Loading...
HomeMy WebLinkAboutNCG160083_MONITORING INFO_20180616" STORMWATER °DIVISION �.,����, �ntt � - NCG -PERMITS PERMIT NO. 1 U IV Lc DOC TYPE ❑ HISTORICAL FILE L MONITORING REPORTS DOC DATE ❑ V YYYYMM DD Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted July 10, 2018 CERTIFICATE OF COVERAGE NO. NCG16 0 0 8 3 FACILITY NAME Martin Marietta Materials, Inc. - Matthews Plant COUNTY Mecklenburg PERSON COLLECTING SAMPLES Tom Neely LABORATORY Pace Analytical Lab Cert. # Comments on sample collection or analysis: 12 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD Q Jan -June ❑ July -Dec or ❑ Monthly' (month] DISCHARGING TO CLASS ❑ORW ❑HCIW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA *Other C PLEASE REMEMBER TO SIGN ON THE REVERSE -4 0 No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids Benchmarks =__> _ 100 mg/L or 50 mg/L 001_RE ` C �' f l� ... . L -ENTR;AL FI .'%qR 3ECTI E- 118 _ES DN 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation most be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ■❑ No discharge this period?z Outfall No. Date Sample Collected, (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> _ 15 mg/L 100 mg/L or 50 mg/L 001 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee) Permit Date,10/1/2014-9/31/2019 July 10, 2018 (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Mr. Larry J. Roberts Martin Marietta Materials, Inc. 413 S. Chimney Rock Road Greensboro, N.C. 27409 Dear Mr. Roberts: ROY COOPER Governor MICHAEL S. REGAN Secrerary WILLIAM E. TOBY VINSON, JR. Interim Direcror February 22, 2018 RECEIVED MAR 13 2018 CENTRAL FILES IDWR SECTION Subject: NPDES Stormwater Permit NCG160083 Martin Marietta Materials, Inc. Formerly Lane Construction Corporation Mecklenburg County Division personnel received your request to revise your stormwater permit Certificate of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 707-9220. State of North Carolina I Environmental Quality � Energy, Mineral, and Land Resources Central Office 1 1612 Mail Service Center I Raleigh, NC 27609 919 707 9200 Sincerely, 7d4 �- ��/ for William E. Toby Vinson, Jr., PE, CPESC, CPM Interim Director Division of Energy, Mineral and Land Resources cc: Mooresville Regional Office tormwater Permitting Program Central Files STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160083 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Martin Marietta Materials, Inc. is hereby authorized to discharge stormwater from a facility located at: Matthews Plant 1011 Sam Newell Road Matthews Mecklenburg County to receiving waters designated as a UT to Irvins Creek in the Catawba River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective February 22, 2018, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day February 22, 2018. for William E. Vinson, Jr., P.E., Interim Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission LANE r January 16, 2018 NC DEQ NPDES Permit Coverage Rescission 1612 Mail Service Center Raleigh, NC 27699-1612 RE: Lane Construction Matthews Plant To Whom It May Concern, RECEIVED BAN 24 2010 DENR-LAND QUALITY STORMWATER PERMITTING Please find enclosed applications for permit rescission and ownership change form for the above referenced plant. The Lane Construction Corporation has not operated the Matthews plant for several years. The plant, situated on property leased from Martin Marietta, was removed in July 2017. The only industrial activity remaining on the site is a recycled asphalt product (RAP) pile that belongs to a different tenant of Martin Marietta. Please transfer permit NCG 160083 from Lane Construction to Martin Marietta. If you need anything else, please do not hesitate to call. Greg Davis Environmental Coordinator Lane Construction e-nl )AWas '�,Pe The Lane Construction Corporation 8205 Wilkinson Blvd Charlotte, NG 28214 T 704-395-3264 F 704-394-5354 www.laneconstruct.com An Equal Opportunity Employer M! F/ D I V -r v Division of Energy, Mineral &Land Resources A �Al Land Quality Section/Stormwater Permitting National Pollutant Discharge Elimination System NC®ENR PERMIT NAME/OWNERSHIP CHANGE FORM Fr�•o+�exr .wo N.cw.LL Rrwuncee FOR AGENCY uSE ONLY Eate Received Year Month Day 1. Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N ,C, 'S 10 N I C I G I I 1 6 1 0 1 O 1 8 3 11. Permit status prior to requested change. a. Permit issued to (company name): Lane Construction Corporation b. Person legally responsible for permit: Timothy C Gaddy RECEIVED First MI Last Plana Manager `rifle JAN 24 207 8205 Wilkinson Blvd DENR•LAND QUALITY Permit Molder ivtailing Address STORMWATER PERMITTING Charlotte NC 28214 City State Zip (704)394-8354 (704)394-5354 Phone Fax c. Facility name (discharge): d. Facility address: e. Facility contact person: Matthews Plant 1011 Sam Newell Road Address Matthews NC 28105 City State Zip Greg Davis (704) 394-8354 First / MI / Last Phone Ill. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ® Change in ownership of the facility ❑ Name change of the facility or owner If other please explain: b. Permit issued to (company name): c. Person legally responsible for permit: d. Facility name (discharge): e. Facility address: Martin Marietta Materials, Inc. Larry J Roberts First Ml Last Division President Title 413 S. Chimney Rock Road Permit ]]older Mailing Address Greensboro NC 27409 City State Zip (336) 668-3253 larry.roberts(@,maTlinmarietta.com Phone F.-mail Address Matthews Plant 1011 Sam Newell Road Address Matthews NC 28105 City State Zip f. Facility contact person: Tom K Neely First Ml Last (704) 841-4335 tom. neely(amart inmarietta.com Phone E-mail Address IV. Permit contact information (if different from the person legally responsible for the permit) Revised Jan. 27, 2014 NPOES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 Permit contact: Richard W Broughton First MI _ Last District Environmental Services Manager Title 8451 Monticello Road Mailing Address Columbia SC 29203 City State Zip 803 978-6275 rich ard.brou hton rnartinmarietta.c Phone E-mail Address V Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) V1 Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): 1, Timothy Gaddy, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. / A- S gnature ate APPLICANT CERTIFICATION 1, Larry Roberts; attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. )) ?4AZ-- Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Energy, Mineral and Land Resources Stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Revised Jan, 27, 2014 IOIWA Aoa Division of Energy, Mineral & Land Resources , ram Land Quality Section/Stormwater Permitting Program NC®ENR National Pollutant Discharge Elimination System Na Cya Denw _ of C1IYIR ..eC -D NR UPi ft� RESCISSION REQUEST FORM FOR AGENCY USE ONLY Date Received Year Month Day Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit. 1) Enter the permit number to which this request applies: Individual Permit (or) Certificate of Coverage N I C I 5 N I C I G Q 3 Z) Owner/Facility Information: "Final correspondence will be mailed to the address noted below Owner/Facility Name Z'AAI�6- �1eti!�l Facility Contact 17�V/S� Street Address loll SA N.GJ' L D City /V/,TT`/�irJS' State Ve ZIP Code County ilE-maiIAddress IJJAJts-��wr�,ffu-r.�t Telephone No. ;7p,�,, _>% �35 Fax: 7 jay 53��y 3) Reason for rescission request (This is required information. Attach separate sheet if necessary): ❑ Facility closed or is closing on i . All industrial activities have ceased such that no discharges of stormwater are contaminated by exposure to industrial activities or materials. © Facility sold to fi�t/�lC on f ? If the facility will continue operations under the new owner it may be more appropriate to request an ownership change to reissue to permit to the new owner. ❑ Other: 4) Certification: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. - 7 Signature Date �la, r -� .fr Print or type name of person signing ab ve Title Please return this completed rescission request form to: NPDES Permit Coverage Rescission Stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 Prone: 919-807-63001 FAX: 919-807-6492 An Equal Opportunity 1 Affirmative Action Employer Division of Energy, Mineral & Land Resources Land Quality Section/Stormwater Permitting NC®ENR National Pollutant Discharge Elimination System NorrrH Gn - Pewm.�rrcr or ErMao--14--RESWR PERMIT NAME/OWNERSHIP CHANGE FORM FOR AGENCY USE ONLY Date Received Year month !Jay 1. Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N G 'S 0 N C I ;G I 1 1 6 1 0 I 0 $ 3 11. Permit status prior to requested change. a. Permit issued to (company name): Lane Construction Corporation b. Person legally responsible for permit: Timothy C Gaddy First M1 bast R'�CCI ED JAN 23 2018 �roRM�TER P uAtITYTTI c. Facility name (discharge): n�NG d. Facility address: e. Facility contact person: Plant Manager 'title 8205 Wilkinson Blvd Permit Holder Mailing Address Charlotte NC 28214 City State Zip (704) 394-8354 (704) 394-5354 Phone Fax Matthews Plant 101 1 Sant Newell Road Address Matthews NC 28105 City State Zip Greg Davis (704) 394-8354 First 1 MI 1 Last phone Ill. Please provide the following for the requested change (revised Permit). a. Request for change is a result of: ® Change in ownership of the facility ❑ Name change ofthe facility or owner If olher please explain: b. Permit issued to (company name): c. Person legally responsible for permit: d. Facility name (discharge): e. Facility address: Martin Marietta Materials, Inc. Larry J Roberts First MI Last Division President Titic 413 S. Chimnev Rock Road Permit holder N-lailinQ Address Greensboro NC 27409 City State Zip (336) 668-3253 larry.roberts@martinmarietta.com Phone E-mad Address Matthews Plant 1011 Sam Newell Road Address Matthews NC 28105 City State Zip f. Facility contact person: Tom K Neely First Nil Last (704) 841-4335 tom.neely(@,,martinmarietta.com Phone E-tnail Address IV. Permit contact information (if different from the person legally responsible for the permit) Revised Jan, 27, 2014 y� �Qn ctLQ,�� Jrnejj t �. NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 Permit contact: Richard W Broughton First fail Last District Environmental Services Manager Title 8451 Monticello Road Mailing Address Columbia SC 29203 City State Zip (803) 978-6275 richard.broughton rt,niartirimarietta.c Phone li-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes ❑ No (please explain) V1 Required Items: THIS APPLICATION WILL BE RETURNED UNPROCF,SSED IF ITEMS ARE INCOMPLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ❑ Regal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERM ITTEE CERTIFICATION (Permit holder prior to ownership change): 1, 'Timothy Gaddy, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of 1ny knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. r /U Signature I ate APPLICANT CERTIFICATION I, Larry Roberts, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. ,or// � 4�� h'L1 Signature Date PLEASE SEND THE.. COMPLETE APPLICATION PACKAGE TO: Division of Energy, Mineral and land Resources Storinwater Permitting Program 1612 Mail Service Center Raleigh; North Carolina 27699-1612 Revised Jan. 27, 2014 �`� • Division of Energy, iNlincral & Land Resources Land Quality Section/Stormwater Permitting Program NCDENR National Pollutant Discharge Elimination System NOFm, c�— oc­.* - oc Er+wronNc.rt wo N� Reaouwces RESCISSION REQUEST FORM FOR AGENCY USE ONLY Date Received Year Month Da Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit. 1) Enter the permit number to which this request applies: Individual Permit (or) Certificate of Coverage N C S I I I J= J.N C I G 3 2) Owner/Facility Information: ' Firml correspondence will be mailed to the address noted below Owner/Facility Name LAN_F C'e,�1rJG'rot� /�I�TT/�E<JS'G/T Facility Contact DAViS Street Address /o // SA1H Nec11eLL R D City State /✓(f ZIP Code aift5- County E-mail Address G'liJfl✓tS'�l1WEc`ccl�i�rx>!��m Telephone No. pll } e' �_Z � Fax: %3fy �3sy 3) Reason for rescission request (This is required information. Attach separate sheet if necessary): ❑ Facility closed or is closing on 7­ 1 , All industrial activities have ceased such that no discharges of stormwater are contaminated by exposure to industrial activities or materials. © Facility sold to /ilk /art _ on . If the facility will continue operations under the new owner it may be more appropriate to request an ownership change to reissue to permit to the new owner. ❑ Other: 4) Certification: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Signature Date A(r— .1r Print or type name of person signing a ove Title Please return this completed rescission request form to: NPDES Permit Coverage Rescission stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 Phone: 919-807-63001 FAX: 919-807-6492 An Equal Opportunity 1 Affirmative Action Employer LANE r January 16, 2018 NC DEQ NPDES Permit Coverage Rescission 1612 Mail Service Center Raleigh, NC 27699-1612 RE: Lane Construction Matthews Plant To Whom It May Concern, ,IqN 2 Ep 31018 `sr RMl' A FNo ��ACrTy R P�RMI7TjNG Please find enclosed applications for permit rescission and ownership change form for the above referenced plant. The Lane Construction Corporation has not operated the Matthews plant for several years. The plant, situated on property leased from Martin Marietta, was removed in July 2017. The only industrial activity remaining on the site is a recycled asphalt product (RAP) pile that belongs to a different tenant of Martin Marietta. Please transfer permit NCG 160083 from Lane Construction to Martin Marietta. If you need anything else, please do not hesitate to call. G" Greg Davis Environmental Coordinator Lane Construction The Lane Construction Corporation 8205 Wilkinson Blvd Charlotte, NC 28214 T 704-395-3264 F 704-394-5354 www, laneconstruct.com An Equal Opportunity Employer M ! F ! D ! V CERTIFICATE -OF COVERAGE No. NCG16 d O T 3 FACILITY NAME 4AIg COUNTY _ /f%CiI�!li PERSON COLLECTING SAMPLES LABORATORY Lab Cert. # Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results Semi-annual Stormwater Discharge _Monitoring Report (DMR) for North Carolina DEMLR General P riglit No. NCG160000 - Asphalt Date submitted SAMPLE COLLECTION YEAR peal' SAMPLE PERIOD ❑ Jan -June [0 July -Dec or ❑ Monthly' _ imonthl DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout QPNA ❑Zero -flow ❑Water supply ❑SA [—]Other PLEASE REMEMBER TO SIGN ON THE REVERSE —) X No discharge this period?2 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids Benchmarks 100 mg/L or 50 mg/1 o f RFr,F[VF-D JAN 10 2018 DIVI'? SECTION INFORKPON PROCESSING UNiT 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outf all, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirem,�tnt. See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc, in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected� (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =--> - - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO [] REGIONAL OFFICE CONTACT NAME: Mail an original and one co o this DMR includln al! "Na Dlschar e" reports, within 30 days o recej t o the lab results or at end o monitoringperiod In the case of "No Discharge" reports) to: r Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION_ REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Date) Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 North Carolina Division of Energy, Mineral, and Land Resources SEMI-ANNUAL STORMWATER OUTFALL DISCHARGE MONITORING REPORT (DMR) Vehicle Maintenance Aptivjties Only Date submitted CERTIFICATE OF COVERAGE NO. NCGJ� d � � SAMPLE COLLECTION YEAR Ileel( FACILITY NAME gj,40,-y !?rt'.Se�d �df'if-T�yG.yS' COUNTY /1e�e j' PERSON COLLECTING SAMPLES PLEASE REMEMBER TO SIGN ON THE REVERSE LABORATORY Lab Cert. # Vehicle Maintenance Activity (VMA) Stormwater Monitoring Results: Only for facilities using an average of > 55 gal of new motor oil per month. Total event rainfall' or W No discharge this period1 Outfail No. Sample Collected, mm/dd/yr Total Suspended Solids (TSS), mg/L Non -polar O&G/TPH, mg/L (Method 1664 SGT-HEM) (If applicable) oil and Grease, mg/L (if applicable) pH, Standard units (if applicable) New Motor Oil Usage, Annual average gal/mo Benchmark - 100 or 50 is 30 Within 6.0-9.0 - 1 The total precipitation must be recorded using data from an on -site rain gauge. z For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here. 3See General Permit text that identifies the especially sensitive receiving water classifications where the more protective TSS benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or any other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the laboratory's detection limit, reporting limit, etc. in mg/L. _ R Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR MONITORING RESULTS: • A single benchmark exceedance triggers TIER 1 REQUIREMENTS. See permit PART 11 SECTION B or C. • Two exceedances in a row for the same parameter at the same outfall trigger TIER 2 REQUIREMENTS. • TIER 3: Has your facility had four or more benchmark exceedances for the same parameter at any one outfall? YES ❑ NO ❑ IF YES: Have you contacted the DEMLR Regional Office? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: SWU-254 Vehicle Maintenance Activities DMR Last Revised: August 11, 2014 Page i of 2 Mall an original and one cagy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the !ab results (or at end o monitoring period in the case of "No Discharge" reportsl to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Pelmittee) 7 ♦o for (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/lr/npdes-stormwater SWU-2`' Vehicle Maintenance Activities DMR Last Revised: August II. 20I4 2of2 L • Division of Energy, A9ineral & Land Resources ,, FA Land Quality Section/Storm-A-ater Permitting Program ram NCDENRNational Pollutant Discharge Elimination System N� Gwo — OEar,RTrilrf OF E�—MD Nd R� RESCISSION REQUEST FORM FOR AGENCY USE ONLY Date Received Year Month Day Please fill out and return this form if you no longer need to maintain your NPDES stormwater permit. 1) Enter the permit number to which this request applies: Individual Permit (or) Certificate of Coverage N I C I S N I C I G 6 Q 0 RECEIVED 2) Owner/Facility Information: ' Final correspondence will be mailed to the address noted below SAP 17 2018 Owner/ Facility Name E G'os/ST,P�or,/ /%TIyEIJ�S' V44A/1—' WAL Facility Contact G � 1�A�-f DIM TRr--p ES Street Address /O// S'AJN. /VE&JELL R P "`')J'J City County Telephone No. SST N-2 116 / State ,,Ve-- ZIP Code o2$10-57 L-mail Address dODA✓I�d l,4�c/0' r7�Tcorit Fax: 3) Reason for rescission request (This is rem information. Attach separate sheet if necessary): ® Facility closed or is closing on [ l . All industrial activities have ceased such that no discharges of stormwater are contaminated by exposure to industrial activities or materials. ❑ Facility sold to �T1 on F-1 . If the facility will continue operations under the new owner it may be more appropriate to request an ownership change to reissue to permit to the new owner. ❑ Other: 4) Certification: I, as an authorized representative, hereby request rescission of coverage under the NPDES stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Signature Date Gr � Print or type name of person signing Above Title Please return this completed rescission request form to: NPDES Permit Coverage Rescission����, VID Stormwater Permitting Program RECEIVED 1612 Mail Service Center r� Raleigh, North Carolina 27699-1612 JUL 3 12017 DENR-LAND WALITY 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 STORMWATC#R PERMITTING Phone: 919-807-63001 FAX: 919-807-6492 An Equal Opportunity 1 Affirmative Action Employer Alexander, Laura From: Khan, Zahid Sent: Monday, August 28, 2017 2:21 PM To: Alexander, Laura Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Laura, My mistake I meant to say We CannOt rescind permit at this time. Sorry for inconvenience. Thanks From: Alexander, Laura Sent: Monday, August 28, 2017 2:14 PM To: Khan, Zahid <zahid .khan@ncdenr.gov> Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Okay I will rescind the permit and send you a copy of the letter I send out. Thank you. From: Khan, Zahid Sent: Monday, August 28, 2017 9:19 AM To: Alexander, Laura <laura.alexander@ncdenr.i;ov> Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Laura, It appears that we can rescind this permit right now. Please see Chad Broadway comments for Lane's Matthews plant and have communicated his findings to Martin Marietta personnel (the lease holder for the plant) and Lane's Environmental Coordinator. From my understanding, Richard Broughton (Martin Marietta) is planning to contact me or James to discuss options for transferring the permit to relieve Lane of ongoing responsibility while process -related materials are removed. I believe we can send refusal to them and let them pick other options. Thanks Zahid From: Broadway, Chad [mailto:Chad.Broadway@mecklenburi?countync.govj Sent: Monday, August 28, 2017 8:55 AM To: Khan, Zahid <zahid.khan@ncdenr.gov> Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Correspondence to MM is at the bottom, the below message was to Lane. Chad Broadway, Environmental Specialist Charlotte -Mecklenburg Storm Water Services Mecklenburg County Water Quality Program 2145 Suttle Avenue Charlotte, NC 28208 704-280-1497 (mobile) shad.broadwayi2meckienburecountync.gov A Consider the environment before printing this email or the attachment Alexander, Laura From: Khan, Zahid Sent: Monday, August 28, 2017 9:19 AM To: Alexander, Laura Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Attachments: SKM_C224e17080910042.pdf Follow Up Flag: Follow up Flag Status: Flagged Laura, \ �7 It appears that we carr scind this permit right now. Please see Chad Broadway comments for Lane's Matthews plant and have communic ed h findings to Martin Marietta personnel (the lease holder for the plant) and Lane's Environmental Coor inator. From my understanding, Richard Broughton (Martin Marietta) is planning to contact me or James to discuss options for transferring the permit to relieve Lane of ongoing responsibility while process -related materials are removed. I believe we can send refusal to them and let them pick other options. Thanks Zahid From: Broadway, Chad [mailto:Chad.Broadway@mecklenburgcountync.gov) Sent: Monday, August 28, 2017 8:55 AM To: Khan, Zahid <zahid.khan@ncdenr.gov> Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Correspondence to MM is at the bottom, the below message was to Lane. Chad Broadway, Environmental Specialist Charlotte -Mecklenburg Storm Water Services Mecklenburg County Water Quality Program 2145 Suttle Avenue Charlotte, INC 28208 704-280-1497 (mobile) chad.broadway@mecklenburgcountync.gov A Consider the environment before printing this email or the attachment. From: Broadway, Chad Sent: Monday, August 21, 2017 12:17 PM To:'gwdavis@laneconstruct.com' <>?wdavis(@Ianeconstruct.com> Subject: FW: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Greg, Please find below the email that I sent to Martin Marietta personnel regarding the current request to rescind coverage of NPDES Permit NCG160083. I reached out to Martin Marietta first to confirm the status of the property moving forward. As I mentioned during our phone conversation, one the three scenarios will need to be completed to close out the permit: 1) Removal of process -related materials from the site and stabilization of soils disturbed during removal of the plant; or, 2) Action from Blythe to include this area in the permitted area covered under their own NCG16 permit; or, 3) This area being included in the Martin Marietta Mining Act / NPDES permitted area. From follow-up correspondence with Richard Broughton, it appears that Martin Marietta will not be pulling this area back into their permitted area. Let me know when actions at the site have been completed and I will conduct a follow-up inspection. Thank you, Chad Broadway, Environmental Specialist Charlotte -Mecklenburg Storm Water Services Mecklenburg County Water Quality Program 2145 Suttle Avenue Charlotte, NC 28208 704-280-1497 (mobile) chad.broadwav @mecklenburgcountync.eov A Consider the environment before printing this email or the attachment. From: Broadway, Chad Sent: Monday, August 21, 2017 8:55 AM To: 'Richard Broughton'<richard.broughton@martinmarietta.com> Cc: Tom Neely <Tom.Neely(@martinmarietta.com> Subject: RE: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Richard / Tom, To follow up on my visit last week to conduct an evaluation for the rescission request submitted by Lane Construction for NPDES permit certificate of coverage NCG160083: At the time of my inspection, a very large pile of RAP, a few smaller piles of RAP, and a pile of sand were present within the leased property that is covered by NPDES permit certificate of coverage NCG160083. Additionally, disturbed soils were present in the area where the plant was demolished. The stockpiled materials represent process -related materials and present a potential for sediment discharge. From my understanding, this area will not be pulled back into the Mining Act / NCG02 permitted areas, nor will it be associated with the NCG16 permit of your other tenant. Since one of the primary intents of the NCG16 permit is to monitoring and reduce sediment discharge (via TSS monitoring), I've recommended to Raleigh that Lane's permit not be rescinded until the above listed materials are removed from the parcel. Additionally, I would like to see at least moderate stabilization of the disturbed soils at the former Plant site. From speaking with Tom, it sounds as if there is already an existing plan to move the RAP and sand to Blythe's area and Tom also indicated that the current lease agreement may require Lane to stabilize the disturbed soils. I will plan to do a follow-up inspection once I receive notification that the above actions have occurred. I would like to mention that although I'm not willing to support the permit being rescinded, I did not find any violations or other compliance -related issues during my inspection for either Lane Construction or Martin Marietta. The primary issue is that Lane will need to continue complying with the terms of the permit until the permit is rescinded. Please let me know if I've misunderstood any of the above stated information, particularly that the area is not being pulled back into the permitted mine area. If the area will be pulled back into your permitted area, that changes my opinion of the rescission since the potential sediment discharges will be accounted for by other permits. I'll plan to reach out to Greg Davis with Lane Construction after I hear back from you. Thank you again for accommodating my visit to your property. Chad Broadway, Environmental Specialist Charlotte -Mecklenburg Storm Water Services Mecklenburg County Water Quality Program 2145 Suttle Avenue Charlotte, NC 28208 704-280-1497 (mobile) chad.broadwa mecklenbur count nc. ov A Consider the environment before printing this email or the attachment. From: Richard Broughton [mailto:richard.broughton@martinmarietta.comj Sent: Friday, August 18, 2017 3:40 PM To: Broadway, Chad <Chad.Broadway@ mecklenburgcountync.gov> Cc: Tom Neely <Tom_Neely@martinmarietta.com> Subject: Re: Facility Inspection - Lane Asphalt Plant - MM Matthews Quarry Chad .... Thanks for the quick response... enjoy your vacation day. Richard Sent from my iPhone On Aug 18, 2017, at 3:38 PM, Broadway, Chad <Chad.Broadwav@mecklenburgcountync.gov> wrote: EXTERNAL MAIL Hi Richard, I visited the site to do a brief inspection of the Lane site for their rescission request of the NCG16 permit. I appreciate Tom taking the time to escort me to the site. I told Tom I would follow up with an email yesterday afternoon with my findings but I got caught up out in the field and I'm on vacation today. They have some more to do before the permit is released. I'll follow up Monday with a more detailed email to you, Tom, and Lane's environmental coordinator. Have a good weekend. Chad Sent from my iPhone On Aug 18, 2017, at 3:19 PM, Richard Broughton <richard.broughton@martinmarietta.com> wrote: Hi Chad, Tom Neely told me this morning that you inspected the Lane plant site on our Matthews Quarry property this week. We are working with Lane to vacate the property and terminate their lease with MM, and one of the things required is that they satisfy all of permit requirements and terminate their permits. Were you satisfied with the site, or is there additional work that needs to be completed? Thanks, Richard Broughton Environmental Services Manager Carolina South District/Mid-Atlantic Division Phone (803) 978-6275 1 Mobile (803) 608-1566 k Fax (803) 771-4200 Address 8451 Monticello Road, Columbia, SC 29203 Email richard,brouahton@martinmarietta.com r Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted CERTIFICATE OF COVERAGE NO. NCG16_Q p _Z3 FACILITY NAME �� /1lhTlYaS Ate% COUNTY _�XLit/yP� PERSON COLLECTING SAMPLES LABORATORY Lab Cert. ># Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR SAMPLE PERIOD ❑ Jan -June E] July -Dec or ❑ Monthly', - _ )month) DISCHARGING TO CLASS ❑ORW []HCfW [—]Trout E]PNA Zero -flow []WaterSupply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ® No discharge this period?Z outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids Benchmarks ===> _ - 100 mg/L or 50 mg/L R ECEIVED JAN 0 6 2017 CENTRAL FILES D1NR SECTION 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part 8 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge "reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permittee) Permit Date:10/1/2014-9/31/2019 / .� 1oi (Date SWU-252, last revised 9/17/2014 Page 2 of 2