Loading...
HomeMy WebLinkAboutSW6191102_McPhail Meadows-1-200304_3/5/20209 001w, 9 of NMI Ofl for 1i a p k � 6 1 WIM __ GENERAL NOTES: 1. DEVELOPMENT SHALL COMPLY WITH HOKE COUNTY AND NCDOT STANDARDS AND SPECIFICATIONS. 2, SIGNAGE, LANDSCAPING AND OTHER MONUMENTATION SHALL BE PERMITTED IN CONFORMANCE WITH HOKE COUNTY ZONING ORDINANCE REQUIREMENTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING EXISTING UTILITIES AND REPAIRING ANY DAMAGE TO SAME. UTILITY LOCATIONS AS SHOWN ON PLANS ARE APPROXIMATE AND MAY NOT BE COMPLETE. THE CONTRACTOR SHALL HAVE NORTH CAROLINA ONE CALL (1-800-632-4949) LOCATE ALL EXISTING UTILITIES PRIOR TO BEGINNING OF CONSTRUCTION. 4. PROVISIONS SHALL BE MADE TO ENSURE POSITIVE DRAINAGE ON THE SITE AT ALL TIMES. NATURAL DRAINAGE FEATURES DISTURBED BY CONSTRUCTION MUST BE RE-ESTABLISHED. NO PONDING DUE TO SPOILS STOCKPILING OR OTHER ACTIVITIES SHALL BE PERMITTED. 5. WORK IN PUBLIC RIGHT-OF-WAYS OR PRIVATE EASEMENTS SHALL BE ACCOMPLISHED BY THE CONTRACTOR ACCORDING TO THE REQUIREMENTS OR CONDITIONS OF THE ENCROACHMENT PERMIT OR OTHER LEGAL DOCUMENTS AS THOUGH DOCUMENTS WERE ISSUED IN THE CONTRACTOR NAME. THE CONTRACTOR SHALL MAINTAIN COPIES OF THESE DOCUMENTS ON THE SITES AT ALL TIMES. 6. WHEN THE CONTRACTOR IS UNABLE TO COMPLETE HIS WORK AS SHOWN ON THE PLANS BECAUSE OF AN EXISTING UTILITY, CONTRACTOR SHALL STAKE THE LOCATION OF THE UTILITY PRIOR TO PROCEEDING AND CONTACT THE ENGINEER. 7. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AGENCIES, THE OWNER, THE ENGINEER AND ALL OTHER CONCERNED PARTIES WHEN CONSTRUCTION IS TO COMMENCE. PRIOR TO ANY CONSTRUCTION A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE MUNICIPALITY/AUTHORITY, THE CONTRACTOR, THE ENGINEER AND ANY OTHER INTERESTED PARTY. \ 8. DATA REQUIRED FOR PREPARATION OF RECORD DRAWINGS SHALL BE OBTAINED \ BY THE CONTRACTOR AT THE TIME FOR INSTALLATION. THIS DATA SHALL BE \ ACCUMULATED BY THE CONTRACTOR DURING THE CONSTRUCTION PERIOD AND EVIDENCE PROVIDED TO THE ENGINEER AS PART OF THE MONTHLY PAY \ REQUEST. PAY REQUESTS WILL NOT BE APPROVED BY THE ENGINEER IF DATA IS NOT SUBMITTED WITH THE PAY REQUEST. CONTRACTOR IS TO PROVIDE NEAT AND LEGIBLE COMPLETED RECORD DRAWINGS TO THE ENGINEER AT THE COMPLETION OF THE PROJECT. 9. INSPECTIONS SHALL BE CONDUCTED IN ACCORDANCE WITH NCDOT STANDARDS. A MINIMUM OF TWO WORKING DAYS NOTICE SHALL BE GIVEN FOR ANY REQUESTED INSPECTION. 10. ALL EXCAVATED EXCESS OR WASTE SOILS AND MATERIAL SHALL BE REMOVED FROM THE SITE BY CONTRACTOR EXCEPT AS SPECIFICALLY APPROVED IN WRITING BY BOTH THE ENGINEER AND OWNER. 11. WHEN CONCRETE SIDEWALKS, CURB AND GUTTER SECTIONS OR ASPHALT PAVEMENT ARE DAMAGED DUE TO CONSTRUCTION ACTIVITIES, THEY SHALL BE REPLACED IN A TIMELY MANNER BY THE CONTRACTOR TO ASSURE THE CONTINUED USE OF THESE FACILITIES BY ALL CONCERNED. 12. ON SITE BOUNDARY AND TOPOGRAPHY INFORMATION TAKEN FROM SURVEY FROM STROTHER LAND SURVEYING, DATED JULY, 2019. 13. CONTRACTOR IS TO COMPLY WITH ALL PROVISIONS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES WHEN WORKING ADJACENT TO AN EXISTING PUBLIC HIGHWAY RIGHT OF WAY. 14. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE. ITIS LOCATED ZONE 'X ' DEFINED BY FEMA FIRM COMMUNITY - MAP NUMBER 3710946600J, EFFECTIVE DATE OCTOBER 17, 2006 15. THE CONTRACTOR WILL MAINTAIN ALL EXISTING ROADS IN A NEAT AND CLEAN CONDITION THROUGHOUT THE COURSE OF THE PROJECT CONSTRUCTION. OWNER IDE VEL OPER i Southeastern Construction of Rockfish, LLC 771 Bostic Road Raeford, North Carolina i i i Hoke County, NC 0 OVERALL PLAN \ V NT ws SCALE IN FEET 0 75 150 300 Southeastern Construction 'Al 9Q. HOKE COUNTY LOCATION MAP SHEET SCHEDULE SHEET TITLE 1 SHEET NO: ORIGINAL DATE LATEST REVISION DATE COVER SHEET � 1 10/29/2019 ^� 02/25/20 .............................. EXISTING CONDITIONS 210/29/2019 02/25/20 OVERALL SITE LAYOUT PLAN 3 1012912019 i 02125120 INITIAL EROSION &SEDIMENTATION CONTROL PLAN 4 1012912019 02125120 INTERMEDIATE ERO. & SED. CONTROL PLAN 1 5 1012912019 02125120 FINAL EROSION & SEDIMENTATION CONTROL PLAN 6 € 1012912019 02125120 SEDIMENTAND EROSION CONTROL NARRATIVE 7.0 1012912019 € 11118119 NC_G01 —GROUND STA_BILlZA TIO_NAND- M_ A-TE_RIAL—S HA—NDL I,NG � PLAN SHEET 7 1 - 11/18/19 NCGOI SELF I SVSPECTION, RECORDKEEP►NG AND REPORTING PLAN SHEET _ _..__. , r 7.2 - 11118119 SEDIMENT AND EROSION CONTROL DETAILS 8.1 1012912019 ; 11127119 SEDIMENT AND EROSION CONTROL DETAILS ; 8.2 - 11127119 3 i SEDIMENT AND EROSION CONTROL DETAILS 9 1012912019 i 11127119 WATERMAIN PLAN AND PROFILE 10 1012912019 02125120 WATERMAIN PLAN AND PROFILE 11 I 1012912019 02125120 WATERMAIN DETAIL j 12 1012912019 12103119 ROADWAY & STORM DRAINAGE PLAN AND PROFILE 13 10/29/2019 02125120 ROADWAY PLAN AND PROFILE 14 1012912019 02125120 ROADWAY PLAN AND PROFILE 15 1012912019 02125120 = ROADWAY PLAN AND PROFILE 16 1012912019 02125120 SITE GRADING PLAN 17 1012912019 �02125120 SITE DETAIL 18� 10/29/2019 i 11/27/19 SITE DETAIL � � � 19 10/29/2019 � 01/02/20 SITE DETAL_ 20 1012912019 01102120 F SWALE DRAINAGE MAP D1 1012912019 01102120 j REVISION OCCURRENCE LIST 6 212512020 ROAD CENTERLINE REVISED PER WETLAND JLF 5 11212020 PER NCDOT COMMENTS DATED DECEMBER 27, 2019 JLF 4 1211212019 APPROVAL WITH MODIFICATION, DECEMBER 12, 2019 JLF 3 121312019 PER NCDNER COMMENTS RECEIVED DECEMBER, 2019 JLF 2 1112712019 PER NCDEQ & NCDOT COMMENTS RECEIVED NOVEMBER 27, 2019 JLF 1 1111812019 PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 JLF REVISION NO. DATE REVISION DESCRIPTION BY THIS SET IS CURRENT THROUGH SHEET DATED: 02/25/2020 1 H IL EfARD, m,, SURVEYOR ENi/NEER/NG, PL L C Strother Land Surveying ,,,,,,, 749 Walker Road, Sanford, NC 27332 •`""" :.'...:°<, �-., PO Box 249, Sanford, NC 27331 120 East Elwood Avenue Esso... Aft = : 4 5 Phone: (919) 352-2834 Raeford, North Carolina 283tu =:, �..�N�� e-mail:jhilliard@hilliardengineering.com Phone: (910)875=8081 NC License A-0836 email:leland@strotherlandsurveying.com 2 CL Q z Vicinity Sketch - Not to scale GENERAL NOTES: 6. ALL WASTE MATERIAL SHALL BE LEGALLY DISPOSED OF OFF -SITE. 1. THE GENERAL CONTRACTOR SHALL VERIFYAND BE RESPONSIBLE FOR ALL 7. ALL CONSTRUCTION TO BE ►NACCORDANCE WITH ALL, HOKE COUNTYAND DIMENSIONS AT THE JOB SITE. STATE REQUIREMENTS. 2. CONTRACTOR SHALL CONTACT LELAND STROTHER OF STROTHER LAND 8. DISTURBED AREAS NOT COVERED BYASPHALT OR OTHER IMPERMEABLE SURVEYING FOR ELEVATIONS AND BENCHMARK LOCATION. SURFACES SHALL BE SEEDED AND STABILIZED PER SPECIFICATIONS. 3. ALL DIMENSIONS AND ELEVATIONS ARE MEASURED TO BACK OF CURB UNLESS 9. ALL TRAFFIC CONTROL DEVICES, PAVEMENT MARKINGS, SIGNS AND SIGNALS OTHERWISE NOTED. SHALL BE DESIGNED, INSTALLED AND MAINTAINED IN CONFORMANCE WITH THE STANDARDS SET FORTH IN THE NORTH CAROLINA MANUAL ON UNIFORM 4. THE INTENT OF THE LIMITS OF CONSTRUCTION (LOC) SHOWN ON THE TRAFFIC CONTROL DEVICES. DRAWINGS IS TO DEFINE THE GENERAL AREA TO CONSTRUCT, INSTALL AND/OR MODIFY THE SITE IMPROVEMENTS. TYPICALLY, THE LOC WILL FOLLOW 10. THIS PLAN INDICATES THE MAJOR DEMOLITION COMPONENTS TO BE REMOVED RIGHT-OF-WAY OR PROPERTY BOUNDARIES. HOWEVER, FOR CLARITY AND/OR, RELOCATED. HOWEVER, THE CONTRACTOR SHALL DEMOLISH AND/OR PURPOSES, THE LOC MAY BE SHOWN IN CERTAIN LOCATIONS FOR READABILITY RELOCATED ALL MISCELLANEOUS COMPONENTS NOT SPECIFICALLY INDICATED PURPOSES. THE CONTRACTOR SHALL CONTACT THE OWNER'S ON THIS PLAN TO PROVIDE A CLEAN SITE FOR THE INSTALLATION OF THE NEW REPRESENTATIVE REGARDING ANY QUESTIONS AS TO THE EXACT LOCATION OF IMPROVEMENTS. THE LOC PRIOR TO BID AND PRIOR TO BEGINNING CONSTRUCTION. ALL ITEMS SHOWN ON THESE PLANS THAT DO NOT SPECIFICALLY STATE 11. SURVEY, BASE MAPPING & TOPOGRAPHICAL DATA PROVIDED BY STROTHER 'NOT -IN -CONTRACT (NIC)' SHALL BE INCLUDED IN THE BID COST, INCLUDING LAND SURVEYING - RAEFORD, NC - ITEMS THAT MAY BE OUTSIDE THE LOC BOUNDARY. (910) 875-8081. 5. LOCATIONS OF EXISTING UTILITY LINES HAVE BEEN TAKEN FROM UTILITY RECORDS SUPPLEMENTED BY FIELD INSPECTIONS AND SHOULD INDICATE IN GENERAL THE TYPE OF UNDERGROUND FACILITIES NOW IN SERVICE. LOCATIONS SHOWN ARE NOT GUARANTEED. DEVELOPERS OR CONTRACTOR SHALL NOT ONLY MAKE SUBSURFACE INVESTIGATIONS BUT SHALL ALSO ALLOW FOR CONTINGENCIES WHICH MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR LINES BEING IN DIFFERENT LOCATIONS THAN INDICATED ON THIS PLAN. PRIOR TO ANY CONSTRUCTION ACTIVITY OR EXCAVATION ON THE SITE, THE GENERAL CONTRACTOR SHALL NOTIFYALL UTILITY COMPANIES TO VERIFY AND/OR FIELD -LOCATE THEIR RESPECTIVE UTILITIES (THE NORTH CAROLINA ONE CALL CENTER: 1-800-632-4949). ALL DAMAGED INCURRED TO EXISTING UTILITY LINES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTORS EXPENSE. NOTES: 1. SUBJECT TO ALL EASEMENTS, RIGHT-OF-WAYS, STREETS, AND ASSESSMENTS, IF ANY, AS THE SAME MAY APPEAR OF RECORD IN THE OFFICE OF THE REGISTER OF DEEDS, CLERK OF COURT, TOWN OR COUNTY TAX OFFICES OR WHICH MAY HAVE BEEN ACQUIRED BY PRESCRIPTIVE USE. 2. EXISTING TOPOGRAPHY TAKEN FROM HOKE COUNTY GIS. 3. ALL DISTANCES ARE HORIZONTAL GROUND. 4. AREA BY COORDINATE COMPUTATION. 5. SURVEY FROM INFORMATION FOUND IN DEEDS AND PLATS OF RECORD IN HOKE COUNTY REGISTRYAND CORNERS LOCATED IN FIELD. 6. NO NC GRID MONUMENTS WITHIN 2000' OF THIS PROPERTY. NC GRID COORDINATES ESTABLISHED BY GPS METHODS. HORIZONTAL COORDINATES NC GRID NAD83(2007) AND ELEVATIONS NAVD 88 DATUM. 7. DASHED OR BROKEN LINES ARE FROM DEED DESCRIPTIONS, PLATS OF RECORD OR PARTIAL SURVEY AND NOT AN ACTUAL FIELD SURVEY. me Rhor ri Clarence 014i li \ r 4� N s �.WIN N � wire fence -A EXISTING LEGEND DESCRIPTION NEW EXISTING IRON ROD RIGHT-OF-WAY — — PROPERTY LINE ROADWAY V CONTOURS 242 5' CONTOURS 250 DITCH 3) i \\/wooden nce i 'n 7 Terry Long D.B, 7, d / (1m �u,ry y for Scott ,, S. Godwin and � -� W- Gs.$i%aP£ f, s %' i/e 1 yE,l bpi I 4 A 'A` 9£ �t n m r m ! \� l % N t J� jj �U Ch N 1 �� on-0ina l ors �Lrr Bey for Terry Long" ( m V N N J/ AbN�+ M ;;r,) pes , fry 4 -7R Map0 i s£z 1m Dff 1121, g. 634 1 'r (0 s-A &Itheasiern -A ( ,,LC,( \ 1 \ 1 \ 1111 r Phi c ;rr cPtm,€� fir. it A� -A z t< 'AN N w �� \ ro � � I jj ''Ai 'A 'A -A j etl3 i -A r X ti \ n .'A SZ 'le _ \ / \ x A207Acres 'A I w. t \ u"�tsultabiesoi/s area 'A,n n, N"V "Pt 1-5 9�� x � � 96Z 'R cambinaticrt Survey for Drv1d rPau;Avf.7a antwife, 4. sl. 4-844 ap 005 EYAff ✓ \ 11Y6RANT j F� w L M�FR IRi��t} / fXSOIL TRAV—ELWgY �` \ ry tone Lane N:454,229.45 US Survey Ft. ♦ E: 1,967,114.43 US Survey Ft. Nathaniel Groves Ei.-236.63' NAVD881 .24 Acres David Paul Avina and wife, � \ t : 3, 256, Pg. 447 Kimberly Ann Miller Avina\ \ 1 _ \) \ t - -- - - __•e ice„ _ -- - private acces_s easemen_t County of Hoke 2,0 Acres ,. 664, Pg, 44 CD ,47 Acres Ies U Q SURVEY NOTE: 1. BOUNDARY INFORMATION FROM A MAP PREPARED BY STROTHER LAND SURVEYING. TOPOGRAPHY TAKEN FROM HOKE COUNTY GIS. "'"NOTE,' CONTOURS HOWN ON THESEPLANS ARE L/DARAND W BASED UPON LIDAR IND TOPOGRAPHIC RVEY. OWNER: Ot N N N 0 ' /N \ t { 6MV 110, O N � NN i Ir \ N ' li jN �1 1 \ 10 \ {N{ \ wooden fence �` \ I I I cods E €base TWA ' I II 3, snide 3- 8, map 0s G . (72) (71) I I I I I I I I I I (7Q) I I I WILLIAM MALCOLM MCPHAIL, JR 22.48 ACRES MCLAUCHLIN TOWNSHIP HOKE COUNTY, NORTH CAROLINA DEED INFORMATION. DEED BOOK 382, PG 373 TRACT D-3 "DIVISION OF J.F.McPHAIL ESTATE" SLIDE 114,M.B. 5, PG 56 Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 11 0 0 s SCALE IN FEET 0' 30 60 120 A REVISION DESCRIPTION: ROAD CENTERLINE REVISED PER WETLAND CARo�',, o�CF : SS/0' !�9 3 670 - 9,Q NGINE��'��O .......... E. ' N O U M N M ,C ZM � Z C\1 � M � a tQ 4Q- L, Vcts C W N>Co•�U t� Op a• .�� 4. M �W 11.A .W O � F Q Z � J Z W 0W v 0 Cc O Z Z_ U ° X U w V O W DESIGNED BY: JEH DATE: DRAWN BY. JLF APPROVED BY.JEH SHEET: 2 02125120 CIVIL OWNER: SOUTHEASTERN CONSTRUCTION OF ROCKFISH, LLC 771 BOSTIC ROAD RAEFORD, NORTH CAROLINA DEED INFORMATION. SOUTHEASTERN CONSTUCT/ON OF ROCKFISH, LLC D.B. 1221, PG 0715-0716 TRACT D-3 "DIVISION OF J.F.MCPHA/L'ESTATE" SLIDE 114, M.B. 5, PG 56 PIN NUMBER: PIN #: 494650401020 Vicinity Sketch - Not to scale TOTAL PROPERTY AREA 18.91 ACRES PROPERTY ZONED: ZONED RA-20 MINIMUM LOT SQ.SF = 20,000 SF PROJECT PERCENT OF IMPERVIOUS AREA: PROJECTPERCENT IMPERVIOUS = 22.95% STREAM CLASSIFICATION: NAME OF STREAM CLASSIFICATION BASIN PUPPY CREEK C CAPE FEAR SOILS INFORMATION: SOILS LOCATED ON PROJECTAREA BaD, Ra & WaB UTILITY NOTE: 1. WATER DATA FROM HOKE COUNTY PUBLIC UTILITIES AND FIRE FLOW REPORT PROVIDED FROM LKC ENGINEERING 2. SEWER SERVICE WILL BE VIA SEPTIC. Lumbee River E) D.B. 1000, Pg. 8 I Terry Long D.B. 417, Pg. 901 f '1 ("Survey for Scottie S. Godwin and wife, Sabrina L. Godwin" Slide 274, Map 003) I I• "Recombination Survey for Terry Long" CAbinet 4, Slide 4-79, Map 005 Te Long 9 D.B. 1121, Pg. 634 20' DRAINAGE ESMT. — SURVEY NOTE: 1. BOUNDARY INFORMATION FROM A MAP PREPARED BY STROTHER LAND SURVEYING. !. TOPOGRAPHY TAKEN FROM HOKE COUNTY GIS. '`*NOTE.' CONTOURS >HOWNON THESEPL4NSARE L/DARMD If BASED ZF0JVL1D.4R AND TOPOGM4PHIC SURVEY CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C 1 230.00' 15915' 156.00' 1 N 53.1141 " E 39°3848" C2 230.00' 158.93' 155,78' S 53c10'01 " W 39.3527" C3 230.00' 178.49' 174.04' 1 S 84°48'22" E 44-2749" 25' REAR SETBACK NOTES: 1. SUBJECT TOALL EASEMENTS, RIGHT-OF-WAYS, STREETS, AND ASSESSMENTS, IFANY, AS THE SAME MAY APPEAR OF RECORD 1N THE OFFICE OF THE REGISTER OF DEEDS, CLERK OF COURT, TOWN OR COUNTY TAX OFFICES OR WHICH MAY HAVE BEEN ACQUIRED BY PRESCRIPTIVE USE. 2 EXISTING TOPOGRAPHY TAKEN FROM LIDAR DATA FROM NC EMERGENCY MANAGEMENT SPATIAL DATA. 3. ALL DISTANCES ARE HORIZONTAL GROUND. 4. AREA BY COORDINATE COMPUTATION. 5. SURVEY FROM INFORMATION FOUND IN DEEDS AND PLATS OF RECORD /N HOKE COUNTY REGISTRYAND CORNERS LOCATED IN FIELD. 6. NO NC GRID MONUMENTS WITHIN 2000' OF THIS PROPERTY. NC GRID COORDINATES ESTABLISHED BY GPS METHODS, HORIZONTAL COORDINATES NC GRID NAD83(2007) AND ELEVATIONS NAVD 88 DATUM. 7. WATER BY HOKE COUNTY,SEWER BY SEPTIC SYSTEMS. 