Loading...
HomeMy WebLinkAboutSW6191003_Calcs (Drawdown)_20191211Hobson Road Concrete Plant Drawdown Time Temporary storage volume = Orifice #Idiameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 8,130 cf 1.5 in 1 0.0123 sf 0 in 0 0.0000 sf 0.60 236.50 ft 237.40 ft 0.30 ft 0.0324 cfs 251171 s 69.8 hr 2_9 days 1440-POND 1 drawdown.xlsx Printed 12/11/2019