOWEL EXPANSION JOINTS 4'- 6 1 4'-6" STD. 840.03 FRAME, ..-.__ - .._-- - � ulll11ll1111I� � � IL i I Um -6'-0" PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP USE ON FLAT ELEV. EXPANSION JOINT GRADES 2% AND UNDER DEPRESSED GUTTER LINE EXPANSION JOINT I I m II I ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT 8' TOP USE ON GRADES OVER 2% ELEV. DEPRESSED GUTTER LINE 10" I 6'-0" EXPANSION JOINT MAX, 1' 0" I I ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU.YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W N0. LENGTH TOTAL LBS. TOP SLAB BOTTOM SLAB TOT.GONC. OR MINIMUM HEIGHT H D A B C G H E F C.M. R.C. 12" 3'-0" 2'-2" 2'-9" 0.235 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-0" 0.235 0.829 0.023 0.036 is,, 3'-0" 2'-2" 3'-3" 0.235 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" 0.235 1.001 0.059 0.085 30" 3'-0" 2'-2" 3'.4" 4'-3" 1'.2" 4'-0" 4 1'-5" 2 3'.9" 3 3'.9" 39 0.123 0.321 1.433 0.092 0.127 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-0" 4 1'-11" 3 3'-9" 3 3'-9" 43 0.161 0.358 1.714 0.132 0.178 42" 3'-0" 2'-2" 4'-5" 5 -3 1'-5" 3'-2" 4 1'-8" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.243 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-2" 4 2'-3" 3 2'-11" 3 2'-11" 35 0.145 0.352 2.052 0.235 0.317 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.180 0.386 2.387 0.297 10.401 N_ #4-BARS r-r-r I � � 12" DOWEL ~ BAR - "X" PLAN SLOPE AS INDICATED ON PLANS VARIABLE TO SUIT CONDITION M G *21 OI 9 / MIN. i S IN E-� 31 PIPE I / �- - --�- -� 10"+T in OPTIONAL 3" CONST. JOINT DOWEL FOOTING B (IF CONST. B JOINT USED ELEVATION END ELEVATION GENERAL NOTES: -CHAMFER ALL CORNERS 1". USE CLASS "B" CONCRETE. -PLACE 2 #6 "Y" BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42" AND OVER WITH A MINIMUM OF 3" COVER AND A LENGTH OF 6" LESS THAN ENDWALL LENGTH. -CONSTRUCT BOTTOM SLAB WITH FORMS. -WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE, PLACE BAR "X" DOWELS IN THE BASE AS SHOWN ON PLANS. SPACE BARS APPROXIMATELY ON 12" CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. -WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY LEAVE THE POUR ROUGH. -DO NOT INTERPRET WALL THICKNESS (T) SHOWN FOR THE THICKNESS ACCEPTABLE, BUT IS USED IN COMPUTING ENDWALL QUANTITIES. REINFORCING QUANTITIES DIA. 15" 18" 24" 30" 36" 42" C.S. 42" R.C. 48" C.S. 48" R.C. BARS ,1X„ „X„ „X.. „Y„ „X„ „Y„ „X„ „Y„ „X„ „Y,, QTY. 5 5 6 6 7 7 1 2 7 2 8 2 8 2 LBS. 12 12 14 14 16 47 49 52 55 *QUANTITIES BASED ON 2'-0" * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT SLOPE AS INDICATED ON PLANS VARIABLE TO SUIT CONDITION gr' M G ,2 O,j 9 / U �+ MIN. / Xi 15" I T T C.S. 31 I 14 : = o o SLOPE PIPE I I I %~- - - I - - �� -� 3 0 OPTIONAL Y CONST. JOINT DOWEL FOOTING co - g (IF CONST. B JOINT USED ELEVATION END ELEVATION #4-BARS � II 12" PLAN DOWEL ~ BAR -"X" DIMENSIONS AND CONCRETE QUANTITIES R.C.P. DIMENSIONS AND VOLUMES C.S.P. DIMENSIONS AND VOLUMES D H B G M S T YD3 H B G M YD3 15" 3'-4„ 1'-8" 2'-6" 1'-1" 101/2 21/4" 1.0 3'-4" 1'-8" 2'-5" 1'-5" 1.0 18" 3'-7" 1'-10" 2'-11" 1'-3" 10" 21/2" 1.2 3'-7" 1'-10" 2'-9" 1'-6" 1.3 24" 4'-2" 2'-1" 3'-9" 1'-6" 10" 3„ 1.7 4'-1" 2'-1" 3'-6" 1'-9" 1.8 30" 4'-9° 2'-5" 4'-8" 1'-10" 10" 31/2" 2.5 4'-7" 2'-4" 4'-3" 2'-0" 2.4 36" 5'-5„ 2'-9" 5'-8" 2'-2" 91/2„ 43/4" 3.6 5'-1" 2,-7 5'-0" 2'-3" 3.1 42" 6'-0" 3'-0" 6'-7" 2'-5" 91/2" 51/4" 4.6 5'-7" 2'-10" 5'-9" 2'-6" 4.0 48" 6'-7" 3'-4" 7'-5" 2'-9" 91/2" 53/4" 6.0 6'-1" 3'-1" 6'-6" 2'-9" 1 5.1 Z O Cn aQ Cr L.LJO1 1 00�=z WQcc zLL2 Qo�o0 Cnl-LLOJ oo0CC a M F-1 CL CL I--1 W o LL N LL C3 J z J W W O_ � j H p � n- Z 0 - W 0 WIt Q; a z J N CY: Q_ a Cn W W y H J Lo T 3 Z p („� N p Z V1 cc O V HEET 1 OF 1 838.05 z 00 �a Q Fz-1 o5c 0 U LLJ�F-IZ 000= = z LU LL F- 0 O 0 H CAHWO_j p0cna z .