Loading...
HomeMy WebLinkAboutSW3161201_5 - SWM Calculations REV02-13-20_3/2/2020Stormwater Management Calculations for The Conservancy at Waxhaw Creek Phase 2 in Union County, NC Stormwater Permit No. SW3161201 Prepared for: True Homes, LLC November 28, 2016 REVISED 02-13-20 Richard L. Modlin, P.E. Civil Engineer 7215 Terrace Drive, Charlotte, NC 28211 Phone: 980-322-4191 ri chardmodlin& att.net REVISED 02-13-20 Contents Modification to Stormwater Permit Background Information Overview Existing Site & Drainage Characteristics Soils Development Plan for Site Project Data USGS Map BMP Design Overview BMP-1 Calculations and Pond Data BMP-2 Calculations and Pond Data Time of Concentration Worksheets BMP-1 Pre -Development BMP-1 Post -Development BMP-2 Pre -Development BMP-2 Post -Development HydroCAD Reports BMP-1: 1-yr, 10-yr, 25-yr and 50-yr BMP-2 1-yr, 10-yr, 25-yr and 50-yr Outlet Stabilization Modification to Stormwater Permit No. SW3161201 The Conservancy at Waxhaw Creek Phase 2 Union County, NC February 13, 2020 These calculations have been revised to reflect modifications to the two wet -pond designs. Based on as -built field surveys of the two sediment basins, the proposed final basin contours were modified to reduce the amount of earthwork required for conversion of the basins to permanent ponds. Based on the original inflow hydrograph, the modified storage was input for each design, modelled and the outlet controls adjusted accordingly. Background Information Overview The project is located off the north side of Steele Road (SR 1177), approximately 4,400 feet west of its intersection with Lancaster Highway (NC 200) in Union County, NC. The entire property comprises approximately 127.6 acres named The Conservancy at Waxhaw Creek and is being developed for single-family homes in three separate phases. The "Project Site" as noted herein, refers to a 53.85-acre tract, Phase 2 of the development. Phase 1, with some 38 lots, has been developed and adjoins the proposed Phase 2 to the south. The future Phase 3 will develop the remaining area north of Phase 2. Phase 2 will ultimately construct approximately 3,500 feet of roadway to serve approximately 40 new single-family lots. Phase 2 will connect to the existing 800-foot roadway Hawk View Road (constructed in Phase 1) that extends to Steele Road (SR 1177). The property is bounded to both the southwest and the northeast by jurisdictional streams within the conservation area owned by the Catawba Lands Conservancy. A FEMA floodplain lies west of the property. There are no impacts to jurisdictional streams or wetlands for the proposed work depicted in this plans. Existing Site & Drainage Characteristics The existing site is undeveloped and heavily wooded. Existing ground slopes within the project area range from 2 to 15 percent. The site drains generally southeast to northwest. The developed portions of the site will drain to each of two proposed wet detention basins: ■ to the northwest property corner, (Area 1) and ■ to a point roughly 1400 feet southeast of the northwest property corner (Area 2). On -Site BMP Drainage Areas Area 1 is approximately 17.3 acres and drains from a high point elevation 585 to elevation 520 over a hydraulic length of approximately 1,700 linear feet. Area 2 drains from a high point (400 feet off -site) elevation 655 to elevation 542 over a hydraulic length of approximately 1,600 linear feet. The 22.6-acre drainage area includes runoff from two off -site areas: ➢ 3.2 acres from adjacent undeveloped property (Area 4A) ➢ 3.5 acres from Phase 1 of Conservancy at Waxhaw Creek (Area 48) Runoff from both of these areas has been included in the storm drainage design and is accounted for in the post -construction storm water management plan. On -Site Undisturbed Undetained Drainage Areas The 53.85-acre project area includes a significant amount of undisturbed land: ➢ 10.6 acres along the north side of the property (Area 3A) ➢ 9.2 acres along the south side of the property (Area 38) ➢ 0.86 acre at the southeast corner of the property (Area 3C) Runoff from these areas will not be detained. Soils The soils in the project area consist of: ■ Cecil gravelly sandy clay loams of both CeB2 (2 to 8-percent slopes) and CeC2 (8 to 15- percent slopes). Cecil clay loams are well -drained and are classified as Hydrologic Soil Group B. These soils comprise roughly 96 percent of the disturbed area. ■ Helena fine sandy loam (HeB, 2 to 8 percent slopes). Helena sandy loams are moderately well -drained and are classified as Hydrologic Soil Group D. These soils comprise less than one percent of the disturbed area. ■ Tarrus gravelly silt loam TaD, 15 to 35 percent slopes) Tarrus silt loams are well -drained and are classified as Hydrologic Soil Group B. These soils comprise less than one percent of the disturbed area. These soils comprise roughly 3 percent of the disturbed area. Project Data Project Name: Owner/Developer Parcel ID: Project Location: County: Proposed Development: Scope of Work: Denuded Area: River Basin: Soils: The Conservancy at Waxhaw Creek Phase 2 True Homes 05099004A north side of Steele Road (SR 1177), approximately 4400 feet west of its intersection with Lancaster Highway (NC 200) in Union County Latitude 34.859066 Longitude-80.726398 Union Construction of 36 single-family lots Roadway, drainage, home construction 25.1 Ac Catawba TaD, HeB, CeB2, CeC2 BMP Design Based on the Site Specific Water Quality Management Plan for the Goose Creek Watershed (NC 15A NCAC 2B .0600-.0609) the project is required to control and treat the difference in the stormwater runoff from the predevelopment and post -development conditions for the one-year, 