Loading...
HomeMy WebLinkAboutSW6191004_SuppEZ-2018-Version-2.1.1_rev01_SW6191004_1/22/2020SUPPLEMENT-EZ COVER PAGE FORMS LOADED INFORMATION act Name Wetland Area Water Area (e this project High or Low Density? )es this Droiect use an off -site SCM? MULTIPURPOSE TRAINING FACILITY, SOTF figh No COMPLIANCE WITH 02H .1003(4 7 Width of ve etated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1003 4 c-d out of the setback? 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 2 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Dan Saltsman, PE 28 Organization: Stantec 29 Street address: 801 Jones Franklin Rd, Suite 300 30 City, State, Zip: Raleigh, NC 27606 31 Phone numbers : 919-532-2331 32 Email: dan.saltsman@stantec.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer CAROZ/' \ �p .oF�Ssio/� 'L SEAL 44924 = GINESeal- ���'�� �a / - Signature of Designer 1/16/2020 Date DRAINAGE AREAS 1 1Is this a hiah densitv oroiect? 2 If so, number of drainage areas/SCMs Is all/part of this project subject to previous rule 3 versions? FORMS LOADED Yes 2 No DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Total BUA in project (sq ft New BUA on subdivided lots (subject to permitting) (sq ft Infiltration Basin Infiltration Basin 5 37662 sf 6 11282 sf 26380 sf 6045 sf 7 New BUA outside of subdivided lots (subject to ermittin s 37662 sf 8 Offsite - total area (sq ft 4261 sf 9 Offsite BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft - Sidewalk (sq ft - Roof (sq ft 13137 sf 2352 sf 10785 sf - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft 24525 sf 8930 sf 15595 sf 11 New infiltrating permeable pavement on subdivided lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 13permitting) Exisitng BUA that will remain (not subject to s ft Existing BUA that is already permitted (sq ft 14 15 Existing BUA that will be removed s ft 16 Percent BUA 24% 17 Design storm inches 1 in 18 Design volume of SCM cu ft 3487 cf 19 Calculation method for design volume Simple ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): Note Line Item #18 Design Volume is considered the required volume for each drainage area/the site. 36% 27% 1 in 1 in 976 cf 2381 cf Simple Simple INFILTRATION SYSTEM 1 1Drainage area number 1 2 2 IDesign volume of SCM (cu ft) 976 cf 2381 cf SENERAL MDC FROM 02H .1050 . 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-yearstorm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewaterina the SCM for maintenance? Pump (preferred) Pump (preferred) 1 u I IT appucaoie, vwu me ouiv1 oe cteanea our arrer construction r 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? If the SCM is on a single family lot, does (will?) the plat comply with General MDC 13 (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC (12)? 16 1 Does the SCM follow the device specific MDC? Yes Yes 17 lWas the SCM designed by an NC licensed professional? Yes Yes INFILTRATION SYSTEM MDC FROM 02H .1051 18 Proposed slope of the subgrade surface (%) 0% 0% 19 jAre terraces or baffles provided? No No 20 IType of pretreatment: Other Other I soils [)Ora 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes Yes 22 SHWT elevation (fmsl) >237.75 219.16 23 Depth to SHWT per soils report (in) >93 64.00 24 Ground elevation at boring in soils report (fmsl) 240.83 225.25 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet. 26 ISoil infiltration rate (in/hr) 3.30 2.02 27 1 Factor of safety (FS) (2 is recommended): 2.00 2.00 I Elevaflnns 29 Bottom elevation (fmsl) 240.83 ft 223.77 ft 30 IStorage elevation (fmsl) 244.50 ft 224.67 ft 31 1 Bypass elevation (fmsl) 244.50 ft 224.67 ft For Basins Only 32 Bottom surface area, ft2: 724 ft 2855 ft 33 IStorage elevation surface area (ft2) 1216. ft 2855. ft For Trenches Only 36 1 Perforated pipe diameter, if applicable (inches) N/A 37 Number of laterals N/A 38 ITotal length of perforated piping N/A 39 IStone tvoe. if applicable #57. Washed 411 lis stone Tree oT Tines! Yes 42 Is the stone wrapped in geotextile fabric? Yes 43 Has at least one infiltration port been provided? Yes Volumes/Drawdown 44 Design volume of SCM (cu ft) 976 cf 2381 cf rmase use inls space to provlae any aaa¢Iona1 Inrormanon aooui me InT1¢rarlon 46 system(s): Note: Design Volume of SCM is the calucated required volume for water quality.See attached O+M letter for Ft. Bragg compliance. Line 24 reflects the elevation at which the infiltration tests were performed, for surface elevation of SHWT add the depth from Line 23 to the SHWT elevation in Line 22. Infiltration 3 2:04 PM 1/16/2020