>_ H d Q 0 c o Z LL 1--I v N Cc CL o = a CC LO 0 V � z c Q W H H C/3 W _ ,CC N C T 1•-I CJ'3 O Z V W 840.02 tionel" Dewberry..pi Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ W Lu Jm� O z z C Q z 0 W G O Z O C)U (� cr 1 � z O LU Q J W J z z 5 W ~ W Z) 0 = z W W O U J O m O O T SEAL ����•(t�� C A R i 5 AL 40016 r ` Qz • U B• KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE CONSTRUCTION DETAILS (SHEET 3 OF 5) PROJECT NO. 50104981 C7mO3 2 3 4 I 5 tionef" Dewberry..pi GENERAL NOTES: 1. DOUBLE CATCH BASIN ONLY FOR USE WITHIN TOWN MAINTAINED STREETS. INSTALLATION ON STREETS WITHIN EXISTING/FUTURE NCDOT MAINTAINED RIGHT OF WAY REQUIRES A MINIMUM OF ONE 4 FOOT LONG SECTION OF REINFORCED CONCRETE PIPE BETWEEN CATCH BASINS. 2. SEE NCDOT STANDARD 840.01 FOR DETAILS BASED ON PIPE SIZE PER CROSS-SECTION. 3. CONSTRUCT TWO SINGLE BASINS PER NCDOT STANDARD WITH DOUBLE INTERIOR WALL. 4. ALL CONCRETE TO BE 3600 P.S.I COMPRESSIVE STRENGTH. 5. BASE SLAB SHALL BE MONOLITHIC. E 6. SEE STANDARD NUMBERS 10.29 AND 10.30 FOR PLACEMENT OF CATCH BASIN. 7. RCP PIPE SECTION D2 CONNECTING CATCH BASINS SHALL HAVE A MINIMUM DIAMETER SAME AS OF OUTLET PIPE D3. 8. ALL REINFORCING STEEL SHOWN ON NCDOT STANDARDS IS TO BE PROVIDED AS CONTINUOUS MEMBERS. (NO LAPS, USED AS A SINGLE CONTINUOUS BAR IN THE SLAB) J-M u PLAN 3- #4 BARS a INLET F I � OUTLET SLOPE I r = SECTION Y-Y 15" to 24" � J 0 Z 0 m MECKLENBURG COUNTY r D LAND DEVELOPMENT f;J STANDARDS C Y APPROVED DATE: 02/2007 3E MONOLITHIC NG TO BE is. J-M .3- A4 RARC U SECTION J-J 30" TO 36" PIPE Z w o BRICK DOUBLE CATCH BASIN 15" THRU 36 PIPE FARMHOUSE DRIVE RESIDENTIAL STREET (MODIFIED OPTION B) NOTES: 1Q SIDEWALK SHALL BE PROVIDED ON ONE SIDE OF THE STREET. 2Q THE CROWN (TRANSVERSE SLOPE) FOR THE TYPICAL SECTION ON THIS SHEET IS 3/8" PER FT. 35' MIN. TO REAR INTERIOR WALL OR-,-] REAR OF PARKING PAD �_10' 20' CLEAR A (SEE NOTE 4) PLAN REVISIONS NO. DATE DESCRIPTION 1 1 5/091 REVISED CROSS SECT. APPROVED DATE: 0212007 PAVEMENT SCHEDULE ® 2'-0" VERTICAL CURB & GUTTER SO 4" THICK CONCRETE SIDEWALK (5' WIDE) © 1-1/2" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9.5A DQ FINAL 1-1/4" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9 5A QE 8" COMPACTED AGGREGATE BASE COURSE, OR 4" BITUMINOUS CONCRETE BASE COURSE, TYPE B-250B AD NOT TO SCALE 20.03 SINGLE-F HOME/TOE TO 2.07 OS% TO 2.0% CONCRETE COMPACTED� �� `� '� STRIP SUBGRADE (TYP,) ALLEY WITH NORMAL CROWN 0.57 TO 2.ni GUTTER ALLEY WITH NO CROWN (TYP,) SUMMERS WALK BLVD. RESIDENTIAL STREET (KAc)nIFIFn C)PTIC)N r.l NOTES: 1Q SIDEWALK SHALL BE PROVIDED ON BOTH SIDES OF THE STREET. 2Q. THE CROWN (TRANSVERSE SLOPE) FOR THE TYPICAL SECTION ON THIS SHEET IS 3/8" PER FT. 3Q PARKING IS SHOWN ON THE EAST SIDE ONLY. HOWEVER, PARKING MAY BE PLACED ON THE WEST SIDE. NOTES: 1. SUBGRADE SHALL BE COMPACTED TO PUBLIC STREET STANDARDS. 2, STORM DRAINAGE (NOT SHOWN) SHALL BE PR❑VIDED AS NECESSARY, 3, ALLEYS SHALL BE C❑NSIDERED PRIVATE EASEMENTS AND WILL NOT BE ACCEPTED FOR MAINTENANCE. 4, NO CUT SLOPES, ❑BSTRUCTI❑NS, HEDGES, ETC, ON NON -LOADED SIDE OF ALLEY WITHIN 20 FEET OF LOADED SIDE EDGE OF PAVEMENT. 