Loading...
HomeMy WebLinkAboutNCG080811_COMPLETE FILE - HISTORICAL_20190329STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. jV DOC TYPE 7f, HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ 2DI 9 0 3 Z GI YYYYMMDD ROY COOPER Governor MICHAEL S REGAN Secretary S DANIEL SMITH Interim Drrector Asheville Oil Company Attention Drew Thorp 4 Fairview Street Asheville, North Carolina 28803 NORTH CAROLINA Environmental Qua&ty May 29, 2019 Subject Compliance Evaluation Inspection Permit NCGO80811 Buncombe County, North Carolina Dear Mr Thorp Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on April 9, 2019 The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah reed@ncdenr gov Sincer , Isaiah Reed, CPSWQ, C SCI, MS4CECI Environmental Specialist Land Quality Section Enclosure Inspection Report r ®� North Carolina Department of Environmental Quality I Division of Energy Mineral and Land Resources Asheville Regional Office 1 2090 U 5 Highway 70 1 5wannanoa North Carolina 28778 NcKr c wcuw ^ 8282964500 /�A Compliance Inspection Report Permit NCGO80811 Effective 11/01/18 Expiration 05/31/21 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville Oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person Drew Thorp Title Phone 828-274-7978 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 04/09/2019 EntryTime 10 00AM Exit Time 11 OOAM Primary Inspector Isaiah L Reed Phone 828-296 4614 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status ® Compliant Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 of 3 k, Permat NCGO80811 Owner Facility Asheville Oil Company Inspection Date 04/0912019 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary On April 9 2019 this Facility was inspected fur compliance I met with Drew Thorp on site The following items were noted during the inspection 1) The SWPPP has been maintained over the past year 2) Monitoring has been conducted 3) The oil/water separator has been maintained Be advised that due to the potential imapcts the the stream the discharge from the oil/water separator on site has been designated by the division as applicable to the discharge limitations of Part 11 Section C of the NCG080000 General Permit The permlttee is directed to modify the Stormwaler Pollution Prevention Plan to reflect that condition If you have any questions please contact this office at (828) 296 4614 Page 2 of 3 Permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 04109/2019 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes Na NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan Include a Narrative Descnption of Practices ? 0 ❑ ❑ ❑ # Does the Plan Include a detailed site map Including outfall locations and dramage areas? 0 ❑ ❑ ❑ # Does the Plan Include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan Include a BMP summary? 0 ❑ ❑ ❑ tY Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan Include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan Include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been Implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted Its Qualitative Monitoring semi annually? 0 ❑ ❑ ❑ Comment Analytical_ Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted Its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment Permit and Outfalls Yes No NA NE # is a copy of the Pernut and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3 Compliance Inspection Report Permit NCGO80811 Effective 1110i118 Expiration 05/31121 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville Oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person drew Thorp Title Phone 828 274 7978 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 04/09/2019 Entry Time 10 00AM Exit Time 11 OOAM Primary Inspector Isaiah L Reed Phone 828 296 4614 Secondary Inspector(s) Reason for inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status Compliant Not Compliant Question Areas Storm Water (See attachment summary) Page 1 of 3 Permit NGG080811 Owner Facility Asheville Oil Company Inspection pate 04/0912019 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary On April 9 2019 this facility was inspected for compliance I met with Drew Thorp on site The following Items were noted during the Inspection 1) The SWPPP has been maintained over the past year 2) Monitoring has been conducted 3) The oillwater separator has been maintained Be advised that due to the potential Imapcts the the stream the discharge from the oil/water separator on site has been designated by the division as applicable to the discharge limitations of Part II Section C of the NCGO80000 General Permit The permlttee Is directed to modify the Stormwater Pollution Prevention Plan to reflect that condition If you have any questions please contact this office at (828) 296-4614 Page 2 of 3 Permit NCG080811 Owner Facility Asheville Oil Company Inspection Date 04/09/2019 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan Include a General Location (USGS) map) E ❑ ❑ ❑ # Does the Plan Include a Narrative Description of Practices E ❑ ❑ ❑ # Does the Plan Include a detailed site map Including outfall locations and drainage areas? E ❑ ❑ ❑ # Does the Plan Include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan Include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? N ❑ ❑ ❑ # Does they Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been Implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi annually? 