8. DASHED OR BROKEN LINES ARE FROM DEED DESCRIPTIONS, PLATS OF RECORD OR PARTIAL SURVEYAND NOT AN ACTUAL FIELD SURVEY. Clarence Willis D.B. 1021, Pg. 957 I I FRONT - 30' 01 REAR - 25' ---- -- CORNER/SIDE - 30' i 130' i LOT i25) SIDE -10' 10' t z0' DRAINAGE EASEMENT 10, ROWIL LOT 125` 30 I-------. I 30' CORNER WHERE APPLICABLE BUILDING SETBACKS/ / UTILITY WEMENTS- (12) / N.T.S. / `Lochaven Estates" J P. C. 3, Slide 3-59, Pg. 004 \ (14) 1 / (13) !!! (TYP.) 20' DRAINAGE wire fence ESMT. 90 wooden fence 'A — — — — — — — - — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - �, r - --- - - - - - - - - - - - - - ------ ---- ----------------------- -------- - ----- -- ----- -- - --------- ---------- - - - - - - - - - - - - - - - - - - - - - - - -------------------------------- --------------------------- -- - - --- --- ----- A A �-- ---- --------------------� �r ----- ------------------------ ---------- ---- -- ----- -- - ---------------------------------------------------_ r------------------------------- ----- --------------------- ----- ------------------ I_ __________________________J L____ ______-_______ __ - _ ��� _________ It --------------------------------------------- ---- pX89"- Iil— -- —'—•� �]„'/��____�_____�_______ 11 i, II it 11 fi 'f it II 1i ,'ri ft A 'A A (il i1 i ii II Ii ii Jri II II II II II I( (( I�IIIIII 1ft PROPOSED PROPOSED CONVEYANCE CONVEYANCE fl' DRAINAGE .SWALE (TYP.)ESMT ESMT.I20DRAINAGE t 1 A I it 311 I ;; 20508 SF 0.47AC 21128 SF ' , I (; 1 I I 20000 SF I I i t III 0.49 A0 + I , 'r I 11 11 " If I, 11 A I I i I ( 20000 SF I 1 1 I I ( 20000 SF III I , �! , ! ,' 1 I , , I I Lot 18 Zo' DRAINAGE I, 1 20570 SF 0.46Ac I I I I , I i t l , Q ,, ''� r J r I PR OPO�ANCE I 0.46Ac III I I I 0.46Ac i i' I 20 000 SF / t r Lot r 9� i f ! ! (f 047Ac II II 11 i II I 11 A CONVE II I i I+IIESMT. Lot 24 /''A SWALEP.) I Lot 23 Lot 22 ( l / Roo' A 'A I Lot 25 III III J I ' I Lot 21 � \ �/ -'% SIDEWALK I I 1 1 I I I I '' CONCRETE I r r � I ' ! 80C; III II CONCRETE i i' nM 1 I i FLUME SIDEWALK l I 41025 SF I PROPOSED I I A -A III I I 0.94Ao WATERMAIN i FLUME i i I ' Lot 17 '„ 'rt 1 A I I I' I Lot 26 --- — — — — — — J I' I — — — ' I �I f 4022 SF t; 1 I I ' / ,./ WIl -•-- WM WM W11 'WM WM WN WM 'WN WM WM 0.55Ac (f r I r A I I I I 50, S 72c5744" W 315.20' ROW ' R50' �, I I 25ROW I � ; T IC2 �+.P\\•r �� \ 0.51 Ac \ OFFSET A IIII 1 / .� \� Lot 20 A� `I I � I I I I I I f J A 11 11 II II II it rt „ / 5' CONCRETE CONCRETE III 1 1 / I I A I I / / �* 30' SIDEWALK (1 I III SIDEWALK I — 'A T 'A A 'A T 'A I ' i /I/ / FRONT —FLUME �t'--_--- �_\,\ � A AI 'I II II IIPROPOSED /�r----_-_-_ -_ =S�'butheastern enstructlQn of�f.'ockfish LLC A .� A A II SETBACK Lot 7 (I I III 1 I I I I / 0 -----------CONY€YANCE T yVlitiam N Icca/m McPhe . Jr. Tract -A Lot 6 (T'P.) p tS� 1 0 Lot 8 " I CORNER R30' 0 / 030' ` ( ) 20032 SF \ 0•�A A 'A I II II II iI °D 'r tl SWALE TYP. A 21840 SF ?,q_ BOC `'J� 0 r r ','+ `� CORNER \` \ �' " �D.B?`1221, Pg. 71�' A A A A i I i I , 20000 SF i i i i a46Aa i i i i F? / g�a I , I O.s0A0 , r r (60) (59) i `� A A A -A 'I 11 0.46Ac I II II II 8s 'ri „ •,^'-^ LOT SETBACK " \ A PIN. 494650401020 A A -A ' I ' I / / 20' DRAINAGE 0 �G A A A J 6 ii ii ESMT ii ii / \ \ " A A o / Lot 5 --I Lot 9 \ '` I ` 70'X I0'SITE \ \ l� 1` 'A T 'A �b J �L III III I I I I , ' �` „ ,. A A / ,- 25000 SF 10' -»— 10, I I I I , I � I 20500 SF �� A II II II i 8 !! ll 1 ' TRIANGLE (TYP.) \ T 09 /� '!� / /, ,`a�G / os7Ac o47Ac ` /�„7 \ ,\ . �� A II II it II \` ` ` T A A .+ s)C. .' ,% SIDE \ R30' �'N. 1 \ A 'A A A o� '�"— SETBACK III III (� co 't' i r t' 61) t , STOP SIGN ./� A A/ BOC Oj A A A '3 TYP. 25' �/ PER NCDOT STD. A A ( ) I I I I \ A / /' o , t,, A A 'A A PROPOSED I i I I I I REAR I I I I STOP SIGN �0 0• I' y .'30273 SF �` � CO CRETE PAD A /� / 20' DRAINAGE i i i i SETBACK i t I i 30' PER NCDOT STD. ( ' tl 1 A A / CONVEYANCE ` \ z O 1 / — — — — ESMT. I� ; „ FO CBU A _ _SWALE TYP. ( ) j Oiz t t ' 1 t-O.BBAa \ �� \` A t/ Z 07 g .A '%'_— 777��� i ) J I I I I TYP. I I I I FRONT. • \ ' r i i 1 1 11 11 ii 11 ______ __J I I ___ -__ ____ _-___J i i I --�� u?isuitable o�lsarea /----------- --------------- �--------- ------------J I I� 1� Lot 27 A A ----------- - ----- -- - - -------------- -------------- - __ ------ �/ �� It'll r -I�- IIA / ---------------------- - ------------_- ---- --------------- ------ , - -- -- ------------_--j 1� III III A A _-_ _- - _-- - _� �. I `� QQ�`\ fr' r 'A A� V +o Qt' \ \ t f w 30' FRONT I I i i 25 5, 25' A w,+ I I I I a / ROPOS D /^/ , 1 \ fr I SETBACK I I I I( TAPER TAPER 25 / I R50 � tih •� \CONVEYANCE --\y I _ r,,, REAR I I I � ROW • '"'' '1 � .�i,r' r r Qt 2) — — — — — — — __-•--- — — — — w+t-'`�� 20' DRAINAGE SETBACK SWALE (TYP.) �� wM wM wM wM wM wM wN w _ y _ — + _ wM WM WM wM / ESMT. (NP) R25'' Proposed Street N 73'01'W' E 444.69 7' T . R25' � t ' , 70'X 10' SITE 26' EOP Lot 4 TRIANGLE (TYP.) 37794 SF -- a87Ac 1 1 Lot 1 Lot 2 I Lot 3 11 20000 SF 20000 SF + 20000 SF EX. FIRE 0.46Ac 0.46Ac I 0.46Aa I HYDRANT MALL CLUSTER BOX UNITS (CBU) 30' CORNER WITH ADA RAMP. REFERENCE NCD07 LOT SETBACK PLACEMENT OF CBU FIGURE 2: CBU 1 FOR C&G SEC71ON RESIDENTIAL LOCAL 0� 5` \ �, a Mw Lot ',R40' ./ ° v 000„ qy „ PIN: 494650401038 \ \ BUG "Recombination Survey for I I I 20' DRAtNAGE6Aa \ �, • � / \ \ " � ,' „ David Paul Avina and wife, I I ESMT. Kimberly Ann MlllerAvina" I i I I I OFFSET — " % A " ' (63) 3. 00 Acres 1z P.C. 4. Si. 4-84, Map 005 I + I I / CONCRETE SIDEWALK FLUME Lot 1 1 20' DRAINAGE ESMT. 20219 SF 0.46Ac \ 20' DRAINAGE ESMT. 1 —AND COLLECTOR STREETS. I ' I L_____—__—__`___—__—________------------------------------------------------------------ - �J Mt7e .9 o?,(00" EX- 50)LTg Le A — — — — -- — — — — — — — — -- — — — — _ _------- ------ _�---___------- (69} Halt 8, P� �—'srs�� wooden gt BiWafone Lane _ - 1 �PX. rE� �� �raea+eReLeesEaam�tmr7J ofisr�:/- \ I \ Nathaniel Groves I \ 1.24 Acres I David Paul Avina and wife, 1 \ �D.B. 256, Pg. 447 Kimberly Ann Miller Avina 1.00 Acre I DB. 636, Pg. 56 I \ (74) Robert D. Beatty I 2.0 Acres PfN: 494650401038 I \ ' ' I D.B. 316, Pg. 549 l I — ""'----- �_ 84'-aa,�ton � I 3(1'private acce�sement F•q \ County of Hoke 2.0 Acres I D.B. 664, Pg. 443 � (75) i A.K. Leach, Jr. I ` I 2.47 Acres D.B. 282, Pg 247 Anthony Glover I � 3.15 Acres I I � D.B. 729, Pg. 595 � I I I 1 I �(76) I I I 1 t I I "foods Edge Phase Two (73) C b. 3, Slide 3-18, Map s- 6 & 7 (72) (71) (70) i 1 I 1 Know what's below Call before you dig. ® Dial 811 Or Call 800-632.4949 1 4 (54) s SCALE IN FEET Fm 0' 30 60 120 REVISION DESCRIPTION: PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 PER NCDOT COMMENTS DATED DECEMBER 27, 2019 ROAD CENTERLINE REVISED PER WETLAND I, t111111ftt)tl, CA /? S S/OZ ° Q SEAL ,A F'�GIN��F-°PQ�: 0b EI �I/zd N O C� N M � ZUoCNI !rp 0 t�ZN a Q) M OC��� G3 �c0CL-Z CO O 0 Ei 0 M 0 CL v C V Cj z Q J 4 2 W Z;4t v� Z _I U -0O Co z �Z = O CL Y C3 S DATE: DESIGNED BY. JEH DRAWN BY: JLF 11 /28/19 APPROVED BY. JEH SHEET: 01/02/20 3 02/25/20 CIVIL oNX ■y■ 2 IL LO Vicinity Sketch - Not to scale SELF INSPECTION NOTE. THE LANDOWNER, THE FINANCIALLY RESPONSIBLE PARTY, OR THE LANDOWNER'S OR THE FINANCIALLY RESPONSIBLE PARTY'S AGENT SHALL PERFORM AN INSPECTION OF THE AREA COVERED BY THE PLAN AFTER EACH PHASE OF THE PLAN HAS BEEN COMPLETED AND AFTER ESTABLISHMENT OF TEMPORARY GROUND COVER IN ACCORDANCE WITH G.S. 113A-57(2). THE PERSON WHO PERFORMS THE INSPECTION SHALL MAINTAIN AND MAKE AVAILABLE A RECORD OF THE INSPECTION AT THE SITE OF THE LAND -DISTURBING ACTIVITY. THE RECORD SHALL SET OUT ANY SIGNIFICANT DEVIATION FROM THE APPROVED EROSION CONTROL PLAN, IDENTIFY ANY MEASURES THAT MAYBE REQUIRED TO CORRECT THE DEVIATION, AND DOCUMENT THE COMPLETION OF THOSE MEASURES. THE RECORD SHALL BE MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED AS REQUIRED BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE INSPECTIONS REQUIRED BY THIS SUBSECTION SHALL BE 1N ADDITION TO INSPECTIONS REQUIRE BY G.S. 113A-61.1_SEE NCGO1 INSPECTION, RECORDKEEPING AND REPORTING GENERAL NOTES: EROSION CONTROL MEASURE - INITIAL PHASE: 1. ENSURE ALL APPROVALS HAVE BEEN OBTAINED PRIOR TO ANY LAND DISTURBANCE. 2. CONDUCT ON -SITE PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, OWNER, ENGINEER AND CONSTRUCTION MANAGER TO REVIEW THE PROJECT AND EROSION CONTROL SEQUENCES. 3. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WITHIN AND IMMEDIATELY ADJACENT TO THE PROJECTAREA. 4. INSTALL CONSTRUCTION ENTRANCE AT LOCATION SHOWN ON THE PLAN - OFF OF EDGE OF EXISTING PAVEMENT ON PITTMAN GROVE CHURCH DRIVE. 5. FLAG LIMITS OF ALL DISTURBED AREA AS SHOWN ON THE PLANS FOR INSTALLATION OF PERIMETER EROSION CONTROL DEVICES - SILT FENCE AND SILT FENCE OUTLET WHERE SHOWN. ANY BORROW MATERIAL BROUGHT ONTO THIS SITE MUST BE FROM A 6. INSTALLSILT FENCE OUTLETAS SHOWN ONTHEPLANS. LEGALLY PERMITTED MINE SITE OR OTHER APPROVED SOURCE. A 7. CONSTRUCT TEMPORARY SEDIMENT TRAP AS SHOWN ON THE PLANS. SINGLE -USE BORROW OR WASTE AREA SITE IS ONLY PERMISSIBLE IF IT IS 'OPERATED UNDER CONTROL OF THE FINANCIALLY RESPONSIBLE PERSON 8. CLEAR AND GRUB SITE (WHERE REQUIRED) AND LEGALLY DISPOSE OF ALL OR FIRM THAT IS DEVELOPING THIS SITE. AN APPROVED EROSION AND DEBRIS OFF SITE. SEDIMENT CONTROL PLAN IS REQUIRED FOR ALL SINGLE USE BORROWAND WASTE SITES. � 9, PERMANENT GROUNDCOVER WILL BE PROVIDED FOR ALL DISTURBED AREAS EROSION CONTROL DESIGN, DETAILS AND MAINTENANCE SPECIFICATIONS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS (WHICHEVER SHALL COMPLY WITH CURRENT NORTH CAROLINA EROSION AND SEDIMENT IS SHORTER). CONTROL PLANNING AND DESIGN MANUAL. 210. TOTAL SITE DISTURBED AREA =1&0 AC. PURSUANT TO G. S. 133A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PERMANENT GROUNDCOVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 CALENDAR DAYS OR 60 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. SYMBOL PRACTICE DESCRIPTION CONSTRUCTION ENTRANCE A STONE STABILIZED PAD LOCATED ATANY POINT THAT TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE TO A PUBLIC RIGHT-OF-WAY, STREET, ALLEY, SIDEWALK, OR PARKING PLOT WHICH WILL REDUCE OR ELIMINATE THE TRANSPORT OF MUD FROM THE CONSTRUCTION SITEA TEMPORARY STRUCTURE USED TO SLOW THE VELOCITY OF RUN-OFF, SILT FENCE CAUSE SEDIMENT DEPOS►TIONAT THE STRUCTURE, AND FILTER SEDIMENT FROM RUN-OFFSILTFENCEOUTLET A TEMPORARY STRUCTUREAS A REINFORCED OUTLETAT LOWPOINTS OF PROTECTION THESILTFENCE. INSTALL #57 WASHED STONEAT UPSTREAM FLOW WITH HARDWARE CLOTH. (SEE DETAIL) TEMPORARY A TEMPORARY RIDGE OR EXCAVATED CHANNEL OR COMBINATION RIDGE DIVERSION AND CHANNEL CONSTRUCTED ACROSS SLOPING LAND ONA PREDETERMINED GRADE. _ _ _ CONSTRUCTION LIMITS A DEFINED AREA THATALL LAND DISTURBANCE WILL OCCUR DURING CONSTRUCTION. SKIMMER SE�IMENT AN EARTHEN EMBANKMENT SUITABLY LOCATED TO CAPTURE RUNOFF, WITH A TRAPEZOIDAL SPILLWAY LINED WITH AN IMPERABLE GEOTEXTILE BASIN OR LAMINATED PLASTIC MEMBRANE, AND EQUIPPED WITH A FLOATING SKIMMER FOR DEWATERING. POROUS BARRIERS INSTALLED INSIDE A TEMPORARY SEDIMENT TRAP, SKIMMER BASIN, OR SEDIMENT BASIN TO REDUCE THE VELOCITY AND POROUS BAkrFLE TURBULENCE OF THE WATER FLOWING THROUGH THE MEASURE, AND TO FACILITATE THE SETTLING OF SEDIMENT FROM THE WATER BEFORE DISCHARGE. SEDIMENT SKIMMER BASIN NO.2 (12)WITH BAFFLES EM.SPILLWAY ELEV.: 233.00' MIN. STORAGE VOLUME AT CRESTEM. SPILLWAY WIDTH: 8' „ OF SPILLWAY:7,875C.F. LOChaVen Estates"EM. SPILLWAY SLOPE: 0.5% MIN. SURFACE AREA AT CREST LINE W/ ENKA MATTING ORIV. OOP OF DAMEEV. 5234.50'colvsrRucrsar P.C. 3, Slide 3-59, Pg. 004(14) FENCE OUTLET PRIOR PROTECT EXISTING BOT. OF BASIN ELEV.: 229.50' (13)TO CONSTRUCTION FENCE CONSTRUCTSILT Clarence Willis SEDIMENT CLEANOUT ELEV = 231.25'OF SEDIMENT TRAP PROTECT EXISTINGmbee River E ctric FENCE OUTLET PRIOR B f021 Pg. 957SKIMMER SIZE: 4" W/1.5'0 ORIFICE �- TO CONSTRUCTION SKIMMER ELEV.: 229.50' / FENCE (TYP OFALL) D. 1000, Pg. 8 ye) OF SEDIMENT TRAP 3 ���� ;SF SF SFO SF \ 1 CL wooden fence CL rlow TOP OF DAM � � —* --� — L — —�4— — ►—_} I D w TD ---TaPa- --- -A � TD -�"_ TD - �-\ - - ►— - ---_ _ SFO 1 Terry Long n A,BINBOTTOM - - — t i��� f l�� D.B. 417, Pg. 901 EM.SPILLVtlAY ELEV : 234.50' ' TEMP. DIVERSION __ TEMP. DIVERSIONEM. SPILLWAY WIDTH: 15' �. _ _ SK _ _ / TEMP. DIVERSION EM. SPILLWAY SLOPE: 0.5% J ' 1 BF DITCH (5): SEEDS , V BF DITCH (4): SEED / DITCH UL SEED �1��;("Survey for Scottie S. God win and wife, LINE W/ ENKA MATTING OR -A I AND MULCHr;,..,�,„_AND MULCH _,AND MULCHSabrina L. Godwin" Ectuly. \ �' TEMP. DIVERSION--, i �i SFO -A SK DITCH (86): SEED —_\ { ii / (54) 7-11 1 Slide 274, Map 003) NOTE: 'A 'ASFO &.MULCH DO NOT INSTALL SILT f` SEDIMENT SKIMMER BASIN NO. 1 FENCE ACROSS THE �� `� WITH BAFFLES rail 1� EMERGENCY SPILLWAY n i MIN. STORAGE VOLUME AT CREST SEDIMENT SKIMMER BASIN NO. 3 � OF SPILLWAY: 14,875 C.F. - WITH BAFFLES i 1 - - . — . — . . MIN. SURFACE AREA AT CREST MIN. STORAGE VOLUME AT CREST ' BF OF SPILLWAY: 6,875 S.F. l�l OF SPILLWAY: 14,464 C.F. , �� I I TOP OF DAM ELEV.: 236.00' l "Recombination Survey for Terry Long ' ' MIN. SURFACEAREAAT CREST i BOT. OF BASIN ELEV.: 231.00' SEDIMENT CLEANOUT ELEV = 232.75' OF SPILLWAY: 7,125 S.F. n -- SKIMMER SIZE: 4" W/ 2.0' 0 ORIFICE / TOP OF DAM ELEV.: 227.50' SFO (59) CAbinet 4, Slide 4-79, Map 005 � � i TD / BOT. OF BASIN ELEV.: 222.50' SK I�1 t a� SKIMMER ELEV.: 231.00' ` ' V \ t SKIMMER SIZE: 4" W/ 2.0"O ORIFICE :' 1 Terry Long 3 \ /� SEDIMENT CLEANOUT ELEV = 224 25 D. . 1121, P 634 QSF t\ z TEMP. DIVERSION SKIMMER ELEV.: 222.50 DITCH (8A): SEED 1 NOSE: i / CL CL \ `` / &MULCH / I DO NOT INSTALL SILT J 1a z j EM. SPILLWAY ELEV .—.00` FENCE ACROSS THE �t✓i� { r n -n t EM. SPILLWAY WIDTH: 12' % 'A % _ r` / EMERGENCY SPILLWAY �`` n 1 i EM. SPILLWAY St PE : 0.5% i I (60) SF LINE W/ENKA MATTING OR I SF \ Southeastern onstructi n ofhoc�sh LLC i l tt, A \ / ` \ tl " William Alcolm McPha Jr. Tract EQUIV. l n � \ -A iD. v r� I n r I �'SF SFO 'A PIN. 4 50401p20 1 'n — _, CONSTRUCT SILT FENCE _� ,E A -1A n �"�— OUTLET AS SHOWN ON .� \ \ -n �, v �� � � \ et�a"� n\ � � � SF � � v _ � I I PLANS. A j i \ r x V TEMP. DIVERSION V l 1 1 � y, 7� 1' DITCH. SEED AND .A -A n 'n \ A- - n i MULCH i / / i BF i �► ar A n 1; . TD � CL � `�ti � � +� 207Acres .� -� SFO � � L � � u�t�u/fab s � � �- ti � le soil are -A (DA _,:-;< _ CL SFO SF SF a SFO12) , — EXISTING FENCE M CE \ — -- �� 1 ' j L. TEMP. DIVERSION S SFO _ — PIN:494650401038 SEDIMENT NO. _ — SEDIME SKIMMER BASIN4 DITCH: SEED AND -- - --- "Recombination Survey for WITH BAFFLES MULCH I David Paul Avina and wife, ' I ; MIN. STORAGE VOLUME AT CREST Kimberly Ann Miller Avina" 1 OF SPILLWAY; 20,930 C.F. _ - 1 CL _ 3.00 Acres 1 / MIN. SURFACE AREA AT CREST 4 CL (63) 1 TEMP. DIVERSION V� --- � P.C.4. S1.4-84, Map005 � OF SPILLWAY:6,785S.F. -___ t DITCH: SEED AND � TOP OF DAM ELEV.: 231.50' MULCH BOT. OF BASIN ELEV.: 226.50' 1 j NOTE: SEDIMENT CLEANOUT ELEV = 228.25' SK fillj � "-FENCE NOT INSTALL SILT SKIMMER SIZE: 4" WI2.5"0 ORIFICE BF LJ �FENGE ACROSS THE n ^\ ' i EMERGENCY SPILLWAY 61, SKIMMER ELEV.: 226.50' EM.SPILLWAY ELEV.: 230.00' z E1 ! _ — � CL � v � � TD "� EM. SPILLWAY WIDTH: 15' wAr, '' D-- __- " CL - - - -►-.