5, DRIVEWAYS SHALL BE SEPARATED BY AT LEAST 5 FEET, OR GREATER IF REQUIRED BY PLANNING (LOT SIZE) REQUIREMENTS AND/OR N,C, BUILDING CODE. 6, PAVEMENT SECTI❑N PER TOWN REQUIREMENTS NOT TO SCALE MECKLENBURG COUNTY RESIDENTIAL ALLEY DETAIL LAND DEVELOPMENT STD. NO. STANDARDS SINGLE LOADED W/ TWO-WAY ❑PERATI❑N 111.19C COUNTRY TIME WAY AND WILBERFORCE WAY TYPICAL ALLEY SECTION (MODIFIED OPTION B) 15' MIN FROM GARAGE 15' MIN FROM GARAGE TO ALLEY CENTERDNE TO ALLEY CENTERDNE :-FAMILY rOWNHOME i 20' PUBLIC R.O.W. PAVEMENT SCHEDULE ® 2'-0" VERTICAL CURB & GUTTER SO 4" THICK CONCRETE SIDEWALK (5' WIDE) © 1-1/2" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9.5A DQ FINAL 1-1/4" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9 5A EQ 8" COMPACTED AGGREGATE BASE COURSE, OR 4" BITUMINOUS CONCRETE BASE COURSE, TYPE B-250B NOTES: 1. REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION. 3• STAKING IS REQUIRED FOR ALL TREES IN R.O.W. OR UPON REQUEST OF ARBORIST. 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN A LEGAL MANNER. 5. RESEED UNMULCHED, DISTURBED AREAS. 3/4" NYLON STRAP ROOT CROWN TO BE AT FINISH GRADE 4" HIGH / 6" WIDE MAXIMUM BERM OUTSIDE OF ROOTBALL 3 - 1"x2"x18" WOOD STAKES WITH CENTERED 3/8" HOLE DRIVEN IN LINE WITH STRAP EQUALLY SPACED AROUND TREE REMOVE TYPICAL EXCESS SOIL FROM ROOT CROWN REMOVE TOP 1/3 BURLAP AND ANY NAILS/PINS, ETC. REMOVE TOP 1/3 OF WIRE BASKET WHERE PRESENT RAISE PIT BOTTOM TO SET ROOT CROWN AT THE CORRECT HEIGHT. FIRM SOIL UNDER R007 BALL. VARIES MULTIPURPOSE TRAIL SECTION (ASPHALT) PATH SCHEDULE GARAGE GARAGE 10' LANE AO 2" ASPHALT PAVEMENT © 6" AGGREGATE BASE COURSE © COMPACTED SOIL BASE NOTES: v 1O THE REVERSE CROWN (TRANSVERSE SLOPE) FOR THE TYPICAL SECTION ON THIS SHEET IS 3/8" PER FT. PAVEMENT SCHEDULE ® 1'-0" CONCRETE EDGE © 1-1/2" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9.5A DQ FINAL 1-1/4" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S-9.5A EQ 8" COMPACTED AGGREGATE BASE COURSE, OR 4" BITUMINOUS CONCRETE BASE COURSE, TYPE B-250B MULTIPURPOSE TRAIL SECTION (NATURAL MATERIAL) 01 s' PATH A B PATH SCHEDULE AO 1" MULCH SURFACE © 4" COMPACTED SOIL BASE PLANTINGS IN STREET RIGHT-OF-WAY GENERAL NOTES 1. TREE GRATES AND ASSOCIATED IRRIGATION SYSTEMS REQUIRED BY TOWN ARE TO COMPLY WITH THE TOWN ZONING REQUIREMENTS. ALL INSTALLATIONS OF IRRIGATION SYSTEMS WITHIN THE RIGHT-OF-WAY OF STATE MAINTAINED STREETS REQUIRE AN ENCROACHMENT AGREEMENT EXECUTED THROUGH NCDOT. TREES INSTALLED WITHIN TOWN MAINTAINED RIGHT-OF-WAY LIMITS SHALL BE PER TOWN REQUIREMENTS. TREES INSTALLED WITHIN THE RIGHT OF WAY OF STATE MAINTAINED STREETS REQUIRE A G� PLANTING PERMIT FROM NCDOT. NCDOT'S REVIEW AND APPROVAL PROCESS MAY INCLUDE ADDITIONAL REQUIREMENTS. 2. A DRAINAGE SYSTEM IS REQUIRED FOR ALL IRRIGATED PLANTING AREAS LOCATED ADJACENT TO STREETS. ALL IRRIGATION/DRAINAGE SYSTEMS REQUIRE AN ENCROACHMENT 6" SUP KNOT WITH STOP KNOT. AGREEMENT EXECUTED BY NCDOT FOR STATE -MAINTAINED ROADS. CONTACT NCDOT FOR ADDITIONAL INFORMATION REGARDING COST, SUBMITTAL AND LIABILITY INSURANCE 6" LARGER THAN TREE DIAMETER COVERAGE REQUIREMENTS. KEEP MULCH AWAY FROM 3. LANDSCAPE INSPECTIONS MAY INCLUDE THE FOLLOWING: TRUNK 1" TO 2" SUBDRAINAGE INSPECTION 4" MAXIMUM LAYER OF MULCH TREE PIT/WELL OR PLANTING STRIP INSPECTION SOIL MIX APPROVALS/INSPECTIONS TREE APPROVALS/INSPECTIONS TREE PLANTING INSPECTION FINISH GRADE IRRIGATION INSPECTION FINAL WALK THROUGH ALL INSPECTIONS SHALL BE PERFORMED BY TOWN AND/OR COUNTY. UNDISTURBED 12" ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) FOR EXAMPLE: CALIPER HEIGHT (RANGE) MAX. HEIGHT MIN, ROOT BALL DIA. MIN. ROOT BALL DEPTH 2" 12-14' 16' 24" 16" APPROVED DATE: 02/2007 3" 14-16' 1b' 32" 21" MECKLENBURG COUNTY ;°z LAND DEVELOPMENT �'� II�IrLLL ' STANDARDS �� BACKFILL AS SPECIFIED TREE PLANTING (FOR SINGLE AND MULTI -STEM TREES) APPROVED DATE: 02/2007 NOT TO SCALE MECKLENBURG COUNTY LAND DEVELOPMENT» syr' S, irp v ,•j STANDARDS STD. NO. I REV. 40.01 TREE PLANTING -NOTES (DRAINAGE AND INSPECTION) Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 U) Cn ~ w w 75 � Z � JmZ) a O Q z 06 p Z) ° C� O z O OU (-D U T_ � � zz 0'wwv QJ w J z =w w� 0 2 z Lu O U J 0 m O O T SEAL o� oFs 1 5 AL 40016 4 •U: '.,�-y,` !�'c! NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 CONSTRUCTION DETAILS (SHEET 4 OF 5) PROJECT NO. 501 04981 STD. NO. REV. 40.10 C7mO4 2 3 5 Dewberry E D Al 0 Charlotte -Mecklenburg STORM WATER Services v BMP Inset Table _ Sand Filter Project Name: Summerswalk Phase 6 Sequence ID: 1 Drainage Area (acres): 6.41 Land Use/Development Type: < 0.25 acres - Reside ntial/A t/Rowhouse Vegetation Type: Grassed Percent Built -Upon Area: 51.80% Sediment Chamber Length ft.: 135 Sediment Chamber Width ft.: 99 Sediment Chamber Height ft.: 2 Sand Filter Type: Surface Media Depth ft.: 2.5 Media Surface Area ft2 : 1200 Flow Diverter Present /N : N Regulated By: Post Construction Ordinance Treatment Effectiveness: Optimal NC State Plane X eastin : 1471634 NC State Plane Y(northing 621244 Charlotte -Mecklenburg STORM WATER ^1� Services BM P Inset Table Extended Dry Detention Project Name: Summerswalk Phase 6 Sequence ID: 1 Surface Areas . ft.: 14,500 Drainage Area (acres): 6.41 Land Use/Development Type'. < 0.25 acres - Reside ntial/A t/Rowhouse Vegetation Type: Grassed Percent Built -Upon Area: 51.80% Maximum Depth ft.: 4.25 Detention Basin Type: Surface Forebay Present /N : Y Flow Diverters Present (Y/N): N Regulated By: Post Construction Ordinance Treatment Effectiveness: Optimal NC State Plane X eastin : 1471634 NC State Plane Y(no rthin : 621244 PROP. BMP ACCESS Al MAINTENANCE ESMT. - M 20' WIDTH (TY Sand Filter Maintenance and Schedule TASK SCHEDULE Inspect banks and surrounding drainage areas for erosion and stabilize if necessary Monthly Street sweep parking lot Quarterly Trash removal Monthly Inspect outlet for obstructions Monthly Inspect for clogging Monthly Inspect inlet grates Monthly Skim sand media Yearly Pump oil and grit from sedimentation chamber Yearly or at 50% full Replace sand media As needed (expect 3 years) BMP CONSTRUCTION SEQUENCE NOTES: 1. CALL THE WATER QUALITY INSPECTOR TO SET UP A BMP PRE -CONSTRUCTION MEETING PRIOR TO STARTING ANY WORK ON BMPs. THIS MEETING SHOULD TAKE PLACE AT LEAST 48 HOURS PRIOR TO STARTING CONSTRUCTION ON ANY BMP AND SHALL INCLUDE THE DESIGN ENGINEER TO ENSURE ENGINEER INSPECTIONS ARE PERFORMED AT KEY BMP INSTALLATION PHASES. 2. THE DESIGN ENGINEER MUST VERIFY AND CERTIFY THE DRAINAGE AREA IS PROPERLY STABILIZED; MEASURES ARE IN PLACE TO PREVENT SEDIMENTATION INTO THE BMP, THE STORM DRAINS, INLETS AND PAVEMENT HAVE BEEN PROPERLY CLEANED PRIOR TO COMMENCEMENT OF BMP CONSTRUCTION. 3. ADDITIONAL MEASURES, TO ENSURE PROPER CONSTRUCTION AND OPERATION OF THE BMP, MAY BE REQUIRED BY THE WATER QUALITY INSPECTOR. 4. A DOUBLE -RINGED INFILTROMETER TEST (ASTM D 3385), OF THE BOTTOM OF THE SAND FILTER, MUST BE SUBMITTED TO THE WATER QUALITY INSPECTOR PRIOR TO THE INSTALLATION OF UNDERDRAIN SYSTEM. 