HomeMy WebLinkAboutSW6191202_LREMC Allendale Substation_Construction Documents_1/23/2020L Li 11V1 13 Fm Fm RIVER ELECTRIC MEMBERSHIP CORPORATION P M ROKE, NORTH CAROLINA ALL IF= 14 El N.C. 51 HOKE COUNTY ALE 15kv LIST OF DRAWINGS C0.00 COVER SHEET C1.00 EXISTING CONDITIONS PLAN C2.00 DEMOLITION PLAN C3.00 LAYOUT PLAN C4.00 GRADING PLAN C5.00 EROSION CONTROL PLAN PHASE I C5.01 EROSION CONTROL PLAN PHASE II C6.00 SITE DETAILS C6.01 SITE DETAILS Almllclr4 a„efasafffroarfvr C6.02 PART 11 OF NCG01 m=�`''�`f� C6.03 PART III F N 1 Jb �y O CGO LUMBEE RIVER EMC {��.r�ti� L 1.00 LANDSCAPE PLAN sodr;�%s, .............��v�,�m, 1p11 P6R� Bi0s641b' L1.01 LANDSCAPE DETAILS Date Revision By LUMBEE RIVER ELECTRIC Date: 8/15/19 MEMBERSHIP CORPORATION Drawn By: GSB Approved: GSB ALLENDALE 115kV SUBSTATION Job No.: 27-142 THE INFORMATION ON THIS DRAWING IS PROPRIETARY COVER SHEET AND IS NOT TO BE USED, REPRODUCED, OR COPIED 2407 NORTH TRYON ST. WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CHARLOTTE, NC 6728206 comoo CONSULTING ENGINEERS INC. TEL:704-372- WEE FIRM NO.F-0429 29 FIRM LICENSE #: F-0429 I ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 I I z CD J W (L' W z W hi � W � w Y w o cn w w &J w w � � w � a 1 00.0' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 _ g 3T 33 45" E 80.00' I I I JI Q I ) z Q U \ I \ I I I N I � / I W I I Ln J �� I LO Ln N Ln Q \z U I I I I I 1 "C� �� I \ I \ \ I 0 o \ \ \ 0 2 \ I CULVERT TOP: 221.70 BOTTOM: 219.05 l _ I CD � w W z w IW Y w w � a 50.050.0' ' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 S 31'42'25" E 460.68' 1 F � 3 LO 't Lo O 0 LO N ` I �J I N 31'45'00" W 503.00' LOWER MACEDONIA ROAD/ NC ROUTE 1106 (60' RIGHT OF WAY) THIS PLAN IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. BOUNDARY INFORMATION DERIVED FROM SURVEY BY ROBERT LEACH. TOPOGRAPHY SURVEY PERFORMED BY ECE. Ln N N BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 LO N N J THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. Date I Revision FIRM LICENSE #: F-0429 HILL LOCATION MAP LOWER MACEDONIA RD. MAXTON, NORTH CAROLINA HOKE COUNTY N.T.S. 11 ZONING INFORMATION 11 PROJECT NAME: OWNER: PLANS PREPARED BY: PHONE: PARCEL ID#: CURRENT ZONING: PROPOSED USE: TOTAL ACREAGE: FLOODPLAIN: FEMA FIRM PANEL• �EF�RE �-o �P ' °'o 6' W BOB �o 0 </NA ON�o� ALLENDALE SUBSTATION AND BREAKER STATION LUMBEE RIVER EMC ELECTRICAL CONSULTING ENGINEERS (704) 372-6673 PART OF 193090001007 RA-20 ELECTRIC SUBSTATION 3.5 ACRES NONE ON PROPERTY 3710930800K EXISTING CONDITIONS LEGEND: DESCRIPTION GRAPHIC PROPERTY LINE -- EXISTING NCDOT RIGHT-OF-WAY EXISTING DUKE ENERGY RIGHT-OF-WAY EXISTING DUKE ENERGY STRUCTURE EXISTING DRAINAGE CANAL (TOP OF BANK) EXISTING EDGE OF PAVEMENT EXISTING CENTERLINE OF LOWER MACEDONIA ROAD EXISTING CONTOURS 0 15 30 60 if 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. ,r LUMBEE RIVER EMC ypl I. (.00 4�. •♦,���44 C. fla,�� By LUMBEE RIVER ELECTRIC MEMBERSHIP CORPORATION Date: 8/15/19 Drawn By: GSB ALLENDALE 115kV SUBSTATION Approved: GSB Job No.: 27-142 EXISTING CONDITIONS PLAN 2407 NORTH TRYON ST. CHARLOTTE, 67 28206 TEL: 704-372-6673 C1 0 0 FIRM NO.F-0429 ■ -WEE ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 w CD I� w ly- Iz w w z Lj 0 cn w � w c3j ly- w w w w � � � 0 1 00.0' I o- A I `\' 001 S 37' 33' 45" E ANY ADDITIONAL DISTURBANCE I/ IN THIS AREA SHALL BE FOR r I LANDSCAPE MATERIALS ONLY U O Q U \ I I. I� A � I I � W LO U LO O Z D Q z Q U BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 to I T J A I B \ O O U O ANY ADDITIONAL DISTURBANCE l IN THIS AREA SHALL BE FOR ` LANDSCAPE MATERIALS ONLY A O U O O O Z CULVERT TOP: 221.70 BOTTOM: 219.05 2 A BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 S 31'42'25" E ti LOC LOWER MACEDONIA ROAD/ NC (W RIGHT OF WAY) LO N N Ln N N BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 GENERAL NOTES: 1. ALL TRAFFIC CONTROL SIGNAGE AND STRIPING TO CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.). 2. ALL PAVING CUTS SHALL BE MADE BY SAW CUTS. EXISTING ELEVATIONS SHALL BE FIELD VERIFIED AND MATCHED. 3. CONTRACTOR TO COORDINATE ANY CHANGES IN FIELD CONDITIONS THAT MAY REVISE THE DESIGN WITH ARCHITECT / ENGINEER PRIOR TO PROCEEDING. 4. CONTRACTOR IS RESPONSIBLE TO REPLACE AND/OR REPAIR ANY DAMAGES TO THE EXISTING LANDSCAPE, IRRIGATION, POWER AND/OR HARDSCAPE. II DEMOLITION NOTES: II 1. BOUNDARY AND TOPOGRAPHICAL SURVEY INFORMATION IS TAKEN FROM A SURVEY DATED 02/22/2019 BY ROBERT E. LEACH II PLS, TITLED: SURVEY FOR: LUMBEE RIVER ELECTRIC MEMBERSHIP CORP, ALLENDALE TOWNSHIP, HOKE COUNTY, NORTH CAROLINA 2. THE LOCATIONS OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES, AND OTHER ABOVE AND BELOW GRADE APPURTENANCES ARE APPROXIMATE AS SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION, SIZE, AND INVERT ELEVATIONS OF SUCH PRIOR TO BEGINNING CONSTRUCTION. 113 INSTALL ALL INFORMATIONNG ONSTRUCCONSTRUCTION. EROSION C 00 - EROS ON CONTROL MEASURES OPLAN PHASE IR TO I FOR MORE I I 11 DEMOLITION LEGEND: 11 RE �-o 0 \61, 0 0� BOB57 ti � �00NA UN�- G� IB LIMITS OF CONSTRUCTION loc LIMITS OF DISTURBANCE EXISTING DUKE ENERGY STRUCTURE TO BE REMOVED BY OTHERS. EXISTING DRAINAGE CANAL (TOP OF BANK) TO REMAIN AND PROTECTED DURING CONSTRUCTION. 0 15 30 60 if 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. LUMBEE � RIVER EMC goo!' \, CA i p /C`0395ou `•.. •Av ...•+ THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. 11 LAYOUT LEGEND: 11 11 ZONING INFORMATION 11 BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 w r z CDly- J w z z o w cn w U) Y � cn Z c-3' ly- BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 1 00.0' I PIN# 1939090001007 I I o 12 '4 S 3T335" E L------------o 80.00' w I I o n I I N Z I J I Q Z Q w I C I I I D C C w JC' 10 I I �,ULVLN I TOP: 221.70 BOTTOM: 219.05 BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 S 31'42'25" E 460.68' V BUFFM ------------------------------------------------------------------- 25 REAR SETBACK - - - - - - - - 250.0' I I (W RIGHT OF WAY) PROPOSED GRAVEL AREA (SEE DETAIL 1 SHEET C6.00) PROPOSED GRAVEL DRIVEWAY PROPOSED CHAIN LINK FENCE (SEE DETAIL 2 SHEET C6.00) X PREFABRICATED UTILITY CONTROL FACILITY 10'X70' NCDOT SIGHT TRIANGLE _ PROPOSED SUBSTATION STRUCTURE FUTURE SUBSTATION EXPANSION AREA EXISTING DUKE RIGHT OF WAY EXISTING DUKE ENERGY STRUCTURE TO BE REMOVED BY OTHERS. PROPOSED SUBSTATION TRANSMISSION POLES WITH GUY WIRES PROPOSED SUBSTATION TRANSMISSION H-FRAMES 10' ACCESS EASEMENT PER NCDEQ BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 OEF0RE \�0 0 �9 RI�RR�O< / NA.:::� 0 PROJECT NAME: OWNER: PLANS PREPARED BY: PHONE: PARCEL ID#: CURRENT ZONING: PROPOSED USE: TOTAL ACREAGE: FLOODPLAIN: FEMA FIRM PANEL: SETBACK REQUIREMENTS FRONT SETBACK: REAR YARD: SIDE YARD (R): SIDE YARD (L): LAYOUT NOTES: ALLENDALE SUBSTATION AND BREAKER STATION LUMBEE RIVER EMC ELECTRICAL CONSULTING ENGINEERS (704) 372-6673 PART OF 193090001007 RA-20 ELECTRIC SUBSTATION 3.5 ACRES NONE ON PROPERTY 3710930800K 30' FROM R/W 25' 10, 10, I A. ALL TRAFFIC CONTROL SIGNAGE AND STRIPING TO CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.) AND NCDOT SUPPLEMENT. B. THE UTILITIES AND THE LOCATION THEREOF, SHOWN ON THE DRAWINGS, REPRESENT THE DESIGNERS UNDERSTANDING OF EXISTING UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DEPTH AND EXISTENCE OF ALL UTILITIES (ELECTRICAL, MECHANICAL, WATER, TELEPHONE, GAS ETC.) WITHIN THE CONSTRUCTION AREA WITH THE OWNER AND/OR THE APPROPRIATE UTILITY COMPANY PRIOR TO ANY EXCAVATION. THE OMISSION OF OR THE INCLUSION OF UTILITY LOCATIONS ON THE PLANS IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCATION. UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTACT U-LOCO (1-800-632-4949) PRIOR TO DIGGING. C. ALL PAVING CUTS SHALL BE MADE BY SAW CUTS. EXISTING ELEVATIONS SHALL BE FIELD VERIFIED AND MATCHED. D. CONTRACTOR TO COORDINATE ANY CHANGES IN FIELD CONDITIONS THAT MAY REVISE THE DESIGN WITH OWNER / ENGINEER PRIOR TO PROCEEDING. E. ANY UNSUITABLE MATERIAL ON SITE IS TO BE QUANTIFIED BY A GEOTECHNICAL ENGINEER, PRIOR TO REMOVING. CONTRACTOR MUST NOTIFY OWNER, OR OWNER'S REPRESENTATIVE IN CASE UNSUITABLE MATERIAL IS UNCOVERED. F. ALL DIMENSIONS ARE TO FACE OF CURB OR TO FINISHED FACE OF BUILDING UNLESS NOTED OTHERWISE. G. ALL RADII ON CURBS SHALL BE 5'-0" UNLESS NOTED OTHERWISE. H. ALL WORK WITHIN THE RIGHT OF WAY OF ALL ROADS AND HIGHWAYS SHALL BE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. CONTRACTOR SHALL SECURE ALL NECESSARY DRIVEWAY AND ENCROACHMENT PERMITS PRIOR TO CONSTRUCTION. PROVIDE TRAFFIC CONTROL IF NECESSARY DURING CONSTRUCTION WITHIN THE RIGHT OF WAY. 0 15 30 60 iv 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. LUMBEE RIVER EMC , %'xA C A R O �Vvo 44 !. e� THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 a N" S 3T33'45" E 80.00' I r z � CDly- J wLd z U� w w � cn � w z C w z w BRYAN G. HAGLER & JANET HAGLER w DEED BOOK 1117 PAGE 510 PIN# 1939090001007 1 00.0' I EX. 223.21 LP 223.97 � I � I J Q / z I / I I I I X I 224.18 I I q- N I I N w Ln o CLO I I N / LO I J z Q \ z I I �<vZ' I 224.93 �E X. 224.15 LP �-ULV LK I TOP: 221.70 BOTTOM: 219.05 ?f \ z Iw w 50.0 EX. 225.67 �Iz CD z w z w•I - w w 0 50e0' S 31'42'25" E 460.68' r EX. 225.35 HP 4n+ a��n 26 I�AR 9ETBA 224.98 z w vn�L_1 ww cca.4y N 31'45'00 W 503.00' c-' EX. 225.67 E 68 LOWER MACEDONIA ROAD/ NC ROUTE M06 (W RIGHT OF WAY) --------------- -------------- II 225.28 II II EX. 225.63 HP EX. 225.38 HP EX. 225.05 LP Ln N N BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 0 N N BEFORE �_o� 6 \�0 0 W GENERAL NOTES: 1. ALL TRAFFIC CONTROL SIGNAGE AND STRIPING TO CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.). 2. THE UTILITIES AND THE LOCATION THEREOF, SHOWN ON THE DRAWINGS, REPRESENT THE DESIGNERS UNDERSTANDING OF EXISTING UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DEPTH AND EXISTENCE OF ALL UTILITIES (ELECTRICAL, MECHANICAL, WATER, TELEPHONE, GAS ETC.) WITHIN THE CONSTRUCTION AREA WITH THE OWNER AND/OR THE APPROPRIATE UTILITY COMPANY PRIOR TO ANY EXCAVATION. THE OMISSION OF OR THE INCLUSION OF UTILITY LOCATIONS ON THE PLANS IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF OR A DEFINITE LOCATION. UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTACT U-LOCO (1-800-632-4949) PRIOR TO DIGGING. 3. ALL PAVING CUTS SHALL BE MADE BY SAW CUTS. EXISTING ELEVATIONS SHALL BE FIELD VERIFIED AND MATCHED. 4. CONTRACTOR TO COORDINATE ANY CHANGES IN FIELD CONDITIONS THAT MAY REVISE THE DESIGN WITH ARCHITECT / ENGINEER PRIOR TO PROCEEDING. 5. CONTRACTOR IS RESPONSIBLE TO REPLACE AND/OR REPAIR ANY DAMAGES TO THE EXISTING LANDSCAPE, IRRIGATION, POWER AND/OR HARDSCAPE. 6. ANY UNSUITABLE MATERIAL ON SITE IS TO BE QUANTIFIED BY A GEOTECHNICAL ENGINEER, PRIOR TO REMOVING. CONTRACTOR MUST NOTIFY OWNER, OR OWNER'S REPRESENTATIVE IN CASE UNSUITABLE MATERIAL IS UNCOVERED. 7. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE NORTH CAROLINA DEPT. OF TRANSPORTATION BEFORE INSTALLATION. GRADING NOTES: 1. ALL NEW CONTOURS AND SPOT ELEVATIONS ARE SHOWN AS FINISHED GRADES. THE GRADING CONTRACTOR MUST MAKE ALLOWANCES FOR THICKNESS OF PAVING SECTIONS, CONCRETE SLABS, AND 4" OF REDISTRIBUTED TOPSOIL WHEN GRADING. 2. THE ENTIRE SITE WITHIN THE LIMIT OF CONSTRUCTION SHALL BE GRADED TO DRAIN FREELY. ALL UNPAVED AREAS DISTURBED BY CONSTRUCTION, WHETHER INSIDE OR OUTSIDE OF THE LIMIT OF CONSTRUCTION, SHALL BE FINE GRADED AND SEEDED TO ESTABLISH A PERMANENT LAWN. 3. CONTRACTORS MUST COORDINATE ALL DRAINAGE STRUCTURE GRATES AND TOP ELEVATIONS SHOWN WITH ACTUAL FIELD CONDITIONS TO INSURE THAT GRATES AND TOPS ARE FLUSH WITH FINISHED GRADE. 4. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES (INCLUDING SANITARY, STORM DRAINAGE, AND WATER) FROM DAMAGE DURING CONSTRUCTION. ALL UNDERGROUND UTILITIES EXPOSED DURING CONSTRUCTION OR THOSE LEFT WITH LESS THAN ACCEPTABLE MINIMUM EARTH COVER SHALL BE RELOCATED AS DETERMINED BY THE CIVIL ENGINEER. 5. NO SLOPES SHALL BE GRADED STEEPER THAN 2:1, UNLESS INDICATED OTHERWISE INDICATED. 6. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 0 15 30 60 if 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. LUMBEE � RIVER EMC Date IRevision I By LUMBEE RIVER ELECTRIC 1/21/20 PER NCDEQ STORMWATER COMMENTS SPF MEMBERSHIP CORPORATION ALLENDALE 115kV SUBSTATION THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED 2407 NORTH TRYON ST. WITHOUT THE WRITTEN CONSENT OF ELECTRICAL MEEE CHARLOTTE, NC 28206 TELCONSULTING ENGINEERS INC. FIRM N4-37246673 FIRM NO.F-0429 FIRM LICENSE M F-0429 ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com Date: 8/15/19 Drawn By: GSB Approved: GSB Job No.: 27-142 GRADING PLAN C4mOO I I z \ U J z o � w z z w O Lj U w z z w BRYAN G. HAGLER & JANET HAGLER c� DEED BOOK 1117 PAGE 510 ~ z PIN# 1939090001007 0 1 00.0' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 2 1 � S 31'42'25" E N OOl OOl 00 a � S 37'33'45" E on. � I ANY ADDITIONAL DISTURBANCE IN THIS AREA SHALL BE FOR r LANDSCAPE MATERIALS ONLY I 5 I U O I I z I N 4 ) Q / 3 I I I I n U I I ry I I I ' I W I I 1 J V S U I I I LO / Z I � I� I 4 BRYAN G. HAGLER & JANET HAGLER I I I DEED BOOK 1117 PAGE 510 PIN# 1939090001007 ro 0��'- In 3 2t I I I 2 \ I r I� r n UO \ \ 3 I ANY ADDITIONAL DISTURBANCE l IN THIS AREA SHALL BE FOR 2 EROSION CONTROL LEGEND: SYM DESCRIPTION 1 LIMITS OF CONSTRUCTION 2 LIMITS OF DISTURBANCE 3 SEDIMENT FENCE 4 16 SEDIMENT FENCE OUTLET 5 TEMPORARY SEDIMENT DITCH CONSTRUCTION ENTRANCE (SEE DETAIL 6 SHEET C6.00) (SEE DETAIL 1 SHEET C6.01) (SEE DETAIL 4 SHEET C6.00) (SEE DETAIL 5 SHEET C6.00) GRAPHIC LOC SI -P.Ol 00 2 1 U 5 I O 1 I 4 3 J li 1 NO� I LANDSCAPE MATERIALS ONLY z \ /' U 4 / O 4 5 r 12.0' V MIN. 0 \ \ 5 > ` 3 1, 0 I r0 SF J �F LOC r LOC n N 31'4' " W LOC LOC _ CULVERT 1 I 2 ✓ I / 2 TOP: 221.70- BOTTOM: 219.05 LO 40C LOC LOC oLOC Loc LOWER MACEDONIA ROAD/ NC R0TJTE T — — 1 (W RIGHT OF WAY) 0 o � z z z z w w — z w Iw z w � z � 0 ' 50.0' 50.0 EROSION CONTROL /MAINTENANCE NOTES: A. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM NCDEQ INSPECTOR. B. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NCDEQ RULES AND REGULATIONS, AND HOKE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. C. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN AND PERMIT IS A VIOLATION OF NCDEQ RULES AND REGULATIONS, AND HOKE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. D. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. E. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. F. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10, REQUIRE ADEQUATE TERRACING. G. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR WITH NCDEQ TO DISCUSS EROSION CONTROL MEASURES. 3. INSTALL SEDIMENT FENCE, SEDIMENT FENCE OUTLETS, DIVERSION DITCHES, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPARTMENT OF AGRICULTURE, AND HOKE COUNTY. 10. SEE SHEET C6.01 - SITE DETAILS FOR TEMPORARY AND PERMANENT SEEDING SCHEDULES. Ln N N BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 LO N N SITE INFORMATION SITE SOILS: Coxville Loam (Co) Norfolk Loamy Sand (NoA) Marlboro Sandy Loam (MaA) TOTAL SITE AREA: 3.50 ac DENUDED AREA: 2.9t ac BEFORE �_o& z \R'o 0 BOB . z9519 _0 0 ADDITIONAL EROSION CONTROL AInTCC- 1) GROUND STABILIZATION' SITE AREA DESCRIPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES STABILIZATION TIME STABILIZATION TIME FRAME FRAME EXCEPTIONS 7 DAYS NONE 7 DAYS NONE SLOPES STEEPER THAN 7 DAYS IF SLOPES ARE 10' OR 3:1 LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE SLOPES FLATTER THAN (EXCEPT FOR 4:1 PERIMETERS AND HQW ZONES) "'EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE." (SECTION II.B(2)(B)) 2) BUILDING WASTES HANDLING NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 3) DISCHARGES TO FEDERALLY -LISTED WATERS REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMIT. THE PERMIT ALLOWS REDUCTION FROM THE 20 ACRE MINIMUM IF THE DIRECTOR OF DWQ DETERMINES THAT OTHER BMPS PROVIDE EQUIVALENT PROTECTION. 4) INSPECTIONS SAME WEEKLY INSPECTION REQUIREMENTS SAME RAIN GAUGE & INSPECTIONS AFTER 0.5" RAIN EVENT INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS" INSPECTION REPORTS MUST BE AVAILABLE ON -SITE DURING BUSINESS HOURS UNLESS A SITE -SPECIFIC EXEMPTION IS APPROVED. RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. ELECTRONICALLY -AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. 5) IMPLEMENTATION OF NEW PERMIT CONDITIONS PROJECTS PERMITTED UNDER THE PREVIOUS PERMIT CAN CONTINUE TO FOLLOW THE PREVIOUSLY -PERMITTED CONDITIONS. COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN FOLLOW CONDITIONS OF APPROVED APPLICATION. APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY WITH NEW PERMIT CONDITIONS. 