- - -- - _ _ _ _ _ _ _ _ _ _ _ "- ---J EM. SPILLWAY SLOPE:0.5% V SF i � I �EX. SOIL TRgVE _ - LINE W/ ENKA MATTING OR (fie, g gip) �— — — — — — — — — — - — - — - — — - — - — - EQUIV wood fence I i = BryanstaneLane SF SF �r�- - - - �t CL �, — -- - CL _ CL CL I - - - - - - - \ � ` I N:454,229.45 US SurveyFt. I \ -� E: 1,967,114.43 US Survey Ft. TEMP. DIVERSION I ' �♦ \ \ EL=236.63' NAVD88 I \ DITCH. SEED AND MULCH 1 I ` Nathaniel Groves 1 1.24 Acres David Paul Avina and wife, D.B. 256, Pg. 447 Kimberly Ann Miller Avina I I "V1�oods Edge Phase TWZ' 1.00 Acre I (73) C b. 3, Slide 3-18, Map os. 6 & 7 D.B. 636 P . 56 I (74) (72) (71) 1 I Robert D. Beatty I _ _ —� _ _ - _ 9 I (70) � 2.0 Acres ----. _ _--._ -_ ---- _ �'"_ PIN: 494650401038 I \ D.B. 316, Pg. 549 �ne I — 3�'p�ivate access easement \ SCALE E -- --- _ _ — i 1 County of Hoke - — - - _ _ �F� _ \ 0' 30 60 120 ! Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 N CA RC 0F S/� � � O GPI NE D ;E: NA % N U M N C .� Z N M p 000 �� -'G CN p M -a CL L � Cp N >C 0 CU = z RimCL:Ei, �h Q. � � V W �W �W Z oZ 0 _ �J � C/)_ Q U 00. ce o W W J � z J� o W Zo V DESIGNED BY. JEH SYM.: REVISION DESCRIPTION: DATE: DRAWN BY" JLF (t PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 11118119 2\\ PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH SHEET. 4 APPROVAL WITH MODIFICATION DECEMBER 12, 2019 12112119 4 ROAD CENTERLINE REVISED PER WETLAND 02125120 CIVIL x U Q a Vicinity Sketch - Not to scale CONSTRUCTION SEQUENCE & EROSION CONTROL MEASURES - INTERMEDIATE PHASE: 1. CHECK ALL SILT FENCE AND REPAIR AS NECESSARY, ASSURE ANY ERODED AREA ARE STABILIZED WITH TEMPORARY SEEDING AND MULCH. Z ROUGH GRADE ROADWAY RIGHT OF WAYAREA. 3. INSTALL THE WATER SYSTEM AS SHOWN ON THE PLANS. 4. INSTALL STORM DRAINAGE SYSTEM. 5. INSTALL INLET / OUTLET BMP'S WHERE REQUIRED. 6. CONSTRUCT PERMANENT DRAINAGE SWALES. IMMEDIATELY STABILIZE WITH SEED AND MULCH, 7, INSTALL PERMANENT SWALE CHECK DAM. 8, GRADE AND PREPARE SUBGRADE FOR PAVEMENT AREA. 9. PLACE COMPACTED G,A,B.0 FOR ASPHALT CONSTRUCTION. 10. FINISH FINE GRADING THE ROAD RIGHT OF WAYS AND COMMON AREAS. 11. COMPLETE ALL REMAINING SITE IMPROVEMENTS, 1Z PLACE ASPHALT, PAVEMENT MARKINGS, AND SIGNAGE. ALL PERMANENT SWALES MUST SYMBOL PRACTICE DESCRIPTION P ® INLET PROTECTION A TEMPORARY SEDIMENT BARRIER LAID AROUND A STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM. RIP RAP CHANNEL / BANK PLACED BELOW DRAINAGE OUTLETS TO 0 P OUTLET PROTECTION REDUCE THE VELOCITY OF FLOW, EROSION, AND STABILIZE GRADES DOWNSTREAM OF OUTLET STRUCTURES. (; E CONSTRUCTION ENTRANCE A STONE STABILIZED PAD LOCATED AT ANY POINT THAT TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE TO A PUBLIC RIGHT-OF-WAY, STREET, ALLEY, SIDEWALK, OR PARKING PLOT WHICH WILL REDUCE OR ELIMINATE THE TRANSPORT OF MUD FROM THE CONSTRUCTION SITE. A TEMPORARY STRUCTURE USED TO SLOW THE VELOCITY OF RUN-OFF, S F - Q----�— SILT FENCE CAUSE SEDIMENT DEPOSITION AT THE STRUCTURE, AND FILTER SEDIMENT FROM RUN-OFF. (;M M M M N CONSTRUCTION LIMITS A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR DURING CONSTRUCTION. SILT FENCE OUTLET A TEMPORARY STRUCTURE AS A REINFORCED OUTLET AT LOW POINTS OF S FO PROTECTION THE SILT FENCE. INSTALL #57 WASHED STONE AT UPSTREAM FLOW WITH HARDWARE CLOTH. (SEE DETAIL) SEDIMENT TUBE SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, ST SLOPE: < 1 % CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MAX SPACING: 150' MULCH. STRAW, PINE NEEDLES AND LEAF MULCH -FILLED SEDIMENT TUBES MAX VELOCITY: 40 fps ARE NOT PERMITTED UNDER THIS SPECIFICATION. HAVE MATTING INSTALLED IMMEDIATELY TOTAL SITE DISTURBED AREA - 18,0 AC, I PERMANENT UPON CONSTRUCTION CONVEYANCE SWALE NO. 1 / ALL PERMANENT SWALES MUST I SLOPE = 0.77% HAVE MATTING INSTALLED IMMEDIATELY ALL PERMANENT SWALES MUST SIDE SLOPES: 3:1 / UPON CONSTRUCTION HAVE MATTING INSTALLED IMMEDIATELY BOT WIDTH: 6' UPON CONSTRUCTION LINER: SEED & MULCH PERMANENT W/EXCELSIOR MATTING / CONVEYANCE SWALE 86 I PER SLOPE @ 2.0% PERMANENT PERMANENT CONVEYANCE SWALE N0.3 / SIDE SLOPES: 3:1 PERMANENT CONVEYANCE SWALE NOA SLOPE = 1,50% \ SOT. WIDTH: 6' CONVEYANCE SWALEWO.5 SLOPE @ 1.50% / SIDE SLOPES: 3:1 PROTECT EXISTING SIDE SLOPES 31 : :\ J � LINER :SEED &MULCH SLOPE @ 1.50 % I BOT. WIDTH: 6' / W/ EXCELSIOR MATTING FENCE SIDE SLOPES: 3:1 BOT. WIDTH: 6' / LINER: SEED & MULCH t BOT. WIDTH: 6' LINER: SEED & MULCH PROTECT EXISTING W/ EXCELSIOR MATTING W/ EXCELSIOR MATTING FENCE (TYP OF ALL) / LINER :SEED &MULCH 3_ L.I / � ayel CL W/EXCELSIOR MATTING i I �� ) A 1 ———--------- —_ ( �� �' SF SF SF wire fence" ST FO / i \�� CL iwoodenfence ST CL SF n _ o 23 1 3 32 23 2 2 _ _ 2 _ m ., k 22 z , E4 �233 232 231 230�� 1 -A � ST 23� - _ ST v n aorroM ensINeorrona ST ,1 ST. r ST r SFO _-A r _ PERMANENT '\ PERMANENT \ ST RERMANEI�T \ ✓ RAILROAD TIE - _ N _ , ` -'RAILROAD TIE PERMANENT CONVEYAN E SWALE 8A I CHEEK DAM 1 q� CHECK -DAM RAILROAD TIE CONVEYANCE SWALE NO.2 N OPE �0.50% ��� ,,` y o N \ CHECK DAM / r i" / SFO SLOPE @ 1.50% / SID LOPES : 3:1.p 1 INSTAL! TEMP. SIDE SLOPES: 3:1 1 BO . WIDTI: 6' SEDIMENT TUBE -" - N - BOT. WIDTH: 6' W/PERMANENT INER: S EXCE Sl RIM ��G ! SFO IN PERMANENT SWALES , � �" RAILROAD TIE N LINER :SEED &MULCH 1 ' , (TYP. OF ALL) W w/CONTRACTOR'S BLEND J" Lot CHECK -DAM � j , s' \ � ( � N PERMANENT S14ALE \� INSTALL TEMP. 3 1 _ -A � ST � � � � � WITH SIDE SLOPE 3:1, � i SEDIMENT TUBE Lot ` — � BOT. WIDTH, PERMANENT 1�� , IN PERMANENT SWALES - _ t 1 RAILROAD TIE �'i SF / ' N M LINER: SEED & MULCH I 11 ,A (TYP. OFAL!) a W/ EXCELSIOR MATTING % CHECK -DAM z7 ( / M TYP OF ALL) / PERMANENT % I : �� \ / , rl. t '1 CONVEYANCE SWALE 98 f _ _ _ o:' i i SFO y � SLOPE = 1.50% _ - %� '`' fj• � �� � SIDE SLOPES : 3:1 4,," _ _ BOT. WIDTH: 6' LINER :SEED & MULCH = -' / F• i W/EXCELSIOR MATTING D r — - - —Lot 20 — I J 235 234 'A ii ?t 'A -A yt 'A .R 1 -A 'A � � SF 4 � F+ PERMANENT ? 1 y , J Lot y I % rs V� .. % CONVEYANCE SWALE 9A it ALL PERMANENT SWALES MUST Lod �a _ o 'l '` ( j' HAVE MATTING INSTALLED IMMEDIATELY �► v. SLOPE = 2.00/0 pq ;, i � j. r;' 1,; w UPON CONSTRUCTION �, , SF N �.SIDE SLOPES: 3:1 -A i �y — W Tt t PERMANENT SWALE— �': SFO 7+ BOT. WIDTH: 6' y Lot % / l CONSTRUCT SILT FENCE -� 2 ! WITH SIDE SLOPE 3:1, W -A LINER. SEED MULCH �, �v r �� -�e ti3n� OUTLET AS SHOWN ON \, a ` w/EXCELSIOR MATTING -�A ► % SF STF BOT. WIDTH, / / i PLANS. •ry to x etla \ rt _7 INSTALL TEMP. (/ LINER: SEED & MULCH N' E 'A 'A, 'A � ' � 1 W/ EXCELSIOR MATTING � ✓,. � SEDIMENT TUBE `A IN PERMANENT SWALES %_ / i r CONVEYANCE SWALE NO 6 I .�,, � �,.�,, -h � �. -7e � ""�-- _ "�` , � � i !� � � �" � ! (TYP OF ALL) ' i � . o l 1 ST -� \ r i (TYP. OFALL) r . SLOPE @ 0.50% i 4a �� i' i ST - - / ' SIDE SLOPES: 3:1 l l: / ST N �� / ' BOT. WIDTH: 6' SFO OP �� l LINER: &MULCH v CL unsuitable sods area > z33� _ - - -rt _ _ z33 y W/ EXCELSIOR MATTING , SFO ` 'A -A ' (a - / 235-- 234 233 ! SF (D 'A AtMOWt �► y y _ SF I r S CONVEYANCE NO.7. SLOPE @ 1.00% ` I W" o _ EXISTING SIDE SLOPES: 3:1 a „: / , - ------ -- -- --- ----- ----- : _ FENCE G - i n BOT WIDTH: 6'- tet � ST LINER SEED & MULCH CH > � _ - -0 EXCELSIOR MATTING i; W/ ELS Lot SFO — t , . / � � � � � � / INSTALL TEMP. - PERMANENT SWALE i SEDIMENT TUBE Lot 4 / ' WITH SIDE SLOPE 3:1, i IN PERMANENT SWALES , \ (TYP. OFALL BOT WIDTH 6 CL _ _ O J ; \ i N' \, LINER: SEED & MULCH _ CL - - ,- -4-z-_: � M � PERMANENT W/EXCELSIOR MATTING � - __-- \ ..` Lot SWA - (TYP LE TYP ALL l YDRAwr - Lot I IRE , r+ ST SED. TRAP #4 23 _ _ — — Ai __ _ — w � CL \, \ ,, � 2 23 _ _ SF CL `231 rRavei — E,� — — — — — — - — — — — — — — woSToden fence "B nstoneLane —= (— C L N:454,229.45 US Survey Ft. INSTALL TEMP. I I I I I E: 1,967,114.43 US Survey Ft SEDIMENT TUBEI \ IN PERMANENT SWALES EI.=236.63' NAVD88 ' (TYP. OFALL) I I I ALL PERMANENT SWALES MUST ` _ I HAVE MATTING INSTALLED IMMEDIATELY I UPON CONSTRUCTION I I I I I SCALE IN FEET 0' 30 60 120 YM.: REVISION DESCRIPTION: Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 1 PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 APPROVAL WITH MODIFICATION DECEMBER 12, 2019 6___--, 1 ROAD CENTERLINE REVISED PER WETLAND N"CA'R-, o���SS�o a'411.1 SEAL 035670 = 7 N E O U M N co � N M '00 Lmw. CN CL, p Co - Aim i� o N t0 try' @) C'_�-, a� k a cu co m 4. �Q CL �W Z a N z am 0 Z 0 I- z 00 WZ Z W0 ry Q Q � � _ Q 0 -D F— W WZ �> Z W 5z �m W Q = C' O V W z W () �_ o _� DESIGNED BY: JEH DATE: DRAWN BY: JLF 11128119 APPROVED BY..IEH SHEET: 12112119 5 02/25/20 CIVIL Vicinity Sketch - Not to scale CONSTRUCTION FINAL PHASE: 'E & EROSION CONTROL MEASURES - 1. UPON COMPLETING ALL SITE IMPROVEMENTS AND FINAL GRADING, STABILIZE ALL DISTURBED AREAS PER LANDSCAPE PLAN. WATER AND MAINTAIN ALL LANDSCAPED AREAS TO ENSURE PROPER GROUND COVERAGE PRIOR TO FINAL APPROVAL. 2. SEE SEEDING SCHEDULE PROVIDED IN EROSION CONTROL DETAIL 3 UPON APPROVAL BY DEMLAR, REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AND CALL FOR FINAL INSPECTION. SYMBOL PRACTICE DESCRIPTION (; LM M M M M CONSTRUCTION LIMITS A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR DURING CONSTRUCTION. SEDIMENT T P CL ■ ■ ■ CONSTRUCTION LIMITS A DEFINED AREA THAT ALL LAND DISTURBANCE WILL OCCUR DURING FULL BUILD OUT CONSTRUCTION (RESIDENTIAL LOTS) (FULL BUILD OUT) SEEDING SCHEDULE FOR Ds3 NOTES: PERMANENT VEGETATION GIANT BERMUDA SEED, INCLUDING NK-37, SHALL NOT BE USED. SCHEDULE COMMON NAME RATE PER ACRE PLANTING NO. OF SEED (LBS.) DATES THE CONTRACTOR SHALL OBTAIN A SATISFACTORY STAND OF PERENNIAL VEGETATION WHOSE ROOT SYSTEM SHALL BE DEVELOPED SUFFICIENTLY TO SURVIVE DRY PERIODS AND WINTER WEATHER, AND COMMON BERMUDA 210 MAR 16 1 (HULLED) O BE CAPABLE OF RE-ESTABLISHMENT IN THE SPRING. THE PERENNIAL TALL FESCUE 140 AUG. 31 VEGETATIVE COVER SHALL HAVE A MINIMUM COVERAGE DENSITY OF 70% FOR THE SEEDED AREAS. CONTRACTOR SHALL DETERMINE ALL RATES OF APPLICATION NECESSARY TO PRODUCE THE REQUIRED SEPT. 1 2 COMMON BERMUDA 175 TO STAND OF GRASS, AND SHALL FOLLOW THE APPLICATION (UNHULLED) MARCH 15 PROCEDURES AS SPECIFIED HEREIN. NOTE: CONTRACTOR TO INSTALL PERMANENT VEGETATION IN ALL ROAD R/W'S, DRAINAGE SWALE, OPEN SPACES / EASEMENT AREAS. 33 ' i I. ,U,u,rrrrr CARDS' o of ESS N E V M tyj N � rz zNM Q)c0 M Cq O p M co N >C O •� V -�CMMO='�z W C 1 r Qi W �W �Z Y •• ,,: V/L/L VLVr L.V J.I 'ji , � , ,5, PERMANENT SWALE N f — W \ BOT. WIDTH: 6' ; �, J 'A 7ti 'A J` - 1 WITH SIDE SLOPE 3:1, ' / Ds3 \ -A LINER: SEED MULCH � � n ti BOT. WIDTH, 6'� a w/ EXCELSIOR MATTING y tla% l 1 w ` g\ INSTALL TEMP. LINER: SEED & MULCH • A 1A -A -A � r ax iN 'A -A� % � � SEDIMENT TUBE � W/EXCELSIOR MATTING 'A i IN PERMANENT SWALES (TYP OFALL) CONVEYANCE SWALE NO.6 R /r (TYP.OFALL) - / SLOPE I. n w -n , n \ n �� Ds3 i V i SIDE SLOPES : 3:1 ! �\,, �_ f`/ N ,' / BOT. WIDTH: 6, +A2.07Acres i �'"L32 / , - I j/ LINER: SEED & MULCHLot�• �/ ,` ` unsuitable soils area 2', . > 233� 233 - ,- %` ( W/ EXCELSIOR � \ w � � F` ,. MATTING Ds3 _ 234 233 jj�� Ds3 M -A A - _ I„ i —. CONVEYANCE SWALE N0.7. W Ds3 SLOPE @ 1.00% \ I SIDE SLOPES: 3:1 \ I` — --- — --------=-. --- — .�--- - BOT. WIDTH: 6' —�I i LINER: SEED & MULCH Proposed Ds3 — — j ' (Public ,0 wrExc EXCELSIOR " ,� ELS MATTING � � +- � � INSTALL TEMP s PERMANENT SWALE SEDIMENT TUBE Lot 4 WITH SIDE SLOPE 3:1, `� IN PERMANENT SWALES BOT. WIDTH, 6' i (TYP. OF ALL) LINER: SEED &MULCH N N PERMANENT W/ EXCELSIOR MATTING Lbtli ` Lot TYPOFALL I SWA - 1 � ,- LE TYP ,1 � - _ oFALL Ds3 J 1Lot }M1Mgt 5 YDRANT � \ � _ �" -.� N N' k Z 1 O _ 23 � � _ � . + Ds3 + � EA O _ _ _ J Ds3 2 23 ME7FR , R �pept) i EX. SOIL TRAVEL 231 i ,i Ds3 Ds3 � i � U P) . 1 _ _ _ . _ . . _ . _ . — .NNW32 �� Bryanstone Lane�� — — — — — — — ��S�axie� i Wooden fence �� ors — — — — — — — — — — — — — \ \ ♦ INSTALL TEMP. Q W � \ ( N:454,229.45 US Survey Ft. I SEDIMENT TUBE I I I o O E: 1,967,114.43 US Survey Ft. I z ♦ ♦ ( EI.=236.63' NAVD88 \ IN PERMANENT SWALES ♦ �♦ \ (TYP.OFALL) I ALL PERMANENT SWALES MUST W W 7 I' t `♦ \ \ ( [HAVE MATTING INSTALLED IMMEDIATELY I I Z UPON CONSTRUCTION o t O uJ 50 SCALE IN FEET Um U) _ N 0' 30 60 120 I Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 DESIGNED BY: JEH >YM.: REVISION DESCRIPTION: DATE: DRAWN BY. JLF 2� PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH 3 SHEET: 4, 6 5� 6-- ROAD CENTERLINE REVISED PER WETLAND O 25120 CIVIL NATURE AND PURPOSE OF CONSTRUCTION THE PURPOSE OF THIS PROJECT IS TO PROVIDE ROAD ACCESS FOR RESIDENTIAL DEVELOPMENT SITE. THE PROJECT WILL INVOLVE CONSTRUCTION OF CONVEYANCE SWALE FOR STORMWATER DISCHARGE AND WATER SUPPLY CONNECTION. THE SITE WILL BE PREPARED FOR INDIVIDUAL RESIDENTIAL HOME CONSTRUCTION ON EACH LOTS. THE TOTAL DISTURBED AREA IS 18.0 ACRES (FULL -BUILD SITE WORK) PERMANENT VEGETATION SHALL BE ESTABLISHED QUICKLY UPON COMPLETION OF THE ROADWAY GRADING AND INFRASTRUCTURES IN ORDER TO REDUCE THE AMOUNT OF SEDIMENT RUNOFF FROM THE SITE. SITE IS NOT IN FLOOD PLAN. NOTE: PURSUANT TO G. S. 133 A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PERMANENT GROUNDCOVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDER DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 CALENDAR DAYS OR 60 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: EFFECTIVE OCTOBER1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES LARGER THAN ONE ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT AND DOCUMENT THE INSPECTION IN WRITING. KEEP WRITTEN INSPECTION REPORTS ON CONSTRUCTION SITE IN WHICH IT SHOULD BE READILYAVAILABLE FOR EROSION CONTROL INSPECTOR'S REVIEW WHEN VISITING SITE. SELF -INSPECTION REPORT FORMS ARE AVAILABLE AS AN EXCEL SPREADSHEET FROM LAND QUALITY WEB SITE: www.dlr.enr.state.nc.us/pages/sedimentation new.html SEEDING SCHEDULE --NOTE--- TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN 21 CALENDAR DAYS AND SUBJECT TO FURTHER DISTURBANCE. PERMANENT SEED MIX SHALL BE CHECKED FOR ADEQUACY ON JULY 15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. TEMPORARY SUMMER SEED MIX MARCH 1 - SEPT. 1 TEMPORARY WINTER SEED MIX SEPT. 1 - MARCH 1 PERMANENT SPRING SEED MIX MARCH 1 - JULY 1 PERMANENT FALL SEED MIX (TO BE FOLLOWED BY PERMANENT FALL SEED MIX) SPECIES RATE (LB./ACRE) GERMAN MILLET 120 (TO BE FOLLOWED BY PERMANENT SPRING SEED MIX) SPECIES RATE (LB./ACRE) WINTER RYE (GRAIN) 200 KOBE LESPEDEZA 120 SPECIES PENSICOLA BAHIAGRASS COMMON BERMUDA SERICEA LESPEDEZA RATE (LB./ACRE) 60 25 30 SPECIES RATE (LB./ACRE) SEPT 1 - NOV. 1 COMMON BERMUDA 30 SERICEA LESPEDEZA (UNSCARIFIED) 30 KOBE LESPEDEZA 10 SOIL AMENDMENTS TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRE APPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE REQUIRED FOR PERMANENT SEED MIX ONLY MULCH APPLY 4, 000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL./ACRE MAINTENANCE MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED). WATER REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE. MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. EROSION CONTROL CONSTRUCTION SEQUENCES PHASE 1 - INITIAL 1. ENSURE ALL APPROVALS HAVE BEEN OBTAINED PRIOR TO ANY LAND DISTURBANCE. 