HomeMy WebLinkAboutNCS000531_Email_20190905Garcia, Lauren V
From: Ann McMillan <amcmillan@stipolymer.com>
Sent: Thursday, September 05, 2019 1:57 PM
To: Garcia, Lauren V
Subject: RE: [External] RE: NCS000531 NPDES Stormwater Permit Renewal
• External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
rMW.Wam@nc.gov
HI Lauren,
Am following up to see if our final permit has been issued?
To the best of my knowledge we have not gotten the final permit.
I am using our daft copy and want to ensure that is what I should be doing.
Have a wonderful day and stay safe,
Ann
Ann McMillan I EH&S/ISO Manager
fffl YOU DRIVE.
WE NAVIGATE.
POLYMER
5618 Clyde Rhyne Drive I Sanford, NC 27330
office: 919.777.5995 ext. 209
www.stipolymer.com I amcmillan@stipolymer.com
From: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Sent: Monday, April 15, 2019 4:11 PM
To: Ann McMillan <amcmillan@stipolymer.com>
Subject: RE: [External] RE: NCS000531 NPDES Stormwater Permit Renewal
Ann,
Thank you so much for getting this together so fast! Everything looks like it is there. I am going to go ahead and attach
your draft permit above. It is scheduled to be published for public comment on May 8t". So if you have any comments or
questions, we can address them between now and the end of the comment period (June 8t")
Thanks so much,
Lauren
From: Ann McMillan <amcmillan@stipolymer.com>
Sent: Monday, April 15, 2019 1:40 PM
1
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Cc: Ann McMillan <amcmillan@stipolymer.com>
Subject: [External] RE: NCS000531 NPDES Stormwater Permit Renewal
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Lauren,
Please see attached information.
1. Stormwater Permit application verification
2. NPDES Stormwater Permit contacts summary, I made changes on this document, I could not find how to make
these minor changes via the links below.
3. Changes since permit renewal application in 2013
4. Building layout with square footage
5. Aerial Photo with building labels
6. Hydrobaster Shed Layout
7. Outfall 1 analytical monitoring data
8. Outfall 1 visual monitoring data
9. Outfall 2 visual monitoring data
Please let me know if I have missed anything or if you need more information.
Have a great day,
Ann
Ann McMillan I EH&S/ISO Manager
ff m+ou aresvc.
W @ NAV ICi�AtE _
FOLY9ER
5618 Clyde Rhyne Drive I Sanford, NC 27330
office: 919.777.5995 ext. 209
www.stipolymer.com I amcmillan@stipolymer.com
From: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Sent: Thursday, April 11, 2019 1:58 PM
To: Ann McMillan <amcmillan@stipolymer.com>
Subject: NCS000531 NPDES Stormwater Permit Renewal
Hello Ann,
Thank you for taking my call! I am working on renewing your facility's individual stormwater permit (Permit No.
NCS000531). There is some information I am required to ask you for to (1.) confirm that the information I have is correct
and (2.) make sure the permit adequality serves the needs of the facility.
PEI
What I need from you:
• A spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the
current permit;
• A verification that the information in the renewal application is still is still complete and correct; and
• An explanation of any operational changes since the renewal application was submitted.
The following link will take you to an online search box where you will be able to enter your permit number and review
the facilities information to make sure it is correct:
https://reports.ncdenr.org/BOE/Open Document/1703191515/CrystalReports/viewrpt.cwr?id=25212&apsuser=BIMS U
&apspassword=blOMs cr%28ddnri59%29&apsauthtype=secEnterprise&cmd=EXPORT&EXPORT FMT=U2FPDF%3AO.
Information can be updated using the links provided below, where applicable:
Owner Update: https://edocs.deg.nc.gov/Forms/SW-Name-Change
Owner Affiliation (i.e., someone with the company who is designated to represent the company per signatory
requirements in the permit (e.g., CEO) or another authorized representative): https://edocs.deg.nc.gov/Forms/SW-
Owner-Affiliation
Company of Facility Name: https://edocs.deg.nc.gov/Forms/SW-Name-Change
What happens next:
• Once I have the above listed information, I will verify the "draft" permit information is correct;
• You will receive the draft for a 30-day comment period. During this time we will be able to address any
comments or concerns you have about your permit draft.
• During the same 30-day period, the draft will be sent to a Raleigh Regional Office staff member for review and
the permit draft will be sent for Public Notice.
Once all comments and concerns are addressed, you will be issued the final permit.
Feel free to contact me with any questions as well.
Thanks,
Lauren
Lauren Garcia
Environmental Specialist II
Stormwater Program
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
919-707-3648 (0)
lauren.garcia@ncdenr.gov
DEMLR Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
ti -5>"Nothing Compares: -
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
* * * * CAUTION: This email originated outside of STIPolymer* * * *
**** CAUTION: This email originated outside of STIPolymer****