Loading...
HomeMy WebLinkAboutNCC192861_ESC Approval Submitted_20191206 ROY COOPER _ Governor MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality October 11, 2019 LETTER OF APPROVAL Duke Energy Carolinas, LLC Attention: Scott Martin 400 South Tryon Street, Suite 30C Charlotte, North Carolina 28202 RE: Project Name: Phase III Rogers CCP Landfill Construction (Express Review) Acres Approved: 37.1 Project ID: CLEVE-2020-006 County: Cleveland City: Cliffside Address: McCraw Road River Basin: Broad Stream Classification: Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: October 10, 2019 Plan Type: New Dear Mr. Martin` This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at PauI.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019, a$100 fee will be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. �_��� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources `� Mooresville Regional Office 1 610 East Center Avenue,Suite 301 1 Mooresville,North Carolina 28115 NORTH OAHOUM . I -a I.�r 704.663.1699 Letter of Approval Duke Energy Carolinas, LLC October 11, 2019 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 7"__'\ c-u_ ames Moore Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet em: Elizabeth.Glenn@Duke-Energy.com cc: Inspection Department V �•' ' d' V � � w O � ! 4 � w PLO CARO VI Zd Q M o U U cl a .� cz 4-0