2. CONDUCT ON -SITE PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, OWNER, ENGINEER AND CONSTRUCTION MANAGER TO REVIEW THE PROJECT AND EROSION CONTROL SEQUENCES. 3. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES WITHIN AND IMMEDIATEL Y ADJACENT TO THE PROJECTAREA. 4. INSTALL CONSTRUCTION ENTRANCE AT LOCATION SHOWN ON THE PLAN - OFF OF EDGE OF EXISTING PAVEMENT ON PITTMAN GROVE CHURCH DRIVE. 5. FLAG LIMITS OF ALL DISTURBED AREA AS SHOWN ON THE PLANS FOR INSTALLATION OF PERIMETER EROSION CONTROL DEVICES - SILT FENCE AND SILT FENCE OUTLET WHERE SHOWN. 6. INSTALL SILT FENCE OUTLET AS SHOWN ON THE PLANS. 7. CLEAR AND GRUB SITE (WHERE REQUIRED) AND LEGALLY DISPOSE OFALL DEBRIS OFF SITE. 8. WITHIN 14 CALENDER DAYS OF COMPLETION OF ANY PHASE OF GRADING, GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 14 CALENDER DAYS OR 60 CALENDER DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. PHASE 2- INTERMEDIATE 1. CHECK ALL SILT FENCE AND REPAIR AS NECESSARY. ASSURE ANY ERODED AREA ARE STABILIZED WITH TEMPORARY SEEDING AND MULCH. 2. ROUGH GRADE ROADWAY RIGHT OF WAYAREA. 3. INSTALL THE WATER SYSTEM AS SHOWN ON THE PLANS. 4. INSTALL STORM DRAINAGE SYSTEM. 5. INSTALL INLET/ OUTLET BMP`S WHERE REQUIRED. 6. CONSTRUCT PERMANENT DRAINAGE SWALES. IMMEDIATELY STABILIZE WITH SEED AND MULCH. 7. INSTALL PERMANENT SWALE CHECK DAM. 8. GRADE AND PREPARE SUBGRADE FOR PAVEMENT AREA. 9. PLACE COMPACTED G.A.B.0 FOR ASPHALT CONSTRUCTION. 10. FINISH FINE GRADING THE ROAD RIGHT OF WAYS AND COMMON AREAS. 11. COMPLETE ALL REMAINING SITE IMPROVEMENTS. 12. PLACE ASPHALT, PAVEMENT MARKINGS, AND SIGNAGE. PHASE 3 - FINAL 1. UPON SUBSTANTIAL COMPLETION OF ROADWAY, THE CONTRACTOR 1S TO FINE GRADE THE RIGHT OF WAY TO ENSURE PROPER DRAINAGE FLOW PATTERNS. 2. UPON COMPLETING ALL ROADWAY CONSTRUCTION AND FINAL GRADING, INSTALL PERMANENT VEGETATION IN ALL ROAD RIGHT OF WAY AND EASEMENT AREAS. 3. UPON APPROVAL BY DEMLAR, REMOVE ALL TEMPORARY EROSION CONTROL DEVICES �A��iG �► 1. RIP THE ENTIRE AREA TO 6" DEPTH. 2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 3. APPLYAGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE INACCORDANCE WITH "SEEDING SCHEDULE" AND MIX WITH SOIL. 4. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 5. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACKAFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE." 6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE" IMMEDIATELY AFTER SEEDING. 7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING SCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL LIME, FERTILIZER, AND SEEDING REQUIREMENTS. GROUND STABILIZATION REQUIREMENTS CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND STABILIZATION AS PER FOLLOWING CHART. SITE AREA STABILIZATION STABILIZATION TIME APPLICABLE DESCRIPTION TIME FRAME FRAME EXCEPTIONS THIS PROJECT PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND YES SLOPES HIGH QUALITY WATER 7 DAYS NONE (HQW) ZONES NO FLATTER THAN 4:1 SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR LESS THAN 3:1 1N LENGTH AND ARE NOT NO STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES GREATER YES FLATTER THAN 50 FEET IN LENGTH ALL OTHER AREAS 14 DAYS NONE WITH SLOPES (EXCEPT FOR PERIMETER YES FLATTER THAN 4:1 AND HQW ZONES) TYPICAL GROUND COVER STABILIZATION TYPES - GRASS AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE STRAW MATTING, SYNTHETIC MATTING, ETC. EROSION CONTROL MAINTENANCE SCHEDULE MD1NG: PERIODICALLY CHECK ALL GRADED AREAS AND THE SUPPORTING EROSION AND VTATION CONTROL PRACTICES, ESPECIALLYAFTER HEAVY RAINFALLS. PROMPTLY REMOVE ALL VT FROM DIVERSIONS AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUT OR BREAKS REPAIR THEM IMMEDIATELY. PROMPT MAINTENANCE OF SMALL ERODED AREAS BEFORE THEY SIGNIFICANT GULLIES IS AN ESSENTIAL PART OF AN EFFECTIVE EROSION AND VTATION CONTROL PLAN. DORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT.MAINTAIN THE GRAVEL PAD IN A CONDITION TO /ENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP MENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS ED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. OUTLET STABILIZATION STRUCTURE: INSPECT RIP RAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. DROP INLET PROTECTION (TEMPORAR)q: INSPECT THE FABRIC BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT FROM THE POOL AREA AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE FABRIC DURING SEDIMENT REMOVAL. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SEDIMENT AND DISPOSE OF THEM PROPERLY. BRING THE DISTURBED AREA TO THE GRADE OF THE DROP INLET AND SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. CA R�<" F°ESS�O„°i�,9: SEAL ° 035670 y��FN N N � O v N M c �NM �cfl M 00 �zN'61 i , O = CL p M 1 M N d'CL V� W �W `w I SEDIMENT FENCE (SILT FENCE): INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. DUST CONTROL: MAINTAIN DUST CONTROL MEASURES THROUGH DRY WEATHER PERIODS UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED. w TREE PRESERVATION AND PROTECTION: REPAIR ANY DAMAGE TO PROTECTED TREE AS FOLLOW SHOULD DAMAGE TO CROWN, TRUNK, OR ROOT SYSTEM OCCUR. o (REFERENCE NCDENR MANUAL, PAGE 6.05.3 AND 6.05.4) REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM WITH TREE PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS. Q REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREAS AS SHOWN IN FIGURE 6.05b, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT. z CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN BRANCH. J USE THREE SEPARATED CUTS AS SHOWN IN FIGURE 6.05C TO AVOID PEELING BARK FROM Q HEALTHYAREAS OF THE TREE. O Z J O z Q U O �- 0 0 Z cu O (Dz �z Z) cu O 0 C C' Y U Lu O _ DESIGNED BY: JEH YM.: REVISION DESCRIPTION. DATE: . (� PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 11118119 DRAWN BY JLF APPROVED BY JEH (2 3 SHEET: 5; 7.0 (6> CIVIL GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers`. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably; available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NCGO I GROUND STABILIZATION AND MATERIAL W ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A HIGH MIN SANDBAGS (TYP.) � COHESIVE & OR STAPLES LOW FILTRATION NIGH o O O O SANDBAGS (TYP.) SOIL BERM 10 MIL COHESIVE & O O OR STAPLES O O O O PLASTIC LINING LOW FILTRATION 10 MIL 1:1 SIDE SLOP SOIL BERM 1:1 PLASTIC O O O SILT FENCE ��\\\ SIDE SLOP LINING SANDBAGS (TYP.) (TYP ) O O I (TYP')OR STAPLES O O o I 0 o O o 0 0 t m O O O SECTION B-B CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES. WASHOUT 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION .DETERMINED IN FIELD CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) 2. THE .CONCRETE WASHOUT WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 PLAN INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. HANDLING EFFECTIVE: 04/01/19 YM.: REVISION DESCRIPTION: ,? PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 1111111111111 11j ' S L r = 0 670 ' 9,Q 01 \PLO OD0000���� t� 1 in Z ac W LEI Z 0 Z as N J J m az � J Q Q z Z O Z a Q cl) _ J -0O Z r z 0 W =CU o �1 PM U C.1 a a Y Z° DESIGNED BY: JEH DATE. 1118119 DRAWN BY JLF APPROVED BY: JEH I.l n SHEET: 7.1 CIVIL PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. GO Z 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a'i'period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G..ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • within 24 hours, an oral or electronic notification. bypasses [40 CFR o Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance o Within 24 hours, an oral or electronic notification. with the conditions o Within 7calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCG01 SELF--I-NSPECTION,'I"v_-Eu�CO-IDV-T""%-Xr-1107..--'�77EP-I-NG AND REPORTINGUPORTING EFFECTIVE: 04/01/19 GYM.: REVISION DESCRIPTION PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 M � U N CY) •� zNM aim Uoo Z� �ZN'�p o M ��� a = oi orn �v LLN ��•" J � O � � z O 1 � a � W z r• W W O W � W W Z ri SHEET: I 7.2 CIVIL i� C E TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE 12" THICK SEDIMENT CONTROL STONE 2 Low 1\ STRUCTURAL STONE 19 GUA CLOTH TOP OF SILT FENCE MUST BEAT LEAST V ABOVE TOP OF THE WASHED STONE. I I 18" M/N. CROSS SECTION 24" NOTES: 1. STRUCTURAL STONE SHALL BE CLASS "B" STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE #5 OR #57 STONE. 2. OUTLETS TO BE PLACED AT LOW POINTS ALONG SILT FENCE. TOP VIEW STEEL POST ----- - --- --" SEE SILT FENCE i-� -- 4' MAX DETAIL WEIR '-12" MAX. NATURAL GROUND IG FILTERED WATER FRONT VIEW INSTALL FILTER FABRIC UNDER RIP RAP AND GRAVEL CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. 1/� ► lam► 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN 1T OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. CONSTRUCTION SPECIFICATIONS 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. PROTECT THE CHANNEL AFTER THE DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE DAM, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. 8. SEE SILT FENCE DETAIL FOR CONSTRUCTION SPECIFICATIONS. 1fj&A TilTirl.1il_1 INSPECT DAM AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS AROUND DAM, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS). REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT a AND CROSS SECTION. ' SILT FENCE OUTLET DETAIL NOT TO SCALE 2" X 2" WOOD STAKES OR 1.25 #/FT STEEL POST 2.0' SPACING (TYPICAL) CONTINUOUS ALONG TUBE WOVEN GEOSYNTHETIC FILTER FABRIC EXTEND FABRIC AND WIRE INTO TRENCH STEEL POSTS 8' D.C. WITH WIRE COMPACTED BACKFILL �- R F, F1.01, NOTE_ REMOVE SEDIMENT DEEPER THAN 8 ol 12". REPAIR ANY UNDERMINE 4r IMMEDIATELY. CONSTRUCTION SPECIFICATIONS: CONSTRUCTION: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD 6J EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO THE POSTS. WIRE OR 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE NOT EXCEED 24 INCHES ABOVE GROUND SURFACE. STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID FROM THE BARRIER. JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLYAT A SUPPORT POST WITH 4 FEET & PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE MINIMUM OVERLAP TO THE NEXT POST. OF THE TRENCH. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE IS CRITICAL TO SILT FENCE PERFORMANCE. POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. FLOW TOP VIEW OF DITCH SEDIMENT TUBE SPACING -i _:: . �a P i END VIEW OF DITCH STAKES PLACED AT 2' MINIMUM SPACING SLOPE MAXIMUM SEDIMENT TUB SPACING LESS THAN 2% 150-FEET 2% 100-FEET 3% 75-FEET 4% 50-FEET 5% 40-FEET 6% ! 30-FEET GREATER THAN 6% ! 25-FEET SEDIMENT TUBE STSCALE: N.T.S. SF >1LT FENCE DETAIL NOT TO SCALE COMP, n1 AAl Al MATERIAL: 1. USE SYNTHETIC FILTER FABRIC OFAT LEAST 95% BY WEIGHT OF POLYOLEFIN OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 4 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEKAND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUTS 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY DIVERSIONS SCALE: N.T.S. REVISION DESCRIPTION. PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 2 PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 5 im W o z J z w U o � H O Z � N Z o Z . O o 0 I W U �o � DATE: DESIGNED BY JEH 11/18/19 DRAWN BY JLF 11/28/19 APPROVED BY.JEH SHEET: 8.1 CIVIL NCDOT #5 OR #57 WASHED STONE 0 0 N x 7-1 Pive Outlet to Flat Area Pipe Outlet to Well-defined Channel k ection AA Rter blanket Notes 1. La is the length of the riprap apron. . d `l titres the maximurn stole diameter but not less than 1". . In a well-defined channel ex- tend the apron asp the channel banks to an elevation of 6' above the maximum tal lwater depth or to the top of the bank, whichever is less. . A filter blanket or filter fabric should be installed between the riprap and s if foundation, OP RIP RAP OUTLET PROTECTION NOT TO SCALE 1 19-QUAGE HARDWARE CLOTH (!14 " MESH OPENINGS) STEEL POSTS WITH WIRE MESH NCDOT #5 OR #57 WASHED STONE .tea INLET TOPS TO REMAIN OFF INLET STRUCTURES WHILE INLET PROTECTION IS IN PLACE. i P HARDWARE CLOTH & GRAVEL INLET PROTECTION DETAIL NOT TO SCALE 4' MAX. o"- N CA RO SS Q S = 03 0 CONSTRUCTION SPECIFICATIONS E. ' Iilllll 1 1` 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOWAREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAYALSO BE FILLED BY M v INCREASING THE RIPRAP THICKNESS. C M N C 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING �- LIMITS SHOWN ON THE PLANS. Z V � M zs Z N '� 00 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE - N C) PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. to N C- REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF tts M10 FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD CO OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 'a Cn C FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. O v 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING i N o �:� THE FILTER. ,Y Mp W Cl- '1 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. CL M 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. ' 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE ' THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. ' 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO ' FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. \ 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION (PRACTICES 6.10, TEMPORARY SEEDING, AND 6.11, PERMANENT SEEDING). W MAINTENANCE �W INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (112 INCH OR ' GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. I >r _ 3 �., 1 2' 16„ INLET WALL 2' CONSTRUCTION SPECIFICATIONS: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5' STEEL POST 2' INTO THE GROUND SURROUNDING THE INLET SPACE POSTS EVENLY AROUND THE PERIMETER ON THE INLET, MAX. 4' APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. AND BOTTOM PLACING A 2� 1 AEP OF THE WIRE AT UNDER MIDDLE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH HEIGHT OF 16"AROUND THE WIRE, AND SMOOTH TO AN EVEN LEVEL. 5. REOUL4T©SDRAINAGE METEETASFLBLR4EMOVACCUMEDINANDSBIH FINAL ELEVATIONS. 