5. THE RESULTS OF THE DOUBLE -RINGED INFILTROMETER TEST MUST SHOW INFILTRATION CAPABILITIES, CONFIRMED BY THE DESIGN ENGINEER, AND SUBMITTED FOR BMP AS -BUILT APPROVAL. Dry Pond Maintenance Tasks and Schedule TASK SCHEDULE Forebay inspection and cleanout Monthly inspection. Remove sediment every 7 years or when sednnent volume exceeds 50% of storage volume Bank mowing and inspection / stabilization of eroded areas Monthly (maintain 3 - 6 inch grass height) Outlet / inlet inspection and cleanout Monthly Unwanted vegetation and trash removal Monthly Inspect for structural damage, leaks, etc. Yearly Inspect / exercise all mechanical devices, valves, etc. Yearly Evaluate sediment level (remove as needed) Yearly Security As needed PREPARATION CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3' DEEP OVER ADVERSE SOIL CONDITIONS IF APPLICABLE, SCARIFY THE ENTIRE AREA TO 6' DEEP, REMOVE ALL LOOSE ROCK, ROOTS AND OTHER ❑BSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. APPLY AGRICULTURAL LIME, FERTLIZER AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE BELOW) CONTINUE TILLAGE UNTIL A WELL —PULVERIZED FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP, SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH, INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON IF POSSIBLE IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ❑RIGINAL LIME FERTILIZER AND SEEDING RATES, CONSULT INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED, APPLY, AGRICULTURAL LIMESTONE — 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) FERTILIZER — 1,000 LBS/ACRE — 10-10-10 SUPERPHOSPHATE — 500 LBS/ACRE — 20% MULCH — 2 TONS/ACRE — SMALL GRAINSTRAW ANCHOR — ASPHALT EMULSION @ 300 GALS/ACRE - _ 726 V A \ v A 30,E 727�� TE TE — —TE � TE TE TE E T TE TE \ TE \ V A\ \ — — 722 725 720 \ — \ 21 _ \\ co 718 715 PROP. BMP FENCE / — — — — — — —7A6 ACCESS GATE (TYP.) v 713 714 v v STABILIZE THE SAND FILTER BASIN WITH \ / _ v A CLEAN WASHED SAND BASE BERMUDA A FES Al A A \ \ \ SOD (TOP, BOTTOM, AND SIDES) (TYP.) PERFORATED UNDERDRAIN SEE CROSS SECTION vv PROP. 2' HIGH BERM, ,\ CLASS B RIP -RAP \A \ \ 732 28 V PROP. PCCO EASEMENT / —730— —/ LO N I` N i I I II- -�,- -- - V A \ --�-726-- \ �\ 2' UPTURN LOCATION \ SAND FILTER \ A� v A V A\ \ V CROSS SECTION JD A \`�0\ I �jl \ IN. A \ V A r'' 6" SCH 40 PVC v v ' V `oA PROP. SAND D.) � \ \ \ v v \ v � �FI\LTER� V \ \ \ > V CS D02— ����'s 6�0 — ----- -- v� �yLy�J1711 PROFILE 722- — — — — -- -- STA.: 2+10 - -- \ \ \ PROP. SAND FILTER - 1 712 \ \ \ \ \ \ 1 \ V A V v 713 v I-- 79 709— / PROP. ANTI -SEEP COLLAR (TYP.) - SEE DETAIL SHEET C7.02 FES D01 oW v l v I ! 4, t o Z-24" RCP CLASS III � PROP. BMP FENCE WITH —?�0— — ��� \ v ACCESS GATE (TYP.) — ---- \ \ \� PROP. 20' RIP -RAP EMERGENCY �\ \ �— - � OVERFLOW SPILLWAY ELEV.: 714.25 -- --_ _— 716 - _____ __ PROP. TOP OF �V � — — — _ _ __ — --- - _ - POND ELEV.: 715.25 — — — _ - --- --- ---- --- PROFILE -- PROFILE — - STA.:0+00 i �\ \ -\ -9 \ �v — — --- Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 VJ ��/^� VJ W LLI z � JmZ) O Q z Q 06 C j 0 Or- W �� G O Z O 0 c� U T- zz p wwv Q J W —1 LLI z ° 5 G = w W Z) 0 = z W W O U J In0 O T SEAL �N CA1?0 oR oF' s 5 AL 40016 4 •U: '.,�-y,` !�'c! NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 BMP DETAILS (SHEET 1 OF 2) PROJECT NO. 501 04981 C7mO5 SCALE: 1" = 20' 1 9 1 A R L C G Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone:704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 vJ ��/^� VJ W LU 1— 75 G Z Z) JmZ) a 0 Q Z 06 p z ° C� � 0 Z 0 OU (� U cr LU � z p z G ` w zZ O 5 G = w U) W LL 2 7 �Z) vJ LU O U J 0" m o 0 T SEAL %10% II10rr4f.