Loading...
HomeMy WebLinkAboutSW3190704_Plan_(Detail)_202003120+ 690 685 680 675 670 665 660 I \ x x I 6SS x / x � I / SCALE: 1" = 10' ON CENTER ALONG 4 LONGITUDINAL ROWS THAT ARE SPACED 90° APART. THE PIPES SHALL HAVE A MINIMUM SLOPE OF 0.5%AND A MAXIMUM SPACING OF 10 FEET ON CENTER. TOP OF FILTER ELEV. 666.00 ELEV. 670.20 3" ORIFICE BLEEDER INV. = 667.70 ORIFICE—\ TURNED DOWN GROUND ELEV. AT CONTROLSTIR UCTURE ELEV. 666.00 PROP. SEDIMENTATION CHAMBER x / / _ R/W AREA = 371 / a < BOTTOM ELEV. = 666.00 / / / / PROVIDE A 6" LIP AT _ I x THE BOTTOM SLAB I Q I Al2-HW R RAP P.) / / / / / 3" ORIFICE BLEEDER x x RIPRAP BERM SEPARATIN / i ^h / / / / / INV. = 667.70 ORIFICE SEDIMENTATION CHAMBER / FROM SAND FILT R TOP ELEV = 668.00 } SEDIMENTATIO / / / 2 / — — CHAMBER �'���'.:,::.::;.::�:..•;.;�;::.';.;-:°:::' ••RCP 690 685 680 675 670 665 660 INSTALL METALTRASH RACK WITH HINGES FOR MAINTENANCE ACCESS. RACK TO HAVE 4" OPENINGS BETWEEN BARS (RUST RESISTANT MATERIALS) 4' X 4' PRECAST ° CONCRETE RISER STRUCTURE PER NCDOT STD. 840.31 FLOW — SIDE VIEW STRUCTURE TOP ELEV. 670.20 a as STEPS PER NCDOT O STD. 840.66 a 6" PVC UNDER DRAIN PIPE INV = 662.50 a e °a 24" O-RING RCP \ a :. x � / i • . :: �:/ / / / � / C2-FES / / / INV = 662.47 ° STABILIZE SAND F LTER BASIN WITH A WASHhA BASE BERMU A S D / / -4 X 5 4CONTROLS CTU x / i SEE DETAIL THIS SHEE U CLEANOUT (TYP.) CAP �� . 8 ABOVE TOP OF N ITH REMOVABLE P NDNO.1 CONSTRUCTION SEQUENCE I BE USED AS A EROSION OF THE PROJECT. CONTROL PRIOR TO ACCEPTTANCE OF THESAND FABASIN CONSTRUCTION SE FILTER FOR THE ITEMS DOST BE COMPLETED: k X / A. THE POND MUST BE CLEANED OF ALL SEDIMENTS ACCUMULATED DURING CONSTRUCTION. / OP. ND LTER AR / / ' / / / / B. THE CONTROL STUCTURE SHALL BE INSTALLED PER THE DESIGN. ARE = 845 F / / / / / C. ALL VEGATATIVE PLANTINGS SHALL BE/ESTABLISHED. x \ ''4U TO ELE -6 i. DN ONS 4 ' X 12' .5 BMP NOTE. DRAINAGE AREA MUST BE STABILIZED BEFORE FILTRATION CONTROLS AND FILTER MEDIA ARE INSTALLED. / STORMWATER BMP / 675 / / E ERD IN C LECTION SYSTEM SHALL BE EQUIPPED WITH 6" ER BMP EASEMENT / / / / I L HDFO PIPE. PER ORALE40NS SOHALLRBENGERPER , PVC PIPE AASHTO M02 8DOUBLE FOR PVC E, A HTO M252 FOR DOUBLE WALL HDPE PIPE, OR BE 3/8" IN / IA ER SP/XCED 3" ON CENTER ALONG 4 LONGITUDINAL ROWS THAT xJ/x �x / / / / AR PAC ED 900 APART. THE PIPES SHALL HAVE A MINIMUM SLOPE OF o x x �C / / / / 0 � ANJ�A MAXIMUM SPACING OF 10 FEET ON CENTER. I I a a FRONT VIEW CONTROL STRUCTURE DETAIL NOT TO SCALE. MAINTENANCE SCHEDULE 1. AFTER EVERY SIGNIFICANT RUNOFF PRODUCING RAINFALL EVENT AND AT LEAST MONTHLY: A. INSPECT THE SYSTEM FOR SEDIMENT ACCUMULATION, EROSION, TRASH ACCUMULATION, VEGETATED COVER, AND GENERAL CONDITION. B. CHECK AND CLEAR THE ORIFICE OF ANY OBSTRUCTIONS SUCH THAT THE DRAWDOWN OF THE TEMPORARY POOL OCCURS WITHIN 2 TO 5 DAYS AS DESIGNED. 2. REPAIR ERODED AREAS IMMEDIATELY. RE -SEED THE EMBANKMENT AS NECESSARY TO MAINTAIN GOOD VEGETATIVE COVER. MOW VEGETATIVE COVER ON EMBANKMENT TO MAINTAIN MAXIMUM HEIGHT OF SIX INCHES, REMOVE TRASH AS NEEDED. 3. INSPECT AND REPAIR THE COLLECTION SYSTEM (i.e. CATCH BASINS, PIPING, SWALES, RIPRAP, ETC.) QUARTERLY TO MAINTAIN PROPER FUNCTIONING. 4. REMOVE WOODY VEGETATION NOT PART OF THE APPROVED PLAN ALONG THE DAM EMBANKMENT. 5. INSPECT FOR CLOGGING - RAKE DEBRIS SCREEN AND FIRST INCH OF SAND. 6. REMOVE SEDIMENT FROM FOREBAY/CHAMBER WHEN MORE THAN 1 FOOT OF STORAGE IS LOST. 7. SEDIMENT, TOPSOIL, AND 3 INCHES OF FILTER MATERIAL MUST BE REMOVED AFTER THE ALLOWABLE DRAWDOWN TIME IS EXCEEDED BY 25 PERCENT. 8. ENTIRE FILTER MATERIAL AND UNDERDRAIN SYSTEM MUST BE REPLACED IF REMOVAL OF 3 INCHES OF MEDIA DOES NOT RESTORE FILTRATION RATE. 9. PERFORM ANNUAL INSPECTION OF THE SAND FILTER (ANNUAL INSPECTION REPORTS TO BE KEPT BY THE OWNER). PRIOR TO INSPECTION NOTIFICATION MUST BE GIVEN TO STORM WATER SERVICES. X —x _x / / / / / / / GRAPHIC SCALE X 10 0 5 10 20 � �X x �x �x x x x—�x—x—x / IN FEET) —x /hAl PAN 6y5 x x x—x—x�L— Rw — — R/W _ 1inch =loft. w — R/w _ _ R/xdv R/w �/W —�_� = x — X — x x x — STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, NC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. V 1 W Cq PT4 Co ® W UD � �' U W W Z E-1 W0-4 0a a D� MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,88E-0 # IN21IH Z 0 Q 000 CL N a�Cou') • N Co g� U CO W �a O L N ) a uj a) Co N Cm W QZ L LV ` o C L E. Q QCoU BMP PLAN SHEET: C591