0 ❑ ❑ ❑ Comment Analytical Monitortng Yes No NA NE Has the facility conducted its Analytical monitonng7 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment Permit and Qutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3 r ROY COOPER GDvernor MICHAEL 5 REGAN Secretary S DANIEL SMITH Interim Direetor Asheville 0i1 Company Attention Drew Thorp 4 Fairview Street Asheville, North Carolina 28803 NORTH CAROLINA Enveronmenta! Quality March 20, 2019 Subject Compliance Evaluation Inspection Permit NCGO80811 Buncombe County, North Carolina Dear Mr Thorp Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 13, 2019 The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah reed@ncdenr gov Enclosure Inspection Report Isaiah Reed, CEPSCI, MS4�ECI Environmental Specialist Land Quality Section DEQ� n�ren.xwL.W. ftea e V North Carolina Department of Environmental Qvality I Division of Energy Mineral and Land Resources Asheville Regional Office 12090 U 5 Highway 70 1 Swannanca North Carolina 28778 828 296 4500 Compliance Inspection Report r Permit NCG080811 Effective 11/01/18 Expiration 05131/21 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville Oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person Drew Thorp Title Phone 828 274 7978 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representatives) Related Permits Inspection date 03/13/2019 Entry Time 12 OOPM Exit Time 12 30PM Primary Inspector Isaiah L Reed Phone 828 296 4614 Secondary Inspectorjs) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wfVehicle MamtenancelPetroleurn Bulk/oil Water Separator Stormwater Discharge COC Facility Status Compliant ® Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 of 3 J permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 03/1312019 Inspection Type Compliance E=valuatJDn Reason for Visit Routine Inspection Summary On March 13 2019 this facility was Inspected for complatnce The facility contact (Drew Thorp) was not available at the time of the inspection A SWPPP was produced but the majority of the components were not In the SWPPP A re -inspection will be scheduled for further analysis o` the site's compliance If you have any questions please contact this office at (828) 296 4614 Page 2 of 3 v ti Permit NCG080811 Owner Facility Asheville Oil Company Inspection pate 0311312019 Inspection Type Compliance Evaluation Reason for visit Rouins Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® ❑ ❑ ❑ # Does the Plan Include a General Location (USGS) map? ❑ ®❑ ❑ # Does the Plan Include a Narrative Description of Practices 9 ❑ ®❑ ❑ # Does the Plan Include a detailed site map including outfall locations and drainage areas? ❑ U ❑ ❑ # Does the Plan Include a list of significant spills occurring during the past 3 years? ❑ ®❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ®❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ®❑ ❑ # Does the Plan Include a SMP summary? ❑ ®❑ ❑ # Does the Plan Include a Spill Prevention and Response Plan (SPRP)? ❑ ®❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ®❑ ❑ # Does the facility provide and document Emptoyee Training? ❑ IN El ❑ # Does the Plan Include a list of Responsible Party(s)9 ❑ ®❑ ❑ # Is the Plan reviewed and updated annually? ❑ ®❑ ❑ # Does the Plan Include a Stormwater Facility Inspection Program? ❑ ®❑ ❑ Has the Stormwater Pollution Prevention Plan been Implemented? ❑ ®❑ ❑ Comment See summary for more Information Qualitative Monitoring Yes No NA NE Has the facility conducted Its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment Analyttcal Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ S # Has the facility conducted Its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the Inspection? ❑ ❑ ❑ # If the facility has representative outfall status Is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated ail illicit (non stormwater) discharges? ❑ ❑ ❑ Comment Page 3 of 3 Compliance Inspection Report Permit NCGO80811 Effective 11/01/18 Expiration 05/31/21 Owner Asheville Oil Company SOC Effective Expiration Fac[ty Asheville Oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person Drew Thorp Title Phone 828-274-7978 Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On -Site Representative(s) Related Permits Inspection Date 03/13/2019 Entry Time 12 00PM Exit Time 12 30PM Primary Inspector Isaiah L Reed Phone 828 296 4614 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status ❑ Compliant Not Compliant Question Areas N Storm Water (See attachment summary) Page 1 of 3 Permit NGG080811 owner Facility Asheville Oil Company Inspection Date 0311312019 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary On March 13 2019 this facility was Inspected for complarnce The facility contact (Drew Thorp) was not available at the time of the inspection A SWPPP was produced but the majority of the components were not In the SWPPP A re -inspection will be scheduled for further analysis of the site's compliance If you have any questions please contact this office at (828) 296-4614 Page 2 of 3 Permit NCG080811 Owner Facility Asheville Oil Company Inspection Date 0311312019 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a Narrative Descnption of Practices ❑ 0 ❑ ❑ # Does the Plan Include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan Include a list of significant spills occurring dunng the past 3 years? ❑ 0 ❑ ❑ ## Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ ## Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan Include a f3MP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP), ❑ ❑ ❑ # Does the Plan Include a Preventahve Maintenance and Good housekeeping Plan? ❑ N ❑ 11 # Does the facility provide and document Employee Training) ❑ E ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ If Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment See summary for more Information Qualitative Monitoring Yes No NA NE Has the facility conducted Its Qualitative Monitonng semi-annually'? ❑ ❑ ❑ 0 Comment Analytical Monitonna Yes No NA NE Has the facility conducted Its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted Its Analytical monitoring from Vehicle Maintenance areas'7 1111110 Comment Permit and Qulfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the sites ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status is it properly documented by the Divisions ❑ ❑ ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? ❑ ❑ ❑ Comment Page 3 of 3 D t� Energy Mineral and Land Resources ENVI90NMENTAL QUALITY June 19, 2018 Asheville Oil Company Attention Drew Thorp 4 Fairview Road Asheville, North Carolina 28803 Subject Compliance Evaluation Inspection Permit NCG080811 Buncombe County, North Carolina Dear Mr Thorpe ROY COOPER Governor MICHAEL S REGAN secrelary WILLIAM E VINSON, JR !Wrenn Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 12, 2018 The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah reed@ncdenr gov Enclosure Inspection Report Si y, Isaiah Reed, PS I Environmental Specialist Land Quality Section State of North Carolina I Eavlronnlentat Quality j Energy Mineral and land Resources 2090 US 70 Highway I Swannanoa NC 28779 8211 9292964500 T . 