Loading...
HomeMy WebLinkAboutNCS000101_Renewal Application_20120130 INTERNATIONAL 10 PAPER RIEGELWOOD MILL JOHN L.RIEGEL ROAD RIEGELWOOD, NC 28456 terse. PHONE 910-655-2211 January 30, 2012 p {©f Ng D Attn: Brian Lowther _ ��JJ Division of Water Quality, Water Quality Section FEB 2 201? Stormwater Permitting Unit DENR-WATER QUALITY" 1617 Mail Service Center WETLANDS AND STORMWATER BRANCH Raleigh, NC 27699-1617 Certified Mail: 7006 0100 0004 8355 1565 Subject: Individual Permit Renewal,NPDES Permit NCS000101 Dear Mr. Lowther: Enclosed is the renewal application for Stormwater NPDES Permit Number NCS000101. Please record the changes indicated on the Renewal Application Form. Requested supplemental information is provided,including the Stormwater Pollution Prevention Plan Development and Implementation Certification. Please also note the enclosed Representative Outfall Status (ROS)Request Form. In Section B of the current permit,Analytical Monitoring Requirements,Footnote 3,representative P sampling locations are listed,including all mill basins are included except Basin J. Per conversation with Aisha Lau, formerly of DWQ,Basin I was supposed to be listed as representative of J,but Basin J was inadvertently omitted from the list. Please list Basin I as the representative sampling point for Basin J. This request is also listed on the attached Repesentative Outfall Status Request Form. Also in Section B of the current permit is a Monitoring Schedule. The left-hand column,Monitoring Period,begins with"Year 1 —Spring". However,the permit was issued in August of 2007, which made the first monitoring period Fall. This agrees with the Start and End columns in the same Schedule. Thus,the final Monitoring Period will be Spring,2012 and not Fall as shown in the first column. Data for that sampling period will be sent as soon as it is available,completing this application. If you have questions or need additional information,please call Ed Kreul at(910)362-4883 or Wallace Coverdale at(910)362-4590. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Sincerely, z.14) i( • Floyd Whitmire Mill Manager o�OFWATF9oG Permit Coverage Renewal Application Form National Pollutant Discharge Elimination System Permit Number Stormwater Discharge Permit NCS000101 following is the information currently in our database for your facility. Please review this information carefully and make all corrections/additions as necessary in the space provided to the right of the current information. Owner Affiliation Information *Reissued Permit will be mailed to the owner address t� p /� Owner / Organization Name: International Paper Company Iti T 'N4tlon� l t A Fi2 C 0 0fi/!_I(i Owner Contact: M " ' elaetc d Mailing Address: 6400 Paplar�.,ems_ M �N U l�OthMFN f ��N�q 65 �r� N L, RIF iI Ro l94Plu�oocd /UC 2 ySy56 Phone Number: , (9t`,-,-�-94 -? Fax Number: E-mail address: Facility/Permit Contact Information Facility Name: Riegelwood Mill Facility Physical Address: 865 John L Riegel Rd Riegelwood, NC 28456 Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: Discharge Information :eiving Stream CAp . fRglOR, Clu �Iiq&im Stream Class: C; Sw Basin: Cape Fear River Basin Sub-Basin: 03-06-17 Number of Outfalls: Impaired Waters/TMDL Does this facility discharge to waters listed as impaired or waters with a finalized TMDL? es ❑ No ❑ Don't Know ( for information on these waters refer to http://h2o.enr.state.nc.us/su/Impaired_Waters_TMDLI ) CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate. Signature f k") Date 7/3i fl/ Print or type name of person signing above Title Please return this completed renewal application form to: Stormwater Permitting Unit Attn: Brian Lowther 1617 Mail Service Center Raleigh, North Carolina 27699-1617 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. 