6. COMPACT THEAREA PROPERLYAND STABILIZE IT WITH GROUND COVER. MAINTENANCE: INSPECT INLETS AT LEAST WEEKLYANDAFTER EACH SIGNIFICANT (112" OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. J O z .J Z Cn U O f=-- 0 O Z � Z O_ Z O o C- 0 e �V U W o DESIGNED BY.JEH 'YM.: REVISION DESCRIPTION: DATE: DRAWN BY.JLF 2 ;> PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 11128117 APPROVED BY: JEH I? 2 0) M SHEET: 8.2 CIVIL x U Q IL IL M M 0 0 N N cM CV 7 STEEL POSTS (QUANTITY VAR.) SKIMMER SEDIMENT BASIN rL.HIv V►c vv DESIGN CRITERIA DRAINAGE AREA <10AC. (ACRES) INFLOW STRUCTURE MIN �2 N LENGTH TO 1 2:1 WIDTH RATIO NEEDS - MAX. LENGTH TO 6:1 WIDTH RATIO' � N MIN 1800 AVERAGE AREA' VOLUME (CU. FT. WIDTH W = -- - REQUIRED PER AC. L DISTURBED) 'AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY 325 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED j CROSS-SECTION VIEW POTENTIAL FOR - PIPING CAN OCCUR. PROPER DESIGN TO MINIMIZE DISCHARGE scA90UM46Mc Pf00fgCTAVfLVgfbR PVC VENT PIPE �M) FLOAT -\ L = 1.4 X DEPTH -� TO THE OVERFLOW MINIMUM LENGTH APPLIES MAINTAIN DEPRESSION TO MINIMIZE CHANCE OF SKIMMER STI IrK COIR FIBER BAFFL6.65) (PRAC. STND 6.65) SIDE VIEW S K SEDIMENT SKIMMER BASIN SCALE: N.T.S. BOTTOM OF BASIN FLEXIBLE HOSE SIDE VIEW TOP OF DAM EMERGENCY SPILLWAY FLOAT EMBANKMENT VW5' MIN. NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2 2. REFER TO STD. 524.1 FOR BAFFLE SPACING AND INSTALLATION. EMERGENCY SPILLWAY EMBANKMENT T=1.5' MIN. EMERGENCY SPILLWAY ANTI -SEEP COLLAR WATER ENTRY UNIT WITH TRASH SCREEN ORIFICE OPENING INSIDE THE HORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD SCHEDULE 40 PVC PIPE (BARREL OR ARM) FLEXIBLE HOSE PIPE INVERT , TOP VIEW PVC VENT PIPE DISCHARGE PIPE SCH. 40 PVC FLEXIBLE HOSE MUST BE SECURELY FASTENED TO THE WATER QUALITY DISCHARGE OPENING WATER ENTRY UNIT -END VIEW GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS 1N CORRECT AMOUNT OF TIME. MODIFICATIONS MAYBE REQUIRED IFFIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. SKIMMER DEWATERING DEVICE NOT TO SCALE MAINTENANCE CONSTRUCTION SPECIFICATION 1. CLEAR, GRUB, AND STRIPAREA UNDER THE EMBANKMENT OFALL VEGETATION TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED. 9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER 1N LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE CONSTRUCTION ( REFERENCES: SURFACE STABILIZATION). EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 10. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR 11. AFTER ALL THE SEDIMENT: PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. REMOVE THE STRUCTURE AND AIL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY ( REFERENCES: SURFACE STABILIZATION). 4. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PREVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS A BACK FILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITYAS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISETHE PIPE FROM THE FIRM CONTRACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE MAINTENANCE HAUNCHES. INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLYAND AFTER EACH SIGNIFICANT RAINFALL PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACK FILL OVER THE PIPE SPILLWAY EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT, IN NO CASE SHOULD THE PIPE CONDUIT DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE BATTLE. PULL BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. COMPLETE. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURES INSTRUCTIONS, OR AS DESIGNED. DOWN THE SKIMMER. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE ANCHOR THE BAFFLES IF WATER IS FLOWING THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND UNDERNEATH OR AROUND THEM. POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY SKIMMER TO THE SIDE FOR MAINTENANCE. JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE 7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST '' AND REMOVE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER FOR DEBRIS. EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH THE LAMINATED PLASTIC OR IMPERMEABLE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND GEO TEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH THE EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, BE ONE PIECE, NOT JOINED OR SPLICED, OTHERWISE WATER CAN GET UNDER THE FABRIC. IF AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAY BE USED. THE UPPER SECTIONS DEBRIS FROM THE SKIMMER AND POOL AREAS. SHOULD OVERLAP THE LOWER SECTIONS SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS (ADAPTED FROM "A MANUAL FOR DESIGNING, INSTALLING AND MAINTAINING SKIMMER SEDIMENT SHOULD BETAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. BASINS." FEBRUARY 1999 J.W. FAIR CLOTH & SON.) 8. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE 1. PULL SKIMMER OVER TO THE SIDE OF BASIN AND REMOVE DEBRIS AND EXCESS SEDIMENTS THAT HAVE ACCUMULATED FROM RAINFALL EVENTS. 2. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, JERK THE SKIMMER TO BOB UP AND DOWN TO DISLODGE THE DEBRIS AND RESTORE FLOW. CHECK ORIFICE INSIDE THE SKIMMER FOR CLOGGING AND REMOVE AS NEEDED. 3, IF SKIMMER ARM OR BARREL PIPE IS CLOGGED, REMOVE THE ORIFICE AND THE OBSTRUCTION CAN BE CLEARED WITH PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. STAKE TO SUPPORT WIRE SUPPORT ROPE STEEL TO WIRE TO POST (TYP.) PREVENT SAGGING COIR MESH OR SIMILAR, v i STAPLED OR TRENCHED INTO BOTTOM OR SIDE SUPPORT POST 24" INTO BOTTOM OR SIDE (TYP.) BAFFLE SECTION /AI! CT 7llA/C 5 OUTI BAFFLE PLAN "" I", "` ------ - ----- 15% OF SURFACE AREA CONSTRUCTION SPECIFICATIONS: GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE SEDIMENT TRAP. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24", SPACED A MAXIMUM OF 4' APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6" HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2" LOWER THAN THE TOP OF THE BERMS. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISHARGE POINT. BASINS LESS THAN THE TOP OF THE BERMS. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER A SAWHORSE OR THE TOP WIRE. HAMMER REPAR INTO THE SAWHORSE LEGS FOR ANCHORING. THE FABRIC SHOULD HAVE FIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRE OR STAPLES. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8" EROSION CONTROL MATTING STAPLES. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN MAINTENANCE: INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OFA BAFFLE COLLAPSE, TEAR DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHED HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PROESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. � (,,,=�BAFFLES FOR TEMPORARY SEDIMENT TRAPS v' l NOT TO SCALE GYM.: REVISION DESCRIPTION: PER NCDEQ COMMENTS DATED NOVEMBER 15, 2019 i PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 N Ei U N to 6 N zNM0)co VOD �ca 1 p co ­0 p c c� (� rk ((Q- k W J W 0 J O z F• J � Z cl) U F=- �O V 00 Z cu a) Z : 0 G Z U .cu o 0 � a' U Y W U 0 DESIGNED BY. JLF DATE. 11118119 DRAWN BY. JLF 11128119 APPROVED BY: JEH SHEET: 9 CIVIL 244 242 240 238 236 234 232 230 228 226 224 222 Recombination Survey for Terry Long- CAbinet 4, Slide 4-79, Map 005 Terry Long D_B. 1121, P_q. 634 EX. Bin ALL CROSSING SHOWN ARE APPROXIMATE -CONTRACTOR SHALL FIELD VERIFY INVERTS AND PROVIDE ADEQUATE SEPARATION AS NEEDED , MIN EXISTING GRADE ,- PROPOSED GRADE 8" SDR-21 PVC WATERMAIN 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 WATERMAIN PROFILE SCALE: Hoz. 1"=50' Vert. 1" = 5' .32 18" CL ROAD STA. 6+5 1- FIRE HYDRANT 4-- 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 L0 N Q U) LLI Z Z U P ►� N LU Z J U Y WATERMAIN PROFILE SCALE: Hoz. 1"=50' Vert. 1" = 5' GENERAL UTILITY CONSTRUCTION NOTE: 1) ALL WORK AND MATERIAL SHALL CONFORM TO HOKE COUNTY SPECIFICATION. 2) THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING WORK. ANY DAMAGE TO EXISTING CULVERTS, WATERLINES AND OTHER UTILITIES DURING CONSTRUCTION WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 3) PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED: -24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS; -18 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF WATER MAINS AND STORM SEWERS OR SANITARY SEWERS (INCLUDING FORCE MAINS); -10 FEET HORIZONTAL SEPARATION BETWEEN PARALLEL SANITARY SEWERS (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED (BOTH HORIZONTAL AND/OR VERTICAL) OR ANYTIME THE SEWER IS OVER THE WATER MAIN, BOTH WATER AND SEWER MUST BE DUCTILE IRON PIPE COMPLYING WITH PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURED TESTED TO 150 PSI TO ASSURE WATERTIGHTNESS BEFORE BACKFILLING. 4) ALL PVC WATERMAIN SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST VERSION OF AWWA STANDARDS C605. 5) CONTRACTOR SHALL REFERENCE AWWA FOR DISINFECTION OF WATERMAINS PER AWWA STANDARD C651. 6). ALL WATER SERVICE SHALL BE 1 " PE UNLESS OTHERWISED NOTED. Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 244 242 240 238 236 234 232 230 228 226 224 222 z SCALE IN FEET 0' 25 50 100 `\\\\111111111///I/ CA &0�� °�OFoES 4,y29�- e4 L r� 3 670 = N O M U N co zNM Q)c0 M �zC*4 toQ)C- 0 Cr) t3 CL CL �o 4 ,�4 �W �W • • a a CUn'z W Z W �FU o '■■ U a �Y U � O DESIGNED BY. JEH iYM.. REVISION DESCRIPTION: DATE: DRAWN BY. � JLF 2 PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY JEH PER NCDNER WATERMAIN COMMENTS 12104119 SHEET' 4 10 5 6 ROAD CENTERLINE REVISED PER WETLAND 0212 I220 CIVIL U Q a v M 0 N 0 N N M FIRE HYDRANT SHALL BE MUELLER BRAND, CONTACT HOKE COUNTY PUBLIC UTILITIES FOR MORE INFORMATION. MINIMUM 36" HORIZONTAL CLEARANCE FROM ANY OBJECT FIRE HYDRANT, PUMPER NOZZLE TO BE PERPENDICULAR TO STREET FLANGE MUSTBE ABOVE GRADE IU 18" MIN. MAX. 6" ABOVE GRADE #57 STONECOMPACTED BACKFILL SURROUND JOINTS (TAMPED 1N 6" LIFTS) MIN. 7 CU. FT. X-6"MIN COVER 6"DUCTILE IRON PIPE 3/4" THREADED ROD (2 REQUIRED) - USE CONCRETECONC. THRUST BLOCK THRUST801b. CONC. BLOCK (TYP.) BLOCKING 5' ENCLOSE ENDS WITH 8" BRICK MASONRY (SEAL WITH NON -SHRINK GROUT AS REQUIRED) STEEL 6" GATE VALVE AND BOX ANCHORING TEE CONCRETE THRUST BLOCK (TYP.) FIRE HYDRANT ASSEMBLY DETAIL NOT TO SCALE VENT TO BE USED FOR ALL STREAM CROSSINGS NOT REQUIRED FOR TYPICAL ROADWAY BORES. 2" GALVANIZED VENT AT HIGH END OF CASING. VENT TO HAVE INSECT -� SCREEN WELDED TO END. ---� 3 =0 1 .GRADE ;- STEEL ENCASEMENT - - l -- - -- - _ --_ i 175 -DRAINAGE GRAVEL ^` (10 CU. FT. STONE) SLOPE TO Df?,41N 314 " WEEPHOLE AT LOW POINT OF CASING F► F\/ATInIV NOTES: 1. STEEL SPACERS SHALL BE USED FOR SUPPORT OF THE CARRIER PIPE WITHIN THE CASING PIPE. 2. A MINIMUM SPACING OF 2 SPACERS PER JOINT OF CARRIER PIPE SHALL BE REQUIRED. 3 SPACERS ARE REQUIRED FOR CARRIER PIPE z 36 INCHES. 3. THE SPACERS SHALL BE LOCATED EVENLYALONG THE CARRIER PIPE SUCH THAT EACH SPACER SUPPORTS THE SAME UNIT WEIGHT OF THE CARRIER MAIN. 4. FOR CASING SIZE SEE STANDARD SPECIFICATION SECTION 05000. 5. RECLAIMED WATERLINE SHALL BE PVC WITH RESTRAINED JOINTS. J� - -' - CARRIER PIPE RESTRAINED JOINT D.I.P. CARRIER MAIN (SEE NOTES FOR EXCEPTIONS) CARRIER PIPE L , - - STEEL ENCASEMENT STEEL -� PIPE �� SPACER 3/8" STEEL PLATE 1, CONTINUOUS 4 _ �'�� WELD BOTH _ -- SIDES (TYP.) Ov � ,.OAP PIPE STEEL CASING NOT TO SCALE END ELEVATION NOTES: I. THRUST BLOCKS SHALL BE INSTALLED ON ALL WATER DISTRIBUTION LINES 6" THRU 12" DIAMETER IN THE MANNER SHOWN. JOINT RESTRAINING FLANGES AND GASKETS THAT MEET "LOCAL GOVERNING AUTHORITY" SPECIFICATIONS ARE AN ACCEPTABLE ALTERNATE FOR RETRAINT. 2. PIPE GREATER THAN 12 INCH DIAMETER SHALL REQUIRE RESTRAINT JOINT PIPE FOR THE PROPER LENGTH. 3. COMPACT FITTINGS ARE NOT ACCEPTABLE. STANDARD FITTINGS SHALL BE USED WITH CONCRETE THRUST BLOCKING OR ALTERNATE JOINT RESTRAINT. 4. NO CONCRETE SHALL BE PLACED ON BOLTS. WRAP JOINT FITTINGS WITH PLASTIC. 5. CONCRETE SHALL BE A MINIMUM 3,000 PSI. 6, ALL BEARING SURFACES SHALL BE AGAINST UNDISTURBED SOIL. 7. USE OF RESTRAINED JOINT DUCTILE IRON WILL BE REQUIRED IF SOIL CONDITIONS DO NOT ALLOW THE USE OF THRUST BLOCKS. 8. ALL VERTICAL BENDS SHALL BE RESTRAINED USING RESTRAINED JOINT DUCTILE IRON PIPE FOR THE REQUIRED DISTANCE BASED UPON THE PIPE DIAMETER. CONCRETE THRUST BLOCK (TYP.) ELBOW HORIZONTAL BEND SIDE EXCAVATIONS (TYP.) TEE 24'5c24'x6" THICK CONCRETE PAD CAST IN PLACE MIN. 2" S9.5B ASPHALT PAVEMENT BASE COURSE ~4 CASTIRON VALVE BOX GATE VALVE VALVE BOX IN PAVEMENT DETAIL NOT TO SCALE EXPANSION CONNECTION - CAST IRON LID METERS TO BE INSTALLED BX HOKE COUNTY CHECK VALVE CAST IRON METER BOX PROVIDE 3/4"-5/8" CONNECTION FOR FUTURE METER 1 " P.E. SERVICE LINE i I" CORPORATION STOP NOTES: 1. CONTRACTOR SHALL PLACE TRACER MAIN X 1 "SADDLE WIRE ALONG LENGTH OF EACH SERVICE AND PULLED INTO SERVICE BOX. 2. PROVIDE 3/4"--5/8" CONNECTION FOR FUTURE METER. TYPICAL SERVICE CONNECTION DETAIL NOT TO SCALE MINIMUM BEARING AREA EACH DIRECTION OF THRUST IN SQUARE FEET (based on soil supporting value of 2,000psf @ 200 psig test pressure) PIPE SIZE TEES & DEADENDS 90` ELBOWS 45" ELBOW & CROSSES 22-1/2° ELBOWS 6" 4 6 3 2 8" 7 10 5 3 12" 15 21 11 6 SEARING CLEAR OF PIPE su►crACES JOINTS (TYP.) SHALL BEAGAINST TAPPING SLEEVE AND UNDISTURBED CROSS VALVE GROUND (TYP.) CONCRETE THRUST BLOCK DETAIL NOT TO SCALE 18N18'x6" THICK CONCRETE PAD CAST IN PLACE OR PRE -CAST NOTE: ALL GATE VALVES SHALL BE PLACED 1/2" CAST IRON` VALVE BOX GATE VALVE ON AN 80 LB. BAG OF SACRETE. VALVE BOX IN GRASS DETAIL NOT TO SCALE SQUARE HEAD NUT (NO WHEEL VALVES) -PRECAST CONCRI PROTECTION RING SEE VALVE BOX PAVEMENT INSTALLATION 518" THREADED RODS (2 EACH SIDE) VALVE BOX TAMPED BACKFILL- TAMPED REDUCER BACKFILL --► ? X 2 2" THREADED BRASS PIPE (36" IN LENGTH) 2" G. V W O N a 0- SPRINGLINE BACKFILL LIGHTLY TO 12" ABOVE PIPE IN 6" LIFTS (95% MAX DENSITY IN MAX 12" LIFTS FOR NON -PAVED AREAS. 4"MIN. THREADED COUPLING 2"THREADED PIPE (24" IN LENGTH) 2" BRASS NIPPLE (6" MIN. LENGTH) REMOVE 2" u PLUG/CAP PAY ITEM INCLUDES ALL ITEMS PERMANENT BLOW -OFF ASSEMBLY NOT TO SCALE CONCRETE BLOCKING MIN.1/3 C.Y. AT 3000 P.S.1. MIN. EXCAVATED TRENCH WIDTH FINAL PIPE WIDTH + 12" BACKFILL if INITIAL BACKFILL LU W - - : PIPE W HAUNCHING a a. BEDDING NOTE. 4" MIN SUITABLE LOOSE SOIL BEDDING FROM TRENCH BEDDING SHALL BE SMOOTH TRENCH EXCAVATION BOTTOM, OR COMPACTED LOOSE FILL MATERIAL AS REQUIRED TO PROVIDE A FIRM, STABLE AND UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. WATER MAIN BEDDING DETAIL NOT TO SCALE TAPPING SLEEVE NOTE; ALL GATE VALVES SHALL BE PLACED ON AN 80 LB. BAG OF SACRETE. 