1 at Permit NCGO80811 SOC County Buncombe Region Asheville Contact Person Cliff Wells Directions to Facility System Classifications Primary ORC Secondary ORC(s) On Site Representative(s) Related Permits Compliance Inspection Report Effective 11116/17 Expiration 10131/18 Owner Asheville Oil Company Effective Expiration Facility Asheville Oil Company 4 Fairview St Asheville NC 28803 Title Phone Inspection Date 06/1212018 Primary Inspector Isaiah L Reed Secondary Inspector(s) Certification Phone Entry Time 10 30AM Exit Time 12 OOPM Phone 828-2964614 Reason for Inspection Routine inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COO Facility Status ❑ Compliant Not Compliant Question Areas Storm Water (See attachment summm) Page 1 Permit NCGOBO811 Owner Facility Asheville Oil Company Inspection Dale 11811212018 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary On June 12 2018 this facility was inspected for compliance I met with Drew Thorp on site During the inspection the following items were noted 1) Many areas around the secondary containment structure could not be inspected due to vegitation These areas shall be maintained and cleared to allow for a full inspection 2) One of the outfalls could not be readily accessed during the Inspection clue to excessive growth These areas shall be 1 maintained and cleared to allow for a full inspection I 3) All analytical and qualitative monitoring data could not be produced on site during the inspection These records shall be x presentable on site for inspection 1 Please contact this office once the above issues have been corrected Currently the next planned inspection will be on or after July 24 K Page 2 4L Permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 06112l2016 Inspection Type Compliance Evaluation Reason for Visit Routine f i Stormwater Pollution Prevention Plan Yes No NA HE f Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ I # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # Does the Plan include a Narrative Description of Practices ? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfali locations and drainage areas? E ❑ ❑ ❑ j # Does the Plan include a list of significant spills occumng during the past 3 years'? E ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ N ❑ I # Does the facility provide all necessary secondary contamment? N ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Dees the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ i # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi annually? ❑ 0 ❑ ❑ Comment See summary for more information Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ E ❑ ❑ Comment See summary, for more information Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ ❑ # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all Illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 I, Compliance Inspection Report Permit NCGO80811 Effective 11/16/17 Expiration 10/31/18 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville Oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person Cliff Wells Title Phone Directions to Facility System Classifications Primary ORG Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection Date 06112/2018 Entry Time 10 30AM Exit Time 12 DOPM Primary Inspector Isaiah L Reed Phone 828-296-4614 Secondary Inspector(s) Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status Compliant Not Compliant Question Areas 0 Storm Water (See attachment summary) Page 1 Permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 0611212018 Inspection Type Compliance Evaluation Inspection Summary Reason for Visit Routine On June 12 2018 this facility was inspected for compliance I met with Drew Thorp on site During the inspection the following items were noted 1) Many areas around the secondary containment structure could not be inspected due to vegltatlon These areas shall be maintained and cleared to allow for a full inspection 2) One of the outfalls could not be readily accessed during the inspection due to excessive growth These areas shall be maintained and cleared to allow for a full inspection 3) All analytical and qualitative monitoring data Could not be produced on site during the inspection These records shall be presentable on site for inspection Please contact this office once the above issues have been corrected Currently the next planned inspection will be on or after July 24 Page 2 Permit NCG080811 Owner Facility Asheville Oil Company Inspection Date (16112/2018 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ 1111 # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a Narrative Description of Practices ? 0❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ M ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the fatality provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ [] # Does the Plan include a Slormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? M ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi annually? ❑ 0 ❑ ❑ Comment See summary for more Information Analytical Monitoring Yas_No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ M ❑ ❑ Comment See summary for more information Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑ # Were all outfalls observed during the inspection? M ❑ [] ❑ # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ M ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 Facility Name Ad,,j It L 0. I M WL, 0 Permits ti C �80�11 Time in/out Li Date rr 5tormwater Pollution Prevention Plan Does the site have a SWPPP? Does the Plan include a General Location (USGS) map? 