6) CONDITIONS IN EROSION & SEDIMENTATION CONTROL PLANS - DESIGNATION ON THE PLANS WHERE THE 7 AND 14-DAY GROUND STABILIZATION REQUIREMENTS OF THE NPDES PERMIT APPLY DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH THE SURFACE -WITHDRAWAL REQUIREMENTS OF THE NPDES PERMIT ARE LOCATED. 7) BUILDING WASTES HANDLING NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES ARE AVAILABLE. EARTHEN -MATERIAL STOCKPILES LOCATED 50' FROM STORM DRAINS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 8) SEDIMENT BASINS OUTLET STRUCTURES MUST WITHDRAW FROM BASIN SURFACE UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE. USE ONLY DWQ-APPROVED FLOCCULANTS. 0 15 30 60 if 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. LUMBEE RIVER EMC �•y' xA CA i� .Y�--w /°°'��aara �1aa6ne61 THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. EROSION CONTROL /MAINTENANCE NOTES: I I z \ J Ql- w z D-1 w O Lj U w z z w BRYAN G. HAGLER & JANET HAGLER c� _D DEED BOOK 1117 PAGE 510 ~ PIN# 1939090001007 0 1 00.0' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 2 1 � 1 S 31'42'25" E 1 1 n —301 OOl OOl 00 COL .6 N s _�0-� '1 a g 373345" E �� I L-------------Q24------------ N— -- ANY ADDITIONAL DISTURBANCE I — 5 224.98 I I I 1 IN THIS AREA SHALL BE FOR r I I / 225 225.28 LANDSCAPE MATERIALS ONLY U I I O :5. .f.. j'- Q4 4 I .,r Q U 3 I � I - - U O W I I Ln r 1 OLO I f r Z I Q \ 4 U _ BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 I PIN# 1939090001007 Vn I 3 210 I I o I ANY ADDITIONAL DISTURBANCE \ IN THIS AREA SHALL BE FOR \\ J 2 LANDSCAPE MATERIALS ONLY � O pp 4 I ... '. � ` 1 1 r LOC n CULVERT 1 TOP: 221.70 J BOTTOM: 219.05 LO 7 40C _ I I z Fr w w z w Iw � w D 0 5 50.0' 0.0' LIZI _"_1 < 225.22 o z_ N 31'45'00" W _6 LOC I25.6 .. LOC o LOC LOWER MACEDONIA ROAD/ NC FkZ I a l I (W FIGHT OF WAY) I I LOC i� I� I I I N II II I U I I I I O U O oll Ln N N BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 LO N N A. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM NCDEQINSPECTOR. B. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NCDEQ RULES AND REGULATIONS, AND HOKE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. C. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN AND PERMIT IS A VIOLATION OF NCDEQ RULES AND REGULATIONS, AND HOKE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. D. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. E. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE CITY ENGINEERING DEPARTMENT. F. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10, REQUIRE ADEQUATE TERRACING. G. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDEQ. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR WITH NCDEQ TO DISCUSS EROSION CONTROL MEASURES. 3. INSTALL SEDIMENT FENCE, SEDIMENT FENCE OUTLETS, DIVERSION DITCHES, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPARTMENT OF AGRICULTURE, AND HOKE COUNTY. 10. SEE SHEET C6.01 - SITE DETAILS FOR TEMPORARY AND PERMANENT SEEDING SCHEDULES. SITE INFORMATION SITE SOILS: Coxville Loam (Co) Norfolk Loamy Sand (NoA) Marlboro Sandy Loam (MaA) TOTAL SITE AREA: 3.50 ac DENUDED AREA: 2.9t ac EROSION CONTROL LEGEND: SYM DESCRIPTION 1 LIMITS OF CONSTRUCTION 2 LIMITS OF DISTURBANCE 3 SEDIMENT FENCE 4 16 SEDIMENT FENCE OUTLET 5 TEMPORARY SEDIMENT DITCH CONSTRUCTION ENTRANCE (SEE DETAIL 6 SHEET C6.00) (SEE DETAIL 1 SHEET C6.01) (SEE DETAIL 4 SHEET C6.00) (SEE DETAIL 5 SHEET C6.00) 0 15 30 60 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. a LUMBEE RIVER EMC o'it""gttt ou t eti° p �,. C A R' THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. 1 r R V D V D d ai 8' max, Standard stre,n th fabric with wire fence b• max- extra strength fabric without wire fence Steel past Ptastic or wire ties Wire is 2 4'---=-== - ............ fence =__ = =......... .. --=------------ - -- -- =--=-----=- ----=- = around Or 8" doom & 4" farwwd al" 24" rench Ff Iter fabric 2.4" DESIGN CRITERIA Compacted sail 2 ' min ►I IN9 if its 1t� 14 - 6 typical Figure 6.20a Temporary earthen divemori dike - Coarse aggfegatd 1 0" min Wire Figure 6.2flb Tomporary gravel diversion dike lorvehicle crossing (modified from Va SWCC). fence Cross -Section View DESIGN CRITERIA Filter steel fabric RcckNJ trench Natural DRAINAGE AREA: 5 ACRES OR LESS. post and compact ground CAPACITY: PEAK RUNOFF FROM 10-YEAR STORM. VELOCITY: SEE TABLE 8.05A, PERMISSIBLE VELOCITIES FOR EROSION PROTECTION, APPENDIX 8.05. ' ■ ` ■ ' ` ` • ° F RIDGE DESIGN SIDE SLOPE: 2:1 OR FATTER ''; T��5► lapp- 3:1 OR FATTER AT POINTS WHERE CROSS 4 F TOP WIDTH: 2 FT MINIMUM min + ' rq F � ■ E• r' FREEBOARD: 0.3 FT MINIMUM ' °' r ' $" SETTLEMENT: 10% OF TOTAL FILL HEIGHT MINIMUM .. ■ + min +� ° .+ e0* „4e CHANNEL DESIGN SHAPE: PARABOLIC, TRAPEZOIDAL, OR V-SHAPED a e° to a'.' ■ *a SIDE SLOPE: 2:1 OR FATTER r--t 3:1 OR FATTER WHERE VEHICLES CROSS ENSURE THE DRAINAGE AREA IS NOT GREATER THAN 1/4 ACRE PER 100 FEET OF FENCE. THIS IS THE MAXIMUM DRAINAGE AREA WHEN THE SLOPE IS LESS THAN 2 PERCENT. WHERE ALL RUNOFF IS TO BE STORED BEHIND THE FENCE, ENSURE THE MAXIMUM SLOPE LENGTH BEHIND A SEDIMENT FENCE DOES NOT EXCEED THE SPECIFICATIONS SHOWN IN TABLE 6.62A. THE SHORTER SLOPE LENGTH ALLOWED FOR STEEPER SLOPES WILL GREATLY REDUCE THE MAXIMUM DRAINAGE AREA. FOR EXAMPLE, A 10-20% SLOPE MAY HAVE A MAXIMUM SLOPE LENGTH OF 25 FEET. FOR A 100-FOOT LENGTH OF SEDIMENT FENCE, THE DRAINAGE AREA WOULD BE 25 FT X 100 FT. = 2500 SQ. FT., OR 0.06 ACRES. TABLE 6.62A MAXIMUM SLOPE LENGTH AND SLOPE FOR WHICH SEDIMENT FENCE IS APPLICABLE SLOPE SLOPE