Loading...
HomeMy WebLinkAboutNCC192868_NOI Application_20191122Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/18/2019 11:26:29 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 11/20/2019 6:00:38 PM (Review- Construction NOI 18571) • The task was assigned to Garcia, Lauren V by round robin distribution 11/18/2019 11:27 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 20, 2019 5:00 PM 11/18/2019 11:27 AM Submit by McCoy, Suzanne 11/22/2019 7:18:07 AM (Payment Verification for NCC192868) * Mark Hardin • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/22/2019 7:17 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 1, 2020 5:00 PM 11 /20/2019 6:00 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * CEDAR POINT TIRE 2. County* Carteret 3. Highway or Street 1083 CEDAR POINT BLVD Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* CEDAR POINT 5. State * NC 6. Zip Code * 28584 7. Latitude * Enter the latitude in decimal degrees 34.6847 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -77.0805 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/25/2019 Estimated Construction Project Start Date 10. Date to End* 05/30/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Developrrent 12. Acres to be 1.67 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.82 (acres) * 14. Post- 0.82 construction (Estimated) impervious area (acres) * NCC Project NCC-CARTE-2019-CEDAR POINT TIRE Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving BOATHOUSE CREEK Wate rbody* Ibrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 20-31 Index No.* NCWaterbody Index Nirrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization HARDIN INVESTMENTS LLC Name * 2. First Name* MARK IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* HARDIN If Corporation, enter F3egistered Agent Last %rre 3b. Title REGISTERED AGENT 4. Permitee E-mail CEDARPTTIRE@BIZEC.RR.COM Address * 5. Permittee 910-581-3795 Telephone No.* 6. Permittee Mailing Street Address Address* 114 Dolphin Street Address Line 2 City Cape Carteret Fbstal / Zip Code 28584 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 114 Dolphin Street Address Line 2 City Cape Carteret Flostal / Zip Code 28584 State / Frovince / Faegion NC Country us State / Frovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site MARK Contact - First Name * 3. Primary Site HARDIN Contact - Last Name * 4. Title OWNER 5. Site Contact E- CEDARPTTIRE@BIZEC.RR.COM mail Address* 6. Site Contact 910-581-3795 Telephone No.* 7. Organization HARDIN INVESTMENTS LLC Name 8. Site Contact Street Address Mailing Address* 114 Dolphin Street Address Line 2 City Cape Carteret Fbstal / Zip Code 28584 9. Consultant Name (Optional) JOHN WADE First and Last narre 10. Consultant E- JOHN@ARENDELLENGINEERS.COM mail This person will be copied on all correspondence. 11. Consultant 252-622-4338 Telephone No. State / Rovince / Fbgion NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/28/2019 Approved * 2. E&SC Plan Project CARTE-2020-009 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Wilmington (WiRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan CARTE-2020-009 Approval 10-28-2019.pdf 301.09KB Approval Wst be RDFfornat letter/documentation 6. NOI Certification 20191118104841579.pdf 1.32MB Form Mist be R7Ffornat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * MARK HARDIN Title REGISTERED AGENT Organization HARDIN INVESTMENTS LLC Date * 11 /18/2019 F. Tracking and COC Info NOI Tracking No. 18571 NC Reference No. NCG01-2019-2868 Uses 'count number' variable (incremrented by SP) Certificate of NCC192868 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2868 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)