'Does the Plan include a Narrative Description of Practices ? Does the Plan include a detailed site map including outfall locations and drainage areas? Does the Plan include a list of significant spills occurring during the past 3 years? Has the facility evaluated feasible alternat,vesto current practices? rpoes the facility provide all necessary secondary containment? Does the Plan include a BMP summary? Does the Plan include a Spill Prevention and Response Plan (SPRP)? Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? Does the facility provide and document Employee' framing? Does the Plan include a list of Responsible Party(s)? - Is the Plan reviewed and updated annually? Does the Plan include a 5tormw2ter Facility Inspection Program? ,Has the Stormwater Pollution Prevention Plan been implemented? bra N' ►-�.��'"�'� �G.-4t� � �- ow -I gualitaUve Monitoring ,Has the facility condusted its Qualitative monitoring semi annually? YRc Energy M*nernt and Land Resources ENVIRONMENTAL OUALITY No NA NE Yes No NA NE ❑ El ❑ Analytical Monitoring Yes No NA NE iHas the facility conducted its Analytical monitoring? --R S- -R R Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Yes No NA NE a copy of the Permit and the Certificate of Coverage available at this site? Were all outfalIs observed during the inspection? If the facility has representative outfall status is it properly documented by the Division? Has the facility evaluated all illicit (non stormwater) discharges? Comments and Others Present CIS 4 el'4r I .7 Reed, Isaiah L From Reed, Isaiah L Sent Monday, June 4 2018 2 46 PM To hartwell@mountaintrue org Sub)ect RE [External] Asheville Oil Carson, Could you please send me the pictures, and the address/map The email I received was forwarded without the attachments Thanks, Isaiah Isaiah L Reed, BSc, MS4CECI, CEPSCI Ens rronmental Specialist Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Land Quality Section Asheville Regional Office Phone (828) 296 4614 Email Isaiah reeclo�NCDE=NR gov 2090 US Hwy 70 Swannanoa, North Carolina 28778 -'- Nothing Compares.-,-_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From Riddle, Shawna Sent Monday, June 4, 2018 2 26 PM To Reed, Isaiah L <isaiah reed@ncdenr gov> Cc Aiken, Stan E. <stan aiken@ncdenr gov> Subject FW [External] Asheville Oil Isaiah - FYI - Shawna Shawna Riddle Environmental Senior Specialist Land Quality Section N C Dept of Environmental Quality 828 296-4500 Phone 828 299-7043 Fax Shawna Riddle{cDncdenr gov I 2090 US Hwy 70 Swannanoa NC 28778 'Nothing Compares,, - Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From Aiken, Stan E Sent Sunday, June 03, 2018 1129 AM To Riddle, Shawna <shawna riddle2ncdenr eov> Subject FW [External] Asheville Oil Please look at this Thank You, Stan From Davidson, Landon Sent Friday, June 01, 2018 2 32 PM To Hartwell Carson <hartwell@mountaintrue org>, Aiken, Stan E <stan aiken@ncdenr gov>, Anna Alsobrook <Anna@mountaintrue or > Cc La Fond, Caroline <caroline lafond@ncdenr gov> Subject RE [External] Asheville Oil Brett is going to go out and have a look He may call you Hartwell as he is familiar with that area We'll then connect with DEMLR and UST as needed Thanks G Landon Davidson, P G Regional Supervisor - Asheville Regional Office Water Quality Regional Operations Section NCDEQ - Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon Davidson@ncdenr gov 2090 U S Hwy 70 Swannanoa N C 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From Hartwell Carson [mailto hartwell mountaintrue or ] Sent Friday, June 01, 2018 2 14 PM To Aiken, Stan E <stan aiken[7a ncdenr gov>, Davidson, Landon <landon davidso_n@ncdenr gov>, Anna Alsobrook <Anna@mountaintrue org> Subject [External] Asheville Oil 2 wanted to flag a potential problem at Asheville Oil I am including you both, because not sure if stormwater would regulate this or DWR We took a look around Asheville Oil, off Sweeten Creek (see attached map) to see if flood waters had topped the containment wall I don't think it did, but it seems that stormwater is washing under the containment wall into the Swannanoa I could be wrong, but there is a ditch and it seems like the water is pooling behind the wall and then working its way under the wall into the river There is also a pipe at the bottom of this ditch that smells of oil and some sheen on the water (see pits) The sheen on the water was likely stirred up by us walking through the sediment It could be old oil buried in the sediment or new oil from this latest storm I am not sure exactly how the containment wall is suppose to function Where does regular stormwater normally flow? Is there a concrete liner under the tanks or just around the perimeter? It is probably worth double checking my assumptions to make sure that stormwater isn't flowing under the wall and reaching the creek Let me know if you have any questions and thanks for checking on this Hartwell Carson French Broad RiN erkeeper Mountain Prue 29 N Market Street Suite 610 Asheville NC office 828-258-87371 eNt 2l l Report Pollution- 828-817-5258 Join MountainTruei Waterkeeper Alliance Member Like us on Facebook Like the French Broad River Paddle I rail acemaiximl wwwpece'abs.cam Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 October 12, 2016 Mr Brian Bauer Mountain Environmental 1560 Pisgah Drive Canton, NC 28716 RE Project AOC 6-A0001-1 A 10l7 Pace Project No 92315326 Dear Mr Bauer Enclosed are the analytical results for sample(s) received by the laboratory on October 07, 2016 The results relate only to the samples included in this report Results reported herein conform to the most current, applicable TNIINELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report If you have any questions concerning this report, please feel free to contact