Loading...
HomeMy WebLinkAboutSW3161201_4 - Supplemental-EZ-2018-Version-2_3/2/2020SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION Project Name Project Area (ac) Coastal Wetland Area (ac) Surface Water Area (ac) Conservancy at Waxhaw Creek Phase 2 53.85 0 0 1 2 3 4 5 Is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 40' 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Richard L. Modlin - Civil Engineer 28 Organization: Richard L. Modlin, PE 29 Street address: 7215 Terrace Drive 30 City, State, Zip: Charlotte, NC 28211 31 1Phone number(s): 980.322.4191 32 Email: richardmodlin@att.net Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. er Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION 4 Type of SCM 5 Total BUA in project (sq ft) New BUA on subdivided lots (subject to permitting) 6 (sq ft) Entire Site wet pond 241449 sf 122992 sf 7 New BUA outside of subdivided lots (subject to permitting) (so Offsite - total area (sq ft) 64786 sf 8 154202 sf 9 Offsite BUA (sq ft) 36046 sf 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft) 8487 sf - Sidewalk (sq ft) - Roof (sq ft) 29672 sf - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 15512 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 8% 17 Design storm (inches) 3 in 18 1 Design volume of SCM (cu ft) 38397 cf 19 lCalculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): WET POND 1 Drainage area number 1 2 2 Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 47912 cf 27000 cf 4es Fes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? WET POND MDC FROM 02H .1053 18 Method used Yes 16 SA/DA Yes SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 517.00 541.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 518.00 542.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 521.50 546.00 23 Elevation of the permanent pool (fmsl) 522.00 546.50 24 Elevation of the top of the vegetated shelf (fmsl) 522.50 547.00 25 Elevation of the temporary pool (fmsl) 523.18 548.85 26 Surface area of the main permanent pool (square feet) 12198:1 7271:1 27 Volume of the main permanent pool (cubic feet) 38356 cf 22157 cf 28 Average depth of the main pool (feet) 3.71 ft 4.03 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 654.0 ft 510.1 ft 311 If using equation 3, width of submerged veg. shelf (feet) 6.0 ft 6.0 ft 32 Volume of the forebay (cubic feet) 5993 cf 4325 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 12 in 12 in 35 Design volume of SCM (cu ft) 44348 cf 26482 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 2 in 2 in 38 If weir, weir height (inches) 6 in 6 in 391 If weir, weir length (inches) 144 in 48 in 40 Drawdown time for the temporary pool (days) 4.2 4.2 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 58 in 62 in 44 Depth of forebay at exit (inches) 48 in 54 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment tall fescue as a planting plan been provided or the vegetated shelf? es es ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 8:19 PM 2/24/2020 LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-1.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:\� 3 sf 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:\� 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: