Loading...
HomeMy WebLinkAboutSW4191201_17-116 - SuppEZ-2018-Version-2.1.1 2_1/2/2020SUPPLEMENT-EZ COVER PAGE f•ORMSLOADE❑ PROJECT INFORMATION 1 jProject Name Lewisville Middle School i 66.21 2 lProiect Area ac 3 Coastal Wetland Area ac 0 1.28 4 Surface Water AreaLac) 5 Is this project H' h or Low Density? Hi h 6 Does this project use an off -site SCM? No COMPLIANCE WIT..'02H .1 _ S 4}. f ve etated setbacks rovided feet 30 T7d ve etated setback remain ve etated? Yes otherthat as listed in ,1003 4 c-d out of the setback? Yes mbank stabilization proposed on this project? Yes NUMBER AND TYPE OF SCMs: 11 Infiltration S stem 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 1 15 Permeable Pavement 0 16 Sand Filter _ 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level S reader -Filter Stri LS-FS 0 20 Disconnected Impervious Surface DIS 0 21 Treatment Swale 0 22 IDry Pond _ 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Kenneth Lorin - Principal 28 Organization: CLH Design PA 29 Street address: 400 Regency Forest Drive. Suite 120 30 City, State, Zip: Cary, NC 31 Phone numbers : 919-319-6716 32 Email: 27518 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 'fes IL N r. SEAL 23953 - P nature of Designer Date /z- 3 49 DRAINAGE AREAS hi h densit roject? Yes number of draina a areas/SCMs Fa 2 part of this project subject to previous rule ns? No FORMS LOADED p1AINAGE AREA INFORMATION M re Sike 1 4 Type of SCM NIA WET POND WETLAND 5 Total BUA in pLoject (sq It) 388943 sf 349943 sf 32979 sf 6 New BUA on subdivided lots (subject to ermittin s ft NIA N/A NIA 7 New BUA outside of subdivided lots (subject to ermittin sf 382❑98 sf 349119 sf 32979 sf 8 Offsite • total area (sq ft 0 19602 sf 0 9 Offsite BUA Lsq ft 0 0 0 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 105490 sf 105490 of 0 Sidewalk (sq ft 25206 sl 23189 sf 2017 sf Roof sa ft 62264 sf 62264 sf 0 Roadwa s it) 121582 sf 93234 sf 28348 sf Future (sq It) 11326 sf 8712 sf 2614 sf Other, please specify in the comment box below (sq ft 56230 sf 58230.sf 0 11 New infiltrating permeable pavement on subdivided lots (sq ft 0 ❑ 0 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 0 0 0 13permitting) Exisitng BUA that will remain (not subject to s ft 8021 sf 824 sf 0 14 Existing BUA tltal is already permitted Jsq ft 0 0 0 15 Existing BUA that will be removed s ft 24871 sf 23202 sf 284 sf 16 Percent BUA 14% 43% 37'/e 17 Design storm inches NIA 1 In 1 In 18 Design valume of SCM cu ft N(A 29521 cf 2822 cf 19 Calculation method for design volume N/A HRT (Rain Do Ih}(Rv}jDA} APOITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): "Other" BUA includes gravel fire lane and `rook dust" track WET POND 1 Drainage area number 1 2 Design volume of SCM (cu fto 29521 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the design volume? What is the method for dewatering the SCM for maintenance? No 7 Yes Yes 8 9 Drawdown Orifice Yes 10 If applicable, will the SCM be cleaned out after construction? 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes No Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Is there an O&M Agreement that complies with General MDC (11)? Is there an O&M Plan that complies with General MDC (12)? 141 15 Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? WET PONE? MDC FROM 02H .1053 18 Method used 19 Has a stage/storage table been provided in the calculations? Elevation of the excavated main pool depth (bottom of sediment 201removal) (fmsl) 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 22 Elevation of the bottom of the vegetated shelf (fmsl) 23 Elevation of the permanent pool (fmsl) Yes HRT Yes 822.50 823.00 826.00 826.50 827.00 24 Elevation of the top of the vegetated shelf (fmsl) 25 Elevation of the temporary pool (fmsl) 828.50 26 Surface area of the main permanent pool (square feet) 30040:1 87015 cf 27 Volume of the main permanent pool (cubic feet) 28 Average depth of the main pool (feet) 3.13 ft 29 Average depth equation used Equation 3 30 If using equation 3, main pool perimeter (feet) 796.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 32 Volume of the forebay (cubic feet) 14313 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 6 in 35 Design volume of SCM (cu ft) 29521 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 3 in 38 If weir, weir height (inches) N/A 39 If weir, weir length (inches) N/A 40 Drawdown time for the temporary pool (days) 3.8 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes et A -re berms or baffles provided to improve the flow patIV No 2:57 PM 12/3/2019 WET POND Depth of forebay at entrance (inches) 54 in r45 Depth of forebay at exit (inches) 54 in Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 49 Yes No 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) Is a trash rack or other device provided to protect the outlet system? Are the dam and embankment planted in non -clumping turf grass? 51 Yes 52 Yes 53 L4 Species of turf that will be used on the dam and embankment No Mow Seed Mix as a planting plan been provideprovidea for the vegetate shelf? es ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): Wet Pond 4 2:57 PM 12/3/2019 STORMWATER WETLAND 1 Drainage area number 2 1 Design volume of SCM (cu it) 3ENERAL MDC FROM 02H .1050 2 T 2822 cf Is the SCM sized to treat the SW from all surfaces at build -out? 1 Is the SCM located away from contaminated soils? What are the side slopes of the SCM (H:V)? Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the design volume? What is the method for dewatering the SCM for maintenance?\ Yes 4 Yes 5 3:1 6 No 7 Yes 8 9 No Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 1 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Is there an O&M Agreement that complies with General MDC (11)? No 14 Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Was the SCM designed by an NC licensed professional? Yes 17 Yes STORMWATER WETLAND MDC FROM 02H .#054 18 jAre the inlet(s) and outlet located in a manner that avoids short-circuiting? 19 jAre berms or baffles provided to improve the flow path? Yes Yes 20 Does the orifice drawdown from below the top surface of the permanent pool? Yes Does the wetland minimize impacts to the receiving channel from the 1-yr, 24-hr 21 storm? Yes 22 Is a trash rack or other device provided to protect the outlet system? Yes Elevations 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Elevation, peak attenuation above temporary pool (if applicable) (fmsl) Elevation, temporary pool (top of the temporary inundation zone) (fmsl) 813.00 Elevation, permanent pool (top of the shallow water zone) (fmsl) 812.00 Elevation, bottom of shallow water zone (fmsl) 811.50 Elevation, bottom of forebay deep pool at deepest point (at forebay entrance) (fmsl) Elevation, bottom of forebay deep pool at shallowest point (at forebay exit) (fmsl) 810.00 810.00 Elevation, bottom of non-forebay deep pool at deepest point (fmsl) 810.00 g Zones Area, total surface area of the SW wetland at temporary pool elev. (sq ft) 4,670.00 Area, temporary inundation zone at temporary pool elev. (sq ft) 1,710.00 Area, shallow water zone at temporary pool elev. (sq ft) 1,690.00 Area, forebay at temporary ool elev. (sq ft 680.00 Area, non-forebay deep pool at temporary ool elev .(sq ft 590.00 Percent area provided, temporary inundation zone should be 30-45% 37% Percent area provided, shallow water zone should be 35-45% 36% Percent area provided, deep pool(forebay) should be 10-15% 15% Percent area provided, deep pool (non-forebay) (should be 5-15%) 13% 2:17 PM 12/3/2019 STORM`IVATER WETLAND Depths and Outlet 39 Peak attenuation depth above temporary inundation zone (inches) 40 I -Temporary inundation zone depth temporary pool to permanent pool) (inches) 41 Shallow water zone depth(permanent pool to bottom of wetland) (inches) Depth, forebay at entrance (permanent pool to bottom of forebay entrance) 42 inches 43 Depth, forebay at exit (permanent pool to bottom of forebay exit) (inches) 44 Depth, non-forebay deep pools (permanent pool to deep pool bottom) (inches 45 If there is an orifice, diameter (inches) 46 If there is a weir, weir height inches 47 If there is a weir, weir length inches 48 Drawdown time for the temporary pool (days) ill and Plants 49 ISoil amendment depth (inches) 50 lHas a soil amendment specification been provided? 51 Has a landscaping plan that meets SW Wetland MDC (12) been provided? 52 Number of plants per 200 square feet (#) in the shallow water zone: Does the temporary inundation zone planting comply with SW Wetland MDC 53 (14)? Are the dam structure and temporary fill slopes planted in non -clumping 54 turfgrass? 55 lWill cattails be planted in the wetland? )DITIONAL INFORMATION Please use this space to provide any additional information about the 56 stormwater wetland(s): 11 in __12 in 6 in 24 in 24 in 24 in 1 in 12 in 12 in 2.2 4 in Yes Yes 50 Yes Yes go — Wetland 6 2:57 PM 12/3/2019