me Sincerely, c � 4- :1,, , �' � Lorn Patton lorri patton@pacelabs com Project Manager Enclosures Received OCT 1 7 2016 Land Quality Section Asheville REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full 9 without the written consent of Pace Analytical Services LLC B Page 1 of 11 aceAnalyt ical w++wpacei'ebs tom Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 CERTIFICATIONS Project AOC 6-A0001 1A I OU Pace Project No 92315326 Charlotte Certification IDs 9800 Kincey Ave Ste 100 Huntersvllle NC 28078 South Carolina Certification # 99006001 North Carolina Drinking Water Certification # 37706 Florida/NELAP Certification # E87627 North Carolina Field Services Certification # 5342 Kentucky UST Certification # 84 North Carolina Wastewater Certification # 12 Virginia/VELAP Certification # 460221 Asheville Certification IDs 2225 Riverside Drive Asheville NC 28804 Florida/NELAP Certification # E87648 Massachusetts Certification # M NCO30 North Carolina Drinking Water Certification # 37712 North Carolina Wastewater Certification # 40 South Carolina Certification # 99030001 Virginia/VELAP Certification # 460222 Received OCT 1 ? 2016 Land Quality section Asheville REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written Consent of Pace Analytical Services LLC Page 2 of 11 acmnalyhcal o wwwpacelabs.cam Pace Analytical Services LLG 2225 Riverside Dr Asheville NC 28804 (828)254 7176 SAMPLE ANALYTE COUNT Project AOC 6-A0001 I 1017 Pace Project No 92315326 Analytes Lab I❑ Sample ID Method Analysts Reported Laboratory 92315326001 ows EPA 1664E SM 2540D SM 4500 H+B REPORT OF LABORATORY ANALYSIS JMS ALC KDF1 Received OCT i > 2016 1 PASI C 1 PASI A 1 PASI A Land Quality Section Asheville This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Page 3 of 11 aceAnalytical" wwwpecefaftcom Pace Analytical Services LLC 2225 Riverside Or Asheville NC 28804 (828)254 7176 ANALYTICAL RESULTS Project AOC 6-A000i-1A 1017 Pace Project No 92315326 Sample OWS Lab ID 92315326001 Collected 10/07/16 15 00 Received 10/07/16 15 30 Matrix Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No Qual HEM Oil and Grease Analytical Method EPA 1664E Oil and Grease ND mg/L 50 1 10/11/16 07 45 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Solids 163 mg/L 83 1 10/10/16 15 08 4500H+ pH, Electrometrrc Analytical Method SM 4500-H+8 pH at 25 Degrees C 65 Std Units 10 1 10/10/16 15 30 H6 Date 10/12/2016 11 05 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the wntten consent of Pace Analytical Services LLC Recelved OCT 1 7 2016 Land Quality seet,,,l Ashevat, Page 4 of 11 aceAnalytical • WWWpscefa &COO Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (628)254 7176 Project AOC6-A0001-1AIOf7 Pace Project No 92315326 QC Batch 332602 QC Batch Method EPA 1664B Associated Lab Samples 92315326001 METHOD BLANK 1843176 Associated Lab Samples 92315326001 Parameter Units Oil and Grease mg1L QUALITY CONTROL DATA Analysis Method EPA 1664E Analysis Description 1664 HEM Oil and Grease Matrix Water Blank Reporting Result Limit Analyzed Qualifiers NU 5 0 10/11/16 07 45 LABORATORY CONTROL SAMPLE 1843177 Spike LCS LCS % Rec Parameter Units Conc Result % Rec Limits Qualifiers Oil and Grease mg1L 40 360 90 78 114 MATRIX SPIKE SAMPLE 1843178 92315264003 Spike MS MS % Rec Parameter Units Result Conc Result % Rec Limits Qualifiers Oil and Grease mg/L 85 40 472 97 78-114 Received OCT 1 ? 2016 Land QualltV Section Asheville Results presented on this page are in the units indicated by the Units column except where an alternate unit is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written consent of Pace Analytical Services LLC Page 5 of 11 acMnalytical e wwwpaaelabs.com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 Protect AOC 6 A0001 1 A 10f7 Pace Protect No 92315326 QC Batch 332427 QC Batch Method SM 2540D Associated Lab Samples 92315326001 METHOD BLANK 1842265 Associated Lab Samples 02315326001 Parameter Units Total Suspended Solids mglL LABORATORY CONTROL SAMPLE 1842266 Parameter Units Total Suspended Solids mg1L QUALITY CONTROL DATA Analysis Method SM 2540D Analysis Descnption 2540D Total Suspended Solids Matnx Water Blank Reporting Result Limit Analyzed Qualifiers ND 2 5 10/10/16 14 56 Spike LCS LCS % Rec Conc Result % Rec Limits Qualifiers 250 244 98 90-110 SAMPLE DUPLICATE 1842267 92315346001 Dup Parameter Units Result Result Total Suspended Solids mg/L ND ND SAMPLE DUPLICATE 1842268 92315173001 Dup Parameter Units Result Result Total Suspended Solids mg1L 155 200 RPD Qualifiers RPD Qualifiers 25 D6 Received OCT] 7 2016 Land QUahty Section Asheville Results presented on this page are In the units indicated by the Units column except where an alternate unit is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written Consent of Pace Analytical Services LLC Page 6 of 11 aceAnalytical trM►wAecelabs.WM Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (826)254 7176 Project AOC6-A0001-1A10l7 Pace Project No 92315326 QC Batch 332437 QC Batch Method SM 4500-H+B Associated Lab Samples 92315326001 SAMPLE DUPLICATE 1842306 Parameter Units pH at 25 Degrees C Std Units SAMPLE DUPLICATE 1842307 Parameter pH at 25 Degrees C QUALITY CONTROL DATA Analysis Method SM 4500-H+B Analysis Descnption 4500H+B pH 92313858001 Dup Result Result RPD Qualifiers 57 57 0 H6 92315278001 Dup Units Result Result Std Units 66 66 RPD Qua Ii fie rs 0 H6 Received OCT I ? ?016 Land Quality Section Asheville Results presented on this page are in the units indicated by the Units column except where an altemate unit Is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except to full Date 10/12/2016 11 05 AM without the written consent of Pace Analytical Services LLC Page 7 of 11 acmnalytii wwwwdabs com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 QUALIFIERS Protect AO 6-A0001-1A 1017 Pace Project No 92315326 DEFINITIONS DF Dilution Factor if reported represents the factor applied to the reported data due to dilution of the sample aliquot ND Not Detected