24-hour storm. Surface Area SA/DA Charts for the Mountains and Piedmont Region (10-2 and 10-3) were used for determination of the minimum permanent pool surface areas. Average depth used was 3 feet. Impervious area for the total 53.85-acre project is 8.01 percent. Minimum Treatment Volume - based on the Simplified Method using assumed 10-percent impervious area. Runoff Calculations Pre and Post -Development peak runoff values were determined based on the time of concentration Rainfall data for the Waxhaw area were downloaded from NOAA website: Atlas 14, Volume 2, Version 3, "Pont Precipitation Frequency Estimates." Runoff coefficients were determined for each of the two drainage areas. Assumed buildout of off -site areas were included in the composite runoff coefficient calculation. Time of concentration for each of the two drainage areas was determined based on hydraulic path and land use characteristics. Routing calculations were performed using HydroCAD software utilizing the Rational Method. Outlet Structure Outlet structure will be a 5-foot concrete riser that will house the water quality orifice, weirs, drawdown drain/valve and outflow barrel. Drawdown Maintenance for each of the wet -ponds will be facilitated by 8-inch ductile iron pipe drawdown drain and handwheel -operated valve located in the riser structure. CNRRL0T7F 71 AI7- Scale 1:250,000 i 0 5 10 15 2C Statute Miles 5 0 5 10 15 20 25 30 Kilometers 5 0 5 10 Nautical Miles CONTOUR INTERVAL 100 FEET WITH SUPPLEMENTARY CONTOURS AT 50 FOOT INTERVALS TRANSVERSE MERCATOR PROJECTION BLACK NUMBERED LINES INDICATE THE 10,000 METER UNIVERSAL TRANSVERSE MERCATOR GRID, ZONE 17 ]Re5 MAGNETIC DECLINATION FROM TRUE NORTH VARIES FROM ]- (20 MILS) WESTERLY FOR THE CENTER OF THE WEST EDGE TO 21hs (40 MILS) WESTERLY FOR THE CENTER OF THE EAST EDGE FOR SALE BY U. S. GEOLOGICAL SURVEY DENVER, COLORADO 80225, OR RESTON. VIRGINIA 22092 LOCATION DIAGRAM USGS Map CMO —E OESIGNAl10X: 10 C A.0AR0 BEF 'B. I1-1 ON 17S THIS TO NLAAEST I.00B M[TErs SAMPLE POINT. ALACKSTDCK 1W.Mx R SQYAAC rDENi PICATION trim fOp.DM me! 1. eQuan inr�nMnANel�poin! ties_ � Ml I. L.m A,et YEATCAL Od E- Lu LEEI N MJ Nl 380 ph, . N r R LARGE 10— I.h 1, V.. nee.Nnr m Ih. I.P,r xhnpm InErpn, a. p. Ne xNNIRH, rN h.e EAlmeh 1-1— Li N pmnl� 3. Luele HEN x0RlzoNTAl rFY line BELOW pant en1 rnE LANE NMa L.helln. Ihe r 6 MH NH nn aN ar NMI me.tl1..w leell. E XORE IIe SMALLER W an rrm ,N ler ANAnA neei All" ONLY Ixe sLmale 4nIAp 1r "W IOB LA Me lu LAAC[P tluren a y,i. n .1; S -KP A[rrrrNCE M1M2A a m.: 37TODAN 11 repwlinE xeroe! Ir ,n .nr • he 1 p,xr. rie mne oewneltw. n- risM.leezL SPARTANBURG, S.C.; N.C. 1953 /r 3 REVISED 1969 y REVISED 02-13-20 BMP-1 Runoff Coefficient Rational Method Description Area Runoff c x A coeff, c On -site undist area 1 106,436 sf 2.443 ac Total undisturbed areas 2.443 ac 0.15 0.37 Impervious areas Roadway 0.750 ac 0.95 0.71 Buildings & driveways 1.520 ac 0.98 1.49 Pond area 30,624 sf 0.703 ac 0.27 0.19 Lawns (heavy soils) 11.844 ac 0.27 3.20 Total acreage 17.260 ac Subtotal = 5.96 Composite c = 0.35 TOTAL ON -SITE IMPERVIOUS AREA = 98,881 sf TOTAL IMPERVIOUS AREA = 98,881 sf BMP-1 Peak Runoff Rate - Pre-Dev Q=cxIxA c = 0.15 Tc = 49.00 m i n i = 1.66 in/hr (1-year, 24-hr storm for Waxhaw) A = 17.26 ac Q = 4.30 cfs (for 1-year, 24-hr storm) BMP-1 Peak Runoff Rate - Post-Dev Q=cxIxA c = 0.35 Tc = 19.00 min i = 2.96 in/hr (1-year, 24-hr storm for Waxhaw) A = 17.26 ac Q = 17.63 cfs (for 1-year, 24-hr storm) REVISED 02-13-20 BMP-1 Runoff Volume (Simple Method) Drainage area 17.26 ac Post Development I = 10.00% (assumed) Runoff coefficient, Rv Rv = 0.05+0.009(I) = 0.140 ac-ft Ro = 2.95 in Vol = 3630 x Ro x Rv x A = 25,876 cf Pre -Development I = 0.00% Rv = 0.05+0.009(I) = 0.05 ac-ft Ro = 2.95 in Vol = 3630 x Ro x Rv x A = 9,241 cf Volume to control 16,635 cf Drainage area = 17.26 ac From Table 10-3 , SA/DA = 0.009 for average depth of 3.Oft and 10016 impervious cover Min. perm pool surface area = 17.26 x 43,560 x 0.0059 = 6,767 sf Actual perm pool surface area = 16,158 sf Average depth calculation Area (sf) Elevation Area bot shelf = 14,518 521.50 Area perm pool = 16,158 522.00 Area bot pond = 9,002 518.00 Depth = 4.0 Average depth = 3.71 ft (Equation 3) 11,123 12,198 7,463 3395 3960 1539 14,518 16,158 9,002 REVISED 02-13-20 B M P-2 Runoff Coefficient/Curve Number Rational Method Description Area Runoff c x A coeff, c Off -site Off -site undev area 144,060 sf F 3.31 ac 0.47 * 1.55 *assume fully developed: 2591 impervious, remaining area lawn Impervious area = 0.83 ac Phase 1 area draining to site 3.54 ac Impervious area 566 LF rdwy x 9' = 5,094 sf 3 lots @ 4177 sf ea = 12,531 sf 17,625 sf 0.40 ac 0.98 0.40 Remaining pervious area 3.14 ac Assume 30% undisturbed wooded 0.94 ac F 0.94 ac 0.15 0.14 70% lawns 2.20 ac F 2.20 ac 0.20 0.44 On -Site On -site undist area 1 146,053 sf 3.35 ac On -site undist area 2 34,494 sf 0.79 ac Total on -site undisturbed areas 4.14 ac 0.15 0.62 Impervious area (on -site) 2.04 ac Roadway 0.74 ac 0.98 0.73 Homes & driveways 1.30 ac 0.98 1.27 Pond area 30,624 sf 0.70 ac 0.20 0.14 Lawns (heavy soils) 8.84 ac 60% 5-7 percent slopes 5.31 ac 0.30 1.59 40% 2-5 percent slopes 3.54 ac 0.20 0.71 Total acreage 22.58 ac Subtotal = 7.59 Composite c = 0.34 TOTAL ON -SITE IMPERVIOUS AREA = 88,862 sf TOTAL IMPERVIOUS AREA = 142,533 sf REVISED 02-13-20 BMP-2 Peak Runoff Rate - Pre-Dev Q=cxIxA c = 0.15 Tc = 35.00 min I = 2.09 in/hr (1-year, 24-hr storm for Waxhaw) A = 22.58 ac Q = 7.08 cfs BMP-2 Peak Runoff Rate - Post-Dev Q=cxIxA c = 0.34 Tc = 22.00 min I = 2.74 in/hr (1-year, 24-hr storm for Waxhaw) A = 22.58 ac Q = 21.04 cfs BMP-2 Runoff Volume (Simple Method) Drainage area (on -site only) 15.73 Drainage area (total) 22.58 ac Impervious area (on -site) 2.04 ac Impervious area (total) 3.11 ac Post Development 1= Runoff coefficient, Rv 10.00% (assumed) Rv = 0.05+0.009(I) = 0.140 ac-ft Ro = 2.95 in Vol = 3630 x Ro x Rv x A = 33,852 cf Pre -Development I = 0.00% Rv = 0.05+0.009(I) = 0.05 ac-ft Ro = 2.95 in Vol = 3630 x Ro x Rv x A = 12,090 cf Volume to control 21,762 cf REVISED 02-13-20 Drainage area (on -site) = 15.73 ac Off -site drainage area = 6.85 ac Total drainage area = 22.58 ac From Table 10-1, SA/DA = 0.0059 for average depth of 3.0 ft and 10% impervious cover Min. perm pool surface area = 22.58 x 43,560 x 0.0059 = 5,803 sf Actual perm pool surface area = 9,228 sf Average depth calculation Area (sf) Elevation Area bot shelf = 7,903 547.00 Area perm pool = 9,228 546.50 Area bot pond = 3,378 542.00 Depth = 5.0 ft Average depth = 4.03 ft (Equation 3) PROJECT: Conservancy at Waxhaw Creek Phase 2 BY PROJECT. NO.: 16079 DATE: 09/09/16 TIME OF CONCENTRATION: BMP-1 (PRE -DEVELOPMENT) SHEET FLOW Surface Description = unpaved Manning's Roughness (n) = 0.40 Flow Length (ft) = 300 585.0 P2 (in.) = 3.56 575.8 Slope (%) = 3.06 9.2 T(t) (min.) = 41.36 SHALLOW CONCENTRATED FLOW Surface Description unpaved Flow Length (ft) = 357 575.8 Water Course Slope (ft/ft) = 0.027 566.1 Average Velocity (fps) = 2.66 9.7 T(t) (min.) = 2.24 SHALLOW CONCENTRATED FLOW Surface Description unpaved Flow Length (ft) = 1055 566.1 Water Course Slope (ft/ft) = 0.044 519.4 Average Velocity (fps) = 3.40 46.8 T(t) (min.) = 5.17 SUM OF TRAVEL TIMES = 48.8 minutes USE TIME OF CONCENTRATION OF 49.0 minutes 0.817 hours Flow Length 1,712 Fall 65.7 RLM 0.0306 0.0271 0.0444 PROJECT: Conservancy at Waxhaw Creek Phase 2 BY: RLM PROJECT. NO.: 16079 DATE: 09/09/16 TIME OF CONCENTRATION: BMP-1 (POST DEVELOPMENT) SHEET FLOW Surface Description = unpaved Manning's Roughness (n) = 0.40 Flow Length (ft) = 100 585.0 P2 (in.) = 3.56 580.5 0.0454 Slope (%) = 4.54 4.5 T(t) (min.) = 14.67 SHALLOW CONCENTRATED FLOW Surface Description unpaved Flow Length (ft) = 354 580.5 Water Course Slope (ft/ft) = 0.06 558.8 0.0612 Average Velocity (fps) = 3.99 21.7 T(t) (min.) = 1.48 PIPE FLOW: Pipe Size (in.) = 18 558.8 Pipe Area (sq.ft.) = 1.77 555.5 Hydraulic Radius = 0.375 3.3 Pipe Slope (%) = 6.9 Manning's Coefficient (n) = 0.012 Velocity (fps) = 16.93 Flow Length (ft) = 48 T(t) (min.) = 0.05 PIPE FLOW: Pipe Size (in.) = 18 555.5 Pipe Area (sq.ft.) = 1.77 554.0 Hydraulic Radius = 0.375 1.5 Pipe Slope (%) = 0.8 Manning's Coefficient (n) = 0.012 Velocity (fps) = 5.71 Flow Length (ft) = 192 T(t) (min.) = 0.56 SHALLOW CONCENTRATED FLOW Surface Description unpaved Flow Length (ft) = 226 554.0 Water Course Slope (ft/ft) = 0.052 542.2 0.0522 Average Velocity (fps) = 3.69 11.8 T(t) (min.) = 1.02 CHANNEL FLOW: Channel Area (sf) = 4.00 Hydraulic Radius = 0.618 Channel Slope (%) = 5.143 Manning's Coefficient (n) = 0.03 Velocity (fps) = 8.17 Flow Length (ft) = 140 T(t) (min.) = 0.29 PIPE FLOW: Pipe Size (in.) = 30 Pipe Area (sq.ft.) = 4.91 Hydraulic Radius = 0.625 Pipe Slope (%) = 5.2 Manning's Coefficient (n) = 0.012 Velocity (fps) = 20.62 Flow Length (ft) = 184 T(t) (min.) = 0.15 PIPE FLOW: Pipe Size (in.) = 30 Pipe Area (sq.ft.) = 4.91 Hydraulic Radius = 0.63 Pipe Slope (%) = 0.5 Manning's Coefficient (n) = 0.012 Velocity (fps) = 6.60 Flow Length (ft) = 42 T(t) (min.) = 0.11 PIPE FLOW: Pipe Size (in.) = 30 Pipe Area (sq.ft.) = 4.91 Hydraulic Radius = 0.63 Pipe Slope (%) = 0.8 Manning's Coefficient (n) = 0.012 Velocity (fps) = 8.01 Flow Length (ft) = 166 T(t) (min.) = 0.35 Bottom Width (ft) = 2 542.2 Side Slope (ft) = 2 535.0 Depth (ft) = 1 7.2 SUM OF TRAVEL TIMES = 18.66 minutes USE TIME OF CONCENTRATION OF 19.0 minutes 1452 ft 535.0 525.5 9.5 525.5 525.3 0.2 525.3 524.0 1.3 PROJECT: Conservancy at Waxhaw Creek Phase 2 BY: RLM PROJECT. NO.: 16079 DATE: 09/09/16 TIME OF CONCENTRATION: BMP-2 (PRE -DEVELOPMENT) SHEET FLOW Surface Description = unpaved Manning's Roughness (n) = 0.40 Flow Length (ft) = 300 655.0 P2 (in.) = 3.56 633.8 0.0706667 Slope (%) = 7.07 21.2 T(t) (min.) = 29.6 SHALLOW CONCENTRATED FLOW Surface Description unpaved Flow Length (ft) = 545 633.8 Water Course Slope (ft/ft) = 0.066 598.0 0.0656881 Average Velocity (fps) = 4.14 35.8 T(t) (min.) = 2.2 CHANNEL FLOW: Channel Area (sf) = 2.63 Bottom Width (ft) = 0 598.00 Hydraulic Radius = 0.249 Side Slope (ft) = 10.5 566.04 Channel Slope (%) = 12.533 Depth (ft) = 0.5 Manning's Coefficient (n) = 0.035 Velocity (fps) = 5.96 Flow Length (ft) = 255 T(t) (min.) = 0.7 CHANNEL FLOW Channel Area (sf) = 8.25 Bottom Width (ft) = 10 566.0 Hydraulic Radius = 0.358 Side Slope (ft) = 13 552.0 Channel Slope (%) = 4.961 Depth (ft) = 0.5 Manning's Coefficient (n) = 0.035 Velocity (fps) = 4.78 Flow Length (ft) = 284 T(t) (min.) = 1.0 SHALLOW CONCENTRATED FLOW: Surface Description unpaved Flow Length (ft) = 210 552.0 Water Course Slope (ft/ft) = 0.049 541.7 0.0488095 Average Velocity (fps) = 3.56 10.3 T(t) (min.) = 1.0 SUM OF TRAVEL TIMES = 34.5 minutes USE TIME OF CONCENTRATION OF 35.0 minutes 15.7 39.4 PROJECT: Conservancy at Waxhaw Creek Phase 2 BY: RLM PROJECT. NO.: 16079 DATE: 09/09/16 TIME OF CONCENTRATION: BMP-2 (POST DEVELOPED) SHEET FLOW Surface Description = Manning's Roughness (n) _ Flow Length (ft) _ P2 (in.) _ Slope (%) _ T(t) (min.) _ SHALLOW CONCENTRATED FLOW: Surface Description Flow Length (ft) = Water Course Slope (ft/ft) _ Average Velocity (fps) _ T(t) (min.) = CHANNEL FLOW: Channel Area (sf) _ Hydraulic Radius = Channel Slope (%) _ Manning's Coefficient (n) _ Velocity (fps) = Flow Length (ft) _ T(t) (min.) = PIPE FLOW: Pipe Size (in.) _ Pipe Area (sq.ft.) = Hydraulic Radius = Pipe Slope (%) = Manning's Coefficient (n) _ Velocity (fps) = Flow Length (ft) _ T(t) (min.) = CHANNEL FLOW: Channel Area (sf) _ Hydraulic Radius = Channel Slope (%) _ Manning's Coefficient (n) _ Velocity (fps) = Flow Length (ft) _ T(t) (min.) = unpaved 0.400 100 3.56 2.79 17.8 unpaved 305 0.08 4.64 1.1 2.00 0.447 6.143 0.03 7.20 477 1.1 24 3.14 0.5 1.0 0.012 7.82 80 0.2 3.00 0.474 5.889 0.03 7.33 569 1.3 ASSUMED FULL DEV 655.0 652.2 2.8 652.2 627.0 25.2 Bottom Width (ft) _ Side Slope (ft) _ Depth (ft) = Bottom Width (ft) _ Side Slope (ft) _ Depth (ft) = 0 2 1 0 3 1 0.0279 0.0827 627.0 597.7 597.7 596.7 1.0 596.7 563.2 PIPE FLOW: Pipe Size (in.) _ Pipe Area (sq.ft.) _ Hydraulic Radius = Pipe Slope (%) _ Manning's Coefficient (n) _ Velocity (fps) _ Flow Length (ft) _ T(t) (min.) _ SHALLOW CONCENTRATED FLOW: Surface Description Flow Length (ft) _ Water Course Slope (ft/ft) _ Average Velocity (fps) _ T(t) (min.) _ SUM OF TRAVEL TIMES = 36 563.2 7.07 559.72 0.75 3.5 3.5 0.012 19.09 88 0.1 unpaved 90 559.7 0.019 558.0 0.0191 2.23 1.7 0.7 22.2 minutes USE TIME OF CONCENTRATION OF 22.0 minutes 1709 ft REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 1-yr Duration=19 min, Inten=2.96 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 1 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 17.260 ac, 13.15% Impervious, Inflow Depth = 0.33" for 1-yr event Inflow = 18.06 cfs @ 0.31 hrs, Volume= 0.472 of Outflow = 0.11 cfs @ 0.63 hrs, Volume= 0.472 af, Atten= 99%, Lag= 19.0 min Primary = 0.11 cfs @ 0.63 hrs, Volume= 0.472 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 522.00' Surf.Area= 14,523 sf Storage= 47,497 cf Peak Elev= 523.18' @ 0.63 hrs Surf.Area= 19,378 sf Storage= 67,896 cf (20,399 cf above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,973.0 min ( 1,991.8 - 18.8 ) Volume Invert #1 518.00' Avail. e Description 106,826 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 518.00 9,002 0 0 520.00 11,986 20,988 20,988 522.00 14,523 26,509 47,497 523.00 18,897 16,710 64,207 524.00 21,531 20,214 84,421 525.00 23,278 22,405 106,826 Device Routing Invert Outlet Devices #1 Primary 520.00' 18.0" Round Culvert L= 40.0' Ke= 0.500 Inlet / Outlet Invert= 520.00' / 519.75' S= 0.0063 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 522.00' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 524.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 523.90' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 523.40' 12.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 1-yr Duration=19 min, Inten=2.96 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 2 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=0.11 cfs @ 0.63 hrs HW=523.18' (Free Discharge) L1=Culvert (Passes 0.11 cfs of 13.27 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.11 cfs @ 5.24 fps) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=522.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 1-yr Duration=19 min, Inten=2.96 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 3 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 47,497 522.00 0.00 0.00 0.00 5.00 0.00 66,133 523.10 0.11 0.11 0.00 10.00 0.00 64,199 523.00 0.11 0.11 0.00 15.00 0.00 62,362 522.89 0.10 0.10 0.00 20.00 0.00 60,632 522.79 0.09 0.09 0.00 25.00 0.00 59,010 522.69 0.09 0.09 0.00 30.00 0.00 57,494 522.60 0.08 0.08 0.00 35.00 0.00 56,085 522.51 0.08 0.08 0.00 40.00 0.00 54,784 522.44 0.07 0.07 0.00 45.00 0.00 53,590 522.36 0.06 0.06 0.00 50.00 0.00 52,502 522.30 0.06 0.06 0.00 55.00 0.00 51,522 522.24 0.05 0.05 0.00 60.00 0.00 50,649 522.19 0.05 0.05 0.00 65.00 0.00 49,885 522.14 0.04 0.04 0.00 70.00 0.00 49,229 522.10 0.03 0.03 0.00 75.00 0.00 48,688 522.07 0.03 0.03 0.00 80.00 0.00 48,262 522.05 0.02 0.02 0.00 85.00 0.00 47,984 522.03 0.01 0.01 0.00 90.00 0.00 47,807 522.02 0.01 0.01 0.00 95.00 0.00 47,694 522.01 0.00 0.00 0.00 100.00 0.00 47,622 522.01 0.00 0.00 0.00 105.00 0.00 47,577 522.00 0.00 0.00 0.00 110.00 0.00 47,548 522.00 0.00 0.00 0.00 115.00 0.00 47,529 522.00 0.00 0.00 0.00 120.00 0.00 47,518 522.00 0.00 0.00 0.00 125.00 0.00 47,510 522.00 0.00 0.00 0.00 130.00 0.00 47,505 522.00 0.00 0.00 0.00 135.00 0.00 47,502 522.00 0.00 0.00 0.00 140.00 0.00 47,500 522.00 0.00 0.00 0.00 145.00 0.00 47,499 522.00 0.00 0.00 0.00 150.00 0.00 47,498 522.00 0.00 0.00 0.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 10-yr Duration=19 min, Inten=4.62 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 4 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 17.260 ac, 13.15% Impervious, Inflow Depth = 0.51" for 10-yr event Inflow = 28.20 cfs @ 0.31 hrs, Volume= 0.737 of Outflow = 4.42 cfs @ 0.58 hrs, Volume= 0.737 af, Atten= 84%, Lag= 15.9 min Primary = 4.42 cfs @ 0.58 hrs, Volume= 0.737 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 522.00' Surf.Area= 14,523 sf Storage= 47,497 cf Peak Elev= 523.66' @ 0.58 hrs Surf.Area= 20,633 sf Storage= 77,526 cf (30,029 cf above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,785.2 min ( 1,804.0 - 18.8 ) Volume Invert #1 518.00' Avail. e Description 106,826 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 518.00 9,002 0 0 520.00 11,986 20,988 20,988 522.00 14,523 26,509 47,497 523.00 18,897 16,710 64,207 524.00 21,531 20,214 84,421 525.00 23,278 22,405 106,826 Device Routing Invert Outlet Devices #1 Primary 520.00' 18.0" Round Culvert L= 40.0' Ke= 0.500 Inlet / Outlet Invert= 520.00' / 519.75' S= 0.0063 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 522.00' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 524.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 523.90' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 523.40' 12.