2. A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results, date sampled, and storm event data. H 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, parameters surveyed, observations, and date monitoring conducted. 4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include �/ information on these BMP's. r7 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) STORMWATER RESULTS: FALL 2007 - SPR 2012 ANALYTICAL MONITORING RESULTS SUMMARY STORMWATER RESULTS: FALL 2007 - SPR 2010 ANALYTICAL RESULTS for Representative Basins B, E, AND I Parameter (Permit Benchmark) COMMENTS BASIN (BOLD), SEMESTER (F=Fall; S=Spring) BOD (30) COD (120) TSS (100) pH (6-9) B F 07 Drought caused late sampling 2/1/2008 2 47 29 7.2 S08 6/21/2008 20 17 19 8.0 F08 11/29/2008 2 39 57 7.0 S09 8/12/2009 5 36 72 7.4 F09 9/22/2009 2 23 35 7.5 S10 3/11/2010 7 71 268 8.0 F10 11/4/2010 3 34 150 7.1 S11 7/8/2011 5 211 78 7.2 F11 11/17/2011 14 75 55 6.9 S12 STORM WATER RESULTS: FALL 2007 - SPR 2010 ANALYTICAL RESULTS for Representative Basins B, E,AND I Parameter (Permit Benchmark) COMMENTS BASIN (BOLD), SEMESTER (F=Fall; S=Spring) BOD (30) COD (120) TSS (100) pH (6-9) E F08 3/7/2008 not tested not tested 341 6.9 Drought caused late sampling 3/20/2008 35 225 193 6.8 S08 6/21/2008 52 860 489 7.7 F08 11/29/2008 11 101 31 6.6 S09 8/12/2009 38 472 24 7.5 F09 9/22/2009 2 389 14 8.0 S10 10/16/2010 38 290 52 7.2 F10 11/4/2010 >38 474 228 6.7 S11 7/5/2011 no flow no flow no flow no flow Construction in area; no flow F11 11/16-17/2011 no flow no flow no flow no flow Construction in area; no flow S12 STORMWATER RESULTS: FALL 2007 - SPR 2010 ANALYTICAL RESULTS for Representative Basins B, E, AND I Parameter (Permit Benchmark) BASIN (BOLD), COMMENTS SEMESTER (F=Fall; S=Spring) BOD (30) COD (120) TSS (100) pH (6-9) F 07 2/1/2008 10 435 597 7.5 Drought caused late sampling 2/26/2008 2 51 42 7.5 S08 6/21/2008 7 30 29 8.1 F08 11/29/2008 2 2 45 7.6 S09 5/11/2009 4 45 51 6.8 F09 9/22/2009 12 27 72 6.9 S10 11/17/2010 17 322 996 8.4 F10 11/4/2010 8 301 770 8.4 S11 7/5/2011 38 36 130 7.8 F11 11/16/2011 12 69 34 7.2 S12 STORMWATER RESULTS: FALL 2007 - SPR 2010 ANALYTICAL RESULTS for Basin S Parameter (Permit Benchmark) BASIN (BOLD), COMMENTS SEMESTER (F=Fall; S=Spring) BOD (30) COD (120) TSS (100) pH (6-9) S Basin S added in May, 2008 S08 no flow no flow no flow _no flow F08 11/29/2008 3 44 12 7.0 Not a qualifying rain event S09 5/18/2009 2 81 14 6.1 Not a qualifying rain event F09 9/22/2009 no flow no flow _no flow no flow S10 11/17/2010 no flow no flow no flow no flow F10 11/4/2010 no flow no flow no flow no flow S11 7/5/2011 no flow no flow no flow no flow F11 11/16/2011 no flow no flow no flow no flow S12 STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL MONITORING RESULTS SUMMARY STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1 - 5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY A F 07 It tan 3 2 2 n n n n/a S08 It tan 3 2 3 n n n n/a F08 clear 2 1 2 n n n n/a S09 med br-gra 8 2 8 n n n n/a F09 It gra 4 1 4 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 off-wh 1 1 1 n n n n F10 It tan 3 1 3 n n n n S11 It yel 2 1 2 n n n n F11 tan 4 2 4 n n n n S12 B F 07 It yet 2 2 2 n n n n/a SO8 It yel 2 1 2 n n n n/a F08 clear 2 2 1 n n n n/a mild S09 off-wh 1 1 1 musky,n n, n n, n n/a F09 med br 4 2 4 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 It yel 2 2 1 n n n sl F10 It tan 2 2 2 n n n y S11 It tan 2 2 3 n n n n F11 It tan 2 2 2 n n n n S12 C _ F 07 dk gra 9 1 9 n n n n/a S 08 tan 8 1 8 n,n n n,n n/a F08 It tan 3 1 3 n n n n/a S 09 med gra 8 1 7 n n n n/a F09 med gra-br 8 2 9 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol, susp.Sol. S10 tan 4 1 3 n n n_ y F10 med gr 5 1 3 n n n y S11 It gra 3 2 3 n n n n F11 very It yel 1 1 1 n n n n S12 D F 07 It tan 3 2 3 n n n n/a S08 It tan 5 2 4 n n n n/a F08 It tan 3 1 3 n n n n/a S09 gra-tn 7 1 9 n n n n/a F09 It br 1 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity, float sol,susp.Sol. S10 very It yel 1 1 1 n n n n F10 It yel 2 1 2 n n n n S11 It yel-br 3 1 2 n n n n STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1-51, OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY F11 It tan 2 1 2 n n very slight no ID y S12 E F 07 It br 3 2 3 n n n n/a S08 med br 6 1 5 n n n n/a F08 off-wh 4 2 1 n n n n/a S09 med br 6 1 5 n sl n n/a F09 med br 7 1 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 yel 1 1 1 n n n n F10 It br 4 1 4 n n n after outfall S11 n.s. n.s. n.s. n.s. n.s. n.s. n.s. n.s. F11 n.s. n.s. n.s. n.s. n.s. n.s. n.s. n.s. S12 F F 07 med br 8 1 8 n n n n/a S08 med br 5 2 4 n n n n/a F08 It tan 4 1 4 n n n n/a S09 med br 9 2 9 n n n n/a F09 It gra 7 3 8 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 tan 3 2 3 n n n y F10 med gr 4 1 5 n n very slight no ID n S11 It br 1 2 2 n n n y F11 med gra-tan 4 2 5 n n n y S12 F1 1 F 07 med br 8 1 8 n n n n/a S08 It br-tan 6 2 5 n n n n/a F08 It tan 4 2 4 n n n n/a S09 gra-tn.• 9 2 9 n n n n/a F09 ns ns ns ns ns ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 i off-wh 3 1 2 n n n y F10 n/a n/a n/a n/a n/a n/a n/a n S11 ns ns ns ns ns ns ns n/a F11 ns ns ns ns ns ns ns n/a S12 F2 F 07 med br 8 1 8 n n n n/a S08 med br 8 4 8 n n n n/a F08 ns ns ns ns ns ns ns n/a S09 It to 2 2 2 n,n n,n n,n n/a F09 med gra 8 3 9 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It tan 4 1 3 n n n y F10 med gr 5 1 5 n n n y STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE(I BEST) [2010 scale 1-5], OR Y/N COLOR EROSION/ BASIN, lt,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY S11 med gra 4 2 4 n n n y F11 It tan 3 2 3 n n n n S12 F3** new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 only tan 3 1 3 n n n y G F 07 It br 6 2 5 n *slight no ID n n/a S08 It tan 5 1 4 n n n n/a F08 It tan 4 1 4 n n n n/a S09 It yel 1 1 1 n n n n/a F09 It yel 2 1 1 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It yel 2 1 1 n n n n F10 It yel 1 1 1 n n n n S11 nearly clear 1 1 1 n n n n F11 4 1 4 n n n n n S12 G1 F 07 ns ns ns ns ns ns ns n/a S08 dk tan 9 2 8 n n n n/a F08 off-wh 4 1 3 n n n n/a S09 tan 1 1 1 n n n n/a F09 tan 5 2 6 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It yel 3 1 3 n n n y F10 It yel 2 1 3 n n n y S11 It br 3 1 3 n n n n ^F11(see G4) n/a n/a n/a n/a n/a n/a n/a n/a S12 G2 F 07 It yel 3 2 3 n n n n/a S08 tan 7 1 6 n n n n/a F08 ns ns_ ns ns ns ns ns n/a S09 It yel 2 1 2 n n n n/a F09 It tan 5 2 5 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It br 4 3 3 n n n y F10 It tan 3 1 3 n n n y S11 ns ns ns ns ns ns ns n/a ^F11(see G10) n/a n/a n/a n/a n/a n/a n/a n/a S12 G3 F 07 ns ns ns ns ns ns ns n/a s08 It tan 7 1 6 n n n n/a F08 ns ns ns ns ns ns ns n/a S09 It yel 2 1 2 n,n n,n n,n n/a STORM WATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1 -5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY F09 very It tan, 3 1 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 It tan 1 1 1 n n n n F10 It yel 2 2 2 n n n y slight S11 very It yel 1 1 1 n n n n ^F11(see G14) n/a n/a n/a n/a n/a n/a n/a n/a S12 G4 F07 ns ns ns ns ns ns ns n/a S08 ns ns ns ns ns ns ns n/a F08 wh 2 1 2 n n n n/a S09 ns ns ns ns ns ns ns n/a F09 off-wh 2 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol, susp. Sol. S10 ns ns ns ns ns ns ns ns F10 tan 5 2 5 n n n y S11 n/a n/a n/a n/a n/a n/a n/a n/a ^F11(new Gi) It tan 3 2 3 n n n n S12 G5 F 07 It tan 3 2 2 n n n n/a S08 It tan 7 2 6 n n n n/a F08 ns ns ns ns ns ns ns n/a S09 ns ns ns ns ns ns ns n/a F09 ns ns ns ns ns ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol, susp.Sol. S10 clear 1 1 1 n n n n F10 tan 5 2 5 n n n y S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G6 F 07 ns ns ns ns ns ns ns n/a S08 ns ns ns ns ns ns ns n/a F08 ns ns ns ns ns ns ns n/a S09 ns ns ns ns ns ns ns n/a F09 very It yel 2 1 1 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 ns ns ns ns ns ns ns ns F10 It tan 3 2 3 n n n y S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G7 F 07 ns ns ns ns ns ns ns n/a S08 ns ns ns ns ns ns ns n/a F08 It tan 7 1 8 n n n n/a STORM WATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1-5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY S09 very It yel 2 1 1 n n n n/a F09 very It yel 2 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It br 2 1 2 n n n y slight F10 ns ns ns ns ns ns ns n S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G8 F 07 ns ns ns ns ns ns ns n/a S08 ns ns ns ns ns ns ns n/a F08 ns ns ns ns ns ns ns n/a S09 ns ns ns ns ns ns ns ns F09 very It yel 2 1 1 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It red-tan 2 1 1 n n n slight F10 ns ns ns ns ns ns ns n S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 • G9 F 07 tan 8 2 7 n n n n/a S08 ns ns_ ns ns ns ns ns n/a F08 wh 5 1 5 n n n n/a S09 ns ns ns, ns ns ns ns n/a F09 It yel 2 1 1 ns ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 ns ns ns ns ns ns ns ns F10 ns ns ns ns ns ns ns y S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G10 _ F07 ns ns ns ns ns ns ns n/a S08 red-tan,ns 8 1 8 n,ns n,ns n,ns n/a F08 ns ns ns ns ns ns ns n/a S09 ns ns ns ns ns ns ns n/a F09 ns ns ns ns ns ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 ns ns ns ns ns ns ns ns F10 ns ns ns ns ns ns ns n S11 n/a n/a n/a n/a n/a n/a n/a n/a AF11(newG2) off-wh 2 1 2 n n n n S12 G11 F 07 ns ns ns_ ns ns ns ns n/a S08 ns ns ns ns ns,n ns,n ns,n n/a STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1-5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY SF08 wh 6 1 6 n n n n/a S09 ns ns ns ns ns ns ns n/a F09 off-wh 3 1 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 ns ns ns ns ns ns ns ns F10 ns ns ns ns ns ns ns n S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G12 F 07 ns ns ns ns ns ns ns n/a 508 ns ns ns ns ns ns ns n/a F08 ns ns ns ns_ ns ns ns n/a S09 ns ns ns ns ns ns ns n/a F09 off-wh 2 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 tan 3 2 2 n n n y F10 tan 3 2 3 n n n y S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G13 • F 07 beige 2 2 2 n n n n/a S08 ns ns ns ns ns ns,n ns,n n/a F08 clear 1 1 1 n n n n/a S09 ns ns ns ns ns ns,n ns,n n/a F09 It tan 3 1 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 clear 1 1 1 n n n n F10 off-wh 2 2 2 n n n y sl S11 n/a n/a n/a n/a n/a n/a