Loading...
HomeMy WebLinkAboutSW6200104_1525 PERMITTING 12-16-19_2/4/2020MARKET PLACE SUBDIVISION 0 00: SITE ?' J PHASE I I S,�� � SITE DEVELOPMENT PLANS �ow�R ROPo M��RO WATER HARN ETT-,REG I ( 700 M CKI N N EY PAR LILLINGTON KIr- 7r- 910-893-7575 W W W W t W W _ Contact: Shane C mings, PE — W6 Know what's below. Call before you dig. NORTH CIVIL ENGINEER 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Scott Brown, PE email: sbrown@4dsitesolutions.com BARBECUE TOWNSHIP NEAR BROADWAY, NORTH CAROLINA HARNETT COUNTY OWNER/DEVELOPER MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 910-263-2944 Contact: Trace McLean email: tracehomespayable@gmail.com AILS TER DETAILS M & EC DETAILS ION CONTROL DETAILS SURVEYOR 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Jimmy Holland, PLS email: jholland@4dsitesolutions.com N C, �FESS /p ••/` I' SEAV') ; 0274G2/ _ �h i r;,: u I N�:�•• 12-12-1� IMS- Iq 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II TAX I D# 9597-31-2392.000 NEAR SANFORD BARBEQUE TOWNSHIP HARNETT COUNTY NORTH CAROLINA CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE SEE SHEETS DATE RELEASED DECEMBER 18, 2019 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED HARNET COUNTY UTILITY NOTES TAPPED DIRECTLY TO THE WATER MAIN. SPLIT SERVICES ARE NOT ALLOWED BY HCDPU. SITE NOTES UTILITY NOTES P. THE WATER MAIN(S), FIRE HYDRANTS, GATE VALVES, SERVICE LINES, METER SETTERS WATER AND ASSOCIATED APPURTENANCES MUST BE RATED FOR 200 PSI AND 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS-BUILTS DURING THE CONSTRUCTION A. THE FIRE MARSHAL'S OFFICE SHALL APPROVE ALL HYDRANT TYPES AND LOCATIONS IN HYDROSTATICALLY PRESSURE TESTED TO 200 PSI. THE HYDROSTATIC PRESSURE THE GENERAL CONTRACTOR. OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS -BUILT NEW SUBDIVISIONS. HOWEVER, HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES TEST(S) MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED (HCDPU) PREFERS THE CONTRACTORS TO INSTALL ONE OF THE FOLLOWING FIRE UTILITY CONTRACTOR MUST NOTIFY HCDPU WHEN THEY ARE READY TO BEGIN FILLING VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE HYDRANTS: IN LINES AND COORDINATE WITH HARNETT COUNTY TO WITNESS ALL PRESSURE CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR THE AS -BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT 1. MUELLER - SUPER CENTURION 250 A11423 MODEL WITH A 5%" MAIN VALVE TESTING. RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION THE COMPLETION OF THE PROJECT. OPENING THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); Q. THE UTILITY CONTRACTOR SHALL CONDUCT A PNEUMATIC PRESSURE TEST USING SHALL BE REPAIRED AT THE GENERAL CONTRACTORS EXPENSE. 2. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS 2. AMERICAN DARLING - MARK B-84-B MODEL WITH A 5�/" MAIN VALVE OPENING COMPRESSED AIR OR OTHER INERT GAS ON THE STAINLESS STEEL TAPPING SLEEVE(S) 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. OTHERWISE NOTED. THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); PRIOR TO MAKING THE TAP ON THE EXISTING WATER MAIN. THIS PNEUMATIC PRESSURE 4. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED TEST MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE 5. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND BY THE PROPOSED WORK. 3. WATEROUS - PACER B-67-250 MODEL WITH A 5%" MAIN VALVE OPENING THREE UTILITY CONTRACTOR SHALL USE ROMAC BRAND STAINLESS STEEL TAPPING SLEEVE(S) LOCAL LAWS AND REGULATIONS. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE) OR APPROVED EQUAL FOR 6. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS STANDARDIZATION. OR APPROVED EQUAL FOR ALL TAPS MADE IN HARNETT COUNTY. ALL NEW WATER LINE REGULATIONS. 5. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES B. FIRE HYDRANTS ARE INSTALLED AT CERTAIN ELEVATIONS. ANY GRADE CHANGE IN THE EXTENSIONS MUST BEGIN WITH A RESILIENT WEDGE TYPE GATE VALVE SIZED EQUAL TO SHALL BE PLACED TRUE TO LINE AND GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, VICINITY OF ANY FIRE HYDRANT WHICH IMPEDES ITS OPERATION SHALL BECOME THE THE DIAMETER OF THE NEW WATER LINE EXTENSION IN ORDER TO PROVIDE A MEANS AND WITH A SMOOTH INVERT AT THE JOINT. RESPONSIBILITY OF THE UTILITY CONTRACTOR FOR CORRECTION. CORRECTIONS WILL BE OF ISOLATION BETWEEN HARNETT COUNTY S EXISTING WATER MAINS AND THE NEW 6. MINIMUM SEPARATION BETWEEN SEWER (STORM OR SANITARY) AND WATER LINES SHALL BE 10' MONITORED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND THE HARNETT WATER LINE EXTENSIONS UNDER CONSTRUCTION. HORIZONTAL OR 18" VERTICAL UNLESS NOTED OTHERWISE. MINIMUM VERTICAL SEPARATION COUNTY FIRE MARSHAL. R. ALL WATER MAINS WILL BE CONSTRUCTED WITH SDR :121 PVC PIPE OR CLASS 50 C. THE PROFESSIONAL ENGINEER (PE) SHALL OBTAIN AND PROVIDE THE NCDENR DUCTILE IRON PIPE RATED FOR AT LEAST 200 PSI OR GREATER. ALL PIPES MUST BE BETWEEN SANITARY SEWER AND STORM SEWER SHALL BE 24" UNLESS NOTED OTHERWISE. "AUTHORIZATION PROTECTED DURING LOADING, TRANSPORT, UNLOADING, STAGING, AND INSTALLATION. 7. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HCDPU TO CONSTRUCT" PERMIT TO THE UTILITY CONTRACTOR BEFORE THE PVC PIPE MUST BE PROTECTED FROM EXTENDED EXPOSURE TO SUNLIGHT PRIOR TO AND NCDEQ TECHNICAL SPECIFICATIONS. CONSTRUCTION OF THE WATER LINE SHALL BEGIN. THE UTILITY CONTRACTOR MUST INSTALLATION. 8. ALL MATERIALS SHALL BE APPROVED BY HCDPU BEFORE INSTALLATION. POST A COPY OF THE NCDENR "AUTHORIZATION TO CONSTRUCT" PERMIT ISSUED BY S. ALL WATER MAINS WILL BE FLUSHED AND DISINFECTED IN STRICT ACCORDANCE WITH 9. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HCDPU A MINIMUM OF 48 THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC HOURS BEFORE CONSTRUCTION OF THE WATER LINE BEGINS. THE CONTRACTOR SHALL ALSO DIVISION OF ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION (NCDENRE UTILITIES. ALL WATER SAMPLES COLLECTED FOR BACTERIA TESTING WILL BE COLLECTED NOTIFY THE ENGINEER OF RECORD AND HCDPU 48 HOURS IN ADVANCE OF ALL TESTING. DEH,PWSS) ON SITE PRIOR TO THE START OF CONSTRUCTION. THE PERMIT MUST BE BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND TESTED IN THE HCDPU 10. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO MAINTAINED ON SITE THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS OF THE LABORATORY. EROSION CONTROL NOTES UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A PROPOSED WATER LINES THAT WILL SERVE THIS PROJECT. T. ALL FITTINGS LARGER THAN TWO (2') INCHES DIAMETER SHALL BE DUCTILE IRON. LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. D. THE UTILITY CONTRACTOR SHALL NOTIFY HARNETT COUNTY DEPARTMENT OF PUBLIC HCDPU REQUIRES THAT MECHANICAL JOINTS BE ASSEMBLED WITH GRIP RINGS AS 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH 11. ALL ELEVATIONS ARE IN NAVD 88 DATUM. UTILITIES (HCDPU) AND THE PROFESSIONAL ENGINEER (PE) AT LEAST TWO DAYS PRIOR "MEGALUG" FITTINGS ARE NOT APPROVED BY HARNETT COUNTY FOR PIPE SIZES ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET C TO CONSTRUCTION COMMENCING. THE UTILITY CONTRACTOR MUST SCHEDULE A UTILITY SMALLER THAN TWELVE INCHES (12") DIAMETER. PVC PIPE USED FOR WATER MAINS PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. U N MOSS, HCDPU UTILITY CONSTRUCTION PRE❑CONSTRUCTION CONFERENCE WITH SHALL BE CONNECTED BY SLIP JOINT OR MECHANICAL JOINT WITH GRIP RINGS. GLUED GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS INSPECTOR LEAST TWO 2 DAYS BEFORE CONSTRUCTION WILL BEGIN AND THE ( ) PIPE JOINTS ARE NOT ALLOWED ON PVC PIPE USED FOR WATER MAINS IN HARNETT PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT UTILITY CONTRACTOR MUST COORDINATE WITH HCDPU FOR REGULAR INSPECTION COUNTY. BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS VISITATIONS AND ACCEPTANCE OF THE WATER SYSTEM(S). CONSTRUCTION WORK SHALL U. HCDPU REQUIRES THAT THE UTILITY CONTRACTOR INSTALL TRACER WIRE IN THE NEEDED TO MAINTAIN A PROPER BARRIER. BE PERFORMED ONLY DURING THE NORMAL WORKING HOURS OF HCDPU WHICH IS 8:00 TRENCH WITH ALL WATER LINES. THE TRACER WIRE SHALL BE 12 GA. INSULATED, SOLID 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO AM - 5:00 PM MONDAY THROUGH FRIDAY. HOLIDAY AND WEEKEND WORK IS NOT COPPER CONDUCTOR AND IT SHALL BE TERMINATED AT THE TOP OF THE VALVE BOXES CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY PERMITTED BY HCDPU. OR MANHOLES. NO SPLICED WIRE CONNECTIONS SHALL BE MADE UNDERGROUND ON EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING E. THE PROFESSIONAL ENGINEER (PE) SHALL PROVIDE HCDPU AND THE UTILITY TRACER WIRE INSTALLED IN HARNETT COUNTY. THE TRACER WIRE MAY BE SECURED CONSTRUCTION. CONTRACTOR WITH A SET OF NCDENR APPROVED PLANS MARKED 'RELEASED FOR WITH DUCT TAPE TO THE TOP OF THE PIPE BEFORE BACKFILLING. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE CONSTRUCTION" AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. THE V. THE UTILITY CONTRACTOR WILL PROVIDE PROFESSIONAL ENGINEER (PE) AND THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA REGISTERED LAND SURVEYOR (RLS) SHOULD STAKE OUT ALL LOT CORNERS AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE FIELD DRAWINGS EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. GRADE STAKES FOR THE PROPOSED FINISH GRADE FOR EACH STREET BEFORE THE TO IDENTIFY THE INSTALLED LOCATIONS OF THE WATER LINES) AND ALL ASSOCIATED 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS UTILITY CONTRACTOR BEGINS CONSTRUCTION OF THE WATER LINE(S). THE GRADE SERVICES. ALL CHANGE ORDERS MUST BE PRE❑APPROVED BY HCDPU AND THE PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 STAKES SHOULD BE SET WITH A CONSISTENT OFFSET FROM THE STREET CENTERLINE PROFESSIONAL ENGINEER (PE) IN WRITING AND PROPERLY DOCUMENTED IN THE RED 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND SO AS NOT TO INTERFERE WITH THE STREET GRADING AND UTILITY CONSTRUCTION. LINE FIELD DRAWINGS. PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. F. THE UTILITY CONTRACTOR SHALL PROVIDE THE HCDPU UTILITY CONSTRUCTION W. THE UTILITY CONTRACTOR SHALL SPOT DIG TO EXPOSE EACH UTILITY PIPE OR LINE 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PUBLIC OR INSPECTOR WITH MATERIAL SUBMITTALS AND SHOP DRAWINGS FOR ALL PROJECT WHICH MAY CONFLICT WITH CONSTRUCTION OF PROPOSED WATER LINE EXTENSIONS PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, MATERIALS PRIOR TO THE CONSTRUCTION OF ANY WATER LINE EXTENSION(S), AND WELL IN ADVANCE TO VERIFY LOCATIONS OF THE EXISTING UTILITIES. THE UTILITY STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL ASSOCIATED WATER SERVICES IN HARNETT COUNTY. THE MATERIALS TO BE USED ON CONTRACTOR SHALL PROVIDE BOTH HORIZONTAL AND VERTICAL CLEARANCES TO THE EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY THE PROJECT MUST MEET THE ESTABLISHED SPECIFICATIONS OF HCDPU AND BE PROFESSIONAL ENGINEER (PE) TO ALLOW THE PE TO ADJUST THE WATER LINE DESIGN STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE APPROVED BY THE ENGINEER OF RECORD PRIOR TO CONSTRUCTION. ALL SUBSTANDARD IN ORDER TO AVOID CONFLICTS WITH EXISTING UNDERGROUND UTILITIES. THE UTILITY DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. MATERIALS OR MATERIALS NOT APPROVED FOR USE IN HARNETT COUNTY FOUND ON CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNER AND BE RESPONSIBLE FOR 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE THE PROJECT SITE MUST BE REMOVED IMMEDIATELY WHEN NOTIFIED BY THE HCDPU TEMPORARY RELOCATION AND/OR SECURING EXISTING UTILITY POLES, PIPES, WIRES, CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND UTILITY CONSTRUCTION INSPECTOR. CABLES, SIGNS AND/OR UTILITIES INCLUDING SERVICES IN ACCORDANCE WITH THE SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR G. THE WATER MAIN(S), FIRE HYDRANTS, SERVICE LINES, METER SETTERS AND ALL UTILITY OWNER REQUIREMENTS DURING WATER LINE INSTALLATION, GRADING AND ROTTED EROSION CONTROL DEVICES IMMEDIATELY. ASSOCIATED APPURTENANCES SHALL BE CONSTRUCTED IN STRICT IN ACCORDANCE WITH STREET CONSTRUCTION. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC X. PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN ESTABLISHED UTILITY EASEMENTS GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION UTILITIES (HCDPU). THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE OR NCDOT RIGHT-OF-WAYS THE UTILITY CONTRACTOR IS REQUIRED TO HAVE A SIGNED OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND NEWLY INSTALLED WATER MAIN(S), WATER SERVICE LINES AND ALL ASSOCIATED METER NCDOT ENCROACHMENT AGREEMENT POSTED ON SITE AND NOTIFY ALL CONCERNED RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, SETTERS AND METER BOXES FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS UTILITY COMPANIES IN ACCORDANCE WITH G.S. 87-102. THE UTILITY CONTRACTOR AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE UNTIL THE NEW WATER MAINS) HAVE BEEN APPROVED BY THE NORTH CAROLINA MUST CALL THE NC ONE CALL CENTER AT 811 OR 632-4949 TO VERIFY THE LOCATION MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. EXISTING UTILITIES 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION (NCDENRi DEH, PWSS)AND SHOWN IN THESE PLANS ARE TAKEN FROM MAPS FURNISHED BY VARIOUS UTILITY HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, ACCEPTED BY HCDPU. COMPANIES AND HAVE NOT BEEN PHYSICALLY LOCATED OR VERIFIED BY THE P.E. (I.E. IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. H. PRIOR TO ACCEPTANCE, ALL SERVICES WILL BE INSPECTED TO INSURE THAT THEY ARE TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, NATURAL GAS, 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF INSTALLED AT THE PROPER DEPTH. ALL METER BOXES MUST BE FLUSH WITH THE ETC.). THE UTILITY CONSTRUCTION ACTIVITY. GROUND LEVEL AT FINISH GRADE AND THE METER SETTERS MUST BE A MINIMUM OF 8" CONTRACTOR WILL BE RESPONSIBLE TO REPAIR ANY AND ALL DAMAGES TO THE 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL BELOW THE METER BOX LID. METER SETTERS SHALL BE CENTERED IN THE METER BOX SATISFACTION OF THE RELATED UTILITY COMPANY. OTHER CONSTRUCTION ACTIVITIES. AND SUPPORTED BY BRICK, BLOCK OR STONE. Y. THE UTILITY CONTRACTOR SHALL PROVIDE HCDPU WITH AT LEAST ONE (1) FIRE 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY I. THE UTILITY CONTRACTOR SHALL PROVIDE THE PROFESSIONAL ENGINEER (PE) AND HYDRANT WRENCH AND ONE (1) BREAKEAWAY FLANGE KIT FOR EVERY SUBDIVISION OTHER PARTIES PERFORMING WORK ON THIS PROJECT. HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE DRAWINGS WITH FIRE HYDRANTS DEVELOPED IN HARNETT COUNTY. THESE ITEMS MUST BE 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND IDENTIFYING THE COMPLETE WATER SYSTEM INSTALLED FOR EACH PROJECT. THE RED PROVIDED TO HCDPU BEFORE THE FINAL INSPECTION WILL BE SCHEDULED BY THE OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN LINE DRAWINGS SHOULD IDENTIFY THE MATERIALS, PIPE SIZES AND APPROXIMATE HCDPU UTILITY CONSTRUCTION INSPECTOR. IN ADDITION, THE UTILITY CONTRACTOR ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEPTHS OF THE WATER LINES AS WELL AS THE GATE VALVES, FIRE HYDRANTS, METER SHALL INSTALL A 4" X 4" CONCRETE VALVE MARKER AT THE EDGE OF THE PRACTICES AS DESIGNED. SETTERS, BLOW OFF ASSEMBLIES AND ALL ASSOCIATED APPURTENANCES FOR ALL RIGHT-OFEWAY TO IDENTIFY THE LOCATION OF EACH GATE VALVE INSTALLED IN THE 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO WATER LINES) NEW WATER SYSTEM WITH THE EXCEPTION OF THE FIRE HYDRANT ISOLATION VALVES. GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER CONSTRUCTED IN HARNETT COUNTY. THE RED LINE DRAWINGS SHOULD CLEARLY THE CONTRACTOR SHALL MEASURE THE DISTANCE FROM THE CENTER OF THE ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED IDENTIFY ANY DEVIATIONS FROM THE NCDENR APPROVED PLANS. ALL CHANGE ORDERS CONCRETE MARKER TO THE CENTER OF THE VALVE BOX. THIS DISTANCE (IN LINEAR WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE MUST BE APPROVED BY HCDPU AND THE PROFESSIONAL ENGINEER (PE) IN WRITING FEET) SHALL BE STAMPED ON THE BRASS PLATE LOCATED ON THE TOP OF THE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES AND PROPERLY DOCUMENTED IN THE RED LINE FIELD DRAWINGS. CONCRETE VALVE MARKER. IN LIEU OF INSTALLING THE CONCRETE VALVE MARKERS, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), J. POTABLE WATER MAINS CROSSING OTHER UTILITIES AND NON ❑POTABLE WATER LINES THE UTILITY CONTRACTOR MAY PROVIDE AT LEAST TWO MEASUREMENTS FROM TWO PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE (SANITARY SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM INDEPENDENT PERMANENT ABOVE GROUND STRUCTURES TO THE PROFESSIONAL ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS VERTICAL DISTANCE OF TWENTY iFOUR (24') INCHES BETWEEN THE POTABLE WATER ENGINEER (PE) IN THE RED LINE DRAWINGS TO IDENTIFY THE VALVE LOCATIONS. THE (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION DEVELOPMENT. MAIN AND ALL OTHER UTILITIES. NCDOT REQUIRES THE NEW WATER MAINS TO BE PROFESSIONAL ENGINEER ( PE) MUST INCLUDE THESE MEASUREMENTS IN THE AS BUILT 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND INSTALLED UNDER THE STORM WATER LINES. THE POTABLE WATER MAIN SHALL BE RECORD DRAWINGS SUBMITTED TO HCDPU. ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF INSTALLED WITH TWENTY iFOUR (24') INCHES OF VERTICAL SEPARATION AND WITH Z. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO 16. CONSTRUCTION. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING DUCTILE IRON PIPE WHEN DESIGNED TO BE PLACED UNDER A NON 1 1 POTABLE WATER LEAKAGE DAMAGE FROM POOR WORKMANSHIP DURING THE ONE YEAR WARRANTY TO THE DETAILS HEREIN. LINE SUCH AS SANITARY SEWER OR STORM SEWER LINES. IF THESE SEPARATIONS PERIOD ONCE THE WATER SYSTEM IMPROVEMENTS HAVE BEEN ACCEPTED BY HARNETT 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS TRACE MCLEAN. CANNOT BE MAINTAINED THEN THE WATER MAIN SHALL BE INSTALLED WITH DUCTILE COUNTY. HARNETT COUNTY WILL PROVIDE MAINTENANCE AND REPAIRS WHEN CONTACT 910-263-2944. IRON PIPE. BOTH THE POTABLE WATER MAIN AND THE NON i iPOTABLE WATER LINE REQUESTED AND BILL THE DEVELOPER AND/OR UTILITY CONTRACTOR IF NECESSARY MUST BE CAST IRON OR DUCTILE IRON PIPE (DIP) IF THE STATE MINIMUM SEPARATIONS DUE TO LACK OF RESPONSE WITHIN 48 HOURS OF NOTIFICATION OF WARRANTY WORK. CANNOT BE MAINTAINED. THE DUCTILE IRON PIPE MUST BE LAID SO THE MECHANICAL THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO JOINTS ARE AT LEAST (10') FEET FROM THE POINT WHERE THE POTABLE WATER MAIN DAMAGES RESULTING FROM FAILURE TO LOCATE THE NEW WATER LINES AND CROSSES THE NON ❑POTABLE WATER LINE. ASSOCIATED APPURTENANCES FOR OTHER UTILITIES AND THEIR CONTRACTORS UNTIL K. POTABLE WATER MAINS INSTALLED PARALLEL TO NON ❑POTABLE WATER LINES THE WATER LINES HAVE BEEN APPROVED BY NCDENR AND ACCEPTED BY HCDPU. THE (SANITARY SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM FINAL INSPECTION OF WATER SYSTEM IMPROVEMENTS CANNOT BE SCHEDULED WITH GRADING NOTES HORIZONTAL DISTANCE OF TEN (10') FEET BETWEEN THE POTABLE WATER MAIN AND HCDPU UNTIL THE STREETS HAVE BEEN PAVED; THE RIGHTS -OF -WAY AND UTILITY SANITARY SEWER MAINS, SEWER LATERALS AND SERVICES. THE HORIZONTAL EASEMENTS HAVE BEEN SEEDED AND STABILIZED WITH AN ADEQUATE STAND OF GRASS 1. ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE EDGE OF PAVEMENT, UNLESS SEPARATION BETWEEN THE POTABLE WATER MAIN AND ANY OTHER UTILITY OR STORM IN PLACE TO PREVENT EROSION ISSUES ON SITE. OTHERWISE NOTED. SEWER SHALL NOT BE LESS THAN FIVE (5) FEET. THE POTABLE WATER MAIN MUST BE AA. THE ENGINEER OF RECORD IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND DUCTILE IRON PIPE IF THIS HORIZONTAL SEPARATION OF TEN (10') FEET CANNOT BE TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE MAINTAINED. THE DUCTILE IRON PIPE SHALL EXTEND AT LEAST TEN (10') FEET BEYOND APPROVED PLANS AND SPECIFICATIONS. NO FIELD CHANGES TO THE APPROVED PLANS CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY THE POINT WHERE THE MINIMUM REQUIRED HORIZONTAL SEPARATION OF TEN (10') FEET ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY HCDPU. A COPY OF EACH DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. CAN BE RE iESTABLISHED. ENGINEER'S FIELD REPORT IS TO BE SUBMITTED TO HCDPU AS EACH SUCH INSPECTION 3. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF L. METER SETTERS SHALL BE INSTALLED IN PAIRS ON EVERY OTHER LOT LINE WHERE IS MADE ON SYSTEM IMPROVEMENTS OR TESTING IS PERFORMED BY THE CONTRACTOR. WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED POSSIBLE TO LEAVE ADEQUATE SPACE FOR OTHER UTILITIES TO BE INSTALLED AT A WATER AND SEWER INFRASTRUCTURE MUST PASS ALL TESTS REQUIRED BY HCDPU UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED LATER TIME. THE METER SETTERS SHALL BE INSTALLED AT LEAST ONE (1') FOOT SPECIFICATIONS AND THOSE OF ALL APPLICABLE REGULATORY AGENCIES. THESE TESTS 4. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT INSIDE THE RIGHT11OF:1WAY AND AT LEAST THREE (3') TO FIVE (5) FEET FROM THE INCLUDE, BUT ARE NOT LIMITED TO: AIR TEST, VACUUM TEST, MANDREL TEST, VISUAL ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE TEST, PRESSURE TEST, BACTERIOLOGICAL TEST, ETC. A HCDPU INSPECTOR MUST BE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR PROPERTY LINE BETWEEN THE LOTS. PRESENT DURING TESTING AND ALL TEST RESULTS SHALL BE SUBMITTED TO HCDPU. STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN M. HCDPU REQUIRES THAT METER BOXES FOR 3/4" SERVICES SHALL BE 12" WIDE X 17" ALL TESTS MUST BE SATISFIED BEFORE THE FINAL INSPECTION WILL BE SCHEDULED LONG ABS PLASTIC BOXES AT LEAST 18" IN HEIGHT WITH CAST IRON LIDS/COVERS. WITH THE HCDPU INSPECTOR. THE ENGINEER OF RECORD MUST REQUEST IN WRITING TO 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES METER BOXES FOR 1" SERVICES SHALL BE 17" WIDE X 21 " LONG ABS PLASTIC BOXES SCHEDULE THE FINAL INSPECTION ONCE ALL CONSTRUCTION IS COMPLETE. THE OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY AT LEAST 18" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP COVERS IN THE DEVELOPER'S ENGINEER OF RECORD AND THE HCDPU UTILITY CONSTRUCTION WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY CENTER OF THE LIDS. METER BOXES FOR 2" SERVICES SHALL BE 20" WIDE X 32" LONG INSPECTOR SHALL PREPARE A WRITTEN PUNCH LIST OF ANY DEFECTS OR DEFICIENCIES HIS OPERATION. ABS PLASTIC BOXES AT LEAST 20" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP NOTED DURING THE FINAL INSPECTION, SHOULD ANY EXIST. UPON COMPLETION OF THE 6. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY COVERS IN THE CENTER OF THE LIDS. PUNCH LIST, THE DEVELOPER'S ENGINEER OF RECORD WILL SCHEDULE ANOTHER THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS N. MASTER METERS MUST BE INSTALLED IN CONCRETE VAULTS SIZED FOR THE METER INSPECTION. IN THE EVENT THE NUMBER OF INSPECTIONS PERFORMED BY THE HCDPU DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD ASSEMBLY AND ASSOCIATED APPURTENANCES SO AS TO PROVIDE AT LEAST EIGHTEEN EXCEEDS TWO, ADDITIONAL FEES MAY BE ACCESSED TO THE DEVELOPER. BE NOTIFIED. (18') INCHES OF CLEARANCE BETWEEN THE BOTTOM OF THE CONCRETE VAULT AND 7. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES THE BOTTOM OF THE METER SETTER. THE MASTER METER MUST BE PROVIDED TEST AND SURROUNDED BY SILT FENCE. PORTS IF THE METER IS NOT EQUIPPED WITH TEST PORTS FROM THE MANUFACTURER 8. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE IN ACCORDANCE WITH THE HCDPU ESTABLISHED STANDARD SPECIFICATIONS AND PERMITTED SITE WHILE WORK IS IN PROGRESS. DETAILS. DUCTILE IRON PIPE MUST BE USED FOR THE MASTER METER VAULT PIPING 9. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH AND VALVE VAULT PIPING. THE UTILITY CONTRACTOR MUST PROVIDE SHOP DRAWINGS THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM FOR THE METER VAULTS TO HCDPU PRIOR TO ORDERING THE CONCRETE VAULTS. WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE 0. THE UTILITY CONTRACTOR WILL INSTALL POLYETHYLENE SDR-9 WATER SERVICE LINES TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. THAT CROSS UNDER THE PAVEMENT INSIDE A SCHEDULE 40 PVC CONDUIT TO ALLOW 10. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER FOR REMOVAL AND REPLACEMENT IN THE FUTURE. TWO (2) INDEPENDENT 3/" WATER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 11. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH SERVICE LINES MAY BE INSTALLED INSIDE ONE (1) - TWO (2") INCH SCHEDULE 40 PVC AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. CONDUIT OR TWO (2) INDEPENDENT 1" WATER SERVICE LINES MAY BE INSTALLED INSIDE ONE - THREE (3') INCH SCHEDULE 40 PVC CONDUIT, BUT EACH WATER SERVICE SHALL BE IICAR9 �% `�p 40FESS/Oi� SEA 027 ''' ;, �C) REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II PROJECT NOTES CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE SEE SHEETS DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER G-1 m0 VICINITY MAP NOT TO SCALE �3-A; N /F DONNA SUE M. HOOPER & HUSBAND, JAMES CLEMONT HOOPER DB 976, PG 697 PB 2000, PG 67 N /F ELBERT W. HOLDER & WIFE, JOYCE P. HOLDER DB 506, PG 163 98 . �5/8" ERB - \ � 97 96; �90, 89 8E 8 W6 I, SEAN R. SEEVER, CERTIFY THAT THIS SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND OR ONE OR MORE EXISTING EASEMENTS AND DOES NOT CREATE A NEW STREET OR CHANGE AN EXISTING STREET. J-Q� -Lt ----------- we PROFESSIONAL LAND SURVEYOR — L-4571 I, SEAN R. SEEVER, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK SHOWN. PAGE HEREON OR OTHER REFERENCE SOURCE ); THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN FROM INFORMATION IN BOOK , PAGE OR OTHER REFERENCE SOURCE ---- --------- • THAT THE RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1:10,000+; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600). WITNESS MY HAND AND SEAL THIS 18 DAY OF PLCEM51-P, 2019. PROFESSIONAL LAND SURVEYOR — L-4571 LEGEND: "MZ ECM —EXISTING CONCRETE MONUMENT EIP 00 EIP—EXISTING IRON PIPE ERBO ERB—EXISTING REBAR o COMPUTED POINT N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY — — — — —SETBACK LINE SD STORM DRAINAGE w WATER LINE PERMANENT EASEMENT ❑ ❑ WOODEN FENCE — SF SF — SILT FENCE LINE TREE LINE 400 MAJOR CONTOUR 403 MINOR CONTOUR X 395.47' SPOT ELEVATION BENCHMARK Mj MAILBOX SIGN SIGN © TRANSFORMER * LIGHT POLE 0 TELEPHONE PEDESTAL D4 WATER VALVE CFIRE HYDRANT R WATER METER IV IRRIGATION VALVE OO WATER BLOW OFF RIP RAP ASPHALT CONCRETE 0 WETLANDS NOTES: AREA: (BY COORDINATE COMPUTATION) 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES 1,984,324 SF (45.55 AC) UNLESS OTHERWISE NOTED. 2. COMBINED SCALE FACTOR: 0.99987325 LOCALIZATION POINT N: 570,617.013 E: 1,992,547.997 PIN NO: 9597-31-2392.000 CONTROL ESTABLISHED VIA NORTH CAROLINA GEODETIC SURVEY VIRTUAL REFERENCE SYSTEM. 3. THE HORIZONTAL AND VERTICAL CONTROL FOR THIS SURVEY ZONING: RA-20R WERE ESTABLISHED USING THE NORTH CAROLINA GEODETIC SURVEY VIRTUAL REFERENCE SYSTEM. 35' FRONT 4. LINES NOT SURVEYED ARE SHOWN AS DASHED LINES FROM 10' SIDE INFORMATION REFERENCED ON THE FACE OF THIS MAP. 25' REAR 5. NONCONFORMING STRUCTURES HAVE NOT BEEN CREATED BY THIS SURVEY. 6. THIS SURVEY WAS DONE WITHOUT BENEFIT OF A TITLE SEARCH SOURCE OF TITLE SOURCETITLE AND IS BASED ON REFERENCED INFORMATION SHOWN HERE ON. DB DB 304T PG 854 OTHER DOCUMENTS OF RECORD MAY EXIST WHICH COULD COUNTY O AFFECT THIS PROPERTY. NO RESPONSIBILITY IS ASSUMED BY REGISTER DEEDS THIS SURVEYOR FOR ANY CONDITIONS WHICH MAY PRESENTLY EXIST BUT ARE UNKNOWN OR REFERENCED HERE ON, SUCH AS BUT NOT LIMITED TO HAZARDOUS WASTE MATERIALS, EASEMENTS, CEMETERIES, AND FLOOD AREAS. 7. LOCATIONS OF ALL UNDERGROUND UTILITIES LYING WITHIN THIS MAPPED AREA MAY NOT BE SHOWN ON THIS PLAN. 5\-\e SotoT' DEVELOPERS OR CONTRACTORS SHOULD NOT ONLY MAKE a N SUBSURFACE INVESTIGATIONS BUT SHOULD ALSO ALLOW FOR CONTINGENCIES WHICH MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR OF LINES BEING IN DIFFERENT LOCATIONS THAN INDICATED ON THIS SURVEY. 8. THIS PROPERTY LIE WITHIN FLOOD ZONE "X" ACCORDING TO MAP# 3710958600J OF THE FLOOD INSURANCE RATE, DATED NOVEMBER 3, 2006. IN I I art❑ U TBM C N 570,617.013 z E 1,992,547.997 cn IT1 C ......... �j'' NC GE DNAD 3683 o co `9 co CP c •�4�.� AL � 7 = NAVD 88 ir r m A:r 457 _ 1E0 � C S UP, J�� i���ccgNl R I, SEAN R. SEEVER, CERTIFY THAT THE CONTROL FOR THIS SURVEY WAS ESTABLISHED FROM AN ACTUAL GPS SURVEY UNDER MY SUPERVISION. THIS GPS SURVEY WAS PERFORMED TO C-211 FGCC SPECIFICATIONS RTK GPS WITH VRS FIELD PROCEDURES WERE USED. THE COORDINATES WERE OBTAINED THROUGH A GRID TO GROUND ADJUSTMENT USING THE COMBINED SCALE FACTOR SHOWN HEREON. THIS SURVEY WAS PERFORMED ON JULY 11, 2019 USING TWO TRIMBLE 5700 RECEIVERS. ------ ----- PROFESSIONAL LAND SURVEYOR — L-4571 I, SEAN R. SEEVER, CERTIFY THAT THIS CLASS "C" TOPOGRAPHIC MAP WAS DRAWN FROM AN ACTUAL SURVEY PERFORMED UNDER MY DIRECT SUPERVISION AND THAT IT MEETS OR EXCEEDS THE NORTH CAROLINA ADMINISTRATIVE CODE 21.56.1605 AND 21.56.1606. WITNESS MY HAND AND SEAL THIS 18 DAY OF DECEM5EIZ, A.D., 2019. -------- ------ ------------------------ PRO ESSIONAL LAND SURVEYOR — L-4571 3-B N /F DAVID T. McNEILL DB 1410, PG 428 PB 2000, PG 67 N 571,710.786 � i aan Any Gam❑ \ t �128; �1 0 C GRAPHIC SCALE 120 0 60 120 240 480 ( IN FEET ) 1 inch = 120 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com `�\\►I I I I11///7 CARO �Z// FESS/O i �AL _ � •• ; S UR ;;.