HomeMy WebLinkAboutNCC190030_MODIFICATION Supporting Doc ADDL LOTS_20200130DURHAM Engineering and -EnvironmentalServices - LETTER OF APPROVAL PROJECT NAME: Croasdaile North (Lots 371-380, 385-387, etc) SUBMITTED BY: Withers Ravenal NEW SUBMITTAL (X) REVISED ( ) January 27, 2020 Homes by Dickerson Attn: Jon Showalter 7101 Creedm.00r Rd. Ste. 115 Raleigh, NC 27613 Dear Sir: JOB NUMBER: 6108-02 January 24, 2020 ACRES: 3.70 Durham County Approval This office has reviewed the subject Sedimentation and Erosion Control Pen -nit Application. We find the application to be acceptable and hereby issue this letter of approval. If any stipulations or recommendations are applicable, a list is attached and is incorporated as a part of this letter of approval. Pursuant to Section 3.8.5 of the Durham City -County Unified Development Ordinance, plans for which no permit has been issued shall expire one year from the approval date. Please be advised that a copy of the approved plan must be on file at the job site, and a land - disturbing permit must be obtained and prominently displayed. Pursuant to G.S. 113A-61 (d) and Section 15.5.1 of the Durham City -County Unified Development Ordinance, you are hereby notified that the Sedimentation and Erosion Control Office has the right to inspect the site over the life: of the pi-cject to inslure Complia -Ce w th the nAnroved elan and ordinance. The Sedimentation and Erosion Control Program is perfonnance oriented, requiring protection of the natural resources and adjoining properties. If following the commencement of this project it is detennined that the sedimentation and erosion control plan is inadequate to meet the requirements of the Durham City -County Unified Development Ordinance, this office may require revisions in the plan and its implementation to ensure compliance with the Ordinance. Pursuant to .Section 12.10.E of the Durham City -County Unified Development Ordinance, prior to initiating land -disturbing activity, the person conducting such activity must notify the sedimentation and erosion control office of the date that such activity will begin. 201 E. Main Street I Fifth Floor, Suite 561, Durham, North Carolina 27701 (919) 560-0735 1 Fax (919) 560-0740 1 dconc.gov Equal Employment/Affirmative Action Employer NCG010000 Requirements — As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCGOl. Please direct questions about the NOI form to Annette Lucas at Annette. lucasgncdenr. gov or Paul Clark at Paul. clarkkncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. There is a $100 annual fee for coverage. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. It should also be noted that approval of an erosion control plan does not in any way indicate approval of, or authorization to begin installation of Stormwater infrastructure without City/County approved Construction Drawings. We look forward to working with you on this project. Sincerely, Robert Sokolowski Erosion Control Technician Encl.: Application Review Comments NCGOI Fact Sheet cc: Debbi Ferm PE, Withers Ravenal o4/19 APPLICATION -REVIEW COMMENTS -- Project Name: Croasdaile North Lots Job Number: 6108-02 Reviewed By: Robert Sokolowski Approved (X) Complete the following items to obtain a land disturbing permit: 1. Upon installation of the tree protection fencing, if required, submit a Tree Protection Fence Certification Form and call this office for an inspection. 