n/a n/a F11 n/a n/a n/a n/a n/a n/a n/a n/a S12 G14 F 07 beige 2 1 1 n n n n/a S 08 It yel 2 1 1 n n n n/a F08 clear 1 1 1 n n n n/a S 09 very It yel 1 1 2 n n n n/a F09 very It yel 2 3 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 to 3 2 3 n n n y F10 off-wh 2 1 2 n n n y sl S11 n/a n/a n/a n/a n/a n/a n/a n/a ^F11(new G3) off-wh 2 1 2 n n n n S12 H IF 07 It tan 3 2 3 n n n n/a STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE(I BEST) [2010 scale 1-5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY S08 tan 9 3 8 n n n n/a F08 off-wh 5 1 6 n n n n/a S09 It yel 1 1 1 n n n n/a F09 tan 4 2 4 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 clear 1 1 1 n n n n F10 off-wh 2 1 2 n n n n S11 very It yel 1 1 1 n n n y F11 It yel 1 1 1 n n n n S12 I F 07 med gra 6 2 6 n n n n/a S08 It gra 4 1 4 n*sl at cascade n n/a F08 It gra-tan 5 4 5 n n n n/a S 09, F09 off-wh 2 1 2 n n n n/a F09 off-wh 3 2 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 med gra 4 1 4 n n n y F10 med br 4 1 4 n n n y slight S11 It tan 3 1 3 n n n n F11 very It yel 2 1 1 n n n n S12 J F 07 It br-y 3 2 3 n n n n/a S 08 It yel 2 1 1 n n n n/a F08 off-wh 2 1 2 n n n n/a S 09 It br 6 1 6' n n n n/a F09 It gra 5 1 4 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 clear 1 1 1 n n n n F10 med br 4 1 4 n n n y S11 It yel 2 1 2 n n n n F11 very It yel 1 1 1 n n n n S12 K F 07 It red-br 4 3 3 n n n n/a S08 red-tan 6 2 6 n n n n/a F08 clear 2 1 2 n n n n/a S09 tan 5 2 5 n n n n/a F09 very It yel 2 1 1 n n faint sheen no ID n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 cl 1 1 1 n n n y F10 off-wh 3 1 2 n n n y S11 nearly clear 1 1 1 n n n n F11 nearly clear 1 1 1 n n n n S12 L STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1 -5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY F 07 It gra-tan 7 2 7 n n n n/a S08 It tan 4 1 4 n n n n/a F08 It tan 2 1 3 n n n n/a S09 off-wh 4 2 2 n n n n/a F09 off-wh 3 1 3 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It gra 2 1 3 n n n y F10 clear 1 1 1 n n n n S11 It tan 3 1 2 n n n n F11 off-wh 2 1 1 n n n n S12 M F 07 It br-yel 4 2 4 n n n n/a S 08, F08 It tan 3 2 2 n n n n/a F08 It wh 2 1 2 n n n n/a S 09 tan 5 2 5 n n n n/a F09 very It tan 2 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity, float sol,susp.Sol. S10 It gra 3 1 2 n n n y F10 very It yel 1, 1 1 n n n n S11 It tan 3 1 2 n n n n F11 very It yel 1 1 1 n n n n S12 N F 07 clear 1 2 1 n n n n/a S 08 clear 1 2 1 n n n n/a F08 It wh 2 1 2 n n n n/a S 09 off-wh 5 3 5 n n n n/a F09 clear 1 1 1 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol, susp. Sol. S10 off-wh 2 1 1 n n n si F10 off-wh 2 1 1 n n n n S11 off-wh 2 1 2 n n n n F11 It gra 3 1 3 n n n n S12 0 F 07 clear 1 3 1 n n n n/a S 08 clear 1 2 1 n n n n/a F08 clear 2 1 2 n n n n/a S 09 off-wh 6 5 6 n n n n/a F09 off-wh 1 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 It yel 2 2 2 n n n y F10 clear 1 2 2 n n n n S11 off-wh 2 1 2 n n n n F11 It tan 2 2 3 n n n n S12 STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1-5], OR Y/N COLOR EROSION/ BASIN, It,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY - F 07 beige 4 1 4 n n n n/a S 08 off-wh 6 1 5 n n n n/a F08 It wh 2 1 2 n n n n/a S 09 off-wh 4 1 3 n n n n/a F09 It off-wh 1 1 1 n n slight sheen no ID n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 clear 1 1 1 n n n n F10 off-wh 3 1 3 n n n y S11 off-wh 2 1 2 n n n n F11 off-wh 2 1 1 n n n n S12 P1 F 07 off-wh 3 2 3 n n n n/a S 08 off-wh 4 1 3 n n n n/a F08 ns ns ns ns