� � q , i�N/ R'ISE Itls q REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II EXISTING CONDITIONS CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION SURVEYED BY: AL DRAWN BY: SEAN CHECKED BY: JIMMY PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=120' DATE SURVEYED JUNE 11, 2019 SHEET NUMBER C-1 00 VICINITY MAP NOT TO SCALE �3-A; N /F DONNA SUE M. HOOPER & HUSBAND, JAMES CLEMONT HOOPER DB 976, PG 697 PB 2000, PG 67 LEGEND: EIP Oa EIP-EXISTING IRON PIPE EIR Oa EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY UTILITY EASEMENT OVERHEAD UTILITY WETLANDS X FENCE LINE PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION -Q� BENCHMARK 5a SIGN a BOLLARD MB MAILBOX PP • UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑o WATER METER HARDWOOD TREE PINE TREE ASPHALT WETLANDS W W W W W W W W W W W W W W W Y 'L W . W W . . W W . W W . . W \ 98 W W W W W W W W W W W W v W W W W W y W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W . W W W . W W . . W W . W W . Y W W . .. y W W W W W W W W W W W W W W W W W W W W W Y W W W Y W W Y Y W W Y W W Y Y W W Y W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W , W W . W . . W W . W W . W W ' W\ W W W W W . W W W W W W W W W W .+ W �k W W W W W W W S 96WY W WY WYY W WY W WYY W 43,677 SF/ . W W . W . . W W . W W �Y W r.w 0.99 AC \ 90 57 r� 89 \1 W W WYY W WY -' 21,484 SF W W W W 0.49 AC �Y �Y W r� 88 W W W 22,873 SF 0.53 AC SITE NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR. 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 4. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER FEDERAL ADA AND LOCAL REQUIREMENTS. 5. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 6. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND REGULATIONS. 7. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. 53 20,038 SF 0.46-AC - 52 20,038 SF 0.46 AC 51 20,038 SF 0.46 AC- PROPOSED ROAD LENGTHS: STOCK MARKET DRIVE: 2,169 LF CAPITAL LOOP: 1,957 LF JUMPMASTER DRIVE: 245 LF BUNKER BUSTER CT: 221 LF r\ 3-B N /F DAVID T. McNEILL DB 1410, PG 428 PB 2000, PG 67 50 49 48 47 20,038 SF 20,038 SF 20,038 SF 20,038 SF 0.46 AC 0.46 AC 0.46 AC - 0.46 AC - - CAPITAL LOOP 50' R/W - PUBLIC STREET & UTILITY ACCESS _ 46 20,038 SF - 0.46 AC - C .2 \ W W \ r . 36 35 37 20,229 SF 26,082 SF / 0.46 AC 0.60 AC 45 0 / 23,524 SF 44 20,086 SF 34 38 0.46 AC 0.54 AC 1 / 28,849 SF I \ /� 34,344 SF 1 0.66 AC 21,989 SF / i. 0.79 AC 0.50 AC 126 43� 22,026 SF g�Q� 77 - 77 - - - - - -\� \ 35 624 SF 0.51 AC !` 20,720 SF 0.46 AC / OG ������ 20,794 SF 0,48 AC W 41 O �124� 1 � 1,204 SF 20,900 SF 1. 0.95 AC / G 0.48 AC 42 lopsG 2iA��9 \ 30 123 ; 30,121 SF / +. ...... ���i22,235 SF / 0.69 AC �i/ \\ 9 oG�QO .51 AC -- \�F 'AL\ / r�122 \�. Y Y 47,092 SF - - 21,967 SF Y \\�, r�121\� 1.08 AC - _ - 28 0.50 AC � y 5 _ '- �� E 31,479 SF 87,i r. 83,1 82,E I - - - - - - _ _ _ _ - - - 26 27 <\ 0.72 AC / _ - J/s" - - 24 25 20,135 SF 22,210 SF \ i �- ERB w _ _ - - 23 20,032 SF 0.46 AC 0.51 AC 20 r� 86\� ,Q» EKki _ - _ _ _ 5 21 22 20,202 SF 0�467AC SF 0.46 AC O 19 20 O 20,096 SF 0.46 AC Ff 13 w m w 17 18 O 20,069 SF 20.469ACF 0.46 AC _��� 1 2 w a �I . O 20,151 SF 0.46 AC EIP I� Ql 16 20,038 SF 0.46 AC 20,117 SF l� I 15 20,119 SF 0.46 AC . 0.46 AC m �I I 20,002 SF 0.46 AC .� �--� r 47 20,375 SF 0.46 AC D _ �--. r 46 12 rr F 0.47 AC .�._�- r 45,I'Lwu mil. �� �- r 44 0 __ __ r 42 I 20,038 SF m _ 40�1 41 0.46 AC -_ �--�1 \ 39 �•�' EIP r 38-' r 36 ` 37,i - -�� 35 _ - 1 34�, r�32�� 33�i 31 i - ERB 5/c" , 4» E ERB TBM N 570,617.013 E 1,992,547.997 ELEV 386.86 NC GRID NAD 83 (2011) NAVD 88 SITE DATA DEVELOPER MARKET PLACE BUILDERS MAILING ADDRESS 3102 NORTH MAIN STREET CITY, STATE FAYETTEVILLE, NORTH CAROLINA 28311 PIN NUMBER 9597-31-2392.000 TOWNSHIP BARBEQUE TOTAL SITE ACREAGE 45.55 AC ACREAGE TO BE DEVELOPED 45.55 AC ZONING RA-20R EXISTING USE UNDEVELOPED PROPOSED USE SINGLE FAMILY RESIDENTIAL PROPOSED LOTS 65 DISTURBED/DENUDED AREA 10.2 AC SETBACKS REQUIRED: FRONT SIDE REAR 35 FT 10 FT 25 FT o 21,681 SF 55 0.50 AC 30,989 SF 0.71 AC O59 22,997 SF / 0.53 AC 60 20,268 SF 0.47 AC 61 20,082 SF 0.46 AC 62 20,042 SF 0.46 AC 63 20,038 SF 0.46 AC 64 20,059 SF 0.46 AC 65 20,088 SF 0.46 AC 74 73 72 76 75 O O 20,304 SF 20,376 SF 20,141 SF 0.47 AC 20,258 SF 0.46 AC 0.47 AC 40,664 SF 0.47 AC 0 93 AC �\ 0.82 AC 40 Q�Q`�e�i 00.48 AC r�125 l 20 031 SF O O 20,035 SF 20,044 SF 20,580 SF 0.46 AC 0.46 AC 0.47 AC O71 70 69 \ \ 20,125 SF 20,353 SF 20,086 SF 0.46 AC 0.47 AC 0.46 AC SEWAGE TREATMENT FOR THE DEVELOPMENT WILL BE BY PRIVATE SEPTIC SYSTEMS ON EACH LOT. PUBLIC SEWER IS NOT AVAILABLE. i ECm 5/8" �- / ERB 119 N _ E 1,994,077.504 JC GRID NAD 83 (2011) r\ 48 �120� N 571,710.786 E 1,994,807.578 NC GRID NAD 83 (2011) 1" EIP (PINCHED) r\ 127 GRAPHIC SCALE 120 0 60 120 240 480 ( IN FEET) 1 inch = 120 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax j 930-426-5777 license number I C-2354 wwwAD site solutions.com NN .•••• ••. •% `9 i •4 SEA • 027 1 11111���``` REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II OVERALL SITE PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=120' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-200 580.03' SITE NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR. 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE 99.33' 159.05' 114.50' 114.50' 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 4. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL _ BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER - - - - - - - - - - - - - - - - - - - - F - - - FEDERAL ADA AND LOCAL REQUIREMENTS. 5. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. \ \ 6. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND p-0, \ REGULATIONS. \ \ 7. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. of iJ of "4 100' DRAINAGE \ UN. �:U' 53 o 52 o VICINITY MAP EASEMENT °� ��\ 54 0Ln 20,038 SF O \.� A" M 20,038 SF m SF NOT TO SCALE \\ 0.501AC 0.46 AC 0.46 AC \ El El .v 55 \ \ - - - - - - - J L_ - - - - - - J E 30,989 SF Ss0° 0.71 AC \ / ­17g9�28� i 10.34' . = 114.50' _ - _ 114.50' _ 19/ / C4 - CAPITAL LOOP #� ♦ p1 \ 50' R/UTILITY PUBLIC SS � � STREET �°� � 30' DRAINAGE Y� EASEMENT -- - -- -- -- -- -- -- l 11.0.00, • �o cl •� h/ / 10'x10 UTILITY ­/ xi • 1 \ 43,077 SF / 0.99 AC 0i Z 62 I ■ 0 I zo oo 20,042 SF ■ / O O 20,082 SF 10D 0.46 AC I CO 20,268 SF I c4 0 I �I / ° ✓ / co O 0.46 AC co I NJ■ ryv> / cn 0.47 AC I CA � I I 0 U1 U .� .� .� � ■ ,�, ,�, .�. s72 40,E , \ `° � 216 03 f / /a 22,997 SF 27 4D•/110. 0.53 AC I I � .� � ■.� .� .� � � /gyp � � I ♦ ■ O / � ♦� ■ 21,484 SF / =`V / / • / 0.49 AC / / � - - - - - - - `I 10' UTILITY EASEMENT po / 107.14' 110.14' 112.14' L - - - _ / gyp/ PER / S09°09'54"W 175.95' 105.13' 215.27' - S83°ll' - - _ 20 TA 5.20' - - - - - 17"E - i N86'21'39"E 198.15' - r N77• 49'16.,W 164.87 z ■ 0 w ■ � v; 0 z J 0 w ZE O N C4 o J N 0) w rn 100.02' S83°30' 0911W CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C1 80.61 175.00 S15°15'33"W 79.90 C20 35.63 25.00 S42°38'37"W 32.69 C21 7.67 50.00 S02°34'24"E 7.66 C22 42.91 25.00 N47°21'23"W 37.84 C23 39.28 25.00 S51°31'21"E 35.36 C24 41.62 118.00 N18.21'02"E 41.40 C25 122.66 125.00 N56°34'02"E 117.80 C26 1 9.98 1 125.00 1 N86°58'00"E 1 9.98 228.29' MAIL KIOSK _ - I n S09°09'54"W / - - 15.98' // 58 75' B MP OUT S28°27'18"W 30.33' I I I I 75 I m ry 22,873 SF / I I I I O I ^`V / 0.53 AC /v/ I I 76 i t o I 20,258 SF 9 / a 40,664 SF i 0.47 AC I o m No I 0.93 AC I o Cn I - - - - - - - - - - - - - - - 10'' TAPER 27 41.�08 ACF I LA I rn l I m S89°15'13"W 263.98' _ I_ (-n Ln N13°24'23"E I r1i L-26.19I i I C R=175.' 31.97' I I I J N � - - - _ 20' DRAINAGE CHORD S02°10'13 E 20 w EASEMENT 26.17' - 1 N06°30'46"W 71.70'- - 112.00' 82 �� - - - - 10' UTILITY EASEMENT )L - -- 83 i 1 I - - 215.00' _ - - N06.30'46"W _ _ 71.70' - _ - - - STOCK MARKET DRIVE `C2 _ 222.96 50 - PUBLIC STREET 3 UTILITY ACCESS - & 103.00' gT05p PUB DEIVE R/W N 11 °17' 58"W 75.29' 31 ; z O 0 0 C N O O iCn 0 D r LEGEND: P Q0 EIP-EXISTING IRON PIPE R 00 EIR-EXISTING IRON ROD RB0 ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY UTILITY EASEMENT - BUILDING SETBACK OVERHEAD UTILITY - - WETLANDS X FENCE LINE ❑ ❑ PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR 69.14' SPOT ELEVATION BENCHMARK EEI SIGN BL BOLLARD © MAILBOX PP• UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER 0 HARDWOOD TREE PINE TREE ASPHALT WETLANDS - -- 103.00,- No 102.00' -1 R25' _ �� 67.89' 10' UTILITY EASEMENT - - - ' _ �R25'- N83'28'04"E - _ - ...... 76.779 - I ���` I I �' - .00' 101 -"-�;LITY _ I - I �u, w i I EASEMENT 18 I 13 I I 0 I I I I Z I 17 �I I w I P 20,038 SF I o. 20,117 SF o I of Jw I I I I zI 16 o I� 6'I O `3'I I t41 0.46 AC I o o 0.46 AC IQ W H a0 I ILD I I `n I 0.46 AC I I I I l 0 I r 15 ^ rn I I 20,002 SF 0.46 AC I I I I I _ -- N m �I I I 20,375 SF 0.47 AC I+ I I I I i_ -- __ N83'15'19E I coo w Y o 01 I I I 203.31 - - - � I w j `n a' I I I I I J _ and o�--_-- I F _IM Z1 1 I I I I _---- 00) z20' - - - J 103.00'- ' I 103.00 - _ 0 20,038 SF- I 1 I 11 �•� o 0.46 AC 118.47' J N 50.00'-�. - - - _ 99.39' _ L - - - - 3 EIP �37; �36; �35, 34,E 50 \ 33 i 32,i 1 l 5/8" ERB 3/4" SD `/ ERB CT �38; GRAPHIC SCALE 0 25 50 100 ( IN FEET ) I inch = 50 ft. 200 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED SITE PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-201 VICINITY MAP NOT TO SCALE LEGEND: EiP Oa EIP-EXISTING IRON PIPE EiR Oa EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY UTILITY EASEMENT - BUILDING SETBACK OVERHEAD UTILITY WETLANDS X FENCE LINE ❑ ❑ PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION BENCHMARK 9cN SIGN a) BOLLARD MB MAILBOX PPS UTILITY POLE C GUY WIRE MTELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER G HARDWOOD TREE PINE TREE ASPHALT 0 WETLANDS CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C8 35.87 25.00 S55°25'53"E 32.87 C9 56.82 124.16 N70°25'19"E 56.33 C19 33.05 175.00 S78°03'27"W 33.00 C28 42.67 25.00 N34°34'07"E 37.68 SITE NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR. 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 4. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER FEDERAL ADA AND LOCAL REQUIREMENTS. 5. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 6. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND REGULATIONS. 7. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. 67 66' TOTAL SITE NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR. 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 4. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER FEDERAL ADA AND LOCAL REQUIREMENTS. 5. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 6. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND REGULATIONS. 7. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. 67 66' TOTAL 30 S Z o Z Z�S � I � N89'15'15"E 963.53' TOTAL - _ _ _ _ _ - _ _ _ - - - - - - - 0 8 -- -- -- -- -- -- -- -- -- -- \ Z �_ _ 35,624 SF - - 113.50' 117.50' 1.22.00' 126.50' 132_00' 40.00' _ \ ` ti� `� 20' DRAINAGE 2 A j - \ \\ \ EASEMENT _ _ _ _ 1 68 \ I 1 11 1 1 zII 67 I, oI g4 z 65 zo 66 00 � 1 20,580 SF \ o 4 20,044 SF I • � 63 z 0 1 rn � 1 20,035 SF �' 0.46 AC � 0.47 AC \ ' i 0 20,088 SF f 10' 20,059 SF a' •v, 0.46 AC w 20,038 SF I 0.46 AC 41 41 0.46 AC I oo U, 1 _ I I \ 5�5�40 0 V1 �� I 1 W 1�50' 1 I i i - - _ - - - �- - - \ 30 DRAINAGE ' L- - J \ Z Z 1 EASEMENT P W 1 I I - - - 172.40' \� 132.17' 132.68' \ Uo_ Ln 126.66' 134.17' 0 0= 122.16' 130.17' 1 i 117.65' NB6'21'39"E 125.16' 'i 1 42 27.20' 86.44' 120.15' - - - - - - 1 cr \ o 115.15' - - \ cfl c�FN I \ o `P 30,121 SF N\ o o \ \ 0.69 AC \ . of 0 \ �' �` \ � I I I 71 I u> O 14. 0!I 20.46125 465ACF \ I I I O 0I 20,086 SF a' \ \ \ \ \ D I I I I 72 20,353 SF I Ln CA0.46 AC °' U' \ 1 \ = I I 73 I I I 0.47 AC I N I I ml \ ; 1 \ 10' UTILITY EASEMENT- - I I O I o 20,376 SF I Co I I \ \ \� --- r 74 I ; 0.47 AC co I I rri - - G0 a z I O No 20,304 SF 10) w I I cn at - - - - m I 200 ,461 AC SF I N 0)I 0.47 AC i LnI i rri I I I m - - �R 5' N83'28'04"E 98.21' I N Ln l I _ I _ J rU�T1 rnI Iw m I I I - 123.00' ---�� 10' UTILITY EASEMENT - _ _ - _ _ - - I J - - - 134.00' --- m 130.00' _ _ - - 0 - 67.10' - n �- - - - 125.00' _ _ - - - RKET DRIVE 107.0� - N STOCK ► A PUSUC STREET _ _ - _ - - - 120.00' _ _ - - - & 50 R I CESS 106.00' UTI ii A - - 115.00' _ - - - TOTAL 106.00' - - - � r \ 28'04"E 1296.96' - _ _ - - N83' _ - - - TOTAL 105. 0' - I N8_3'_2B'04"E 1285.99TO - - 105.00 22,210 SF \ 0 - - - 104:00 -� I I I I 25 I Z I o0.51 AC 20,135 SF I a'. I \ - - 104.00 - - - 23 L ZoU I I 24 �I Icc�on0crI l I 0.46 AC 20,032 SF00 WI 0.46 AC `Q20117 SF o.46 AC IOct C� Wo o 20,202 SF I \ \ I I I I I I \ O L o 0.46 AC I (CL al I I I I Z I 0I C I 20,096 SF I 0 0.46 AC I I I I _ J I I Z I 20 I�� I 20,179 SF I ono. a? I I I I I - I rn l O Nv� v; l 0.46 AC I I I I _- 36.24' Z 19 I �, L 20,069 SF I Cc at I I I I _ _j 1 W I O I I 0.46 AC I I I I I I J �- - oo' 20,151 SF _ - 107 6 I 0.46 AC _ I ---- I I I I I-------_�o�'�j1 J 105.00' L- - - - - - 105.00 104.00' TOTAL �� 46 S830201"W 1766.07' - 10400 f 45 44 39; 40; 41 ; 42 ; 43; GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED SITE PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-202 VICINITY MAP NOT TO SCALE LEGEND: EIP 0 EIP-EXISTING IRON PIPE EIR (0 EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE -- RIGHT-OF-WAY UTILITY EASEMENT - BUILDING SETBACK OVERHEAD UTILITY WETLANDS X FENCE LINE ❑ ❑ PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION -Q� BENCHMARK EE SIGN a BOLLARD ® MAILBOX PPS UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER HARDWOOD TREE PINE TREE ASPHALT WETLANDS CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C10 25.45 128.66 N51`38'44"E 25.40 C11 61.89 50.00 N81°12'59"E 58.01 C12 40.00 50.00 S40°24'24"E 38.94 C13 40.00 50.00 S05°25'48"W 38.94 C14 76.74 50.00 S72`19'03"W 69.43 C15 30.77 25.00 S81`01'21"W 28.87 C16 39.27 25.00 S00°45'29"W 35.36 C17 39.27 25.00 N89°14'31"W 35.36 C18 82.13 175.00 S59°12'09"W 81.38 SITE NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR. 2. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 3. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 4. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER FEDERAL ADA AND LOCAL REQUIREMENTS. 5. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 6. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND REGULATIONS. 7. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. 208.30' 12.26' \ 123.38' 276.63' .Still.uu _ _ _ _ - - - - - - - - - - - - - - 60' BUFFER AND DRAINAGE 7 EASEMENT CENTERED ON STREAM 35 200,229 0,2 9ACF- 26,082 SF 5�23p q2 w / \ \ \ ��� A� , 0.60 AC C- \ / s `� \ 8�, �F 20,086 SF 0.46 AC 1 / R35' I I 34 344 SF �27'38"E 66.56' \ \ A 10 UTILITY EASEMENT / , 01 21,989 SF \ \ \ 0.50 AC 10' UTILITY EASEMENT \ / �c� Off'. / 20,794 SF \ ` J / \ 20,900 SF \ \ / �/ / / \ 0.48 AC0 /W10 \ �O 41 v \ 123 22,235 SF S A \ ♦ \ \ 0.51 AC O T 9 AG �Q ��sz� ♦ \ \ R- \SF�9,967 SF.50 AC31Q72 AC �6 0BUFFER AND DRAINAGE EASEMENT CENTERED ON STREAM / O' I c� v1 109.85, S83'02'01"W 47 ; 48 POSSIBLE ENCROACHMENT 125 ; 126 ) 50 , N 571,710.786 E 1,994,8 07.57.578 NC GRID NAD 83 (2011) / 1 1" EIP ,--� (PINCHED) i 128 127) 1 1 I 1 1 G) o z Z r� n n 700 C ��01 GRAPHIC SCALE 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED SITE PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-2m3 VICINITY MAP NOT TO SCALE �3-A, N /F DONNA SUE M. HOOPER & HUSBAND, JAMES CLEMONT HOOPER DB 976, PG 697 PB 2000, PG 67 LEGEND: EiP Oa EIP-EXISTING IRON PIPE EPKO EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR ERSO ERS-EXISTING RAILROAD SPIKE 0 CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT-OF-WAY -- -- --- -SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE w WATER LINE OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT X FENCE LINE 100 YEAR FLOOD LINE TREE LINE LOC LIMITS OF CONSTRUCTION SF SEDIMENT FENCING 51C SIGN © MAILBOX A� HVAC UNIT ® TRANSFORMER LIGHT POLE PP. UTILITY POLE C- GUY WIRE ❑T TELE PEDESTAL © CABLE PEDESTAL N WATER VALVE CFIRE HYDRANT 6WATER METER ® CATCH BASIN TREE ASPHALT 0 SOIL WATER WETLANDS NORTH AMERICAN GREEN TURF MATTING 0 CHECK DAM W/WEIR NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL. N CD EN R. ORG/WEB /LR /EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. >\Tk 77- < �/ ���� = ���1� � �� ��� �� t�� �I � r"X5 ( )W1\�%� 1/ ���� ✓" l�,1�� �/ 54 f oR 53 52 51 / 5 �5/S,r _ W W�W /, y✓ W /1/� W W W W W Wf / S O ERB -� � � � l l ' ✓��f�,\�����y // �Cy C� �S' S, W(� W � �-, W / (J � ' �I ✓ I� J! S 1 / CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE -CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, TEMPORARY SEDIMENT BASINS & TEMPORARY SKIMMER BASINS WHERE SPECIFIED. 3. CLEAR AND GRUB THE SITE AS NEEDED. 4. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN GRASSED. 5. INSTALL TEMPORARY CHECK DAMS AND GROUND REINFORCEMENT MATTING 6. INSTALL UTILITIES. 7. PERFORM FINE GRADING. 8. INSTALL AND PREPARE BASE COURSE. 9. PAVE ROADWAYS 10. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 11. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 12. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. O49 48 CAPITAL LOOP 97 W� 00 0+0050' R/W - PUBLIC STREET 1 UTILITY ACCESS \ �YV , W J✓ .N •V / / J /��'�� 1 r� f t"/(\( `Ys\ W W W W � fW/. �'�/ 1.t 'J .: ._.:: - ,� I I / W� I W W •1•/� W •1• vW - 96// \f �W� W��.I ��� l y�/ �I�)�1\ I / 1��1�\\ !��`Y� `Y /W �W •1•/W W� ��ii.. �J/�/ ` l �` \ 61 62 6g 64 65 r i 90 89 1 // �) f((� ►��( / 58 l � 3 t Il 87 i 1 \ 1 �' \ �� 82 �� �I , �`�'N��•�^� _ LOCH LOC « moo a+oo I EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS TRACE MCLEAN. CONTACT 910-263-2944. NN 571,710.786 /t l ) / E78 294GRT 8R1A�D 3 rl- (�R NCH(�128 37 y 44 l \ , / 34 \ r� co z m T3 i00 14+00 ` 15+00 33 , O 1 40 32 67 �' / o C 1 - z+oo .�--� ERB = r f _ 1+00 H w ?1i1rr'"`/ \ 86 ( f + d v'°'' LpC 22 v / w 0 MARKET DRIVE _. �..«: `� Bit,Lp 19 20 STOCK - - 50' PUBLIC RfW C O X L w 13 w .� ;� W6 C < � �! 15 rr i, , --.� w �,a���; 5/ » P� 14 Z0 L0 nl I 33; I I 5, ERI I 3/4» ERB C TBM N 570,617.013 E 1,992,547.997 ELEV 386.86 NC GRID NAD 83 (2011) NAVD 88 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS THAN 4:1 PERIMETERS AND HQW ZONES) Know what's below. Call before you dig. IO _j - 35 LA 34 LOC u6�� 5/8» ER I r� ERB ERB 1 �40 i , r\41 _ I GRADING NOTES 1. ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE PAVEMENT, UNLESS OTHERWISE NOTED. 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 3. THE GRADING ON THIS PLAN IS INTERNAL TO THE ROADWAYS AND THEIR ASSOCIATED DRAINAGE ONLY. DRAINAGE PLANS FOR THE INDIVIDUAL LOTS/HOMES ARE THE RESPONSIBILITY OF THE LOT OWNER. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE so `) l >15+00 � � % � G 29 �F �.,. 14+00 / C p i FT .. er 13 �/ i I "`12+00 ��Rs 121 � \ S 2826 0 l �, L 1 23 24 �W �� I?p Cl / 15�8- N 570,999.779 E 1,994,077.504 47,E / NC GRID NAD 83 (2011) I � PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. GRAPHIC SCALE xx o xx xx xx xx ( IN FEET ) I inch = XX ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II OVERALL GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-3mO THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED CAPITAL LOOP 97 W� 00 0+0050' R/W - PUBLIC STREET 1 UTILITY ACCESS \ �YV , W J✓ .N •V / / J /��'�� 1 r� f t"/(\( `Ys\ W W W W � fW/. �'�/ 1.t 'J .: ._.:: - ,� I I / W� I W W •1•/� W •1• vW - 96// \f �W� W��.I ��� l y�/ �I�)�1\ I / 1��1�\\ !��`Y� `Y /W �W •1•/W W� ��ii.. �J/�/ ` l �` \ 61 62 6g 64 65 r i 90 89 1 // �) f((� ►��( / 58 l � 3 t Il 87 i 1 \ 1 �' \ �� 82 �� �I , �`�'N��•�^� _ LOCH LOC « moo a+oo I EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS TRACE MCLEAN. CONTACT 910-263-2944. NN 571,710.786 /t l ) / E78 294GRT 8R1A�D 3 rl- (�R NCH(�128 37 y 44 l \ , / 34 \ r� co z m T3 i00 14+00 ` 15+00 33 , O 1 40 32 67 �' / o C 1 - z+oo .�--� ERB = r f _ 1+00 H w ?1i1rr'"`/ \ 86 ( f + d v'°'' LpC 22 v / w 0 MARKET DRIVE _. �..«: `� Bit,Lp 19 20 STOCK - - 50' PUBLIC RfW C O X L w 13 w .� ;� W6 C < � �! 15 rr i, , --.� w �,a���; 5/ » P� 14 Z0 L0 nl I 33; I I 5, ERI I 3/4» ERB C TBM N 570,617.013 E 1,992,547.997 ELEV 386.86 NC GRID NAD 83 (2011) NAVD 88 GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS NONE (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS THAN 4:1 PERIMETERS AND HQW ZONES) Know what's below. Call before you dig. IO _j - 35 LA 34 LOC u6�� 5/8» ER I r� ERB ERB 1 �40 i , r\41 _ I GRADING NOTES 1. ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE PAVEMENT, UNLESS OTHERWISE NOTED. 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 3. THE GRADING ON THIS PLAN IS INTERNAL TO THE ROADWAYS AND THEIR ASSOCIATED DRAINAGE ONLY. DRAINAGE PLANS FOR THE INDIVIDUAL LOTS/HOMES ARE THE RESPONSIBILITY OF THE LOT OWNER. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE so `) l >15+00 � � % � G 29 �F �.,. 14+00 / C p i FT .. er 13 �/ i I "`12+00 ��Rs 121 � \ S 2826 0 l �, L 1 23 24 �W �� I?p Cl / 15�8- N 570,999.779 E 1,994,077.504 47,E / NC GRID NAD 83 (2011) I � PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. GRAPHIC SCALE xx o xx xx xx xx ( IN FEET ) I inch = XX ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II OVERALL GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-3mO THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. Call before you dig. IO _j - 35 LA 34 LOC u6�� 5/8» ER I r� ERB ERB 1 �40 i , r\41 _ I GRADING NOTES 1. ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE PAVEMENT, UNLESS OTHERWISE NOTED. 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 3. THE GRADING ON THIS PLAN IS INTERNAL TO THE ROADWAYS AND THEIR ASSOCIATED DRAINAGE ONLY. DRAINAGE PLANS FOR THE INDIVIDUAL LOTS/HOMES ARE THE RESPONSIBILITY OF THE LOT OWNER. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE so `) l >15+00 � � % � G 29 �F �.,. 14+00 / C p i FT .. er 13 �/ i I "`12+00 ��Rs 121 � \ S 2826 0 l �, L 1 23 24 �W �� I?p Cl / 15�8- N 570,999.779 E 1,994,077.504 47,E / NC GRID NAD 83 (2011) I � PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. GRAPHIC SCALE xx o xx xx xx xx ( IN FEET ) I inch = XX ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II OVERALL GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-3mO THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-3mO THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED SITE �J� � � CD ~ FIFTY CALIBER DRIVE / / STRIKE EAGLE DRIVE �/ ~ I J / /* t 1 M ��J - TST #5 - / i ROPo (�L! ��Lj� �L� I�L� ` ✓l�� I `�L `I' ' r /�li�� rV ' r % Wfj L-40'� W 15'� D 4' /� / �\ l / �1 `�SIDE SLOPES= 63 1 TOP OF BASIN: 363.0' 10 -� � BOTTOM OF BASIN: 358.0' M\CR / �/ J/ `Li' `i' ; 3 362.00 ` SIDE SLOPES4' EMEYOFPBASINYARE TO' NORTH > / r� 330 , 1 J� f l I l - BE SEEDED WITHIN SEVEN DAYS. � � VICINITY MAP - �1 �,/f� / �, �, �, / �, .� I �, �, �� �, ^ /�, J (�, r�/ ��� ��� 54 001YO O NOT TO SCALE J�f f✓ ��,�-����.�� �. c �- rj ��,� r i //� / 11 �f/ o ���•/`; -�� �f �' � � � �� /�� _sue � -� '� �1,� ��/l/ff r��r ���1 � � � TST #4 l I 55 J / / I o L=26 , W=14', D=2.5' t / ♦ S��� .� .�% // ��,�����/\, ,� rK�L///y / �N � 1 �L �L �L J ✓ �L SIDE SLOPES= 2:1 // I J/// / 00 L / 1 / J // / /�/ 1 J l \\ ✓ J '� TOP OF BASIN: 348.0' JI (� , SILT FENCE SF l / BOTTOM OF BASIN: 344.5' '7 �J OUTLET (TYP) �j 4' EMERGENCY SPILLWAY: 347.0' �.) I ° T _ 1 ��� / •N �1 j l/�Y�/ �L� �L 1 �, / �>� ��L \ �L �1. �L ��1 SIDE SLOPES OF BASIN ARE TO �r f CAPITAL LOOP / I \ BE SEEDED WITHIN SEVEN DAYS. 0 50' R/W - PUBLIC STREET & ��5� �flI i,lls / /�/ � l /J �(�/ f YJJ��/� / ���J� \ (A ' 11 J7 ((r / f }J1� I \ �� f� / -J ��� ���I I �LEASEMENT �♦J�J �// �/0� \���U-TI��ITACCES 8+0-0 Z+o0 —rn m wnrn 6 o rn 30'V�/ 00 / g-c � p � mil, �l� � � � ��� � �♦ l y �� � ( � � � �' � � � � � / � . � �� RIP RAP DISSIPATER ( � 3s2 �= ; ; /, ^ �001 001 001- L 48' W 18/32 001 n / %%'� CAPITAL 00l 0 / CLASS 2 32" THICK � ` I ♦ / 00"I O / � � �,,� 3+70-7+OORT CAPITAL NAG 1`1125 /CUT SLOPE l l I SR ,, PAT D 75 J I PAT D� �J INV I�� / v ti 352 0 .'�' �! /' 7 DAY GROUND _r ' \ / / �/ SWALE 1 �h �0// COVER REQUIRED 4% GRADE � � Mcoo �jC : � �J 14' BOTTOM 6u O f JV 4:1 SLOPES, /� 55.411 LF @ 8.66% 30 RCP ^ � SILT FENCE (TYP)� , / % 59 OUTLET / o TSB #1 / �%-� ^� INV.356.80!J J n� L=210', W=28', D=2' J� / 7 ' `� �' SIDE SLOPES= 2:1 d ; J / TOP OF BASIN: 359.8' ^ #3 0 BOTTOM O 16' EMERGENCY SPILLWAY: '358.8' r L= 57 14', D=2' \ t oo Z \�� INVERT OF SKIMMER: 356.8' �J �� \ ♦ f I I 1 /� / // Y J / �/- SI PES= 2:1 OC �,x ,%,%� \\ \�� ♦� �� I / / �/ `\t/ / l� J �l�- .tlr TOP OF BASIN: 349.0' SIDE SLOPES OF BASIN ARE TO -��(�j/, I, ,�'�' ��� / BE SEEDED WITHIN SEVEN DAYS. r- — / / J / ♦ BOTTOM OF BASIN: 346.0' /jam / /� ��, o "ATTACH A 2.5" FAIRCLOTH SKIMMER (OR EQUAL) o / R� / � ✓�- 4' EMERGENCY SPILLWAY: 348.0' / I O wb / `0 n WITH 1.8" ORIFICE FOR DEWATERING THE v -- �`M��/� SIDE SLOPES OF BASIN ARE TO o SKIMMER BASIN DURING _CONSTRUCTION. �� ) /� � � o / \� � t�I�y. / �/ � BE SEEDED WITHIN SEVEN DAYS. /n ' / �� \• —_// (L � \ f (ram J / I� ���� �/� // 340/ / // / , ✓✓✓w�wr ;i►;OO ` I \\ \\ (� / f I �� 33`'i- J( �L r— �L♦ --��� f / �3Q i / /, 1 I Fr 7 DAY GROUND COVER REQUIRED K\\) l 10' UTILITY EASEMENT % o1TEMPORARILY TIE ( // > '. ;'0✓/ ti DITCH TO TSB#1 DOI l / o `CAPITALCUTSLOPE 77\\�/ l ♦ �� PNAG AT D75 CAPITAL �/ ���V / �` ♦ �� �/ i (i 0+00-3+70RT ♦ J ( J � 1 3 111 ; I NAG SC150 1\� \ / ♦ 1 C s� of PAT D I ) ( C C .\ ? �✓ — ( 4 20' DRAINAGE � C — ` EASEMENT \� �L �L �L �L �L♦ I i A i U` \ 1 1 STOCK MARKET DRIVE LOC _ LO �` �L (0 10' UTILITY EASEMENT 50R/W_ PUBLIC STREET_ao6 DIY I I \\ * ss ;;1 �' STOCK MARKET \ LOC & IY ACCESS 83 \� ro s �� �1� 0+50-5+21 LT LOCH LOC may_ _ 398 / I I \O NAG C125BN ��'/'�' .1" •�- - C Lo ,`- 5+0L PAT D 4+00 40 � \` wo O \ o 2+00cp wT f m%W� �9 0 o�w� \ ��� —%� -- s r'�1� .— • — -—w�wj ;tea o EXCAVATED INLETS =dr —ERB TEMPORARY PROTECTION i��, ,yr✓� n o ,2 w INV:379.00 /fir % ✓ �%% 1.0 \ r 10' UTILITY EASEMENT IINV:381. �� 2+70-5+21RT CONSTRUCTION o 5Q %� r'' �; OC J � � '� � �% !;�� �'� / STOCK MARKET ENTRANCE \--------- II i/ �..�✓% 5/RB8" E W6 W6 5/8 -�- ERB -�- STO 50K MUB CER�W IVE 46 W6 � Know what's below. Call before you dig. W6 7 DAY GROUND COVER REQUIRED — . nor- LOC L.06 tier ' �'g MUOC RIP RAP DISSIPATEI �- .LOC LOC�� L=9' W=5/11' I CHECK DAM STOCK MARKET 13 D-8" D-12" WI WEIR 0+00-2+OORT CLASS B 18" THICK p (TYP) NAG C125 / n PAT D I 'fl al I 12�/ % J 7 DAY GROUND COVER REQUIRED 14 r— `O -� ,1 % `t C7 DAY GROUND IT � OC�0 COVER REQUIRED �IL� 38.12 LF @ 6.56% 18" RCP II�JLIMITS OF CONSTRUCTION lIlUillill1r. 10.5 AC II��I� ��IIIII t STOCK MARKET M I` Se BUNKER CUT SLOPE 4 lllllf� II I �I NAG SC150 16 lill 11 I'd Iilo i PAT D Ill i �10 U O �1 Flo J � I U o r r o LLOC LOG' \ 5/8"J4 I ( VN U O J 7 DAY GROUND COVER REQUIRED 61 PERMISSION TO GRADE LETTER REQUIRED FROM THE OWNER OF LOT 34 TO INSTALL THIS DITCH. NAG C125BN \ PAT D LOC � LOC LEGEND: OO EIP-EXISTING IRON PIPE O EPK-EXISTING PK NAIL O ERB-EXISTING REBAR Oo ERS-EXISTING RAILROAD SPIKE 0 CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT-OF-WAY -- — - —- —-- SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE w WATER LINE OVERHEAD UTILITY - - WETLANDS PERMANENT EASEMENT X FENCE LINE +� FW 100 YEAR FLOOD LINE TREE LINE LOC LIMITS OF CONSTRUCTION SF SEDIMENT FENCING M STOCK MA 5+21-9+ NAGS P C SIGN SIGN Mj MAILBOX Aa HVAC UNIT [!:]TRANSFORMER * LIGHT POLE pp UTILITY POLE C GUY WIRE ❑T TELE PEDESTAL © CABLE PEDESTAL N WATER VALVE C FIRE HYDRANT Lug WATER METER ® CATCH BASIN TREE ASPHALT SOIL WATER WETLANDS NORTH AMERICAN GREEN TURF MATTING CHECK DAM W/WEIR GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com ��� �•• Z�: E SS /0 ••. ����i OF•• `9 i •4 SEA • 027 �/O 1 1111g��X\§ REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-3m 1 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED VICINITY MAP NOT TO SCALE LEGEND: OO EIP-EXISTING IRON PIPE O EPK-EXISTING PK NAIL O ERB-EXISTING REBAR Qo ERS-EXISTING RAILROAD SPIKE 0 CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE -- RIGHT-OF-WAY -- — - —- —-- SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE W WATER LINE OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT X FENCE LINE +� FM 100 YEAR FLOOD LINE TREE LINE LOC LIMITS OF CONSTRUCTION SF SEDIMENT FENCING a� SIGN MB MAILBOX AC HVAC UNIT © TRANSFORMER 0 LIGHT POLE pp UTILITY POLE C GUY WIRE ❑T TELE PEDESTAL © CABLE PEDESTAL WV N WATER VALVE FIRE HYDRANT ❑o WATER METER ® CATCH BASIN E) TREE ASPHALT SOIL 0 WATER WETLANDS NORTH AMERICAN GREEN TURF MATTING 0 CHECK DAM W/WEIR Know what's below. Call before you dig. J -- s � _�0' UTILITY EASEMENT 9+I 0 + 10+00 4 �- 38" STOCK MARKET 5+21-10+OOLT NAG S150 PAT D r J7 'IV v67 60' BUFFER AND DRAINAGE r EASEMENT CENTERED ON STREAM 44 LIMITS OF CONSTRUCTION 10.5 AC '�^� ^44� �9l . �. �Ol —OOl � — 00� OOl — OOl _ TST #6 »Q4" �-2A ��8.1�-30+,� - - - - ��J \ \�� L� \ ( SIDE '�SLOPES= 2:1, 1' SF SF SF Sr \ TOP OF BASIN: 354.0' CAPITAL LOOP 13+00 14+00 15+00 \ 7 DAY GROUND BOTTOM OF BASIN: 351.0' 11+00 +00 _ — - — }— COVER REQUIRED �50' R W -PUBLIC STREET 8c��o °j — I ��^ +`O �' ° ' 4' E NCY SPILLWAY: 353.0' / r�0�' n� nj� M , M �i M^ M^ �i M M 'i Rio �� ` �6'x O UTILITY ACCESS �� �� �/�° SWALE#3 ` SID 43 ES of BASIN ARE TO �_ _ �� 7% GRADE J I BE WITHIN SEVEN DAYS. 6 8' BOTTOM 3:1 SLOPES 001 001 OOl 301 -006--0 l l l l l R %� 365 \ NAG S150 t\ / \ PAT D 3� \ 13+00-17+OIORT> / \�!