Loading...
HomeMy WebLinkAboutNCC200278_ESC Approval Submitted_20200124ROY COOPER. Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality October 11, 2019 LETTER OF APPROVAL WITH MODIFICATIONS ABJ Investments, LLC ATTN: Brian Raynor, Member/Manager 2031 Middle Road Fayetteville, NC 28312 RE: Project Name: Williams Farm Subdivision Acres Approved: 13.2 Project ID: HARNE-2020-021 County: Harnett, City: Stewarts Creek, River Basin: Cape Fear Stream Classification: Other Submitted By: 4D Site Solutions, Inc. Date Received by LQS: September 11, 2019 Plan Type: New Dear Mr. Raynor: Address: US Hwy 401 This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Fayetteville Regional Office 1 225 Green street, Suite 7141 Fayetteville, North Carolina 28301 E Q` � NGRrCN FppU Dr Rowe 01fim—ai 910.433.3300 Letter of Approval with Modifications ABJ Investments, LLC October, 11, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, EI Regional Engineering Assistant Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Scott Brown, 4D Site Solutions, Inc. (electronic copy) Ken Slattum, Building Inspector (electronic copy) Jay Sikes, Building Inspector (electronic copy Fayetteville Regional Office file Letter of Approval with Modifications ABJ Investments, LLC October, 11, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: WILLIAM FARM SUBDIVISION Project ID: HARNE-2020-021 County: Harnett Provide one full size copy of only the revised plan sheets, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Ref: G.S.113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities