Loading...
HomeMy WebLinkAboutSW3190804_2712 - Pine Forest II Design Book Revised 2-12-20_2/14/2020Storm Drain/Erosion Control Project Report for Pine Forest II Iredell County, North Carolina Date: February 12, 2019 Client: The Johnson Group, Inc. 323 Walnut Street Statesville, North Carolina 28677 Engineer: R.. Joe Harris & Associates ID.C. Iingineering • Surveying • Planning • Management 1186 STONECREST BLVD, TEGA CAY, SC 29708 P: (803) 802-1799 ��IIIIIIIf� `���11111111fI�� .•``��N CAROB',, .••`�N CAROB',, `� ��•�oFEsS/oN,y/;9 � ��oQ��FESSjoy9�� .; Q < • r i(V � i • U s , SEAL 21 _ iw SEAL r C-4168 036836 �L9 - Report - Submittal to City of Statesville & Iredell County Pine Forest II Storm Drain/Erosion Control Project Report SECTION I: Project Summary • Project Summary SECTION II: Project Information • Vicinity Map • Soil Classification Map • USGS Topographic Map • FEMA Map • Rainfall Data SECTION III: Storm Drain Calculations • Storm System 100 o Plan View o Inlet Spread — 10-year Storm Event o Pipe Design —10-year Rational Method o Inlet Sump Calculations o Rip -Rap Apron Calculations • Storm System 200 o Plan View o Inlet Spread — 10-year Storm Event o Pipe Design —10-year Rational Method o Inlet Sump Calculations o Rip -Rap Apron Calculations SECTION IV: Erosion & Sediment Control • Initial Phase Erosion Control Basin Calculations o Sediment Basin #100 o Sediment Basin #200 • Initial Phase Erosion Control Pipe Slope Drain Calculations • Final Phase Erosion Control Basin Calculations o Sediment Basin #100 o Sediment Basin #200 SECTION V: Pre & Post Analysis • Pre & Post -Development Summary • Pre & Post -Development Curve Numbers Table of Contents Pine Forest II Storm Drain/Erosion Control Project Report • 2, 10,50 & 100-year Storm Event Hydrograph Analysis SECTION VI: Water Quality Calculations • Sand Filter Pond #100 o BMP Curve Number Calculations o Water Quality Calculations o Hydrograph Analysis o Barrel and Riprap Outlet Design • Sand Filter Pond #200 o BMP Curve Number Calculations n Waer Quality Calculations o Hydrograph Analysis o Barrel and Riprap Outlet Design SECTION VII: Appendix A • Pre Development Drainage Area Map • Post Development Drainage Area Map • Storm Drainage Area Map • BMP Drainage Area Map Table of Contents Pine Forest II Storm Drain/Erosion Control Project Report Project Summary Section 1: Project Summary Pine Forest II Storm Drain/Erosion Control Project Report A. PROJECT DESCRIPTION Project Summary The Pine Forest II Subdivision project is a Planned Development located west of Interstate 77 off of Amity Hill Road in Iredell County, North Carolina. This development consists of approximately 29.36 Ac. This project will consist of 70 single family residential lots. This property has a Tax Parcel Number of 4742-58-9712, Deed Book Number of 2470 and Deed Book Page Number of 1971, The predominant soil types within the proposed limits of construction are Cecil sandy clay loam and Hiwassee fine sandy loam; all of which belong to the Soil Hydraulic Group B (as taken from the Web Soil Survey 2.1— National Cooperative Soil Survey by NRCS). The disturbance for the site will encompass roughly 23.88 acres. The site will encounter two phases of erosion and sediment control management, beginning with an initial phase. Initial clearing, grading and infrastructure placement will occur during this phase. The last phase (stabilization or final phase) will include paving and stabilization of the site. Given the amount of grading work that will take place, the majority of the erosion control is best managed through the use of sediment basins; with temporary diversion ditches to help channel flow to the aforementioned basins. Accessory features such as inlet protection, silt fence, and concentration outlets will also be used to assist with the bypass areas and smaller areas of concentrated flow. Two proposed sediment basins (Basin #100 and Basin #200) have been specified for the initial phase erosion control. Sediment Basin #100 and Sediment Basin #200 will remain active during the final phase of erosion control and sediment management. All storm drainage systems will be installed per plans with no stubbed pipes or temporary pipes. B. STORMWATER MANAGEMENT Pre and Post development flows were analyzed to determine if storm water detention would be necessary for the higher level storm events. The pre -development analysis point was conducted along the existing creek which runs west/east on the south side of the area. The Post development analysis was analyzed at the same location which includes BMP #100 and BMP #200. Pre and Post Development runoff summaries can be found in Section V of this project report and in summary for the 2-year, 10-year, 50-year and 100-year Storm Events. Where impervious drainage from the rear of lots could not be captured within proposed stormwater BMP's, it is allowed to sheet flow off of the rear of the lots, through a minimum 30' length of vegetated ground cover, with a longitudinal slope of 25% or less, before collecting in existing channels on and off site. Pine Forest II Storm Drain/Erosion Control Project Report Project Summary C. WATER QUALITY There are 2 main drainage areas that make up the combined flow for Pine Forest II. The 2 main drainage areas make up the developed areas of the site. The larger of the 2 collects approximately 55% of the total runoff of the site. This runoff will drain to BMP #100. The 2nd drainage area is primarily flow from the remaining 45% of the development. This runoff will drain to BMP #200. Both of these drainage areas have been designed to collect the bulk of the sites impervious runoff and treat it before releasing downstream. The BMP water quality design can be found in Section VI of the report booklet. D. STORM DRAINAGE SYSTEM An analysis of both receiving storm drainage systems within the Pine Forest 11 site was conducted to verify the drainage systems would not surcharge or be beyond capacity due to the drainage areas and the storm water runoff from the site for the 10-year, 24-hour rainfall intensity, and all yard inlets have been evaluated for sump capacity using the 10-year, 24-hour rainfall intensity. For the analysis of the infrastructure, RJH utilized a combination of Aerial topography for the area and proposed lot/road grading to evaluate each of the storm drain systems. Storm systems #100 and #200 are new systems within the limits of the Pine Forest II project site. These storm systems function with the design parameters set forth by the City of Statesville, Iredell County and NCDOT for both pipe design and inlet spared capacity. All systems have been fitted with a properly sized riprap apron at the outflow for energy dissipation. All proposed storm drain profiles have been designed to limit the hydraulic gradient line (HGL) to no closer than 0.5' below the weir/rim elevation. End Report Plne Forest II Storm gain/Erosion Control Project Report^ Section 2; Project Information Overall Project Information 3s' 4r4•u 5118M Hydrologic Soil Group—Iredell County, North Carolina 3 (2712) 5119(i0 512010 512090 512170 512250 ! 1RI I W #r 27 M t; 511770 511850 511930 512010 512090 Map Scale: 1:3,180 if printed on A portrait (8.5 x 11") sheet. _,Meters N 0 45 -90 180 270 0 150 300 6O0 _ _... Feet 900 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDe% Natural Resources Web Soil Survey ;iM Conservation Service National Cooperative Soil Survey 512170 35' 44 4" V 51'u.`Q i N 611212018 Page 1 of 4 m C 0 m U t 0 0 z C J O U r N mti � N W 0 0 M F a a Z 0 C� G Q LL. Z ca G 0 z /W V W J D N O N m U)o a N N ccepp 0 (D o U (1)i r `N° a� O z ?: a C Q m ,G U O N> .� m U LO to N 3 C p E' Q. 0) 0 E E j 3 c N N C Y m cu`_°co ° 0 i` mm(D `) m E co Nao E cmo Q�m� y lG <'!f �am� CO U 5 O 0 0. Q yON . 'S N y C O O L N m N .a N N N X Z U E N 0) Q m N W a 'O m N U N 3 O O CO t6 OQ. ; C p E U N m m O N m Q N N O N O m t Q 3 m y C .N.. N A VS 0 E0 ° mo C a cn mmmq)• N ai A'm5OQ-00g U O C N Eo E Qy.. O O > :� O yCEq o C . m E ,2 N`m3m aN ad° i roam ay �o U o J O NgC O _ NNrE j 0a) ay 17, z d N a)E 02 E~ C V " O ?y To O ' O Q OEL o O c C c d N m Ern 0 .> Q c _ 0 LCN. M— N E m E o(n 0c m Q p ym a m o Q Qo Q) cO.�Q Qa `oC) N C N m m a O Q O > N y N E O y .Q � _G H � S' N C f0 W E C U tm I d E cn S' U .� a a Q m Ff- o fn V) cn O N H U E N y i0 2 A m n c U L m 4� m o c C N V m O E A a 0 a 0 0 O O z » UI c O N O J Q � a C 0 a ® � m Y V H m m m Q m m> � m o 0 c O rn » m Q 0 o m c m a o a 0)m 0 ¢ 0 J 0 U 0 0 z o 0, a i m o a o m u u 0 z a° o 0 0 a m m m❑������❑aao a I I Z I Z: I: a®� o 0 N U) Q N co I�r 0 0 NN" tD a m z Hydrologic Soil Group—Iredell County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres In AOI Percent of AOI CeB2 Cecil sandy clay loam, 2 B 4.5 15.2% to 6 percent slopes, moderately eroded CeC2 Cecil sandy clay loam, 6 B 8.2 27.9% to 10 percent slopes, moderately eroded CgC Cecil -Urban land B 0.7 2.5% complex, 2 to 10 percent slopes ChA Chewacla loam, 0 to 2 B/D 4.7 16.0% percent slopes, frequently flooded 2.1 HwC Hiwassee tine sandy B 7.1% loam, 6 to 10 percent slopes HwD Hiwassee fine sandy B 4.6 15.6% loam, 10 to 15 percent slopes PcD2 Pacolet sandy clay B 2.3 7.8% loam, 10 to 15 percent slopes, moderately eroded 2.3 7.9% PcE2 Pacolet sandy clay B loam, 15 to 25 percent slopes, moderately eroded Totals for Area of Interest 29.4 100.0% 2712 t1SDA Natural Resources Web Soil Survey 6/12/2018 �t Conservation Service National Cooperative Soil Survey Page 3 of 4 U.S. DEPAR�EH`t OF ME INTE 09 MUSGS SHEPHERDS QU DUHGU V.S.MOCKA WPM OS—To-po X SITE tt A F. Tnnlnlan NIMMVILLE T IRS r7-7-1, SMEPHEROS W FLOOD HAZARD INFORMATION iN •n 9Ea09trtA'%T.uLLJ 'AA,A xR,�RF.t vaP RP MYaNf "_apy � R?fnal N.9 .w?wnwn ei5 M!� YIE v 4t* SPfLW.1F9PI .. •• wrwu.wTx� 9antlla,. r,am.. O,S :�,� tNau Nara Mw a,u w+.tna. M1WA+WPO' u.ah..a 9w,r r.nr FCRF ,eurar u.l w,„a Nx59 iPLa.9 +w+�u�r,�w.a n�.a ru..a 4tNttNPf3 . .,, .,„ eua.or „taayi rtam.n NOTES TO USERS SCALE C� NATIONAL TLOOD INWRANCE PROGRAM iREDEII COUNTY, NORTH CAROLINA O AND INCORPORATED AREAS wCL N — 4742 " 4893 11RCh+,504t"t ' 1& Ob C u 13n yw I.lOU suo :,�w i 1 >D IpR®AM'1n = :OMtlyNNr VyM9E11 i.vFl O iun ,y � i a.aa aw aJ .., I. u M04TA2001 OL LA 2008 W U y U _ u c OCL E a � U i Wo �I' vya v, 'omoc Zfi U �U A r .cut ut 4 C. s d m J o U. E"" y o< a K E G Z O I/ 7 +/� �i m Z N 'mod' F-� Al n a M�mo� r. W C Z 8 8 Lu C L £ EELL 4 N ON "°,w �RU U. d Z ri~r tom. g >�>� a W00 �u R �O=oS O 'o LSJ w i cD3 w �SLV % u �'wp ao U- 3,c� W 3.0-Ey1 LUJ L - l� a B E O .� FREIDE i JUNI E , C! I , C'F S TESVILL r \ I _ r o I 2 r: ` t{ Z t Q z yam• .,lc* ,'.ySj: `t. 9/18/2018 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 �, Location name: Statesville, North Carolina, USA* r'�- g" l Latitude: 35.7391*, Longitude:-80.8684* Elevation: 852.99 ft**. - " source: ESRI Maps vim" nr source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B Lin, T Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical i Maps 8 aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in in ches)1 Duration -- - -- Average recurrence interval (years) in 2S 50_100 __. _ _ 200 � 500. _.. 1000 0 377 0.446 0.523 0.578 0.644 0.689 0 731 0.7T0 0.815 0,847 5-min (0 348-0 410),(0.412-0.486) (0 481.0.570) {0.531-0 629) (0.587.0.699) (0.624-0.749 0 6557 0.7977) (0.686-0.842) 0.7116.0.897� 0.736.0,937 10-min 0.60E 0.7 33 0.838 0.925 F 1.03 1.10 F 1. 66 1.22 1.29 1.33 556.0654) (0.658_0.778) 0.7704912) (0.848.1y01) (0.935-1.11) (0.994-1.19) (1.051.27)..:.(1A9133) (1^13-1.42) (L16148) [15-_min 0 T52 0.896 1.06 1 1T 1 30 1 39 1.47 1.54 1 62 1.68 (0.694-0.818) (0.827-0,977) (0.974.1 15) (1.07 i 27 �� (1 19 7.41) y (1 2fi1.51) (1.32 1.60) (1 37 1.68) (1 43 L79) (1.46 1.SS) 30-min 1.03 1 24 1.51 1. 00 1.93 2.09 1 2.25 2.40 2 58 2.71 -- - (0 952-1 12) (1 14.1.35) L1.39-1 64) (1 56-11.84) (1 76-2,009) (1,90-2.28) (2.02-2.45) (2214-2_62) (2 27 2.84) (2.36-3.00) 1.29 1,55 1.93 1 2.21 ' 2.56 2.83 3.10 3 36 3.70 3 96 60-min (1 19-1 40) (1 43-1 69) (1 78 2.10) (2 03 2 40) (2.34-2.79) (2.57.3.08) (2.79.3.38) (3.00 3 68) (3.26-4.08) (3.44.4.38 II . __._._....__-_, 2-hr 1.49 1 81 2.26 2 61 3,06 3.42 3 77 1 4.12 4.60 4. 66 (1.37 1.62) (i 66 1 97)` 1 (2.08 2.46) (2.38 2.84) (2 79 3.33) (3W08 3.72) (3.374.12) (3.654 52) F(4Y02.5.07} (425-5.50) 1. F3-hr ._ (1 486074) (1.78 2311) (2^23 2.65) (2.573�06) (3.03 3363) (3: 8 4.08) (3.72 4.54) i (4_05 5802) (4 9.8.70) (4 83 6?24).. 6 hr (L82 2T13) (2.19 P 58) (2.74 3.23) (317 3474) (3 30943) (4`� 4099) (4 60 5.57) -(5,03 616) (5 9- AO)- (6 29.67) 12-hr ^M-2.36 _tl_2 85 ___. 3.57 4.15 �_s _ $_95_ __ 5_58__) -__:.0-6. 6 6 92 ..___._ _ �.86____, _.40-9.._ (2.18 2.56} (2,64 3 70) {3.31 3.89) (3.$2 4.50) (4.52-5.35) (--- -0.03) (5 60 6.74) {6 14 7 48} (6 $6 8.51) (7.40 9.34) 24-hr 2.82 3.41 4.32 5,02 6,00 6.77 .57 839 9.51 104 (2,623A5) (317.3.69) (4004.67)(4'64-543)_.:...t5S2.6,481_ t6.2t•7.32) [:'7----- 28�78)- ^(764-908) (8_62-10.3) J (9.38.1113) 2 day (3 8 3a8) (3.724033) (4 65 S1T, (5 37 6 26) (6 33864t) (7. 9 8032) (7.85 9625) (8.621 10 2) (9.66.161.5) (10.151 10 5 12 5) 3-day 3.53 F 4.24 5,28 6.09 7.19 8.06 8.94 9.84 11.1 12.0 (3.28-3.80) (3.95-4.58) (4.91 5 70) h(5.65-6.57) (6,64.7 75) (7.43-8.69) (8.22.9.65) (9.02-10.6) 1(10.1.12.0) (10 9 13.0) 39 da496y ?(7.77406) 13 a 54 3.(3_48401) (d.9483) (5, 8598) (5.94688) {6.fi810) i89�) (9.4:1j (1Q5-2V4) 14 Fd7-ay 4.30 5.15 6.2T 7 44 8.30 9.22 101 11,1 123 13.3 (4.04-4.61) (4.83-5.51) (5.88.6.70) 1 (6.68 7 63) _� (7.75-8.88) (8859-9.87) (9.41-10.9) (10.3-11`9) (11.4-13.3) (12.214.3) 10-day 4.94 1 5.88 7.06 F 7 97 9.17 10.1 11.0 12.0 13.2 14.2 (4v66.5.26) (5.554.6.26) (6.66-7.52) (7.50 8 48) (8.60-9.76) (9.46-103) (10.3-11.8) (11.2-12.8) (12.3 14.1) (13.1-15.1) 20-day 6.62 7,83 9.24 10.3 11.8 12.9 14.1 15.2 16.7 17.9 (6.29 i 98) (7.43 8.25) (8.76 9.74} (9.79 10.9) 01.1.12.4) (12.2 13.6) (13.2 14.8) (14.2 16.1) (15.6-17.7) (16.6 19.0} - -- -- 8.20 9.6d 11.1 12.3 13.7 14.8 15.8 16.9 18.2 19.3 30-day (7 83-8.59) 1 (9.21-10.1) (10,6.11.7) (11.7 12.8) 1 (13.0-14.4) (14.1-15.5) (15.0-16.6) (16.0-17.7) (17.2-19.2) 1 (18.220.3) F [45-day 1013.7 14.9 .19.8 21.1 22.2 (9.90 10.8) (11.6 ,6-1 12.6) (13.1-14.3) (14.3-15 6) (15.16.5 1T,6 187 7-17.2) (16-8.18.4) (17.8.19.6) (18.8-20.7) 1 (20.1.22.2) 1 (21 0 23 3) 60-day 12.3 14,3 16.1 1T 5 19.2 20.4 21.6 22.8 24.3 25,4 (11.8.12.8) (13.8.14.9) (15.5-16.8) (16.8 18.2))j (18.4-20.0) (19.6.21.3) (20.7-22 6) (21.8 23 8) (23725.4) (24.2.26.6) _..-.__.._ _-1.._..�_. Precipitation frequency (PF) estimates in this table are based on Frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top httos://hdse nws.noaa aov/hdsctofds/nfds nrintnAnp. htmi?lat=lri 7391RInn=-An RRRetRrlatn=rianthR,inite_ennliehRenrioe-neie Ire 9118/2018 Precipitation Frequency Data Server PF graphical PIDS-based depth -duration -frequency (DDF) curves Latitude- 35 7391', Longitude, -30 86840 30 25 20 CL 0 ,C C C C C >1 >1 *_1 >1 >1 >1 >1 >1 9, M M M M M M M MM A 4 r� 6 0' Du ration N JV 25 20 5 0 r 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14. Volume 2, Versior 3 Created (GNM: Tue Sep 18 1217.35 2018 Back to Top Maps & aerials Small scale terrain A.%?ra90 recurrence 2 25 50 100 200 Soo 1000 Duration -day. -day 4-day ?-day 1 o-day -hr 2"ay 3411 60-day httnq-/ihrfqr nwq nnR;i nn%j/hHqr./nfrIqInfrIR nrintnnnp htmI?IAt=A; 7'IqIkInn=_An ARAAXHnt==,I­fhR., 114 9/18/2018 Precipitation Frequency Data Server vi• -�_•�: w � ?� b taiesvitip IT r ti. r�3 � i�y SA � � �..•X" ��t1Y i rd & •'�'v � A Barium j 51 wing S. )tilt an Large scale terrain 3t C y�. ng port • t?ri,tul )hnSun city • Winston-Salem • • Durhsm Greensboro • r It t.Ill. 1 i. it E •Asheville N0r:TIt i AFOI.INA Chad Otte Fa'.tt--- • Large scale map Kinnrrtct>t t�n:11 Johnson City Winston-6?Iern Greensboro '� Ash_evilla Y (Chaiotte Gre"Ie i Large scale aerial httn¢ I/hricr nwc nnaa nnv/hrtcr/nfric/nfric nnntnana html?Iat=ZK 74Q1Rinn=.Rn RRRdR.riatscricrdhR.nnitc=annlichp—im -nrrc ore 9/18/201 a Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions( noaa.gov Disclaimer httos:/lhdsc.nws.noaa.00v/hdsc/Dfds/Dfds Drintoaoe.html?lat=35 7391RInn=-AO AIA 9/18/2018 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Statesville, North Carolina, USA* Latitude: 35.7391*, Longitude:-80.8684* Elevation: 852.99 ft** ' source: ESRI Maps v� R source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M Bonnin, D Martin. B. Lin. T Parzybok, M Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland F tabular I PF grgphical I Mapq_L aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/ _ _. Duration Average recurrence interval (years) _ __..h _.._. �0 25 50 100 ! 200._1000 5 min 4.52 5.35 6.28 6.94 7.73 827 8 77 9.24 9.78 10.2 (4.18-4.92) (4 94-5,83) (5.77.6V84) (6.37-7.55) (7 04.8.39) (7.49 8 99) (7 8$ 9 56) (8.23-10`1) (8.59-10.8) (8.83.11,2)„ [10-m3.61 428 5.03 5.55 6.16 6.58 6.97 7 32 - -----7 73 8, 00 (3,34-3.92) (3.95.4.67) (4.62.5A) 09-604) (n 61-6.68) (5.96.7.16) (6.27.T60) (6.53 8.00) (6,80-8.51) (6.96.8,85)- - --_-__ - - - - __ . ...... . . ..... 15-min . ..... 3.01 3.58 4,24 4,68 F 5.20 5.56 5.88 6 16 6,49 6.70 (2.78-3 P7) (3 31.3.91) (3 90-4.62) (4-.29-5.9)^J (4.74-5.65)^ (5.03-6.04) (5.28.6.40) y(5.49 6 74) F5.70_7.14) T (5.82.T41) F30-min 2,06 2 48 3.01 3.39 3.85 4 18 4.50 4 79 5.16 5 42 (L9D 2 24) (2:29 2 70) (2.77 3 28) (3.11.3.69) Y (351 4 18) ^(3.79 4 55) a (405rv4.90) ` (4 27 5 24) (4.54 5 68)(4.7 ^ 1,6.00) 1.29 1.55 1,93 2.21 2.56 2 83 3. 00 3.36 3.70 3 96 60-min (1.19-1.40) (1 43.1.69) (1.78.2.10) (2.03-2.40) (2 342.79) (2.57 308) (2.79.3.38) ._.._._-_...:������ (3.00-3_68) [326-4.08) - (3.44 4 38)m 2-hr (D^6$6-0 811) (0.832-D 986) (1�0411323)� (1.93042) (1 95.67) (1.54 1186) (1 69?$O6) (1. 30.26) (2.01 2053) (2,14 2875) 1. 1. _3-hr Y (0.491-0580) 0.59 -0 04) (O744-D883) (0.857- 02)w (1.01.11,21)_ (1 22536) (12431851)_ (1.355267) (1 01290) (1_61 2.08) 6-hr O'328 0,396 0.496 0.575 0.682 0.768 0.855 0 945 1 07, r 1.17 {0 303-0.357) 0.366 D 431 } (0.458 0 540) (0.529-0625J (0 623 0 740)(0.696-0.833) �(D 768 0 930)(0.840 1,03) (0 934 1 V17) (1 00-L28) F12-hr (0 18110.212) 0Y2119.0.257) (0.274.0 323) (0.3017 0 374) 1(0� 375-0.444) _ 20.0. 0.518 I_- 0-0.62.___. .56 653� 0 715- (0.420.0.500) (0 J65.0 .55 .._ - 0 621) (0 569 0.76) (0.614-0.775) .349 F24-hr (0.109-0 127) (0.132.0..1i 54) (0.1167 0..1195) (0,1193.0 226) (0.230-0 270) (0.259.0 305) (0 288-0 3-r I (0 3018-0 378) (0 359-Os 30) ((00 39 00,471 ,121 21 2-day (0. 64-0 075) (0.07 -0 090) (0 97 0.1113) (0.1012 0 130) (0.132 0.3154) (0.148-00 73) (0.163-08 93; li(0,10( BO.0.213) (0.20120 240)^ 0 2o18 0.261) 3-day (0.0 6-0 053) (0._55 0 064) (D 68-0 079) (0.079.0 091) (0,092-00108) (0.103.012i) (0 1014 0,413a) �(0 125 0� 48) (0 140.0166) (0 152 0.181) 0.039 F 0.047 F 0.058 r 0.067 1 0.0T8 0,088 0.097 0.107 F10120 0.13(0.036 0042) (0.044-0.050)(0054 0.062)(0.062 0.072) (0.073.0.084) (0.081 0.094) (0089 0.105)j(0.08,0.115) 0.130) (0:119-0.1414-day F0.026 0031 0037 0.042 0.049 0.055 0.060 0,066 73 OA797-da00 0.0240.027)0029.0.033)(0 035-0040). 0040Q. 45046-O053) (0.051-0.059) .06-OA)j0061-0071[O.�6-0079J _-0085 10-day 0.021 0.024 0.029 0.033 0.038 0.042 0.046 I 0,050 0, 555 0. 559 F1 0-da� (0.019{OA22): (0.023 0.026) (0�028 0.031 Y. (0.031-0.035) (OA36-0,041) (0.039-0.045) (0.043 0.049}j 0.046 0.053) (0.051.0.059) (0.055-0.063) 0.014 0 016 0. 119 0 222 0.025 0.027 0.029 j 0.032 0.035 0. 337 20-day (0.013.0.015 (0.015-0.017) (0.018-0.020) (0.020 0 023) (0023-0.026) (0.025-0.028) (0.0�28-0.03�1)I (0.030-0.033} (0.033�0.037� 0.03�5-0.040�} [30-day� ��� 0.027 ._.__ _ {OA11 0 012} (0.013-0.014) (0.015-0.016) (0.016.0.018) (0.018.0.020);(0.020-0.022) (0.021-0.023) 0.022.0.025) (0.024-0.027)'(0.025 0 028) 0.015 0.017 0.019 0. 221 0,022 i 0.023 0.025 [45-day 0.010 r 0.011 F 0.013 0. 114 0.015 0.016 F 0.0 77 0 018F 0.020 0.021 (0.009.0.010) (0.011-0.012) (Oi012-0.013)J (0 013-0 014) (0 015-0.016) (0.016-0.017) (0.017-0.018) I(0.017 0 019) (0.019.0.021) (0.01990.022) -_ 0,013 0.014 0.015 0 116 0017 0.018 60 day 0 009 I 0 00. _ 01-0. ) ( 0 00 (0.013-0.014) (0 014-0.015) (0 014.0.016) 1(0.015-0.017) (0 016-0018) (0 017 0.018) (0 008 0.009) (0.010 0 010) (0.011 0.012 0.012 0 013) �_- 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PbIP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information, Back to Top httDs://hdsc.nws noaa.aov/hdsc/Dfds/Dfds orintoaae.html71at=35 73g1RInn=-Ro RRA4?data=inloncihrRnnitc=onnlichRc=rioc=nric I,A 9/18/2018 Precipitation Frequency Data Server PF graphical PDS-based intensity -duration -frequency (IDF) curies Latitude 35 7391", Longitude -80 8684* 100000 10 000 S ZI w 1,000 0100 ci 0.010 0-001 E k6 A 4 -6 M M M M M M M -4 N AI rrt r. p 0 tn c Duration tpV 100 000 'Z 10 000 .0 C 1000 sU 2 0100 WI 0.010 0001, - 3 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14. Volume 2, Version 3 Created (GMT): Tue Sep 18 12 50:00 2018 Back to Top Maps & aerials Small scale terrain kerago recurrence intet,%,al i;ears) 2 5 10 25 50 loo 200 500 1000 Duration 6-41`10 1 3 -da" I 4-41ay 30-min I -tit 30-day 6-4rif — 4.15-08y 12411 — Go -day littns-Uhrisc nws noaa.aov/hdsc/r)fds/r)fds nrintnqnp. htmI?Iqt=3.5 7.'IQIPInn=_RO ARAI&rintp=intanqihigiinitq=onnlichkcoriac=ntic 114 9/18/2018 Precipitation Frequency Data Server C'drna s Barium 3 springs i s, 1 Jtrllatl Large scale terrain C ng:port • el istul • Allison City Q Will stars A till • • [)urh.�n GreeniborO • • Asheville N O R'T H A h O L INA '��`Ai` • Chad Otte Fay�ti -- 109km 5un,i < : Large scale map Kin{�puxt E'trI' � i winstanSem Greensboro Dar Fashevin 3 r l ; I 1l � .1charlOtte + ' ,/ Fajt Greet14�Ale f lf"r+r L J_ f t _--r e Large scale aerial httnc Ahriec nws nnna nnv/hrisr./nfric/nfrlc nrintnanr. htm171at=qc; 7101 R.Inn=.An RRRdR.rlata=intoneit"R„nitc=ennlichReer oovn 4c O,A 9/ 18/2018 Precipitation Frequency Data Server Back to Told US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Centel 1325 East West Highway Silver Spring, MD 20910 Questions? HDSC.Ouestions@noaa.govv Disclalmer htti)s://hdsc.nws,noaa.gov/hdsc/ofds/ofds printoaaehtml?lat=35.7391Mon =-80.8684Rdata=intensityRunits=anniishRcaries=nric a;n Pine Forest Tr Storm Drain/Erosion Control Project Report Section 3; Storm ©rain Calculations Storm System Analysis Storm Pine Forest 11 Storm Drain/Erosion Control Project Report Section 3: Storm Drain Calculations Storm System 100 Analysis Storm 100 ■ r ■ V. V. IN■ A (I 7 M i II I I � a U y r g � U r M r � U N c C U U RI v m m U U N I Cl w CN 't! c ra r� l% CL t 0 CL a) w 7E "m La (0 N Op in -Co- m 2 N N C) 00 't r-. 00 co r co N 00 C) It rq W lCl ul rh to oo Ld 10 0) q 0 -: Ln N I- CD N- " m to 0) 0) (D 00 a $ � 00 9 s 4=; C) 0 0 6 ci 'i cc a C5 d 4-6 Sig d N c4 rq N (N N N N CV N N N N c"i 0 CV cq m C3 N 00 CV 0 CV g N 0 N 00 CV 0 CV 0 N n CV (9 N 0 C) O O 0 CI Q qq a a qq O O a 0 0 0 0 0 0 0 0 1 q 8 8 8 8 C6 H m m 0 a E E 2 t E E E E S E 0 0 0 L) 0 0 0 8 0 06 a CD E LP ci 0": c; ci 0 0 C:5 C) C, CD V C) 0 t5n a to QO 0) CN 0 to 0) C5 0to 0 v q Lq 04 Cc) mz o :3 .... ... ... w 0 (7) 0 N N CC4 R I k r. 0 V MAW q 00 07 LO 0 c; 13 eshh (e) to 0 ME CV -cr I, M 11 "1- N fm� n M (n cli cli Cri "I O as 0 to 0 CD a 0 8 8 8 vi vi to C:) w 0 0 w C oq fi 0 tO 40 —Cl V- q Lq M N N N CV O 0 p M 0 N m M 0 OD II cf 0 0 0 C'4 a 81 CO is O NO LIO '0 a C) 0 LU 0 tn N (0 C14 I� C\l .,a z R, y N i� N h `i cCi aoi "� cr0 t°i o N cnb ry ha h0 c` C�Ot (�`p? r M tV -j ' v. h� t` ado uM7 ea oNo c O N cMo Qji �fnV c��y a0o co ppy� h� 0 000 Oro m ��h++j OD CO 00 (pMyp w 0 Mm Mo 00 (�j}vj 1po�p c0 0D a0 a0 W W tlt5 05 mm OD o00 t0� I`y 00 000 0;0 co OND OND W NM W CMD 00 N � � oMD t%'! W a�tl oD 000 (3 i+'? h OL7 00 W try h !L1 OrD• ( M OO, C~ A n C) m oa o°o ��J bci Q aMo m sd p� _ � r tS; '�t; �� � h aM•- emit; 47 c09 tcOD��h �t M � C�V! I. �ap1My,' IXi aro Oo W ap CG tCeMiV-� aD �tnD, W co 00 bcl oMD W a0 �r��-j rtl �rr, a� eN, �j D0p N N T N N C�NNQ C] �N1 W N N T N s N R� N s N N ti M r QN 4' N T � r QN N M Y N �NV gN N ci T. I-r T• r Y r O a- rM r r Cv C r m M r M cY) M m M m M m th M M M M m M M M M M M M M Go 0 o 0 C) 4 G O Ci O 0 r Ci at © G C.i ci C q C'i o d o v o �i C7 Cti C d C'1 M M N N N N OQ CO OD CO O0O 00 0 00 0 w 0 r Y 0 Y s0- N Cop N a w =t ui N to r cl° N cif N N o v cavD O ccth� i*; r hMi i N a uC6 tc��l N' hi emh N��M ll C n Wj 0W NW q M co 00 DN p N W W G Q o O F) tNO, C 4'i 4i� mV, h uy0'), CD C? p, h h O�Q 000 W OD m t0 W N� ryN MSifcMD�•, O ym� tali OD 00 W co 00 lYl O6 00 00D OD OD �p7 qq f0 7`1 r N P! pp 2 pp s f�D pp (C ONO, t��p OD tt�� CD M � � yy�� V' M llD 0 N N �t ttl�� CO M CMD LL uN7 Ui r) IN em- w .tsi- N CD 1� r- 0 +ip+ {{7�� '((p� h C0D CAD ram- .N-- ONO OTU CIj d0', to cD p l0 tLn m M O N i" U. a ++ I`h r Y I` r' 0 Cri CCi L6 d' C+1 Ch N O m m 90 t` tO N r O t7 C; Ca C* 0 �q?-0 CO to LO cm N M Q G] Q N Q N .T L CTl Q� W Cn q C)) CA O t71 C;t O C"% CJ O O O O O W O (/) _ 04 N N N N N N C6 M C+7 M Cl) ,ai M m (ri c+'j m cMO, � Cf? h h � ffl � COD, N h CO h IN•. I��, Ch r h � 0 (3J C� ci o a CD 0 0 0 0 0 o 0 o 0 0 0 o ci a c ci o o a d O M et0}, 67 O N LB 0;3 OO '�t N .7 t(�t�� 2 C0V 10 O Q C.7 O CT O O O rl m t-- 47 CD r 00 CS/ COv O �+ aJ p .•• m W W lb m m tY1 Liz LQ W m tY3 00 m ca m CO AO (D 10 pp r N M d' W 0 Ph W M O 1 r M d LO to N 4r0 O N CN M CV (j y N M mil' CD cA �. 00 to O N M V Cn tp h, 00 0 N Cy m CL 8 tZ +ti Iz r � 00 *' MN OMO W oa W LQQQ o5 co p O M �y Ca 00 o U) o 03 y5 N N 8 N N N N N M ru M a fi7 M o M a M a M o M • °• ca ca ty� o o � cti o � U U Cl U U q1 N u) 00 u� ui u1 u) td � t:. C \ co CN'� � Cp r itryy tND O N N tV O m R. •-� N � � S� CI M h MmW Ov> �acoy 05 cC*C�1 c0 t� Mro tC�! at7 h CrV e� 'C) tlND aC1 C-0 my ^ I� ca�� LCf Yd'• � � � � cq r II a W i• •� �L MM Q6 M 6� 6tp M cd � � y � CTn M Cn t0 tp tD Cp ..y d h � � f•MQ � � � r � V Q J $ th N M N N N So M ab c-• f�. P'� N N N N 1 V. r t� II p •� hl N as �•" h Y f6 r N f- Y � N LO N N N N CAN p CL Z Inlet Report Hydrailow Express Extension for AutodesKO A&CADO Clvll 308 by Autodesk, ]no. Wednesday, Sep 19 2018 DG #123 Drop Grate Inlet Calculations Location = Sag Compute by, Known Q Curb Length (fi) = -0- Q (Cfs) = 0.02 Throat Height (in) = -0- Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.02 Grate Length (ft) a 3.00 Q Capt (of$) = 0.02 Q Bypass (cfe) = . -0- Gutter Depth at Inlet (in) = 0,09 Slope, Sir (ft/ft) = 0.021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0,021 Gutter Spread (ft) = 2.73 Local Depr (in) = -0- Gutter VeI (ftls) = -0- Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = .0. Bypass Depth (in) = -0- Gutter n-value = -0- NO dimensbalm In MI i ;9 a ;j Inlet Report Hyd raflow Express Extension for AutodeskO AutoCAD® Civil 300 by Autodesk, Inc, Wednesday, Sep 19 2018 DG #'124 Drop Grate Inlet Calculations Location = Sag Compute by: !mown Q Curb Length (ft) = -0- Q (cfs) = 0.89 Throat Height (in) = .0� Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.89 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.89 Q Bypass (cfs) = -0. Gutter Depth at Inlet (in) = 1.15 Slope, Sw (ft/ft) = 0.021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0,021 Gutter Spread (ft) = 11.12 Local Depr (in) _ .0. Gutter Vel (ft/s) = -0- Gutter Width (ft) = 2,00 Bypass Spread (ft) = -0- Gutter Slope (%) = .0. Bypass Depth (in) = -0- Gutter n-value = -0- All dlm.ans�ons Irt Beet Inlet Report Hydraflow Express Extenslon For Autodesk®AutoCADO CIA 3DO by Autodesk, Inc. Wednesday, Sep 19 2o1 o DG #130 Drop Grate Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = -0- Q (cfs) = 2.14 Throat Height (in) = -0- Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) : 2.00 Q Total (cfs) = 2.14 Grate Length (ft) = 3.00 Q Capt (cfs) = 2.14 Q Bypass (cfs) _ -0- Gutter Depth at Inlet (in) = 2.06 Slope, SW (ft/ft) = 0.021 Oiclency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 18.37 Local Depr (in) = -0- Gutter Vol (ftls) _ -0- Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-Value . = -0- .0.. almerlsionsInfed iF S ":+->:Y:1"T.'•N•:,w"" .::"�F7�tp wC:"efir m";., � �?c'xr. �o .'w�.7:xa�.tw;a :• ..:gas.�',-:..-:;;;xn:,.n-mr:m:�arNn m�.ranr�x�^rv�re,Mar•v��n•:� ��-:m•v,,,w.�,.�nr�rww n,�.,..-,M�-..,.,.»....,�..,,.-.,............,.,......�......................._.__.., Inlet Report Hydraffow Express Extenslon for AutodeskO AufoCADO Civil 300 by Autodesk, Inc. Wednesday, Sep 19 2D18 DG #131 Drop Grate Inlet; Calculations Location = Sag Compute by; Curb Length (ft) = -0. Q (cfs) Throat Height (in) = �0- Grate Area (sqft) = 6,00 Highlighted Grate Width (ft) = 2,00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0,021 Efficiency (%) Slope, Sx (ft/ft) = 0,021 Gutter Spread (ft) Local Depr (in) = -0- Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = -0- Bypass Depth (in) Gutter n-value = .0. Al d1m,&IS1am rol Ud Known Q = 3.69 3,69 3.69 _ -0- = 2,97 = 100 2a,54 — -0- -0- L b 0 M 0 & '-a o Z d O O) M C CD p V LL d a in W � m Cd o ,� z y 0�. J (11) oxig dBadjU osp M N j a � A >a 3 M O N � � w �I �I O O N AI q CO Vi A F z 0 0 0 Pine Forest IT Storm Drain/Erosion Control Project Report Section 3; Storm brain Calculations Storm System 200 Analysis Storm 200 cli r CM 04 nc Ito" i `�I ■ S L Q 0 wo (� arr V OD o r� �0 W Q� O O CJ O C;J C7 f,7 O C> Q O O O 6 Q O C> C7 Cl f3 C3 „C„ OO t� r r �'^ p+ �+ 1^' e� r Y-• r' c' P r 5^ r Q !^ l^' co + y O O q ti (O Ci G] n W r § (n N cM- tV st r I N GO W p, pp O N Or CO 1 N r It 0 -t M CO Co fD G O o l7 O t7 O D G r C] r O r Ca N C? r C; r Q r 6 r CS ry C�, r 6 r C7 ' r t7 C o n chi b c, Gi r rP (� th N h` M V Ld 4' I� Il) fV t*) n9 Ph r~- u'i V= CO.^, b P. N O N !D Cn r M CO M d> lC1 O O tD O f0 tp d' a� C CJ O C C7 O O Ci O q C� ti C7 C7 O C] O O O b M M M M M M M M M M M M M M M M a o 0 ,,,` O q r r O r G r a N D Nr O r 4 �Yry'j C� pry CS Syr} Cf r Nr p Nr p r r 4 r O r O r o CQJ 6 O 0 O O �Cfj O 6 O O O O GO1 �Gy pC pC pO pO pO }�� O C Q O O CI O O O O O O 6 6 O O v CS hl N N CV CV N N hl CV tV N N iV N N N N N N d t13 f6 Q, O GJ O O O v N N N N N N N N = a q r� q q 8. q Q o a q o q o q J O M M M M M Ci M M M m C4 M CM M M M lri Ci M Cl Q Q O O Q Ca q C;a O O O C7 C O O Cc1 O O O o ui td o d o v o a o 0 o c o c m a C n CS M CYi M of m M m M "i M ri Mi M m o M M � C7 CSi CCj m tf3 V' lq CC7 (Ci Kl [O lCi fD tD tG ZD Ci f9 f0 Oro o .g K i N U U C1 U U (J (j U r fi q q o o f N i r kN, O Oi CIO rn O O rn Cn C"y E a CA ,;N U CJ C C? O C7 r O O O O ci o p t7 O 6 d Q. N q O? d', i`~•, (r0• M (p Obp Uq h tl�d, O CS> N O r C71 CO f{ Q p O O } p O Q �p O Lq N m cr- INLI Ca<1 p C,7 O O N O p O O O p O r II .: C7 o C7 4 O r O q C7 C; O O C7 d l~C') C; Ci p O Ci N M N C II ^ i O O Imo. O r � � S µµ�� c0 M � � fn cq � dO dm y� ri q U O cr o o O G] d CV 6 CS o C7 CV r q C7 N p G O � II O N N N N N N o CO (n C NN N N N N N N N [qj i17 m (il ✓Yl m m Da CO m Cn tS1 m !70 a7 [Ll m f9 qj U Cp I. rtb r ti w tt r aN to vM y to a` zd ry 11pp o �o'i o u`ri coo o o 00o 90 t- ,`> J c �. h NN [D O M q 7 "aM, Z y h tl0 � OrO Orp � � ��r1ry,; t�Cvv. ��'rgWp}, � a3 97 atl 00 OD OQ G] c0 tlN0 allo 00 � °, � o�• oNo aid N � o�i v � �`' oo OQO W m M I ��rryy W Mm 00 m� tl0 co � [p ONO -1 eh1• U7 1$ cMO, iV OR � {� WM', !��'{� S� mil; lh ed 000 o`b orpQ0OCR ro n N N N CD ) O O2!p $ s rs� O OPO1 OWO N y � f� NN Oo 0 cocoO a0 t0 00 OND (NN� N N lnO NN N NN N N N N N N O M O V O liD CT% Q In (Nry ON M M M M M M M M M M M M M M M M M M M M a r a r o T ci r Gi r co r 0 C+ o T Ci Y Ci ci ray ch�i r T ca W v r © r ci r ci r o r Gi tJ U C 7 U U CU t� Ci 2? C� 6c� U U CJ C7 (3 CU U y C v N �N N oO 0 aD aD as co ao to to U) u> to u) Ln U) co 00 V, Q h $ r m 8vI' v T M O Lr) O to CO VV M C'9 tG f� r Q Ci tl OD 0 � � t� e�rj+ � C � OPO•, �tppQ p� 0�0• EDD N ��yNpy � �O�Mq�•, O+MpY, �tyd C> No t E QD cp CrJ a0 OND a0 aM0 ttl � M IX3 9O Od oto p lap6 (.�, �MD dM•,csdoT' to VO', G ( 1 0to 00 f- 0CrQ Qr'1 � cMOVn 10 �OT7• � thNn1 tqV _ a`D ueNO OND io cM0 OMu oD t0 r O � M� dfM'• SIN', f`') 1m a0 O c0 N a0 M O rt' e- 4t") M N M � � ti � 'V' CD N e^ N N N r M r, � N cD cn q• � ih I 00 LO 6 , O 42 Occ©hi Q� Cr7 C sn•• j .M- C Cf1 tD 'M�t,' %7 G Q `�Y, Q O G D C C O O O Q C1 C) CMJ O Q G1 C7 O In u7 �CqI � c00 0. tp a)h tlj QMf 0i, vj 0 LO L0 to 0 tfp7 � cD fD tD OHO O etpo eD c00, t0 t0 f00 lN. PNM �llp W tuba tD cOD i`V UDOfi, tMQ, �fp0 SD N t0o 4M"7 tMp• c00, ^ O V O O O 0 O p C? p Cj O O p Q O C 0 0 Q O O ^ LM S to T h p pp O a O � O�• O N �pj ro N N h N C�i a0 N C7 `nd' N �� 4 V T Y C•i 407 S! N N N dd'� N u7 N ccoo N N N N N N N N N N N N N N CAE U U U U U U U U U U U co c- 0 U U U U p U U U) M M M M m v h v b d M tOn 85 q" rNii c m t M m m sir •Mv v v n z 1=1 Inlet Report Hydraflow Express Extension for AutodeskO AutoCADO Civil 3D® by Aatodesk, Inc. Wednesday, Sep 19 2018 DG #21 8 Drop Grate Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = -0- Q (cfs) = 1.98 Throat Height (in) = -0- Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.98 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.98 Q Bypass (cfs) = .0- Gutter Depth at Inlet (in) = 1.96 Slope, SW (ft/ft) = 0,021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 17.54 Local Depr (in) = -0- Gutter Vel (ftls) = -0- GLitter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- ,A l d;imar s6ons 8n fset co > V- n O N r 00 1 .O v Z+ O O O O V LL O a can d E O O Z = Q. O r,. a` o 0 A o Q a a a (11) ezig dead({ 09p O N 4 w .4 OI rl N �a o O N a� v, a •o vi p ^ to N 'a -ill Y U N cd .fl mg w .y Rl 3 0 6 0 o N a ¢ vA O a� b .a v o { a� 4 1 3 A 3 � A 0 I O M O i S i� t 4 I sj' b S I I U � Q oo Fine Forest TI Storm Drain/Eroslon Control Project Report Section 4, Sediment & Erosion Control Erosion Control Calculations Initial Basins Calcs Pine Forest IZ Storm Drain/Erosion Control Project Report Section 4, Sediment & Erosion Control Initial Phase Erosion Control Basin Calculations Initial Basins Calcs Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 12.06 ac. Paved Roads/Sidewalk/Structures 0,03 ac. Wooded Area C = 0.95 C = 0.25 4.76 ac. Good Grass (>75% coverage) 6.83 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 100) 0.29 0.44 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Initial Sediment Basin #100 POND STORAGE VOLUME: DATE: 7-Aug-18 DESIGNER: IAB ENGINEER: PLM DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV, AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 790.00 8,868 0.0 0 0 791.00 10,456 1.0 9,651 9,651 792.00 12,043 2.0 11,240 20,891 793.00 13,860 3.0 12,941 33,832 794.00 15,677 4.0 14,760 48,592 795.00 17,733 5.0 16,695 65,287 Weir 796.00 19,789 6.0 18,751 84,038 Spillway 797.00 22,344 7.0 21,054 105,092 Top 798.00 24,900 8.0 23,611 128,702 Type of Basin: Riser & Barrel Drainage Area: 12.06 Acres Denuded Area: 0.44 Acres Req. Volume: 21,706 Cubic Feet Provided Volume: 84,038 Cubic Feet ( @796-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 798.00 Spillway Elevation: 797.00 Riser Weir Elevation: 796.00 Cleanout Elevation: 793.00 Bottom of Basin: 790.00 "C" Value: 0.29 Q2=(12.06Acres)(5.34 in/hr)(0.29) Q2= 18.86 cfs Q10=(12.06Acres)(6.95 in/hr)(0.29) Q10= 24.55 cfs SA = (Q10)*(435) SA= 10,680 sq.ft. SA @ Design storage at Principal Spillway elevation= SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 2'X2' I.D. Box Barrel: 24" RCP @ 2.22% * Barrel designed to carry 2yr, flow 19,789 sq.ft. OK OK PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Initial Sediment Basin #100 POND STORAGE VOLUME: DATE: 07-Aug-18 DESIGNER: IAB ENGINEER: PLM CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F. FT.) C.F.) C.F.) 790.00 8,868 0.0 0 0 791.00 10,456 1.0 9,651 9,651 792.00 12,043 2.0 11,240 20,891 793.00 13,860 3.0 12,941 33,832 794.00 15,677 4.0 14,760 48,592 795.00 17,733 5.0 16,695 65,287 796.00 19,789 6.0 18,751 84,038 797.00 22,344 7.0 21,054 105,092 798.00 24,900 8.0 23,611 128,702 ORIFICE FLOW DATA: ORIFICE NO. DIA. N. AREA S.F. 'C' INVERT ELEV. T. CENTR. ELEV. (FT.) DESCRIPTION WEIR FLOW DATA: WEIR NO. CREST ELEV. LENGTH FT. 'C' 1 796.00 12.00 3.3 SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. = 797.00 WIDTH = 20 Z = 4 'C' = VARIES PROJECT: Pine Forest II DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #100 ENGINEER: PLM COMBINED FLOW: MIN- Q Q1 Q2 ® 1 11 1 11 1 11 11 1 11 1 11 1 11 11 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 11 111 111 11! 1 1 11 111 111 11 11 i 11 1 11 � 11 1 11 1 11 11 1 11 11 1 1 1 11 1 11 1 11 1 11 1 1 11 1 1 11 1 11 11 1 11 1 11 11 1 11 1 11 / 11 11 11 111 111 111 111 11 i 1 11 FINAL RESULTS: STAGE REVERSE Q DISCHARGE (FT.) (C.F./DAY) (C.F.S.) 790.00 0 0.00 791.00 189,127 2.19 792.00 179,595 2.08 793.00 169,507 1.96 794.00 158,790 1.84 795.00 147,292 1.70 796.00 134,825 1.56 797.00 121,076 41.36 798.00 105,552 179.96 Contour Area (Acres): 790.00 0.2036 791.00 0.2400 792,00 0.2765 793.00 0.3182 794.00 0.3599 795.00 0.4071 796.00 0.4543 797.00 0,5130 798.00 0.5716 o o_ N h 00 n RI .O r N ' E V ] fl 0 a'o S `� 'N N O m Z v A L 0 LL 0 of N N d II u r� w' W tS Gi LO a. p �'' -j C 0 d o a o a a w 4i w NI NI � GI) eziS deidia 09p 8 N O N 0 114 i4 It! 0 A d y � q II II Ld Vi O a Q c f7, A A A c H d PC d °z I ) Project Name: Pine Forest II Ballast Pad Design: RJH Ref #2712 Riser Size (3'x3' O.D.): Riser Size (2'x2' I.D.): Barrel Size: Top of Basin: Bottom of Basin: Principle Riser Weir: Top of Riser Structure: Bottom of Riser Structure: Spillway Height from top of Basin: Bottom of Barrel AammWom • Wahr buoyerwy In Wad urM botbm of ma bealn &ucltn. •wltweol dco 1.M 160 UP •Might d by ebb e.d Wp.1. not mdudW b cdcuwum. Uplift at Peak Elevation: Peak Elevation =796 ft. - 788.5 ft Pine Forest II Initial Sediment Basin #100 9 ft2 797' SplllwA 1' Spillway Height T 4 ft2 796' Riser Welr _ 24 In T TxT OD Box 798 ft. 790 ft. 796 ft. 796 ft. 788.5 ft. 1 ft. 788.5 ft. 790' Bottom of Basin 788.6' Bottom of Riser Structuw ftludnp typkd 8 bew) Peak Elevation = 7.5ft. Uplift Force= (62.4 Ib/ft3)(7.5')(9ft2) Uplift Force= 4212 lb Volume of Concrete Required to Stabilize Riser: 4212 Ibs X 11150 Ibs/ft3= 28.08 R3 Volume of Concrete Within Riser: Weight of Concrete Within Riser: [(3'x3'x7.5')-(2'x2'x7.5')+(3'x3'x0'-0.5')]xl501bs/ft'= 4950 lb Volume of Concrete Within Riser: 4950 Ibs X 1/150 Ibs/ft3= 33.00 ft' 30" O.D. RCP X 6"= -2.45 ft 4" x 6" x 6" _ -0.08 R3 2 X 2.0" O.D. X 6"= -0.02 ft3 Total volume of concrete in riser = 30.44 ft3 Volume of additional ballast needed = -2.36 ft3 Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 4'x4'x1' 16ft3 Weight of Concrete Within Ballast Pad: 12.25ft' x 150 IMP= 2400 lb Buoyancy of Ballast Pad: 62.4 lb/ft' x 12.25 W = 998.4 lb 7 Ballast Pad of Basin Stone Bedding 241n. RCP -M.— 8- bca htdudad In precast d-8 wba hew yet to be removed •A—.. 241. I.D. pipe has 300.0. Outlet barrel connection Weir at 796.00 'Assume we# heIV er,& at prbdpal weir eWw w Orifice at 790.00 = 28.08 ft' - 30.44 ft3 'Awn. weight of sA over mWeon0 adpa of belled pad Is moUtdo A—. baled pad ha blpy— Rom water mgWthq ih ambednant Mad Total Weight of Concrete In Riser Incld. Ballast = 6966 lb = (30.44ft' + 1611:3) x 150 IWO Total Weight Required to Prevent Uplift = 5210.4 lb = (42121b + 998.4) Factor of safety = 1.34 8.5' 0' PROJECT: Pine Forest II DATE: 7-Aug-18 PROJECT #: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #100 ENGINEER: PLM Initial Sediment Basin 100 Actual Volume W* ;08 Actual Surface Area ft` Values from RJHA Sediment Basin Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) S Skimmer Sizes as Manufactured 0.333 Head on Skimmer (feet) by Faircloth (Standard Sizes) #. Orifice Size (1/4 inch increments) , 3.22 Dewatering Time (days) Skimmer size should be a min. 1-pipe Suggest about 3 days ,sl size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Spreadsheet for sizing skiinmers taken from NCDENR Land Quality Section Website. Visit http://portal.nedenr.org/web/Ir/Iinlcs for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 9.28 ac. Paved Roads/Sidewalk/Structures 0.00 ac. Wooded Area C = 0.95 C = 0.25 2.84 ac. Good Grass (>75% coverage) 5.78 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 200) 0.31 0.66 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Initial Sediment Basin #200 POND STORAGE VOLUME: DATE: 7-Aug-18 DESIGNER: IAB ENGINEER: PLM DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 788.00 8,380 0.0 0 0 789.00 9,637 1.0 9,002 9,002 790.00 10,895 2.0 10,260 19,261 791.00 12,291 3.0 11,586 30,847 792.00 13,688 4.0 12,983 43,831 793.00 15,617 5.0 14,642 58,473 Weir 794.00 17,546 6.0 16,572 75,045 Spillway 795.00 19,180 7.0 18,357 93,402 TOP 796.00 20,814 8.0 19,992 113,393 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Emergency Spillway Length: Riser & Barrel 9.28 Acres 0.66 Acres 16,704 Cubic Feet 75,045 Cubic Feet ( @794-Top of Riser Weir) 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 796.00 Spillway Elevation: 795.00 Riser Weir Elevation: 794.00 Cleanout Elevation: 791.00 Bottom of Basin: 788.00 "CN" Value: 0.31 Q2=(9.28Acres)(5.34 in/hr)(0.31) Q2= 15.16 cfs Q10=(9.28Acres)(6.95 in/hr)(0.31) Q10= 19.73 cfs SA = (Q10)*(435) SA= 8,582 sq.ft. SA @ Design storage at Principal Spillway elevation -- SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 21X2' I.D. Box Barrel: 18" RCP @ 2.21% * Barrel designed to carry 2yr, flow 17,546 sq.ft. OK OK PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Initial Sediment Basin #200 POND STORAGE VOLUME: DATE: 07-Aug-18 DESIGNER: IAB ENGINEER: PLM CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME T. S.F.) (FT.) (C.F.) (C.F.) 788.00 8,380 0.0 0 0 789.00 9,637 1.0 9,002 9,002 790.00 10,895 2.0 10,260 19,261 791.00 12,291 3.0 11,586 1 30,847 792.00 13,688 4.0 12,983 43,831 793,00 15,617 5.0 14,642 58,473 794.00 17,546 6.0 16,572 75,045 795.00 19,180 7.0 18,357 93,402 796.00 20,814 8.0 19,992 113,393 ORIFICE FLOW DATA: ORIFICE NO. DIA. (IN.) AREA S.F. 'C' INVERT ELEV. (FT.) CENTR. ELEV, T.) DESCRIPTION WEIR FLOW DATA: WEIR NO. CREST ELEV. (FT.) LENGTH FT. 'C' 1 794.00 10.00 3.3 SPILLWAY FLOW DATA: E: EMERGENCY SPILLWAY CREST ELEV. = 795.00 WIDTH = 20 Z = 4 'C' = VARIES PROJECT: Pine Forest II DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #200 ENGINEER: PLM COMBINED FLOW: ELEV Qt � tt ttt ttt t t ttt t t ttt tt • tt t � Ott tt ttt Ott ttt tit t � • t � ttt ttt � t t ttt ttt FINAL RESULTS: STAGE REVERSE Q DISCHARGE FT. (C.F./DAY) (C.F.S.) 788.00 0 0.00 789.00 189,127 2.19 790.00 179,585 2.08 791.00 169,507 1.96 792.00 158,790 1.84 793.00 147,292 L70 794.00 134,825 1.56 795.00 121,076 34.70 796.00 105,552 161.12 Contour Area (Acres): 788.00 0.1924 789.00 0.2212 790.00 0,2501 791.00 0.2822 792.00 0.3142 793.00 0,3585 794.00 0.4028 795,00 0.4403 796.00 0,4778 I �a �o 0 C) � ._ •N O Z m C E G d 0U. N d tC m :c a = c E C 0 Z = a G m a` -j in v Sam 0 0. a ��aa� p {{���� y �I •g I � 1 w 4� it! 00 V'i V! "• i O� er 0 Ili It! it! 'AI al v O N .y as tn � a II II � y IA � o _ A a, a qa> Project Name: Pine Forest II Ballast Pad Design Initial Sediment Basin #200 RJH Ref#2712 Riser Size (3'x3' O.D.): 9 ft" Riser Size (2'x2' I.D.): 4 ft" Barrel Size: 18 in Top of Basin: 796 ft. Bottom of Basin: 788 ft. Principle Riser Weir: 794 ft. Top of Riser Structure: 794 ft. Bottom of Riser Structure: 786.5 ft. Spillway Height from top of Basin: 1 ft. Bottom of Barrel 786.5 ft. 788' Bottom of Basin A.aanpgon• 766.6' Bottom of Riser Structure • Water buoymoy In afr«t until bottom of the bash ebuotura. • unit 'eight of oonafaeet M IMI (Whaling hpkal6 bees) Might of kp asb am supports nm Inwuded In calWallon. Uplift at Peak Elevation: Peak Elevation =794 ft. - 786.5 ft Peak Elevation = 7.5ft. Uplift Force= (62.4 Ib/ft3)(7.5')(9ft2) Uplift Force= 4212 lb Volume of Concrete Required to Stabilize Riser: 4212 lbs X 11150 Ibs/fO= 28.08 fts Volume of Concrete Within Riser: Weight of Concrete Within Riser: [(3'x3'x7.5')42'x2'x7.5')+(3'x3'x0'-0.5')Ix1501bs/ft3= 4950 lb Volume of Concrete Within Riser: 4950 Ibs X 1/150 Ibs/fts= 33.00 fts 23" O.D. RCP X 6"= -1.44 fts 4" x 6" x 6" = -0.08 fts 2 X 2.0" O.D. X 6"= -0.02 Rs Total volume of concrete in riser = 31.45 Rs Volume of additional ballast needed = -3.37 fts Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 4'x4'xV 16 fts Weight of Concrete Within Ballast Pad: 16 fts x 150 lb/ft' = 2400 lb Buoyancy of Ballast Pad: 62.4 Ib/fts x 16 fts = 998.4 lb of Basin 795' II E 1' Spillway Height 794' Riser WelrM012gq TxT OD 7 Ballast Pad Stone Bedding 18 In. RCP •Antmos R• ban Imluded h fanned riser& wtlds hem yet lobe removed Outlet barrel connection -A-- te' I.D. ppa has 2r O.D. Weir at 794.00 •A--wabheight and. atishmpal re*deaamn Orifice at 796.00 = 28.08 fts - 31.45 fts •Assume weight of a * — ovalapow odges of ballast pad la negggiMa •Asslme balled pad has buoyenca fmm water nogtwdq Its a omrnsit In W Total Weight of Concrete in Riser Incid. Ballast = 7118 lb = (31.45ft3 + 16fts) x 150 Ib/fts Total Weight Required to Prevent Uplift = 5210.4 lb = (4212Ib + 998.4) Factor of safety = 1.37 8.5' 0' PROJECT: Pine Forest II DATE: 7-Aug-18 PROJECT #: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #200 ENGINEER: PLM Initial Sediment Basin 200 ,, w _3 Actual Volume ft3 4 . 'f Actual Surface Area ft`' Values from RJHA Sediment Basin " Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways t' Skimmer Size inches . (inches) [ Skimmer Sizes as Manufactured 0.25 Head on Skimmer (feet) { ` s by Faircloth (Standard Sizes) Orifice Size (1/4 inch increments) 3.62 Dewatering Time (days) Skimmer size should be a min. 1-pipe Suggest about 3 days size bigger than orifice * Volume and surface area is half the actual basin values due to there being two skimmers and orifices that split the amount water captured by each. Spreadsheet for sizing skimmers taken from NCDENR Land Quality Section Website. Visit http://Portal.nedenr.org/web/ir/linlcs for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Pine Forest II Storm Drain/Erosion Control Project Report Section 4. Sediment & Erosion Control Initial Erosion Control Pipe Slope Drain Calcif.ations Ptp4Slope Drains Plne Forest II Iredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #100 West Slope Draln Soli Type: Cecil Sandy Clay Loam & Hiwassee Pine Sandy Loam • HSG "B" Total Drainage Area = 10.68 ac. Paved Roads/Sldewalk/Structures 0.00 ac. Wooded Area C = 0.96 C = 0.25 3,77 ac. Good Grass (>76% coverage) 6.88 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 100) 0.28 0.00 ac. Pine Forest II Iredell County" North Carolina Project Number: 2712 August 10, 2018 Rational "C° Values 24 Hour Storm Event Initial Sediment Basin #100 East Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG"B" Total Drainage Area = 0,31 ac. Paved Roads/Sidewalk/Structures 0.00 ac. Wooded Area C = 0.95 C = 0.25 0.31 ac, Good Grass (>75% coverage) 0.00 ac. Newly Graded C = 0,3 C = 0.6 Composite C (Initial Basin 100) 0.25 0.00 ac. Pine Forest II lredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 West Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam , HSG "B" Total Drainage Area = 0,61 ac, Paved Roads/Sidewalk/Structures 0,00 sc, Wooded Area C W 0.95 C = 0.25 0.59 ac, Good Grass (>75% coverage) 0.02 ac, Newly Graded C = 0,3 " Composite C (initial Basin 200) 0.25 0,00 ac, Dine Forest 11 Iredell County, North Carolina Propoct Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 East Slope Drain Soil Type; Cecil Sandy Clay Loam & Hlwassee twine Sandy Loam - HSG "B" Total Drainage Area a 6.88 ac. Paved Roads/Sidewalk/Structures 0.00 ac. Wooded Area C = 0.95 C = 0.26 1,50 ac. Good Crass (>75% coverage) 5.38 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 200) 0.29 0.00 ac. Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCADG Civil 3002018 by Autodesk. Inc, v12 Hyd. No. Hydrograph type (origin) Peak flow (cfa) Time Interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maxlmum elevation (ft), Total strge used (tuft) Hydrograph Description 1 Rational 9.346 1 20 11,215 -••--- •--- -.--. B881n#100 West Slope Draln 2 Rational 0,413 1 5 124 -- - ----,• ...•.. Basin #100 East Slope Drain 3 Rational 0,814 1 8 244 —•-- -.•.• ------ Basin #200 West Slope Drain 4 Rational t3.253 1 20 7,504 Basin #200 east Slope Drafn Slope Drains.gpw Return Period: 2 Year Tuesday, 09 125 f 2018 Hydrograph Deport Hydraflow Hydrographs Extenslon for AutoCADO Civil 3DO 2018 by Autodesk, Inc, V12 Hyd. No. 9 Basin #100 West Slope Drain Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 10,650 ac Intensity : 3.134 1n/hr OF Curve = Iredell.IDF Q (cfs) 10.00 10 r M 4,00 2,00 Peak discharge Time to peak Hyd. volume Runoff coeff, Tc by User Asc/Rec limb fact Basin #100 West Slope Drain Hyd, No. 1 -- 2 Year Tuesday, 09 / 25 / 2018 = 9.346 cfs 20 min = 11,215 tuft 0.28 = 20.00 min - 1/1 Q (cfs) 10.00 M • 6Y 4.00 2,00 0.00 19 1 1 1 1 I I I I I I I I I J I I I 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 - Hyd No. 1 Time (min) Hydrog raph Report Hydraflow Hydrographs Extension For AutoCADO Civil 300 2018 by Autodesk, Inc, 02 Hyd, No, 2 Basin #100 East Slope Drain Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.310 ac Intensity = 5.335 in/hr IDF Curve = IredeII.IDF Q (cfs) 0.50 0,45 0,40 0 35 0,30 0,25 0.20 0,15 0,10 0.05 0.00 a 1 • Hyd No. 2 Peak discharge Time to peak Hyd, volume Runoff. coeff. Tc by User Aso/Rec limb fact Basin #100 East Slope Drain Hyd. No. 2 w 2 Year u Tuesday, 09 / 25 / 2018 = 0,413 cfs = 5 min = 124 tuft = 0,25 = 5.00 min = 1/1 2 3 4 5 6 7 6 9 Q (cfs) 0.50 0.46 0.40 0.35 0,30 0,25 0.20 0,15 0.10 0.05 0.00 10 Time (min) Hydrograph Report HydraflowHydrographs Extcrislon for AutoCADSCMI 3DG2018 by Autodask, Inc.. v12 Hyd. No. 3 Basin #200 West Slope Drain Hydrograph type = Rational Storm frequency = 2 yrs Time interval = I min Drainage area = 0,610 ac Intensity = 5.335 in1hr IDF Curve = lredell.IDF Q (Ofs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0,30 0.20 0.10 7;04- 0.00 0 1 — Hyd No. 3 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Aso/Rec limb fact Basin #200 West Slope Drain Hyd, No. 3 -- 2 Yamr 2 3 4 5 6 4 Tuestiny, 09 / 25 / 2018 = 0,814 cfs = 5 min = 244 tuft = 0.25 = 5.00 min = 1/1 Hydrograph Report Hydraftow Hydrographs r=xtenslon for AutoCAD® Clvll 3DO 2018 by Autodesk, Inc. v12 Hyd. No. 4 Basin #200 East Slope Drain Hydrograph type = Rational Storm frequency ; 2 yrs Time interval 1 min Drainage area = 6,880 ac Intensity = 3.134 in/hr IDF Curve = Iredell.IDF 0 (Cfs) 7.00 M. 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd, volume Runoff coeff. Tc by User Aso/Rec limb fact Basin #200 East Slope Drain Hyd, No. 4 -- 2 Year 6 Tueadey, 09 126 / 2018 = 6.253 cfs = 20 min = 7,504 ouft = 0.29 = 20.00 min = 1/1 Q (A) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0,00 -i _ 1__ I I I I 1 1 � I I i I i I I I I I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Hyd No, 4 Time (min) Hyd graph Summary ro Report Hydrafiow Hydrographs Extension for AutoCAD® Civil "2018 by Autodesk, Inc, v12 Hyd. No, Flydrograph type (origin) Peak flow (cfe) Time Interval (min) Time to peak (min) Hyd, volume (cuft) Inflow hyd(s) Maximum elevation (1t) Total strge used (cuff) Hydrograph Description 1 Rational 12.66 1 20 15,068 .... ...._ ____ Basin *100 West Slope Drain 2 Rational 0.537 1 5 161 •••.•• w--- •--•- Basin0100 East Slope Drain 3 Rational 1.057 1 5 317 -•---- --- -- ...... Basin #200 West Slope drain 4 Rational 8,401 1 20 10,081 ...... i , I I -- - -- Basin #200 East Slope Drain Slope Drains,gpw Return Period; 10 Year Tuesday, 09 / 25 / 2018 Hydrograph Repoft 7 Hydraflow Hydrographs Extenslon for AutoCA06 ONO 3OO 201 B by Autodeak, Inc. v12 Tuesday, 09128 / 201 a Hyd. No. I Basin #100 West Slope Drain Hydrograph type = National Peak discharge = 12.56 cfs Storm frequency = 10 yrs Time to peal[ = 20 min Time Interval = 1 min Hyd. volume = 15,068 cuft Drainage area = 10,650 ac Runoff coeff. = 0.28 Intensity = 4.211 In/hr To by User = 20.00 min 11DF Curve = IredeII.IDF Asc/Rec limb fact = 1/1 Q (cfs) 14.00 12.00 10.00 M 1401 4.00 Basin #100 West Slope Drain Hyd. No. 1 -- 10 Year Q (cfs) 14.00 12.00 10.00 e M 4.00 2.00 0.00 w I I I I I I I I i i i I i 1 1 I I --I N 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 - Hyd No. 1 Time (mire) Hydrograph Report Hydraflow Hydrographs Extension for AwtoCADO QvIl SM 2018 by Autodesk, Inc. V12 Hyd, No. 2 Basin #100 East Slope Drain Hydrograph type = Rational Storm frequency = 10 yrs Time interval' = I min Drainage area = 0.310 ac Intensity = 6.933 in/hr IDF Curve = lredel(,IDF Q (cfs) 1.00 0.90 0,80 0.70 0,60 0.50 0.40 0,30 0.20 0.10 0.00 Peak discharge Time to peak Hyd, volume Runoff coeff, Te by User Asc/Rec limb fact Basin #100 East Slope Drain Hyd, No, 2 -- 10 Year 1 2 3 4 Hyd No. 2 Tuesday, 09 126 / 2018 = 0.537 cfs = 5 min = 161 CLIft = 0,25 = 5.00 min = 111 a (cfs) 1.00 0.90 0.80 0,70 0.60 0.50 0.40 0.30 0,20 0,10 0,00 5 6 7 8 9 10 Time (min) Hydroglraph Report 8 I*draflow Hydrographs Extenalon for AutoCACO Civil 300) 2018 by Autodesk, Inc, v12 Tuesday, 09125 / 2018 Hyd. No. 3 Basin #200 West Slope Drain Hydrograph type = Rational Peak discharge = 1.057 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd, volume = 317 cuff Drainage area = 0.610 ac Runoff coeff. = 0,25 Intensity = 6.933 in/hr Tc by User = 5.00 min OF Curve = IredeII.IDF Asc/Rec limb fact = 1/1 Q (cfs) 2,00 1.00 Basin #F200 West Slope Drain Hyd, No. 3 -» 10 Year 0.00 0 1 2 3 4 5 6 7 8 8 Hyd No. 3 Q (cfs) 2.00 1.00 --N 0.00 10 Time (min) Hydrograph Report Hydraffow Hydrographs Extension for AufoCAD® CIA 3D0 2018 by Autodask, [no, v12 Hyd. No. 4 Basin #200 East Slope Drain Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.880 ac Intensity = 4.211 in/hr OF Curve = Iredell.10F Q (cfs) 10.00 8.00 6.00 4.00 2.00 Leak discharge Time to peak Hyd, volume Runoff coeff, To by User Aso/Rec limb fact Basin #200 East Slope Drain Hyd. No. 4 — 10 Year 10 Tuesday, 09 / 28 / 2018 = 8.401 cfs = 20 min 10,081 cult = 0.29 = 20.00 min = Ill Q (cfs) 10.00 M . i� 4,00 2.00 a.0a Z I `I I I I I I I f I I I I I I I - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Hyd No. 4 Time (min) Pine Forest II Storm Drain/Froslon Control Project Report Section 4. Sediment & Erosion Control Final Phase Erasion Control Basin Calculations Final Basins Calcs Pine Forest 11 Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #100 Sail Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area m 12.02 ac. Paved Roads/Sideoialk/Structures 2.35 ac. C = 0,95 Wooded Area C = 0.25 0.00 ac. Good Grass (>75% coverage) 9.67 ac. Newly Graded G = 0.3 C = 0,6 Composite C (Final Basin 100) 0.43 0.00 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #100 POND STORAGE VOLUME: DATE: 19-Sep-19 DESIGNER: ABW ENGINEER: PLM DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 790.00 5,310 0.0 0 0 791.00 6,887 1.0 6,081 6,081 792.00 8,464 2.0 7,662 13,743 793.00 10,302 3.0 9,368 23,111 794.00 12,139 4.0 11,208 34,319 795.00 14,245 5.0 13,178 47,497 Weir 796.00 16,350 6.0 15,285 62,782 Spillway 797.00 18,714 7.0 17,518 80,300 TOP 798.00 21,077 8.0 19,884 100,184 Type of Basin: Riser & Barrel Drainage Area: 12.02 Acres Denuded Area: 11.85 Acres Req. Volume: 21,330 Cubic Feet Provided Volume: 62,782 Cubic Feet ( @796-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 798.00 Spillway Elevation: 797.00 Riser Weir Elevation: 796.00 Cleanout Elevation: 793.00 Bottom of Basin: 790.00 "C" Value: 0.43 Q2=(12.02Acres)(5.34 in/hr)(0.43) Q2= 27.42 cfs Q10=(12.02Acres)(6.95 in/hr)(0.43) Q10= 35.69 cfs SA = (Q10)*(435) SA= 15,525 sq.ft. SA @ Design storage at Principal Spillway elevation-7 SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 21X2' I.D. Box Barrel: 24" RCP n 2.22% * Barrel designed to carry 2yr. flow 16,350 sq.ft. OI{ Required Surf Provided Surf OIC Pine Forest II Iredell County, North Carolina Project Number: 2712 September 19, 2019 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 12.02 ac. Paved Roads/Sidewalk/Structures 2.35 ac. Wooded Area C = 0.95 C = 0.25 0.00 ac. Good Grass (>75% coverage) 9.67 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Final Basin 100) 0.43 0.00 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #100 POND STORAGE VOLUME: DATE: 19-Sep-19 DESIGNER: ABW ENGINEER: PLM DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 790.00 5,310 0.0 0 0 791.00 6,887 1.0 6,081 6,081 792.00 8,464 2.0 7,662 13,743 793.00 10,302 3.0 9,368 23,111 794.00 12,139 4.0 11,208 34,319 795.00 14,245 5.0 13,178 47,497 Weir 796.00 16,350 6.0 15,285 62,782 Spillway 797.00 18,714 7.0 17,518 80,300 Top 798.00 21,077 &0 19,884 100,184 Type of Basin: Drainage Area: Denuded Area: Req. Volume: Provided Volume: Emergency Spillway Length: Riser & Barrel 12.02 Acres 11.85 Acres 21,330 Cubic Feet 62,782 Cubic Feet ( @796-Top of Riser Weir ) 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 798.00 Spillway Elevation: 797.00 Riser Weir Elevation: 796.00 Cleanout Elevation: 793.00 Bottom of Basin: 790.00 "C" Value: 0.43 Q2=(12.02Acres)(5.34 in/hr)(0.43) Q2= 27.42 cfs Q10=(12.02Acres)(6.95 in/hr)(0.43) Q10= 35.69 cfs SA = (Q10)*(435) SA= 15,525 sq.ft. SA @ Design storage at Principal Spillway elevation= SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 21X2' I.D. Box Barrel: 24" RCP @ 2.22% * Barrel designed to carry 2yr. flow Required Surf 16,350 sq.ft. Provided Surf OK PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #100 POND STORAGE VOLUME: DATE: 19-Sep-19 DESIGNER: ABW ENGINEER: PLM CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME T. S.F. FT. (C.F.) C.F. 790.00 5,310 0.0 0 0 791.00 6,887 1.0 6,081 6,081 792.00 8,464 2.0 7,662 13,743 793.00 .10,302 3.0 9,368 23,11.1 794.00 12,139 4.0 11,208 34,319 795.00 14,245 5.0 13,178 47,497 796.00 16,350 6.0 15,285 62,782 797.00 18,714 7.0 17,518 80,300 798.00 21,077 8.0 19,884 100,184 ORIFICE FLOW DATA: ORIFICE NO. DIA. (IN.) AREA (S.F.) 'C' INVERT ELEV. (FT. CENTR. ELEV. T. DESCRIPTION WEIR FLOW DATA: WE, NO. CREST ELEV. FT.) LENGTH (FT.) 'C' 1 796.00 12.00 3.3 SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV.— 797.00 WIDTH = 20 Z = 4 fC' = VARIES PROJECT: Pine Forest II DATE: 19-Sep-19 PROJECT REF: Project Number: 2712 DESIGNER: ABW DESCRIPTION: Final Sediment Basin #100 ENGINEER: PLM COMBINED FLOW: ELEV. (FT.) ORIFICES WEIRS SPILLWA Q1 Q2 Q3 Q1 C.F.S.) (C.F.S.) (C.F.S.) (C.F.S.) TOTAL, FLOW (C.F.S, Q1 (C.F.S.) Q2 (C.F.S.) Q3 (C.F.S.) 790.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 791.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 794.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 795.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 796.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 797.00 0.00 0.00 0.00 39.96 0.00 0.00 0.00 39.96 798.00 0.00 0.00 0.00 113.02 0.00 0.00 65.72 178.74 FINAL RESULTS: STAGE REVERSE Q DISCHARGE (FT.) (C.F.IDAY) (C.F.S.) 790.00 0 0.00 791.00 189,127 2.19 792.00 179,585 2.08 793.00 1 169,507 1 1.96 794.00 158,790 1.84 795.00 147,292 1.70 796.00 134,825 1.56 797.00 121,076 1 41.36 798.00 105,552 179.96 Contour Area (Acres): 790.00 0.1219 791.00 0.1581 792.00 0.1943 793.00 0.2365 794.00 0.2787 795.00 0.3270 796.00 0.3753 797.00 0.4296 798.00 0.4839 0 -7f! W a 1J 8 c O � 0 �'m tC U 0.4v O Z = d '4� N r M L C N _U d 11 II tl� �I d E C Z 11 .q y v ..2 .a q d a` 0 o a a (11) azig dwdiH Osp 19 to b p O I IR ti .ti M 0 q y II II a2 C � y O O O "' N M Project Name: Pine Forest II Ballast Pad Design: Final Sediment Basin #100 RJH Ref #2712 Riser Size (3'x3' O.D.): 9 ft' 797' Riser Size (2'x2' I.D.): 4 ft" Barrel Size: 24 In Top of Basin: 798 ft. Bottom of Basin: 790 ft. Principle Riser Weir: 796 ft. Top of Riser Structure: 796 ft. Bottom of Riser Structure: 788.5 ft. Spillway Height from top of Basin: 1 ft. Bottom of Barrel 788.5 ft. 790' Bottom of Basin Aseunlpt—' 788.5' Bottom Watw buoymoyln of(W win b°tiam of the bean an,clum. of Riser structure • unit welghl of conomisel 150 MIN pnG,nttq Iyrylca 8 base) ' Welght of 4 4M and wppof° not Ndndad In o&ulelon. Uplift at Peak Elevation: Peak Elevation =796 ft. - 788.5 ft. Peak Elevation = 7.5ft. Uplift Force= (62.4 Ib/ft )(7.5')(9ftg) Uplift Force= 4212 lb Volume of Concrete Required to Stabilize Riser: 4212 Ibs X 1/150 Ibs/ft'= 28.08 ft3 Volume of Concrete Within Riser: Weight of Concrete Within Riser: [(3'x3'x7,5')-(2'x2'x7.5')+(3'xnO'-0.5')]x1501bs/ft3= 4950 lb Volume of Concrete Within Riser: 4950 Ibs X 1/150 Ibs/ft3= 33.00 ft3 30" O.D. RCP X 6"= -2.45 ft3 4" x 6" x 6" = -0.08 ft3 2 X'2.0" O.D. X 6"= -0.02 ft3 Total volume of concrete in riser = 30.44 ft3 Volume of additional ballast needed = -2.36 ft Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 4' x 4' x 1' 16 ft3 Weight of Concrete Within Ballast Pad: 16 ft3 x 150 Ib/ft3 = 2400 lb Buoyancy of Ballast Pad : 62.4 lb/ft' x 16 ft3 = 998.4 lb 798' Top of Basin 1' Spillway Height I+: 3'x3' OD Box i�l III ' liii, . 7 Ballast Pad Stone Bedding 241n. RCP 'Aewme Vbml hn al preeaat diet B wMa hew)91 to t» removed 'Anume 241n. I.D. plpo hn 30 O.D. Outlet barrel connection Weir at796.00 'A--IMrMight and. atWamlpawar a.auw, Orifice at 790.00 =28.08ft' -30.44ft' -A-0 Woot Of gal owe o-hpping edgnof belaM pad la not!" 'Am ina bat mat pad has buo'Anca fretn water neglectIng It. aabadmanl in adl Total Weight of Concrete in Riser Incld. Ballast = 6966 lb = (30.44ft3 + 103) x 150 lb/ft3 Total Weight Required to Prevent Uplift = 5210.4 lb = (4212Ib + 998.4) Factor of safety = 1.34 8.5' 0' PROJECT: Pine Forest II DATE: 19-Sep-19 PROJECT #: Project Number: 2712 DESIGNER: ABW DESCRIPTION: Final Sediment Basin #100 ENGINEER: PLM Final Sediment Basin 100 3t� Required Volume ft3 ;.; Required Surface Area ft`' FValues from RJHA Sediment Basin Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) Skimmer Sizes as Manufactured 0.333 Head on Skimmer (feet) t by Faircloth (Standard Sizes) RISMA Orifice Size (1/4 inch increments) 3.16 Dewatering Time (days) Skimmer size should be a min. 1-pipe Suggest about 3 days; size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Spreadsheet for sizing skimmers taken from NCDENR Land Quality Section Website, Visit httn://Portal.nedenr.ora/web/ir/links for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Pine Forest If Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.21 ac. Paved Roads/Sidewalk/Structures 1.49 ac. C = 0.95 Wooded Area C = 0.25 0.00 ac. Good Grass (>75% coverage) 6.72 ac. C = 0.3 Newly Graded Composite C (Final Basin 200) 0.42 0.00 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #200 POND STORAGE VOLUME: DATE: 7-Aug-18 DESIGNER: IAB ENGINEER: PLM DESC. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Bottom 788.00 8,380 0.0 0 0 789.00 9,638 1.0 9,001 9,001 790.00 10,895 2.0 10,260 19,261 791.00 12,292 3.0 11,586 30,847 792.00 13,688 4.0 12,983 43,831 793.00 15,227 5.0 14,450 58,281 Weir 794.00 16,765 6.0 15,990 74,271 Spillway 795.00 18,445 7.0 17,598 91,869 TOP 796.00 20,124 8.0 19,278 111,147 Type of Basin: Riser & Barrel Drainage Area: 8.21 Acres Denuded Area: 7.90 Acres Req. Volume: 14,215 Cubic Feet Provided Volume: 74,271 Cubic Feet ( @794-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 796.00 Spillway Elevation: 795.00 Riser Weir Elevation: 794.00 Cleanout Elevation: 791.00 Bottom of Basin: 788.00 "C" Value: 0.42 Q2=(8.21Acres)(5.34 in/hr)(0.42) Q2= 18.31 cis Q10=(8.21Acres)(6.95 in/hr)(0.42) Q10= 23.83 cfs SA = (Q10)*(435) SA= 10,364 sq.ft. SA @ Design storage at Principal Spillway elevation -- SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 21X2' I.D. Box Barrel: 18" RCP a 2.21% * Barrel designed to carry 2yr, flow 16,765 sq.ft. OK PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #200 POND STORAGE VOLUME: DATE: 07-Aug-18 DESIGNER: IAB ENGINEER: PLM CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) S.F. (FT.) (C.F.) 788.00 8,380 0.0 0 0 789,00 9,638 1.0 9,001 9,001 790.00 10,895 2.0 10,260 19,261 791.00 12,292 3.0 11,586 30,847 792.00 13,688 4.0 12,983 43,831 793.00 15,227 5.0 14,450 58,281 794.00 16,765 6.0 15,990 74,271 795.00 18,445 7.0 17,598 91,869 796.00 20,124 8.0 19,278 111,147 ORIFICE FLOW DATA: ORIFICE NO. DIA. (IN.) AREA S.F.-(FT.)---FT.) 'C' INVERT ELEV. CENTR. ELEV. DESCRIPTION WEIR FLOW DATA: WEIR NO. CREST ELEV. +T.) LENGTH T. 'C' 1 794.00 10.00 3.3 SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. — 795.00 WIDTH = 20 Z = 4 'C' = VARIES PROJECT: Pine Forest II DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #200 ENGINEER: PLM COMBINED FLOW: ELEV. Q2 TOTAL FLOW Q3 FINAL RESULTS: STAGE REVERSE Q DISCHARGE (FT.) (C.F./DAY) (C.F.S.) 788.00 0 0.00 789.00 189,127 2.19 790.00 179,585 2.08 791.00 169,507 1.96 792.00 158,790 1.84 793.00 147,292 1.70 794.00 134,825 1.56 795.00 121,076 34.70 796.00 t 05,552 161.12 Contour Area (Acres): 788.00 0.1924 789.00 0.2212 790.00 0.2501 791.00 0,2822 792.00 0,3142 793.00 0.3496 794.00 0.3849 795.00 0.4234 796.00 0.4620 I N { p LL O Z C C% m � � d U) 4= u M d fL d LL II II E c z c fl. � G1 O ` a o '" 0 -j •�j IIn � a a A a (lU ezig dead! { 09p M N It! 4� OO I N I �D O � M O O p 8 In 8 N bhp ~ q II II � A 0 A a t JD q Q b V A z PROJECT: Pine Forest 11 DATE: 7-Aug-18 PROJECT #: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #200 ENGINEER: PLM Final Sediment Basin 200 Actual Volume ft3 * Actual Surface Area W Values from RJHA Sediment Basin Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) Skimmer Size Skimmer Sizes as Manufactured 0.25 Head on Skimmer (feet) (Inches) by Faircloth (Standard Sizes) Orifice Size (1/4 inch increments) f 3.08 Dewatering Time (days) Skimmer size should be a min, t-pipe Suggest about 3 days size bigger than orifice Flow Through Skimmer q = 4620.00 ft /day q = 0.05 ft3/sec Spreadsheet For sizing skimmers taken from NCDENR Land Quality Section Website. Visit http://portal.nedenr.orz/web/ir/links for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Pine Forest II Storm Drain/Erosion Control Project Report Section 5: Pre & Post Analysis Pre & Post -Development Summary Summary Pine Forest II Iredell County, North Carolina Project No.: 2712 February 12, 2020 STREAM SIDE POINT OF DISCHARGE — SOUTH/EAST SIDE OF PROPERTY Pre -Development Flow (cfs) Post -Development Flow (cfs) (Post Sand Filter #100, Post Sand Filter #200 and No System). Pre vs Post Hydrology Area 2 YR 10 YR 50YR 100 YR (Acres) 26.23 7.57 24.52 47.53 59.38 26.55 13.35 30.49 49.87 71.65 Pine Forest IZ Storm Drain/Erosion Control Project Report Section 5; Pre & Post Analysis Pre & Post -Development Curve Numbers Curve Numbers Pine Forest II Statesville, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Pre Development Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 26.23 ac. Paved Roads/Sidewalk/Structures 0.15 ac. C = 98 Wooded Area C = 60 12.15 ac. Good Grass (>75% coverage) 13.93 ac. Newly Graded C= 61 C = 86 Composite CN (Sand Filter) 60.7 0,00 ac. Pine Forest 11 Statesville, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 9.76 ac. Paved Roads/Sidewalk/Structures 4.85 ac. C = 98 Wooded Area C = 60 0,00 ac. Good Grass (>75% coverage) 4.91 ac. Newly Graded C = 61 C :• Composite CN (Pre Area Bypass; 79.4 0.00 ac. Pine Forest II Statesville, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.27 ac. Paved Roads/Sidewalk/Structures 3.05 ac. C = 98 Wooded Area C = 60 Ct11iI11" Good Grass (>75% coverage) 5.22 ac. Newly Graded C = 86 Composite CN (Pre SF#100) 74.6 0.00 ac. Pine Forest II Statesville, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development No System Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.52 ac. Paved Roads/Sidewalk/Structures 1.58 ac. C = 98 Wooded Area C = 60 0.00 ac. Good Grass (>75% coverage) 6.94 ac. Newly Graded C = 61 C -TO Composite CN (Pre SF#100) 67.9 0.00 ac. Pine Forest II Storm Drain/Erosion Control Project Report Section 5: Pre I Post Analysis Pre & Post -Development Time of Concentrations TC T J � LL Rl gg C bin IZ91 0 LL w a wz J= 0Q Q W p W x Vl NtJLWW�F- 16 0�0 Eat � o� J �,a z aW�O� O <wLU 0) ul LU LU i C 0 ci 6 ��O qop ppO G1 PQ 0�0 Wi�1��M��ao9a,uio _ IUif E �F pan, pw 010 > oFwz J a Z gZ: J W 8 wQ �pWmmnz3a owo Sti um0 uult'li ¢ J w 12 116 ooc; ci c o 000 0 Q q $d O O D 47 O Q �oo o LU "+pjJ.�I, ax1U. IWwo Ia. �� � 4 88 W F ON 186 W�v jaJ�a8dOw MIX HOtLi LU o Q U 0 w 0 r 9 000 OU FU�l4o�w�� Zed �9ILS� o N��WW�dc fl 8813 ddd 0 �S o ci I Ioo C o 0 4p Cg OQ I C d d p q o O 5Qy2 gC pG a d ci dod o d ad al E Eff �p s JiE�Mt RUH x C7 0 !��r d d9 doo d i I o0 i I o ci qo ao tlbq oo � rip P3r$] Ci G t` t 0 G do 000 ci �a d 8 8 Roo I pdo I d o0 W� L V, a r t�aid ro©d o3r0000ic � I11; e-aFGtlS�WOOW �p f9��Q4j �jOh qqr O O ORd 5$ b Oo do d b oG� d d d ddo a a d O 0 Q ddo Gi Qo Qo Fil O @ r 2 J Z L UTnub, �9 ci a I I d o0 S$S d d q O q I I G) P C! oa� o ao d as 000 o"ddoo og --c a 0 Z41 ? a LUO' p U. Zp�ag�4�OZp 0 UmoN $�G' ilt�t¢F a 0 o, a u u �u �C LL u, U' I m i $SS> g o8 a d O p O Q i I o 00 4 p oo 8 0 o O � 6 d O O O I I i O O Q O �$a o: g oo1:1 Qa � I O Orb O O pdp o t7 O O o O 0 0 0 4 4 O 88 coo 0 0 o ci o$$ c7dci � �8 d 00 d z U aco I o, Otl O �?O !�7 PN�hfJ0�0 m co va� r r. orno dc;n coo c� o cu a r lf}('iM r-5riM d�W�OG�O O d tl I C Ej z wa LL z °�Epw0zu0>ap9z>owd z oJsz wdvvPLU�z� L. 0! 0 -,Zzbwl) zi a-�wAzoZ�o a�[[[ LL lij F- AW U uOX W -W� S z z U LL 0 3 din O- !p zo �dozz Wa 0U8�aowc�o LLo_1I� y to L.L W w F- ci I � cggcs� g gggg Q o7 to [V S W�OQm�t�VNlM sY N chmOhC1 CCG C1 004 7 �1 CZ©^ �M oa, o ro o ti aJNNOQ1�t~DC1�p0p 1+.1[)�O O(M CV W v �a�>z�Zp�oa U- ��Uz��inWO t9 zw a 0 O O 0 0 S g$ ' cioo I q i 0 ig � a 4 4 o o OHO q'S f � I"".g YJ i 0 0 0 q 'I 00 c4�atlo oS tl r O Q S.oa § So 000 I o 0 d o0 S o tl ¢$ I I IO 00 A E w=�� JQ �U1UC7 z�j' >O zk w° jac°izuo ?�0 0 uj 9LoL�'W'i W zdzww Um0 >S�U dF Z ouq S So tltlo 4 as I S S O S O Q O O q fOJ SOd q �4jy c] pO d6 c ci a 4477 G? O q C) C aSC5 0 00 o ci d co HY IW. tld CQ� mON o�r;d� �M C30 VlO r LqL �LUo(D_zui' 7 JId� z A� G G O i i I oaci C! a O 0 0 O b I Q C O S o S Q P O O 0 0 G O d4 o pq O S S 0 6 a 4 O O O O 00 p S. pp A 5 pp 8 8 co I 9 Q 0 od O OG c qC O Q O O O O O cc a U= o� RNa7-o,°a wUC7 oz�.wz �yp a �W Pine Forest II Storm Drain/Erosion Control Project Report Section 5; Pre & Post Analysis 2,10, 50, & 100-year Storm Event Hydragraph Analysis Hydrograph Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.566 2 740 53,336 ------ ------ ------ Pre Area 2 SCS Runoff 26.30 2 718 52,941 ------ ------ ------ Post Area SF#100 3 SCS Runoff 17.97 2 718 35,936 ------ ------ ------ Post Area SF#200 4 Reservoir 1.002 2 826 52,921 2 793.60 29,682 Post SF#100 5 Reservoir 0.782 2 816 35,917 3 790.09 18,564 Post SF#200 6 SCS Runoff 12.73 2 718 25,982 ------ ------ ------ Post Area No SF 7 Combine 13.35 2 718 114,820 4, 5, 6 ------ ------ Post Area Total Pre vs Post.gpw Return Period: 2 Year Wednesday, 02 / 12 / 2020 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 7.566 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 53,336 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 8.00 4.00 2.00 0.00 ' 0 2 4 Hyd No. 1 Pre Area Hyd. No. 1 -- 2 Year 6 8 10 12 14 Q (cfs) 8.00 4.00 2.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 9.760 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.50 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 : M 4.00 0.00 ' 0 2 4 Hyd No. 2 6 8 4 Wednesday, 02 / 12 / 2020 Peak discharge = 26.30 cfs Time to peak = 11.97 hrs Hyd. volume = 52,941 cuft Curve number = 79.4 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#100 Hyd. No. 2 -- 2 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 ..iM/ I I I I-- ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) ly Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 8.270 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.50 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 s �� N. MIN 3.00 0.00 0 2 4 ---- Hyd No. 3 6 8 Wednesday, 02 / 12 / 2020 Peak discharge = 17.97 cfs Time to peak = 11.97 hrs Hyd. volume = 35,936 cuft Curve number = 74.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#200 Hyd. No. 3 -- 2 Year Q (cfs) 18.00 15.00 12.00 • wo] . 01 3.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 1.002 cfs Storm frequency = 2 yrs Time to peak = 13.77 hrs Time interval = 2 min Hyd. volume = 52,921 cuft Inflow hyd. No. = 2 -Post Area SF#100 Max. Elevation = 793.60 ft Reservoir name = SF #100 Max. Storage = 29,682 cuft Storage Indication method used. Post SF#100 Q (cfs) Q (cfs) Hyd. No. 4 -- 2 Year 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 Time (hrs) - Hyd No. 4 - Hyd No. 2 Total storage used = 29,682 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Pond No. 1 - SF #100 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 790.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) 0.00 790.00 5,310 0.50 790.50 6,099 1.00 791.00 6,887 1.50 791.50 7,676 2.00 792.00 8,464 2.50 792.50 9,383 3.00 793.00 10,302 3.50 793.50 11,220 4.00 794.00 12,139 4.50 794.50 13,192 5.00 795.00 14,245 5.50 795.50 15,297 6.00 796.00 16,350 6.50 796.50 16,509 7.00 797.00 16,669 7.50 797.50 16,828 8.00 798.00 16,987 Incr. Storage (cuft) Total storage (cuft) 0 0 2,850 2,850 3,244 6,094 3,639 9,732 4,033 13,765 4,459 18,225 4,919 23,144 5,378 28,522 5,838 34,360 6,330 40,690 6,857 47,547 7,383 54,930 7,910 62,840 8,214 71,054 8,294 79,347 8,373 87,721 8,453 96,173 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 790.00 --- --- --- --- --- --- --- --- 0.05 285 790.05 --- --- --- --- --- --- --- 0.10 570 790.10 --- --- --- --- --- --- --- --- 0.15 855 790.15 - --- --- --- --- --- --- 0.20 1,140 790.20 --- --- --- --- --- --- --- --- 0.25 1,425 790.25 --- --- --- --- --- --- --- --- 0.30 1,710 790.30 --- --- --- --- --- --- --- 0.35 1,995 790.35 --- --- --- --- --- --- --- --- 0.40 2,280 790.40 --- --- --- --- --- --- --- --- 0.45 2,565 790.45 -- --- --- --- --- --- --- 0.50 2,850 790.50 --- --- --- --- --- - --- --- 0.55 3,174 790.55 --- --- --- --- --- - --- --- 0.60 3,499 790.60 --- --- --- --- --- --- --- --- 0.65 3,823 790.65 --- --- --- --- --- --- --- 0.70 4,147 790.70 --- --- --- --- --- --- --- --- 0.75 4,472 790.75 --- --- --- --- --- --- --- --- 0.80 4,796 790.80 --- --- --- -- --- --- --- --- 0.85 5,121 790.85 --- --- --- --- --- --- --- --- 0.90 5,445 790.90 --- --- --- --- --- --- --- 0.95 5,769 790.95 --- --- --- --- --- --- --- --- 1.00 6,094 791.00 --- --- --- --- --- - --- --- 1.05 6,458 791.05 --- --- --- --- --- - --- --- 1.10 6,822 791.10 --- --- --- --- --- --- --- --- 1.15 7,185 791.15 --- --- --- --- --- --- - --- --- 0.000 --- 0.014 0.014 --- 0.028 0.028 --- 0.042 0.042 --- 0.056 0.056 --- 0.070 0.070 --- 0.084 0.084 --- 0.098 0.098 --- 0.112 0.112 --- 0.126 0.126 --- 0.140 0.140 --- 0.144 0.144 --- 0.148 0.148 --- 0.152 0.152 --- 0.156 0.156 --- 0.160 0.160 --- 0.164 0.164 --- 0.168 0.168 --- 0.172 0.172 --- 0.176 0.176 --- 0.180 0.180 --- 0.185 0,185 --- 0.190 0.190 --- 0.195 0.195 Continues on next page 8 SF #100 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.20 7,549 791.20 --- --- --- --- --- --- --- --- --- 0.200 0.200 1.25 7,913 791.25 --- --- --- --- --- --- --- --- --- 0.205 0.205 1.30 8,277 791.30 --- --- --- --- --- --- --- --- --- 0.210 0.210 1.35 8,641 791.35 --- --- --- --- --- --- --- --- --- 0.215 0.215 1.40 9,005 791.40 --- --- --- --- --- --- --- --- --- 0.220 0.220 1.45 9,369 791.45 --- --- --- --- --- --- --- --- --- 0.225 0.225 1.50 9,732 791.50 --- --- --- --- --- --- --- --- --- 0.230 0.230 1.55 10,136 791.55 --- --- --- --- --- --- --- --- --- 0.235 0.235 1.60 10,539 791.60 --- --- --- --- --- --- --- --- --- 0.240 0.240 1.65 10,942 791.65 --- --- --- --- --- --- --- --- --- 0.245 0.245 1.70 11,346 791.70 --- --- --- --- --- --- --- --- --- 0.250 0.250 1.75 11,749 791.75 --- --- --- --- --- --- --- --- --- 0.255 0.255 1.80 12,152 791.80 --- --- --- --- --- --- --- --- --- 0.260 0.260 1.85 12,556 791.85 --- --- --- --- --- --- --- --- --- 0.265 0.265 1.90 12,959 791.90 --- --- --- --- --- --- --- --- --- 0.270 0.270 1.95 13,362 791.95 --- --- --- --- --- --- --- --- --- 0.275 0.275 2.00 13,765 792.00 --- --- --- --- --- --- --- --- --- 0.280 0.280 2.05 14,211 792.05 --- --- --- --- --- --- --- --- --- 0.284 0.284 2.10 14,657 792.10 --- --- --- --- --- --- --- --- --- 0.288 0.288 2.15 15,103 792.15 --- --- --- --- --- --- --- --- --- 0.292 0.292 2.20 15,549 792.20 --- --- --- --- --- --- --- --- --- 0.296 0.296 2.25 15,995 792.25 --- --- --- --- --- --- --- --- --- 0.300 0.300 2.30 16,441 792.30 --- --- --- --- --- --- --- --- --- 0.304 0.304 2.35 16,887 792.35 --- --- --- --- --- --- --- --- --- 0.308 0.308 2.40 17,333 792.40 --- --- --- --- --- --- --- --- --- 0.312 0,312 2.45 17,779 792.45 -- --- --- --- --- --- --- --- --- 0.316 0.316 2.50 18,225 792.50 - --- --- --- --- --- --- --- --- 0.320 0.320 2.55 18,717 792.55 --- --- --- --- --- --- --- --- --- 0.356 0.356 2.60 19,209 792.60 --- --- --- --- --- --- --- --- --- 0.392 0.392 2.65 19,700 792.65 --- --- --- --- --- --- --- --- --- 0.428 0.428 2.70 20,192 792.70 --- --- --- --- --- --- --- --- --- 0.464 0.464 2.75 20,684 792.75 --- --- --- --- --- --- --- --- --- 0.500 0.500 2.80 21,176 792.80 --- --- --- --- --- --- --- --- --- 0.536 0.536 2.85 21,668 792.85 --- --- --- --- --- --- --- --- --- 0.572 0.572 2.90 22,160 792.90 --- --- --- --- --- --- --- --- --- 0.608 0.608 2.95 22,652 792.95 --- --- --- --- --- --- --- --- --- 0.644 0.644 3.00 23,144 793.00 --- --- --- --- --- --- --- --- --- 0.680 0.680 3.05 23,682 793.05 --- --- --- --- --- --- --- --- --- 0.708 0.708 3.10 24,219 793.10 --- --- --- --- --- --- --- --- --- 0.736 0.736 3.15 24,757 793.15 --- --- --- --- --- --- --- --- --- 0.764 0.764 3.20 25,295 793.20 --- --- --- --- --- --- --- --- --- 0.792 0.792 3.25 25,833 793.25 --- --- --- --- --- --- --- --- --- 0.820 0.820 3.30 26,371 793.30 --- --- --- --- --- --- --- --- --- 0.848 0.848 3.35 26,909 793.35 --- --- --- --- --- --- --- --- --- 0.876 0.876 3.40 27,446 793.40 --- --- --- --- --- --- --- --- --- 0,904 0.904 3.45 27,984 793.45 --- --- --- --- --- --- --- --- --- 0,932 0.932 3.50 28,522 793.50 --- --- --- --- --- --- --- --- --- 0.960 0.960 3.55 29,106 793.55 --- --- --- --- --- --- --- --- --- 0.981 0.981 3.60 29,690 793.60 --- --- --- --- --- --- --- --- --- 1.002 1.002 3.65 30,273 793.65 --- --- --- --- --- --- --- --- --- 1.023 1.023 3.70 30,857 793.70 --- --- --- --- --- --- --- --- --- 1.044 1.044 3.75 31,441 793.75 --- --- --- --- --- --- --- --- --- 1.065 1.065 3.80 32,025 793.80 --- --- --- --- --- --- --- --- --- 1.086 1.086 3.85 32,608 793.85 --- --- --- --- --- --- --- --- --- 1.107 1.107 3.90 33,192 793.90 --- --- --- --- --- --- --- --- --- 1.128 1.128 3.95 33,776 793.95 --- --- --- --- --- --- --- --- --- 1.149 1.149 4.00 34,360 794.00 --- --- --- --- --- --- --- --- --- 1.170 1.170 4.05 34,993 794.05 --- --- --- --- --- --- --- --- --- 1.187 1.187 4.10 35,626 794.10 --- --- --- --- --- --- --- --- --- 1.204 1.204 4.15 36,259 794.15 --- --- --- --- --- --- --- --- --- 1.221 1.221 4.20 36,892 794.20 --- --- --- --- --- --- --- --- --- 1.238 1.238 4.25 37,525 794.25 --- --- --- --- --- --- --- --- --- 1.255 1.255 4.30 38,158 794.30 --- --- --- --- --- --- --- --- --- 1.272 1.272 4.35 38,791 794.35 --- --- --- --- --- --- --- --- --- 1.289 1.289 4.40 39,424 794.40 --- --- --- --- --- --- --- --- --- 1.306 1.306 4.45 40,057 794.45 --- --- --- --- --- --- --- --- --- 1.323 1.323 4.50 40,690 794.50 --- --- --- --- --- --- --- --- --- 1.340 1.340 4.55 41,376 794.55 --- --- --- --- --- --- --- --- --- 1.356 1.356 4.60 