* % �N CA A. �,� o� oF�s 5 5 AL 40016 4 •U: '.,�-y,` !�'c! NEB• �2�: KEY PLAN 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY APPROVED BY CHECKED BY DATE TITLE MTK BML BML MAY 31, 2019 BMP DETAILS (SHEET 2 OF 2) PROJECT NO. 501 04981 C7mO6 1 2 3 4 5 E Tree # Size/Species Tree # Size/Species Tree # Size/Species Tree # Size/Species Tree # Size/Species Tree # Size/Species LANDSCAPE NOTES 8. TREES AND UNDERGROWTH IN DESIGNATED OPEN SPACE IN AN APPROVED PLAN 1. EXISTING VEGETATION SHALL BE PRESERVED WHENEVER FEASIBLE. THE DECISION TO SHALL REMAIN UNDISTURBED EXCEPT FOR PERMITTED PATHWAYS. PRESERVE TREES SHOWN ON THE ENVIRONMENTAL INVENTORY SHALL BE MADE 9. SEE PLAN SHEET C7.04 FOR TREE PLANTING DETAILS. JOINTLY BY THE PLANNING DIRECTOR, DEVELOPER AND DESIGN TEAM DURING THE APPROVAL PROCESS 10. LIGHTING TO BE PROVIDED BY LOCAL ELECTRIC UTILITY PROVIDER. CONTRACTOR TO 2. WHEN SELECTING WHICH TREES TO PRESERVE, THE FOLLOWING SHALL BE COORDINATE WITH ELECTRIC UTILITY COMPANY FOR THE INSTALLATION OF THE CONSIDERED: EXISTING AND PROPOSED GRADING; AGE, CONDITION, AND TYPE OF ELECTRICAL CONDUITS TO SERVICE THE LIGHTS. TREE; AND LOCATION OF SITE IMPROVEMENTS AND UTILITY CONNECTIONS. 11. "THE TOWN OF DAVIDSON MAY PLACE AN OCCUPANCY HOLD ON INDIVIDUAL BUILDING 3. TRENCHING, PLACING BACKFILL IN THE CRITICAL ROOT ZONE (CRZ), DRIVING OR PERMITS THAT IS TO BE RELEASED UPON VERIFICATION OF THE FOLLOWING: (1) PARKING EQUIPMENT IN THE CRZ, AND DUMPING TRASH, OIL, PAINT OR OTHER EXISTING TREES ON THE LOT HAVE BEEN PRESERVED SUCH THAT THE REQUIREMENTS MATERIALS DETRIMENTAL TO PLANT HEALTH IN CLOSE PROXIMITY OF THE TREES TO OF THE ABOVE TABLE ARE SATISFIED; (2) NEW TREES HAVE BEEN PLANTED SUCH THAT BE PRESERVED IS PROHIBITED. IN COMBINATION WITH THE PRESERVATION OF EXISTING TREES THE REQUIREMENTS OF THE ABOVE TABLE HAVE BEEN SATISFIED; OR (3) THE APPLICANT FOR THE BUILDING 4. SHOULD ANY TREE DESIGNATED FOR PRESERVATION IN THE LANDSCAPE PLAN DIE, PERMIT WILL PAY THE TOWN OF DAVIDSON $500 PER TREE THAT IS REQUIRED TO THE OWNER SHALL REPLACE IT WITHIN 180 DAYS WITH LANDSCAPING EQUAL TO WHAT SATISFY THE ABOVE PLANTING SCHEDULE ON EACH LOT. IF THE PAYMENT IN LIEU WOULD BE REQUIRED IN THIS ORDINANCE. OPTION IS EXERCISED THE TOWN OF DAVIDSON WILL UTILIZE THESE FUNDS FOR TREE PLANTING, PREFERABLY IN THE VILLAGE INFILL PLANNING AREA AND SPECIFICALLY 5. PROTECTIVE BARRICADES SHALL BE PLACED AROUND ALL TREES DESIGNATED TO BE WITHIN A ONE-HALF MILE RADIUS OF THE SITE." SAVED PRIOR TO THE START OF DEVELOPMENT ACTIVITIES OR GRADING (SEE DETAIL SHEET C6.02). THESE BARRICADES SHALL CONSIST OF 2" X 4" POSTS WITH 2" x 4" RAILS OR ORANGE SAFETY FENCE. PROTECTIVE BARRICADES SHALL REMAIN IN PLACE UNTIL 1 TRD 4 4 BIRCH CLUSTER 141 TRD 14 7 OAK 193 TRD 10 5 OAK 2 TRD 10 5 OAK 142 TRD 12 6 GUM 194 TRD 8 4 OAK 244 TRD 12 6 OAK 3 TRD 10 5 OAK 143 TRD 18 9 GUM 195 TRD 10 5 OAK 245 TRD 16 8 OAK 4 TRD 10 5 OAK 144 TRD 12 6 OAK 196 TRD 10 5 OAK 246 TRD 18 9 TULIP 5 TRD 10 5 OAK 145 TRD 12 6 OAK 197 TRD 10 5 OAK 247 TRD 14 7 TULI P TWIN 6 TRD 10 5 OAK 146 TRD 12 6 OAK 198 TRD 10 5 OAK 248 TRD 14 7 TULIP 7 TRD 10 5 OAK 57 TRD 3815 OAK SPECIMEN 147 TRD 12 6 OAK 199 TRD 8 4 OAK 8 TRD 10 5 OAK 148 TRD 16 8 TULIP 200 TRD 8 4 OAK 9 TRD 10 5 OAK 149 TRD 10 5 OAK 10 TRD 10 5 OAK 100 TRD 16 8 GUM 150 TRD 12 6 OAK SPECI MEN 11 TRD 8 4 OAK 101 TRD 12 6 GUM 151 TRD 8 4 OAK SPECIMEN 12 TRD 6 3 OAK 102 TRD 12 6 OAK 152 TRD 8 4 OAK 