1/2" CAST IRON VALVE BOX TAPPING VALVE TAPPING SLEEVE AND VALVE DETAIL NOT TO SCALE CWATER UTILITY GENERAL NOTES 1. CONTRACTOR SHALL REPAIR ALL WATER LATERALS AND MAINS DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL REPORT IMMEDIATELY ALL WATER MAIN AND LATERAL BREAKS TO THE PROJECT COORDINATOR. 2. THE CONTRACTOR SHALL NOT USE HOUSE HOSE BIBBS OR ANY OTHER METHOD OF BLOW OFF WHICH ALLOWS DOMESTIC WATER CONTAINING SEDIMENTS OR HIGH LEVELS OF CHLORINE TO PASS THRU RESIDENT'S METERS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES RESULTING FROM ALLOWING 'DIRTY" WATER TO ENTER RESIDENT'S PLUMBING SYSTEM, SUCH AS WATER HEATERS, STAINED CLOTHING, CLOGGED SCREENS, ETC. 3. ALL EXISTING UTILITIES IMPACTED BY CONSTRUCTION SHALL BE ADJUSTED TO FINISHED GRADE.. 4. ALL WORK ON "LOCAL GOVERNING AUTHORITY" WATER UTILITIES (MAINS, LATERALS, ETC) SHALL BE PERFORMED BY LICENSED UTILITY CONTRACTOR. 9. SEPARATION REQUIREMENTS: PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED: -24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS; -18 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF WATER MAINS AND STORM SEWERS OR SANITARY SEWERS (INCLUDING FORCE MAINS); -10 FEET HORIZONTAL SEPARATION BETWEEN PARALLEL SANITARY SEWERS (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED (BOTH HORIZONTAL AND/OR VERTICAL) OR ANYTIME THE SEWER IS OVER THE WATER MAIN, BOTH WATER AND SEWER MUST BE DUCTILE IRON PIPE COMPLYING WITH PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150 PSI TO ASSURE WATERTIGHTNESS BEFORE BACKFILL►NG. NOTES: 1. ALL EXCAVATION SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE CONSTRUCTION STANDARDS FOR EXCAVATIONS IN OSHA "SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION", CHAPTER XVII OF TITLE 29, CFR, PART 1926. t t 11111111 t„� CA `Z:� EAL �. 567 or,H , \\-\ \P . 1 0 N 0O v Ce) N � ,c Lm z N Mco N � U oo c: �ZNp i = p M M CU o� Zz Rf m O 1 wv t4 z �w THE CONTRACTOR SHALL HAVE A COMPETENT PERSON ON SITE AT ALL TIMES Q DURING EXCAVATION AND BACKFILLING. Z 2. CONTRACTOR SHALL USE TRENCH BOX SHORING IN ALL OPEN CUTS IN PAVED J AREAS. TRENCH WIDTH SHALL BE MAINTAINED AT THE MINIMUM PRACTICAL WIDTH. 0 3. SEE PLANS FOR MINIMUM COVER. V 4. LOOSE SOIL OR SELECT MATERIAL IS DEFINED AS" NATIVE" SOIL EXCAVATED FROM V) THE TRENCH, FREE OF ROCKS, FOREIGN MATERIAL AND FROZEN EARTH. 5. BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH WALLS AND TRENCH BOTTOM. BEDDING MATERIAL WILL NOT BE PAID FOR UNLESS SPECIFICALLY W O APPROVED BY THE PROJECT REPRESENTATIVE AND ONLY FOR THE AUTHORIZED CU Z QUANTITY. Q 6. WHERE NATIVE SOIL IS DETERMINED TO BE ADEQUATE BY THE ENGINEER, NO F- EXCAVATION BELOW THE BOTTOM OF PIPES IS REQUIRED. Z 7. BEDDING MATERIAL SHALL BE PROPERLY RODDED AND COMPACTED AROUND THE W O PIPE HAUNCHES. V 8. TEST FOR DENSITY OF COMPACTION MAY BE MADE AT THE OPTION OF THE W ENGINEER AND DEFICIENCIES SHALL BE CORRECTED BY THE CONTRACTOR AT NO V V ADDITIONAL COST TO THE OWNER. THE ENGINEER MAY HAVE COMPACTION TEST PERFORMED AFTER THE BACKFILL 1S COMPLETE. CONTRACTOR SHALL BE Q REQUIRED TO EXCAVATE TO VARIOUS ELEVATIONS FOR DENSITY TESTING EXCAVATION, BACKFILL AND RECOMPACTION SHALL BE PERFORMED AT NO ADDITIONAL COSTS TO THE OWNER. DESIGNED BY. JEH SYM.: REVISION DESCRIPTION: DATE: DRAWN BY. JLF 2 PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11/28/19 APPROVED BY. JEH 3 , SHEET: 5 12 6 CIVIL NCDOT STANDARD NOTES: `L ( 1. ALL UTILITY STRUCTURES SHALL BE LOAD RATED FOR THE APPROPRIATE DEAD LOAD PLUS HL-93 LIVE LOAD. SUCH STRUCTURES SHALL BE -A DESIGNATED AND CERTIFIED BYA LICENSED PE OR DESIGNATED AS iTerry .-7\ e MEETING NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. (ADD THIS f 2 NOTE IN UTILITY NOTES SECTION OF THE PLANS). 2. ELECTRICAL POWER AND COMMUNICATIONS FACILITIES SHOULD N CONFORM TO THE CURRENTLY APPLICABLE NATIONAL ELECTRICAL SAFETY A ' CODE EXCEPT VERTICAL CLEARANCES SHALL BE NO LESS THAN 18 FEET IN ANY CAS (ADD THIS NO N UTILITY NOTES SECTION OF THE PLANS). E. (A NOTE / '1 3. ALL NON-FERROUS PIPELINES SHALL BE INSTALLED WITH A LOCATING TAPE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 3 3 234' 1 / i N . 234 \ 'sc"3Pn m;'��rr. jr, _ s„ #" W 494A150 :'i r 020 /R \w\ \ w.' CONTRACTOR SHALL INSTALL CLASS A RIP -RAP UNDERLINED WITH '1V - 1 ; 3 N w \ \\N \ NON -WOVEN FILTER FABRIC. 1 0 _\ '( ` HAND PLACE STONE UP TO ;\ TOP OF PIPE AND SLOPE } \ M - %\ TO PREVENT SCOUR AND ry3ti / F I EROSION '% y3 ` r CLASS A RIP -RAP APRON` 00 -A '' ON NONWOVEN FILTER FABRIC, ` ✓\ 1� MIN. 9' LONG, 3.75' WIDE ✓\ �w AT PIPE OUTLET 10.25' WIDE' ' \ q - A AT OUTLET END. / y v\ r{ \ n EXISTING a \ "�'` MAIL CLUSTER BOX UNITS (CBU) ` A END 1 30' =231.- s DITCH 70' X 10' b WITH ADA RAMP. REFERENCE NCDOT' Inv Out \ } SITE TRIANGLE _ PLACEMENT OF CBU FIGURE 2: CBU , V -A OR C&G SECTION RESIDENTIAL LOCAL N 8LF - 18" RCP CL V ND COLLECTOR STREETS. INSTALL STOP SIG�- o (12 t @ 1.00 % PER NCDOT STD. A M " e\ ✓ I N CONSTRUCT ADA RAMP ` CI-2 29LF - 18" \ Eop = 234.24' CL DO% \' FROM EDGE OF PAVEMENT �3' BEGIN 24" WEDGE \ Inv. In = 231.38' 6xp RCP V @ Inv Out=231.38'. CURB & GUTTER N:545,283.40 \ - -' RCP E.- 1,967,949.29 A 50' 25' \ @ 1,00% TA R TAPERS 5'q M — — �-- — -CONCRETE PAD � ��� FOR CBU i e END-4 n- y Tr Inv Out=231.53'� \ l � � mow„ _ �,;,.� _ �z �_ ST RM Wm _- r - _.m_ T. v� W �- — Wm - frt � �� � N ESM BEGIN CL ��8 N / 20� ;, - `\t � �` DRAIN. INTERSECTION R2 2 _ _,— _ ?� — — — —ems —_ " E� STA. 0+00 EOP + ✓ y N. 454,325.48 o m 0 00 ^��0� 0+50 ��� 1+00 5 , 1+50 %--- P sed Stre f 3t00 0 4+00 4 50 2+00 E.1,967,961.10 �"� `v , 0 O OP ROW (Public 50� R/W) �_ " - \ CI-3 \ x rp £LY£Z= 13 dH - __ 96'6L+o= V1S dH - - R2 ' ILA �� _ _ _ �. 6 Eop 234 24' \ Inv. In 23167 _..__....P .... .._ ._. ,_..._. _�_. - - - _ _ __......._...... _ _.._. _ - _ In =231. EO " g A �;� a, v Out 6T m; BEGIN 24"WEDGELot 4-ADASIDEWAL K i \ CURB '& GUTTER-5�WIDE CONC. RAMP Z N.454) .32 ' SIDEWALK - — ` (TYP.) E:1,967,921,57 _- _ �_ - _ ti� l BEGIN 5' WIDE �� i NOTES: I SIDEWALKAT CURB \ �� AND GUTTER 1. INSTALL ASPHALT PA NC y � N PAVEMENT PER DOT REQUIREMENTS, SEE DETAIL Lot 2 Lot 3 „ 2. INSTALL 24 CONCRETE WEDGE CURB & GUTTER PER, SEE DETAIL 70' X 10' SCALE IN FEET SITE TRIANGLE RO D NAME PLAN VIEW 0' 15 30 SCALE: 1 "=30' ROAD NAME PROFILE SCALE: HORIZ.1"=30' VERT. 1"=5' 'o Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 ■ rc M 00 N M W ch N Z cm,N 't N N 11 � N II j N ii 1.'-' pCIL» Q. p» z � ULU UW?? W Z 240 240 238 PROPOSED .238 GRADE 236 EXISTING 236 GRADE 234 r— 234 232 « 232 16-LF 18" RC 230 3 230 29�E 228 CL. V 1. 0% 228 8-LF 1 "RCP 226 226 224 224 M tD HOR. 1 "= 30 N N VERT 1"= 5 N N 222 222 0+00 0+30 0+60 STORM DRAINAGE PROFILE 60 SCALE: HORIZ. 1"=30' VERT. 1"=5' N E Cn U M 6 N Cn •� zNM �cfl M M Cz Cr - J Co CL 1 Cif CL t1i 4 ImA �w W t' Q z 0 LU W LU OW F. J Z U- L6 o �O Q LU Z OG U = Q Lp W Q i'12CU z Qz > Q z Z .FU o Q Q a. W OJ �R OC L r DESIGNED BY.JEH REVISION DESCRIPTION: DATE: DRAWN BY.JLF PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH SHEET.• PER NCDOT COMMENTS DATED DECEMBER 27, 2019 01102120 13 ROAD CENTERLINE REVISED PER WETLAND 02125120 CIVIL NCDOT STANDARD NOTES: 1. ALL UTILITY STRUCTURES SHALL BE LOAD RATED FOR THE APPROPRIATE DEAD LOAD PLUS HL-93 LIVE LOAD. SUCH STRUCTURES SHALL BE DESIGNATED AND CERTIFIED BY A LICENSED PE OR DESIGNATED AS MEETING NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 2. ELECTRICAL POWER AND COMMUNICATIONS FACILITIES SHOULD CONFORM TO THE CURRENTLY APPLICABLE NATIONAL ELECTRICAL SAFETY CODE EXCEPT VERTICAL CLEARANCES SHALL BE NO LESS THAN 18 FEET IN ANY CASE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 3. ALL NON-FERROUS PIPELINES SHALL BE INSTALLED WITH A LOCATING TAPE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). X o ROAD NAME PLAN VIEW SCALE: 1 "=30' ROAD NAME PROFILE SCALE: HORIZ. 1"=30' VERT. 1"=5' NOTES: 1. INSTALL ASPHALT PAVEMENT PER NCDOT REQUIREMENTS, SEE DETAIL 2. INSTALL 24 " CONCRETE WEDGE CURB & GUTTER PER, SEE DETAIL Know what's below Call before you dig. ® Dial 811 Or Call 800-632-4949 1 E: 1,966,599.97 O 2 SCALE IN FEET 0' 15 30 60 246 244 242 240 238 236 234 232 230 228 226 224 222 220 .00 A REVISION DESCRIPTION. PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27. 2019 4 5 PER NCDOT COMMENTS DATED DECEMBER 27, 2019 64 ROAD CENTERLINE REVISED PER WETLAND CAR %;�° °�°ESg� = va q3 °�°oa - ,A .......... N rm M U N c Z N M N M M N �o 6— ai cL NCL O v 4 v Z W �W W J O 09 CL 0 z a z Z W a A cn = oW >m -00 C Z a >: z 0 .FU O a � WO °- V ccU O G r DESIGNED BY. JEH DATE: DRAWN BY. JLF 11128119 APPROVED BY. ,IEH SHEET 01102120 14 7777 02125120 CIVIL r. FIRE HYDRANT SHALL BE MUELLER BRAND, CONTACT HOKE COUNTY PUBLIC UTILITIES FOR MORE INFORMATION. MINIMUM 36" HORIZONTAL CLEARANCE FROM ANY OBJECT FIRE HYDRANT, PUMPER NOZZLE TO BE PERPENDICULAR TO STREET FLANGE MUST o BE ABOVE GRADE 18" MIN. MAX. 6" O D O O ABOVE GRADE #57 STONE SURROUND JOINTS MIN. 7 CU. FT. CONCRETE THRUST BLOCK (TYP.) COMPACTED BACKFILL (TAMPED IN 6" LIFTS) 6" DUCTILE IRON PIPE 3'-6" MIN COVER 3/4" THREADED ROD (2 REQUIRED) - USE CONC. THRUST BLOCK 80 lb. CONC. BLOCKING 5' FIRE HYDRANT ASSEMBLY DETAIL NOT TO SCALE VENT TO BE USED FOR ALL STREAM CROSSINGS NOT REQUIRED FOR TYPICAL ROADWAY BORES. 2" GALVANIZED VENT AT HIGH END OF CASING. VENT TO HAVE INSECT SCREEN WELDED TO END. --- 3,_0/„ Tn rj �-m_� G- DE STEEL ENCASEMENT 1=� Illlll iil CARRIER '- RESTRAINED JOINT D.I.P. PIPE CARRIER MAIN (SEE NOTES FOR EXCEPTIONS) CARRIER NOTES: PIPE 1. STEEL SPACERS SHALL BE USED FOR SUPPORT OF THE CARRIER PIPE WITHIN THE CASING PIPE. STEEL j SPACER 2. A MINIMUM SPACING OF 2 SPACERS PER JOINT OF CARRIER PIPE j 3/8" STEEL SHALL BE REQUIRED. 3 SPACERS ARE REQUIRED FOR CARRIER PLATE 4_ ; - _ PIPE z 36 INCHES. CONTINUOUS WELD BOTH - 3. THE SPACERS SHALL BE LOCATED EVENLYALONG THE CARRIER I SIDES (TYP.) PIPE SUCH THAT EACH SPACER SUPPORTS THE SAME UNIT WEIGHT OF THE CARRIER MAIN. 4. FOR CASING SIZE SEE STANDARD SPECIFICATION SECTION 05000. 1 5. RECLAIMED WATER LINE SHALL BE PVC WITH RESTRAINED j JOINTS. PIPE STEEL CASING NOT TO SCALE END ELEVATION STEEL ENCASEMENT PIPE NOTES: 1. THRUST BLOCKS SHALL BE INSTALLED ON ALL WATER DISTRIBUTION LINES 6" THRU 12" DIAMETER IN THE MANNER SHOWN. JOINT RESTRAINING FLANGES AND GASKETS THAT MEE "LOCAL GOVERNING AUTHORITY" SPECIFICATIONS ARE AN ACCEPTABLE ALTERNATE FOR RETRAINT. 2. PIPE GREATER THAN 12 INCH DIAMETER SHALL REQUIRE RESTRAINT JOINT PIPE FOR THE PROPER LEI JGTH. 3. COMPACT FITTINGS ARE NOT ACCEPTABLE. STANDARD FITTINGS SHALL BE USED WITH CONCRETE THA UST BLOCKING OR ALTERNATE JOINT RESTRAINT. 4. NO CONCRETE SHALL BE PLACED ON BOLTS. WRAP JOINT FITTINGS WITH PLASTIC. 5. CONCRETE SHALL BE A MINIMUM 3, 000 PSI 6. ALL BEARING SURFACES SHALL BE AGAINST UNDISTURBED SOIL. 7. USE OF RESTRAINED JOINT DUCTILE IRON WILL BE REQUIRED IF SOIL CONDITIONS DO NOT ALLOW THE L fSE OF THRUST BLOCKS. 8. ALL VERTICAL BENDS SHALL BE RESTRAINED USING RESTRAINED JOINT DUCTILE IRON PIPE FOR THE REQUIRED DISTANCE BASED UPON THE PIPE DIAMETER. 6" GATE VALVE AND BOX - ANCHORING TEE CONCRETE THRUST BLOCK (TYP.) VALVE BOX IN PAVEMENT DETAIL NOT TO SCALE CAST IRON LID EXPANSION METERS TO BE� INSTALLED B HOKE COUNTY CHECK VALVE LOW .♦ r CAST IRON METER BOX y - PROVIDE 3/4"-5/8" CONNECTION FOR FUTURE METER I 1"P.E. SERVICE LINE I" CORPORATION STOP NOTES: 1. CONTRACTOR SHALL PLACE TRACER MAIN X 1 "SADDLE WIRE ALONG LENGTH OF EACH SERVICE AND PULLED INTO SERVICE BOX. 2. PROVIDE 3/4' -5/8" CONNECTION FOR FUTURE METER. TYPICAL SERVICE CONNECTION DETAIL MINIMUM BEARING AREA EACH DIRECTION OF THRUST IN SQUARE FEET (based on soil supporting value of 2,000psf @ 200 psig test pressure) PIPE SIZE TEES & DEADENDS 90, ELBOWS 45° ELBOW & CROSSES 22-1/2` ELBOWS 6" 4 6 3 2 8" 7 10 5 3 12" 15 21 11 6 1 THRUST UNDISTURBED ELBOW BLOCK SOIL M.J.PLUG AREA OF VALVE BOX IN GRASS DETAIL NOT TO SCALE SQUARE HEAD NUT (NO WHEEL VALVES) PAVEMENT PRECAST CONCRETE PROTECTION RING\ SEE VALVE BOX INSTALLATION-ti 5/8" THREADED C RODS (2 EACH SIDE) 7 VALVE BOX TAMPED BACKFILL--- TAMPED REDUCER - BACKFILL 2 X 2" -� 2 THREADED BRASS - PIPE (36" IN LENGTH) i 2" G. V --- ----- - --- - _. _ - _- - -, it 2" BRASS NIPPLE (6" MIN. LENGTH) REMOVE 2" PLUG/CAP PAY ITEM 4"MIN. THREADED COUPLING 2" THREADED PIPE (24" IN LENGTH) INCLUDES ALL ITEMS I PERMANENT BLOW -OFF ASSEMBLY NOT TO SCALE O U MIN. EXCAVATED TRENCH WIDTH FINAL PIPE WIDTH t 12" BACKFILL 2 N a INITIAL ' BACKFILL w SPRINGLINE "- - - - - PIPE g w HAUNCHING a / �i.% BEDDING /, / / %�• CONCRETE BLOCKING MIN.113 C.Y. AT 3000 P.S.I. BACKFILL LIGHTLY TO 12" ABOVE PIPE IN 6" LIFTS (95% MAX DENSITY IN MAX 12" LIFTS FOR NON -PAVED AREAS. NOTE: 4" MIN SUITABLE LOOSE SOIL BEDDING FROM TRENCH BEDDING SHALL BE SMOOTH TRENCH EXCAVATION BOTTOM, OR COMPACTED LOOSE FILL MATERIAL AS REQUIRED TO PROVIDE A FIRM, STABLE AND UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. WATER MAIN BEDDING DETAIL NOT TO SCALE TAPPING SLEEVE AND VALVE DETAIL NOT TO SCALE WATER UTILITY GENERAL NOTES 1. CONTRACTOR SHALL REPAIR ALL WATER LATERALS AND MAINS DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL REPORT IMMEDIATELY ALL WATER MAIN AND LATERAL BREAKS TO THE PROJECT COORDINATOR, 2. THE CONTRACTOR SHALL NOT USE HOUSE HOSE BIBBS OR ANY OTHER METHOD OF BLOW OFF WHICH ALLOWS DOMESTIC WATER CONTAINING SEDIMENTS OR HIGH LEVELS OF CHLORINE TO PASS THRU RESIDENT'S METERS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES RESULTING FROM ALLOWING 'DIRTY" WATER TO ENTER RESIDENT'S PLUMBING SYSTEM, SUCH AS WATER HEATERS, STAINED CLOTHING, CLOGGED SCREENS, ETC. 3. ALL EXISTING UTILITIES IMPACTED BY CONSTRUCTION SHALL BE ADJUSTED TO FINISHED GRADE.. 4. ALL WORK ON "LOCAL_ GOVERNING_ AUTHORITY" WATER UTILITIES (MAINS, LATERALS, ETC) SHALL BE PERFORMED BY LICENSED UTILITY CONTRACTOR. 