42,061 794.60 --- --- --- --- --- --- --- --- --- 1.372 1.372 4.65 42,747 794.65 --- --- --- --- --- --- --- --- --- 1.388 1.388 Continues on next page... 9 SF #100 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft Cuft ft Cfs cfs cfs cfs cfs Cfs Cfs cfs Cfs cfs Cfs 4.70 43,433 794.70 --- --- --- --- --- --- --- --- --- 1.404 1.404 4.75 44,118 794.75 --- --- --- --- --- --- --- --- --- 1,420 1.420 4.80 44,804 794.80 --- --- --- --- --- --- --- --- --- 1.436 1.436 4.85 45,490 794.85 --- --- --- --- --- --- --- --- --- 1.452 1.452 4.90 46,176 794.90 --- --- --- --- --- --- --- --- --- 1.468 1.468 4.95 46,861 794.95 --- --- --- --- --- --- --- --- --- 1.484 1.484 5.00 47,547 795.00 --- --- --- --- --- --- --- --- --- 1.500 1.500 5.05 48,285 795.05 --- --- --- --- --- --- --- --- --- 1,514 1.514 5.10 49,024 795.10 --- --- --- --- --- --- --- --- --- 1.528 1.528 5.15 49,762 795.15 --- --- --- --- --- --- --- --- --- 1.542 1.542 5.20 50,500 795.20 --- --- --- --- --- --- --- --- --- 1.556 1.556 5.25 51,239 795.25 --- --- --- --- --- --- --- --- --- 1.570 1.570 5.30 51,977 795.30 --- --- --- --- --- --- --- --- --- 1.584 1.584 5.35 52,715 795.35 --- --- --- --- --- --- --- --- --- 1.598 1.598 5.40 53,453 795.40 --- --- --- --- --- --- --- --- --- 1.612 1.612 5.45 54,192 795.45 --- --- --- --- --- --- --- --- --- 1.626 1.626 5.50 54,930 795.50 --- --- --- --- --- --- --- --- --- 1.640 1.640 5.55 55,721 795.55 --- --- --- --- --- --- --- --- --- 1.654 1.654 5.60 56,512 795.60 --- --- --- --- --- --- --- --- --- 1.668 1.668 5.65 57,303 795.65 --- --- --- --- --- --- --- --- --- 1.682 1.682 5.70 58,094 795.70 --- --- --- --- --- --- --- --- --- 1.696 1.696 5.75 58,885 795.75 --- --- --- --- --- --- --- --- --- 1.710 1.710 5.80 59,676 795.80 --- --- --- --- --- --- --- --- -- 1.724 1.724 5.85 60,467 795.85 --- --- --- --- --- --- --- --- -- 1.738 1.738 5.90 61,258 795.90 --- --- --- --- --- --- --- --- --- 1.752 1.752 5.95 62,049 795.95 --- --- --- --- --- --- --- --- --- 1.766 1.766 6.00 62,840 796.00 --- --- --- --- --- --- --- --- --- 1.780 1.780 6.05 63,661 796.05 --- --- --- --- --- --- --- --- --- 2,735 2.735 6.10 64,482 796.10 --- --- --- --- --- -- --- --- --- 3.690 3.690 6.15 65,304 796.15 --- --- --- --- --- -- --- --- --- 4.645 4.645 6.20 66,125 796.20 --- --- --- --- --- --- --- --- --- 5.600 5.600 6.25 66,947 796.25 --- --- --- --- --- --- --- --- --- 6.555 6.555 6.30 67,768 796.30 - --- --- --- --- --- --- --- --- 7.510 7.510 6.35 68,589 796.35 - --- --- --- --- --- --- --- --- 8.465 8.465 6.40 69,411 796.40 --- --- --- --- --- --- --- --- --- 9.420 9.420 6.45 70,232 796.45 --- --- --- --- --- --- --- --- --- 10.38 10.38 6.50 71,054 796.50 --- --- --- --- --- --- --- --- --- 11.33 11.33 6.55 71,883 796.55 --- --- --- --- --- --- --- --- --- 13.01 13.01 6.60 72,712 796.60 --- --- --- --- --- --- --- --- --- 14.69 14.69 6.65 73,542 796.65 --- --- --- --- --- --- --- --- --- 16.37 16.37 6.70 74,371 796.70 --- --- --- --- --- --- --- --- --- 18.05 18.05 6.75 75,200 796.75 --- --- --- --- --- --- --- --- --- 19.73 19.73 6.80 76,030 796.80 --- --- --- --- --- --- --- --- --- 21.41 21.41 6.85 76,859 796.85 --- --- --- --- --- --- --- --- --- 23.09 23.09 6.90 77,688 796.90 --- --- --- --- --- --- --- --- --- 24.77 24.77 6.95 78,518 796.95 --- --- --- --- --- -- --- --- --- 26.45 26.45 7.00 79,347 797.00 --- --- --- --- --- -- --- --- --- 28.13 28.13 7.05 80,185 797.05 --- --- --- --- --- --- --- --- --- 31.98 31.98 7.10 81,022 797.10 --- --- --- --- --- --- --- --- --- 35.82 35.82 7.15 81,859 797.15 --- --- --- --- --- --- --- --- --- 39.67 39.67 7.20 82,697 797.20 --- --- --- --- --- --- --- --- --- 43.51 43.51 7.25 83,534 797.25 --- --- --- --- --- --- --- --- --- 47.36 47.36 7.30 84,371 797.30 --- --- --- --- --- --- --- --- --- 51.21 51.21 7.35 85,209 797.35 --- --- --- --- --- --- --- --- --- 55.05 55.05 7.40 86,046 797.40 --- --- --- --- --- --- --- --- --- 58.90 58.90 7.45 86,883 797.45 --- --- --- --- -- --- --- --- --- 62.74 62.74 7.50 87,721 797.50 --- --- --- --- -- --- --- --- --- 66.59 66.59 7.55 88,566 797.55 --- --- --- -- --- --- --- --- 70.59 70.59 7.60 89,411 797.60 --- --- --- -- --- --- --- --- --- 74.60 74.60 7.65 90,256 797.65 --- --- --- --- --- --- --- --- --- 78.60 78.60 7.70 91,102 797.70 --- --- --- --- --- --- --- --- --- 82.60 82.60 7.75 91,947 797.75 --- --- --- --- --- --- --- --- 86.60 86.60 7.80 92,792 797.80 --- -- --- --- --- --- --- --- --- 90.61 90.61 7.85 93,638 797.85 --- --- --- --- --- --- --- --- --- 94.61 94.61 7.90 94,483 797.90 --- --- --- --- --- --- --- --- --- 98.61 98.61 7.95 95,328 797.95 --- --- --- --- --- --- --- --- --- 102.62102.62 8.00 96,173 798.00 --- --- --- --- --- --- --- --- --- 106.62 106.62 ..End U111] Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 5 Post SF#200 Hydrograph type = Reservoir Peak discharge = 0.782 cfs Storm frequency = 2 yrs Time to peak = 13.60 hrs Time interval = 2 min Hyd. volume = 35,917 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 790.09 ft Reservoir name = SF #200 Max. Storage = 18,564 cuft Storage Indication method used. Post SF#200 Q (cfs) Q (cfs) Hyd. No. 5 -- 2 Year 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 5 Hyd No. 3 Total storage used = 18,564 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Pond No. 2 - SF #200 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 788.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 788.00 7,386 0 0 0.50 788.50 8,105 3,871 3,871 1.00 789.00 8,824 4,231 8,102 1.50 789.50 9,542 4,590 12,691 2.00 790.00 10,261 4,949 17,641 2.50 790.50 11,112 5,341 22,982 3.00 791.00 11,964 5,767 28,749 3.50 791.50 12,815 6,193 34,942 4.00 792.00 13,666 6,618 41,560 4.50 792.50 14,540 7,050 48,610 5.00 793.00 15,414 7,487 56,097 5.50 793.50 16,288 7,924 64,020 6.00 794.00 17,162 8,361 72,381 6.50 794.50 17,933 8,772 81,153 7.00 795.00 18,704 9,158 90,311 7.50 795.50 19,475 9,543 99,854 8.00 796.00 20,246 9,929 109,783 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] IBl [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) Inactive Inactive Inactive Inactive Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW EIev. (ft) = 0.00 Notes Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 788.00 --- --- --- --- --- --- --- --- --- --- 0.000 0.05 387 788.05 --- --- --- --- --- --- --- --- --- 0.021 0.021 0.10 774 788.10 --- --- --- --- --- --- --- --- --- 0.042 0.042 0.15 1,161 788.15 --- --- --- --- --- --- --- --- --- 0.063 0.063 0.20 1,548 788.20 --- --- --- --- --- --- --- --- --- 0.084 0.084 0.25 1,935 788.25 --- --- --- --- --- --- --- --- --- 0.105 0.105 0.30 2,323 788.30 --- --- --- --- --- --- --- --- --- 0.126 0.126 0.35 2,710 788.35 --- --- --- --- --- --- --- --- --- 0.147 0.147 0.40 3,097 788.40 --- --- --- --- --- --- --- --- --- 0.168 0.168 0.45 3,484 788.45 --- --- --- --- --- --- -- --- --- 0.189 0.189 0.50 3,871 788.50 --- --- --- --- --- --- --- --- --- 0.210 0.210 0.55 4,294 788.55 --- --- --- --- --- --- --- --- --- 0.217 0.217 0.60 4,717 788.60 --- --- --- --- --- --- --- --- --- 0.224 0.224 0.65 5,140 788.65 --- --- --- --- --- --- --- --- --- 0.231 0.231 0.70 5,563 788.70 --- --- --- --- --- --- --- --- --- 0.238 0.238 0.75 5,986 788.75 --- --- --- --- --- --- --- --- --- 0.245 0.245 0.80 6,409 788.80 --- - --- --- --- --- --- --- --- 0.252 0.252 0.85 6,832 788.85 --- --- --- --- --- --- --- --- --- 0.259 0.259 0.90 7,255 788.90 --- --- --- --- --- --- --- --- --- 0.266 0.266 0.95 7,678 788.95 --- --- --- --- --- --- --- --- --- 0.273 0.273 1.00 8,102 789.00 --- --- --- --- --- --- --- --- --- 0.280 0.280 1.05 8,561 789.05 --- --- --- --- --- --- --- --- 0.286 0.286 1.10 9,020 789.10 --- --- --- --- --- --- --- --- 0.292 0.292 1.15 9,478 789.15 --- --- --- --- --- --- --- --- --- 0.298 0.298 Continues on next page... 12 Sr#200 Stage /Storage /Discharge Table Stage Sm,000 Elevation c|vA c|va o|vo prfns, vv,A xv,o m/,c w,o sxn| uso, Total u cuft u us ms ms mn cfs mn cfs mn us ms mn 1.20 9.837 78e.20 -' -- -' -' -' '- -' -' -' 0.304 0304 1.25 10.396 789.25 -- -- -- -- -- - - -- -- 0310 0.310 1.30 10.855 789.30 -' -' -' -- -' -' -' -- -' 0.316 0.310 1.35 11.314 78835 -- - -- -- -- -- -' - -- 0.322 0322 1.40 11.773 789.40 '- -' -' -' -' -' -' -' -' 0.320 0.328 1.45 12.232 789.45 -- -- -' -- -- -- - - - 0.334 0.:34 1o0 12.691 789.e0 -' -' -' - -' -' -' '- -' 0.340 0.340 1.55 13.186 789.55 -- -- -- - -- -- -- - - 0.379 0.378 1.00 13.681 783.80 -' -' -' -' -' '- -' -' -' 0.418 0.418 1.65 14.176 789.65 -- - -- -- -- - -- -- -- 0.457 0.457 170 14.871 789.70 -' -' -' -' -' -' -' -' -' 0.496 8.498 1.75 15.1*6 78e.75 -- -- -- -- -- -- -- -- -- ooss 0.535 1.80 15.661 789.80 -' -' -' -' -' -' -' -' -' 0.574 0.574 1.85 16.150 08.85 - - - - - - - - - 0.813 0.013 1e0 16.651 789.90 -- - -- - -- -- - -- - 0.652 0.652 1.95 17.148 788.95 '- -' -' -' -' -' -' '- -' 0.891 0.091 200 17.641 780.00 -- -- -- -- -- -- -- - - 0.730 0.730 2.05 18.175 790D5 -' -' -' -' -' -- -' -' -' 0.780 0.760 2.10 18.709 7e0.10 -- -- -- -- -- -- -- -- -- 0.790 0.780 2.15 19.243 790.15 -' -' -' -' '- -' -' -' -' 0.820 0.820 zzn 19.777 79020 -- -- -- -- -- -- - -- -- 0850 0.850 2.25 20.311 7e0.25 -- -' -- -' -' -' -' -' -' 0.880 0.880 230 20.845 790.30 -- -- - -- -- -- - -- -- 0910 0.910 2.35 21.379 790.35 -' -' -' -' -' -' '- -' -' 0.940 0.940 2.40 21.914 790.40 -- -- -- -- -- -- -- -- - 0.970 0.970 2.45 22.448 780.45 -- -' -' -' -' -' -' -' -' 1.000 1.000 2.50 22.982 790a0 -- -- -- - - -- -- - - 1.030 1.030 2.55 23,559 790.55 -- -- -- -- -- -- -- -- - 1.053 1.053 2.60 24.135 790.00 -' -' -- -' -' -' -' -- -' 1.070 1.070 2.65 24.712 790.65 -- - -- -- -- -- -- -- -- 1.099 1.099 2.70 25.289 790.70 '- -' -' -' -' -' -' -' -' 1.122 1.122 2.75 25,865 7e0.75 -- -- -- -- -- -- - -- -- 1.145 1.145 2.80 26.442 790.80 -' -' -' '- -' -' '- -' -' 1.168 1.168 2.85 27.018 790.85 -- -- - - -- - -- -- -- 1191 1191 2.90 27.596 790.80 - - - - - - - - - 1.214 1.214 2.95 28.172 790.95 - - - - - - - - - 1.237 1.237 3.00 28.749 781.00 - - - - - - - - - 1.260 1.260 3.05 29.368 791.05 - - - - - - - - - 1.279 1.279 3.10 28.988 791.10 - - - - - - - - - 1.298 1.298 3.15 30,607 78115 - - - - - - - - - 1.317 1o17 lzO 31,226 781.20 - - - - - - - - - 1.336 1.336 3.25 31.845 791.25 - - - - - - - - _ 1.355 1.355 3.30 32.465 791.30 - - - - - - - - - 1.374 1.374 3.35 33.084 791.85 - - - - - - - - - 1.393 1.393 3.40 33.703 791.40 - - - - - - - - - 1.412 1.412 3.45 34,323 791,45 - - - - - - - - _ 1,431 1,431 3.50 34,942 791.50 - - - - - - - - - 1.450 1.450 3.55 35,804 781.55 - - - - - - - - - 1.468 1.468 3.60 36,266 791/60 - - - - - - - - - 1.486 1.486 3.6e 36,927 781/65 - - - - - - - - _ 1.504 1.504 3.70 37,589 791.70 - - - - - - - - - 1.522 1.522 3.75 38,251 791.75 - - - - - - - - - 1.540 1.540 3.80 38.813 791.80 - - - - - - - - - 1.558 1.558 3.85 39.575 791.85 - - - - - - - - - 1.576 1.576 8.90 40,237 791/90 - - - - - - - - - 1.594 1.594 3.85 40,898 7e1.85 - - - - - - - - - 1.612 1.612 4.00 41.560 792.00 - - - - - - - - - 1.630 1.630 4.05 42.265 792.0e - - - - - - - - - 1.647 1.647 4.10 42.90 792.10 - - - - - - - - - 1.064 1.664 4.15 43,675 79215 - - - - - - - - - 1.681 1,601 4.20 44,380 792.20 - - - - - - - - - 1.698 1.698 4.25 45.085 792.25 -- - -- -- -- - -- - -- 1.715 1.715 4.30 45.790 792.30 - - - - - - - - - 1.732 1.732 4.35 40.495 792.35 -- -- -- - -- -- - -- -- 1.749 1.749 4.40 47.200 792.40 -' -' -' -- -' -' -' -' -' 1.706 1.766 4.45 47.905 792.45 -- -- -- -- -- -- -- -- -- 1.783 1.783 4.50 48.610 78250 -- -' -' -' -' -' -' -' -' 1.800 1.800 4.55 4e.359 78255 -' - -- -- -- -- -- -- -- 1.816 1.815 4.60 50.107 792.00 -' -' -' '- -' -' -' -' '- 1.832 1.832 4s5 50,856 792.85 -- -- -- -- - -- -- - - 1.848 1.848 Continues onnext paOo- 13 SF #200 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Civ B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft Cuft ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 4.70 51,605 792.70 --- --- --- --- --- --- --- --- --- 1.864 1.864 4.75 52,353 792.75 --- --- --- --- --- --- --- --- --- 1.880 1.880 4.80 53,102 792.80 --- --- --- --- --- --- --- --- --- 1.896 1.896 4.85 53,851 792.85 --- --- --- --- --- --- --- --- --- 1.912 1.912 4.90 54,599 792.90 --- --- --- --- --- --- --- --- --- 1.928 1.928 4.95 55,348 792.95 --- --- --- --- --- --- --- --- --- 1.944 1.944 5.00 56,097 793.00 --- --- --- --- --- --- --- --- --- 1.960 1.960 5.05 56,889 793.05 --- --- --- --- --- --- --- --- --- 1.976 1.976 5.10 57,681 793.10 --- --- --- --- --- --- --- --- --- 1.992 1.992 5.15 58,474 793.15 --- --- --- --- --- --- --- --- --- 2.008 2.008 5.20 59,266 793.20 --- --- --- --- --- --- --- --- --- 2.024 2.024 5.25 60,059 793.25 --- --- --- --- --- --- --- --- --- 2.040 2.040 5.30 60,851 793.30 --- --- --- --- --- --- --- --- - 2.056 2.056 5.35 61,643 793.35 --- --- --- --- --- --- --- --- - 2.072 2.072 5.40 62,436 793.40 --- --- --- --- --- --- --- --- --- 2.088 2.088 5.45 63,228 793.45 --- --- --- --- --- --- --- --- - 2.104 2.104 5.50 64,020 793.50 --- --- --- --- --- --- --- --- --- 2.120 2.120 5.55 64,856 793.55 --- --- --- --- --- --- --- -- - 2.134 2.134 5.60 65,693 793.60 --- --- --- --- --- --- --- -- --- 2.148 2.148 5.65 66,529 793.65 --- --- --- --- --- --- --- --- --- 2.162 2.162 5.70 67,365 793.70 --- --- --- --- --- --- --- --- --- 2.176 2.176 5.75 68,201 793.75 --- --- --- --- --- --- --- --- --- 2.190 2.190 5.80 69,037 793.80 --- --- --- --- --- --- --- --- --- 2.204 2.204 5.85 69,873 793.85 --- --- --- --- --- --- --- --- --- 2.218 2.218 5.90 70,709 793.90 --- --- --- --- --- --- --- --- --- 2.232 2.232 5.95 71,545 793.95 --- --- --- --- --- --- --- --- --- 2.246 2.246 6.00 72,381 794.00 --- --- --- --- --- --- --- --- --- 2.260 2.260 6.05 73,258 794.05 --- --- --- --- --- --- --- --- --- 3.217 3.217 6.10 74,136 794.10 --- --- --- --- --- --- --- --- --- 4.174 4.174 6.15 75,013 794.15 --- --- --- --- --- --- --- --- --- 5.131 5.131 6.20 75,890 794.20 --- --- --- --- --- --- --- --- --- 6.088 6.088 6.25 76,767 794.25 --- --- --- --- --- --- --- --- --- 7.045 7.045 6.30 77,644 794.30 --- --- --- --- --- --- --- --- --- 8.002 8.002 6.35 78,522 794.35 --- --- --- --- --- --- --- --- --- 8.959 8.959 6.40 79,399 794.40 --- --- --- --- --- --- --- --- --- 9.916 9.916 6.45 80,276 794.45 --- --- --- --- --- --- --- --- --- 10.87 10.87 6.50 81,153 794.50 --- --- --- --- --- --- --- --- --- 11.83 11.83 6.55 82,069 794.55 --- --- --- --- --- --- --- --- --- 13.13 13.13 6.60 82,985 794.60 --- --- --- --- --- --- --- --- --- 14.43 14.43 6.65 83,901 794.65 --- --- --- --- --- --- --- --- --- 15.72 15.72 6.70 84,816 794.70 --- --- --- --- --- --- --- --- --- 17.02 17.02 6.75 85,732 794.75 --- --- --- --- --- --- --- --- --- 18.32 18.32 6.80 86,648 794.80 --- --- --- --- --- --- --- --- --- 19.62 19.62 6.85 87,564 794.85 --- --- --- --- --- --- --- --- --- 20.92 20.92 6.90 88,479 794.90 --- --- --- --- --- --- --- --- --- 22.21 22.21 6.95 89,395 794.95 --- --- --- --- --- --- --- --- --- 23.51 23.51 7.00 90,311 795.00 --- --- --- --- --- --- --- --- --- 24.81 24.81 7.05 91,265 795.05 --- --- --- --- --- --- --- --- --- 27.00 27.00 7.10 92,220 795.10 --- --- --- --- --- --- --- --- --- 29.20 29.20 7.15 93,174 795.15 --- --- --- --- --- --- --- --- --- 31.39 31.39 7.20 94,128 795.20 --- --- --- --- --- --- --- --- --- 33.58 33.58 7.25 95,082 795.25 --- --- --- --- --- --- --- --- --- 35.78 35.78 7.30 96,037 795.30 --- --- --- --- --- --- --- --- --- 37.97 37.97 7.35 96,991 795.35 --- --- --- --- --- --- --- --- --- 40.16 40.16 7.40 97,945 795.40 --- --- --- --- --- --- --- --- - 42.35 42.35 7.45 98,900 795.45 --- --- --- --- --- --- --- --- - 44.55 44.55 7.50 99,854 795.50 --- --- --- --- --- --- --- --- - 46.74 46.74 7.55 100,847 795.55 --- --- --- --- --- --- --- --- --- 50.69 50.69 7.60 101,840 795.60 --- --- --- --- --- --- --- --- --- 54.64 54.64 7.65 102,833 795.65 --- --- --- -- --- --- --- --- --- 58.59 58.59 7.70 103,826 795.70 --- --- --- -- --- --- --- --- --- 62.54 62.54 7.75 104,818 795.75 --- --- --- --- --- --- --- --- --- 66.49 66.49 7.80 105,811 795.80 --- --- --- --- --- --- --- --- --- 70.43 70.43 7.85 106,804 795.85 --- --- --- --- --- --- --- --- --- 74.38 74.38 7.90 107,797 795.90 --- --- --- --- --- --- --- --- --- 78.33 78.33 7.95 108,790 795.95 --- --- --- --- --- --- --- --- --- 82.28 82.28 8.00 109,783 796.00 --- --- --- --- --- --- --- --- --- 86.23 86.23 ..End Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc. v2020 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 8.520 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.50 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 1:1Me . �9 4.00 2.00 0.00 ` 1' 0 2 4 Hyd No. 6 6 8 14 Wednesday, 02 / 12 / 2020 Peak discharge = 12.73 cfs Time to peak = 11.97 hrs Hyd. volume = 25,982 cuft Curve number = 67.9 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area No SF Hyd. No. 6 -- 2 Year Q (cfs) 14.00 12.00 10.00 0e M 4.00 2.00 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 13.35 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 114,820 cuft Inflow hyds. = 4, 5, 6 Contrib. drain. area = 8.520 ac Post Area Total Q (cfs) Q (cfs) Hyd. No. 7 -- 2 Year 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 Time (hrs) - Hyd No. 7 Hyd No. 4 Hyd No. 5 Hyd No. 6 16 Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 24.52 2 738 134,111 ------ ------ ------ Pre Area 2 SCS Runoff 47.79 2 716 97,143 ------ ------ ------ Post Area SF#100 3 SCS Runoff 34.79 2 716 70,245 ------ ------ ------ Post Area SF#200 4 Reservoir 1.684 2 824 97,123 2 795.66 57,407 Post SF#100 5 Reservoir 1.538 2 804 70,227 3 791.74 38,177 PostSF#200 6 SCS Runoff 28.17 2 718 56,343 ------ ------ ------ Post Area No SF 7 Combine 30.49 2 718 223,693 4, 5,6 ------ ------ Post Area Total Pre vs Post.gpw Return Period: 10 Year Wednesday, 02 / 12 / 2020 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 24.52 cfs Storm frequency = 10 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 134,111 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 14 4.00 0.00 ' 1' 0 2 4 Hyd No. 1 6 8 Pre Area Hyd. No. 1 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 01 4.00 r I I I I I I `--j 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Peak discharge = 47.79 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 97,143 cuft Drainage area = 9.760 ac Curve number = 79.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 -1--1 - ' 0 2 4 - Hyd No. 2 Post Area SF#100 Hyd. No. 2 -- 10 Year 6 8 10 12 14 16 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' 0.00 18 20 22 24 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.270 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.10 in Storm duration = 24 hrs Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -1 1' 0 2 4 - Hyd No. 3 6 8 19 Wednesday, 02 / 12 / 2020 Peak discharge = 34.79 cfs Time to peak = 11.93 hrs Hyd. volume = 70,245 cuft Curve number = 74.