Loading...
HomeMy WebLinkAboutSW6190901_Calcs (SCM)_20200215LA ENGINEERING - SURVEYING - DESIGNING - DRAFTING Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Stormwater Wet Pond Design Criteria Project Name: P19-014 Hoke Landing Phase 2 Outlet: 1 Calculate Runoff Coefficient A= 6.68 acres Ai= 5.24 acres la= 0.78 Rv=0.05+0.9*la Rv= 0.76 290,955 sf Watershed area 228,200 sf Impervious area Impervious fraction Runoff Coefficient Calculate Runoff Volume Required to be Controlled Rd= 1 in Design storm rainfall depth (typically 1" or 1.5") V=3630*Rd*Rv*A WQV= 18,327 cf Volume of runoff that must be 5.06 Ac in controlled for specified design storm Calculate Required Pond Surface Area for Permanent Pool Elevation SA/DA= 3.7 Based, 4 Avg. Perm. Pool Depth *"See Table 10-1,10-2,10-3 for SAIDA SA= 0.247 Ac 10,765 sf Required Surface Area @ Perm Pool SC-3 Project Name: Outlet: Pond Storage= Pond Depth(h)= Drawdown Time= Cid= 9= The Orifice Equation ENGINEERING. SURVEYING - DESIGNING - DRAFTING Lany King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Drawdown Orifice Sizing Calculations P19-014 Hoke Landing Phase 2 1 18,327 cf Water Quality Volume 0.3333 ft HO=H/3 2.5 days 2-5 days 0.6 Coefficient of Discharge (typical 0.6) 32.2 ft/sec^2 Gravity Q= Cd A Sgrt(2 g h) Rearrange to solve for A, the minimum orifice area needed to meet drawdown requirements Q= 0.08 cfs Based on pond volume and desired drawdown time A- 0.03052 sf 4.40 si Number of Orifices= 1 Minimum diameter to meet area d= Use: Check Outflow time Q= Cd A Sgrt(2 g h) Q= Drawdown time= 2.37 inch diameter orifice 2 " diameter orifice 0.0218 sf 0.06 cfs 3.50 days OK SC-5 ENGINEERING - SURVEYING - DESIGNING - DRAFTiNG Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Pond Volume Calculations Project Name: 1319-014 Hoke Landing Phase 2 Outlet: 1 Permanent Pool Volume (Main+Forebay) t-lev. Contour Accum. Stage Diff Area Incr. Vol. Vol. (ft) (ft) (Sf) (cf) (cf) 238 0.0 3,611 0 0 239 1.0 4,486 4,049 4,049 240 1.0 5,417 4,952 9,000 241 1.0 6,406 5,912 14,912 242 1.0 7,454 6,930 21,842 243 1.0 8,562 8,008 29.850 243.5 0.5 9,137 4,425 34,274 244 0.5 10,743 4,970 39,244 Forebay Only Volume Stage ev, Diff Contour Area Incr. Vol. Accum. Vol. (ft) (ft) (SO (cf) (cf) 240 0.0 1031 0 0 241 1.0 1291 1.161 1,161 242 1.0 1580 1,436 2,597 243 1.0 1898 1,739 4.336 243.5 0.5 2067 991 5,327 244 0.5 2574 1,160 6,487 Temporary Pool Volume Stage ev. Diff uontour Area Incr. Vol. Accum. Vol. (ft) (ft) (Sf) (cf) (cf) 244 0.0 10,742 0 0 244.5 0.5 12,320 5,766 5,766 245 0.5 13,130 6,363 12,128 18,899 245.5 0.5 13,953 6,771 Permanent Pool Volume (Main Only) ev. Contour Accum. Stage Diff Area Incr. Vol. Vol. (ft) (ft) (Sf) (cf) (cf) 237 0.0 2380 0 0 238 1.0 3018 2,699 2,699 239 1.0 3687 3,353 6,052 240 1.0 4386 4,037 10,088 241 1.0 5115 4,751 14,839 242 1.0 5874 5,495 20,333 243 1.0 6664 6,269 26,602 243.5 0.5 7070 3,434 30.036 244 0.5 8169 3,810 33,845 Avg. Depth= 4.14 ft Perm Pool Elev. 16.53% 18,327 cf Perm Pool Elev. Temp Pool Elev. SC-7