� 36� \ 's o I NAG C125 �O �� \ 363 PAT D ' �` CVO/ ' I \L / \L \ 68 � � j • \ �A I 66 l 67 / BOG \ 1 362 VOC CAPITAL \4, �- O \ FILL SLOPE _� )i `I,�It o� NAG S75 l f TSB #7 v o 1 1 I� I I PAT D 1 L- 200', W=35', D- 36� 2' �I 111�111 SIDE SLOPES= 2:1 TOP OF BASIN: 357.0' `I �Gp�l L SWALE#2 j 2.1 % GRADE / BOTTOM OF BASIN: 354.0' � � � I 61 � 12' BOTTOM / 15' EMERGENCY SPILLWAY: 356.0' 11 30' DRAINAGE I / INVERT OF SKIMMER: 354.0' v \ i 1 I 3:1 SLOPES 00 o I — / SIDE SLOPES OF BASIN ARE TO J as EASEMENT ju I ° a01 �001 / BE SEEDED WITHIN SEVEN DAYS. �,'1� SILT FENCE pj / "ATTACH A 2.5" FAIRCLOTH SKIMMER -4% \ w III OUTLET (TIP) (OR EQUAL) WITH 2.0" ORIFICE 'g Il� 35► y \ I �1; 50.27 LF @ 3.48% 36" /RCP HOC / O, / 1 0 It r_. ;53 �� 42 C 7 DAY GROUND ( ` \ INV:354.45 INV:352.70 �1 r COVER REQUIRED \ v t . SILT FENCE � \ "\ �+ t, II�1 LCOUTLET (TYP) RIP RAP DISSIPATER f > \ 0-N % I-, L=55W=17/61 4 I 70 M— W \ `RIP RAP DISSIPATER Dw=14" DrA,r-21" I\' 71 L=134' W=25/30' CLASS 2 32" THICK I O \ N D-20" D-30" STOCK MARKET �o CLASS 2 30" THICK n M 1 14+50-16+OOLT NAG S150 STOCK MARKET \ 10+00-13+OOLT \ NAG SC150�QC \ 10' UTILITY EASEMENT PAT D C LOCH � I OC DIV DIV 36 r LO3 \ /\ LO O IV DIV .� , 6S 14+00 DIV s -- 1 LOG DI - - ------ - --- \ \ LO � LOC ��� DIv DIV - -------- - - _ J 13+00 i LOC � DIv DIV - a J��� \ M CO LO r: o o 15+00 M LOC DIV _ --_._- - 12+00 _ M I `9 ` LOCH L DIV DIV <�Ds+ ------ �^- M M M/ / - HOC' C� V ..a 11+00 co ^ '� — DIv �bIV=------------- ^ ^ CO / / / 4 364• IVLO 7 DAY GROUND C ^ M _ LOG I __-- - 10+00 �� 1 — o ^° M� ' ' - OC COVER REQUIRED __------- --- DIV LOCH �O ---- B+00 _ —I-10 Cb M '� ---- - w�DIVLOCHo�� STOCK MARKET _---- _ I-`�Mc,° M� '� �.__- �-"-�� LOG L STOCK MARKET �/ CUT SLOPE \ \ +oo _M-I—� rn M = ___ - LOG q \ 12+50 16+OORT \, �O NAG S75 27 \ \ ��� _ �� rn M "' �_ = - IVY LIMITS OF CONSTRUCTION NAG SC250 o PAT D O 1 -1 ^ M� �_ _ _ �orvL� Iv L�OC D� L 10.5 AC \ ( PAT E �/ 26 I \ 1 °; ��"' M -/ _`- —__sir DIV�� C J G L0 STOCK MARKET - t�IVLO LOC 9+00-12+50RT 25 TST #8 1 �$ DIVA Iv e�C NAG C125 ��' ` 1 1 - DIY — Lo� PAT D L=100', 1N=1 T, D DlvtflC� LO 24 Q� DE SLOP BASIN: TOP358.0' \ 23 1 gyp\ �OC BOTTOM OF BASIN: 355.0' \ \ STOCK MARKET l Di �, - 4' EMERGENCY SPILLWAY: 357.0' NAG SC150 5+21-9+O\ 22 ( \��/ i SIDE SLOPES OF BASIN ARE TO 50 LOC BE SEEDED WITHIN SEVEN DAYS. 1 \ 1 \ 1( PAT D \ \ 1 1 ( 1 5/8' ERB — \ I 1 l , 1 2„Efl J \ \ 1 RB (11 \ \ \ » 2 E E RB \ \ \ I I / 42 � GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11CARO V// ��:s .. :�- q�,: ; •4 SEA 027 O1 I111g���``` REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED VICINITY MAP NOT TO SCALE LEGEND: OO EIP-EXISTING IRON PIPE O EPK-EXISTING PK NAIL O ERB-EXISTING REBAR Qo ERS-EXISTING RAILROAD SPIKE 0 CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE -- RIGHT-OF-WAY -- — - —- —-- SETBACK LINE ss SANITARY SEWER LINE SD STORM DRAINAGE w WATER LINE OVERHEAD UTILITY WETLANDS PERMANENT EASEMENT X FENCE LINE 0"Rb100 YEAR FLOOD LINE TREE LINE LOC LIMITS OF CONSTRUCTION SF SEDIMENT FENCING a� SIGN MB MAILBOX AC HVAC UNIT © TRANSFORMER 0 LIGHT POLE pp UTILITY POLE C GUY WIRE ❑T TELE PEDESTAL © CABLE PEDESTAL WV N WATER VALVE FIRE HYDRANT ❑o WATER METER ® CATCH BASIN TREE ASPHALT SOIL 0 WATER WETLANDS NORTH AMERICAN GREEN TURF MATTING 0 CHECK DAM W/WEIR Know what's below. Call before you dig. 355 NC1 99 GRID NA 83t \ 1 1 PINCHED) -� \ \ � 128 � � l 36 37 r 1 // 60' BUFFER AND DRAINAGE 1 EASEMENT CENTERED ON 10' UTILITY EASEMENT STREAM j I C1 / 370.05 o 367 ' G�� LQC VOC/ a \\r y l O�o0 366 / 1 C ) I OC ono ` T 365 I i I TST #10 ( I // J�li F ;;•; �, 10' UTILITY EASEMENT L=60', W=15', D=3' I SIDE SLOPES= 2:1 \ \ TOP OF BASIN: 354.0' / A `I' BOTTOM OF BASIN: 350.0' l \ \J / QQ` Q G4�' O ' 4' EMERGENCY SPILLWAY: 353.0' Cr P "' ' STOCKMARKET SIDE SLOPES OF BASIN ARE TO 18+40-20+OORT ) \ BE SEEDED WITHIN SEVEN DAYS. / .��G 363\� '. �O NAG SC150 1 ) c� g0 ` I ;`';� . PAT D I 0� .1, STOCK MARKET FILL SLOPE NAG S75 3s0 /;';'; // , o / PAT D + �Xo3\� �i'� �; �t EXCAVATED INLET �i INV:357.00 `PROTECTION 1 JO> ERB / 35.65 LF @ 3.65% 24" RCP 30 r / INV: 355.70 7 DAY GROUND Mo .� ,-�,,.� 123 COVER REQUIRED 356 , JUMPMASTER / y / A�� J 0+30-2+40LT �X J '►�`.• O \) NAG C125 s� w 1,6 �, ��`, , PAT D \ INV:344�95 \ - \ 37.30 LF @*3.46% 66" RCP ��FT :�•� `. \ i �122, �,�� / Off' TEMPORARILY TIE oo �? ��/ �r DITCH TO TSB#9 \ \ \ M`°�o i oo- \ TSB #9 "j r:• c•� 1 �O G L=105', W=32', D=2' ♦ Morn 5/ " \ • v RIP RAP DISSIPATER SIDE SLOPES= 2:1 ERB \ STOCK MARKET L=2' W=1/2' TOP OF BASIN: 356.0' \1k,�- FILL SLOPE D-8" D-12" BOTTOM OF BASIN: 353.0' 121 NAG S75 \ \ I PAT D CLASS B 18" THICK\15' EMERGENCY SPILLWAY: 355.0' INVERT OF SKIMMER: 353.0' \ SIDE SLOPES OF BASIN ARE TO 5 8 \ �' BE SEEDED WITHIN SEVEN DAYS. ERB \ "ATTACH A 2.0" FAIRCLOTH \ � \ \ll ( SKIMMER(OR EQUAL)WITH 1.5" ORIFICE �♦ �460' BUFFER AND DRAINAGE \� EASEMENT CENTERED ON r I I 1 \STREAM \ I f L l 120; \ 1 1� CM / N 570,999.779 E 1,994,077.504\ NC GRID NAD 83 / (2011) \ 47 ; 48 / I / / I / 0 oz z r "o � C 5 e Sot&T O N N 0 N m m Q z c� U Z GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4DSite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com •4 SEA • 027 7- fill It 12-12-1� REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED GRADING AND EROSION CONTROL PLAN CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3m3 VICINITY MAP NOT TO SCALE �3-A; N /F DONNA SUE M. HOOPER & HUSBAND, JAMES CLEMONT HOOPER DB 976, PG 697 PB 2000, PG 67 LEGEND: EIP Oa EIP—EXISTING IRON PIPE EiR Oa EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY PROPOSED EASEMENT OVERHEAD UTILITY WETLANDS X FENCE LINE PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION PROPOSED FIRE HYDRANT ❑■ PROPOSED WATER METER PROPOSED GATE VALVE ►N PROPOSED WATER VALVE • PROPOSED BLOW OFF F7APROPOSED TEE PROPOSED PLUG BENCHMARK SIGN SIGN 9 BOLLARD ® MAILBOX PP. UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER HARDWOOD TREE PINE TREE ASPHALT WETLANDS UTILITY NOTES 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS—BUILTS DURING THE CONSTRUCTION OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS —BUILT DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE THE AS —BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT THE COMPLETION OF THE PROJECT. 2. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED BY THE PROPOSED WORK. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS 5. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE PLACED TRUE TO LINE AND GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, AND WITH A SMOOTH INVERT AT THE JOINT. 6. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HCDPU AND NCDEQ TECHNICAL SPECIFICATIONS. 7. ALL MATERIALS SHALL BE APPROVED BY HCDPU BEFORE INSTALLATION. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HCDPU A MINIMUM OF 48 HOURS BEFORE CONSTRUCTION OF THE WATER LINE BEGINS. THE CONTRACTOR SHALL ALSO NOTIFY THE ENGINEER OF RECORD AND HCDPU 48 HOURS IN ADVANCE OF ALL TESTING. 9. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. 10. ALL ELEVATIONS ARE IN NAVD 88 DATUM. 11. WATER METERS SHALL BE PLACED 1.5' INSIDE OF THE UTILITY EASEMENT SEE SHEET G1.0 FOR HARNETT COUNTY UTILITY NOTES N 571,710.786 E 1,994,807.571' 1 S l f > j % NC GRID NAD 83 \\ \\ ) I4 i f ( ) / / / �_ �\-`���'�" \\�'\� (2011) �f�rrS�(fll r i -� __, f\ — Z «( a l f �� 1" EIP-- �� 4 d \\ (PINCHED) \ \ 124 / z�� \\ (<� �� W v �j I (� /� o l 41 vw 98,/ 5/8"�_ I Jr ( /{�/ l.Y'� �� (``//7��\/\///1 �yl`,�`I .✓"".Y�/�'`.�(l �t(�� �/ 54 // f 53 52 51 50 49 48 47 46 45 `, \ r �W (I>� 1\ / ERB 0/S/O/ 44 Y W `\ 34 r127 ERB =/� W r�Y—�`� �J� (1�/�'- J `v \ ` W \ \1( (� `) r 38 1 — / W l .YJ W W W i� / 1 f% (yr c(� •P'J W .Y .Y Wj! W� .Y �`�'� .Y ) 55 /� � j /� / / .\ . ���' \ �� N. 1) i / l I ` \ \ 5 8" I , \ 1J k �Y�r—W�/j�Y�—Y✓,y f C _ — _ -- i W RB �126 1 \ d W W Y \ < 1 1W W Y iJ �JW �, - - - - -- - - - CAPITAL LOOP \�\ \`5`\_) 1� 39 JFF�/ 1 j / -�" '11 , W / —/ 97,E v� v. v v� ' v v -� �� — � N 1 �� r 33 'j r/{Ol,� — — --50' R/W —PUBLIC STREET &_ — — — — — r. 43� J )l` r .Y [.YJ (1 l ` •l� .Y\.Y .Y (�--J.y .Y .Y �"/ J� � '� -- — UTILITY ACCESS y� W .Y/.N J �� 1 •Y1Y s\Y�• W .Y .Y� P W W J f - --_ \ Z `r /\ _il . W 4O /� `�� �r 32 W�j %4 / J 1, i` �� r t C r�96 ( 7,S1,W 68 �\ `I�Y\- (�/•� \��, \� ,\ .y � I � .Y .Y �.Y .Y .Y .1.! .Y Y •Y � i / / / 6g 64 65 • / ( 1-•F-•W 1 (�.� OV, Q' �`� v `"111j W W "' 1JJ / �l�l r • 3141 % 1 v . �90 89�� ���5 71 .. �ti )11 J /~ ` f 74 ly`� ♦ f �9`c� 58 - ' \ 75 / 77 29 l ✓f� I p % ` ��1��� � l l I ? l L � / � � %� > I � 1 � � �� I �' W - c ti � r l �-. � =W Y W (` ,I I f �� �� \ �� 11�I ( t `�����' l 1 , )W 2(121 8 '• ERB' 5 1 1 �• .Y .Y .Y .Y .Y% /.� ) — —Z — �_ L \ I `I l f \ i 1 /8" r 87 ��\� �` 1 W W W W —v✓ ri 82 �1 ER `��/�� /l� _ / - — — — 27 ERB \ I / 83,; `_--� 5 _ \ — — 26 �•11 \ v W 1 �( 5 8" — ERB �'- — - RB r�120 1 o 1 I �J / _ F- - _ — 1 23 1� `� ERB _ w - \ 22 I l \ l\ v — — N '+. 1 20 21 ( �_ \ 1 ECM ' tKtl �� -�� { ) 5/e i : V j 18 19 1 I I ° /ERB 1 r�119 W6 ERI �,-/ 13 " W j r 17 O I 1 it W6 !i` I� Q`,, �\ �\ !� / N 570sss.77s `� 1 \ I 6 W6 J r y Im J 15 �� \ \ 1 \ O % 5/8 •—•f 2a FP 1�--\� 47 NCI GRID NAD 83 — W 1/2„ 5/8" l ERB 146�/ — / .--. (2011) Z�I ,,� _ �� l 5/8" \� ERB 1EIP .� EIP 7 ERB,- — I I / 48,) / 1/2" `ERB\~ ERB--� r 1 l \ I m ERB EIP 1 140 / \ 41 ERB -- i--� j4" �- I r� 37�� 138i 3/4 EIP I ERB l�. \\ I �--� I ( 36 FRR--. r 35 J \r 34 31 i 32'� I 5/8" I I IERB \ 5/8" 5/8„ I 3/4" ERB ERB 5/8" ERB I TBM N 570,617.013 E 1,992,547.997 ELEV 386.86 NC GRID NAD 83 (2011) NAVD 88 Know what's below. Call before you dig. GRAPHIC SCALE 120 0 60 120 240 480 ( IN FEET ) 1 inch = 120 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II OVERALL UTILITY PLAN PIN# 9597-31-2392.000 CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=120' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-400 r rIVI zCD ~ FIFTY CALIBER DRIVE STRIKE EAGLE DRIVE ff =�j / r /4 / / / J ��� ✓ / TOWER DRIVE \ `l' �' '� �•� NORTH �j 52 IV N T�'�IVIA �1/f� �.� �, �, J / �1.� I �, �, �, ^ /�, (�, r�/ ��� ��� 54 / O ICI I �/ , r t �� / 1 ��., ��i// , SNOT TC(sCAL of f 55 �, / /l / l� / J / �� \�� ✓ /,���� / �� / / 10' UTILITY EASEMENT 00 00 — f ���� S W / /S �✓ �,`�I /�,d�� `F � (�I, �/ � .I�� �L — �1. � � �L � �L �L �N � �L � � J� / �( �� (, , . �X � - _ _' 00 00/T r J,- UTILITY NOTES 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS-BUILTS DURING THE CONSTRUCTION OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS -BUILT DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE THE AS -BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT THE COMPLETION OF THE PROJECT. 2. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED BY THE PROPOSED WORK. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS 5. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE PLACED TRUE TO LINE AND GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, AND WITH A SMOOTH INVERT AT THE JOINT. 6. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HCDPU AND NCDEQ TECHNICAL SPECIFICATIONS. 7. ALL MATERIALS SHALL BE APPROVED BY HCDPU BEFORE INSTALLATION. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HCDPU A MINIMUM OF 48 HOURS BEFORE CONSTRUCTION OF THE WATER LINE BEGINS. THE CONTRACTOR SHALL ALSO NOTIFY THE ENGINEER OF RECORD AND HCDPU 48 HOURS IN ADVANCE OF ALL TESTING. 9. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. 10. ALL ELEVATIONS ARE IN NAVD 88 DATUM. 6+00 7+ 0 -- 8+oo 30' DRAINAGE l �. ♦ oo 'W �LEASEMENT 6fi+72T9E -- -- -- -- 1 6+72.9 / / FH EASEMENT /� r / / 11I I \ 1 \ �� 1 l ` _f f / \/.�// //�/r/ %/� / \ `O ♦ + + 10' UTILITY + + 10'X 10' UTILITY00 56 i / EASEMENT co co - -J t fQQ11/ ,IC6 O �55.41 LF @ 8.66% 30" RCP rj � 1 ,-Jj 4P) ,_, 10 UTILITY EASEMENT ��f, Nr 58 1 0 o 10 20' DRAINAGE \ EASEMENT F%R". � f 10' UTILITY EASEMENT � 1 I 1 �. �•t/ .t/ .t/ .t/ * 82+coo ( ', - - 5+00 1 f ) REMOVE EXISTING BLOW OFF 0+40.7� +oo W6 GATE VALVE TO REMAIN �.� '��\ 2+0o rc t - - / 1 - — - _ -- 1 I _ — A-. -- — W6, 6"X6" TEE Z - \ I 1 FRB _ Wb 1/ 6" 0 -- i \ 2+80.9 2+80.9 IW6 FH �� �� 10' UTILITY EASEMENT \ 6" GV _ W W ERB W6 - W6 STO 50 PUB�ER�w NE Know what's below. Call before you dig. 6"X6" TEE r 0+48.8 —�� ! i +38.8 - I ( bo 00 �+ 38.12 LF @ ti.56% 18" RCP I w00 13 �I O LU f 4 �r 1" WATER SERVICE / TO BE INSTALLED BY SITE CONTRACTOR J I / 10' UTILITY EASEMENT 1 I I \ / / r I � 0 I I \ I 1 I � oW \\ 34 6+00 1 ril \ CC8 SEE SHEET G1.0 FOR HARNETT COUNTY UTILITY NOTES LEGEND: EiP Qo EIP-EXISTING IRON PIPE EiR O EIR-EXISTING IRON ROD ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY PROPOSED EASEMENT OVERHEAD UTILITY - - WETLANDS X FENCE LINE PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION PROPOSED FIRE HYDRANT ❑■ PROPOSED WATER METER * PROPOSED GATE VALVE ►N PROPOSED WATER VALVE • PROPOSED BLOW OFF F7APROPOSED TEE PROPOSED PLUG -J�- BENCHMARK 5EG SIGN 9 BOLLARD 0 MAILBOX pp UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER HARDWOOD TREE PINE TREE ASPHALT WETLANDS GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com UCARo'% Z�: OFF /0 ••• `9 i •4 SEA • 027 •• G ► NE ••°���� 12-12-J� REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED UTILITY PLAN PIN# 9597-31-2392.000 CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-401 1 J VICINITY MAP NOT TO SCALE LEGEND: EiP OO EIP—EXISTING IRON PIPE EiR (0 EIR—EXISTING IRON ROD ERBO ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY PROPOSED EASEMENT OVERHEAD UTILITY WETLANDS X FENCE LINE ❑ ❑ PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION PROPOSED FIRE HYDRANT L�J PROPOSED WATER METER PROPOSED GATE VALVE ►N PROPOSED WATER VALVE • PROPOSED BLOW OFF F2-!PROPOSED TEE ► PROPOSED PLUG -Q� BENCHMARK SIGN SIGN a) BOLLARD ® MAILBOX PP. UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER HARDWOOD TREE PINE TREE ASPHALT 0 WETLANDS UTILITY NOTES 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS—BUILTS DURING THE CONSTRUCTION OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS —BUILT DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE THE AS —BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT THE COMPLETION OF THE PROJECT. 2. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED BY THE PROPOSED WORK. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS 5. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE PLACED TRUE TO LINE AND GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, AND WITH A SMOOTH INVERT AT THE JOINT. 6. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HCDPU AND NCDEQ TECHNICAL SPECIFICATIONS. 7. ALL MATERIALS SHALL BE APPROVED BY HCDPU BEFORE INSTALLATION. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HCDPU A MINIMUM OF 48 HOURS BEFORE CONSTRUCTION OF THE WATER LINE BEGINS. THE CONTRACTOR SHALL ALSO NOTIFY THE ENGINEER OF RECORD AND HCDPU 48 HOURS IN ADVANCE OF ALL TESTING. 9. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. 10. ALL ELEVATIONS ARE IN NAVD 88 DATUM. SEE SHEET G1.0 FOR HARNETT COUNTY UTILITY NOTES Know what's below. Call before you dig. � \ 10' UTILITY EASEMENT — 10' UTILITY EASEMENT \ _ \ \ 15+00 _ �'- \_ ++ \ — — 14+00 �1 LO � — �� 6" GV — 1 W6 '00 co �\. _ — — — 13+00 _ - - 1 19+57.1 W6 — \ 12+00 �� J W6 4 GV 6. — — — — — — �� W66 6"X6" TEE 6"X6" TEE ,14+16.8 — — \ 1 I -� — — CK MARKET DRIVE �— 14+06.8 — ��� ---� 13+92.8 1 I 10+00 _ ST50' RAW —PUBLIC STREET— � W 1 1 + —& UTI ITY AC SS W6 — + 13+92.8 rr 9+00 �ro — I �a — — — — — FH + ? \ — �W6 �� � � \ � I ` t 1 w + \ M 6 + 0 00 S+ — — — I \ lOD Q0 � W6 W6 — --- -- --- � � � � l � \ \ \ Il 1 0 — — 6" X6" TEE — — + + — — — — — — 8+64.= � 00 10' UTILITY EASEMEN00 U' CO 1 FH 0 ) 25 . �00 co 5/6" ERB l �� ERB I 46 � \ I I 42 ; I I GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) 1 inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com •4 SEA • 027 %° REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED UTILITY PLAN PIN# 9597-31-2392.000 CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-402 VICINITY MAP NOT TO SCALE LEGEND: EiP Oa EIP—EXISTING IRON PIPE EiR Oa EIR—EXISTING IRON ROD ERBC) ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT—OF—WAY PROPOSED EASEMENT OVERHEAD UTILITY — WETLANDS X FENCE LINE PVC SPLIT RAIL FENCE TREE LINE 155 MAJOR CONTOUR 151 MINOR CONTOUR x 169.14' SPOT ELEVATION ,iL�J �, PROPOSED FIRE HYDRANT PROPOSED WATER METER * PROPOSED GATE VALVE ►N PROPOSED WATER VALVE • PROPOSED BLOW OFF Fr -I PROPOSED TEE ► PROPOSED PLUG -BENCHMARK s SIGN a) BOLLARD © MAILBOX PP UTILITY POLE C- GUY WIRE ❑T TELEPHONE PEDESTAL © CABLE PEDESTAL ❑❑ WATER METER HARDWOOD TREE PINE TREE ASPHALT 0 WETLANDS UTILITY NOTES 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS—BUILTS DURING THE CONSTRUCTION OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS —BUILT DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE THE AS —BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT THE COMPLETION OF THE PROJECT. 2. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS OTHERWISE NOTED. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED BY THE PROPOSED WORK. 4. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS 5. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE PLACED TRUE TO LINE AND GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, AND WITH A SMOOTH INVERT AT THE JOINT. 6. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HCDPU AND NCDEQ TECHNICAL SPECIFICATIONS. 7. ALL MATERIALS SHALL BE APPROVED BY HCDPU BEFORE INSTALLATION. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HCDPU A MINIMUM OF 48 HOURS BEFORE CONSTRUCTION OF THE WATER LINE BEGINS. THE CONTRACTOR SHALL ALSO NOTIFY THE ENGINEER OF RECORD AND HCDPU 48 HOURS IN ADVANCE OF ALL TESTING. 9. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. 10. ALL ELEVATIONS ARE IN NAVD 88 DATUM. SEE SHEET G1.0 FOR HARNETT COUNTY UTILITY NOTES Know what's below. Call before you dig. FW r 36 °j WM ZZ 60' BUFFER AND DRAINAGE / x�A ' �x`O� ZZk�g2 \ i3 v / vdM 1 EASEMENT CENTERED ON 21+19.3 � 2" BO STREAM \ ( 10' UTILITY EASEMENT \ ,7���� x r I ` ��9x 9x6 A ' °O / 19+77.0, \4, \ / 2" GV �■ I l ' \ / 1 / �J�<c,� 6" PLUG TAP 2„ / // 19+67.0 Cl� xo� �/ • xIQ / 6"X6" TEE' I 18+51.1 I x_ 6„ GV H 18+51.1 I \ \ ' 18+02.4 FH 1 I/I 6"X6" TEE Jr 17+92. \ 35.65 LF @ 3.65% 24" RCP 30 / +23 �,, 0--.0 Yl 37.301 LF @ 46% 66" RCP s 8� ' �9 9 29 � i r I x \ f TIE TO EXISTING r ■ 0 28 WATER LINE N \ 60' BUFFER AND DRAINAGE EASEMENT CENTERED ON \ • STREAM `�, I f 120; 1 ECM I w ( 5/8„ 1 ( ! \ l 1 ERB 1/2 �119; \ jIP� / N 570,999.779 E 1,994,077.504\ NC GRID NAD 83 / (2011) \ 47 ; 48 / I / / I / I 5/8" �B 122 ) 5/8" ERB 123 ) \ \ \ \ \ N99 E14,807.578 NC GRID NAD 831(2011) 1 � 1 L (PINCHED) —� \ 128 GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11CARO'''�� •4 SEA • 027 %° 12-12-1� REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILED UTILITY PLAN PIN# 9597-31-2392.000 CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-4m3 01 J.,\ + l WM 0+69.75\� % + + \\ 10 UTILITY EASEMENT REMOVE EXISTING � y \PO PO co GATE VALVE TO OW GFF ! - - - - REM.11N 0 F 0.7- - 1\ T _ 1 0+00 0 6 GV 1+00 2+00 0 +00 4+00 o -0+03 ' - - - 1-` - - ,c , J6 W6 W6 W6_" 6 W6 Wf L6 X6" TEE- 6" GV - - � 6„X6„ TEE � 0+38.8 "-"0+48.8--- -- - - - -- -- -- 2+80.9 2+80.9 FH -a)- ±\-�- I I �� / �M 10' UTILITY EASEMENT -f J -J �����/�✓�' 38.12 LF @ 5.56718" RCP / ow �1 fn / w�Q i I ( ca CC 4 / / j I 1 I 1 > / �� amp 415 410 405 'm 395 390 385 380 375 370 365 U1 + 0 w 00 75 L ) l O � 74 1 73 1 + w o o \00 00 00 00 I � 5+00 6+00 7+00 8+00\ -I � '- - � - � I' - i - - i \ - f 6 W6 W W6 9+00 \ -- -I _ W6 W -- - -- -- �C -- -- L - - 6..X6„ TEE, 8+64.8 -- -{ \ 00 00 \ 00 LCO \ \ 08+64 LO c(0 FH c(0 \ �4 1 STOCK MARKET 50' R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 14+00 11> 71 \ � O � 10' UTILITY EASEMENT -, - 00 00 I � � 50.27 LF @ 3.48% 36" RCP + +00 00 � \ co co Ai Sot 10+00 \ 11+00 i W6 W6 W w 10' UTILITY EASEMENT \ + 1 22 23 \l 1 � l a o 3s 06 � N S 12� - - - - 13++00 - + 6" GV 141 19+57.1 �W W6 W6 6 X6" TEE 6"Xf 13+92.8 14-F A_ . . L�. I . 7 . . - LO 00 \ 13+92. 00 �� M 1 FH 25 24 O f 1 LOW POINT ELEV = 373.31 LOW POINT STA = 0+91.44 HIGH POINT ELEV = 402.60 HIGH POINT STA = 5+21.89 LOW POINT ELEV = 390.53 LOW POINT STA = 7+97.19 PVI STA = 1+81.44 PVI ELEV = 376.32 PVI STA = 4+64.18 PVI ELEV = 410.25 PVI STA = 7+44.95 PVI ELEV = 392.56 A.D. = 8.65% A.D. _-18.30% A.D. = 2.40% K=20.80 180' VC K=20.25 371' VC K=43.53 104' VC \ COVER / 36" MINIMUM \ \ \ o \ \ \ \ HIGH POINT ELEV = 376.82 HIGH POINT STA = 11+48.53 p� PVI ELEV = 374.88 \ \ A.D. _ -1.74% K = 57.25 \ 100, VC / \ ��3 wq rFR��NF \ I \ o cn Q rn O OD N Q� + 0 N CO \ 0 M L=iN �+ II 00 N w J j W d \ - - - - EXISTING GRADE FINISHED GRADE \ �S Egg N N N X N CO cfl O r7 00 � O � � O 00 M r) N c0 00 0) O f` G7 N L0 N O N N N N L r- f` N 00 r- 00 N 00 r N N r, 0) d7 O r L0 0) r) Q0 O N W N O O O - f\ r- O O O 00 n Ln 0) f\ r7 � O c0 Ln � N C0 O 00 cc Ln u? N O O O CO it r\ it Ln rn f` N r) O f` r7 W Op f` 00 cc r,- r, f` 00 O W 0) O c O rn O N O O N O O O rn O rn O N O rn 00 rn o0 00 00 00 00 00 N 00 00 r\ 00 r` r\ r\ r co O co co O r7 O r7 r� LLJ M 00 r7 r7 0 Op r� r) r) r7 r0 r) r7 M r7 M n n r7 r7 r7 n r7 n r7 n r7 r) r7 r) r7 r) r7 r0 r7 r0 M r0 r7 r0 M r0 M r) r7 M K) M M r� r7 � �o �o (0o 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 GRAPHIC SCALE 50 0 25 50 100 ( IN FEET ) I inch = 50 ft. 415 410 405 400 395 0 w 390 z O O w J O 385 00� O L_ N Lc� 1 380 U w w w w Cn 375 370 365 Ln ri CD n 14+00 200 ■ sl e solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com •4 SEA 027 TT REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II STOCK MARKET PROFILE CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' VERTICAL: 1 "=5' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-5mO Orl i %, S`�7 J,--, A}11 J 0) --A _ Imo- �-' �0' ,�` "� - �\ �'_ �— �- -✓' f� - �/ ✓/ 10' UTILITY EASEMENT 00 00 i 00 390 L�too 7tt 8�100 2+00 3 00 4+00 / p0 W6 — i W6 W6 W6 �3s W6 6"X6" TEE i 55.41 LF C� 8.66% 0 RCP \� / , / - - j 6+72.9 _ N zk + + 10' UTILITY EASEMENT OD/ 10'X 10' UTILITY :i 0+0 6' * _z_ 'fl� iy . U' EASEMENT 91 91 / 61 � 1 - \ / 60 1-1 _ - o Qf l � `, I v IL 395 390 385 380 375 370 365 360 355 350 345 CAPITAL 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 14+00 HIGH POINT ELEV = 384.52 HIGH POINT STA = 8+83.26 PVI STA = 7+64.69 50 + 10' UTILITY EASEMENT —' �+ +_ rn 00 00 00 t-- -- -- - -- -- -- -- - 9+I 0 + W6 00 00 10+00 11+00 CAPITAL LOOP +00 13+00 141 �50' R/W - PUBLIC STREET &� UTILITY ACCESS W6 W6 6" GV %A16 W6 W6 W6 -- -- -- 11+20.9 -- -- -- -- --�- -- PO � ` J � f r HIGH POINT ELEV = 384.85 HIGH POINT STA = 9+34.78 PVI STA = 9+34.02 PVI ELEV = 383.32 A.D. _ -7.90% K = 30.0 237' A.D��=-1.98%-- K = 36.96 73' VC HIGH POINT ELEV = 382.33 HIGH POINT STA = 12+12.91 PVI STA = 12+65.41 PVI ELEV = 381.83 A.D. _ -3.23% K = 32.48 105' VC LOW POINT ELEV = 360.48 LOW POINT STA = 3+73.79 PVI STA = 4+55.91 PVI ELEV = 355.80 A.D. = 12.39% K = 30.21 374' VC 01% -0.97% / 36" MINIMUM COVER — — — — 6" SDR 21 WgTERLINE O \ O r I II Q �_> II N W J W 0_ / 0 0 N + \3 489,— r Q N _ _ / + > 0+ O TeRc�Ne 36" MINIMUM COVER 0 _ O �I / 24" MINIMUM SEPARATION 30" RCP 3+73.6 2.55' 6" DI PIPE FOR DIRECTIONS BELOW CROSSING 10' IN BOTH THE STORM — — — — EXISTING GRADE FINISHED GRADE c0 O r\ r) O r` M co M ro W � cfl O M r� r- r` co M r) N � co O r7 r r7 O n r" r7 co � r7 r� O 0, o) N cc N r7 r7 00 O r7 O � co M r7 00 cn 0 in O r7 r� O n O in O r7 r� ' cD r7 N O cfl co r7 r7 r7 N O �_ r` 7 r� 0 0) 00 r- f\ r� O n f` r` r7 r7 0) O f\ r` M r� N 0) N O 00 O 00 r� N N L0 rM N 00 00 r� O r` O 00 00 rn a) r` O 00 00 r7 N 00 00 M 00 00 r� � N r) M 00 CO r7 r7 r7 CO 00 00 r� r) O M 00 00 r� r7 00 N N 00 00 CO r7 O N N N M 00 00 r7 O r� N r7 m 00 f\ r� rM N O r` f` r� rM 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 GRAPHIC SCALE 50 0 25 50 100 ( IN FEET ) I inch = 50 ft. 395 390 385 380 375 W z 370 � z 0 U W J E 0 365 0 L_ I 360 w w In w w In 355 350 345 O r7 14+00 200 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com o����'(N 11CARO'''�� 20: pkE /p •.• `9 . 4 SEA • 027 REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II CAPITAL PROFILE CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' VERTICAL: 1 "=5' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-5m 1 390 385 380 375 370 365 360 355 350 345 340 rn I� cc 30, l SFtij 40F ♦ / l( � 970, Y Fq F F + \ �` M /V ?'A79 NP � W \ S1}69.19 1r11 `3i5 Af SiTE , 4 11 — / ♦ l WM 2 I ) % n / CD o}o WM 70 UTj4\ \ \ ) ( �C `((• i r I /' vE W2 — / 370.05 '� 22+19.2 �� \ /TY .� FRS �REE1 / w2 6.. eN \ �68`� 0 C i o. S 7 0- f� i� 6' 8X T� 1�+/ 6 >>X6 0 � T 24 Y / N (,ii J � �o is+0o .u� 1 x 37.30 LF @ 3.46% 66" RCP 35.65 LF @ 3.65% 24 RCP / D _ ON G 3� o. ?� STOCK MARKET 501 R/W (PUBLIC STREET) ROADWAY PROFILE 13+00 TO 22+00 0 LOW POINT ELEV = 354.58 LOW POINT STA = 16+43.85 PVI STA = 16+45.78 PVI ELEV = 349.64 A.D. = 11.41% K = 30.35 346' VC HIGH POINT ELEV = 364.66 HIGH POINT STA = 19+43.69 PVI STA = 18+86.33 PVI ELEV = 363.52 A.D. _ —3.78% K = 30.33 115' VC co `r) 00 + o6 N II M II <w N J w > 0 —1.99q° 36" MINIMUM — COVER \ — — — O ai 0] + N N N \ �\�� <I — o - rn O�—N(n 6 >_ (nN Q 0) 00 36" MINIMUM COVER / OP/ +—wo w�2 Q� b 0 �00 66" RCP / PIPE GRADES HAVE BEEN SET SUCH THAT THE INV IS 1.0' BELOW EXISTING GRADE AT UPSTREAM AND DOWNSTREAM INVERTS. FIELD VERIFY 24" MINIMUM SEPARATION 16+42.1 2.06' — — — — EXISTING GRADE FINISHED GRADE 6" DI PIPE FOR 10' IN BOTH DIRECTIONS BELOW THE STORM CROSSING u7 WM Nr7 O 6 O Occ r7 WM � co O (0�O WM a? o tor7 O M K) W o to O — In r7 - � � � r M O co 0 r7 M cc r7 D rn r Ln D n r n D 7 r 0 CD r7 K) Co co Co rM C0oK) 0 Co M LLJ — w Igo I WM 3�53.8 w 1 W WM 3+43.8 J � } I I r o (1106MaVNCINE)ON J Oy L0I� f -- WM 2+98.8 [ '403 I WM 2+88.8 00 1 i / N 38.12 LF @ 6.56% 18" RCP — — / 'T — _ 0, U ISS3COb llllllfl J 1 s+,o / �J If I / I —133&S oiiend — ml2j ,OS �. 0 o — I lunoq a31sn 3 00 16 I � - — 0co o � \6�i'\ f WM 1+07.1 � + WM 0+97.1 390 410 385 405 380 400 375 395 370 390 365 385 360 380 355 375 350 370 345 365 340 360 BUNKER BUSTER 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 3+50 HIGH POINT ELEV = 391.41 HIGH POINT STA = 2+24.98 PVI STA = 2+08.71 PVI ELEV = 393.10 A.D. _ —8.37% K = 20.00 167' VC — - 0 O + N O 0) � \ II Q II > w � 0- J W O 0 o r \ I II r 7q II II TIE TO EXISTING ROADWAY \ N w J \ W / 5• • 009, 18" RCP — — — — EXISTING GRADE FINISHED GRADE 0) O M Co Co n O O O O LO N u7 O N N O 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 0+00 1+00 2+00 3+00 GRAPHIC SCALE 50 0 25 50 100 ( IN FEET ) 1 inch = 50 ft. 410 405 400 395 390 385 380 375 370 365 360 200 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II STOCK MARKET & BUNKER BUSTER PROFILES CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' VERTICAL: 1 "=5' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-502 390 385 380 375 370 365 360 355 350 345 340 00 ro 00 NK CIO J W r\ A'�' lb /00 cp co w x0/o 50.27 LF @ 3.48% 36 RCP �6 �♦ !� I 1 / ~ -� �\ �6 362 19xs� \ \ G 11 OroO ro I I } 0 0 I Xj- CAPITAL 501 R/W (PUBLIC STREET) ROADWAY PROFILE 13+00 TO 20+00 HIGH POINT ELEV = 370.47 HIGH POINT STA = 15+35.77 PVI STA = 15+85.77 PVI ELEV = 368.37 A.D. _ -1.11 % K = 90.01 100, VC \ 4,2py\ LOW POINT ELEV = 359.63 LOW POINT STA = 18+30.08 PVI STA = 18+05.96 PVI ELEV = 356.68 A.D. = 9.02% K = 30.02 271' VC \ \ \ 36" MINIMUM COVER \ 6" S 0 I PVI STA = 1 ELEV = 362 00% gTFRv�F ° PVI STA = 19+46.71 ELEV = 361.89 N V) \ \ 36" RCP >�-w� - ~ + co +� 18+25.0 I 2.53' I 6" DI PIPE FOR 10' DIRECTIONS BELOW CROSSING IN BOTH THE STORM - - - - EXISTING GRADE FINISHED GRADE N r7 O m r` r7 r7 N O 00 f\ r r7 � O r` M � O r7 �r7 W N O 00 O cc U7 N to co (0 0) O O ccCD � 0 O � f\ N r7 r7 O r7 r O r7 r7 00 it 't r7 r7 O O it f\ Ln r7 r7 � � O O (o r7 M CO rn r7 WM 19+54.8 LU w 0_ \ v~i ' WM 19+37.1 `e 0 N WM 19+27.1 \! LU I a��\I ' Y`� 0 r \ �`1'�o�uT IONS IN � I ra x0�'��j�35.65 LF C� 3.65% 24" RCP i oti 0+- �o JUMPMASTER DRIVE 2+00" - 2445 WM 18+04.8 $ +1x -& 50' R/W - PUBLIC STREET I - �WM 17+94.8 °0�M UTILITY ACCESS M 9M WM 16+84.9- i I i WM 16+74.9 \37.30 LF @ 3.46% 66" RCP 390 390 385 385 380 380 375 375 370 370 365 365 9+56.71 09 360 360 355 355 350 350 345 345 340 340 JUMPMASTER 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 3+00 0 r7 + LOW POINT ELEV = 365.43 N LOW POINT STA = 1+45.08 II PVI STA = 1+71.74 Q PVI ELEV = 366.76 V A.D. = 0.53% K = 100.00 � 53' VC o M II J w i 0 0 + 00 S� ro N w X w > 0-o r-* 0 �-w N + + c0 N ~ N j J w / / / 36" MINIMUM COVER / - / 009 24" RCP 24" MINIMUM SEPARATION 0+40.0 2.37' i 6" DI PIPE DIRECTIONS CROSSING FOR 10' IN BELOW THE BOTH STORM w0 F- �00 - - - - EXISTING GRADE FINISHED GRADE 00 LOOn r- CO 00 r N O r- 0') 00 Ln (O 0) N n 390 385 380 375 370 365 360 355 350 345 340 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 0+00 1 +00 2+00 3+00 GRAPHIC SCALE 50 0 25 50 100 ( IN FEET ) I inch = 50 ft. 200 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11DAR0 `�2pQ'.O�ES3 /0 •.