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 10-yr Duration=19 min, Inten=4.62 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 5 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=4.40 cfs @ 0.58 hrs HW=523.66' (Free Discharge) L1=Culvert (Passes 4.40 cfs of 14.51 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.20 fps) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir (Weir Controls 4.26 cfs @ 1.37 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=522.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 10-yr Duration=19 min, Inten=4.62 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 6 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 47,497 522.00 0.00 0.00 0.00 5.00 0.00 71,123 523.34 0.12 0.12 0.00 10.00 0.00 68,977 523.24 0.12 0.12 0.00 15.00 0.00 66,919 523.13 0.11 0.11 0.00 20.00 0.00 64,950 523.04 0.11 0.11 0.00 25.00 0.00 63,073 522.93 0.10 0.10 0.00 30.00 0.00 61,301 522.83 0.10 0.10 0.00 35.00 0.00 59,636 522.73 0.09 0.09 0.00 40.00 0.00 58,078 522.63 0.08 0.08 0.00 45.00 0.00 56,627 522.55 0.08 0.08 0.00 50.00 0.00 55,284 522.47 0.07 0.07 0.00 55.00 0.00 54,047 522.39 0.07 0.07 0.00 60.00 0.00 52,918 522.32 0.06 0.06 0.00 65.00 0.00 51,895 522.26 0.05 0.05 0.00 70.00 0.00 50,981 522.21 0.05 0.05 0.00 75.00 0.00 50,173 522.16 0.04 0.04 0.00 80.00 0.00 49,473 522.12 0.04 0.04 0.00 85.00 0.00 48,889 522.08 0.03 0.03 0.00 90.00 0.00 48,410 522.05 0.02 0.02 0.00 95.00 0.00 48,078 522.03 0.01 0.01 0.00 100.00 0.00 47,867 522.02 0.01 0.01 0.00 105.00 0.00 47,733 522.01 0.01 0.01 0.00 110.00 0.00 47,647 522.01 0.00 0.00 0.00 115.00 0.00 47,592 522.01 0.00 0.00 0.00 120.00 0.00 47,558 522.00 0.00 0.00 0.00 125.00 0.00 47,536 522.00 0.00 0.00 0.00 130.00 0.00 47,522 522.00 0.00 0.00 0.00 135.00 0.00 47,513 522.00 0.00 0.00 0.00 140.00 0.00 47,507 522.00 0.00 0.00 0.00 145.00 0.00 47,503 522.00 0.00 0.00 0.00 150.00 0.00 47,501 522.00 0.00 0.00 0.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 25-yr Duration=19 min, Inten=5.13 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 7 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 17.260 ac, 13.15% Impervious, Inflow Depth = 0.57" for 25-yr event Inflow = 31.31 cfs @ 0.31 hrs, Volume= 0.818 of Outflow = 7.03 cfs @ 0.56 hrs, Volume= 0.818 af, Atten= 78%, Lag= 14.7 min Primary = 7.03 cfs @ 0.56 hrs, Volume= 0.818 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 522.00' Surf.Area= 14,523 sf Storage= 47,497 cf Peak Elev= 523.75' @ 0.56 hrs Surf.Area= 20,884 sf Storage= 79,458 cf (31,961 cf above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,614.0 min ( 1,632.8 - 18.8 ) Volume Invert #1 518.00' Avail. e Description 106,826 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 518.00 9,002 0 0 520.00 11,986 20,988 20,988 522.00 14,523 26,509 47,497 523.00 18,897 16,710 64,207 524.00 21,531 20,214 84,421 525.00 23,278 22,405 106,826 Device Routing Invert Outlet Devices #1 Primary 520.00' 18.0" Round Culvert L= 40.0' Ke= 0.500 Inlet / Outlet Invert= 520.00' / 519.75' S= 0.0063 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 522.00' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 524.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 523.90' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 523.40' 12.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 25-yr Duration=19 min, Inten=5.13 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 8 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=7.00 cfs @ 0.56 hrs HW=523.75' (Free Discharge) L1=Culvert (Passes 7.00 cfs of 14.75 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.38 fps) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir (Weir Controls 6.87 cfs @ 1.61 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=522.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 25-yr Duration=19 min, Inten=5.13 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 9 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 47,497 522.00 0.00 0.00 0.00 5.00 0.00 71,161 523.34 0.12 0.12 0.00 10.00 0.00 69,013 523.24 0.12 0.12 0.00 15.00 0.00 66,954 523.14 0.11 0.11 0.00 20.00 0.00 64,983 523.04 0.11 0.11 0.00 25.00 0.00 63,104 522.93 0.10 0.10 0.00 30.00 0.00 61,330 522.83 0.10 0.10 0.00 35.00 0.00 59,664 522.73 0.09 0.09 0.00 40.00 0.00 58,104 522.63 0.08 0.08 0.00 45.00 0.00 56,652 522.55 0.08 0.08 0.00 50.00 0.00 55,306 522.47 0.07 0.07 0.00 55.00 0.00 54,068 522.39 0.07 0.07 0.00 60.00 0.00 52,936 522.33 0.06 0.06 0.00 65.00 0.00 51,912 522.26 0.05 0.05 0.00 70.00 0.00 50,995 522.21 0.05 0.05 0.00 75.00 0.00 50,186 522.16 0.04 0.04 0.00 80.00 0.00 49,484 522.12 0.04 0.04 0.00 85.00 0.00 48,898 522.08 0.03 0.03 0.00 90.00 0.00 48,418 522.06 0.02 0.02 0.00 95.00 0.00 48,083 522.04 0.01 0.01 0.00 100.00 0.00 47,870 522.02 0.01 0.01 0.00 105.00 0.00 47,734 522.01 0.01 0.01 0.00 110.00 0.00 47,648 522.01 0.00 0.00 0.00 115.00 0.00 47,593 522.01 0.00 0.00 0.00 120.00 0.00 47,558 522.00 0.00 0.00 0.00 125.00 0.00 47,536 522.00 0.00 0.00 0.00 130.00 0.00 47,522 522.00 0.00 0.00 0.00 135.00 0.00 47,513 522.00 0.00 0.00 0.00 140.00 0.00 47,507 522.00 0.00 0.00 0.00 145.00 0.00 47,503 522.00 0.00 0.00 0.00 150.00 0.00 47,501 522.00 0.00 0.00 0.