ns ns ns n/a S 09 ns ns ns ns ns ns ns n/a F09 ns ns ns ns ns ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 ns ns ns ns ns ns ns ns F10 clear 1 1 1 n n n n S11## n/a n/a n/a n/a n/a n/a n/a n/a F11## n/a n/a n/a n/a n/a n/a n/a n/a S12#11 n/a n/a n/a n/a n/a n/a n/a n/a Q F 07 tan 4 2 4 n n n n/a S08 It tan 3 1 2 n n n n/a F08 It tan 3 1 2 n n n n/a S09 It tan 6 2 6 n n n n/a F09 clear 1 1 1 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 very It yel 1 1 1 n n n n F10 off-wh 2 1 2 n n n n S11 very It yel 1 1 1 n n n n F11 nearly clear 1 1 1 n n n n S12 Q1# F 07 n/a n/a n/a n/a n/a n/a n/a n/a S08 n/a n/a n/a n/a n/a n/a n/a n/a F08 n/a n/a n/a n/a n/a n/a n/a n/a S09 med gra 8 2 8 n- n n n/a F09 ns ns ns ns ns, ns ns ns new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 ns ns ns ns ns_ ns ns ns F10 ns ns ns ns_ ns ns ns ns S11 ns ns ns ns ns ns ns ns F11 ns ns ns ns ns ns ns ns STORMWATER RESULTS: FALL 2007 - SPR 2012 VISUAL INSPECTION: 1-10 SCALE (I BEST) [2010 scale 1 -5], OR Y/N COLOR EROSION/ BASIN, lt,med, FLOATING SUSPENDED DEPOSITION SEMESTER dk(Imd) CLARITY SOLIDS SOLIDS ODOR FOAM OIL SHEEN 2010-12 ONLY S12 Q2** new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 only It tan 3 1 2 n n n y R F 07 off-wh 5 1 5 n n n n/a S 08 bge 5 2 4 n n n n/a F08 It gra-wh 4 2 4 n n n n/a S 09 It gra 8 2 8 n n n n/a F09 very It tan 5 1 5 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp. Sol. S10 It gra 2 1 1 n n n sl F10 It gra 3 1 4 n n n y S11 off-wh 4 1 4 n n n y F11 very It tan 3 1 3 n n n y S12 R1 F 07 It tan 6 2 5 n n n n/a S 08 ns ns ns ns ns ns ns n/a F08 It wh 2 1 2 n n n n/a S 09 very It tan 2 2 2 n n n n/a F09 off-wh 2 1 2 n n n n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol, susp.Sol. S10 It yel 3 1 2 n n n y F10 clear 1 1 1 n n n n S11 off-wh 2 1 1 n n n n F11 very It tan 3 1 3 n n n n S12 S# F 07 n/a n/a n/a n/a n/a n/a n/a n/a S08 ns ns ns ns ns ns ns n/a F08 off-wh 1 2 1 n n n n/a S09 It br-yel 2 2 2 n n n n/a F09 ns ns ns ns ns_ ns ns n/a new NCDENR quantitative rating scale 1-5 for clarity,float sol,susp.Sol. S10 off-wh 2 1 2 n n n y F10 ns ns ns ns ns ns ns n S11 ns ns ns ns ns ns ns n F11 ns ns ns ns ns ns ns n S12 ^Outfalls G1-G14 reduced to 3. New G1=old G4; new G2=old G10; new G3=old G-14 ** erosion caused extra discharge point; repair eliminated outfall #outfall developed to support new mill activities * slight bubbling where runoff exits pipe;dissipates quickly ##slight sheeting only at this location; runoff redirected Stormwater Best Management Practices Summary 2012 NPDES Stormwater Permit NCS000101 International Paper Mill Riegelwood, NC At the International Paper Mill, approximately 90% of runoff from the main mill facility drains to the mill wastewater treatment system (WWTS), and is treated under the mill's NPDES wastewater permit. Runoff from the remaining 10% of the mill and from a few outlying areas is covered in the mill Storm Water Pollution Prevention Plan (SWPPP). The SWPPP identifies 19 stormwater basins, where numerous Best Management Practices (BMPs) are used to control or prevent erosion and sediment runoff. Non-structural BMPs include the Stormwater Pollution Prevention Plan; the Spill Prevention, Control, and Countermeasures Plan; the Hazardous Waste Handling Program; The Facility Response Plan; and the Waterfront Dock Transfers manual. All stormwater basins include signs marking the boundaries of stormwater runoff and the locations of outfalls. Activities such as chemical storage, painting, and