� •4 SEA 027 G ► NE ••°���� COTT REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II CAPITAL & JUMPMASTER PROFILES CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE HORIZONTAL: 1 "=50' VERTICAL: 1 "=5' DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-5m3 50' R/W VARIES 6' 20' 6' (SWALE) (SHOULDER) (SHOULDER) 10' 10' FINISH GRADE S9.56 Ja 5' U a .5' CARRY BASE COURSE 6" BEYOND SURFACE COURSE 0 8% 2% 2% r 8% 0 y rr�////////\//\//\\//\\/���\�/.�//!\//THIS IS FOR //'` �\ � FILL SECTION -197,,77 ... 1 3 \ri��//3 \\\/j/GEOTECHNICAL ENGINEER SHOULD BE 1 3 //\\ \ COMPACTED CONSULTED TO DETERMINE DEPTH OF ABC SUBGRADE NEEDED TO MEET NCDOT REQUIREMENTS OTHERWISE 8" SHALL BE USED. 6" COMPACTED USE 3:1 CUT SLOPES IN CUT SECTIONS SUBGRADE CARRY BASE COURSE 6" BEYOND SURFACE COURSE AT LOCATIONS WITHOUT CURB AND GUTTER NTS 1 ROADWAY TYPICAL SECTION (WITH DITCH) 2 ASPHALT PAVEMENT DESIGN CRITERIA TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 SWITCHGRASS 50 SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) GERMAN MILLET 40 A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1- AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 SEEDING DATES: AUGUST 15-DECEMBER30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. 4 TEMPORARY SEEDING SPECIFICATIONS I 1 5 LASS 1 RIP RAP / (SEE SECTION THRU BASIN BELOW) \ \\\\ LASS 1 RIP RAP HEADWALL ///r�r//////lllllllllllll�/, WASHED STONE 1'T 1' THICK X THIGH MIN. SEDIMENT STORAGE AREA e PERSPECTIVE VIEW NOT TO SCALE FLOG STORAGE NATURAL GROUND ZONE 1' 2' RIP RAP HEADWALL SEDIMENT 1' STORAGE 1.5- - - - - - - - FLOAT -- 1.5' FLOL�F IPE INVERT #57 FILTER FABRIC MAX. SEDIMENT DEPT WASHED LASS 1 RIP -RAP CONSTRUCTION SPECIFICATIONS: (CLEAN OUT POINT) STONE 1. CLEAR THE AREA OF ALL DEBRIS. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND SECTION THRU BASIN, FILTER, &CULVERT PIPE THE PIPE INLET. NOT TO SCALE 3. A 1 FOOT THICK LAYER OF NCDOT 45 OR 457 STONE SHOULD BE MAINTENANCE: PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER OUTSIDE OF THE STONE HORSESHOE 18" BELOW NATURAL GRADE. EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT, STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS AND STABILIZE WITH GROUND COVER. ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM NTS THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. 10 EXCAVATED INLET PROTECTION 11 SEEDING SPECIFICATIONS SEEDING MIXTURES SPECIES RATE (LBS./ACRE PENSACOLA BAHIAGRASS 50 INDIAN WOODOATS 2.5 VIRGINIA WILD RYE 6 EASTERN BOTTLEBRUSH GRASS 2.5 WHEAT 30 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RATE (LB./ACRE) LITTLE BLUESTEM 7 SWEET WOODREED 2.5 BROWNTOP MILLET 10 RICE CUTGRASS 6 SEEDING DATES: COASTAL PLAIN: APR. - JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB./ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. PERMANENT SEEDING SPECIFICATIONS GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) GROUND STABILIZATION CHART NTS GRAVEL ENTRANCE SHALL BE 50 FEET IN LENGTH AND 12 FEET IN WIDTH WITH 20 FOOT RADIUS AT EXISTING ROADWAY 36-0" MIN 4'-0" 10'-0" 6"� FILTER FABRIC 2-3" WASHED STONE GRAVEL CONSTRUCTION ENTRANCE PIPE OUTLE WELL-DEFINED PLAN GRAVEL OR FABRIC MAINTENANCE 1. INSPECT THE OUTLET PROTECTION AFTER EACH RAINFALL BUT IN NO CASE LESS THAN ONCE PER WEEK. ANY STONES THAT THAT HAVE BEEN DISLODGED SHOULD BE REPLACED AND ANY EROSION AROUND THE OUTLET SHOULD BE REPAIRED. N F== 00 � o =1YER 31 TII II I�II�II 8" COMPACTED I I II GRAVEFILTEL RFABRIC ABC SECTION A -A NOTES 1. LA IS THE LENGTH OF THE RIPRAP 3. IN A WELL-DEFINED CHANNEL EXTEND APRON.(SEE EC PLAN) THE APRON THE REQUIRED 4' WIDTH OR UP TO THE TOP OF THE CHANNEL 2. D = 1.5 TIMES THE MAXIMUM BANKS, WHICHEVER IS LESS. STONE DIAMETER BUT NOT LESS THAN 6". 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAD THICKNESS -6INCHES MINIMUM WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER LENGTH- 50 FT. MINIMUM. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. MAINTENANCE NTS MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. 3 TYPICAL RIP RAP APRON NOTES: 1. INSTALL SILT FENCE PER STD. SILT FENCE DETAIL. 2. LOCATE REINFORCED OUTLET AT LOW POINTS OF SILT FENCE BARRIER. STEEL FENCE POST 3. PLACE RIP RAP WITH CARE. DO NOT TEAR SILT FENCE FABRIC. WIRE FENCE HARDWARE CLOTH - MAINTENANCE NOTES: FILTER OF 1" DIAMETER WASHED STONE 1. REMOVE THE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE/OUTLET. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE & REPLACE STONE AS NECESSARY AS IT BECOMES CLOGGED WITH SEDIMENT. 2. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TOP OF SILT FENCE MUST BE AT LEAST 1' SILT FENCE ABOVE THE TOP OF THE WASHED STONE 4' MIN. NTS 6 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 7 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. 8 GENERAL EROSION AND SEDIMENT CONTROL NOTES DRIVE STEEL POSTS 18" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES: MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" THE BOTTOM OF THE FENCE 8" INTO THE TRENCH UPHILL ALONG THE LINE OF EXCAVATED TRENCH AND TURNED OUT POSTS. 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND TOP & BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. MIN. 10 GA. WIRE 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRE MIN. 12-1/2 GA STAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCH WIRES EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE LINE MIN. WIRE: GA. REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. 3. STEEL POSTS SHALL BE A MIN. OF S HEIGHT AND SHALL BE THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK -� AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF THE DEVICE SHALL BE MADE IMMEDIATELY. 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE AS NEEDED. STEP 1 STEP 2 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE FIRMLY TO ANCHOR THE BOTTOM OF THE SILT CONTRIBUTING DRAINAGE AREA IS STABLE. TRENCH AND TURNED OUT 4" IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. POSTS MAX 8' O.C. WIRE FENCE "HOG WIRE" A FI LTER FABRIC X i f::Ec?F•::5i::%:>`?'..:^:('^:4i:::::E:d �; :>.. #9 WIRE STAPLES 1-112"LONG JJ s ....:<.:;"^!:.;......::::.>... :i;>"::':i>;:: ist?its:*::`a::::::.::::.::>::.:s">.•t.:::: :.. �. : e::::.T".^;..::.:..<:�::.:> BOTTOM OF WIRE FENCE AND .S (9 FILTER FABRIC BURIED 8 IN w EXCAVATED TRENCH &TURNED OUT 4" IN THE TRENCH SLOW STEEL POST DRIVEN 24" INTO GROUND A STEP 3 STEP 4 SECTION A -A MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. ■ T/.� 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER NTS THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. 12 SILT FENCE FRONT VIEW STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND NTS •j!cL !Ik !1 • -• • • •�' :n'' ••�.. • 18" MINIMUM HEIGHT OF STONE iILulI lLli��� BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH SILT FENCE OUTLET L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION CENTER OF THE DAM IS TO BE 9" LOWER THAN THE EDGES (MIN) 1.5' TO FORM A WEIR A MIN. 9" MIN. FILTER FABRIC CLASS A OR B EROSION CHANNEL OR DITCH CONTROL STONE APPLICATION A MAINTENANCE 1. INSPECT THE CHECK DAMS AFTER EACH RAINFALL BUT IN NO NTS CENTER OF THE DAM IS TO BE 9" LOWER THAN THE EDGES (MIN) TO FORM A WEIR 2•� ' adi . 24" MAX. i AT CENTER CASE LESS THAN ONCE PER WEEK FILTER FABRIC 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. TAKE CARE SECTION A -A TO AVOID UNDERMINING THE DAM DURING CLEANOUT. 3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY 4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS 5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE HEIGHT OF THE WEIR. 9 CHECK DAM WITH WEIR NTS 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II SITE & EROSION CONTROL DETAILS CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE NOT TO SCALE DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-6mO BRICK SUPPORT ON EACH SIDE OF PIPE STEAMER AS SHOWN PRECAST CONCRETE CONNECTION RECAST CONCRETE EDGE PROTECTION RING IG TO BE EXPOSED PROTECTION RING OF ON PLANS ROAD d' d a 2» a ° 2 1/ 2" HOSE .44 a . ° ° m CONNECTION I _ a MIN' I -I I I —III—III—III I —III —III- ' ' • —III—III—III = III- ' ' _—ADJUSTABLE — VALVE BOX U 6" G.V. & BACKFILL a THREADED 6" WATER C. I. BOX 24" MIN N •,..,�'<,,�,,�~• COUPLING LINE 36" MAX STONE Na .-.",TAMPED BACKFILL.."­ (7 C.F. MIN.) r VALVE NUT ONLY m ECHANICAL JOINT n " d N TH GRIP RING 1—1 BRASS PIPE NIPPLE 2" DI Od. CONC. RICK TO OR LONGER TO BRING PIPE _ BLOCKING » SUPPORT UP TO FINISHED GRADE 4-3/4" TIE RODS WITH BRACKETS (SEE NOTE) THREADED VALVE BOX 6" HYDRANT TEE PIPE NIPPLE (SEE DETAIL) WEEP HOLE TO NOTE: REMAIN OPEN TIE HYDRANT TO MAIN LINE 2 —0 MIN 18" CONCRETE BLOCKI PIPE NIPPLE 2" DIA MIN. 1/3 C.Y. AT 3000 P.S.I. W/TIE RODS IN LIEW OF CONC. BLOCKING IN SANDY SOIL. WITH 2" THREADED PORT NOTE: SEE TYPICAL VALVE BOX DETAIL NTS FOR BRICK INSTALLATION 1 PERMANENT BLOW -OFF ASSEMBLY PLAN r---1 ELEVATION OA 24"X18" Rrr TAN(_I II Ali V/ 0 + + + + + + + + + + + + + + M T �++ + + J++ + + + + +++ + + + + + + ++ + + + + + + + 16 3/4" CAST IRON ISOMETRIC NTS METER BOX DETAIL FOR 3/4" SERVICE VALVE BC EXCESS LOOPED IN BOX TRACER WIRE NOTE: NO. 1 DRILL HOLE IEIM1® NOTE: AT PIPE INTERSECTIONS, MULTIPLE VALVES, RUN WIRE UP AT ONLY ONE VALVE. SINGLE 12 AWG SOLID CORE WIR PLACE EMPTY VALVE BOX AT INTERVALS WHERE VALVES DO NOT OCCUR & PLACE TRACER WIRE IN BC" PRECAST CONCRETE PROTECTI ,-FINISHED GRAI BOX P.V.C. PIPELINE 0 /1 — 11 TRACER WIRE TO BE LAID __GATE VALVE UNDERNEATH WATER LINE NOTES: 1. DRILL HOLE IN VALVE BOX TO INSERT TRACER WIRE,BRING UP TO INSIDE AND ROLL UP AT LEAST 6"—B" EXCESS 2. PLACE TRACER WIRE IN VALVE BOX AT 1,000" INTERVALS OR AS NOTED ON THE PLANS, TYPICAL. 3. DO NOT SPLICE WIRE WHEN BEGINNING A NEW SPOOL. INSTEAD INSTALL A VALVE BOX AND ATTACH EACH WIRE WITH A NTS BRASS SCREW TO THE VALVE BOX. 13 TYPICAL TRACER WIRE INSTALLATION NTS 2 FIRE HYDRANT ASSEMBLY INSTALLATION LAYI N G CONDITIONS DESCRIPTION PROJECT USE TYPE 1 TYPE 2 TYPE 3 TYPE 4 EXISTING AS NOTED ON PLANS ROAD ROAD SHOULDER z BACKFILL AS INDICATED X p �Z COQ M NEW WATER LINE 45° BE SERVICE LINE TO CORPORATION METER CONNECTION COCK—A.Y. MCDONALD OR EQUAL SERVICE SADDLE — A.Y. MCDONALD OR EQUAL STYLE HINGED 3891 FOR 3/4" SERVICE SADDLE — A.Y. MCDONALD OR EQUAL TRENCH WIDTH PIPE O.D. + 18" FOR PIPES UNDER 33" O.D. NOTE: PIPE O.D. + 24" FOR PIPES OVER 33" O.D. 1. "SERVICE CONNECTION" IN PROPOSAL TO INCLUDE SERVICE SADDLE, 45° BEND, CORPORATION COCK AND ALL LABOR INVOLVED IN MAKING A COMPLETE SERVICE CONNECTION. 2. SERVICE PIPING TO BE 3/4" COPPER OR POLYETHELENE (SEE SPECS) 3. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE NTS 3 TYPICAL WATER SERVICE CONNECTION FLAT BOTTOM UNDISTURBED NOT USED. EARTH TRENCH, LOOSE BACKFILL NOTES: 1. INSTALL METER AT R/W 2. "TWO (2)-3/4" SERVICE LINES MUST BE INSTALLED INSIDE A 2 SLEEVE. 3. "TWO (2)—l" SERVICE LINES MUST BE INSTALLED INSIDE A 3" SLEEVE." 4. SLEEVES SHOULD BE SCHEDULE 40 PVC PIPE. 5. SEE DETAIL FOR SERVICE MATERIAL AND METER SETTING 6. SERVICE LINE SHALL BE 3' BELOW FINISHED GRADE OF DITCHES. NOT USED. 7. CONDUIT MUST EXTEND PAST PROPOSED SIDEWALK. FLAT BOTTOMED UNDISTURBED EARTH TRENCH. BACKFILL LIGHTLY >_ CONSOLIDATED TO CENTERLINE ~ W w OF PIPE. wZ 11 _ O J of 1' R/W 6' PIPE BEDDED IN 4" MININUM ALL DUCTILE JOB EXCAVATED MATERIAL. IRON GRAVITY SIDEWALK BACKFILL LIGHTLY CONSOLIDATED SEWER LINE. TO TOP OF PIPE. 2" PVC SLEEVE W/ 3/4" CARRIER PIPE BEDDED IN SAND, GRANULAR MATERIAL OR GRADED GRAVEL TO THE DEPTH OF 1 /8 PIPE DIAMETER, 4" MIN. JOB EXCAVATED MATERIAL COMPACTED TO 4" ABOVE TOP OF PIPE. (APPROX. 95% STANDARD PROCTOR, AASHTO T-99) PIPE BEDDED TO ITS CENTERLINE + + ++++++\/ +++++r��+ ++`++++`+ �// IN COMPACTED GRANULAR MATERIAL ++`++ �j 4" MIN. UNDER PIPE. COMPACTED GRANULAR OR SAND MATERIAL TO +++`+ %�\ +++++ ++++++. % 4"ABOVE TOP OF PIPE. (APPROX. 959 STANDARD PROCTOR, (AO9 TYPE 5 10 TYPICAL LAYING CONDITIONS 1' FROM EDGE OF ROW o D_ 0_ i METER BOX LID, CAST IRON STREET ALL PVC WATER WATERMAIN LINE AND PVC FORCE MAIN. 12" MIN 0 SINGLE 3/4" SERVICES R/W METERS SHOULD BE >- INSTALLED 3' OFF W w PROPERTY LINE ILz OJ X CL ALL PVC GRAVITY SEWER LINE. NTS NTS 11 TYP. DOMESTIC WATER SERVICE DETAIL 9> o- w 0 U M 3/4 Inch Gate Valve Z Required on Customer side 2 3 " X 18" Within 12 inches of SERVICE LINE - B SS NIPPLE the Meter Box FROM STREET 00 d METER SETTER CENTERED P.R.V. Location down stream of the cut—off valve IN BOX METER TO BE INSTALLED BRICK SUPPORT 1. METER AND SERVICE LINE NOT IN CONTRACT UNLESS SPECIFIED METER SETTER WITH DOUBLE CHECK VALVE 2. INCLUDE STONE IN PRICE OF METER BOX. (BACKFLOW PREVENTER) 3. METER SETTER SIZE AS NOTED ON PLANS. 4. ALL BRASS FITTINGS SHALL BE COMPRESSION TYPE. NTS 14 TYPICAL 3/4" METER BOX INSTALLATION ENCASEMENT DUCTII TOBE STORMSEWER� PIPE PLUS O.D. PLUS 2'-0" OR AS SHOWN ON PLANS. NTS 15 TYPICAL STORM SEWER CROSSING DETAIL FINISHED GRADE ° 2„ 1"� ° BACKFILL TO EDGE n PRECAST CONCRETE I I III —III— -IIII I PROTECTION RING J ~ Q Z w O N N Q VALVE BOX J VALVE OPERATOR NUT NTS 4 TYPICAL VALVE BOX DETAIL NOTES: 1. CONCRETE SHALL BE 3,000 PSI MIN. 2. CONCRETE FOR THRUST BLOCKING SHALL BE KEPT FAIRLY DRY, THUS MAKING THE CONCRETE WEDGE SHAPE MORE EASILY FORMED WITH THE WIDEST PART (BLOCKING AREA) AGAINST UNDISTURBED E 3. NO CONCRETE SHALL COVER ANY BOLTS OR GLA 4. ALL PIPING AND ACCESSORIES TO BE WRAPPED WITH 10 MIL. POLYETHYLENE PRIOR TO POURINC BLOCKING. 5. VOLUME OF THRUST BLOCKING SHALL BE AS SHf ON THE THRUST BLOCKING SCHEDULE. x d ° G e . 6" MIN. X MIN.1/3 C.Y. AT 3000 P.S.I. PLAN BENDS J" 0 OR LESS 24" MIN. — 12" 0 OR LESS X HYDRANT TEE PLAN TEES 18" MIN. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com IIL; •4 SEA • 027 11 .• G ► NE •.