at or above adjusted reporting limit J Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit MDL Adjusted Method Detection Limit PQL Practical Quantitation Limit RL - Reporting Limit S Surrogate 1 2 Diphenylhydrazirie decomposes to and cannot be separated from Azobenzene using Method 8270 The result for each analyte is a combined concentration Consistent with EPA guidelines unrounded data are displayed and have been used to calculate % recovery and RPD values LCS(D) - Laboratory Control Sample (Duplicate) MS(i - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC Not Calculable SG Silica Gel Ciean-Up U Indicates the compound was analyzed for but not detected Acid preservation may not be appropriate for 2 Chloroethylvinyl ether A separate vial preserved to a pH of 4 5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylomtrile by EPA Method 8260 N Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270 The result reported for each analyte is a combined concentration Pace Analytical is TNI accredited Contact your Pace PM for the current list of accredited analytes TNI -The NELAC Institute LABORATORIES PASI A Pace Analytical Services -Asheville PASI C Pace Analytical Services Charlotte ANALYTE QUALIFIERS D6 The precision between the sample and sample duplicate exceeded laboratory control limits H6 Analysis initiated outside of the 15 minute EPA required holding time Received 0 C T 17 2016 Land Quality Section Asheville REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written consent of Pace Analytical Services LLC Page 8 of 11 acmnalytical wwwpacarabs com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project AOC 6 A0001 1A 1017 Pace Project No 92315326 Analytical Lab ID Sample ID QC Batch Method QC Batch Analytical Method Batch 92315326001 OWS EPA 1664B 332602 92315326001 OWS SM 2540D 332427 92315326001 OWS SM 4500 N+13 332437 Date 10/12/2016 11 05 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Received OCT 1 7 2016 Land Quality Section Asheville Page 9 of 11 uocument ivame Sample Condition Upon Receipt(SCUR) /_e7Pa1CeAna1X1Ca1e Document No F CAR CS 033 Rev 00 ConditionSample • • Client Name Re ipt, Project # ce f l�.n. ✓ Courier []Fed Ex Oups ❑USPS QC6ent ❑ Commercial ❑Pace ❑Other Custody Seal Present? ❑Yes []Nis Seals Intact? Dyes pt9a uocument Kevisea aept ci, Zuao Page I of 2 Issuing Authority Pace Qualitv Office Page 2 of 2 for internal Use ONLY WQ#:92315325 1111111111111111111111 92315326 Date/initials Person Examining Contents �-- Packing Material ebble Wrap �bble Bags []None[:]OtherThermome$�,R GunID s _ Type of Ice j2Wet ❑Blue []None amples on Ice cooling process has begun Correction Factor () Cj Cooler Temp Corrected (T) _ _ Za j Biological Tissue Frozen? ❑Yes []No �tt1r Temp should be above frepmg to VC USDA Regulated Soil ( N/A, water sample) Did samples originate in a quarantine zone within the United States CA NY or SC (check maps)? Did samples originate from a foreign source (internationally i—iYes ❑No including Hawaii and Puerto Roco)y ❑Yes ❑No Comments/Discrepant Chain of Custod Present? Q<s QNo ❑N/A 1 Samples Arrived within Hold Time? Qfes QNo []N/A 2 Short Hold Time Analysis (<72 hr )? (]Yes C249 N/A 3 Rush Turn Around Time Requested? Oyes o ❑N/A 4 Sufficient Volumes es ONO ❑N/A S Correct Containers Used? Pace Containers Used? 2fes F xKsNo ❑No ❑N/A ❑N/A 6 Containers Intact? es ONO ❑N/A 7 Samples Field Filtered? ❑Yes ❑No eA S Note if sediment is visible in the dissolved container Sample Labels Match COC? -Includes Date/Time/ID/Analysis Matrix 110Yes ONO ❑N/A 9 All containers needing acid/base preservation have been checked and documented on page two of ? Exceptions VOA, Coliform, TOC it and Gmas , DRO/8015 (water) DOC, LLH Samples checked for dechlorination? ❑Yes Dyes ❑Nt, ONO 26/A /A 10 Recelved 11 n ('T 1 7 201.E Headspace In VOA Vials >5 6mrn)? ❑Yes QNo A 12 Trip Blank Present? Trip Blank Custody Seals Present? Pace Trip Blank Lot €1(ifpurchased) ❑Yes ❑Yes ONO ONO [�WA /A ¢� 13 Land Q ualsty Section Ashevlllo CLIENT NOTIFICATION/RESOLUTION Person Contacted Comments/Sample Discrepancy Date/Time Field [late Required? ❑Yes mNo Project Manager SCURF Review `/` 111 Date _ L_IJ Project Manager SRF Review Date 7 11 Note whenever there is a discrepancy affecting North Carolina co pliance samples a capyof this form will be sent to the North Carolina DEIRNR Certification Office (i e Out of hold, incorrect preservative, out of temp, incorrect containers) Laboratory receiving samples Ashevlllex Eden[] Greenwood ❑ Huntersville ❑ Raleigh❑ Mechanicsville[] Page 10 of 11 %~ 2ace Analytical CHAIN -OF -CUSTODY ! Analytical Request Document The Chamol-Custody is a LEGAL DOCUMENT All relevant Gelds must be completed accurately Section A Section 8 Section C Pogo Of rs Required Client infonnalion Rsqulrad Project Intormaton Invoice Information Coma , Report To Attention �'L J r /LG7 2040417 Address Copy To Company Name REGULATORY AGENCY , ` Address T— NPDES F GROUND WATER r DRINKING WATER f— UST RCRA OTHERS 0" V a Email To Purchase Order No Paco Ouoto Reference !� Phone Fax Project Name Pace Project Site Location Manarw STATE Requested Duo OatoITAT Prgecl Number /! u �+ `s Paw Pmrid a ! /'7 l.- Requested Analysis Filtered (YIN) Received Section D Matrix Codas lRaquiroliCkatil 2 r Z lnfa lion MAYRIx ! (.(ME 9 COLLECTED PreservativesY OCT 1 ] 2016 DTadllria Water OW Water WT $ U z Waste Water WW d (") m EOMtPOurTE cgrmoaTE F ti Product P START ENDIGRAa w [V SoiVSo6d SL 0 \ } SAMPLE ID Woe � � � a w Land quality Section (AZ a 51) Air AR a w a � � Asheville Sample IDS MUST BE UNIQUE Tissue TS O a Z (� r U Other OT U X W w O y O p C 0 y+ N W U o an o d o T o N m L¢ Ey v �2 r h u°, X T z z 3 �`cZ�t DATE TIME HATE TIME O ..