2. Submit a Review Fee in the amount of $462.50 3. Submit a permit fee made payable to Durham County in the amount of $528.70. Forms may be obtained from this office or from the Durham County Engineering website at: https://www.dconc.gov/government/departments-a-eJengineering-and-environmental- services/stormwater-and-erosion-control-division THIS PLACARD MUST BE PROMINENTLY DISPLAYED AT THE LAND DISTURBING SITE FOR WHICH IT WAS ISSUED CITY/COUNTY OF DURHAM, NC THIS CERTIFIES THAT LAND DISTURBING NUMBER 6108 PERMIT DATE HAS BEEN ISSUED TO PERMITTEE Homes by Dickerson PROJECT 1/28/2020 Croasdaile Farm North Subdivision As required by the Durham City/County Sedimentation and Erosion Control Ordinance for a land disturbing activity not to exceed 161,236 Sq. Ft. On Pin No. Hillandale Croasdale Farm Pkwy No land -disturbing activity authorized by this permit shall be commenced until all other licenses, permits or approvals required by Federal, State, County or Municipal governments are obtained. EXPIRES 2 YEARS FROM DATE OF ISSUE. SE-37 Rev. 5/05 0813-16-68-9043 --- Stormwater and Erosion Control Division PHONE: 919-560-0735 SINGLE-FAMILY LOT EROSION CONTROL PLANS FOR:0 LOT#S 371 - 3771385 - 38714121 & TOWNHOMES 13 - 16 VICINITY MAP NOT TO SCALE �o o� HORTON RD SITE O� a� w Q o Uj o � W. CARVER ST ------------ �d Cr Lq �v o z DURHAM COUNTY, NC JANUARY 9,2020 1%, u A . co GRAPHIC SCALE 300 0 150 300 600 1 inch = 300 ft. 000 \ LAURELWO DR �ROASDMLE FARM PK�M' PREPARED BY: t�o WithersRavenet / Engineers I Planners I Surveyors 115 MacKenan Drive I Cary, NC 275111 t: 919.469.3340 I license #: C-0832 I www.withersravenel.com HORTON RD INDEX OF SHEETS 1.0 OVERALL SUBDIVISION PLAN 2.0 LOT EROSION CONTROL PLAN (1 OF 2) 2.1 LOT EROSION CONTROL PLAN (2 OF 2) 3.0 EROSION CONTROL DETAILS 4.0 NCGo1 APPROVED JAN 2 8 2020 DCo Engr & Enviro Services Sedflmr�nt & Erosion Control \A ARp'' 028892 • M.�FE`;; DEVELOPER/OWNER HOMES BY DICKERSON NC 7101 CREEDMOOR RD SUITE 115 RALEIGH, NC 27613 919-847-4447 ATTN: JON SHOWALTER RECEIVED JAN222 ENRIM�t"HfMt38EP I MM vn = O Z � Ce az" J O Off°; N OWZ J_ z Q U O�w Ln ==a w U w d `Z O LL m D i EROSION CONTROL NOTES: `� •` 1. ALL INDIVIDUAL LOT EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH DURHAM 1 i * COUNTY REQUIREMENTS PER UDO. / i \ 2. THE TYPICAL INDIVIDUAL LOT EROSION CONTROL DETAILS CONTAINED ON THIS PLAN ARE PROVIDED FOR 00 PURPOSES OF ILLUSTRATING VARIOUS TYPICAL CONDITIONS, AND SHALL BE ADAPTED AND MODIFIED AS NECESSARY IN ORDER TO ADDRESS THE SPECIFIC CONDITIONS FOR EACH LOT. THE TYPICAL DETAILS MAY NOT = - - - -- y . ' ^ ADDRESS EACH UNIQUE SITUATION, AND SHOULD BE USED AS A GENERAL GUIDELINE FOR THE TYPES OF i �. �, � 1 B i' ; ` CONTROL MEASURES PROVIDED, SOME LOTS MAY REQUIRE COMBINING ELEMENTS OF MORE THAN ONE TYPICAL \ / DETAIL IN ORDER TO PROVIDE ADEQUATE EROSION CONTROL MEASURES. M 3. SILT FENCE SHALL BE INSTALLED ALONG THE LOW SIDE(S) OF THE LOT SUCH THAT ALL RUNOFF FROM DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE PRIOR TO CROSSING ANY LOT LINE. / w ♦'' , ` � ` � e 4. SILT FENCE OUTLETS SHALL BE INSTALLED AT ANY LOCATION WHERE RUNOFF LEAVES THE PROPERTY IN A CONCENTRATED FLOW CONDITION SUCH AS SWALES, DITCHES OR ANY OTHER SIMILAR TOPOGRAPHIC DRAINAGE • v FEATURE. ' 4 / 5. A GRAVEL PAD AT LEAST 10' WIDE AND 30' LONG MUST BE INSTALLED AT THE ACCESS POINT INTO THE LOT. •.•.`.. .yam• \ \ �' E y - � _ - _ __ _ _ _ 6. ALL AREAS WITHIN 25, OF THE EDGE OF PAVEMENT OF THE STREET MUST BE STABILIZED BEFORE ISSUANCE OF A - - , r CERTIFICATE OF OCCUPANCY. THE EXISTING STREET SHOULDER AND/OR DITCH ALONG THE LOT FRONTAGE - � SHALL BE KEPT FREE OF SEDIMENT AND MAINTAINED IN A MANNER SUCH THAT THE DRAINAGE AND STABILIZATION ASPECTS OF THE PUBLIC RIGHT-OF-WAY ARE NOT ADVERSELY AFFECTED BY THE CONSTRUCTION ACTIVITY ASSOCIATED WITH THE LOT DEVELOPMENT. 11 ' � •��1 ` ' __ 1 r t 1 7. ALL DISTURBED AREAS THAT ARE SUBJECT TO EROSION AND MOVEMENT OF SEDIMENT OFFSITE FROM THE LOT _ __ ___ ` + MUST BE PROVIDED WITH GROUND COVER OR OTHER PROTECTIVE MEASURES SUFFICIENT TO RESTRAIN EROSION AND CONTROL OFF -SITE SEDIMENTATION. \ 8. THE DURHAM COUNTY EROSION CONTROL INSPECTOR MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES ''- - ! \ �`\ !i ` - - - - "- - _ _ _ ,.. ± OR MODIFICATIONS TO THE EROSION CONTROL PLAN BASED ON FIELD CONDITIONS. do T a . 31 GENERAL NOTES: 1. AT THE START OF GRADING INVOLVING THE LOWERING OF THE EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THIS CUT FARTHEST AWAY FROM THE TREE TRUNK. 