9. SEPARATION REQUIREMENTS: PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED: -24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS; -18 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF WATER MAINS AND STORM SEWERS OR SANITARY SEWERS (INCLUDING FORCE MAINS); -10 FEET HORIZONTAL SEPARATION BETWEEN PARALLEL SANITARY SEWERS (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED (BOTH HORIZONTAL AND/OR VERTICAL) OR ANYTIME THE SEWER IS OVER THE WATER MAIN, BOTH WATER AND SEWER MUST BE DUCTILE IRON PIPE COMPLYING WITH PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150 PSI TO ASSURE WATERTIGHTNESS BEFORE BACKFILLING. NOTES: 1. ALL EXCAVATION SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE CONSTRUCTION STANDARDS FOR EXCAVATIONS IN OSHA "SAFEiYAND HEALTH REGULATIONS FOR CONSTRUCTION", CHAPTER XVII OF TITLE 29, CFR, PART 1926. THE CONTRACTOR SHALL HAVE A COMPETENT PERSON ON SITE AT ALL TIMES Q DURING EXCAVATION AND BACKFILLING. Z 2. CONTRACTOR SHALL USE TRENCH BOX SHORING IN ALL OPEN CUTS IN PAVED -j AREAS. TRENCH WIDTH SHALL BE MAINTAINED AT THE MINIMUM PRACTICAL WIDTH, 3. SEE PLANS FOR MINIMUM COVER. V 4. LOOSE SOIL OR SELECT MATERIAL IS DEFINED AS " NATIVE" SOIL EXCAVATED FROM THE TRENCH, FREE OF ROCKS, FOREIGN MATERIAL AND FROZEN EARTH. WALLS AND TRENCH 5. BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH W O BOTTOM. BEDDING MATERIAL WILL NOT BE PAID FOR UNLESS SPECIFICALLY APPROVED BY THE PROJECT REPRESENTATIVE AND ONLY FOR THE AUTHORIZED QUANTITY. Q (� Z (D W 6. WHERE NATIVE SOIL IS DETERMINED TO BE ADEQUATE BY THE ENGINEER, NO EXCAVATION BELOW THE BOTTOM OF PIPES IS REQUIRED. Z 7. BEDDING MATERIAL SHALL BE PROPERLY RODDED AND COMPACTED AROUND THE Uj U O PIPE HAUNCHES. U 8. TEST FOR DENSITY OF COMPACTION MAY BE MADE AT THE OPTION OF THE 1..1. W ENGINEER AND DEFICIENCIES SHALL BE CORRECTED BY THE CONTRACTOR AT NO V ADDITIONAL COST TO THE OWNER. THE ENGINEER MAY HAVE COMPACTION TEST O PERFORMED AFTER THE BACKFILL IS COMPLETE. CONTRACTOR SHALL BE REQUIRED TO EXCAVATE TO VARIOUS ELEVATIONS FOR DENSITY TESTING EXCAVATION, BACKFILL AND RECOMPACTION SHALL BE PERFORMED AT NO ADDITIONAL COSTS TO THE OWNER. DESIGNED BY. JEH YM.: REVISION DESCRIPTION: DATE: DRAWN BY JLF PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH SHEET; (5 12 ���� CIVIL NCDOT STANDARD NOTES: 1. ALL UTILITY STRUCTURES SHALL BE LOAD RATED FOR THE APPROPRIATE DEAD LOAD PLUS HL-93 LIVE LOAD. SUCH STRUCTURES SHALL BE DESIGNATED AND CERTIFIED BYA LICENSED PE OR DESIGNATED AS MEETING NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 2. ELECTRICAL POWER AND COMMUNICATIONS FACILITIES SHOULD CONFORM TO THE CURRENTLY APPLICABLE NATIONAL ELECTRICAL SAFETY CODE EXCEPT VERTICAL CLEARANCES SHALL BE NO LESS THAN 18 FEET IN ANY CASE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 3. ALL NON-FERROUS PIPELINES SHALL BE INSTALLED WITH A LOCATING TAPE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). X n a M 0 N N co ROAD NAME PLAN VIEW SCALE: 1 "=30' ROAD NAME PROFILE SCALE: HORIZ. 1"=30' VERT. 1"=5' NOTES: 1. INSTALL ASPHALT PAVEMENT PER NCDOT REQUIREMENTS, SEE DETAIL 2. INSTALL 24 " CONCRETE WEDGE CURB & GUTTER PER, SEE DETAIL ' Know what's below Call before you dig. Dial 811 or Call 800-6324949 L. W L / V , E: 1,966 ,599.97 O 2 SCALE IN FEET 01 15 30 60 246 244 242 240 238 236 234 232 230 228 226 224 222 220 .00 GYM.. REVISION DESCRIPTION: 1 PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 PER NCDOT COMMENTS DATED DECEMBER 27, 2019 ROAD CENTERLINE REVISED PER WETLAND N O U co N co •� ZNM aico U00 =00 � z c\1 to Na- C) CO z p N N N >C O•�V Q. O �t E v 4 z W �W W J U O L 0 z a z_ Z 0 Q W Q J L cn o = i' 00 W- CIO z Q i' z 0 �(� O � U O � U Y � O DESIGNED BY.JEH DATE: DRAWN BY. ELF I1128119 APPROVED BY: JEH SHEET.• 31102120 14 02125120 CIVIL a 0 N x 9G 10-7 k 10-7 �- j - CL STA. Ot67.08 STA. 0+00 o BEGIN CUt-DE-SAC REJECT CURBING a Oxvim vim vim rs - LP STA. 1+20.65µ 1goy os+o - �� W Proposed Str LP ELEV = 231. 77' `' T'�o 0 96 0 Q' RNV' ram/ L XN Rao' �� STORM _ _ . - r...,� - - -64C '- 25'---'BOC v �s�a;/ c INA STA.2+76.14 3? / u END CUL-DE-SAC SWALE- SEE p ; GRADING SHEET SIDEWALK ,, �'� a� s ss 14 FLUME - SEE ROW_-- 'od DETAIL CP- o STANDARD W k �� CURBING O U 4 2STORM / DRA1NA GE ESMT jeo � f O� �'� NO CUL-DE-SAC-SOUTH PLAN VIEW SCALE INFEET SCALE: 1 "=30' o' 15 30 246 246 PVI STA.-1 20.00 i i _____ _._____ _ __.BA.G..�A. 2�5___..___ _ _ _ _, _ W _ _ _«««_. _.___ . _ « _ _ _ — _ � � € ___.._ __ _ _._____.__ � ____. _ . _ _ _ _ _ . �_.____ _ _ _.._ � _._ _ �_ _. _. « _._._____...___ � 244 SAG LEV. 31.7T t 242 242- .«._..«...__._....._.......,...__.«.._...._«.......«�....._..._..«......_.._«............._ ., e.,.—_._........_«................_...«_...._«....e ....«.. ......E i cy o- c' •sM o____._..__._,_._ ......________ ....._.._..... ._._......___.___... __...,_ .._._.. ____«««_......______ «� _...�.�... ...�.......... .....__.........._._....._..__. .._.____._.._......._ C. to,.: +11 1 M M i+ 1 238 d u, W W E ISTING GRAD c~n "' -' W W _ __««..._ _ «« __«_.« __n_ __ _..._.._ __.__. _ 23 � � V -_ __ «.____ � _«_.__.. _..___.«__ _ __.._._____�--_-.. _�___ _____o_ . _ � _.____ ____ � 236 e s z 234 _ ________ _ _ ...........(EHflE ®F P EMEPfT) 234 232 232 230 230 f 228 228 i 226----____.___...__«__ ___ __ ____ _ _______.._.. _ ._ m___- 226 __._ _ __...... �_.____ W _ _. E 224 ___... _.:_.__.__.. _ _..._ __ _.__ _______ ... __.______ 224 ry o cO rn o co o 0 222` 'Q _._.«__._____._.._.. �..._._ _._� ___... _ _____..__.._..._..._su n _.._....._ _.____ o ____ m_w .. _ _ o .__. _._..__ _�_____«..__«_ _ s ue_ __ ._._W._.� �___.. ___ 222 N Cvi c i c) N c•i N c i N N`N NON MM MM MM MM MM MM MM MM cr)c4 MM M=M MM cy .cy. .cy .ct.. .cat- c't.... c+t cy.. ..cV W ..c«V �r .....cat-...=Y;,cat E t220 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 CUL-DE-SAC-SOUTH EOP PROFILE SCALE: HORIZ. 1"=30' VERT. 1"=5' 3+00 M NCDOT STANDARD NOTES: 1. ALL UTILITY STRUCTURES SHALL BE LOAD RATED FOR THE APPROPRIATE DEAD LOAD PLUS HL-93 LIVE LOAD. SUCH STRUCTURES SHALL BE DESIGNATED AND CERTIFIED BY A LICENSED PE OR DESIGNATED AS MEETING NCDOT STANDARD SPECIFICATIONS AND DRAWINGS. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 2. ELECTRICAL POWER AND COMMUNICATIONS FACILITIES SHOULD CONFORM TO THE CURRENTLYAPPLICABLE NATIONAL ELECTRICAL SAFETY CODE EXCEPT VERTICAL CLEARANCES SHALL BE NO LESS THAN 18 FEET IN ANY CASE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). 3. ALL NON-FERROUS PIPELINES SHALL BE INSTALLED WITH A LOCATING TAPE. (ADD THIS NOTE IN UTILITY NOTES SECTION OF THE PLANS). Uk 101 1- STA. 2+76.14 END CUL-DE-SAC a 'tea a 4 - AM CL STA. 3+04,11 STA. 0+00 BEGIN CUL-DE-SAC Zk 10 7 -ZD"STORM - DRAINAGE ESM �N NOTES: 1. INSTALL ASPHALT PAVEMENT PER NCDOT REQUIREMENTS, SEE DETAIL 2. INSTALL 24"CONCRETE WEDGE CURB & GUTTER PER, SEE DETAIL j SWALE - SEE GRADING SF SIDEWALK f FLUME -SEE f DETAIL f / LP STA 1+96 90 Km LP ELEV-231 — -- r► `'�'r, c r 82� 9t �z R50' 81 R30' 25' RO o o ' 32.68 o / r R-D a 4099 P'T +40 g9 Y R40' p PC ' BOC STANDARD CURBING — L REJECT CURBING WM ✓ �= O O Mt, UL-DE-SAC -NORTH PLAN VIEW SCALE: 1 "=30' SCALE IN FEET 0' 15 30 60 SS/02%,9 ; S L = 0356 0 N E U co M pj N zNCO aiM U 00 M Z p 40-5 CL //c� p co mac: pED Qi W d' q) J ttj m CL 1 CL M 4 *�4 �W PVI STA.=1t96.90 PVI ELEV.=231.80' 246 _ ._ _.._ ___ _._ n___.__ __ _..______._____ ____._____ __.________.__ ��`�EYG'�STA:" �------ ____.W_.___.-__._ .__ _._ �._ �._ 246 SAG LEV. 31.82' _.____.____.,___ _ _______._..._._._. _ _ _ ___._...__......_.___..__.. .... .... ....... ._..... ..... ..... ...___..............$0.OQ._VC_...__..__.__..__......_. 242 242 W .... __...... ... F 240._..___.__ _ _ ___.__ __ _.._. _ _-__ _. _ _ __._ _ sv a........-....._. __ _._ 240 W n u n �� 2380 _u:_ _ ___ _ _ ____ _ _. _w___ ____......n238LU o > EXIST NG GRADE v U > 2365 ______ _ __._._____...._____ _ ..«_ __ ___..__..__ _. _ _ _ _ _ _... ___,_ 236 a a PROPOSED GI ADE CL (EDGt_ OF PA MENT)- 234 __._ _ ___ ..._..____... _ ___.. 234 - -0.51 1.27/0 232 232 230 z 1 230 ot 228 228 z 0 226 - -- -- _ _ __._.__ _ __ _______ __. __._.. _ _ _ ___.__ m ______- 226 cl) V 224-of «._. __.. __-__.._._____ .__ ....._ ____ ____ 224 of o M�- o �� v a o co o ..._., ____ `O so 222 (o Z 222 M ri N �°i�N �'i N r5 N M M M M M M M M M M M M M M M M M M M M M M M M r 0+25 0+50 0+75 +00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 CUL-DE-SAC - NORTH EOP PROFILE SCALE: HORIZ. 1 "=30' VERT. 1 "=5' Know what's below Call before you dig. o Dial 811 Or Call 800-632-4949 r 3+00 wo 10 49 o _ Z .ia O c- U �Y U � O DESIGNED BY. JEH REVISION DESCRIPTION: DATE: DRAWN BY: JLF PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY: JEH SHEET.• 16 ROAD CENTERLINE REVISED PER WETLAND 02125120 CIVIL oXi 0 N .N y V 9 NOTES: 1. PIPE LENGTHS SHOWN ABOVE INCLUDE THE FLARED END SECTIONS WHERE APPLICABLE. 2. RIM ELEVATIONS REPRESENT FINISH GRADE ELEVATION WHERE APPLICABLE. CURB INLETS NOTE EOP GRADE CENTERED ON STRUCTURE AT EDGE OF PAVEMENT, SEE CONCRETE CURB AND GUTTER DETAIL. 3. ALL PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE. CONTRACTOR TO ORDER PIPE MATERIAL BASED ON ACTUAL INSTALLED LENGTHS NEEDED. 4. ALL STORM DRAIN PIPE TO BE CLASS 3 REINFORCED CONCRETE, UNLESS OTHERWISE NOTED ON PLANS. 5. CURB INLETS AND ALL BOX CONSTRUCTION MUST PER NCDOT SPECIFICATIONS. CONSTRUCTION OF STRUCTURE IS TO MEET NCDOT REQUIREMENTS. 6. DATA REQUIRED FOR PREPARATION OF RECORD DRAWINGS SHALL BE OBTAINED AND RECORDED BY THE CONTRACTOR AT THE TIME OF INSTALLATION. THE DATA SHALL BEACCUMULATED BY THE CONTRACTOR DURING THE CONSTRUCTION PERIOD AND EVIDENCE PROVIDED TO THE ENGINEER AS PART OF THE MONTHLY PAY REQUEST. PAY REQUESTS WILL NOT BE APPROVED BY THE ENGINEER IF THIS DATA IS NOT SUBMITTED WITH THE PAY REQUEST. THE CONTRACTOR IS TO PROVIDE NEAT AND LEGIBLE COMPLETED RECORD DRAWINGS TO THE ENGINEER AT THE COMPLETION OF THE PROJECT. 7. ALL DRAINAGE EASEMENTS ARE TO BE CLEARED AND ARE TO REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AND STRUCTURES. 8. ALL SIDE LOT SWALES ARE TO REMAIN FREE AND CLEAR OF STRUCTURES AND 1 1 11 1 I' 11 ,1 1, 1 CONVERYANCE SWALE NO.9B 1 SLOPE @ 1.50 SIDE SLOPES: 3:1 BOT WIDTH: 6` LINER: SEED & MULCH w/EXCELSIOR MATTING _235- _ z34 \ t � \ t , \ 23 .10 Lot'27 �234, � 11 Proposed Street - (Public 50' RAW} 1 , x Lai 1 HYDRANT M1r, 1 ent) i 1 IR ro / f4 Al) / / Bryanstone L< OTHER OBSTRUCTIONS AND MAINTAINED BY THE LOT OWNERS. 9. PROVIDE MINIMUM 1 FOOT COVER OVER STORM DRAINAGE PIPE. 10. PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER PIPE SLOPES. HOWEVER, SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON THE PLAN WITHOUT PRIOR APPROVAL FROM THE ENGINEER. 11. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS ARE FINISHED SURFACE GRADE. 12. EXISTING AND PROPOSED CONTOURS ARE ATONE FOOT INTERVALS. 13. ALL CUT AND FILL SLOPES ARE TO BE 3:1 MAXIMUM GRADE UNLESS OTHERWISE NOTED ON THE PLANS OR DETAILS. 14. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, TRENCHING, OR OTHER LAND DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND LIMITS OF GRADING WITHOUT PRIOR APPROVAL FROM THE OWNER. 15. PROVISIONS SHALL BE MADE TO ENSURE POSITIVE DRAINAGE ON THE SITE ATALL TIMES. NATURAL DRAINAGE FEATURES DISTURBED BY CONSTRUCTION MUST BE RE-ESTABLISHED. NO PONDING DUE TO SPOILS, STOCKPILING OR OTHER ACTIVITIES SHALL BE PERMITTED. 16, VERTICAL CONTROL BASED ON THE NORTH AMERICAN VERTICAL DATUM, 1988. P OFST P- i I 1 Know what's below Call before you dig. ® Dial811 Or Call 800-632-4949 CnNVFYANCF SWAT F N[7 1 1 O SCALE IN FEET 0' 30 60 120 I N U M N cy) •_ ZNM aim U 00 00 �ZNp O p M 'Ou` N'aJ N >C O•�U � to CLCL .:.: Q v 4 0. w �w �w a z 0. O Q Z VJ OW 00 cu W FU o � U Y � O DESIGNED BY. JEH >YM.: REVISION DESCRIPTION: DATE: DRAWN BY. JLF PER NCDEQ COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH SHEET: 4 , - 17 5:> NA*� � 6 ROAD CENTERLINE REVISED PER WETLAND 02125120 CIVIL qV 50' R.O.W. WEDGE WEDGE CURB CURB 10.0' SHOULDER 26' PAVEMENT WIDTH 5' 5.0` SIDEWALK SHOULDER WHERE 13.0' 13.0' EXISTING GRADE APPLICABLE VARIES 15% _ y ---_ 3.0% 3.0% 1 i£ - 7777,,7 ...........i d j$ ££ H. 5 i jj 2j C 7 COMPACTED 12" ... .1 E - , 24" WEDGE CURB SUBGRADE €7 E t - PAVEMENT T SHOULDER _F° CE1 NnTF- � a-R 9 {.,_...,_..._�._. PAVEMENT SCHEDULE ABC STONE SYMBOL DESCRIPTION C1 PROPOSED 2"ASPHALT SURFACE COURSE TYPE S9.5B E 1 PROPOSED 6" ABC COMPACTED TO 100 PERCENT. PREPARED SUBGRADE: COMPACTED TO A MINIMUM OF 98 % OF THE SOIL'S O MODIFIED PROCTOR DENSITY (ASTM 698) PLACE IN 6. LIFTS. - SEE NOTE 3 PROVIDE TEST RESULTS FOR SUBGRADE COMPACTION. TYPICAL LOCAL RESIDENTIAL ROAD CROSS SECTION NOT TO SCALE NOTES: CONSTRUCT STANDARD SIDEWALK 5' WIDE AND 4" THICK UNLESS OTHERWISE DENOTED ON PLANS. PLACE A GROOVE JOINT 1" DEEP WITH 1/8" RADII IN THE CONCRETE SIDEWALK AT 5' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 50' INTERVALS. A /2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. SEE STD. DWG. 848.05 FOR CURB RAMP LOCATION REQUIREMENTS AND CONSTRUCTION GUIDELINES. %g' RAD SURFACE OF JOINT SEALER SIDEWALK o :v , o:_v'. -o..,v '.. o,_v '. 'v '. e:. _v•. v 'v . o. '.v . d •v . � ' p',.d',' p•..d•+' p•.�d �•'' p'...d'�• / p•.:d'.'• p,_.G'•'• p',.d'�• p',.d' 1/2" JOINT WIDTH JOINT FILLER T = SIDEWALK THICKNESS TRANSVERSE EXPANSION .JOINT IN SIDEWALK /2" EXPANSION JOINT FILL 3/,8" WIDE x 111 DEEP GROOVED OR SAWN JOINT WITH JOINT BUILDING, f SEALING COMPOUND WALL, ETC. !{1 1/8" RAD 1/8" RAD PROPOSED CONCRETE PROP. C&G a. SIDEWALK CONC. PAVEMENT DETAILS SHOWING JOINTS IN CONCRETE SIDEWALK CONCRETE SIDEWALK DETAIL NOT TO SCALE Q U_ .,.i Q H 00,oxz I= z F— C)F�—tJ„OJ QQC�±4 f— H t f� Q LL. 0 Zcc Q W CIO ^ N CO cc LU Q ~ � W C� Qa C v OF 1 11 .0111 24" 101, L - ALL WORKAND MATERIALS SHALL COMPLY WITH NCDOT SECTION 846 24" CONCRETE WEDGE CURB AND GUTTER DETAIL' NOT TO SCALE TYPICAL CUL-DE-SAC DETAILS NOT TO SCALE GENERAL NOTES: WIDTH AND SHAPE OF PROPOSED CONCRETE FLUME AND ETC. SHALL BE AS SHOWN OR AS DIRECTED BY THE ENGINEER. REINFORCING BARS ARE TO BE ASTM A615, GRADE 60. THE FOLLOWING SHALL BE CONSTRUCTED IN ACCORDANCE WITH N.C. ROADWAY SPECIFICATIONS, CONCRETE CURB AND GUTTER -SECTION $46, CONCRETE FLUME COVER (TO BE CONSTRUCTED UNDER SIDEWALK SPECIFICATIONS) SECTION 848, CONCRETE PAVED DITCH- SECTION B50. t SECTION D-D CONCRETE PAVED DITCH SECTION "C-C CONCRETE PAVED DITCH 6" CONCRETE RISER ON FLUME N' 4'-0 BASE n .... SECTION ;B - B mCONCRETE PAVED DITCH CONCRETE FLUME E E 1 I i D _D CONCRETE PAVED DITCH C... _..... ..k.....................: ........... .. 6" CONCRETE RISER ONFLUME E i t � i B 03 BARS @ 8" CTRS, 0.376 Ibs Ift.�-- (est.32 Ibs.)---''J� �` 5' CONCRETE E 4'-8r' SIDEWALK 5' CONCRETE- t. SIDEWALK €' 1 f GRASS BERM F, GRASS BERM 2'-6° CURB AND GUTTER PLAN Jr-6" CONCRETE RISER ON FLUME _O,r F! N 1 sa 8AT 7 @ 8" CTRS.—� 2,-6" \ CURB &GUTTER —� � � ! py �I --CONCRETE FUME U SLOPE 1.-5' CONCRETE SIDEWALK PROVISIONS FOR PAYMENT _ J 1.1 cubic yards - p "CDNCREi 1 ELEVATION CONCRETE SIDEWALK .FLUME NOT TO SCALE PyeEQ G��4 G�P4i i r ice. /y, PERSPECTIVE PROJECT REFERENCE NO, .PSN'CAkp�`4.p SEAL 022966 CONTRACT STANDARDS & DEVELOPMENT UNIT STANDARDS AND SPECIAL DESIGN Office 919-707-6950 FAX 919-250-4119 CONCRETE FLUME DETAIL ORIGINAL BY: rl-i'i DATE: o3-2712 MODIFIED BY: CHECKED BY: DATE: .......... ___ ............ __ �N CARp -S` 35 0 °A` N o U N M � zNM �cfl M C\1Co CL -C.)Lo Co '�Lf W Cn a� k - �c oZ caCoa CL Co � N ' �w-4 '*.