LENGTH (FT.) MAXIMUM AREA (F7) <2% 100 10,000 2 T 5% 75 7,500 5-10% 50 5,000 10-20% 25 2,500 >20% 15 1,500 • MAKE THE FENCE STABLE FOR THE 10-YEAR PEAK STORM RUNOFF. • ENSURE THAT THE DEPTH OF IMPOUNDED WATER DOES NOT EXCEED 1.5 FEET AT ANY POINT ALONG THE FENCE. • IF NON -EROSIVE OUTLETS ARE PROVIDED, SLOPE LENGTH MAY BE INCREASED BEYOND THAT SHOWN IN TABLE 6.62A, BUT RUNOFF FROM THE AREA SHOULD BE DETERMINED AND BYPASS CAPACITY AND EROSION POTENTIAL ALONG THE FENCE MUST BE CHECKED. THE VELOCITY OF THE FLOW AT THE OUTLET OR ALONG THE FENCE SHOULD BE IN KEEPING WITH TABLE 8.05D, APPENDIX 8.05. OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. • PROVIDE A RIP RAP SPLASH PAD OR OTHER PROTECTION DEVICE FOR ANY POINT WHERE FLOW MAY OVERTOP THE SEDIMENT FENCE, SUCH AS NATURAL DEPRESSIONS OR SWALES. ENSURE THAT THE MAXIMUM HEIGHT OF THE THE FENCE IS PROTECTED, REINFORCED OUTLET DOES NOT EXCEED 2 FEET AND THAT SUPPORT POST SPACING DOES NOT EXCEED 4 FEET. MATERIALS • USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS PART IN TABLE 6.62b OF THE NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT OR TEMPERATURE RANGE OF 0° TO 120' F. • ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.25LB/LINEAR FT. MINIMUM STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. • FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN WIRE MESH SUPPORT FENCE IS USED, SPACE POST A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.62a). 8. PLACE 12 INCHES OF FABRIC ALONG THE BOTTOM SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT.THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. INSTALLATIONS SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST 1 FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH LEVEL IF NECESSARY. 2. INSTALL POST 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON DOWNSTREAM SIDE IF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE (3) TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND END POST AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE • INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. • SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. • REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND T REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. • REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SEDIMENT FENCE 6 NOT TO SCALE GRADES EITHER A UNIFORM OR A GRADUALLY INCREASING GRADE IS PREFERRED. SUDDEN DECREASES IN GRADE ACCUMULATE SEDIMENT AND SHOULD BE EXPECTED TO CAUSE OVERTOPPING. A LARGE INCREASE IN GRADE MAY ERODE. OUTLET DESIGN THE OUTLET TO ACCEPT FOW FROM THE DIVERSION PLUS ANY OTHER CONTRIBUTING AREAS. DIVERT SEDIMENT -LADEN RUNOFF AND RELEASE THROUGH A SEDIMENT -TRAPPING DEVICE (PRACTICE 6.60, TEMPORARY SEDIMENT TRAP AND PRACTICE 6.61, SEDIMENT BASIN). FLOW FROM UNDISTURBED AREAS CAN BE DISPERSED BY A LEVEL SPREADER (PRACTICE 6.40, LEVEL SPREADER). SMALL DIVERSIONS WHERE THE DIVERSION CHANNEL GRADE IS BETWEEN 0.2 AND 3%, A PERMANENT VEGETATIVE COVER IS REQUIRED. A PARABOLIC CHANNEL AND RIDGE 1.5 FEET DEEP AND 12 FEET WIDE MAY BE USED FOR DIVERSIONS WITH FOWS UP TO 5 cfs. THIS DEPTH DOES NOT INCLUDE FREEBOARD OR SETTLEMENT. SIDE SLOPES SHOULD BE 3:1 OR FATTER, AND THE TOP OF THE DIKE MUST BE AT LEAST 2 FEET WIDE. CONSTRUCTION SPECIFICATIONS AND MAINTENANCE 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFCIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. �LTi►Is] 9 INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. CORNER EXTENSION ARM WITH 45° ANGLE T a TEMPORARY DIVERSION DITCH NOT TO SCALE 2500 PSI CONCRETE AT 28 DAYS WITH MAXIMUM AGGREGATE OF 1 INCH. Y� 12" TYP. CHAIN LINK FENCE DETAIL NOT TO SCALE l The distance such that paints A and B are of equal elevation A B f Figure B.83a Space check darns In a charnel so that the cress a! downstream clam is at einvation of the toc of upstream darn 9" min f Figure 6.06e Griivel en Irance/exit keeps sediment from leaving the construction site (modified from Va SWC.0). DESIGN CRITERIA AGGREGATE SIZE -USE 2-3 INCH WASHED STONE DIMENSIONS OF GRAVEL PAD - THICKNESS: 6INCHES MINIMUM WIDTH: 12-FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER. LENGTH: 50-FEET MINIMUM LOCATION -LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES (FIGURE 6.06A). AVOID STEEP GRADES, AND ENTRANCES AT CURVES IN PUBLIC ROADS. WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. AWASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. �LTir_v►rra►r_1►Is] 9 MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. BARBED WIRE CONSISTING OF 2 STRANDS OF 12-1/2 USWG GALVANIZED STEEL WIRE WITH 4-POINT BARBS AT MAXIMUM SPACING OF 5 INCHES APART. VANISED TOM TENSION CONSTRUCTION ENTRANCE NOT TO SCALE EXTENSION ARM GALVANISED 23/8" LINE POST (ASTM A53 GRADE FINISHED GRADE EXTENSION ARMS FINISHED GRADE 2500 PSI CONCRETE AT 28 DAYS WITH MAXIMUM AGGREGATE OF 1 INCH. 24" TYP THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. rrFt'��' {:lpTt1 Plan View 12' of NCDOT #5 or #57 mashed stutros Iff Ckm B Rlprap 2' max. of t center Filter Cidth * r .