13 TRD 10 5 OAK 103 TRD 10 5 OAK 153 TRD 14 7 OAK 14 TRD 10 5 OAK 104 TRD 10 5 OAK 154 TRD 2010 TULIP SPECIMEN 206 TRD 14 7 OAK SPECIMEN 15 TRD 10 5 OAK 105 TRD 12 6 OAK 155 TRD 12 6 TULI P TWIN 307 TRD 14 7 TULIP k C IV 0 SPECIMEN 106 TRD 16 8 OAK 156 TRD 12 6 OAK 208 TRD 14 7 TULIP 308 TRD 16 8 GUM DEVELOPMENT ACTIVITIES ARE COMPLETE. THE AREA WITHIN THE PROTECTIVE BARRICADE SHALL REMAIN FREE OF ALL BUILDING MATERIALS, STOCKPILED SOIL, OR OTHER CONSTRUCTION DEBRIS. CONSTRUCTION TRAFFIC, STORAGE OF VEHICLES AND MATERIALS, AND GRADING SHALL NOT TAKE PLACE WITHIN THE PROTECTIVE AREAS OF THE EXISTING TREES. BARRICADES SHALL BE ERECTED AT A MINIMUM DISTANCE FROM THE BASE OF THE PROTECTED TREE ACCORDING TO THE FOLLOWING STANDARDS: 5.1. FOR TREES 10" OR LESS DIAMETER AT BREAST HEIGHT (DBH): PROTECTIVE BARRICADES SHALL BE PLACED A MINIMUM DISTANCE OF 10' FROM THE BASE OF EACH PROTECTED TREE, OR OUTSIDE THE DRIPLINE, WHICHEVER IS GREATER. 5.2. FOR TREES GREATER THAN 10" DBH: PROTECTIVE BARRICADES SHALL BE PLACED AT A MINIMUM DISTANCE EQUAL TO 10' FROM THE BASE OF THE PROTECTED TREE PLUS AN ADDITIONAL V FOR EACH ADDITIONAL V DBH GREATER THAN 10" DBH, OR OUTSIDE THE DRIPLINE, WHICHEVER IS GREATER. 107 TRD 105 CHERRY 157 TRD 1010 OAK 209 TRD 3616TULIP SPECIMEN 259 TRD 2010TULIP SPECIMEN 309 TRD 2613 TULIP SPECIMEN 108 TRD 12 6 OAK 158 TRD 12 6 OAK 260 TRD 14 7 TULI P 310 TRD 26 13 TULIP SPECIMEN 19 TRD 16 8 OAK 109 TRD 12 6 OAK 159 TRD 16 8 GUM 261 TRD 12 6 GUM 110 TRD 10 5 GUM 160 TRD 12 6 OAK SPECIMEN 111 TRD 3417 TULIP SPECIMEN 161 TRD 3015 TULIP SPECIMEN SPECIMEN 112 TRD 16 8 GUM 162 TRD 3015 TULIP SPECIMEN 314 TRD 18 8 TULIP 113 TRD 18 9 OAK 163 TRD 12 6 OAK 315 TRD 4 4 BIRCH CLUSTER 114 TRD 12 6 OAK 164 TRD 2412 TULIP SPECIMEN 115 TRD 3015 TULIP SPECIMEN 165 TRD 14 7 OAK 116 TRD 16 8 OAK 166 TRD 14 7 OAK PLANTING LENGEND & SCHEDULE TREES COMMON NAME SPECIES NAME QUANTITY PROVIDED 0 SILVER MAPLE ACER SACCHARINUM 11 Ag EASTERN RED OAK QUERCUS RUBRA 9 117 TRD 168 OAK 167 TRD 12 6 OAK 6. CONSTRUCTION ACCESS TO A SITE SHOULD OCCUR WHERE AN EXISTING OR TREE PLANTING NOTES 118 TRD 10 5 OAK 168 TRD 2412 OAK SPECIMEN PROPOSED ENTRANCE/EXIT IS LOCATED. 119 TRD 12 6 OAK 169 TRD 12 6 GUM 7. EXCEPT FOR DRIVEWAY ACCESS POINTS, SIDEWALKS, CURB AND GUTTER, LAND DISTURBANCE WITHIN A TREE DRIPLINE IS STRONGLY DISCOURAGED. WHERE GRADING WITHIN A TREELINE CANNOT BE AVOIDED, CUT AND FILL SHALL BE LIMITED TO 1/4 TO 1/3 OF THE AREA WITHIN THE DRIPLINE, TREE ROOTS MUST BE PRUNED WITH CLEAN CUTS AT THE EDGE OF THE DISTURBED AREA, AND NO FILL SHALL BE PLACED WITHIN THE DRIPLINE OF A TREE WITHOUT VENTING TO ALLOW AIR AND WATER TO REACH THE ROOTS. \ 120 TRD 14 7 OAK 170 TRD 12 6 GUM SPECIMEN 121 TRD 2412 GUM SPECIMEN 171 TRD 2613 TULIP SPECIMEN 122 TRD 2412 GUM SPECIMEN 172 TRD 18 9 TULIP 123 TRD 3015 TULIP SPECIMEN 173 TRD 12 6 TULIP 124 TRD 12 6 GUM 174 TRD 18 9 OAK 125 TRD 12 6 GUM 175 TRD 14 7 GUM 126 TRD 189 GUM 177 TRD 28 14 TULIP SPECIMEN 127 TRD 189 GUM 178 TRD 28 14 TULIP SPECIMEN 128 TRD 14 7 GUM 180 TRD 14 7 OAK 129 TRD 14 7 ELM 181 TRD 14 7 TULIP 130 TRD 147 GUM 182 TRD 2613TULIP SPECIMEN 131 TRD 12 6 OAK 183 TRD 14 7 TULIP EXIST. LOT NUMBER PARCEL REQUIREMENT TREES TO TREES T❑ SIZE BE BE PLANTED PRESERVED 1 - 11 LESS THAN T❑WNH❑MES - N/A N/A 4,500 SQFT N/A 12 5,144 2 LARGE N/A 2 LARGE 13 - 36 LESS THAN T❑WNH❑MES - N/A N/A 4,500 SQFT N/A COMMON N/A N/A N/A 8 LARGE OPEN SPACE MATURING PROPOSED LARGE RIGHT-OF-W N/A MATURING N/A 10 LARGE AY STREET TREES MATURING 40' ON CENTER TOTALS N/A 20 LARGE MATURING 132 TRD 16 8 GUM TWI N 184 TRD 10 5 OAK \ 133 TRD 12 6 TULIP 185 TRD 10 5 OAK \ 134 TRD 126TULIP 186 TRD 84OAK 135 TRD 14 7 TULIP 187 TRD 10 5 OAK \ 136 TRD 14 7 GUM 188 TRD 10 5 OAK 137 TRD 12 6 OAK 189 TRD 10 5 OAK \ 138 TRD 12 6 GUM I I 190 TRD 10 5 OAK `�-� 139 TRD 12 6 GUM 191 TRD 10 5 OAK \ Slf��e Pq 9 140 TRD 12 6 OAK TWI N 192 TRD 10 5 OAK I / \ Lit �• D �'S �a A J EXISTING TREE TO REMAIN (TYP.) , \ \ / �'Li T 9 q — — EXISTING STREET TREE T REMAIN TYP. I 1 2 p / / •� i \��e�s63 \ S GS O WIDE COUNTRY_TIME WAY — — _ f / ® / �• / \ P-2 .•• / PROP- VARfABCE 2 _�� — \ �� / �. OO OROOP. C.O.S. \ L ���✓✓ 0.063 AC. \ / PROP. C.O.S.0.206 AC. / 1 •j�yF// \ • / I / 1 1 10 11 \ ♦♦Y QJ��C G / \ • OP. C.O.S. 9 ro " • \ �J" / 1 2 3 4� ,32AC. I \ PROP. PR.S. 5 6 7 / 1 PROPOD 13 S \ / g,, R COS �r PQD / I -114 \ SED LARGE MATURING S� 7� 1 1 / TREE (TYP.) \ ��e 3 / 15 M13 9 �S tea/ ( Pq6 EXISTING TREELINE TO REMAIN TYP.) . ". 16 J? -J �- - S� \ \ 9 SS___ • , 17 18 Ile T ss 1 IA 19 •a / n` T 20 / \ • •• � 21 22 23 / PROP. C.O.S. 36 35 \ \ •/ 25 0.834AC. N 33 32 29 26 �y ,• •. 28 27 • 31 30 \ / PROPOSED STREET \ TREE (TYP.) \ / / / ��/ \ T� r�\ rF / / PROPOSED 20' PUBLIC \ — WALKING PATH EASEMENT T ZIA G / / TREE SAVE NOTES / („® PROPOSED WALKING PATH. 6' / ^O , �� e �L \ / WIDE NATURAL MATERIAL. \ T 1. ALTHOUGH LOT 1 IS BEING SUBDIVIDED AS AN EXEMPT • % c� \ r ° ��° �y / SEE DETAIL ON SHEET C7.0X / SUBDIVISION, WE ARE INCLUDING THIS LOT AS PART OF THE CALCULATIONS FOR THE OVERALL NEIGHBORHOOD. THERE IS NOT A MATERIAL DIFFERENCE WHETHER IT IS INCLUDED. �31 '1 31 31 —mil —=1 / 2. REQUIREMENT FROM TABLE 9-1 OF SECTION 9.3.1 OF F THE DAVIDSON PLANNING ORDINANCE (DPO): TWO r \ \ TES TC' LARGE MATURING TREES PER 7,000 SQUARE FEET OF , / EXISTING TREE TO REMAIN (TYP.) / PROPOSED PEDESTRIAN STREET J LIGHTING FIXTURE (TYP.) - TO BE / SELECTED BY OWNER IN ACCORDANCE / ITH THE TOWN OF DAVIDSON ORDINANCE \ TE- TE TE TE TE— T PROP. C.O.S. PARCEL AREA, OR 1 LARGE MATURING TREE AND 1 \ \ 3.116AC. '+ SMALL MATURING TREE PER 4,500 SQUARE FEET OF PARCEL AREA. ti 3. TOTAL AREA OF DEVELOPMENT: 198,736 SQUARE FEET. PROP. 20' STORM DRAIN PER THE ABOVE, 57 LARGE MATURING TREES ARE EASEMENT (TYP.) REQUIRED. 4. PER 9.3.1.0 OF THE DPO, "ALL TREES PRESERVED OR PROP. 20' BMP ACCESS / 1 PLANTED TO SATISFY THE VARIOUS REQUIREMENTS OF EASEMENT (TYP.) / r r THIS ORDINANCE MAY COUNT TOWARDS THE MINIMUM ITREE COVERAGE REQUIREMENTS ESTABLISHED ABOVE." / I 5. AS IDENTIFIED ON THE TREE SURVEY PROVIDED, THERE ARE 173 LARGE MATURING TREES CURRENTLY ON THE PROPERTY. OF THESE TREES 30, OR 19%, ARE DESIGNATED TO BE PRESERVED. THIS LEAVES 27 LARGE / PROPOSED TREE LINE (TYP.) \ I T MATURING TREES TO BE PROVIDED. WE ARE \ — — — PROPOSING TO PROVIDE THESE TREES AS SHOWN ON r----� THIS PLAN. PROP. SAND \ I FILTER-1 I / 0 220201 Dewberry Dewberry Engineers Inc. 9300 Harris Corners Pkwy, Suite 220 Charlotte, NC 28269 Phone: 704.509.9918 Fax: 704.509.9937 www.dewberry.com NCBELS #F-0929 U) ��/��1 vJ Z w W Jm� Q p H z J z O cn Q (.c) O z o OU 0 U T- W WC) U m° C G v) < J w w Y z U) w w j ^= W O U M� W O O T SEAL %�•(t� G A. 5 5 AL 40016 4 'U: '.,�-y,` !�'�! NEB• �2�: KEY PLAN SCALE: 1" =40' 3 10/03/19 MTK REV. PER LUESA COMMENTS 2 08/30/19 MTK REV. PER LUESA COMMENTS 1 07/12/19 MTK REV. PER LUESA COMMENTS NO. DATE BY DESCRIPTION REVISIONS DRAWN BY MTK APPROVED BY BML CHECKED BY BML DATE MAY 31, 2019 TITLE LANDSCAPE PLAN PROJECT NO. 501 04981 C8m01