2. NO STORAGE OF MATERIALS, DUMPING OF WASTE MATERIALS, FILL, OR PARKING OF EQUIPMENT SHALL BE ALLOWED WITHIN THE ROOT PROTECTION ZONE, AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE ROOT PROTECTION ZONE. ERSOSION CONTROL NOTES: 1. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES DURING THE LIFE OF THE PROJECT UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE DURHAM COUNTY INSPECTOR. 2. CONTRACTOR SHALL CONSTRUCT DIVERSION DITCHES AS NECESSARY SO AS TO DIRECT ALL SEDIMENT RUNOFF INTO THE EROSION CONTROL MEASURES TO THE MAXIMUM EXTENT PRACTICAL. 3. LAND LEFT EXPOSED SHALL BE STABILIZED WITHIN THE TIME PERIODS SPECIFIED BELOW FOR ANY PHASE OF GRADING IN ACCORDANCE WITH THE FOLLOWING SCHEDULE DEPENDING ON THE SLOPE OF THE LAND: • AREAS WITH SLOPES OF 3H:1V OR GREATER SHALL BE STABILIZED WITHIN 7 DAYS; • AREAS WITH MODERATE SLOPES THAT ARE FLATTER THAN 3H:1V SHALL BE STABILIZED WITHIN 10 DAYS; • AREAS WITH MINIMAL SLOPE, GENERALLY FLAT IN NATURE SHALL BE STABILIZED WITHIN 14 DAYS. 4. FOR ANY AREA OF LAND -DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICABLE, BUT IN NO CASE LATER THAN SEVEN DAYS AFTER COMPLETION OF GRADING. 5. ALL STREETS ADJACENT TO THIS PROJECT MUST BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED. 6. TOPSOIL STOCKPILING SHALL OCCUR AT A SITE APPROVED BY DURHAM COUNTY. EROSION CONTROL MAINTENANCE NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 2. SEDIMENT SHALL BE REMOVED FROM SEDIMENT TRAP DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 3. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 6 INCHES DEEP AT THE FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 4. INLET PROTECTION DEVICES SHALL BE INSPECTED AFTER EVERY RUNOFF -PRODUCING RAINFALL EVENT. ANY DAMAGE TO MESH SHALL BE REPAIRED IMMEDIATELY, AND GRAVEL SHALL BE REPLACED OR CLEANED TO ENSURE PROPER DRAINAGE. DURHAM COUNTY EROSION CONTROL ENFORCEMENT NOTES: 1. Failure to follow this construction sequence may result in local enforcement actions, including but not limited to civil 9 penalties to $5000 per violation per day, injunctive relief, criminal penalties, and permit revocation. Additionally, off -site sedimentation may result in restoration requirements. t `� /'� / �\ _', ` ° i i i •/ 2. If the Durham County S&E staff determines that excessive sediment is leaving the site, a revised sedimentation and erosion _ - ` ` r ,� �' : • \ \\ \ 1 { control plan may be required, with associated requirements for additional S&E measures. - - \N \\ \\ \ J '- - - _ _ _ _ _ _ _ - ;� � COSNTRUCTION SEQUENCE: 1. Install tree protection fencing in accordance with the approved Site Plan. 2. Inspect tree fence and submit a Tree Protection Fencing Certification form to Durham County S & E Office, fax: (919)560-0740. -- \ , \ o •� a , '� - 3. Call Durham County S&E office for inspection of tree fence installation, (919)560-0735. 4. Schedule and hold a pre -construction conference prior to beginning any land -disturbing activities This conference should be attended b 0 vv t representative of the financially responsible party and/or the general contractor, grading sub -contractor, erosion control sub -contractor and the Durham County S&E office. 5. Obtain Land Disturbing Permit and placard, and post the placard on site. 6. Obtain an approved (stamped) S&E control plan and keep it on site, either in the inspection box, construction office or with the contractor. % 7. Install construction egress/exit, silt fencing, sediment traps/basins, diversion ditches, check dams, and other initial erosion control measures as specified in the plan. Remove only trees and ground cover necessary to install these devices. - / 8. If a stockpile is necessary due to excavation of the sediment trap/basin, place a double row of silt fence 10 feet apart at the limits of the r stockpile area shown on this plan. Trees and groundcover may be removed only as necessary for this stockpile. 9. Temporary ground cover shall occur within the timefrome specified per #3 of the erosion control notes. Permanent ground cover shall be i - provided as soon as practical but in no case later that 7 days after completion of grading (see sheet 3.0 for seeding schedule). 10. Notify the Durham County S&E site inspector after measures have been installed and project has started. 11. Remove all erosion control measures after the Durham County S&E office approval of permanent stabilization10 • 1 � !d \.... wo 10 \ a All 1. - -- -- - - -- 37 41 r_ owe X\ , qftft io \ cl 3 10 10 366 EROSION CONTROL NOTATION KEY LEGEND A REFERENCE LABEL FOR TYPICAL LOT EROSION CONTROL DETAIL THAT IS MOST APPLICABLE FOR THIS LOT (SEE DETAIL SHEET). SHADING LEGEND: ,. DENOTES RESIDENTIAL LOTS THAT ARE SUBJECT TO LAND DISTURBANCE PERMITTING IN CONJUNCTION �. WITH THIS PLAN W W EXISTING WETLANDS PER CONSTRUCTION DRAWINGS W W W (PLAT BOOK 200, PAGE 205) ✓ W .Y V co GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 Ft. o u V'I c C L , L i 3 N tI1 W 0 � v C U tA rp L E co a R L Q 01 a r+ u, • �■ !. N LL.I Z z *a U 'L c a u at,AF n r-+ ti X 0 ZZ 0 LL ILAa LL W o an L l 0 a 0 [LL V J 0 I� Z N 0U. u0 Z r' polo v I Z 0a = J LLJ F_ 0 J Job No, Drawn By 02190194.10 W&R Date Designer 01/7/2020 W&R `%"01111111!t'll �,.� VH CARP"/A,.. O� ••••••••• l ;, U28892 • • '••FNGINLE`�•X �`4 OYA M. FF'�.� z •-Zo �94,111111it1111,� Revisions Sheet No. 2.0 i 5 _ � 3 41b 377 381 382 ' - 383 F / 384 385 i EROSION CONTROL NOTES: 1. ALL INDIVIDUAL LOT EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH DURHAM COUNTY REQUIREMENTS PER UDO SECTION 12. 2. THE TYPICAL INDIVIDUAL LOT EROSION CONTROL DETAILS CONTAINED ON THIS PLAN ARE PROVIDED FOR PURPOSES OF ILLUSTRATING VARIOUS TYPICAL CONDITIONS, AND SHALL BE ADAPTED AND MODIFIED AS NECESSARY IN ORDER TO ADDRESS THE SPECIFIC CONDITIONS FOR EACH LOT. THE TYPICAL DETAILS MAY NOT ADDRESS EACH UNIQUE SITUATION, AND SHOULD BE USED AS A GENERAL GUIDELINE FOR THE TYPES OF CONTROL MEASURES PROVIDED. SOME LOTS MAY REQUIRE COMBINING ELEMENTS OF MORE THAN ONE TYPICAL DETAIL IN ORDER TO PROVIDE ADEQUATE EROSION CONTROL MEASURES. 3. SILT FENCE SHALL BE INSTALLED ALONG THE LOW SIDE(S) OF THE LOT SUCH THAT ALL RUNOFF FROM DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE PRIOR TO CROSSING ANY LOT LINE. 4. SILT FENCE OUTLETS SHALL BE INSTALLED AT ANY LOCATION WHERE RUNOFF LEAVES THE PROPERTY IN A CONCENTRATED FLOW CONDITION SUCH AS SWALES, DITCHES OR ANY OTHER SIMILAR TOPOGRAPHIC DRAINAGE FEATURE. 5, A GRAVEL PAD AT LEAST 10' WIDE AND 30' LONG MUST BE INSTALLED AT THE ACCESS POINT INTO THE LOT. 6, ALL AREAS WITHIN 25' OF THE EDGE OF PAVEMENT OF THE STREET MUST BE STABILIZED BEFORE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. THE EXISTING STREET SHOULDER AND/OR DITCH ALONG THE LOT FRONTAGE SHALL BE KEPT FREE OF SEDIMENT AND MAINTAINED IN A MANNER SUCH THAT THE DRAINAGE AND - STABILIZATION ASPECTS OF THE PUBLIC RIGHT-OF-WAY ARE NOT ADVERSELY AFFECTED BY THE CONSTRUCTION ' ACTIVITY ASSOCIATED WITH THE LOT DEVELOPMENT, /7. ALL DISTURBED AREAS THAT ARE SUBJECT TO EROSION AND MOVEMENT OF SEDIMENT OFFSITE FROM THE LOT f MUST BE PROVIDED WITH GROUND COVER OR OTHER PROTECTIVE MEASURES SUFFICIENT TO RESTRAIN EROSION AND CONTROL OFF -SITE SEDIMENTATION. ' 8. THE DURHAM COUNTY EROSION CONTROL INSPECTOR MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES OR MODIFICATIONS TO THE EROSION CONTROL PLAN BASED ON FIELD CONDITIONS. ' ' \ ,f r -22 f i ,J \� 390 400 00 3 ' 1 - 14 15 � F ! j y 12 , f - ...... .. 1 �- 10 -- ---- �/ i Ile 00 y �9 • � .. - /. .. � � �,. ..p / ,'r.'/ //' / --ems . - - ool .01 _ ---- / /i " rw -w- -- w w- ---___.--------------- W W~--- / A AI --w_ s J� YW .� f- - _ EXISTING (84' PUg r 1 . .`• - A '' J / / / .ram s• _ +. . _ ' *_• _. -- .� -.ram- -•r f'_` _`- _�'r_ -••- Y`.'^��.. % 100 XV 00 00 100 /� �,Q p` s-AiNG - 1• r i� .. 00, GENERAL NOTES: 1. AT THE START OF GRADING INVOLVING THE LOWERING OF THE EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THIS CUT FARTHEST AWAY FROM THE TREE TRUNK. 2. NO STORAGE OF MATERIALS, DUMPING OF WASTE MATERIALS, FILL, OR PARKING OF EQUIPMENT SHALL BE ALLOWED WITHIN THE ROOT PROTECTION ZONE, AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE ROOT PROTECTION ZONE. ERSOSION CONTROL NOTES: 1. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES DURING THE LIFE OF THE PROJECT UNLESS OTHERWISE INDICATED ON THE PLANS OR DIRECTED BY THE DURHAM COUNTY INSPECTOR, 2. CONTRACTOR SHALL CONSTRUCT DIVERSION DITCHES AS NECESSARY SO AS TO DIRECT ALL SEDIMENT RUNOFF INTO THE EROSION CONTROL MEASURES TO THE MAXIMUM EXTENT PRACTICAL. 3. LAND LEFT EXPOSED SHALL BE STABILIZED WITHIN THE TIME PERIODS SPECIFIED BELOW FOR ANY PHASE OF GRADING IN ACCORDANCE WITH THE FOLLOWING SCHEDULE DEPENDING ON THE SLOPE OF THE LAND: • AREAS WITH SLOPES OF 3H:1 V OR GREATER SHALL BE STABILIZED WITHIN 7 DAYS; • AREAS WITH MODERATE SLOPES THAT ARE FLATTER THAN 3H:1V SHALL BE STABILIZED WITHIN 10 DAYS; • AREAS WITH MINIMAL SLOPE, GENERALLY FLAT IN NATURE SHALL BE STABILIZED WITHIN 14 DAYS. 4. FOR ANY AREA OF LAND -DISTURBING ACTIVITY WHERE GRADING ACTIVITIES HAVE BEEN COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON AS PRACTICABLE, BUT IN NO CASE LATER THAN SEVEN DAYS AFTER COMPLETION OF GRADING. 5. ALL STREETS ADJACENT TO THIS PROJECT MUST BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED. 6. TOPSOIL STOCKPILING SHALL OCCUR AT A SITE APPROVED BY DURHAM COUNTY. EROSION CONTROL MAINTENANCE NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 2. SEDIMENT SHALL BE REMOVED FROM SEDIMENT TRAP DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 3. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 6 INCHES DEEP AT THE FENCE. THE SILT FENCE SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 4. INLET PROTECTION DEVICES SHALL BE INSPECTED AFTER EVERY RUNOFF -PRODUCING RAINFALL EVENT. ANY DAMAGE TO MESH SHALL BE REPAIRED IMMEDIATELY, AND GRAVEL SHALL BE REPLACED OR CLEANED TO ENSURE PROPER DRAINAGE. DURHAM COUNTY EROSION CONTROL ENFORCEMENT NOTES: 1. Failure to follow this construction sequence may result in local enforcement actions, including but not limited to civil penalties to $5000 per violation per day, injunctive relief, criminal penalties, and permit revocation. Additionally, off -site sedimentation may result in restoration requirements. 2. If the Durham County S&E staff determines that excessive sediment is leaving the site, a revised sedimentation and erosion control plan may be required, with associated requirements for additional S&E measures. COSNTRUCTION SEQUENCE: 1. Install tree protection fencing in accordance with the approved Site Plan. 2. Inspect tree fence and submit a Tree Protection Fencing Certification form to Durham County S & E Office, fox: (919)560-0740. 3. Call Durham County S&E office for inspection of tree fence installation, (919)560-0735. 4. Schedule and hold a pre -construction conference prior to beginning any land -disturbing activities. This conference should be attended by a representative of the financially responsible party and/or the general contractor, grading sub -contractor, erosion control sub -contractor and the Durham County S&E office. 5. Obtain Land Disturbing Permit and placard, and post the placard on site. 6. obtain an approved (stomped) S&E control plan and keep it on site, either in the inspection box, construction office or with the contractor. 7. Install construction egress/exit, silt fencing, sediment traps/basins, diversion ditches, check dams, and other initial erosion control measures as specified in the plan. Remove only trees and ground cover necessary to install these devices. 8. If a stockpile is necessary due to excavation of the sediment trap/basin, place a double row of silt fence 10 feet apart at the limits of the stockpile area shown on this plan. Trees and groundcover may be removed only as necessary for this stockpile. 9. Temporary ground cover shall occur within the timefrome specified per #3 of the erosion control notes. Permanent ground cover shall be provided as soon as practical but in no case later that 7 days after completion of grading (see sheet 3.0 for seeding schedule). 10, Notify the Durham County S&E site inspector after measures have been installed and project has started. 11. Remove all erosion control measures after the Durham County S&E office approval of permanent stabilization. EROSION CONTROL NOTATION KEY LEGEND REFERENCE LABEL FOR TYPICAL LOT EROSION �D CONTROL DETAIL THAT IS MOST APPLICABLE FOR THIS LOT (SEE DETAIL SHEET). LEGEND: DENOTES RESIDENTIAL LOTS THAT ARE SUBJECT TO i LAND DISTURBANCE PERMITTING IN CONJUNCTION ` 1 WITH THIS PLAN .......*'I*I : •: , DENOTES RESIDENTIAL LOTS THAT ARE SUBJECT TO LAND DISTURBANCE PERMITTING IN CONJUNCTION ... ... ;(_.}� WITH PREVIOUS PLAN W W W EXISTING WETLANDS CONSTRUCTION DRAWINGS W W (PLAT BOOK 200, PAGE 205) E O u (V t/1 o 0 ; 12 a s > N cM ro N 00 o N r N 0 ro V M V o: v a. v �R Ln N LLJ U z ft U a 0 c c v Y ANAFn 0 20 t-n• V) LL> aup) V) 0 Li.. U J 0 L.L Z N 0U_ U0 0 un Z 0 Q � a W F_ 0 Job No. Drawn By 02190194.10 W&R Date Designer 01/712020 W&R CA ��•� �.Q pFESSlp,�••� '�. ` SEAL 892 ; Revisions GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 Ft. Sheet No. 2.1 x tz N 5 SILT FENCE PROPERTY LINE I — SF Sl` - fir_ j r T T T I I SILT FENCE 1UTLET I 1 AT LOW POINT 1 JcLLA- I �-nI _ I I Z1 I 14t- nit � IJ w 01co Ala O oft H''USE T T {0- a I� T �Tr_. RIGHT—OF—WAY LINE — 100.0 GRAVEL CONSTRUCTION STREET STREET ELEV. ENTRANCE TYPICAL LOT EROSION CONTROL — DETAIL NOT TO SCALE Worms --I SILT 1 l 1 t{ I rl FLOW OF WATER �I t 111 l PIT TO INCREASE STORAGE CAPACITY AND PROLONG THE LIFE OF THE SILT FENCE, IT IS GENERALLY AOVt5A S TO DIG A SEDWENT PR IN FRONT OF THE SILT FENCE WHENEVER POSSIBLE -_ 107- L PROPERTY LINE06 _ I W W ( 1 n 1 SILT FENCE l 1L, Z LL �- ` `�V . lLoj OI I a In - HOUSE I. I-_ -1 - - - z- � _101— -- 1 o SILT FENCE I �'-- is —� RIGHT—OF—WAY LINE 100.0 GRAVEL CONSTRUCTION STREET STREET ELEV. ENTRANCE TYPICAL LOT EROSION CONTROL - DETAIL NOT TO SCALE ---- 19 CAW, MtM' OR "4- WFLNO WWF NOWED ado MRaiOra/iD HnNN ON •ETA. POSrs uLnMVIDIM 1113MAM (auk) Non EAOM OR EOLOVAIEM Mein" To WIRE W/ IACIAL cups OR WOK AT a' on, CEMER. WX %DREW STORAGE LML RIIIAM SEDea]/T WHEN 9115 AM 15 WOO" OR M DIRECTED / C° - 's ' ---- VOCK coo" W/ saL a TAMP eAani- --SHEET DrMINVE (ONLY) NITURAL r1MM CAM APFKXlr OF FABRIC INFO FROICk, WW a' or WIRE ado TRENai UML POSTS AT 1e'O.C. WK. SI EROSIONCONTROL DETAIL 5 DUREiRNNCDEPAR MC TEMPORARY SILT FENCE DAi ID E?VGINEERP.vG DEPARTENT __., d2OV sF.l NPDES Stormwater Discharge Permit for Construction Activities (NCGOI ) NCDENR/Division of Energy, Mineral and Land Resources STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None High Quality Water (HOW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less In length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' In length. All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. _ PROPERtY LINE_ dCZdS T ,b / f SILT/FENCE OUTLET AT/ LOW POINT I / / r • � of � i LU ZI / SILT FENCE JI ILU {Z' l II-4 lLAJ / 01 n f0 HOUSE a 3 cn LLJ 1 0:p •� I 1 RIGHT—OF—WAY LINE a GRAVEL CONSTRUCTION STREET STREET ELEV. ENTRANCE NOTE: DRAINAGE PATTERN MAY BE MIRRORED TYPICAL LOT EROSION CONTROL - DETAIL NOT TO SCALE Steel F000r Post Wire Fonibe, Filter Fabric Harohn" Cloth On Ground I FIIW of V Diameter W.ehad Stma Aid", - -- Wire Fence and Harchrore Cloth SECTION 60 860960 to CIA y Silt Fence PLAN i i i i i i R (W i111R W W iNIRi i W iYlpi W iiiYYlli W W iAIR W W iglR W ��� W iYAiiN'i W ��tio W i at � fiYii�f!>�i4il�im$i�tilitilAl6t9tt1iBi®�91®mlBm�m�®gym i RA � tmmmmm�m4l���m��tilBiBlO��®i����10��1t1�$l�ila9i(tYi fI► mtse,eesalsaam-m>delolmmmn lf�M�mMmmm ' m>OMR1tA�Ig�R !�®lliiMo4 ®iB6itili®�iA1ltii llml9m�mtdM miit8mi�® ®i Iam>smmelrl Iammaalmmiar �imtIAA111mt�lR- IMt)imi011R�iRiO Top of Slit Foorce Muirt FRONT VIEW Be at Least V Ab" M the Top of the Washed Stone 4ors Force, Filter Fabric cloth In Trafth , r e l PRQPERT-Y1" LINE_ ' F SF SF 1 ISILT FENCE OUTLET 1 AT LOW POINT 1 I� I 1 SILT FENCE`�'I I Iz �1 __n IJ Of wl LLJ 01 la Will >,o: a� HOUSE 1 pL nI 1 > t 1 � � RIGHT` OF —WAY LINE GRAVEL CONSTRUCTION STREET STREET E:Ev ENTRANCE NOTE: DRAINAGE PATTERN MAY BE MIRRORED TYPICAL LOT EROSION CONTROL — DETAIL O NOT TO SCALE PROPERTY LINE- { SF SF SF { I 1 IU. Cn1 ---102 I I I WI1 SILT FEI�E I LL _ ,. ----- _.� -,103 -- -- ZI w �_ T!Z . Jt RIDGE LINE J D! � w w 01 y 10 $I HOUSE y _; 1 D3 -- la LL �— —102 — 3 JI I > SILT FENCE 1. 1 —C _ �. 5 0 t _ RIGHT—OF—WAY LINE 100.0 GRAVEL CONSTRUCTION STREET STREET ELEV. ENTRANCE TYPICAL LOT EROSION CONTROL — DETAIL 0 NOT TO SCALE t, 10fTMA� JRFACE-� II II I I 2% IN DIAMETER GALVANIZED STEEL OR ALUMINUM POSTS 34 IN MIN, 11 36 IN MIN. 11 - GALVANIZED CHAIN LINK FENCE WITH WOVEN SLIT FILM GEOTEXTILE ELEVATION CHAIN LINK FENCING WOVEN SLIT FILM GEOTEXTILE FLOty EMBED GEOTEXTILE AND CHAIN LINK FENCE 8 IN MIN. INTO GROUND CROSS SECTION CONSTRUCTION SPECIFICATIONS t. INSTALL 2% INCH DIAMETER GALVANIZED STEEL POSTS OF 0.095 INCH WALL THICKNESS AND SIX ', FOOT LENGTH SPACED NO FURTHER THAN 10 FEET APART. DRIVE THE POSTS A MINIMUM OF 36 INCHES INTO THE GROUND. 2. FASTEN 9 GAUGE OR HEAVIER GALVANIZED CHAIN LINK FENCE (2% INCH MAXIMUM OPENING) 42 INCHES IN HEIGHT SECURELY TO THE FENCE POSTS WITH WARE TIES OR HUG RINGS, 3. FASTEN WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS, SECURELY TO THE UPSLOPE SIDE OF CHAIN LINK FENCE WITH TIES SPACED EVERY 24 INCHES AT THE TOP AND MID SECTION. EMBED GEOTEXTILE AND CHAIN LINK FENCE A MINIMUM OF 8 INCHES INTO THE GROUND. 4. WHERE ENDS OF THE GEOTEXTILE COME TOGETHER, THE ENDS SHALL BE OVERLAPPED BY 6 INCHES, FOLDED, AND STAPLED TO PREVENT SEDIMENT BY PASS. 5. EXTEND BOTH ENDS OF THE SUPER SILT FENCE A MINIMUM OF FIVE HORIZONTAL FEET UPSLOPE AT 45 DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND THE ENDS OF THE SUPER SILT FENCE. 6. PROVIDE MANUFACTURER CERTIFICATION TO THE INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT GEOTEXTILE USED MEETS THE REQUIREMENTS IN SECTION H-1 MATERIALS. 7. REMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP IN FENCE OR WHEN SEDIMENT REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEXTILE IF TORN. IF UNDERMINING OCCURS, REINSTALL CHAIN LINK FENCING AND GEOTEXTILE. SUPER SILT FENCE DETAIL NPOLS Storrnwater Discharge ParrRlt for construction AdlvIlles (RCC101) NCDENR/Divislon of Water Quality NEW STABILIZATION TIMEFRAMES (EHective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TINEFRAME HXCEPTTONS Perimeter tikes. 5w1les, ditches, 7 days Nate slopes High Ouality Water tHOM Zones 7 days None Slopes steeper then 3 1 7 days If slopes are 10' or less in length and are not steeper then 21. 14 - days are allowed Slopes 3.1 or latter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes letter 14 days None, except for perimeters and HOW Zones. then 4 1 Seedbed Preparation: 1 Chisel compacted areas and spread topsoil three inches deep over adverse soil conditions, if available 2 Rip the entire area to six inches deep 3 Remove all loose rock, roots and other obstructions, leaving surface reasonably smooth and uniform. 4. Apply agricultural lime- fertilizer and superphosphate uniformly and mix with soil (see mixture below). 5. Continue tillage until a well -pulverized: firm, reasonably uniform seedbed is prepared four to six inches deep. 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or cultipack after seeding 7 Mulch immediately after seeding and anchor mulch 8 Inspect all seeded areas and make necessary repairs or reseedmgs withn the planting season, if possible. If stand should be more than 60% damaged: re-establish following the original lime, fertilizer and seeding rates 9. Consult S&EC Environmental Engineers on maintenance treatment and fertilization after permanent cover is established. Mixture: Aoicultural Limestone : 2 tonslacre (3 tons/acre in clay sots) fertifizer "I 1.000 Ibs/acre - 10.10.10 Superphosphate LMulch 5w tbs/acre - 20% analysis j2tons/ecre-smaN grain straw Anchor i Asphaf emulsion at 300 gals/acre Seeding Schedule: For Shoulder, Side Ditches, Slopes (Max 3:1) [Data Type JLPlant" Rate _. - _ --. --- -- - Aug 15-Novi TaN Fescue 3001bs/atte Nov i-Mar 1 Tell Fescue & Atxuzn Rye 300 Ws/acre Mar --Apr 15 Tag Fescue 1[300lbs/acre Ppr 15-Jun 30 Hulled Canmon Bennudegress 125lbs/acre Jul 1-Aug 15 Tall Fescue AND Browntop Mliet or IlSorghum-Sudan i 125 Wslacre iTell Fescue): 35lbsiecre (Browntop Mail. 30 Jkbs/acre Hybrids— (Sorghum -Sudan Hybrids) For Shoulder, Side Ditches, Slopes (31 to 2 1) Date [I)Tt— l RMIng Rate ' Serices Lespedeze (scarified) and use Jun 1 the fdlowNy cartthklations: 501Gsiscre (Seneca Lespedeza): - Mar.!-Apr 15 IAdd Tel Fescue��. 120 WsPocro Mar '-Jun 30 Or add weeping Love grass 10 Ibslacre Mar' -Jun 30 or add Hulled Gammon Sennudagrass 251bsfaae Tail Fescue AND Browntop Mullet or 120 bsfacre (Tel Fescue); 35 itrVaae (Bramitop Mullet); 30 Jun 1-Sept 1 Sorghum -Sudan Hybrids'- Ibs/acre (Sorghum -Sudan Hoods) Series Lespedeza (unhulled - Sept 1-Mar 1 unscanled) AND Tal Fescue 70 Wstacra ISarkea Lespedeza), 120 ibsJaere (Tell Fescue) Nw 1-Mar 1 AND Abruzzi Rye 25lbsiaae Consult S&EC Environmental Engineers for additional Irdormation concerning other alfematives for vegetation of denuded areas The above vegetation rates are those that do well under local conditions, other seeding rate combir>atiorls are Dossible EROSION CONTROL NOTES: 1. ALL INDIVIDUAL LOT EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH DURHAM COUNTY REQUIREMENTS. 2. THE TYPICAL INDIVIDUAL LOT EROSION CONTROL DETAILS CONTAINED ON THIS PLAN ARE PROVIDED FOR PURPOSES OF ILLUSTRATING VARIOUS TYPICAL CONDITIONS, AND SHALL BE ADAPTED AND MODIFIED AS NECESSARY IN ORDER TO ADDRESS THE SPECIFIC CONDITIONS FOR EACH LOT. THE TYPICAL DETAILS MAY NOT ADDRESS EACH UNIQUE SITUATION, AND SHOULD BE USED AS A GENERAL GUIDELINE FOR THE TYPES OF CONTROL MEASURES PROVIDED. SOME LOTS MAY REQUIRE COMBINING ELEMENTS OF MORE THAN ONE TYPICAL DETAIL IN ORDER TO PROVIDE ADEQUATE EROSION CONTROL MEASURES. 3. SILT FENCE SHALL BE INSTALLED ALONG THE LOW SIDE(S) OF THE LOT SUCN THAT ALL RUNOFF FROM DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE PRIOR TO CROSSING ANY LOT LINE. 4. SILT FENCE OUTLETS SHALL BE INSTALLED AT ANY LOCATION WHERE RUNOFF LEAVES THE PROPERTY IN A CONCENTRATED FLOW CONDITION SUCH AS SWALES, DITCHES OR ANY OTHER SIMILAR TOPOGRAPHIC DRAINAGE FEATURE. 5. A GRAVEL PAD AT LEAST 20' WIDE AND 50' LONG MUST BE INSTALLED AT THE ACCESS POINT INTO THE LOT. 6. ALL AREAS WITHIN 25' OF THE EDGE OF PAVEMENT OF THE STREET MUST BE STABILIZED BEFORE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. THE EXISTING STREET SHOULDER AND/OR DITCH ALONG THE LOT FRONTAGE SHALL BE KEPT FREE OF SEDIMENT AND MAINTAINED IN A MANNER SUCH THAT THE DRAINAGE AND STABILIZATION ASPECTS OF THE PUBLIC RIGHT-OF-WAY ARE NOT ADVERSELY AFFECTED BY THE CONSTRUCTION ACTIVITY ASSOCIATED WITH THE LOT DEVELOPMENT. 7. ALL DISTURBED AREAS THAT ARE SUBJECT TO EROSION AND MOVEMENT OF SEDIMENT OFFSITE FROM THE LOT MUST BE PROVIDED WITH GROUND COVER OR OTHER PROTECTIVE MEASURES SUFFICIENT TO RESTRAIN EROSION AND CONTROL OFF -SITE SEDIMENTATION. 8. THE DURHAM COUNTY EROSION CONTROL INSPECTOR MAY REQUIRE ADDITIONAL EROSION CONTROL MEASURES OR MODIFICATIONS TO THE EROSION CONTROL PLAN BASED ON FIELD CONDITIONS. ummmif E o 0 Gj l/'1 c 0 > C v s Q) i > 33 +D v ' 3 �'17 — N Cl)00 V L- U N � u co V a Q1 a 4.1 �J in • eta N LLJ U z u lu t7 SIL C Y AFAF A In a-1 N mr F— W O Z Z 2O eteVr���ll Q — LL W 0 /0 cn V Q O V Ij O Cr. ` 1 Z cn O V Q Z~ oW V) O ry W Job No. Drawn By 02190194.10 W&R Date Designer 01/7/2020 W&R Revisions Sheet No. 3,0