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 50-yr Duration=19 min, Inten=5.51 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 10 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 17.260 ac, 13.15% Impervious, Inflow Depth = 0.61" for 50-yr event Inflow = 33.62 cfs @ 0.31 hrs, Volume= 0.879 of Outflow = 9.01 cfs @ 0.54 hrs, Volume= 0.879 af, Atten= 73%, Lag= 13.9 min Primary = 9.01 cfs @ 0.54 hrs, Volume= 0.879 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 522.00' Surf.Area= 14,523 sf Storage= 47,497 cf Peak Elev= 523.82' @ 0.54 hrs Surf.Area= 21,054 sf Storage= 80,758 cf (33,261 cf above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,505.9 min ( 1,524.7 - 18.8 ) Volume Invert #1 518.00' Avail. e Description 106,826 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 518.00 9,002 0 0 520.00 11,986 20,988 20,988 522.00 14,523 26,509 47,497 523.00 18,897 16,710 64,207 524.00 21,531 20,214 84,421 525.00 23,278 22,405 106,826 Device Routing Invert Outlet Devices #1 Primary 520.00' 18.0" Round Culvert L= 40.0' Ke= 0.500 Inlet / Outlet Invert= 520.00' / 519.75' S= 0.0063 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 522.00' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 524.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 523.90' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 523.40' 12.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 50-yr Duration=19 min, Inten=5.51 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 11 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=8.99 cfs @ 0.54 hrs HW=523.82' (Free Discharge) L1=Culvert (Passes 8.99 cfs of 14.91 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.49 fps) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir (Weir Controls 8.85 cfs @ 1.76 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=522.00' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 MOD Conservancy Ph 2 BMP-1 REV Waxhaw 50-yr Duration=19 min, Inten=5.51 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 12 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 47,497 522.00 0.00 0.00 0.00 5.00 0.00 71,178 523.34 0.12 0.12 0.00 10.00 0.00 69,030 523.24 0.12 0.12 0.00 15.00 0.00 66,970 523.14 0.11 0.11 0.00 20.00 0.00 64,998 523.04 0.11 0.11 0.00 25.00 0.00 63,118 522.93 0.10 0.10 0.00 30.00 0.00 61,344 522.83 0.10 0.10 0.00 35.00 0.00 59,676 522.73 0.09 0.09 0.00 40.00 0.00 58,116 522.64 0.08 0.08 0.00 45.00 0.00 56,663 522.55 0.08 0.08 0.00 50.00 0.00 55,316 522.47 0.07 0.07 0.00 55.00 0.00 54,077 522.39 0.07 0.07 0.00 60.00 0.00 52,945 522.33 0.06 0.06 0.00 65.00 0.00 51,920 522.26 0.05 0.05 0.00 70.00 0.00 51,002 522.21 0.05 0.05 0.00 75.00 0.00 50,192 522.16 0.04 0.04 0.00 80.00 0.00 49,489 522.12 0.04 0.04 0.00 85.00 0.00 48,902 522.08 0.03 0.03 0.00 90.00 0.00 48,421 522.06 0.02 0.02 0.00 95.00 0.00 48,085 522.04 0.01 0.01 0.00 100.00 0.00 47,871 522.02 0.01 0.01 0.00 105.00 0.00 47,735 522.01 0.01 0.01 0.00 110.00 0.00 47,649 522.01 0.00 0.00 0.00 115.00 0.00 47,594 522.01 0.00 0.00 0.00 120.00 0.00 47,558 522.00 0.00 0.00 0.00 125.00 0.00 47,536 522.00 0.00 0.00 0.00 130.00 0.00 47,522 522.00 0.00 0.00 0.00 135.00 0.00 47,513 522.00 0.00 0.00 0.00 140.00 0.00 47,507 522.00 0.00 0.00 0.00 145.00 0.00 47,503 522.00 0.00 0.00 0.00 150.00 0.00 47,501 522.00 0.00 0.00 0.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 1-yr Duration=22 min, Inten=2.74 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 1 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 22.580 ac, 11.73% Impervious, Inflow Depth = 0.34" for 1-yr event Inflow = 21.03 cfs @ 0.37 hrs, Volume= 0.642 of Outflow = 0.16 cfs @ 0.73 hrs, Volume= 0.642 af, Atten= 99%, Lag= 21.9 min Primary = 0.16 cfs @ 0.73 hrs, Volume= 0.642 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 546.50' Surf.Area= 9,135 sf Storage= 27,109 cf Peak Elev= 548.84' @ 0.73 hrs Surf.Area= 14,311 sf Storage= 54,809 cf (27,700 cf above start) Plug -Flow detention time= 4,864.0 min calculated for 0.020 of (3% of inflow) Center -of -Mass det. time= 1,838.8 min ( 1,860.8 - 22.0 ) Volume Invert #1 542.00' Avail. e Description 88,785 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 542.00 3,378 0 0 546.00 7,893 22,542 22,542 547.00 10,376 9,135 31,677 548.00 12,770 11,573 43,250 549.00 14,594 13,682 56,932 550.00 15,834 15,214 72,146 551.00 17,445 16,640 88,785 Device Routing Invert Outlet Devices #1 Primary 542.00' 18.0" Round Culvert L= 48.0' Ke= 0.500 Inlet / Outlet Invert= 542.00' / 541.00' S= 0.0208 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 546.50' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 550.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 549.20' 8.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 549.70' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 1-yr Duration=22 min, Inten=2.74 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 2 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=0.16 cfs @ 0.73 hrs HW=548.84' (Free Discharge) L1=Culvert (Passes 0.16 cfs of 21.01 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 7.37 fps) 4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=546.50' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 1-yr Duration=22 min, Inten=2.74 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 3 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 27,109 546.50 0.00 0.00 0.00 5.00 0.00 52,387 548.67 0.15 0.15 0.00 10.00 0.00 49,668 548.47 0.15 0.15 0.00 15.00 0.00 47,080 548.28 0.14 0.14 0.00 20.00 0.00 44,623 548.10 0.13 0.13 0.00 25.00 0.00 42,298 547.92 0.13 0.13 0.00 30.00 0.00 40,124 547.73 0.12 0.12 0.00 35.00 0.00 38,105 547.56 0.11 0.11 0.00 40.00 0.00 36,240 547.39 0.10 0.10 0.00 45.00 0.00 34,529 547.25 0.09 0.09 0.00 50.00 0.00 32,973 547.11 0.08 0.08 0.00 55.00 0.00 31,572 546.99 0.07 0.07 0.00 60.00 0.00 30,349 546.85 0.06 0.06 0.00 65.00 0.00 29,323 546.74 0.05 0.05 0.00 70.00 0.00 28,493 546.65 0.04 0.04 0.00 75.00 0.00 27,862 546.58 0.03 0.03 0.00 80.00 0.00 27,487 546.54 0.01 0.01 0.00 85.00 0.00 27,299 546.52 0.01 0.01 0.00 90.00 0.00 27,204 546.51 0.00 0.00 0.00 95.00 0.00 27,157 546.51 0.00 0.00 0.00 100.00 0.00 27,133 546.50 0.00 0.00 0.00 105.00 0.00 27,121 546.50 0.00 0.00 0.00 110.00 0.00 27,115 546.50 0.00 0.00 0.00 115.00 0.00 27,112 546.50 0.00 0.00 0.00 120.00 0.00 27,111 546.50 0.00 0.00 0.