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#200 Hyd. No. 3 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 ..O - I I I I- - 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk(D Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 1.684 cfs Storm frequency = 10 yrs Time to peak = 13.73 hrs Time interval = 2 min Hyd. volume = 97,123 cuft Inflow hyd. No. = 2 -Post Area SF#100 Max. Elevation = 795.66 ft Reservoir name = SF #100 Max. Storage = 57,407 cuft Storage Indication method used Post SF#100 Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 66 Time (hrs) Hyd No. 4 Hyd No. 2 Total storage used = 57,407 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 5 Post SF#200 Hydrograph type = Reservoir Peak discharge = 1.538 cfs Storm frequency = 10 yrs Time to peak = 13.40 hrs Time interval = 2 min Hyd. volume = 70,227 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 791.74 ft Reservoir name = SF #200 Max. Storage = 38,177 cuft Storage Indication method used. Post SF#200 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 5 Hyd No. 3 ' Total storage used = 38,177 cult Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.520 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.10 in Storm duration = 24 hrs Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' 1 -- 0 2 4 Hyd No. 6 6 8 22 Wednesday, 02 / 12 / 2020 Peak discharge = 28.17 cfs Time to peak = 11.97 hrs Hyd. volume = 56,343 cuft Curve number = 67.9 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area No SF Hyd. No. 6 -- 10 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 30.49 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 223,693 cuft Inflow hyds. = 4, 5, 6 Contrib. drain. area = 8.520 ac Post Area Total Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 7 Hyd No. 4 - Hyd No. 5 Hyd No. 6 24 Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 47.53 2 738 240,877 ------ ------ ------ Pre Area 2 SCS Runoff 71.56 2 716 147,640 ------ ------ ------ Post Area SF#100 3 SCS Runoff 54.40 2 716 110,646 ------ ------ ------ Post Area SF#200 4 Reservoir 15.62 2 724 147,620 2 796.63 73,172 Post SF#100 5 Reservoir 2.115 2 812 110,628 3 793.48 63,767 Post SF#200 6 SCS Runoff 46.52 2 716 93,913 ------ ------ ------ Post Area No SF 7 Combine 49.87 2 718 352,160 4, 5, 6 ------ ------ Post Area Total Pre vs Post.gpw Return Period: 50 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 25 Hydraflow Hydrographs Extension for Autodesk(D Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 47.53 cfs Storm frequency = 50 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 240,877 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' 0 2 4 - Hyd No. 1 Pre Area Hyd. No. 1 -- 50 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Peak discharge = 71.56 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 147,640 cuft Drainage area = 9.760 ac Curve number = 79.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Post Area SF#100 Hyd. No. 2 -- 50 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 2 Time (hrs) Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 2 min Drainage area = 8.270 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.80 in Storm duration = 24 hrs Q (cfs) 60.00 40.00 30.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 3 6 8 Wednesday, 02 / 12 / 2020 Peak discharge = 54.40 cfs Time to peak = 11.93 hrs Hyd. volume = 110,646 cuft Curve number = 74.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#200 Hyd. No. 3 -- 50 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 -w -- 0.00 10 12 14 16 18 20 22 24 Time (hrs) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 15.62 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 147,620 cuft Inflow hyd. No. = 2 -Post Area SF#100 Max. Elevation = 796.63 ft Reservoir name = SF #100 Max. Storage = 73,172 cuft Storage Indication method used. Post SF#100 Q (cfs) Hyd. No. 4 -- 50 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 4 Hyd No. 2 Total storage used = 73,172 cuft 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 5 Post SF#200 Hydrograph type = Reservoir Peak discharge = 2.115 cfs Storm frequency = 50 yrs Time to peak = 13.53 hrs Time interval = 2 min Hyd. volume = 110,628 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 793.48 ft Reservoir name = SF #200 Max. Storage = 63,767 cuft Storage Indication method used. Post SF#200 Q (cfs) Q (cfs) Hyd. No. 5 -- 50 Year 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) -- Hyd No. 5 Hyd No. 3 Total storage used = 63,767 cuft Hydrograph Report 30 Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Peak discharge = 46.52 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 93,913 cuft Drainage area = 8.520 ac Curve number = 67.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type If Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 ' 0 2 4 --- Hyd No. 6 Post Area No SF Hyd. No. 6 -- 50 Year 6 8 10 12 14 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 49.87 cfs Storm frequency = 50 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 352,160 cuft Inflow hyds. = 4, 5, 6 Contrib. drain. area = 8.520 ac Post Area Total Q (cfs) Q (cfs) Hyd. No. 7 -- 50 Year 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) Hyd No. 7 Hyd No. 4 Hyd No. 5 Hyd No. 6 32 Hydrograph Summary Re po rtydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 59.38 2 738 296,192 ------ ------ ------ Pre Area 2 SCS Runoff 82.83 2 716 172,129 ------ ------ ------ Post Area SF#100 3 SCS Runoff 63.83 2 716 130,506 ------ ------ ------ Post Area SF#200 4 Reservoir 33.83 2 722 172,108 2 797.07 80,588 Post SF#100 5 Reservoir 3.728 2 768 130,488 3 794.08 73,727 Post SF#200 6 SCS Runoff 55.82 2 716 112,805 ------ ------ ------ Post Area No SF 7 Combine 71.65 2 720 415,401 4, 5, 6 ------ ------ Post Area Total Pre vs Post.gpw Return Period: 100 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 33 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 59.38 cfs Storm frequency = 100 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 296,192 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Area Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 1141 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 9.760 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.60 in Storm duration = 24 hrs Wednesday, 02 / 12 / 2020 Peak discharge = 82.83 cfs Time to peak = 11.93 hrs Hyd. volume = 172,129 cuft Curve number = 79.4 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#100 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 2 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 8.270 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.60 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1' 0.0 2.0 4.0 Hyd No. 3 35 Wednesday, 02 / 12 / 2020 Peak discharge = 63.83 cfs Time to peak = 11.93 hrs Hyd. volume = 130,506 cuft Curve number = 74.6 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Post Area SF#200 Hyd. No. 3 -- 100 Year Q (cfs) 70.00 .1 1M 50.00 40.00 30.00 20.00 10.00 _'- 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Report 36 Hydraflow Hydrographs Extension for Autodesk0 Civil 31DO by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 33.83 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 172,108 cuft Inflow hyd. No. = 2 - Post Area SF#100 Max. Elevation = 797.07 ft Reservoir name = SF #100 Max. Storage = 80,588 cuft Storage Indication method used. Q (cfs) Post SF#100 Hyd. No. 4 -- 100 Year Q (cfs) 90.00 80.00 90.00 70.00 80.00 60.00 70.00 50.00 60.00 40.00 50.00 30.00 40.00 20.00 30.00 10.00 20.00 000 10.00 000 0 4 Hyd No. 4 8 12 16 20 24 28 32 Hyd No. 2 Total storage used = 80,588 cuft 36 Time (hrs) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 5 Post SF#200 Hydrograph type = Reservoir Peak discharge = 3.728 cfs Storm frequency = 100 yrs Time to peak = 12.80 hrs Time interval = 2 min Hyd. volume = 130,488 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 794.08 ft Reservoir name = SF #200 Max. Storage = 73,727 cuft Storage Indication method used Post SF#200 Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 5 Hyd No. 3 l 1 1 1 l Total storage used = 73,727 cult 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Peak discharge = 55.82 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 112,805 cuft Drainage area = 8.520 ac Curve number = 67.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0 2 4 - Hyd No. 6 6 8 Post Area No SF Hyd. No. 6 -- 100 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 .WO- 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 7 Post Area Total Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 4, 5, 6 Q (cfs) Wednesday, 02 / 12 / 2020 Peak discharge = 71.65 cfs Time to peak = 12.00 hrs Hyd. volume = 415,401 cuft Contrib. drain. area = 8.520 ac Post Area Total Hyd. No. 7 -- 100 Year Q (cfs) 80.00 ou.uu 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0 00 n nn 0 4 Hyd No. 7 8 12 Hyd No. 4 16 20 Hyd No. 5 24 28 32 Time (hrs) - Hyd No. 6 Pine Forest II Storm Drain/Erosion Control Project Report Section 6: Water Quality Water Quality Calculations Volume Calculations Pine Forest II Storm Drain/Erosion Control Project Report Section 6; Water Quality Sand Filter Pond 100 Analysis BMP 100 Pine Forest II Statesville, Iredell County, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Sand Filter #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 9.76 ac. Paved Roads/Sidewalk/Structures 4.85 ac. C = 98 Wooded Area C = 60 0.00 ac. Good Grass (>75% coverage) 4.91 ac. Newly Graded C= 61 C = 86 Composite CN (Sand Filter) 79.4 0.00 ac. Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC. By: Corin Brown BMP Type: Surface Sand Filter #100 Required Background Information: 1.0 Drainage Area Size (Area in SF Draining to BMP) = 425191 SF 2.0 Impervious Area (Area in SF Draining to BMP) = 211335 SF 3.0 % Impervious Area (Impervious Area/DA) = 4g 7p; o/o Compute Water Quality Volume (WQv): 1.0 Compute Runoff Coefficient (Rv) using Schueler's Method Rv BMP Equation Rv = 0.05 + 0.009(I) Where "I" is % Impervious (in percent, not decimal) 0.50 2.0 Compute Water Quality Volume (WQv) using Schueler's Method WQv BMP Equation WQv = 1.ORvA/12 Where "A" is Area Draining to BMP in Acres = 0,40 ac-ft = _ 1753.1.75' cu.ft. 3.0 Convert Water Quality Volume (WQv) into Inches of Runoff WQv BMP Equation WQv = 1.0(Rv) _ G.50inches Compute Water Quality Peak Flow (WQp): 1.0 Compute Modified SCS Curve Number (CN) CN BMP Equation CN = 1000/[10 + 5P + 10WQv - 10(WQVA2 + 1.25QQVP)AO.5) "P" is precipitation = 1.0 = 93.9 A. If in Charlotte or Mecklenburg County, run pre and post hydrologic model using 1-inch, 6-hour storm in HEC-1 model output using SCS method B. If in Huntersville, skip this section Compute Channel Protection Volume 1.0 Compute Maximum Soil Retention (S) using SCS Methods (CN is Standard Value - Not Modified CN Value) S = 1000/CN-10 79.4 CN Value (Post) 2.59 inches 2.0 Compute Total Runoff for the 1-year, 24-hour Storm Event (Statesville Requirements) Qd = (P-0.2S)A2 / (P+0.8S) For Statesville 2.84 P = Precipitation LW inches For Char-Meck 2.58 P = 1-yr, 24-hr For Statesville 3.02 P = 1-yr, 24-hr 3.0 Compute Watershed Runoff (CPv) CPv = Qd * Area * (1ft/12inches) Area = In Acres of DA = it 0.89 ac-ft = Ac. Convert to cubic feet = CPv(ac-ft) * 43560 sf/acre = 38835 cu.ft. Compute Release Rates for Water Quality Control (WQv) and Channel Protection Volume (CPv) These are average release rates (estimates) based on Static Method and should be used as "targets" for routing calculations. For Mecklenburg County 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 0 096. cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 0,14 cfs For City of Statesville 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) 0.096. cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) 0.164cfs Sedimentation Chamber Volume 1.0 Compute Sediment Chamber Volume (20% of Water Quality Volume) SCvol = (WQv)(43,560 sf/ac)(0.20) 3524 cu.ft. Compute Surface Sand Filter Area and Volume to Treat Water Quality Volume (WQv) Duration: 2.0 days (48 hrs) + 3 hours 51 hrs Duration: 1.0 days (24 hrs) + 12 hours 36 hrs Where CPv = WQv ac-ft - CPv ac-ft 0.49 ac-ft Duration: 2.0 days (48 hrs) + 3 hours 51 hrs Duration: 1.0 days (24 hrs) + 12 hours 36 hrs Where CPv = WQv ac-ft - CPv ac-ft 0.49' ac-ft 1.0 Check Surface Sand Filter Area based on Darcy's Equation (assumed value of 1.75 in/hr for the design coefficient of permeability for the sand filter media) Af = (WQv)(df) / [(k)(hf + df)(tf)] «««««« = 1185sq.ft. Surface Area Used = Sand Filter Dims @ Filter Media = 2276 sq.ft. 31 Width (ft) 73! Length (ft) Where: df- 1 ft filter bed depth (1' Minimum) k - 3.5 ft/dy permeability coeff. hf - 1 ft avg. height of water tf - 2.125 days filter bed drain time Develop Stage -Discharge for Bioretention Filter Media & BMP Outlet Structure Outflow computed using following equations: Af Qo Qa = Where: Af = surface area of filter bed (sq.ft.)(Required Surface Area) df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hf = avg. height of water above filter bed (ft) (WQ,,)(df) / [(k)(hf + df)(tf)] WQv/tf [(Af)(k)(hf + df)] / df x a 2276 sf Elevation Contour Area (SF) Depth (Incr.)(ft) Volume (cf) Incr. Accum. Discharge (cfs) (Filter Media) This Is For Filter Media Only Comments 790.00 5310 0.0 0 0 0.000 790.50 6099 0.5 2852 2852 0.138 791.00 6887 0.5 3246 6099 0.184 791.50 7676 0.5 3641 9739 0.230 792.00 8464 0.5 4035 13774 0.277 792.50 9383 0.5 4462 18236 0.323 793.00 10302 0.5 4921 23157 0.369 793.50 11220 0.5 5380 28537 0.415 794.00 12139 0.5 5840 34377 0.461 794.50 13192 0.5 6333 40710 0.507 795.00 14245 0.5 6859 47569 0.553 795.50 15297 0.5 7385 54954 0.599 796.00 16350 0.5 7912 62866 0.645 796.50 16509 0.5 8215 71081 0.691 797.00 16669 0.5 8294 79375 0.738 797.50 16828 0.5 8374 87749 0.784 798.00 16987 0.5 8454 96203 0.830 Weir Discharge (cfs) This is for Primary Weir Only Stage Elev. Weir Elev. Length (L) Head (H) Coeff (Cw) (Q) Comments/Notes 790.0 796.00 8 0.0 3.33 0.00 Sides of Weir = 4 EA 790.5 796.00 8 0.0 3.33 0.00 Length of Weir = 2 LF 791.0 796.00 8 0.0 3.33 0.00 Length (L) = 8 LF 791.5 796.00 8 0.0 3.33 0.00 792.0 796.00 8 0.0 3.33 0.00 Cw = Sharp -Crested 3.33 792.5 796.00 8 0.0 3.33 0.00 Broad Crested 3.00 793.0 796.00 8 0.0 3.33 0.00 793.5 796.00 8 0.0 3.33 0.00 794.0 796.00 8 0.0 3.33 0.00 794.5 796.00 8 0.0 3.33 0.00 795.0 796.00 8 0.0 3.33 0.00 795.5 796.00 8 0.0 3.33 0.00 796.0 796.00 8 0.0 3.33 0.00 796.5 796.00 8 0.5 3.33 9.42 797.0 796.00 8 1.0 3.33 26.64 797.5 796.00 8 1.5 3.33 48.94 798.0 796.00 8 2.0 3.33 75.35 Weir Equation »»> Q= Cw*L*H^1.5 Weir Discharge (cfs) This is for Emergency Spillway Only Stage Elev. Spillway Elev. Length (L) Head (H) Coeff (Cw) (Q) Comments/Notes 790.0 797.0 0 0.0 3.00 0.00 Sides of Weir = 1 EA 790.5 797.0 0 0.0 3.00 0.00 Length of Weir = 20 LF 791.0 797.0 0 0.0 3.00 0.00 Length (L) = 20 LF 791.5 797.0 0 0.0 3.00 0.00 792.0 797.0 0 0.0 3.00 0.00 Cw = Sharp -Crested 3.33 792.5 797.0 0 0.0 3.00 0.00 Broad Crested 3.00 793.0 797.0 0 0.0 3.00 0.00 793.5 797.0 0 0.0 3.00 0.00 794.0 797.0 0 0.0 3.00 0.00 794.5 797.0 0 0.0 3.00 0.00 795.0 797.0 0 0.0 3.00 0.00 795.5 797.0 0 0.0 3.00 0.00 796.0 797.0 0 0.0 3.00 0.00 796.5 797.0 0 0.0 3.00 0.00 797.0 797.0 0 0.0 3.00 0.00 797.5 797.0 20 0.5 3.00 21.21 798.0 797.0 20 1.0 3.00 60.00 Weir Equation »»> Q= Cw*L*HA1.5 PROJECT: PROJECT #: DESCRIPTION: Pine Forest Il 2712 Sand Filter #100 DATE: 12-Feb-20 DESIGNER: C.E.B ENGINEER: P.L.M. POND STORAGE VOLUME: CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) 790.00 5.310 790.50 6,099 0.5 >.g; 791.00 6,SS7 l.0 791.50 7,676 1.5 792.00 8 A 6 4 792,50 9.383 4.46' Z? > 793.00 10,302 7.0 7.921 ? ;.1 793.50 1 1.220 794.00 12,139 4.0 �_7 40 4.377 794.50 13,192 4.5 41.710 795.00 14 245 5.0 6,X59 47150') 795.50 15.297 7.954 796.00 16,350 6.0 7.91) 62.866 796.50 16,509 6.5 ?? 1 ? 1 1.0� 1 797.00 16,669 7.0 �_ 294 79_ ; 75 797.50 16,828 7.5 S. 74 7J49 798.00 16,987 U 45 1 96?O; ORIFICE FLOW DATA: ORIFICE NO. DIA. (IN.) AREA (S.F.) 'C' INVERT ELEV. (FT.) CENTR. ELEV. (FT.) DESCRIPTION 1 6 0.196 0.4 1 792.5 1 792.75 WEIR FLOW DATA: WEIR NO. CREST ELEV. (FT.) LENGTH (FT.) 'C' SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. _ WIDTH = Z = 'C' = VARIES PROJECT: PROJECT #: DESCRIPTION: COMBINED FLOW: Pine Forest II DATE: 12-Feb-20 2712 DESIGNER: C.E.B Sand Filter #100 ENGINEER: P.L.M. ELEV. (FT.) ORIFICES WEIRS SPILLWAY Q1 (C.F.S.) TOTAL FLOW (C.F.S.) Q1 (C.F.S.) Q2 (C.F.S.) Q3 (C.F.S.) Q1 (C.F.S.) Q2 (C.F.S.) Q3 (C.F.S.) 790.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 790.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 791.!� 0.00 0.00 0.00 0.00 0.00 0.00 0.00 791.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 792.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793.00 0.32 0.00 0.00 0.00 0.00 0.00 0.32 793.50 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.55 794.00 0.70 0.00 0.00 0.00 0.00 0.00 0.00 0.70 794.50 0.81 0.00 0.00 0.00 0.00 0.00 0.00 0.83 795.00 0.00 0.00 0.00 0.00 0.00 0.00 0.95 795.5r! 0.00 0.00 0.00 0.00 0.00 0.00 1.04 796.( 0.00 0.00 0.00 0.00 0.00 0.00 1.14 796. . _ - 0.00 0.00 0.00 0.00 0.00 0.00 1.22 - - 1.30 0.00 0.00 0.00 0.00 0,00 0.00 97.50 1.37 0.00 0.00 0.00 0.00 0.00 0.00 798.00 1.44 0.00 0.00 0.00 0.00 0.00 0.00 FINAL RESULTS: STAGE STORAGE DISCHARGE (FT.) (C.F.) (C.F.S.) 790.50 2,852 0.00 791.00 6,099 0.00 791.5' 9,739 0.00 792.00 13,774 0.00 792.50 18,236 0.00 793.00 23,157 0.32 793.50 28,537 0.55 794.00 34,377 0.70 794.50 40,710 0.83 795.00 47.569 0.95 795.50 � 4.954 1.04 796.00 62,866 1.14 796.50 - 1.081 1.22 797.00 79,375 1.30 797.50 87.749 1.37 798.00 96.203 1.44 Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 202C Client: The Johnson Group, INC. By: Corin Brown BMP Type: Surface Sand Filter #100 Verify Diameter of BMP Outlet Pipe (Barrel) Equation for Submerged Orifice = C * A * (2g*h)A0.5 Where: C = 0.6 A = see below g = 32.2 ft/sA2 h = headwater over orifice Inputs: Dia. of Pipe 24 inches convert to area in SF = 3.1416 sq.ft. Principal Weir 796.00 MSL (from Surface Sand Filter Design) Media Filter 790.00 MSL (from Surface Sand Filter Design) Bot. of Media 788.50 MSL (from Surface Sand Filter Design) Results for Submerged Orifice: (Max Q out of BMP Structure) Orifice Dia = Barrel Discharge Results in CFS Discharge noted as "BMP Out" (see table below) Stage Elev. Bot. Media HW (ft.) Discharge Notes 788.50 788.50 0.00 0.00 Bottom of Soil Media 789.00 788.50 0.50 10.70 789.50 788.50 1.00 15.13 790.00 788.50 1.50 18.53 Top of Soil Media 790.50 788.50 2.00 21.39 791.00 788.50 2.50 23.92 791.50 788.50 3.00 26.20 792.00 788.50 3.50 28.30 792.50 788.50 4.00 30.25 793.00 788.50 4.50 32.09 793.50 788.50 5.00 33.82 794.00 788.50 5.50 35.48 794.50 788.50 6.00 37.05 795.00 788.50 6.50 38.57 795.50 788.50 7.00 40.02 795.75 788.50 7.25 40.73 796.00 788.50 7.50 41.43 Principal Weir 796.50 788.50 8.00 42.78 797.00 788.50 8.50 44.10 Emergency Spillway 797.50 788.50 9.00 45.38 798.00 1 788.50 9.50 46.62 Top of Dam Final Stage -Discharge Results Flow Through Riser & Barrel - Excludes Spillway Riser & Barrel + Spillway Stage Q (cfs) Q (cfs) Q (cfs) Q (cfs) Q (cfs)* Net BMP Q (cfs) Q (cfs) (MSQ Soil Media Weir Orfice Subtotal BMP Out Outflow Spillway Final Pond Discharge 790.00 0.00 0.00 0.00 0.00 18.53 0.00 0.00 0.00 790.50 0.14 0.00 0.00 0.14 21.39 0.14 0.00 0.14 791.00 0.18 0.00 0.00 0.18 23.92 0.18 0.00 0.18 791.50 0.23 0.00 0.00 0.23 26.20 0.23 0.00 0.23 792.00 0.28 0.00 0.00 0.28 28.30 0.28 0.00 0.28 792.50 0.32 0.00 0.00 0.32 30.25 0.32 0.00 0.32 793.00 0.37 0.00 0.32 0.68 32.09 0.68 0.00 0.68 793.50 0.41 0.00 0.55 0.96 33.82 0.96 0.00 0.96 794.00 0.46 0.00 0.70 1.17 35.48 1.17 0.00 1.17 794.50 0.51 0.00 0.83 1.34 37.05 1.34 0.00 1.34 795.00 0.55 0.00 0.95 1.50 38.57 1.50 0.00 1.50 795.50 0.60 0.00 1.04 1.64 40.02 1.64 0.00 1.64 796.00 0.65 0.00 1.14 1.78 41.43 1.78 0.00 1.78 796.50 0.69 9.42 1.22 11.33 42.78 11.33 0.00 11.33 797.00 0.74 26.64 1.30 28.68 44.10 28.13 0.00 28.13 797.50 0.78 48.94 1.37 51.10 45.38 45.38 21.21 66.59 798.00 0.83 75.35 1.44 77.62 46.62 46.62 60.00 106.62 * If BMP Out value is < than combined flow of Soil Media + Weir, use BMP Out Value for Pond Discharge (BMP Structure Outflow through Riser & Barrel) Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc, Location: Statesville, North Carolina Date: February 12, 202C Client: The Johnson Group, INC. By: Corin Brown BMP Type: Surface Sand Filter #100 Size Underdrains for Surface Sand Filter The calculations utilized are taken from the Charlotte -Mecklenburg BMP Design Manual (July 1, 2010 ed.) for sizing of underdrains for bioretention ponds/rain gardens. 