� 4' to 6' Cross -Section View Figure 6.83b Slane check dam stone should be placed over the channel banks to steep water from culling Mound Iheft rya rtt DESIGN CRITERIA THE FOLLOWING CRITERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: • THE DRAINAGE AREA IS LIMITED TO ONE HALF ACRE. • KEEP A MAXIMUM HEIGHT OF 2 FEET AT THE CENTER OF THE DAM. • KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES AT NATURAL GROUND ELEVATION. • KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER. • ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM (FIGURE 6.83a) • STABILIZE OUTFLOW AREAS ALONG THE CHANNEL TO RESIST EROSION. • USE NCDOT CLASS B STONE AND LINE THE UPSTREAM SIDE OF THE DAM WITH NCDOT #5 OR #57 STONE. • KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUTMENTS A MINIMUM OF 1.5 TO AVOID WASHOUTS FROM OVERFLOW AROUND THE DAM. CONSTRUCTION SPECIFICATIONS 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATRUAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK (FIGURE 6.83b) TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS TABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES. • INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. • ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS) • REMOVE SEDIMENT ACCUMULATED BEHIND DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 3 CHECK DAM NOT TO SCALE SUBGRADE, 6" t- MIRAFI 140N GEOTEXTILE FABRIC OR APPROVED EQUAL. 6" WASHED #57 STONE 0-97���EL AREA DETAIL LUMBEE RIVER EMC Date Revision By LUMBEE RIVER ELECTRIC 1/21/20 PER NCDEQSTORMWATER COMMENTS SPF MEMBERSHIP CORPORATION ALLENDALE 115kV SUBSTATION 2407 NORTH TRYON ST. CHARLOTTE, NC 28206 TEL: 704.372.6673 NEE FIRM NO.F.0429 ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com FIRM LICENSE #: F-0429 "4844!t Date: 8/15/19 Drawn By: GSB Approved: GSB Job No.: 27-142 SITE DETAILS C6m00 W TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER TEMPORARY SEEDING RECOMMENDATIONS FOR FALL Place posts TABLE 6.10A TABLE 6.10B TABLE 6.10C �— 4' 8' max at low points SEEDING MIXTURE SEEDING MIXTURE SEEDING MIXTURE max SPECIES RATE (LB/ACRE) SPECIES RATE (LB/ACRE) SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 GERMAN MILLET 40 RYE (GRAIN) 120 — - — - - — - — - — - — - - — - - �A ANNUAL LESPEDEZA 50 A (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS) (IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SEEDING DATES 1' max 1.5' SUBSTITUTED AT A RATE OF 50 LB/ACRE.) v \M 1„ OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND MOUNTAINS AUG. 15 - DEC. 15 w. ��% �" BEYOND JUNE. SEEDING DATES COASTAL PLAIN AND PIEDMONT AUG. 15 - DEC. 30 5' SEEDING DATES MOUNTAINS MAY 15 - AUG. 15 SOIL AMENDMENTS Dui "' ` y� . t t. '�' , ��, «Ji •`�� Orr `��� MOUNTAINS ABOVE 2500 FEET: FEB. 15 - MAY 15 PIEDMONT MAY 1 - AUG. 15 5' min BELOW 2500 FEET: FEB. 1- MAY 1 COASTAL PLAIN APR. 15 -AUG. 15 FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND ' PIEDMONT JAN. 1 - MAY 1 1,000 LB/ACRE 10-10-10 FERTILIZER. COASTAL PLAIN DEC. 1 -APR. 15 SOILAMENDMENTS Figure 6.62c Perspective of reinforced, stabilized outlet for sediment fence. MULCH SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE DESIGN CRITERIA AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH USED AS A MULCH ANCHORING TOOL. THE FOLLOWING CRITERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, MAINTENANCE . SET OUTLET ELEVATION SO THAT WATER DEPTH CANNOT EXCEED 1.5 FT. AT THE LOWEST POINT APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE ALONG THE FENCELINE. OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE . SET FABRIC HEIGHT AT 1 FT. MAXIMUM BETWEEN SUPPORT POSTS SPACED NO MORE THAN 4FT. USED AS A MULCH ANCHORING TOOL. OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTENT TEMPORARY COVER BEYOND APART. INSTALL A HORIZONTAL BRACE BETWEEN THE SUPPORT POSTS TO SERVE AS AN OVERFLOW MAINTENANCE JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR WEIR AND TO SUPPORT TOP FABRIC. PROVIDE A RIPRAP SPLASH PAD AS SHOWN IN FIGURE 6.62C MAINTENANCE KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. 0 EXCAVATE FOUNDATION FOR SPLASH PAD A MINIMUM OF 5 FT. WIDE, 1 FT. DEEP, AND 5 FT. LONG ON REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH LEVEL GRADE. THE AREA AROUND THE PAD MUST BE STABLE. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. CONSTRUCTION SPECIFICATIONS 1. DIG A TRENCH APPROXIMATELY 8 INCHES DEEP AND 4 INCHES WIDE, OR AV -TRENCH, IN THE LINE OF THE SILT FENCE. 2. DRIVE POSTS SECURELY, AT LEAST INCHES INTO GROUND, ON THE DOWNSLOPE SIDE OF THE TRENCH. SPACE POSTS A MAXIMUM OF 8 FT. IF FENCE IS SUPPORTED BY WIRE, 6 FT. IF EXTRA -STRENGTH FABRIC IS USED WITHOUT SUPPORT WIRE. ADJUST SPACING TO PLACE POSTS AT LOW POINTS ALONG THE FENCELINE. 3. FASTEN SUPPORT WIRE FENCE TO UPSLOPE SIDE OF POSTS, EXTENDING 6 INCHES INTO THE TRENCH. SEEDING 4. ATTACH CONTINUOUS LENGTH OF FABRIC TO UPSLOPE SIDE OF FENCE POSTS. AVOID JOINTS, �NO����ORARY PARTICULARY AT LOW POINTS IN THE FENCE LINE. WHERE JOINTS ARE NECESSARY, FASTEN FABRIC SECURELY TO SUPPORT POSTS AND OVERLAP TO THE NEXT POSTS. MAINTENANCE • INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. • SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. PERMANENT SEEDING RECOMMENDATIONS FOR PRIMARY STABILIZATION • REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE (NON-NATIVE SPECIES) NEXT RAIN AND T REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. SEEDING MIXTURE • REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO SPECIES RATE (LB/ACRE) GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY KY 31 TALL FESCUE 100 STABILIZED. BERMUDA GRASS 25 SEEDING DATES PIEDMONT KY 31 TALL FESCUE SEPT. 1 - APR. 15 BERMUDA GRASS APR. 15 - JUN. 30 COASTAL PLAIN KY 31 TALL FESCUE SEPT. 30 - MAR. 15 BERMUDA GRASS APR. 15 - JUN. 30 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF A SOIL TEST. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PERMENANT SEEDING MENT FENCE OUTLET 2 &!�Tl NOT TO SCALE es�ee�arr�y��/eeao°ff A LUMBEE W 6161_? ���` RIVER EMC ` �o - �f B°,��aetCeann&"''0 !! Date Revision By LUMBEE RIVER ELECTRIC Date: 8/15/19 1/21/20 PER NCDEQSTORMWATER COMMENTS SPF MEMBERSHIP CORPORATION Drawn By: GSB Approved: GSB ALLENDALE 115kV SUBSTATION Job No.: 27-142 SITE DETAILS THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED 2407 NORTH TRYON ST.� CHARLOTTE, NC 28206 WITHOUT THE WRITTEN CONSENT OF ELECTRICAL 4.F-042973 C6m01 CONSULTING ENGINEERS INC. FIRTELM N FIRM NO.F-0429 FIRM LICENSE M F-0429 ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A 0 O O 0 SANDBAGS (TYP.) 0 0 OR STAPLES 10 MIL 0 SILT FENCE 1:1 PLASTIC SANDBAGS (TYP.) SIDESLOPE LINING OR STAPLES (TYP) 0 0 0 0 oD a - A 0' HIGH MIN COHESIVE & B LOW FILTRATION SOIL BERM T7 0 O O O I 0 0 0 -2 0 0 10� C-)a CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN &CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT PLAN SANDBAGS (TYP.) OR STAPLES 10 MIL HIGH COHESIVE & PLASTIC LINING LOW FILTRATION -1:1 SIDE SLOPE SOIL BERM (TYP.) SECTION B-B NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. &CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 LUMBEE RIVER EMC �`�e,��ee+laryn eroor►,� \ A C A f gN, its`+� `• .......... f...." 'Y9'A(J ++ I20 THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. 1l_1:4911 PART III PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the a-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated . A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR . Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions o Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 LUMBEE RIVER EMC %S It 1%?2411 P to orFPO �11 \ A C A f ,FPO, o 03 5165) IIZ tl20 THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 1 z I� L J z w w w w u: w w w U) z w � w w c3' ry- w w � 100.0' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 S 37' 33' 45" E w w 50.0' TREES KEY QUANTITY BOTANICAL NAME COMMON NAME SIZE ROOT REMARKS ACRU 11 ACER RUBRUM'OCTOBER GLORY' 'OCTOBER GLORY' RED MAPLE 2.5" CAL. B & B MATCHED SPECIMEN LAIN 11 LAGERSTROEMIA INDICA'NATCHEZ' 'NATCHEZ' CRAPE -MYRTLE 2.5" CAL. B & B MATCHED SPECIMEN SHRUBS KEY QUANTITY BOTANICAL NAME COMMON NAME MIN. HEIGHT/SPREAD MIN. ROOT REMARKS LIGU 325 LIGUSTRUM JAPANICUM JAPANESE LIGUSTRUM 30" HT/30" SPREAD 5 GAL. MATCHED SPECIMEN GROUNDCOVER KEY QUANTITY BOTANICAL NAME COMMON NAME MIN. HEIGHT/SPREAD MIN. ROOT REMARKS SEED 95,975 BERMUDA/FESCUE MIX 'ALL DISTURBED AREAS NOT COVERED BY PLANT MATERIAL TO BE SEEDED WITH TALL FESCUE/ BERMUDA MIX' BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 S 31'42'25" E BRYAN G. HAGLER & JANET HAGLER DEED BOOK 1117 PAGE 510 PIN# 1939090001007 PLANTING NOTES: 1. MINIMUM TREE SIZE AT PLANTING IS 2-INCH CALIPER (FOR SINGLE STEM TREES). SMALL MATURING MULTI -STEM TREES MUST BE TREE FORM, MAXIMUM 3 TO 5 TRUNKS, AND MINIMUM 8 FEET TALL. 2. UNLESS APPROVED BY COUNTY STAFF ALL REQUIRED TREES MUST HAVE SINGLE STEM TRUNKS WITH NO CO -DOMINANT TRUNKS BRANCHES. TREE TRUNKS SHALL BE STRAIGHT IN FORM AND FREE OF DAMAGE OR CRACKS. PRUNING CUTS SHALL BE CALLUSED OVER. BRANCH LENGTH SHALL BE TYPICAL FOR THE TREES AGE AND NOT BE BROKEN, DISEASED OR INJURED. ROOT FLARE SHALL BE LOCATED AT GRADE AND BE FREE FROM EXCESSIVE ADVENTITIOUS ROOT GROWTH. 3. ALL STRAPPING AND TOP X OF WIRE BASKET MUST BE CUT AWAY AND REMOVED FROM ROOT BALL PRIOR TO BACKFILLING PLANTING PIT. REMOVE TOPY OF THE BURLAP FROM ROOT BALL. 4. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 24" NEW TOPSOIL, OR TILL AND AMEND THE TOP 24" OF EXISTING SOIL TO MEET TOPSOIL/ PLANTING MIX STANDARDS FOR TREES WITHIN ENTIRE MINIMUM AREA OF 274 SQUARE FEET PER TREE. 5. LARGE MATURING TREES MAY NOT BE PLANTED WHERE THERE ARE OVERHEAD DISTRIBUTIONS OR TRANSMISSION LINES. IF TREES CONFLICT WITH POWER LINES OR SIGNS, CALL COUNTY SPECIALIST TO RESOLVE BEFORE PLANTING. 6. SITE LIGHTING MUST BE A MINIMUM THIRTY (30) FEET AWAY FROM A TREE. IF PEDESTRIAN SCALE LIGHTING IS BEING USED, THEN LIGHTING MUST BE A MINIMUM OF FIFTEEN (15) FEET AWAY FROM A TREE, UNLESS APPROVED OTHERWISE BY THE COUNTY. SHOW SITE LIGHTING PLAN. 7. ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15, FROM ALL UNDERGROUND UTILITIES (GAS, WATER, PHONE, AND ELECTRICAL LINES.) 9. ATTENTION LANDSCAPER: NOTIFY LANDSCAPE ARCHITECT OF ANY SIGN, POWER LINE, OR OTHER CONFLICTS BEFORE PLANTING NEW TREES. 12. ALL LANDSCAPE MATERIALS SHALL BE IN ACCORDANCE WITH THE'AMERICAN STANDARD FOR NURSERY STOCK' AND SHALL BE INSPECTED PRIOR TO PLANTING. 13. CONTRACTOR IS RESPONSIBLE TO REVIEW ALL UTILITY LOCATIONS PRIOR TO EXCAVATION OR MATERIAL INSTALLATION. 14. CONTRACTOR IS RESPONSIBLE FOR SOIL PREPARATION, ADDITIVE OF NUTRIENT AND FERTILIZATION PER TESTING AS OUTLINED IN SPECIFICATIONS. 15. IF ANY DISCREPANCIES OCCUR BETWEEN QUANTITIES OF MATERIAL SHOWN ON THE PLAN AND QUANTITIES LISTED IN THE PLANT LIST, THE QUANTITIES GRAPHICALLY SHOWN ON THE PLAN SHALL TAKE PRECEDENCE. 16. SOIL AMENDMENTS SHALL BE UNIFORMLY SPREAD AND ROTOTILLED INTO SOIL PER SPECIFICATIONS. 17. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY SOIL CONDITIONS THE CONTRACTOR CONSIDERS DETRIMENTAL TO PLANT GROWTH. 18. ALL PLANT BEDS AND NEW TREES SHALL BE MULCHED WITH 3" THICK LAYER OF DOUBLE HAMMERED HARDWOOD MULCH. 19. CONTRACTOR IS RESPONSIBLE FOR THE SOIL PREPARATION AND SEEDING OF ALL NEW LAWN AND DISTURBED EXISTING LAWN AREAS. 20. IN ADDITION TO THE SOIL MIXTURE, LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ANY NECESSARY SOIL AMENDMENTS, AS INDICATED BY SOIL TESTS, AS WELL AS, AN ADEQUATE DRAINAGE SYSTEM FOR PLANTING BEDS. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN ENVIRONMENT SUITABLE FOR THE GROWTH OF HEALTHY PLANT MATERIAL. REFER TO PLANTING DETAILS FOR INFORMATION ON PLANTING BED PREPARATIONS. 21 ALL PLANT MATERIAL MUST BE PLANTED IN CORRELATION WITH THE APPROPRIATE GROWING SEASON OF INDIVIDUAL PLANT REQUIREMENTS. SOME PERENNIALS MAY REQUIRE A SPRING PLANTING IN ORDER TO SURVIVE A FULL WINTER DORMANCY. 22. PROVIDE QUALITY, SIZE, GENUS, SPECIES AND VARIETY OF EXTERIOR PLANTS INDICATED, COMPLYING WITH APPLICABLE REQUIREMENTS IN ANSI 260.1, 'AMERICAN STANDARD FOR NURSERY STOCK' 23. IT IS THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO UNDERSTAND THE OVERALL CONSTRUCTION SCHEDULE AND PLAN PLANT DIGGING AND INSTALLATION ACCORDINGLY. IF THE LANDSCAPE CONTRACTOR IS REQUIRED TO RETURN TO THE SITE AT A LATER DATE DURING AN APPROPRIATE PLANTING SEASON, IT SHALL BE AT NO COST TO THE OWNER. LANDSCAPE CONTRACTOR WILL BE RESPONSIBLE TO REPAIR ANY DAMAGE CAUSED TO LAWNS, EXISTING LANDSCAPING OR PAVEMENTS AT NO COST TO THE OWNER. PLANTING CALCULATIONS: BUFFER REQUIREMENTS: HOKE COUNTY ZONING ORDINANCE, SECTION 5.3, D - MINIMUM TEN (10) FOOT WIDE BUFFER AREA WITH A TWO (2) FOOT TALL EVERGREEN HEDGE EXPECTED TO BE OPAQUE AND REACH A MINIMUM HEIGHT OF FIVE (5) FEET WITHIN THREE (3) YEARS. REQUIRED: 10' WIDE BUFFER WITH 2 FOOT TALL EVERGREEN HEDGE PROVIDED: 10' WIDE BUFFER WITH 2 FOOT TALL EVERGREEN HEDGE STREET YARD REQUIREMENTS: HOKE COUNTY ZONING ORDINANCE, SECTION 5.4, C - THE MINIMUM LANDSCAPING REQUIREMENT FOR A STREET YARD IS TWO (2) LARGE TREES, TWO (2) SMALL OR INTERMEDIATE TREES, AND FOURTEEN (14) SHRUBS PER ONE HUNDRED (100) LINEAR FEET. 503t LF ALONG LOWER MACEDONIA ROAD = REQUIRED: 11 LARGE TREES, 11 SMALL TREES AND 70 SHRUBS PROVIDED: 11 LARGE TREES, 11 SMALL TREES AND 70 SHRUBS BEFORE O GP 6 \�0 0 BOB �0�0 W ONA ONE co, 0 15 30 60 it 1 INCH = 30 FEET CAUTION!!! The locations and elevations of existing underground utilities as shown on this drawing are only APPROXIMATE. No guarantee is either expressed or implied as to the completeness of accuracy thereof. The contractor shall be exclusively responsible for determining the exact utility locations and elevations prior to the start of construction. aujpjl nt°rfor IFA • LUMBEE 0395E RIVER EMCVIP C 0 Date Revision By LUMBEE RIVER ELECTRIC Date: 8/15/19 1/21/20 PER NCDEQ STORMWATER COMMENTS SPF MEMBERSHIP CORPORATION Drawn By: GSB Approved: GSB ALLENDALE 115kV SUBSTATION Job No.: 27-142 THE INFORMATION ON THIS DRAWING IS PROPRIETARY AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL CONSULTING ENGINEERS, INC. FIRM LICENSE M F-0429 LANDSCAPE PLAN 2407 NORTH TRYON ST. CHARLOTTE, NC28208 ■ TEL: 704-372-667673 MEEEF,R. NO.F-0429 L 1 ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com a 00 N O N O N N N N N 0 O 0- 0 w O N O N O N N 0 N N co N J NOTES: v SPACING VARIES SEE LANDSCAPE PLAN 1. REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. NOTES: 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION. 1. SCARIFY ROOT MASS OF CONTAINERIZED PLANT MATERIAL. TYP. COLLAR � slti � ,iti 3. STAKING IS REQUIRED FOR ALL TREES IN R.O.W. OR UPON REQUEST OF MIN. 2" HT. 2. INSTALL CONTAINERIZED PLANTS AT � ARBORIST. FINISHED GRADE 4" LAYER 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN A OF APPROVED MULCH LEGAL MANNER. 3. TAMP PLANTING MIX FIRMLY AS PIT IS FILLED AROUND 5. RESEED UNMULCHED, DISTURBED AREAS. EACH PLANT BALL. s� 4 6"— MIN. 4. OMIT COLLAR AROUND EACH SHRUB l 7ROOT 3/4" NYLON STRAP N WHEN IRRIGATION SYSTEM IS PRESENT. V' TRENCH AROUND 6" SLIP KNOT WITH STOP KNOT. 6" LARGER THAN TREE DIAMETER HIIIIIIIIIIII ENTIRE PLANTING BED 5. SOAK EACH PLANT BALL AND CROWN TO PIT IMMEDIATELY AFTER EDGE OF ZPLANT MIX TAMP SOIL MIX UNDER BEAT FINISH GRADE KEEP MULCH AWAY FROM TRUNK 1"TO2" PLANTING BED INSTALLATION. EACH PLANT BALL TO MINIMIZE SETTLEMENT 4" HIGH /6" WIDE MAXIMUM BERM OUTSIDE OF ROOTBALL 4" MAXIMUM LAYER OF MULCH TYPICAL PLANTING BED DETAIL 3 - 1 "x2"x18" WOOD STAKES WITH CENTERED 3/8" HOLE DRIVEN IN LINE WITH STRAP EQUALLY SPACED AROUND TREE FINISH GRADE CROWN HEIGHT IN INCHES EQUALS MEDIAN o 0 0 o TYP. WIDTH IN FEET STAGGERED TO 12" MAX. ROWS BACKFILL AS SPECIFIED REMOVE TYPICAL EXCESS SOIL FINAL o 0 o FROM ROOT CROWN y GRADE — —+ -- I REMOVE TOP 1/3 BURLAP UNDISTURBED SOIL 10" (EX.) ° ° ° AND ANY NAILS/PINS, ETC. ` ROOT BALL DIA. 12" } f---- 0' (EX.) EXISTING EQUAL SPACING —EDGE OF REMOVE TOP WIRE VARIES GRADE BETWEEN ALL PLANTS PLANTING BASKET WHERE PRESENT BED TYPICAL BED CROWNING TYPICAL PLANTING BED PLAN RAISE PIT BOTTOM TO SET ROOT CROWN AT THE CORRECT HEIGHT. FIRM SOIL UNDER ROOT BALL. ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) FOR EXAMPLE: CALIPER HEIGHT (RANGE) MAX. HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH 2" 12-14' 16' 24" 16" 3" 14-16' 18' 32" 21" TREE PLANTING (FOR SINGLE AND MULTI -STEM TREES) BP LANTING DETAIL 2 TREE PLANTING DETAIL NOT TO SCALE 1 NOT TO SCALE ill fit ����� ++,�glttyttlt 0 • .ems, s LUMBEE 039 65 �. ��-= RIVER EMC :.., `d I 41 ass` -'0 d ,eAd /A6169�e Date Revision By LUMBEE RIVER ELECTRIC Date: 8/15/19 Drawn By: GSB MEMBERSHIP CORPORATION Approved: GSB Job No.: 27-142 ALLENDALE 115kV SUBSTATION LANDSCAPE DETAILS THE INFORMATION ON THIS DRAWING IS PROPRIETARY 2407 NORTH TRYON ST. CHARLOTTE, NC M"EEEF,R. AND IS NOT TO BE USED, REPRODUCED, OR COPIED WITHOUT THE WRITTEN CONSENT OF ELECTRICAL 6728206 4-372-6673 Ll 0 CONSULTING ENGINEERS INC. N O.F-0429 ■ FIRM LICENSE M F-0429 ELECTRICAL CONSULTING ENGINEERS www.ECEpower.com