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 10-yr Duration=22 min, Inten=4.32 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 4 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 22.580 ac, 11.73% Impervious, Inflow Depth = 0.54" for 10-yr event Inflow = 33.17 cfs @ 0.37 hrs, Volume= 1.013 of Outflow = 7.23 cfs @ 0.65 hrs, Volume= 1.013 af, Atten= 78%, Lag= 17.2 min Primary = 7.23 cfs @ 0.65 hrs, Volume= 1.013 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 546.50' Surf.Area= 9,135 sf Storage= 27,109 cf Peak Elev= 549.67' @ 0.65 hrs Surf.Area= 15,425 sf Storage= 67,126 cf (40,017 cf above start) Plug -Flow detention time= 3,256.6 min calculated for 0.391 of (39% of inflow) Center -of -Mass det. time= 1,599.2 min ( 1,621.2 - 22.0 ) Volume Invert #1 542.00' Avail. e Description 88,785 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 542.00 3,378 0 0 546.00 7,893 22,542 22,542 547.00 10,376 9,135 31,677 548.00 12,770 11,573 43,250 549.00 14,594 13,682 56,932 550.00 15,834 15,214 72,146 551.00 17,445 16,640 88,785 Device Routing Invert Outlet Devices #1 Primary 542.00' 18.0" Round Culvert L= 48.0' Ke= 0.500 Inlet / Outlet Invert= 542.00' / 541.00' S= 0.0208 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 546.50' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 550.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 549.20' 8.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 549.70' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 10-yr Duration=22 min, Inten=4.32 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 5 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=7.22 cfs @ 0.65 hrs HW=549.67' (Free Discharge) L1=Culvert (Passes 7.22 cfs of 22.38 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 8.57 fps) 4=Broad-Crested Rectangular Weir (Weir Controls 7.03 cfs @ 1.87 fps) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=546.50' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 10-yr Duration=22 min, Inten=4.32 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 6 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 27,109 546.50 0.00 0.00 0.00 5.00 0.00 58,314 549.09 0.17 0.17 0.00 10.00 0.00 55,331 548.88 0.16 0.16 0.00 15.00 0.00 52,478 548.67 0.15 0.15 0.00 20.00 0.00 49,755 548.48 0.15 0.15 0.00 25.00 0.00 47,163 548.29 0.14 0.14 0.00 30.00 0.00 44,701 548.11 0.13 0.13 0.00 35.00 0.00 42,372 547.92 0.13 0.13 0.00 40.00 0.00 40,193 547.74 0.12 0.12 0.00 45.00 0.00 38,168 547.56 0.11 0.11 0.00 50.00 0.00 36,298 547.40 0.10 0.10 0.00 55.00 0.00 34,583 547.25 0.09 0.09 0.00 60.00 0.00 33,022 547.12 0.08 0.08 0.00 65.00 0.00 31,615 546.99 0.07 0.07 0.00 70.00 0.00 30,386 546.86 0.06 0.06 0.00 75.00 0.00 29,353 546.75 0.05 0.05 0.00 80.00 0.00 28,517 546.65 0.04 0.04 0.00 85.00 0.00 27,879 546.58 0.03 0.03 0.00 90.00 0.00 27,495 546.54 0.01 0.01 0.00 95.00 0.00 27,303 546.52 0.01 0.01 0.00 100.00 0.00 27,206 546.51 0.00 0.00 0.00 105.00 0.00 27,158 546.51 0.00 0.00 0.00 110.00 0.00 27,134 546.50 0.00 0.00 0.00 115.00 0.00 27,122 546.50 0.00 0.00 0.00 120.00 0.00 27,115 546.50 0.00 0.00 0.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 25-yr Duration=22 min, Inten=4.82 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 7 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 22.580 ac, 11.73% Impervious, Inflow Depth = 0.60" for 25-yr event Inflow = 37.02 cfs @ 0.37 hrs, Volume= 1.131 of Outflow = 12.10 cfs @ 0.61 hrs, Volume= 1.130 af, Atten= 67%, Lag= 14.8 min Primary = 12.10 cfs @ 0.61 hrs, Volume= 1.130 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 546.50' Surf.Area= 9,135 sf Storage= 27,109 cf Peak Elev= 549.80' @ 0.61 hrs Surf.Area= 15,591 sf Storage= 69,161 cf (42,051 cf above start) Plug -Flow detention time= 2,862.9 min calculated for 0.508 of (45% of inflow) Center -of -Mass det. time= 1,436.8 min ( 1,458.8 - 22.0 ) Volume Invert #1 542.00' Avail. e Description 88,785 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 542.00 3,378 0 0 546.00 7,893 22,542 22,542 547.00 10,376 9,135 31,677 548.00 12,770 11,573 43,250 549.00 14,594 13,682 56,932 550.00 15,834 15,214 72,146 551.00 17,445 16,640 88,785 Device Routing Invert Outlet Devices #1 Primary 542.00' 18.0" Round Culvert L= 48.0' Ke= 0.500 Inlet / Outlet Invert= 542.00' / 541.00' S= 0.0208 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 546.50' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 550.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 549.20' 8.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 549.70' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 25-yr Duration=22 min, Inten=4.82 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 8 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=11.94 cfs @ 0.61 hrs HW=549.80' (Free Discharge) L1=Culvert (Passes 11.94 cfs of 22.60 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 8.75 fps) 4=Broad-Crested Rectangular Weir (Weir Controls 10.32 cfs @ 2.14 fps) =Broad -Crested Rectangular Weir (Weir Controls 1.43 cfs @ 0.87 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=546.50' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 25-yr Duration=22 min, Inten=4.82 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 9 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 27,109 546.50 0.00 0.00 0.00 5.00 0.00 58,342 549.09 0.17 0.17 0.00 10.00 0.00 55,358 548.89 0.16 0.16 0.00 15.00 0.00 52,504 548.68 0.15 0.15 0.00 20.00 0.00 49,780 548.48 0.15 0.15 0.00 25.00 0.00 47,186 548.29 0.14 0.14 0.00 30.00 0.00 44,724 548.11 0.13 0.13 0.00 35.00 0.00 42,393 547.93 0.13 0.13 0.00 40.00 0.00 40,213 547.74 0.12 0.12 0.00 45.00 0.00 38,187 547.56 0.11 0.11 0.00 50.00 0.00 36,315 547.40 0.10 0.10 0.00 55.00 0.00 34,598 547.25 0.09 0.09 0.00 60.00 0.00 33,036 547.12 0.08 0.08 0.00 65.00 0.00 31,628 546.99 0.07 0.07 0.00 70.00 0.00 30,397 546.86 0.06 0.06 0.00 75.00 0.00 29,362 546.75 0.05 0.05 0.00 80.00 0.00 28,524 546.65 0.04 0.04 0.00 85.00 0.00 27,884 546.58 0.03 0.03 0.00 90.00 0.00 27,498 546.54 0.01 0.01 0.00 95.00 0.00 27,304 546.52 0.01 0.01 0.00 100.00 0.00 27,207 546.51 0.00 0.00 0.00 105.00 0.00 27,158 546.51 0.00 0.00 0.00 110.00 0.00 27,134 546.50 0.00 0.00 0.00 115.00 0.00 27,122 546.50 0.00 0.00 0.00 120.00 0.00 27,115 546.50 0.00 0.00 0.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 50-yr Duration=22 min, Inten=5.19 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 10 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Summary for Pond 2P: P1 Inflow Area = 22.580 ac, 11.73% Impervious, Inflow Depth = 0.65" for 50-yr event Inflow = 39.83 cfs @ 0.37 hrs, Volume= 1.217 of Outflow = 15.90 cfs @ 0.59 hrs, Volume= 1.216 af, Atten= 60%, Lag= 13.2 min Primary = 15.90 cfs @ 0.59 hrs, Volume= 1.216 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs / 3 Starting Elev= 546.50' Surf.Area= 9,135 sf Storage= 27,109 cf Peak Elev= 549.88' @ 0.59 hrs Surf.Area= 15,681 sf Storage= 70,266 cf (43,157 cf above start) Plug -Flow detention time= 2,599.1 min calculated for 0.594 of (49% of inflow) Center -of -Mass det. time= 1,336.8 min ( 1,358.8 - 22.0 ) Volume Invert #1 542.00' Avail. e Description 88,785 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 542.00 3,378 0 0 546.00 7,893 22,542 22,542 547.00 10,376 9,135 31,677 548.00 12,770 11,573 43,250 549.00 14,594 13,682 56,932 550.00 15,834 15,214 72,146 551.00 17,445 16,640 88,785 Device Routing Invert Outlet Devices #1 Primary 542.00' 18.0" Round Culvert L= 48.0' Ke= 0.500 Inlet / Outlet Invert= 542.00' / 541.00' S= 0.0208 '/' Cc= 0.900 n= 0.012, Flow Area= 1.77 sf #2 Device 1 546.50' 2.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 550.00' 20.0' long x 8.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 #4 Device 1 549.20' 8.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 #5 Device 1 549.70' 16.0' long x 1.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 50-yr Duration=22 min, Inten=5.19 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 11 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. 2.50 3.00 Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31 3.30 3.31 3.32 Primary OutFlow Max=15.78 cfs @ 0.59 hrs HW=549.88' (Free Discharge) L1=Culvert (Passes 15.78 cfs of 22.71 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.19 cfs @ 8.85 fps) 4=Broad-Crested Rectangular Weir (Weir Controls 12.40 cfs @ 2.29 fps) =Broad -Crested Rectangular Weir (Weir Controls 3.19 cfs @ 1.13 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=546.50' (Free Discharge) L3= Broad -Crested Rectangular Weir( Controls 0.00 cfs) REVISED 02-13-20 Conservancy Ph 2 BMP-2 REV Waxhaw 50-yr Duration=22 min, Inten=5.19 in/hr Prepared by HydroCAD SAMPLER 1-800-927-7246 www.hydrocad.net Printed 2/13/2020 HydroCAD®10.10-3a Sampler s/n S16802 ©2020 HydroCAD Software Solutions LLC Page 12 This report was prepared with the free HydroCAD SAMPLER, which is licensed for evaluation and educational use ONLY. For actual design or modeling applications you MUST use a full version of HydroCAD which may be purchased at www.hydrocad.net. Full programs also include complete technical support,training materials, and additional features which are essential for actual design work. Hydrograph for Pond 2P: P1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 27,109 546.50 0.00 0.00 0.00 5.00 0.00 58,350 549.09 0.17 0.17 0.00 10.00 0.00 55,366 548.89 0.16 0.16 0.00 15.00 0.00 52,511 548.68 0.15 0.15 0.00 20.00 0.00 49,787 548.48 0.15 0.15 0.00 25.00 0.00 47,193 548.29 0.14 0.14 0.00 30.00 0.00 44,730 548.11 0.13 0.13 0.00 35.00 0.00 42,399 547.93 0.13 0.13 0.00 40.00 0.00 40,218 547.74 0.12 0.12 0.00 45.00 0.00 38,192 547.56 0.11 0.11 0.00 50.00 0.00 36,320 547.40 0.10 0.10 0.00 55.00 0.00 34,603 547.25 0.09 0.09 0.00 60.00 0.00 33,040 547.12 0.08 0.08 0.00 65.00 0.00 31,631 547.00 0.07 0.07 0.00 70.00 0.00 30,400 546.86 0.06 0.06 0.00 75.00 0.00 29,364 546.75 0.05 0.05 0.00 80.00 0.00 28,526 546.66 0.04 0.04 0.00 85.00 0.00 27,885 546.58 0.03 0.03 0.00 90.00 0.00 27,499 546.54 0.01 0.01 0.00 95.00 0.00 27,305 546.52 0.01 0.01 0.00 100.00 0.00 27,207 546.51 0.00 0.00 0.00 105.00 0.00 27,158 546.51 0.00 0.00 0.00 110.00 0.00 27,134 546.50 0.00 0.00 0.00 115.00 0.00 27,122 546.50 0.00 0.00 0.00 120.00 0.00 27,115 546.50 0.00 0.00 0.00 REVISED 02-13-20 3 II I Outlet K op + La 90 Pipe : diameter (Do) 80 i rater < 0.500 �Ctl 70 - e r , `rotPt 6n - s- A n 011" i q _ ,� y -r.. tiA to 10 ip La 10' CL cc --�v = ZU Is v to a dso = 0.33' 10 20 so 100 zoo SOD 1000 Q10 4.4 Discharge (0/sec) = cfs D=18" Figure 8.06a Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter) Riprap Apron Design BMP-1 Outfall REVISED 02-13-20 3 �I Outlet W Do + La 90 Pipe :. diameter IDur so . i rater < 0.500 i �Ctl 70 - e r , "rot 6n - s- A n i q.................. _ y 30 20 » 3 10.. :. }( 4 La = 10, - -. � _ Oe {c, a 3t vr° _ 1 i i5 dso = 0.33' v x 10 A v- 10 20 50 100 200 500 1000 Q10 = 7.2 CfS Discharge (0/sec) D=18" Figure 8.06a Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter) Riprap Apron Design BMP-2 Outfall REVISED 02-13-20 RIPRAP APRON SUMMARY Do Q10 d50 La W1 W2 dmax T Pipe No. (in) (cfs) (in) (ft) (ft) (ft) (in) (in) BMP-1 18 4.4 4 10 5 12 6 12 BMP-2 18 7.2 4 10 5 12 6 12