1.0 Compute perforation capacity of underdrain pipe. Minimum requirements or guidance as follows: min. pipe diameter equals 6" underdrains shall be centered 10' max. on center (10' o.c.) min. slope on underdrain shall be 0.50% - assume 4 rows of perforation in pipe (3/8" perforations) reduce perforated pipe length by 1' for each fitting (cleanouts, tees, wyes) assume 50% of perforations will become clogged and be ineffective Input Data: Total Length of Underdrain Pipe (If) 149 Total Number of Fittings (ea) 5 Diameter of Pipe (inches) 6 Number of Perforations = (Length of Pipe - Fittings)*(4 rows/ft)*(4 holes/row) = 2304 perforations Actual Perforations Active = Number of Performations * 0.50 (50%) = 1152 perforations Capacity of One Hole = C*A*(2g*h)^0.5 Where: C = 0.6 0.0037 cfs/hole A = 0.000767 (sf) g = 32.2 ft/s^2 h = 1 ft Capacity of Active Perfs. = No. Active Performations * Capacity of One Hole = 4.25 cfs (ok if > than filter media capacity) `i ©t438a cfs (soil media capacity at 0.5' from biorentention design) if Capacity of Active Performations < Soil Media at 0.50' headwater depth, add additional pipe lenghth Project: Pine Forest 11 Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC. By: Corin Brown BMP Type: Surface Sand Filter #100 Verify Sediment Forebay Storage Volume From Sand Filter Design Worksheet, Req. Sediment Forebay Volume = 20% of Water Quality Volume SCvol = (WQv)(43,560 sf/ac)(0.20) 3524 cu.ft. Elevation Contour Area (SF) Depth (Incr.)(ft) Volume (cf) Incr. Accum. 790.0 2032 0.0 0 0 791.0 2628 1.0 2330 2330 792.0 3739 1.0 3184 5514 793.0 4718 1.0 4229 9742 794.0 5830 1.0 5274 15016 Storage Volume Water Elevation = Principal Weir Equalized Storage from Sediment Forebay Added to H&H Calculations (added to Sand Filter Volumes) Project: Pine Forest 11 Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC. By: Corin Brown BMP Type: Surface Sand Filter #100 Water Quality Volume (WQv) 17621.75 cu.ft. POND STORAGE VOLUME: LOCATION CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Top of Soil Media/Bottom of Pond 790.00 5,310 UC 790.50 6,099 0.5 - - 791.00 6,887 G.5 3,245 791.50 7,676 0.5 3,b41 9,739 792.00 8,464 0.5 13.774 Water Quality Volume 792.43 9,271 0.9 7,839 17,528 792-50 9,383 0.1 18,271 793,00 10,302 OS 4 z- 23,192, 793.50 11,220 OS 3 28,573 794.00 12,139 J, 794.50 13,192 - -- dC,745 795.00 14,245 0.5 - 47, 0.:4 795.50 15,297 ,.5 - 54,79C Principal Weir 796.00 16,350 u 5 796.50 16,509 3 215 7i,116 Emergency Spillway 797.00 16,669 0 79,4ll 79730 16,828 0S - - 87.785 Top of Berm 798.00 16,987 0-5 - 96,239 STATESVILLE SAND FILTER BMP REQUIRED PROVIDED ELEVATION SAND FILTER 1,420SF 2,276SF 790.00 WQV 17,622 CF 17,628 CF 792.43 PEAK CONTROL POST -DEVELOPMENT STORM EVENT RUNOFF 2 YR - 24HR 26.30 CFS 10 YR - 24HR 47.79 CFS 50YR-24HR 71.56CFS 100 YR - 24HR 82.83 CFS POST ROUTING RUNOFF ELEVATION 1.002 793.60 1.684 795.66 15.62 796.63 36.83CFS 797.07 Project: Pine Forest 11 Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC. By: Corin Brown BM P Type: Surface Sand Filter #100 POND STORAGE VOLUME: OVERALL CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) 790.00 5,310 0.0 0 0 790.50 6,099 n 2,852 2,852 791.00 6,887 3,246 6,099 791.50 7,676 I. 3,641 9,739 792.00 8,464 1 2.0 4,035 13,774 792.50 9,383 2.5 4,462 18,236 793.00 10,302 3.0 4,921 23,157 793.50 11,220 3.5 5,380 28,537 794.00 12,139 4.0 5,840 34,377 794.50 13,192 45 6,333 40,710 795.00 14,245 5,o 6,859 47,569 795.50 15,297 5.5 7,385 54,954 796.00 16,350 6.0 7,912 62,866 796.50 16,509 6.5 8,215 71,081 797.00 16,669 7.0 8,294 79,375 797.50 16,828 8,374 a- 19 798.00 16,987 8,454 96,203 POND STORAGE VOLUME: SEDIMENT CHAMBER CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (Sx.) (FT.) (C.F.) (C.F.) 790.00 2,033 0.0 0 790.50 2,460 0.5 1,123 791.00 2,886 1.0 1,336 791.50 3,313 1.5 1,550 4,009 792.00 1 3,740 2.0 1,763 792.50 4,262 2.5 2,000 793.00 4,785 3.0 2,262 793.50 5,307 35 2,523 12,557 794.00 5,830 4.0 _ - 4 15,342 d IL - ------- I- POND STORAGE VOLUME: SAND CHAMBER CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) 790.00 2,282 0 0 790.50 2,689 1,24, 1,243 791.00 3,096 - 1,446 2,689 791.50 3,503 1,650 4,339 792.00 3,910 2.0 0,192 792.50 4,403 2.5 u78 8,271 793.00 4,896 3.0 325 10, 793.50 5,390 3.5 5,883 4.0 '.� I f13,1J67794.00 Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 26.30 2 718 52,941 ------ ------ ------ Post Drainage Area 2 Reservoir 1.002 2 826 52,921 1 793.60 29,682 BMP #100 BMP #100.gpw Return Period: 2 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Peak discharge = 1.002 cfs Storm frequency = 2 yrs Time to peak = 13.77 hrs Time interval = 2 min Hyd. volume = 52,921 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 793.60 ft Reservoir name = BMP #100 Max. Storage = 29,682 cuft Storage Indication method used BMP #100 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 Time (hrs) - Hyd No. 2 Hyd No. 1 Total storage used = 29,682 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Pond No. 1 - BMP #100 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 790.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 790.00 5,310 0 0 0.50 790.50 6,099 2,850 2,850 1.00 791.00 6,887 3,244 6,094 1.50 791.50 7,676 3,639 9,732 2.00 792.00 8,464 4,033 13,765 2.50 792.50 9,383 4,459 18,225 3.00 793.00 10,302 4,919 23,144 3.50 793.50 11,220 5,378 28,522 4.00 794.00 12,139 5,838 34,360 4.50 794.50 13,192 6,330 40,690 5.00 795.00 14,245 6,857 47,547 5.50 795.50 15,297 7,383 54,930 6.00 796.00 16,350 7,910 62,840 6.50 796.50 16,509 8,214 71,054 7.00 797.00 16,669 8,294 79,347 7.50 797.50 16,828 8,373 87,721 8.00 798.00 16,987 8,453 96,173 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) Inactive Inactive Inactive Inactive Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 8.00 6.00 4.00 2.00 0.00 ' 0.0 10.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 Elev (ft) 798.00 796.00 794.00 792.00 `- 790.00 110.0 Discharge (cfs) Hydrograph Summary Re po gydraflow Hydrographs Extension for AutodeskO Civil 3D0 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 47.79 2 716 97,143 ------ ------ ------ Post Drainage Area 2 Reservoir 1.684 2 824 97,123 1 795.66 57,407 BMP#100 BMP #100.gpw Return Period: 10 Year Wednesday, 02 / 12 / 2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 1 - Post Drainage Area Reservoir name = BMP #100 Storage Indication method used. 40.00 30.00 20.00 10.00 0.00 0 6 12 18 24 30 36 42 48 54 60 Hyd No. 2 Hyd No. 1 1 1 1 I 1 :' Total storage used = 57,407 cuft L Wednesday, 02 / 12 / 2020 = 1.684 cfs = 13.73 hrs = 97,123 cuft = 795.66 ft = 57,407 cuft Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BMP #100 Hyd. No. 2 -- 10 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 66 Time (hrs) Hydrograph Summary Repo- Fiydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 71.56 2 716 147,640 ------ ------ ------ Post Drainage Area 2 Reservoir 15.62 2 724 147,620 1 796.63 73,172 BMP#100 BMP #100.gpw Return Period: 50 Year Wednesday, 02 / 12 / 2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 1 - Post Drainage Area Reservoir name = BMP #100 Storage Indication method used. Q (cfs; 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage BMP #100 Hyd. No. 2 -- 50 Year L Wednesday, 02 / 12 / 2020 = 15.62 cfs = 12.07 hrs = 147,620 cuft = 796.63 ft = 73,172 cuft Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 w 1 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 73,172 cult Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 82.83 2 716 172,129 ------ ------ ------ Post Drainage Area 2 Reservoir 33.83 2 722 172,108 1 797.07 80,588 BMP #100 BM #100.gpw Return Period: 100 Year Wednesday, 02 / 12 / 2020 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Peak discharge = 33.83 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 172,108 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 797.07 ft Reservoir name = BMP #100 Max. Storage = 80,588 cuft Storage Indication method used. Q (cfs) BMP #100 Hyd. No. 2 -- 100 Year Q (cfs) 90.00 80.00 90.00 70.00 80.00 60.00 70.00 50.00 60.00 40.00 50.00 30.00 40.00 20.00 30.00 10.00 20.00 000 10.00 000 0 4 Hyd No. 2 8 12 16 20 24 28 32 Hyd No. 1I Total storage used = 80,588 cuft 36 Time (hrs) Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Dec 12 2019 Pond #100 Riprap Flow Invert Elev Dn (ft) = 787.00 Calculations Pipe Length (ft) = 76.30 Qmin (cfs) = 47.79 Slope (%) = 1.97 Qmax (cfs) = 47.79 Invert Elev Up (ft) = 788.50 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 47.79 No. Barrels = 1 Qpipe (cfs) = 42.77 n-Value = 0.012 Qovertop (cfs) = 5.02 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 13.63 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 13.61 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 788.98 HGL Up (ft) = 791.23 Embankment Hw Elev (ft) = 797.20 Top Elevation (ft) = 797.00 Hw/D (ft) = 4.35 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 20.00 W N i—+ 0 0 0 Q � to p N o N 0 t� rA p i! .. H O y w D � r+ eD VI y C �y�77 fD 0 N O Ith I\Z K M o A = — 1"c Z eD (D II II i� 03 -s O 0 0 N C rt 0 a -a- 0 0 90r -fie N O s:; r .. �9 A n �n 0 d5o Riprap Size (ft) w 00 a o 0 w a IV N N rn L ou t0 Pine Forest11 Storm Drain/Erosion Control Project Report Section 5; Water Quality Sand Filter Fond 200 Analysis BMP 200 Pine Forest II Statesville, Iredell County, North Carolina Project Number: 2712 December 5, 2019 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Sand Filter #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.27 ac. Paved Roads/Sidewalk/Structures 3.05 ac. C = 98 Wooded Area C = 60 0.00 ac. Good Grass (>75% coverage) 5.22 ac. Newly Graded C = 61 C = 86 Composite CN (Sand Filter) 74.6 0.00 ac. Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC By: Corin Brown BMP Type: Surface Sand Filter #200 Required Background Information: 1.0 Drainage Area Size (Area in SF Draining to BMP) 2.0 Impervious Area (Area in SF Draining to BMP) 3.0 % Impervious Area (Impervious Area/DA) Compute Water Quality Volume (WQv): 360327 SF 133009 SF 1.0 Compute Runoff Coefficient (Rv) using Schueler's Method Rv BMP Equation Rv = 0.05 +0.009(I) Where "I" is % Impervious (in percent, not decimal) 2.0 Compute Water Quality Volume (WQv) using Schueler's Method WQv BMP Equation WQv = 1.ORvA/12 Where "A" is Area Draining to BMP in Acres ac ft =04 cu.ft. 3.0 Convert Water Quality Volume (WQv) into Inches of Runoff WQv BMP Equation WQv = 1.O(Rv) inches Compute Water Quality Peak Flow (WQp): 1.0 Compute Modified SCS Curve Number (CN) CN BMP Equation CN = 1000/[10 + 5P + 10WQv - 10(WQVA2 + 1.25QQVP)AO.5] "P" is precipitation = 1.0 _ A. If in Charlotte or Mecklenburg County, run pre and post hydrologic model using 1-inch, 6-hour storm in HEC-1 model output using SCS method B. If in Huntersville, skip this section Compute Channel Protection Volume (CPv): 1.0 Compute Maximum Soil Retention (S) using SCS Methods (CN is Standard Value - Not Modified CN Value) S = 1000/CN-10 74.6 CN Value (Post) �'{` `Ga '�S max• i"PI'M inches 2.0 Compute Total Runoff for the 1-year, 24-hour Storm Event (Statesville Requirements) Qd = (P-0.2S)A2 / (P+0.8S) For Statesville 2.84 P = Precipitation _ . 5 ari inches For Char-Meck 2.58 P = 1-yr, 24-hr For Statesville 3.02 P = 1-yr, 24-hr 3.0 Compute Watershed Runoff (CPv) CPv = Qd * Area * (1ft/12inches) Area = In Acres of DA a c-ft = -S Ac. Convert to cubic feet CPv(ac-ft) * 43560 sf/acre cu.ft. Compute Release Rates for Water Quality Control (WQv) and Channel Protection Volume (CPv) These are average release rates (estimates) based on Static Method and should be used as "targets" for routing calculations. For Mecklenburg County 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 0 063E cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) 0.106. cfs For City of Statesville 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) 0.063i cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = cfs Compute Sedimentation Chamber Volume 1.0 Compute Sediment Chamber Volume (20% of Water Quality Volume) SCvol = (WQv)(43,560 sf/ac)(0.20) = 2295 cu.ft. Duration: 2.0 days (48 hrs) + 3 hours 51 hrs Duration: 1.0 days (24 hrs) + 12 hours 36 hrs Where CPv = WQv ac-ft - CPv ac-ft = 031i! ac-ft Duration: 2.0 days (48 hrs) + 3 hours 51 hrs Duration: 1.0 days (24 hrs) + 12 hours 36 hrs Where CPv = WQv ac-ft - CPv ac-ft _ ® ac-ft Compute Surface Sand Filter Area and Volume to Treat Water Quality Volume (WQv) 1.0 Check Surface Sand Filter Area based on Darcy's Equation (assumed value of 1.75 in/hr for the design coefficient of permeability for the sand filter media) Af = (WQv)(df) / [(k)(hf + df)(tf)] «««««« M sq.ft. Surface Area Used = Sand Filter Dims @ Filter Media = 3404 sq.ft. 45 Width (ft) ® Length (ft) filter bed depth (1' Minimum) k - 3.5 ft/dy permeability coeff. hf - 1 ft avg. height of water tf- 2.125 days filter bed drain time Develop Stage -Discharge for Bioretention Filter Media & BMP Outlet Structure Outflow computed using following equations: Af = (WQv)(df) / [(k)(hf + df)(tf)] Qo = W Qv / tf Qo = [(Af)(k)(hf + df)] / df Where: Af = surface area of filter bed (sq.ft.)(Required Surface Area) _sf df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hf = avg. height of water above filter bed (ft) Elevation Contour Area (SF) Depth (Incr.)(ft) Volume (cf) Incr. Accum. Discharge (cfs) (Filter Media) This Is For Filter Media Only Comments 788.00 7386 0.0 0 0 0.000 788.50 8105 0.5 3873 3873 0.207 789.00 8824 0.5 4232 8105 0.276 789.50 9542 0.5 4591 12696 0.345 790.00 10261 0.5 4951 17647 0.414 790.50 11112 0.5 5343 22990 0.483 791.00 11964 0.5 5769 28759 0.552 791.50 12815 0.5 6195 34954 0.621 792.00 13666 0.5 6620 41574 0.689 792.50 1 14540 0.5 7052 48626 0.758 793.00 15414 0.5 7489 56114 0.827 793.50 16288 0.5 7926 64040 0.896 794.00 17162 0.5 8363 72402 0.965 Principal Weir 794.50 17933 0.5 8774 81176 1.034 795.00 18704 0.5 9159 90335 1.103 Emergency Spillway 795.50 19475 0.5 9545 99880 1.172 796.00 20246 0.5 9930 109810 1.241 Top of Berm Weir Discharge (cfs) This is for Primary Weir Only Stage Elev. Weir Elev. Length (L) Head (H) Coeff (Cw) (Q) Comments/Notes 788.0 794.00 8 0.0 3.33 0.00 Sides of Weir = 4 EA 788.5 794.00 8 0.0 3.33 0.00 Length of Weir = 2 LF 789.0 794.00 8 0.0 3.33 0.00 Length (L) = 8 LF 789.5 794.00 8 0.0 3.33 0.00 790.0 794.00 8 0.0 3.33 0.00 Cw = Sharp -Crested 3.33 790.5 794.00 8 0.0 3.33 0.00 Broad Crested 3.00 791.0 794.00 8 0.0 3.33 0.00 791.5 794.00 8 0.0 3.33 0.00 792.0 794.00 8 0.0 3.33 0.00 792.5 794.00 8 0.0 3.33 0.00 793.0 794.00 8 0.0 3.33 0.00 793.5 794.00 8 0.0 3.33 0.00 794.0 794.00 8 0.0 3.33 0.00 794.5 794.00 8 0.5 3.33 9.42 795.0 794.00 8 1.0 3.33 26.64 795.5 794.00 8 1.5 3.33 48.94 796.0 794.00 8 2.0 3.33 75.35 Weir Equation »»> Q= Cw*L*H-1.5 Weir Discharge (cfs) This is for Emergency Spillway Only Stage Elev. Spillway Elev. Length (L) Head (H) Coeff (Cw) (Q) Comments/Notes 788.0 795.0 0 0.0 3.00 0.00 Sides of Weir = 1 EA 788.5 795.0 0 0.0 3.00 0.00 Length of Weir = 20 LF 789.0 795.0 0 0.0 3.00 0.00 Length (L) _ 20 LF 789.5 795.0 0 0.0 3.00 0.00 790.0 795.0 0 0.0 3.00 0.00 Cw = Sharp -Crested 3.33 790.5 795.0 0 0.0 3.00 0.00 Broad Crested 3.00 791.0 795.0 0 0.0 3.00 0.00 791.5 795.0 0 0.0 3.00 0.00 792.0 795.0 0 0.0 3.00 0.00 792.5 795.0 0 0.0 3.00 0.00 793.0 795.0 0 0.0 3.00 0.00 793.5 795.0 0 0.0 3.00 0.00 794.0 795.0 0 0.0 3.00 0.00 794.5 795.0 0 0.0 3.00 0.00 795.0 795.0 0 0.0 3.00 0.00 795.5 795.0 20 0.5 3.00 21.21 796.0 795.0 20 1.0 3.00 60.00 Weir Equation »»> Q= Cw*L*HA1.5 PROJECT: Pine Forest II DATE: 12-Feb-20 PROJECT #: 2712 DESIGNER: C.E.13 DESCRIPTION: Sand Filter #200 ENGINEER: P.L.M. POND STORAGE VOLUME: CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) 788.00 T386 QO 0 U 788.50 5,105 ti. 3.` 7, ; t7 789.00 8,824 LO 4,2 789.50 9,542 1.5 =1.5�)1 790.00 10,261 ?.0 4.951 7.G47 790.50 1 L l 12 25 5.>43 791.00 11,964 1.0 5.761) 791.50 12,815 ; 5 6.195 14.)5-4 792.00 13,666 4.0 6.6?O 1.5 7 792.50 14,540 4 5 7.05 4�.620 793.00 15,414 5.0 7. 1 9 56. i I 793.50 16,288 5.5 7.�J?0 794.00 17,162 6.0 7. , 6 7 ' .4W 794.50 17,933 6.5 '�.774 795.00 18,704 7.0 795.50 19,475 796.00 20,246 0 9.90 1U9.810 ORIFICE FLOW DATA: ORIFICE NO. DIA. (IN.) AREA (S.F.) 'C' INVERT ELEV. (FT.) CENTR. ELEV. (FT.) DESCRIPTION 1 6 0.196 0.1 1 7S9.5 7 ') 75 WEIR FLOW DATA: WEIR NO. CREST ELEV. (FT.) LENGTH (FT.) 'C' SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. _ WIDTH = Z = 'C' = VARIES PROJECT: PROJECT #: DESCRIPTION: Pine Forest II DATE: 12-Feb-20 2712 DESIGNER: C.E.B Sand Filter #200 ENGINEER: P.L.M. COMBINED FLOW ELEV. (FT.) ORIFICES WEIRS SPILLWAY Q1 (C.F.S.) TOTAL FLOW (C.F.S.) Q1 (C.F.S.) Q2 (C.F.S.) Q3 (C.F.S.) Q1 (C.F.S.) Q2 (C.F.S.) Q3 (C.F.S.) 788.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 788.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 789.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 789.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 790.00 0.32 0.00 0.00 0.00 0.00 0.00 1 0.00 0.32 790.50 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.55 791.00 0.70 0.00 0.00 00 0.00 0.00 0.00 0.70 791.50 0.83 0.00 0.00 0.00 0.00 0.00 0.00 0.83 792.00 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.95 1.04 0.00 0.00 0.00 0,00 0.00 0.00 1.04 793.00 1.14 0.00 0.00 0.00 0.00 0.00 0.00 1.14 793.50 1.22 0.00 0.00 0.00 0.00 0.00 0.00 1.22 794.00 1.30 0.00 0.00 0.00 0.00 0.00 0.00 1.30 794.50 1.37 0.00 0.00 0.00 0.00 0.00 0.00 1.37 795.00 1.44 0.00 0.00 0.00 0.00 0.00 0.00 1.44 795.50 1.51 0.00 0.00 0.00 0.00 0.00 0.00 1.51 796.00 1.58 0.00 0.00 0.00 0.00 0.00 0.00 1.58 FINAL RESULTS: STAGE STORAGE DISCHARGE (FT.) (C.F.) (C.F.S.) 788.50 3,873 0.00 789.00 8,105 0.00 789.50 12,696 0.00 790.00 17,647 0.32 790.50 22,990 0.55 791.00 28,759 0.70 791.50 34,954 0.81, 792.00 41.574 0.95 792.50 48,626 1.04 793.00 56,114 1.14 793.50 64,040 1.22 794.00 72,402 1.30 794.50 81,176 1.37 705.00 90,335 1.44 ,�.50 99,880 1.51 796.00 109,810 1.58 Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC By: Corin Brown BMP Type: Surface Sand Filter #200 Verify Diameter of BMP Outlet Pipe (Barrel) Equation for Submerged Orifice = C * A * (2g*h)A0.5 Where: C = 0.6 A = see below g = 32.2 ft/sA2 h = headwater over orifice Inputs: Dia. of Pipe 18 inches convert to area in SF = 1.7672 sq.ft. Principal Weir 794.00 MSL (from Surface Sand Filter Design) Media Filter 788.00 MSL (from Surface Sand Filter Design) Bot. of Media 786.50 MSL (from Surface Sand Filter Design) Results for Submerged Orifice: (Max Q out of BMP Structure) Orifice Dia = Barrel Discharge Results in CFS Discharge noted as "BMP Out" (see table below) Stage Elev. Bot. Media HW (ft.) Discharge Notes 786.50 786.50 0.00 0.000 Bottom of Soil Media 787.00 786.50 0.50 6.017 787.50 786.50 1.00 8.509 788.00 786.50 1.50 10.421 Top of Soil Media 788.50 1 786.50 2.00 12.033 789.00 786.50 2.50 13.454 789.50 786.50 3.00 14.738 790.00 786.50 3.50 15.918 790.50 786.50 4.00 17.018 791.00 786.50 4.50 18.050 791.50 1 786.50 5.00 19.026 792.00 786.50 5.50 19.955 792.50 786.50 6.00 20.842 793.00 786.50 6.50 21.693 793.50 786.50 7.00 22.512 793.75 786.50 7.25 22.911 794.00 786.50 7.50 23.302 Principal Weir 794.50 786.50 8.00 24.066 795.00 1 786.50 8.50 24.807 Emergency Spillway 795.50 786.50 9.00 25.526 796.00 786.50 9.50 26.226 Top of Dam Final Stage -Discharge Results Flow Through Riser & Barrel - Excludes Spillway Riser & Barrel + Spillway Stage Q (cfs) Q (cfs) Q (cfs) Q (cfs) Q (cfs)* Net BMP Q (cfs) Q (cfs) (MSQ Soil Media Weir Orfice Subtotal BMP Out Outflow Spillway Final Pond Discharge 788.00 0.00 0.00 0.00 0.00 10.42 0.00 0.00 0.00 788.50 0.21 0.00 0.00 0.21 12.03 0.21 0.00 0.21 789.00 0.28 0.00 0.00 0.28 13.45 0.28 0.00 0.28 789.50 0.34 0.00 0.00 0.34 14.74 0.34 0.00 0.34 790.00 0.41 0.00 0.32 0.73 15.92 0.73 0.00 0.73 790.50 0.48 0.00 0.55 1.03 17.02 1.03 0.00 1.03 791.00 0.55 0.00 0.70 1.26 18.05 1.26 0.00 1.26 791.50 0.62 0.00 0.83 1.45 19.03 1.45 0.00 1.45 792.00 0.69 0.00 0.95 1.63 19.95 1.63 0.00 1.63 792.50 0.76 0.00 1.04 1.80 20.84 1.80 0.00 1.80 793.00 0.83 0.00 1.14 1.96 21.69 1.96 0.00 1.96 793.50 0.90 0.00 1.22 2.12 22.51 2.12 0.00 2.12 794.00 0.97 0.00 1.30 2.26 23.30 2.26 0.00 2.26 794.50 1.03 9.42 1.37 11.83 24.07 11.83 0.00 11.83 795.00 1.10 26.64 1.44 29.19 24.81 24.81 0.00 24.81 795.50 1.17 48.94 1.51 51.62 25.53 25.53 21.21 46.74 796.00 1.24 75.35 1.58 78.17 26.23 26.23 60.00 86.23 * If BMP Out value is < than combined flow of Soil Media + Weir, use BMP Out Value for Pond Discharge (BMP Structure Outflow through Riser & Barrel) Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC By: Corin Brown BMP Type: Surface Sand Filter #200 Size Underdrains for Surface Sand Filter The calculations utilized are taken from the Charlotte -Mecklenburg BMP Design Manual (July 1, 2010 ed.) for sizing of underdrains for bioretention ponds/rain gardens. 