����� • •s••••• ''''' 0 REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II nn �z U) WATER L DETAILS 000000000000 12 THRUST BLOCK DETAIL NTS CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE NOT TO SCALE DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-6m 1 3 SPA. @ 2-Z1,1-Z2 M � m Cn H Z z j r- C) r r 0 r- m :0Cn H _ 0)n = - N vrn N 4-B1 m � 11-4 00 D1 I -I m Z n o o 0 m D r2 0M T O 0 yeti (n H1 - 8'-0" mC H2 s'-s"- C H3 - 3'-6"� "H" BARS HEET 1 OF 1 838D35 5 L 5 SPA. @ 10" PLAN 3-N1,3-N2 l l'-4"�� - 5'-4„ 6r_0r� �~ 4-V5 @ 9" FILL FACE 2-V5 @ 9 FILL FACE B­t 2-V5 @ 1'-6" STIR. FACE 1-V5 2-G1 E R. FACE FIELD BEND "B" BARS AS NECESSARY \ 3" DRAINS 6" 12" ABOVE FLOW LINE 66" I.D. 1 9„ 2-B1 1-1 \` �7 CONST. JT. o \ ' o --- 0-♦- -- -------a---- I 2-B2 B-J 4-T4 8'-3" z O 4'-6" - FILL F@C 612 co co = FILL FACE 3 SPA. @ 12" 2-V,,2-V2,1-V3,2-V4 co Q Q 1-V1,1-V2, 1-V3,1-V4 1-58" STR. FACE = C? Q • Z ' - 5' 011 _ n �I 53/a' 3 SPA. @ 2r_Orr �6„ F-I O Gj �O STR. FACE 1-V2,,1-V4 1-V1,1-V2,1-V3, 1-V4 La i a I r O Q � = z 12 2 N2 F•HIS _ U 05 = (n LLJ < Q LL_ NN "rM CM CM 7W CD -- I I <�zw = U U N1 LL V1 V2 V4 V4 V4 V1� 1 U N1 LL � O J Q ~ Q cc N2 z CIDLL i0 -H4 O � I Cn .jam ------- - ----------- w Q ------- -- ----------- � 0 FILL FACE FILL FACE L5" 5„ 4 SPA. @ 11 7 SPA. @ 11" 3r_6rr 6Lr_5,r 2-N1, 3-N2 4-N1, 4-N2 WING ELEVATION NOTES: ALL CONCRETE TO BE CLASS "A". ALL REINFORCING STEEL TO BE ASTMA615-GRADE 60. ALL REINFORCING STEEL TO BE DEFORMED BARS. WHERE SPLICING OF REINFORCMENT IS NECESSARY, BARS ARE TO BE LAPPED 45 DIAMETERS. ALL DIMENSIONS RELATIVE TO REINFORCEMENT ARE TO CENTERS OF BARS. THE FOOTING, CURTAIN WALL AND 4" OF WALL ARE TO BE POURED IN ONE OPERATION ALLOWING NO TIME FOR INITIAL SET TO TAKE PLACE BETWEEN THEM. THE REMAINING WALL SHALL THEN BE POURED IN ONE OPERATION. ALL EXPOSED CORNERS ARE TO BE CHAMFERED 1". 3" DIAMETER DRAINS TO BE PLACED IN WALL AS SHOWN AND BE 6" ABOVE NORMAL FLOW LINE. ALL MATERIAL AND WORKMANSHIP AS PER N.C.DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 4-N2 @ 9" FILL FACE FILL FACE ELEVATION 10" ,- N 2_rrGrr 2' 10'r z z _ 2 r, FILL FACE 2„2" J5 @ 9" 2 "B1" FILL FACE 21/2 " l� y o VI 5 @ j a N c� 1 _6r, Vrr@ 12 rrVrr@ 2'-0" co PIPE NOT SHOWN n 2rrB1rr 11 N" T r_6rr- rrZrr If N II BARS LErr T1 @ 6" I "T" H4 - 4r 5rr -� co HIS 3r_6rr Z1 - 3'-6 " 6" - 22 3r_6rr 7rr a 92 @ H6 1'-9" Z3 3'-9" 7rr M T" m f I 1 1 1 "H" BARS Err_ 3_j \ Brr HK. 6-T "Z" BARS SECTION - BB SECTION - AA DRIVE POSTS 24" INTO THE GROUND MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILL ALONG THE LINE OF POSTS. STEP 1 ATTACH THE JUTE NETTING OR OTHER FABRIC APPROVED BY THE ENGINEER TO THE STAY WIRE AND POSTS, EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH OR USE 8" EROSION CONTROL MATTING STAPLES. STEP 3 ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT 4" IN TUF T.1111u BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. THE TOP OF THE FABRIC SHALL BE 6" HIGHER THAN THE WEIR. STEP 4 NOTES: 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN. 3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE ACCROSS THE BASIN OR TRAP. 4. POSTS FOR THE BAFFLES SHALL BE 4' OC. MAINTENANCE 1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE BAFFLES WHEN THE SEDIMENT IS REMOVED. 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS STABLE. 4. PLACEMENT OF BAFFLES: INLET ZONE- 35 % OF LENGTH FROM ENTRY POINT FIRST CELL - 25 % OF LENGTH FROM INLET ZONE SECOND CELL - 25 % OF LENGTH FROM FIRST CELL OUTLET ZONE - 15 % OF LENGTH FROM SECOND CELL POSTS MAX 4' O.C. TOP STAY WIRE OR ROPE = JUTE NETTING OR EQUIVILENT x BOTTOM OF FABRIC BURIED 8" < IN EXCAVATED TRENCH & = TURNED OUT 4" IN THE O TRENCH, OR PINNED WITH 8" w EROSION CONTROL MATTING = FSTAPUES. SLOW STEEL POST DRIVEN 24" INTO GROUND SECTION A -A BOTTOM ANCHORE POROUS BAFFLES DRAWING NOT TO SCALE PERSPECTIVE VIEW BILL OF MATERIAL FOR ENDWALL REINF. STEEL 1 - PIPE BAR I SIZE I LENGTH NO.1 WEIGHT Z1 1 #4 1 3'-5" 8 I 18 Z2 #5 4'-1" 7 30 Z3 #5 4'-4" 1 5 I I I I N1 #4 3'.5" 6 14 N2 1 #5 1 3'-11" 13 53 V1 1 #4 1 3'-5" 4 9 V2 1 #4 4'.2" 5 14 V3 1 #4 4'-10" 3 10 V4 1 #4 5'-5" 5 1 10 VS 1 #4 6' 8" 9 40 -11" 5 30 H2 #4 7'.5" 1 5 FIG 1 #4 4'-5" 2 6 I H4 #4 V-10" 5 16 HS 1 #4 4'-1" 1 1 3 H6 1 #4 2'-2" 2 1 3 G1 #7 10'-8" 2 44 T7 1 #4 2'-6" 46 77 T4 #4 15'-0" 6 60 T5 #4 I 4'-9" 3 10 T6 #4 8'-0" 3 16 I I 81 I #4 5'-6" 6 22 I B2 #4 7'_6rr 2 10 (REINF. STEEL LBS. XI 505 ICONC/C.M. CU. YDS. 7.5 ICONC/R.C. CU. YDS. 7.1 J w J U) 30 0 O O0 Z N W r CD z W` o 1- 4 r W ccCD o v Z LLI � W � LLI J O J zU. z Z LLI U) fi O ILL SHEET 1 OF 1 838D35 NATURAL GROUND MAX. SLOPE (TYP) IN. 2.52.5 1 1�/ NATURAL GROUND z 2.5 / 11- 00 \-- COMPACTED SOIL Ell, WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGHT ALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", L OTHER REQUIREMENTS SHALL REMAIN THE SAME. TEMPORARY DIVERSION KEY NOTES: 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE FOR LESS THAN 30 DAYS. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 1 INFLOW STRUCTURE CONSTRUCTION SPECIFICATIONS TEMPORARY DIVERSION BERM BAFFLES INFLOW DEWATERING ZONE FILTER F y,,' ' SKIMMER DEWATERING DEVICE ON STONE BEDDING MIN B" 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER THE FABRIC. EMERGENCY SPILLWAY STONE BEDDING' SEDIMENT STORAGE ZONE 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 10. INSTALL POROUS BAFFLES AS SPECIFIED. 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. NTS 1' FREEBOARD / \ Ir/ 6" MIN. IN VE T ELEVATION OF �-EMERGENCY SPILLWAY EMERGENG SPILLWAY SCH 40 PVC "SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. SKIMMER MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE SKIMMER AND POOL AREAS. 3 TEMPORARY SKIMMER BASIN GRASSED OR RIP RAP LINED SWALE NOTE: THIS CROSS SECTION IS TO BE USED FOR THE ENTIRE LENGTH OF THE SWALE. 1 SEE PLAN FOR WIDTH E 'J NTS / GRASS OR RIP RAP LINING / GROUND 1� SEE PLAN �. SEE PLAN FOR 1� DEPTH SEE PLAN r- 1 SEE PLAN INLET ZONE i i� i i� 11= I I CONSTRUCTION SPECIFICATIONS: 35% OF SURFACE AREA '1�1111�I I- 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER MBER COMPACTED SEE PLAN OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. JRFACE AREA SUBGRADE 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW A FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY. MAINTENANCE & CONSTRUCTION: 1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. 3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE. NTS4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES. NTS 6 TYPICAL SWALE CROSS SECTION 1' THICK #57 FILTER STONE NOTES: 1. USE FOR DRAINAGE AREAS NOT EXCEEDING 5 (FIVE) ACRES. 2. EARTH BERM SHALL BE STABILIZED W/ SEEDING ACCORDING TO SPECIFICATIONS. 3.FILTER STONE TO BE A DEPTH OF 1 FOOT ON THE DAM SIDE FILTER FABRIC CROSS SECTION OVERFILL 6" FOR SETTLEMENT EMERGENCY 21" MIN BY-PASS 6' BELOW SETT TOP 4' MIN. 5 DA y y 1.5' �2:1 SIDE SLOPE MAX FILTER FABRIC EXIST. GRADE 1:1 SIDE SLOPE MAX CLASS B RIP RAP 3' MIN. MAINTENANCE STONE SECTION DESIGN OF SPILLWAYS INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND DRAINAGE AREA WEIR LENGTH RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE (ACRES) (FT.) DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF GRAVEL FACING. 1 4.0 2 6.0 CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OF PIPING. PERIODICALLY CHECK THE DEPTH OF THE 3 8.0 4 10.0 SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT. BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY 5 12.0 FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. DIMENSIONS SHOWN ARE MINIMUM STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. NTS 2 TEMPORARY SEDIMENT TRAP 0 COARSE AGGREGATE 1/2 DIAMETER OF PIPE EARTH FILL COVERED BY OR 12" WHICHEVER IS 6" GREATER LARGE ANGULAR ROCK GREATER FILTER FABRIC ;0P _ III -III CAPACITY OF PIPE CULVERTS TOGETHER = BANK FULL FLOW EARTH FILL COVERED BY LARGE ANGULAR ROCK COARSE AGGREGATE p .0 $ g O 0 O .O o000o 00 O o.00 p 00 0 0 O op. 00 00 O 0 0.W O to�,:� 00 O0 00 0 o O OO OOD 00 0- 0 0 00O O 0°.O0°0 O. O O o 00 ° 00 O 0 ° o 00 .00 O 0o O p O p d° O o p 0 0 00 p o 000�.; O OO 0 p0 0 OoOO °o o 0� 0°po °Oo� 00 00 p Oo op 00 .Op .0o po pO. 0 0 0 Op° O� O Oo O O'0 Oo CJO °O 0 O 0 0 O 00 0 0 00 p 0p0 o° 06 000°°'�00000 p00. cc> 00 0° oC>. 0000 pO °0o00 cb°O _ O 600 9.00 0 0.0°.°OOOPC> AO� � 0 0�c;> °. L25' 25' STREAM CHANNEL; "!- MINIMUM MINIMUM TOP OF BANK TOP OF BANK PLAN 1. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED TO A MINIMUM. 2. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE STEAM. 3. KEEP STREAM CROSSINGS AT RIGHT ANGLES TO THE STREAM FLOW. 4. ALIGN ROAD APPROACHES WITH THE CENTER LINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FEET. RAISE BRIDGE ABUTMENTS AND CULVERT FILLS A MINIMUM OF 1 FOOT ABOVE THE ADJOINING APPROACH SECTIONS TO PREVENT EROSION FROM SURFACE RUNOFF AND TO ALLOW FLOOD FLOWS TO PASS AROUND THE STRUCTURE. 5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER, INCLUDING PLANNED OVERFLOW AREAS, WITH RIPRAP OR OTHER SUITABLE MEANS IF DESIGN VELOCITY EXCEEDS THE ALLOWABLE FOR THE IN -PLACE SOIL. 6. ENSURE THE BYPASS CHANNELS NECESSARY TO DEWATER THE CROSSING SITE ARE STABLE BEFORE DIVERTING THE STREAM. UPON COMPLETION OF THE CROSSING, FILL, COMPACT, AND STABILIZE THE BYPASS CHANNEL APPROPRIATELY. 7. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED RESTORE THE STREAM CHANNEL TO ITS ORIGINAL CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. 8. ANY IN -STREAM SEDIMENT CONTROL MEASURES MUST BE REMOVED UPON STABILIZATION OF THE AREA. MAINTENANCE INSPECT TEMPORARY STREAM CROSSINGS AFTER RUNOFF -PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. TEMPORARY STREAM CROSSING PVC VENT PIPE----\. NTS SCH 40 PVC "SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AN AFTER EACH SIGNIFICANT (0.5 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO 1/2 HEIGHT OF THE 1ST BAFFLE. PULL THE SKIMMER TO ONE SIDE SUCH THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE THE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. a�]lli::I�:1_lyy��yl�l:Ial_la��l_l�G1H���:a�P.[a:[�]:i::I�:1_lyy�Z.yl�'1G�1�:�6yySiPlllRelIP.U1�:a.Iy�:a�l:�_L'i�llP.Ui::I��: IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVED THE DEBRIS. CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO, REMOVE THE DEBRIS. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS. 7 FAIRCLOTH SKIMMER NTS 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11OAR9/����� .• •4 SEA 027 .• G ► NE •.����� REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II DETAILS CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE NOT TO SCALE DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER C-602 (`UAAIAICI IAICTAI I ATInKI i ® 1�11��►15� II �J \2p,Q .. /\ ............ i( 0 \ ..... 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON BLANKET TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: * IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. A NOTE: B C CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE CRITICAL POINTS ALONG THE CHANNEL SURFACE. C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. 1 MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE ��� REINSTALLED. EROSION CONTROL BLANKET INSTALLATION TRM INSTALLATION -5- 2 6" 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTE0 , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE REINSTALLED. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control Ian approved b the p p Y p pp Y delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level round at least 50 feet away from storm drains p ground, Y streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated g ,p Y g q erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLI NA .fr Environmental Quality NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name ofthe person performingthe inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of Stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. p NORTH CAROLINA ,Environmental Quality _ l PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved F&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER W 'm' 9 0 Wcma 0 T 0 o I} A fi 0 `F'� i a srwus 1 0 !hilly D 0o Q MOM 1 a WJFAILILGTYI Elflll•ED N I IAN7W1 DE'If10.O N iR1.D 1 1 E'V.'�L� IW e M 0OR1[ VA9O/f e M CWEEE v�••ur rnetn•Et swu sl•¢luo awi E xiwr.vo E N1011N10 Vld M 11•® NNW Vlell M L1aN NNW >EU >a• EM]Q ]•: W M 31NICIIR2 EMNFi ]3 W M !I•IL'IUET rrKnr, rr.cm m vWv[ •ocarre 26AU. It a'•"W10nct i••.r .�,. VNI•rt �� EOi m E E� nrNn MM® VIM NNIE •ml• EVR amnd<rz vNNWr snecnNc VIM HELDE �W GRAWASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. AZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the groun( EFFECTIVE: 04/01 / 19 PAKI III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. M 4.00' [1.22M] 8.00' [2.44M] • • 2.00' [0.61M] 4.00' [1.22M] • • • • 40 1.3 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) [� 4.00' [L22M] Iu. 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) 2.00' [0.61 M] 1.50' [0.46M] 3.00' [0.91 M] • • ._4• 2.00[0.61M] 2.00' [0.61 M] 4.00' [L22M] 4.00'[1.22M] 41•41 1.7 STAPLES PER SQ. YD. (2.0 STAPLES PER SQ. M) 3.00'[0.91 M] 1.50' [0.46M] 3.00'[0.91M] •• 1.50' [0.46M] �.61 M] •••• �••• •••• • • • 4.00' [L22M] ••• • • • 1.00' [0.30M] ••7•2.00' [0.61 M] 1.00' [0.30M] 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. NTS (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) 2 STAPLE PATTERN FOR 8' ROLLS G� 4.00' [1.22M] • 8.00'[2.44M] L4.00' 2.00'[0.61 M] [L22M] 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) ® L T� 2.00' [0.61 M] 3.00' [0.91 M] • 1.50' [0.46M] 4.00' [1.22M] • 2.00' [0.61 M] •N 41 40 4.00' [1.22M] 40 4.00' [1.22M] 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M) L 1.50' [0.46M] • 2.00' [0.61 M] 4.00' [1.22M] • • 3.4 STAPLES PER SQ. YD. (4.1 STAPLES PER SQ. M) L ® � 1.50' [0.46M] • .. 1.00' [0.30M] 2.00' [0.61 M] • • 4.00' [1.22M] • 3.6 STAPLES PER SQ. YD. (4.3 STAPLES PER SQ. M) 3 STAPLE PATTERN FOR 4' ROLLS NTS 1 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com IICARO 4Z//i 0 % 1. SEA • 027 It . ♦♦ ';/,��f REVISIONS PROJECT NAME MARKET PLACE SUBDIVISION PHASE II EROSION CONTROL DETAILS CLIENT MCL, LLC 3857 Legion Road Hope Mills, North Carolina 28348 Phone: (910) 263-2944 PROJECT INFORMATION DESIGNED BY: CHRIS DRAWN BY: CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1525 DRAWING SCALE NOT TO SCALE DATE RELEASED DECEMBER 18, 2019 SHEET NUMBER NTS 4 EROSION CONTROL BLANKET INSTALLATION � NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/191 C-6m3