*4 �W I.nj Rt Z J J_ Cl) U Q -0O CU Z W 0 W =o CU C Q PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 DESIGNED BY. JEH GYM.: REVISION DESCRIPTION: DATE: DRAWN BY. JLF 1,,12s1,7APPROVED PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 BY. JEH �J SHEET: AA 18 5- 5, CIVIL W' WU` W'' pW 7.5'I - 7.5' 3.0' f 4.5' 3 1.5' NOTE. SWALE SLOPES AS CLOSE TO ZERO AS DRAINAGE WILL PERMIT. • <2 GRASS SPECIES IN THE SWALE SHALL BE. - NON -CLUMPING AND DEEP ROOTED. - ABLE TO WITHSTAND A VELOCITY OF 4 FT/SEC. - MANAGED AT AN AVERAGED OF 6 INCHES. - NOT TO BE CUT LOWER THAN 4 INCHES. MAINTENANCE. - THE DRAINAGE AREA OF THE GRASSED SWALE WILL BE CAREFULLY MANAGED TO REDUCE THE SEDIMENT LOAD TO THE GRASSED SWALE - AFTER THE FIRST -FERTILIZATION TO ESTABLISH THE GRASS IN THE SWALE, FERTILIZER WILL BE APPLIED TO THE GRASSED SWALE. THE GRASSED SWALE WILL BE INSPECTED ONCE A QUARTER. RECORDS OF INSPECTION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. TYPICAL CONVEYANCE SWALE CROSS SECTION SCALE: N.T.S. ISOMETRIC VIEW ,= PAY LIMITS FOR CURB RAMP NOTES: 1. DETECTABLE WARNING DOMES WILL COVER 2'-0" LENGTH AND FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAILS. 2. DETECTABLE WARNING DOMES WILL CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK, OR PARK -ON -LIGHT SEQUENCE COVERING THE. ENTIRE RAMP, .RAMP. WIDTH AREA .IS VARIABLE �_. .. BASE DIAMETER cn � 0.9"R TO 1 'R (D 1 TOP DIAMETER OF NO LESS 0 THAN 50% TO NO MORE ICJ @ (\J ;l, THAN 65% OF THE BASE DIAMETER 1..4�2 4'7 I. r, J. .c DETECTABLE WARNING DOMES W A - W#A+9" X 8 5'- ED, 5.8' 5.8' 57• 8' 0.0' 6.8' B.S. 6. 0' 7 0.0' 7.8' 7.3' 6. W 8' 0.0' 8.8, 7.3' 6.5' f 2. 0' 7.8` 7.8' 5.0' 5' 2 1 5' 8.3' 8. V 4, 8' 5' 3.01 8-.8' 8.3' 1 4. 4' 4. V 3.8' 5' 4.5' 10.3' B.7' 3.4" 5' 5.0' 10.8' 8.9 3. t' B = X-(At9") B DISTANCE FROM FRONT EDGE OF SIDEWALK ID BACK POINT OF 12t.1 (8.3a%) SLOPE. " BACK OF SIDEWALK DROP REQUIRED FOR ALL SIDEWALK SLOPES. " BACK OF SIDEWALK DROP REQUIRED FOR SIDEWALK SLOPES 0.04. SECTION B-B SIDEWALK 5' MIN.TOP OF ELEVATION; � CURBURB TRANSITION s DROP i TRANSITION (.... CURB 1 3 YARIASLE. SLOPES i1OT TO EXCEED 10:1 SECTION A -A PLAN VIEW DUAL RAMPS ANY RADII (4` MIN. FLOOR. WIDTH) NOTES 1. SWALES SHALL NOT BE EXCAVATED BELOW THE SEASONALLY HIGH WATER TABLE. 2.00' A A 2.00' 2. SWALE SHALL BE TRAPEZOIDAL IN CROSS SECTION Side Slope ,1 �� i-� WITH MAXIMUM BOTTOM WIDTH OF SIX FEET. SIDE SLOPES STABILIZED WITH VEGETATIVE COVER aete SlopesSHALL BE NO STEEPER THE 3:1(HORZ TO Lu as Close Ct °i r ` „sue : � Zero Drainager r � , � ; Optional vel Railroad fti3 Tie VERTICAL). Q CONCRETE PIPE a <; Check -dam Will Permit; (Increases Infiltration) 3. LONGITUDINAL SWALE SLOPE SHALL BE EXCEED Q 1 r�� SEVEN PERCENT Ca k � r € 'ifLx./'a1fr7,,i'R �.',,€.t�'f K d x Igo �4. GRASS SPECIFICATION: 4.1. NON -CLUMPING AND DEEP ROOTED k GEOTEXTILE 4.2. ABLE TO WITHSTAND A VELOCITY OF FOUR FEET ' r� !� ��• NON -WOVEN FABRIC PIPE JOINT �f�APER SECOND �!W/ 1' MIN. OVERLAP .f f 5 ` r .$3"t✓ F ;6•t S" •,?`k `Xd g+y'm,1 r ,f� '4� 4.3. MANAGED AT AN AVERAGE OF SIX INCHES 4.4. NOT BE CUT LOWER THAN FOUR INCHES. z o� H r Q Q 0 H LL _!OH 00co _ Mz ¢V< CD CC 0O1-4 U3`L Z t-i cr CL t^i t Q � LLl d < I= z cc 0 0 V Lu CL Ll Q cc O CL Cr CONVEYANCE SWALE SCALE: N.T.S. L,9 {' 11( gIg tE -- SEE NOTE 4 99� i SIDEWALK _SIDEWALK _ --- - NOTE 12 SEE N o ----- 4'-0" (TYP) -r / NOTE 3 U] o '.' .................... STOP LINE I ---SEE NOTE 10 - _ DETAIL SHOWING TYPICAL LOCATION OF CURB RAMPS PEDESTRIAN CROSSWALKS AND STOP LINES FOR TEE INTERSECTIONS SEE NOTE 10 STOPL T NE�� SIDEWALK qPP NOTE 4 NOTES - MAINTENANCE IMPORTANT MAINTENANCE PROCEDURES: 1. THE DRAINAGE AREA OF THE GRASSED SWALE WILL BE CAREFULLY MANAGED TO REDUCE THE SEDIMENT LOAD TO THE GRASSED SWALE. 2. AFTER THE FIRST-TIME FERTILIZATION TO ESTABLISH THE GRASS IN THE SWALE, FERTILZER WILL NOT BE APPLIED TO THE GRASSED SWALE. 3. THE GRASSED SWALE WILL BE INSPECTED ONCE A QUARTER. RECORDS OF INSPECTION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. SIDEWALK - - - 4'-0" (TYP) \ 0\ DETAIL SHOWING TYPICAL LOCATION OF CURB RAMPS, PEDESTRIAN CROSSWALKS AND STOP LINES ROADWAY PLAN SYMBOL CPi\ PROPOSED CURB RAMP W/ LANDING FOR PROPOSED PROPOSED OR FUTURE SIDEWALK. CURB RAMP ALLOWABLE LOCATIONS ----_.--.____._._.__ DUAL RAMP RADII ........... ANY t�-tOCCOSU LL O O co S 0 U) cc CL H I Q cc OIo w N � a O z Cr co ZQ CC C} VO > Cl) 0 CL a O 4 a cc 05 SLOPE TRENCH OSHA REQUIREME TOUNGE & GROOVE JOINTS MASTIC SEAL SECTION 'A" --"A" PIPE JOINT SCALE. N.T.S. NOTES: CONCRETE PIPE 1. BEDDING SHALL BE REQUIRED IF TRENCH BOTTOM IS BELOW THE GROUNDWATER TABLE. 2. FILL SHALL BE NATIVE MATERIAL FREE OF LARGE ROCKS, DEBRIS OR ORGANICS PLACED IN 6" LIFTS AND COMPACTED TO 95 % OF THE SOIL'S MODIFIED PROCTOR. ERIAL IMPACTED E BEDDING REINFORCED CONCRETE PIPE BEDDING SCALE: N.T S. \\\\\1\1111111"ff, HOARo�" oo�aoo'' , SS/ 0 ; a SEA 0356 E. H/ .. . .... . ... . ... .... z NOTES: O 1. CONSTRUCT THE RAMP SURFACE TO BE STABLE, FIRM, AND SLIP RESISTANT. CONSTRUCT THE CURB RAMP TYPE AS SHOWN IN THE PAVEMENT MARKING # Q PLANS OR AS DIRECTED BY THE ENGINEER, < . 2. LOCATE CURB RAMPS AND PLACE PEDESTRIAN CROSSWALK MARKINGS AS SHOWN IN THE PAVEMENT MARKING PLANS. WHEN FIELD ADJUSTMENTS REQUIRE .'V u F,0 MOVING CURB RAMPS OR MARKINGS AS SHOWN, CONTACT THE SIGNING AND DELINEATION UNIT OR LOCATE AS DIRECTED BY THE ENGINEER. O 00 3. COORDINATE THE CURB RAMP AND THE PEDESTRIAN CROSSWALK MARKINGS SO A 4'x4' CLEAR SPACE AT THE BASE OF THE CURB RAMP WILL FALL H U d<C p CD WITHIN THE PEDESTRIAN CROSSWALK LINES. < s } UJ 4, SET BACK DISTANCE FROM INSIDE CROSSWALK MARKING TO NEAREST EDGE OF TRAVEL LANE I5 4' MINIMUM. o p < u) CC 2 5, REFER TO THE PAVEMENT MARKING PLANS FOR STOP BAR LOCATIONS AT SIGNALIZED INTERSECTIONS. IF A PAVEMENT MARKING PLAN IS NOT PROVIDED, CONTACT THE SIGNAL DESIGN SECTION FOR THE STOP BAR LOCATIONS OR LOCATE AS DIRECTED BY THE ENGINEER. r � QZ 6. TERMINATE PARKING A MINIMUM OF 20' BACK OF A PEDESTRIAN CROSSWALK. 7, CONSTRUCT CURB RAMPS A MINIMUM OF 4' WIDE. _J 8. CONSTRUCT THE RUNNING SLOPE OF THE RAMP 8.33% MAXIMUM. NON L1� 9. ALLOWABLE GROSS SLOPE ON SIDEWALKS AND CURB RAMPS WILL BE 2% MAXIMUM. Q V 10. CONSTRUCT THE SIDE FLARE SLOPE A MAXIMUM OF 10% MEASURED ALONG THE CURB LINE, OCn � 11. CONSTRUCT THE COUNTER SLOPE OF THE GUTTER OR STREET AT THE BASE OF THE CURB RAMP A MAXIMUM OF 5% AND MAINTAIN A � ' : F.. SMOOTH TRANSITION. O N LOL 12. CONSTRUCT LANDINGS FOR SIDEWALK A MINIMUM OF 4'x4' WITH A MAXIMUM SLOPE OF 2% IN ANY DIRECTION. CONSTRUCT LANDINGS FOR CC ON. MEDIAN ISLANDS A MINIMUM OF 5'x5 WITH A MAXIMUM SLOPE OF 20 IN ANY DIRECTION. CC Z � CU 13. TO USE A MEDIAN ISLAND AS A PEDESTRIAN REFUGE AREA, MEDIAN ISLANDS WILL BE A MINIMUM OF 6' WIDE. CONSTRUCT MEDIAN ISLANDS 0 to H ^1 (D TO PROVIDE PASSAGE OVER OR THROUGHT THE ISLAND. Q F- z W 14. SMALL GHANNELIZATION ISLANDS THAT CAN NOT PROVIDE A 5'X5' LANDING AT THE TOP OF A RAMPS, WILL BE GUT THROUGH LEVEL WITH 0 CAz �- THE SURFACE STREET. Cr o < rn �� N 15. CURB RAMPS WITH RETURNED CURBS MAY BE USED ONLY WHERE PEDESTRIANS WOULD NOT NORMALLY WALK ACROSS THE RAMP. THE ADJACENT SURFACE O oIS PLANTING OR OTHER NON -WALKING SURFACE OR THE SIDE APPROACH IS SUBSTANTIALLY OBSTRUCTED. M 16. PLACE A 1,2" EXPANSION JOINT WHERE THE CONCRETE CURB RAMP JOINS THE CURB AS SHOWN IN ROADWAY STANDARD DRAWING 848.01 4 W 17, PLACE ALL PEDESTRIAN PUSH BUTTON ACTUATORS AND CROSSING SIGNALS AS SHOWN IN THE PLANS OR AS SHOWN IN THE MUTCD. O U Y 4CL I 18. CURB RAMPS THROUGH MEDIAN ISLANDS, SINGLE RAMPS AT DUAL CROSSWALKS OR LIMITED R/W SITUATIONS, WILL BE HANDLED BY SPECIAL DETAILS. O 4)1 CONTACT THE CONTRACT STANDARDS AND DEVELOPMENT UNIT FOR THE DETAILS OR FOR A SPECIAL DESIGN. 848.05 NCDOT CURB RAMP DETAIL NOT TO SCALE DESIGNED BY. JEH iYM.: REVISION DESCRIPTION: DATE: DRAWN BY. JLF PER NCDEQ & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH 3 SHEET: 19 J� PER NCDOT COMMENT DATED DECEMBER 27, 2019 01103120 6 CIVIL #4 REBAR @ 12"O.C.E,W Z W Q CL �W FRAME AND GRATE & HOOD PER NCDOT STD. 840.03 EDGE OF PAVEMENT ELEVATION FOR CURB INLETS PAVEMENT 2'-2" r � � M 1 i d � d i z ALL STEPS IN MANHOLES ARE COPOLYMER POLYPROPYLENE PLASTIC, REINFORCED WITH 112" GRADE 60 REINFORCEMENT MANHOLE STEPS @ 16"0.C. IF DEPTH 1S MORE THAN X-0" - 8" SOLID CONCRETE BRICK OR PRECAST CONCRETE BOX STORM DRAIN LINE 3000 PSI CONCRETE FOUNDATION MIN. 6" COMPACTED / #57 STONE BEDDING �- COMPACTED SUBGRADE NOTE: SEE NCDOT STD. #840.01 #840.02 MASONRY OR CONCRETE INLET BOXES. CURB INLET DETAIL NOT TO SCALE GRASS MEDIAN OR CONCRETE ISLAND B A — EXPANSION JOINT F A„ h 101_01,�-B %a" RADIUS 34" RADIUS uj J O� C STD. 840.03 FRAME, GRATE AND HOOD H Q 73-4" RADIUS r/g" RADIUS EXPANSION JOINT > SECTION - AA 10'-0" Z a U) H } � Q „"-•,C~c0U LLJKHz O O (5 S LLJ m Z a U m O H } a)LLJ iF-LLO 00 co `t z H °c � H LLB 0 %g" RADIUS 344" RADIUS o� I�e" RADIUS 13a" RADIUS ~` Z W SECTION - BB 0 m CD rZ -- --- ------- -�r ��Q DEPRESSED GUTTER LINE J a Q co EXPANSION JOINT EXPANSION JOINT p C.± p c.> SEE STANDARD NO. 840.01 OR 840.02 �tipSP� CC cr ELEVATION 5cl gPSs>s o L+- B" p'-p" in 2:. RADsus I~/} cc = 3"RADIUS RADIUS �JG°� °P $ >- � eye uj 9�P�°PPQ 1° �P CG��P51N O< C/) (.f p ccLU d o SECTION - CC ���SG�ioN F m o �PeEP e QNP� SHEET 1 OF 1 1r-6" CURB AND GUTTER 1852.051 3,_1,/2„ C PLAN 3'-1%" CURB TRANSITION FOR CATCH BASIN NOT TO SCALE N X O O O M 0 x U O! Q a v 0 N O N N M T" H Lu 0 BACK OF CURB x y$„ Y v. J s PLAN x SECTION.Y-Y RISER HT. VARIES - o -, - - - M 0 6„ WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES i A WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RI$ER_CONSTRUCTION Y SECTION X-X =ENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66.. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840,00, USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER W-O" TO 16'-0' IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. T E- 4 B 6., ro. C . 6" D e' G' T SECTION J-J WHERE 30" TO 36" PIPE IS USED SEE NOTE L PLAN z 0 aQ z�z� LLJ�104 Lu LL aa�°„zz D: dO�OFOa ciF---U-o"', O CC Q In Q Er z > I- H a Lu O 0 A O z • E ►I . M a � z m Lu o x < = CL D p Q aLo p V O C2= SECTION M-M co W WHERE 42" TO 54" PIPE IS USED Q Oor J pcc f� 1- t A LL �t m PLAN SHEET 1 OF 2 840.02 S_"� s" 17i'2:,r R C h Q � Lu M PLAN OF TOP SLAB SECTION S-S 6' E - #8 `rW" BARS -#4 BAR # A VAC"j4A F N @ EQUAL PES S 6 SECTION R-R DOWEL PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES. TOP , EXPANSION JOINT USE ON FLAT ELEV GRADES 2% AND UNDER jL = —� DEPRESSED GUTTER LINE EXPANSION JOINT � ("^�•.�- ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT 8 TOP USEtONGRADES OVER2%ELEV•==DEPRESSED GUTTER LINE EXPANSIONJOINT0" MAX. ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN(BASED ON MIN. HEIGHT H WITH NO RISER) DIMENSIONS OF BOX. AND PIPE COVER DIMENSION CU.YDS. CONC, IN BOX DEDUCTIONS ONE. PIPE PIPE SPAN WIDTH WIDTH SPAN. MIN. HEIGHT BARS--U BARS-V BARS-W TOTAL LBS, TOP SLAB BOTTOM SLAB TOT, INItiC. dlh26iJii SIGN D A B C. O H E F NO. LENGTH NO. . LENGTH NO.. LENGTH '0.M. R:C, 12" 3'-0" 2'-2" - 2 9" 10.235 0.772 0.015 0,.026 15" 3' 0 2 •2" 3 11 0.235 G.829 0,023 0.036 "', 3' O 2 2" 3 V 0.235. 0:887 0.033 0.049 24" 3' 0 2-2" 3-9" 0.235 1.001 0.059 0.085 3 4 2'-2" 3,-4" 4 3" , 2" 4`-0" 4 ,'-5r` 2 31-91• 3 3 -9 39 0.123 0.321 1.433 0.092 0.127 36" 3' O 2 2" 3'-,0" 4 -9" 7 B' 4'•O" 4 , -1i'" 3 3°-9" 3 3', 9'r 43 0..16 1 0. 358 1.774 0.132 0.178 42" 0 2 •2" 4`-5" 5 -3"' i 5' 3'-2" 4 , -8" 2 2'-11" 3 2 t 32. 0.112 0,37$ 1.738 0.180 -0,243 4 B" 3' 0' 2'-2" 5'-0". 5' 9" 2 0:" 3'-2" 4 2`�-3" 3 2'.-1," 3 21111, 5 4' ,- 3 0 ,- „ 2 2 ,-7 „ 5 7 6'-3:.. „ 2 r ,_ " 3 2 A 2 10 r 5 2 1.-.11„ 3 2 r-11" NCDOT CATCH BASIN DETAIL NOT TO SCALE z ow 5. 43 - _ H NOTE: USE TYPE "E" , "F" AND "G" GRATE M\�� 3� n P z UNLESS OTHERWISE NOTED. i� H �_ g LL J CL 000 III 2/8" 2/g" Q U CC O G'3 r 1� N N ���0J lip" SECTION - LL SECTION -GSM � O r" < C� - z cn cr eD A--��^--- A ALIGN FRAME WITH INSIDE 13/Sr, > EDGE OF WALL TO ALLOWLLJ ~ FOR VERTICAL ADJUSTMENT-7.';I. 1 „ _ ti� i m Gl �-��- WALL SECTION SECTION - BB I T SECTION - PP SECTION - NN PLAN 4„ FRAME , GRATE , & HOOD ASS'Y r w CC d LL O Q 6„ 1. 2, O„ G„ O = m rz-td v K L M __K N N � 1 - 0) �vjcc SECTION - AA W —� z�¢ H ;� L M °' Tz tnt3FRAME PLAN Q n O --�{ secTloN - .�� W 3 If' T-0%8" 5$/g+' n cn R 3„ H 0 O T 1 6„ 2,-0„ 6„ /2„ 1 U- t 6, 6„ 11/ -2r, 3 —_ I /2„ 3/2r, 3,-0„ 3/2" 3/„ U 43 /„ /2 SECTION - KK 2'- 11/2 R-i- SHEET 1 OF 2 NOQD... ELEVA..TION SECTION - RR H4O.03 DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. TYPE "G" .TYPE "E„ TYPE "Fr, WATER FLOW --}- SAG --■•--- WATER FLOW -r-- ---------------------------------- ---------------------- ----------------------------------- -*- WATER FLOW - SAG - WATER FLOW TYRE "F" TYPE "E" TYPE "G" RAISED FLOW ARROW 23_/4' #+ j %grr HIGH V_ O Lj 34 1 /2" 13! ' 2, -11- it4 1�„ 7 11/2 13/4/ 'ISECTION A -A TYPE - F NCDOT FRAME, GRATE AND HOOD DETAIL 0,352 -0.235 0.317 35 0.145 . 2.052. .,80 0:385 0.297 0:40, 4, - 0 2.387 * RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT Wgrr r r;r,r,;.,. z F- < Z . HmC�SV LL CL "m 000'= CC z O {- H tos --o; Occ a Cr q E'" H o- o 1 � p SHEET 2 OF 2 840.02 z O 23� „ 1 %' z cc LLJ�_j0 Hz a R'n in=5"< 0O00Er 11/211 C] r p 13/ rr SECTION B-B 1 /4'r 2/4' z a � cHn 1 �" 'ION A -A TYPE - E LL LL m 0 in z Q RAISED FLOW ARROW 2„ HIGH �—�—....� �, p p3� p � 4 P4 r pro \ CC Lu p r•- z CD o = 1/Bit to� Codz >- 0 A LLJ Lu q p m 'j` 1 /2 t, R /B r, CC tLL o 2'- 1114/4 D- �ii_rr 11/2 r, TYPE G j8n SECTION A -A J03 :Ss of o SEAL - 035670 9� \PLO cV M U cV c zNM aim U 00 � 00 co Z 04 = CL M � cakf-p _Z cc 0) -f-, cz mo d' (b N >C O•�U O 1`� h **4 ,4 W �W NOT TO SCALE Q z_ J O Q cl) U Q cu Z N W —Z) LLI � o CL W � U Y �Z DESIGNED BY: JEH YM.: REVISION DESCRIPTION: DATE: DRAWN BY JLF PER NCDEO & NCDOT COMMENTS DATED NOVEMBER 27, 2019 11128119 APPROVED BY. JEH SHEET: (j%_'�, PER NCDOT COMMENT DATED DECEMBER 27, 2019 01103120 20 (� 71 CIVIL L urnbee River El dfirc D,B. '1000. fc,- 8,, Al fi 901 .B. '1_7 fi"g ("Sli-inve5y r'or Scottie S, Godwir andwiJk,',, S 0 SEA 3 IN till o CC) c1r) CY) c1r) ce) 00 00 C\j I ) C\4 LO 0) (ts Cz 0 •T Q) "Lloohavpn Estates" P�C, 3, Sfide, 3-59, Pg- 00/1 CU m S IWIAA, L E 2 SWIALE 3- 03) C) 0.25 ac,.rcas fg957 D. & < 0.59 acres *4 wire fence wooden fence -65AM-1 %-4 -Z� WALE LE 5.- Know what's below Call before you dig. Dial 811 or call 800- 632-4949 SCALE IN FEET L I 0' 30 60 920 Ym.: REVISION DESCRIPTION: 7 7 0- W L) �e 0 r DESIGNED BY: JEH DATE: DRAWN B Y.- JLF APPROVED BY. JEH SHEET D1 CIVIL