1.0 Compute perforation capacity of underdrain pipe. Minimum requirements or guidance as follows: - min. pipe diameter equals 6" - underdrains shall be centered 10' max. on center (10' o.c.) - min. slope on underdrain shall be 0.50% - assume 4 rows of perforation in pipe (3/8" perforations) - reduce perforated pipe length by 1' for each fitting (cleanouts, tees, wyes) - assume 50% of perforations will become clogged and be ineffective Input Data: Total Length of Underdrain Pipe (If) 254 Total Number of Fittings (ea) 8 Diameter of Pipe (inches) 6 Number of Perforations = (Length of Pipe - Fittings)*(4 rows/ft)*(4 holes/row) 3936 perforations Actual Perforations Active = Number of Performations * 0.50 (50%) 1968 perforations Capacity of One Hole = C*A*(2g*h)A0.5 Where: C = 0.6 0.0037 cfs/hole A = 0.000767 (sf) g = 32.2 ft/SA2 h = 1 ft Capacity of Active Perfs. = No. Active Performations * Capacity of One Hole 7.27 cfs (ok if > than filter media capacity) 0.207' cfs (soil media capacity at 0.5' from biorentention design) if Capacity of Active Performations < Soil Media at 0.50' headwater depth, add additional pipe lenghth Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC By: Corin Brown BMP Type: Surface Sand Filter #200 Verify Sediment Forebay Storage Volume From Sand Filter Design Worksheet, Req. Sediment Forebay Volume = 20% of Water Quality Volume SCvol = (WQv)(43,560 sf/ac)(0.20) = 2295 cu.ft. Elevation Contour Area (SF) Depth (Incr.)(ft) Volum_e_(cf) Incr. Accum. 788.0 3637 0.0 0 0 789.0 4364 1.0 4001 4001 790.0 5091 1.0 4728 8728 791.0 5933 1.0 5512 14240 792.0 6 775 1.0 6354 20594 Storage Volume Water Elevation = Principal Weir Equalized Storage from Sediment Forebay Added to H&H Calculations (added to Sand Filter Volumes) Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC By: Corin Brown BMP Type: Surface Sand Filter #200 Water Quality Volume (WQv) 11477.04 cu.ft. POND STORAGE VOLUME: LOCATION CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) Top of Soil Media/Bottom of Pond 788.00 7,386 0.0 0 0 788.50 8,105 0.5 3,873 3,873 789.00 8,824 0.5 4,232 8,105 Water Quality Volume 789.37 9,338 0.4 3,378 11,483 789.50 9,542 0.5 4,591 12,696 790.00 10,261 0.6 4,951 16,434 790.50 11,112 0.5 5,343 21,777 791.00 11,964 0.5 5,769 27,546 791.50 12,815 0.5 6,195 33,740 792.00 13,666 0.5 6,620 40,361 792.50 14,540 0.5 7,052 47,412 793.00 15,414 0.5 7,489 54,901 793.50 16,288 0.5 7,926 62,826 Principal Weir 794.00 17,162 0.5 8,363 71,189 794.50 17,933 0.5 8,774 79,962 Emergency Spillway 795.00 18,704 0.5 9,159 89,122 795.50 19,475 0.5 9,545 98,666 Top of Berm 796.00 20,246 0.5 9,930 108,597 STATESVILLE SAND FILTER BMP REQUIRED PROVIDED ELEVATION SAND FILTER 772 SF 3,404 SF 788.00 WQV 11,477 CF 11,483CF 789.37 PEAK CONTROL POST -DEVELOPMENT POST ROUTING STORM EVENT RUNOFF RUNOFF ELEVATION 2 YR - 24HR 17.97 CFS 0.782 790.09 10 YR - 24HR 34.79 CFS 1.538 CFS 792.74 50 YR - 24HR 54.40 CFS 2.115 CFS 793.48 100 YR - 24HR 63.83 CFS 3.728 CFS 794.08 Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc. Location: Statesville, North Carolina Date: February 12, 2020 Client: The Johnson Group, INC. By: Corin Brown BM P Type: Surface Sand Filter #200 POND STORAGE VOLUME: OVERALL CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT.) (S.F.) (FT.) (C.F.) (C.F.) 788.00 7,386 0.0 0 0 788.50 8,105 0.5 3,873 ,873 789.00 8,824 1.0 4,232 789.50 9,542 1.5 4,591 790.00 10,261 1 2.0 4,951 1 17,647 790.50 11,112 2.5 22,990 791.00 11,964 3.0 -�,769 28,759 791.50 12,815 3.5 6,195 34,954 792.00 13,666 4.0 6,620 41,574 792.50 14,540 4.5 7,052 48,626 793.00 15,414 5.0 7,489 56,114 793.50 16,288 5.5 7,926 64,040 794.00 17,162 6.0 8,363 72,402 794.50 17,933 6.5 X.774 81,176 795.00 18,704 7.0 �9 90,335 795.50 19,475 7.5 9,545 99,880 796.00 20,246 8.0 9,930 109,810 POND STORAGE VOLUME: SEDIMENT CHAMBER CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (Fr.) (S.F.) (PT.) (C.F.) (C.F.) 788.00 3,637 0.0 0 0 788.50 4,001 OS 1,909 1,909 789.00 4,364 1.0 2.091 4,001 789.50 4,727 1.5 6,273 790.00 5,091 1 2.0 2,455 1 8,728 790.50 5,512 2.S 2,651 11,379 791.00 5,933 3. 2,861 14,240 791.50 6,354 3,072 17,312 792.00 6,775 4.! 3,282 20,594 POND STORAGE VOLUME: SAND CHAMBER CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FP.) (S.F.) (FT.) (C.F.) (C.F.) 788.00 3,474 0.0 0 0 788.50 3,859 0.5 1,833 1,833 789.00 4,243 1.0 2,026 789.50 4,628 1.5 2,218 790.00 1 5,012 1 2.0 2,410 790.50 5,450 2.5 2,616 2 791.00 5,888 3.0 2,834 13,937 791.50 6,325 3.5 3,053 16,990 792.00 6,763 4.0 3,272 20,26 ) Hydrograph Summary Re po - Tiydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 17.97 2 718 35,936 ------ ------ ------ Post Drainage Area 2 Reservoir 0,782 2 816 35,917 1 790.09 18,564 BMP #200 BMP #200.gpw Return Period: 2 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 0.782 cfs Storm frequency = 2 yrs Time to peak = 13.60 hrs Time interval = 2 min Hyd. volume = 35,917 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 790.09 ft Reservoir name = BMP #200 Max. Storage = 18,564 cuft Storage Indication method used BMP #200 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 18,564 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Pond No. 1 - BMP #200 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 788.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 788.00 7,386 0 0 0.50 788.50 8,105 3,871 3,871 1.00 789.00 8,824 4,231 8,102 1.50 789.50 9,542 4,590 12,691 2.00 790.00 10,261 4,949 17,641 2.50 790.50 11,112 5,341 22,982 3.00 791.00 11,964 5,767 28,749 3.50 791.50 12,815 6,193 34,942 4.00 792.00 13,666 6,618 41,560 4.50 792.50 14,540 7,050 48,610 5.00 793.00 15,414 7,487 56,097 5.50 793.50 16,288 7,924 64,020 6.00 794.00 17,162 8,361 72,381 6.50 794.50 17,933 8,772 81,153 7.00 795.00 18,704 9,158 90,311 7.50 795.50 19,475 9,543 99,854 8.00 796.00 20,246 9,929 109,783 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] Rise (in) Inactive Inactive Inactive Inactive Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No No No [A] Crest Len (ft) Inactive Crest El. (ft) = 0.00 Weir Coeff. = 3.33 Weir Type = 1 Multi -Stage = Yes [Bl [C] [D] Inactive Inactive Inactive 0.00 0.00 0.00 3.33 3.33 3.33 No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 788.00 --- --- --- --- --- - --- 0.05 387 788.05 --- --- --- --- --- --- --- --- 0.10 774 788.10 --- --- --- --- --- --- --- 0.15 1,161 788.15 --- --- --- --- --- --- --- --- 0.20 1,548 788.20 --- --- --- --- --- --- --- --- 0.25 1,935 788.25 --- --- --- --- --- --- --- --- 0.30 2,323 788.30 --- --- --- --- --- --- --- --- 0.35 2,710 788.35 --- --- --- --- - --- --- 0.40 3,097 788.40 --- --- --- --- --- - --- --- 0.45 3,484 788.45 --- --- --- --- --- --- --- --- 0.50 3,871 788.50 --- --- --- --- --- --- --- --- 0.55 4,294 788.55 --- --- --- --- --- --- --- --- 0.60 4,717 788.60 --- --- --- --- --- --- --- --- 0.65 5,140 788.65 --- --- --- --- --- --- --- --- 0.70 5,563 788.70 --- --- --- --- --- --- --- - 0.75 5,986 788.75 --- --- --- --- --- - --- --- 0.80 6,409 788.80 --- --- --- --- --- - --- --- 0.85 6,832 788.85 --- --- --- --- --- - --- --- 0.90 7,255 788.90 --- --- --- --- --- --- --- --- 0.95 7,678 788.95 --- --- --- --- --- --- 1.00 8,102 789.00 --- --- --- --- --- --- --- --- 1.05 8,561 789.05 --- --- --- --- --- --- --- --- 1.10 9,020 789.10 --- --- --- --- --- --- --- --- 1.15 9,478 789.15 --- --- --- --- --- --- --- --- --- --- 0.000 --- 0.021 0.021 --- 0.042 0.042 --- 0.063 0.063 --- 0.084 0.084 --- 0.105 0.105 --- 0.126 0.126 --- 0.147 0.147 --- 0.168 0.168 --- 0.189 0.189 --- 0.210 0.210 --- 0.217 0.217 --- 0.224 0.224 --- 0.231 0.231 --- 0.238 0.238 --- 0.245 0.245 --- 0.252 0.252 --- 0.259 0.259 --- 0.266 0.266 --- 0.273 0.273 --- 0.280 0.280 --- 0.286 0.286 --- 0.292 0.292 --- 0.298 0.298 Continues on next page 5 BMP #200 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.20 9,937 789.20 --- --- --- --- --- --- --- --- --- 0.304 0.304 1.25 10,396 789.25 --- --- --- --- --- --- --- --- --- 0.310 0.310 1.30 10,855 789.30 --- --- --- --- --- --- --- --- --- 0.316 0.316 1.35 11,314 789.35 --- --- --- --- --- --- --- --- --- 0.322 0.322 1.40 11,773 789.40 --- --- --- --- --- --- --- --- --- 0.328 0.328 1.45 12,232 789.45 --- --- --- --- --- --- --- --- --- 0.334 0.334 1.50 12,691 789.50 --- --- --- --- --- --- --- --- --- 0.340 0.340 1.55 13,186 789.55 --- --- --- --- --- --- --- --- --- 0.379 0.379 1.60 13,681 789.60 --- --- --- --- --- --- --- --- --- 0.418 0.418 1.65 14,176 789.65 --- --- --- --- --- --- --- --- --- 0.457 0.457 1.70 14,671 789.70 --- --- --- --- --- --- --- --- --- 0.496 0.496 1.75 15,166 789.75 --- - --- --- --- --- --- --- --- 0.535 0.535 1.80 15,661 789.80 --- --- --- --- --- --- --- --- --- 0.574 0.574 1.85 16,156 789.85 --- --- --- --- --- --- --- --- --- 0.613 0.613 1.90 16,651 789.90 --- --- --- --- --- --- --- --- --- 0.652 0.652 1.95 17,146 789.95 --- --- --- --- --- --- --- --- --- 0.691 0.691 2.00 17,641 790.00 --- --- --- --- --- --- --- --- --- 0.730 0.730 2.05 18,175 790.05 --- --- --- --- --- --- --- --- --- 0.760 0.760 2.10 18,709 790.10 --- --- --- --- --- --- --- --- --- 0.790 0.790 2.15 19,243 790.15 --- --- --- --- --- --- --- --- --- 0.820 0.820 2.20 19,777 790.20 --- --- --- --- --- --- --- --- --- 0.850 0.850 2.25 20,311 790.25 --- --- --- --- --- --- --- --- --- 0.880 0.880 2.30 20,845 790.30 --- --- --- --- --- --- --- --- --- 0.910 0.910 2.35 21,379 790.35 --- --- --- --- --- --- --- --- --- 0.940 0.940 2.40 21,914 790.40 --- --- --- --- --- --- --- --- --- 0.970 0.970 2.45 22,448 790.45 --- --- --- --- --- --- --- --- --- 1.000 1.000 2.50 22,982 790.50 --- --- --- --- --- --- --- --- --- 1.030 1.030 2.55 23,559 790.55 --- --- --- --- --- --- --- --- --- 1.053 1.053 2.60 24,135 790.60 --- --- --- --- --- --- --- --- --- 1.076 1.076 2.65 24,712 790.65 --- --- --- --- --- --- --- --- --- 1.099 1.099 2.70 25,289 790.70 --- --- --- --- --- --- --- --- --- 1.122 1.122 2.75 25,865 790.75 --- --- --- --- --- --- --- --- --- 1.145 1.145 2.80 26,442 790.80 --- --- --- --- --- --- --- --- --- 1.168 1.168 2.85 27,019 790.85 --- --- --- --- --- --- --- --- --- 1.191 1.191 2.90 27,596 790.90 --- --- --- --- --- --- --- --- --- 1.214 1.214 2.95 28,172 790.95 --- --- --- --- --- --- --- --- --- 1.237 1.237 3.00 28,749 791.00 --- --- --- --- --- --- --- --- --- 1.260 1.260 3.05 29,368 791.05 --- --- --- --- --- --- --- --- --- 1.279 1.279 3.10 29,988 791.10 --- --- --- --- --- --- --- --- --- 1.298 1.298 3.15 30,607 791.15 --- --- --- --- --- --- --- --- --- 1.317 1.317 3.20 31,226 791.20 --- --- --- --- --- --- --- --- --- 1.336 1.336 3.25 31,845 791.25 --- --- --- --- --- --- --- --- --- 1.355 1.355 3.30 32,465 791.30 --- --- --- --- --- --- --- --- --- 1.374 1.374 3.35 33,084 791.35 --- --- --- --- --- --- --- --- --- 1.393 1.393 3.40 33,703 791.40 --- --- --- --- --- --- --- --- --- 1.412 1.412 3.45 34,323 791.45 --- --- --- --- --- --- --- --- --- 1.431 1,431 3.50 34,942 791.50 --- --- --- --- --- --- --- --- --- 1.450 1.450 3.55 35,604 791.55 --- --- --- --- --- --- --- --- --- 1.468 1.468 3.60 36,266 791.60 --- --- --- --- --- --- --- --- --- 1.486 1.486 3.65 36,927 791.65 --- --- --- --- --- --- --- --- --- 1.504 1.504 3.70 37,589 791.70 --- --- --- --- --- --- --- --- --- 1.522 1.522 3.75 38,251 791.75 --- --- --- --- --- --- --- --- --- 1.540 1.540 3.80 38,913 791.80 --- --- --- --- --- --- --- --- --- 1.558 1.558 3.85 39,575 791.85 --- -- --- --- --- --- --- --- --- 1.576 1.576 3.90 40,237 791.90 --- --- --- --- --- --- --- --- --- 1.594 1.594 3.95 40,898 791.95 --- --- --- --- --- --- --- --- --- 1.612 1.612 4.00 41,560 792.00 --- --- --- --- --- --- --- --- --- 1.630 1.630 4.05 42,265 792.05 --- --- --- --- --- --- --- --- --- 1.647 1.647 4.10 42,970 792.10 --- --- --- --- --- --- --- --- --- 1.664 1.664 4.15 43,675 792.15 --- --- --- --- --- --- --- --- --- 1.681 1.681 4.20 44,380 792.20 --- --- --- --- --- --- --- --- --- 1.698 1.698 4.25 45,085 792.25 --- --- --- --- --- --- --- --- --- 1.715 1.715 4.30 45,790 792.30 --- --- --- --- --- --- --- --- --- 1.732 1.732 4.35 46,495 792.35 --- --- --- --- --- --- --- --- --- 1.749 1.749 4.40 47,200 792.40 --- --- --- --- --- --- --- --- --- 1.766 1.766 4.45 47,905 792.45 --- --- --- --- --- --- --- --- --- 1.783 1.783 4.50 48,610 792.50 --- --- --- --- --- --- --- --- --- 1.800 1.800 4.55 49,359 792.55 --- --- --- --- --- --- --- --- --- 1.816 1.816 4.60 50,107 792.60 --- --- --- --- --- --- --- --- --- 1.832 1.832 4.65 50,856 792.65 --- --- --- --- --- --- --- --- --- 1.848 1.848 Continues on next page... 6 BMP #200 Stage /Storage /Discharge Table Stage Storage Elevation C|vA c|vo o|vo prfmn, vmA xv,o vv,o vv,o s^n| uoo, Total u ouu ft ofs cfs xfs Cfs ofs ofs ofs cfs cfs ofs ofs 4.70 51.805 rnoJU -' -' -' -' -- -' -' _' -' 1.864 1.864 *.75 52.353 782.75 -- -- -- -- -- - - -- -- 1.880 1.880 *.80 53.102 792o0 -' '- -' -' -' -' -- -' -' 1.886 1.096 4.85 53.851 792.85 -- -- -- -- -- -- -- -- -- 1.912 1.812 4.90 54.599 782.e0 -' -' -' -' -' -' -' -' -' 1.828 1.928 4e5 55.348 792.95 -- -- -- - -- -- -- -- -- 1.944 1.944 5.00 56.097 793.00 -' -' -' -' -' -' -' -' -' 1.980 1.960 5.05 e8.889 79305 -- -- - -- -- - _ -- -- 1.976 1.976 5.10 57.681 793.10 -' -' -' -' -' -' -' '- -- 1a92 1.992 515 58.474 783.15 -- -- -- - -- -- -- -- -- 2.008 2.008 5.20 se.o*s reozo -' -' -' -- '- -' _' -' -' 2.024 2o24 5.25 80.059 783.25 -- -- -- -- -- -- -- -- -- 2040 2040 5.30 00.851 793.30 -' -' -- -' -' - -' -' '- 2.056 2.050 5.35 61.643 793.35 -- -- -- -- -- -- - -- -- 2.072 2.072 5.40 62.436 793.40 -' -' -' '- -' -' _' -' -' 2.088 2.088 5.45 63,228 793.45 -- -- -- -- -- -- -- -- -- 2.104 2.104 oao 04.020 785.50 -' -' -- -' -' -' -' -' -' 2.120 2.120 5.55 64.856 793.55 -- -- -- -- - -- -- -- -- 2134 2134 xao 65.698 793.60 -' -' -' -' -- -' '- _' '- 2.148 2.148 5.65 66,529 793.65 -- -- -- '- -- -- _ -- -- 21e2 2162 nJO 87.365 783.70 -' -' -- -' '- -' -' -' -' 2.170 2.170 5.75 88.201 798.75 -- -- -- -- -- -- -- -- _- 2.190 2.190 5.80 09.037 7e3.80 -' -' -' -' -' -' -' '- -' 2.204 2.204 oon 69.873 7e3o5 -- -- -- - -- -- -- -- -- 2.218 2218 5.90 70,709 7e3.e0 -' -' -- '- -' '- -' -' -' 2.232 2.232 5.95 71.545 ryoyo - - - - - - - _ _ 2.24e 2.246 6.00 72.301 794.00 -- -' -- -- -- -- - -- -- 22*0 2280 nun 73.258 7**.05 -' -' -' -' -' -' _' -' -' 3z17 3.217 6.10 74.136 794.10 - - - - - - _ _ _ 4.174 4.174 05 75.013 794.15 - - - - - - - _ _ 5.131 5.131 6.20 75.890 794.20 - - - - - - - _ _ 8.080 0.088 6.25 76.767 794.25 - - - - - - _ _ _ 7.045 7.045 *.00 77.644 794.30 - - - - - - - _ _ 8.002 8.002 *.ou 78.522 794.35 - - - - - - - _ _ 8.959 8.959 0.40 79.399 794.40 - - - - - - _ _ _ 9.918 9.816 6.45 80.276 794.45 - - - - - - - - _ 10.87 0.87 6.50 81.153 794.50 - - - - - - _ _ _ 11.0 11.83 uso 82,069 794.55 - - - - - - - _ _ 1313 13.13 6.60 02.985 794.60 - - - - - - - _ _ 14,43 14.43 6.65 83,901 794.65 - - - - - - _ _ _ 15.72 15.72 0.70 84.816 794.70 - - - - - - - - _ 17.02 17.02 arn 85,732 794.7 - - - - - - _ _ _ 18.32 18.32 6.80 86,048 794.80 - - - - - - - _ _ 19.62 19,82 soa 87,564 794.85 - - - - - _ _ _ _ uunu mueu 6.90 88,479 794.90 - - - - - - - - _ 22.21 22.21 6.95 89,395 nwsm - - - - - - - _ _ 23.51 23.51 7.00 90,311 795l0 - - - - - - - - _ 24.81 24.01 rOo 91.265 795.05 - - - - - - _ _ _ azOO 27.00 7.10 92.220 795.10 - - - - - - - - _ 29.20 29.20 7.15 93.174 795.15 - - - - - - _ _ _ 31.39 31.38 7.20 94,128 79520 - - - - - - _ _ _ 33.58 33.58 7.25 eimm 795.25 - - - - - - _ _ _ uara szra rao 96,037 795.30 - - - - - - - _ _ 37.9 37.97 7.35 90.991 795.35 - - - - - - - _ _ 40.10 40.16 nm 97,*45 7e,40 - - - - - - _ _ _ /2.35 *o.00 7.45 98,900 795*5 - - - - - _ _ _ _ 44.55 44/55 rou e9,854 795.50 - - - - - - - _ _ *6.7* 46.74 7.55 100,847 795.55 - - - - - - - - _ 50.69 50/69 rso 101.840 79510 - - - - - - - _ _ 54.84 54.6 ren 102.833 795a* - - - - - - - - _ 58.59 58.*9 7.0 103,826 795.70 - - - - - - - _ _ 0254 02.54 7.75 104,818 795.75 - - - - - - - - _ 86.43 66,49 7.80 105,811 795.80 - - - - - - _ _ _ 0.43 70,43 7.85 106,804 795.85 - - - - - - - - _ 74.38 7*38 7.90 107.797 795.90 - - - - - - _ _ _ 78.33 78.33 roo 108,790 795.95 - - - - - - - - _ 82.28 82.28 8.00 109,783 796.00 - - - - - - - - _ 86.23 86.2 .End Hydrograph Summary Repo rtydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 34.79 2 716 70,245 ------ ------ ------ Post Drainage Area 2 Reservoir 1.538 2 804 70,227 1 791.74 38,177 BMP #200 BMP #200.gpw Return Period: 10 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 1.1 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 1.538 cfs Storm frequency = 10 yrs Time to peak = 13.40 hrs Time interval = 2 min Hyd. volume = 70,227 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 791.74 ft Reservoir name = BMP #200 Max. Storage = 38,177 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 15.00 10.00 .M 0.00 1• " 0 4 8 ---- Hyd No. 2 BMP #200 Hyd. No. 2 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) - Hyd No. 1 Total storage used = 38,177 cuft Hydrograph Summary Repo- TiydraflowHydrographsExtension for Autodesk®Civil3D®byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 54.40 2 716 110,646 ------ ------ ------ Post Drainage Area 2 Reservoir 2.115 2 812 110,628 1 793.48 63,767 BMP #200 BMP #200.gpw Return Period: 50 Year Wednesday, 02 / 12 / 2020 Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D@ by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 2.115 cfs Storm frequency = 50 yrs Time to peak = 13.53 hrs Time interval = 2 min Hyd. volume = 110,628 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 793.48 ft Reservoir name = BMP #200 Max. Storage = 63,767 cuft Storage Indication method used. BMP #200 Q (cfs) Q (cfs) Hyd. No. 2 -- 50 Year 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) Hyd No. 2 Hyd No. 1 Total storage used = 63,767 cult 11 Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 63.83 2 716 130,506 ------ ------ ------ Post Drainage Area 2 Reservoir 3.728 2 768 130,488 1 794.08 73,727 BMP #200 BMP #200.gpw Return Period: 100 Year Wednesday, 02 / 12 / 2020 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 02 / 12 / 2020 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 3.728 cfs Storm frequency = 100 yrs Time to peak = 12.80 hrs Time interval = 2 min Hyd. volume = 130,488 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 794.08 ft Reservoir name = BMP #200 Max. Storage = 73,727 cuft Storage Indication method used BMP #200 Q (cfs) Q (cfs) Hyd. No. 2 -- 100 Year 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) - Hyd No. 2 Hyd No. 1 I 1 11 1 1 _ Total storage used = 73,727 cult Pine Forest II Storm Drain/Erosion Control Project Report (C-SWPPP) Section VII; Appendix APPENDIX A biy'7 ,a 2 ❑ �� u9 E1lai ,a� J � � Wiiic �. fir � c i yy� 1 °av'`-x�� , 0 43 a 08. > ID ILL 0 Z; 001, rif NO OW Sal MAO I Jill 'A ------ - R IN I wo 1011 AIR air(, oil IS EMMOR"k