vehicle maintenance are forbidden in stormwater basins, and this information is also posted. Basic good housekeeping is enforced, and numerous mill employees participate in monthly basin inspections. Annual training is required for all employees working in stormwater basins. Street and storm drain maintenance is a focus in stormwater basins. Grasses and other vegetation are maintained wherever feasible. Structural BMPs and other control measures are used to reduce erosion and sedimentation while promoting groundwater recharge. Grassy swales and meandering natural streams carry flow, and geotextile cloth with gravel or riprap covers bare areas. Jersey dividers protect unpaved road edges. Earthen collection ponds and basins allow groundwater infiltration. Rock filters surround several outfalls, and a small French drain system directs runoff to one outfall. Riprapped swales, a retaining berm, rock checkdams, and drainage channels direct flow. In areas of high traffic and high runoff flow, hardened structural BMPs direct flow, prevent erosion and pollutants from entering runoff, and provide flood control. Concrete and paved surfaces and plastic ditch liners harden surfaces. Concrete containments, sumps, curbing, and two oil/water separators (OWS) protect against runoff contamination. Runoff is conveyed via pipes and concrete structures such as catch basins, culverts, and outfall structures. A concrete flow diverter and a concrete flow diffuser further control flow. Planned BMPs: Roadwork is underway, and more is planned, that will reduce the potential for erosion in Basins E, F, and G. In conjunction with the road construction, the OWS at #2 wood chip truck dump (Basin E) has been re-engineered to improve runoff quality, and will be constructed in 2012. After construction, vegetation will be established along the new roadways. Significant Changes In Industrial Activities NPDES Stormwater Permit NCS000101 International Paper Mill Riegelwood, NC International Paper's Riegelwood Mill has made several changes in industrial activity that reduced the potential for stormwater pollution. An out of service ground level pipeline was removed from Basins G and H. Previously this pipeline had prevented effective control of stormwater flow along the west fenceline; now the area is shaped into a long riprap swale. Runoff is currently directed to 4 discharge points along the west fenceline, whereas previously there were 15 outfalls. A water treatment chemical feed system was removed from storage in Basin F to an area that drains to the mill wastewater treatment system, eliminating the chance for a spill to stormwater. New mill procedures have reduced material storage in stormwater basins. Maintenance material, mainly steel and concrete, is no longer permitted in Basin F, and all miscellaneous materials have been removed from the area. In Basin G, storage is limited to currently usable maintenance material, eliminating most material storage. STORM WATER POLLUTION PREVENTION PLAN DEVELOPMENT AND IMPLEMENTATION CERTIFICATION North Carolina Division of Water Quality - Storm water Permitting Unit Facility Name: Riegelwood Mill Permit Number: NCS000101 Location Address: 865 John L. Riegel Rd Riegelwood, NC 28456 County: Columbus "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to permit signatory requirements)and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature irgy ,' Date /41 /' t- r2 o , Pt A„r1 , iL Print or type name of person signing above Title SPPP Certification 5/09