► Pace Protec Lab A 1 O w Dvi 2 3 4 5 Ii 7 10 11 12 ADDITIONAL COMMENTS FILIATION DATE TIME ACCEPTED BY! AF ILIATtON VATf i TIME SAMPLE CONDITIONS SAMPLER NAME AND SIGNATURE ORIGINAL e a PRINT Name of SAMPLER � i1�� V 2 N = � � — �' c rz SIGNATURE ofSADATE Signed ti � � (MWDOrrY) lmparl.uil Nole By srgnral; eus loan you wo rccLptM PIw NET JD dry p iymcnl toms and apremrul 10 Lila dh rpus of IS per monllr 1w any uivorces nal %wj=% -30 drys F ALL 0 020rev 07 15 May 2007 alcleAnalytcalo wwwpacelahs corn Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 October 12, 2016 Mr Brian Bauer Mountain Environmental 1560 Pisgah Drive Canton, NC 28716 RE Protect AOC 6-A0001-1A 1017 Pace Protect No 92315326 /VC G v<� nail aC�t a(A� Dear Mr Bauer Enclosed are the analytical results for sample(s) received by the laboratory on October 07, 2016 The results relate only to the samples included in this report Results reported herein conform to the most current, applicable TNIINELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report If you have any questions concerning this report, please feel free to contact me Sincerely, 64-11 7� Lorri Patton loin patton@pacelabs com Protect Manager Enclosures REPORT OF LABORATORY ANALYSIS This report shall not he reproduced except in full without the written consent of Pace Analytical Services LLC Page 1 of 11 rX'� aceAnalXical wwwpaWatis com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 CERTIFICATIONS Protect AOC 6-A0001-1A 1017 Pace Protect No 92315326 Charlotte Certification iDs 9800 Kincey Ave Ste 100 Huntersville NC 28078 South Carolina Certification # 99006001 North Carolina Drinking Water Certification # 37706 Flonda/NELAP Certification # E87627 North Carolina Field Services Certification # 5342 Kentucky UST Certification # 84 North Carolina Wastewater Certification # 12 VirginiaNELAP Certification # 460221 Asheville Certification I0s 2225 Riverside Drrve Asheville NC 28804 FlondalNELAP Certification # E87648 Massachusetts Certification 4 M-NCO30 North Carolina Drinking Water Certification # 37712 North Carolina Wastewater Certification # 40 South Carolina Certification # 99030001 VirgintaNELAP Certification # 460222 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Page 2 of 11 aceAnaljftal wwwpacelab&com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 Project AOC 6-A0001-IA 10I7 Pace Project No 92315326 Lab ID Sample 1D 92315326001 OWS SAMPLE ANALYTE COUNT Analytes Method Analysts Reported Laboratory EPA 1664E JMS 1 PAS[-C SM 2540D ALC 1 PASI-A SM 4500-H+$ KDF1 1 PAS[ A REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Page 3 of 11 acmnalXlcal wwwpwdabs cam Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828)254 7176 ANALYTICAL RESULTS Project AOC 6-A0001-1A 1017 Pace Project No 92315326 Sample OWS Lab ID 92315326001 Collected 10/07/16 15 00 Received 10/07/16 15 30 Matrix Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No Quai HEM, Oil and Grease Analytical Method EPA 1664E Oil and Grease ND mg1L 5 0 1 10/11116 07 45 2540D Total Suspended Solids Analytical Method SM 2540D Total Suspended Sands 163 mg/L 8 3 1 10/10/16 15 08 4500H+ pH, Etectrometric Analytical Method SM 4500 H+B pH at 25 Degrees C 65 Std Units 1 0 1 10/10/16 15 30 H6 Date 10/12/2016 11 05 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Page 4 of 11 aceAna1y4ica1" wmvpacelahs corn Pace Analytical Services LLC 2225 Riverside Or Asheville NC 28804 (828)254 7176 Project AOC6A0001-1A1017 Pace Project No 92315326 QC Batch 332602 QC Batch Method EPA 1664B Associated Lab Samples 92315326001 METHOD BLANK 1843176 Associated Lab Samples 92315326001 Parameter Units Oil and Grease mg1L LABORATORY CONTROL SAMPLE 1843177 Parameter Units Oil and Grease mg1L MATRIX SPIKE SAMPLE 1843178 Parameter Units Oil and Grease mg1L QUALITY CONTROL DATA Analysts Method EPA 1664B Analysis Description 1664 HEM Oil and Grease Matrix Water Blank Reporting Result Limit Analyzed Qualifiers ND 50 10111116 07 45 Spike LCS LCS % Rec Conc Result % Rec Limits Qualifiers 40 360 90 78-114 92315264003 Spike NIS MS % Rec Result Conc Result % Rec Limits Qualifiers 8 5 40 472 97 76-114 Results presented on this page are in the units indicated by the Units column except where an alternate unit is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written consent of Pace Analytical Services LLC Page 5 of 11 aceAnalj trcal wwwpacelahs corn Pace Analytical Services LLC 2225 Riverside Dr Asheyilte NC 28804 (828)254 7176 QUALITY CONTROL DATA Project AOC 6 A0001 1A 1017 Pace Project No 9231532E QC Batch 332427 Analysis Method SM 2540D QC Batch Method SM 2540D Analysis Description 2540D Total Suspended Solids Associated Lab Samples 92315326001 METHOD BLANK 1842265 Associated Lab Samples 92315326001 Parameter Units Total Suspended Solids mg1L LABORATORY CONTROL SAMPLE 1842266 Parameter Units Total Suspended Solids mg/L SAMPLE DUPLICATE 1842267 Parameter Units Total Suspended Solids mg/L SAMPLE DUPLICATE 1842268 Parameter Total Suspended Solids Matrix Water Blank Reporting Result Limit Analyzed Qualifiers ND 2 5 10/10/16 14 56 Spike LCS Conc Result 250 244 92316346001 Dup Result Result ND N❑ 92315173001 Dup Units Result Result mg/L 155 200 LCS % Rec % Rec Limits Qualifiers 98 90-110 RPD Qualifiers RPD Qualifiers 25 D5 Results presented on this page are in the units indicated by the "Units column except where an alternate unit is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/1212016 11 05 AM without the written consent of Pace Analytical Services LLC Page 6 of 11 aceAnaljftal wwwpacelabs com Pace Analytical Services LLC 2225 Riverside Dr Asheville NC 28804 (828 )254 7176 QUALITY CONTROL DATA Project AOC 6-A0001 1A 1017 Pace Project No 92315326 QC Hatch 332437 Analysts Method SM 4500-H+B QC Batch Method SM 4500 H+B Analysis Description 4500H+B pH Associated Lab Samples 92315326001 SAMPLE DUPLICATE 1842306 Parameter pH at 25 Degrees C SAMPLE DUPLICATE 1842307 Parameter pH at 25 Degrees C 92313858001 Dup Units Result Result RP❑ Qualifiers Std Units 57 57 0 H6 92315278001 ❑up Units Result Result RPD Qualifiers Std Units 66 66 0 H6 Results presented on this page are in the units indicated by the "Units column except where an alternate unit is presented to the right of the result REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written consent of Pace Anaiytical Services LLC Page 7 of 11 Pace Analytical Services LLC a.4imaly ical ® 2225 Riverside Dr Asheville NC 28804 m»vpacefahs com (828)254 7976 QUALIFIERS Project AOC S A0001 1A 10i7 Pace Project No 92315326 DEFINITIONS DF Dilution Factor if reported represents the factor applied to the reported data due to dilution of the sample aliquot ND - Not Detected at or above adjusted reporting limit J Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit MDL Adjusted Method Detection Limit PQL practical Quantitation Limit RL Reporting Limit S - Surrogate 1 2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270 The result for each analyte is a combined concentration Consistent with EPA guidelines unrounded data are displayed and have been used to calculate % recovery and RPO values LCS(D) Laboratory Control Sample (Duplicate) MS(D) Matrix Spike (Duplicate) DUP Sample Duplicate RPD Relative Percent Difference NC Not Calculable SG Silica Gel - Clean Up U - Indicates the compound was analyzed for but not detected Acid preservation may not be appropriate for 2 Chloroethylvinyl ether A separate vial preserved to a pH of 4 5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylonitnle by EPA Method 8260 N Nitrosodiphenylamrne decomposes and cannot be separated from Diphenylamine using Method 8270 The result reported for each analyte is a combined concentration Pace Analytical is TNI accredited Contact your Pace PM for the current list of accredited analytes TNI - the NELAC institute LABORATORIES PASI-A Pace Analytical Services Asheville PASI-C Pace Analytical Services - Charlotte ANALYTE QUALIFIERS D6 The precision between the sample and sample duplicate exceeded laboratory controi limits H6 Analysis initiated outside of the 15 minute EPA required holding time REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full Date 10/12/2016 11 05 AM without the written consent of Pace Analytical Services LLC Page 8 of 11 aceAna1j41ca1 wwwpacelabs com Pace Analytical Services LLC 2225 Riverside Dr Asheville NG 28804 (828)254 7176 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project AOC 6-A0001-1A 1017 Pace Project No 92315326 Lab ID Sample ID QC Batch Method QC Batch Analytical Method 92315326001 OWS E=PA1664B 332602 92315326001 OW5 SM 2540D 332427 92315326001 OWS SM 4500-H+B 332437 Date 10/12/2016 11 05 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced except in full without the written consent of Pace Analytical Services LLC Analytical Batch Page 9of11 uocumeni Name uocumenr rcevisea aepT es, [u'.o Sample Condition Upon Recei t(SCUR) Page 1 of 2 aceAnalytrca! Document No Issuing Authority Y F CAR CS 033-Rev 00 Pace Quality Office Page 2 of 2 for Internal Use ONLY Sample tonclition UponClient Name Project itWQ# : 92315326 Courier ❑Fed Ex Elm ❑USPS 111111111111111111111 ❑ Commercial ❑Pace 00ther ` 92315326 Custody Seal Present? ❑Yes � FIri45' Seals Intact? []Yes MRo Date/initials Person Examining Contents d4=� Packing Material Obubble wrap j2fubble Bags [—]None ❑0ther Thermometer �!R Gun ID � --- Type of Ice �et [:]Blue ❑None ampler on ice, cooling process has begun Correction Factor (j , (� Cooler Temp Corrected ('C) Z0 3 Biological Tissue Frozen? [—]Yes[]NOPN A Temp should be above fre mg to 6'C USDA Regulated Soil {El N/A, water sample) Did samples originate in a quarantine zone within the United States CA, NY, or SC (check maps)? Did samples originate from a foreign source (internationally ny.-s nNo Includinx Hawaii and Puerto Rico)? ClYes nNo Comments/Discrepancy Chain of Custody Present? es [:IN. ❑N/A 1 Samples Arrived within hold Time? es []No ❑N A 2 Short Hold Time Analysis (<72 hr )7 []Yes o N/A 3 Rush Turn Around Time Requested? MYes o ❑N/A 4 Sufficient Volume? Oes []No ❑N/A 5 Correct Containers Used? es ❑No ❑N/A 6 Pace Containers Used? es []No ❑N/A Containers Intact? es ❑No ❑NN///A 7 Samples Field Filtered? ❑Yes ❑No Z N/A 8 Note if sediment is visible in the dissolved container Sample. Labels Match COC? ,,,r)Yes ❑No ❑N/A 9 includes Date/iime/ID/Analysis Matrix All containers needing acid/base preservation have been documented two F? []Yes❑No 10 checked and on page of /A Excepttons VOA, Coliform, TOC, CandG',e)a,, 0110/8015 (water) DOC, LLHg 11 Samples checked for dechlannation? []Yes []No /A Headspace in VOA Vials (s5 Emm)? []Yes ❑No DHfA 12 Trip Blank Present? ❑Yes ❑No [?WA 13 Trip Blank Custody Seals Present? [_-]Yes ❑No [XIA Pace Trip Blank Lot # (if purchased) CLIENT NOTIFICATION/RESOLUTION Person Contacted Comments/Sarnple Discrepancy Project Manager SCURF Review Project Manager SRF Review Note Wheneverthere is a discrepancy affecting North Carolina co F Out of hold, incorrect preservative, out of temp, incorrect containers) Laboratory receiving samples Ashevillex Eden❑ Greenwood ❑ Field Data Required? ❑Yes PNo Date/Time Date f j V i / I 110 Date j samples a copy of this form will be sent to the North Carolina DEMR. Certification Office (i e Huntersville ❑ Raleigh❑ Mechanicsville❑ Page 10 of 11 aceAnaVicaf wrw pacalatrs cam Section A Required Client Information Com a Addres�� Phone Faz Requested Due DaterTAT f Section B Roqu4Tad Protect Infomtallon Report To Ccpy 70 se order No Name Number / _ A off, el CHAIN -OF -CUSTODY ! Analytical Request Document She Chain of Custody is a LEGAL DOCUMENT All relevant fields must be completed accurately Section C Page of m 7 Invoice Iniarmalion 2040417 L A1tenGon GomDany Namo Section 0 Matrlx Codas g eagnlaooc«rnt lnlarmadan MATRIX r CODL a M COLLECTED Di Water DW z water WT v Waste Water WW m couvosnE L1ART corer RAB E?l0lGMB U Product P nl - SOIUSDIId SL 0 p SAMPLE ID oil wP Y 6wpe " z (A Z 0 91 1 Air AR Lit p w a Sample IDs MUST SE UNIQUE Tissue TS O 4 z 1¢- Other OT L) l!: w O U tL a 4 a 4 aa.. 4 Q t= w DATE TIME DATE TIME +� c'7ixl c t,r j� --7 I s'. REGULATORY AGENGY NPDES ( GROUND WATER r DRINKING WATER f" UST r RCRA yL OTHER $ite Location !1 a STATE Requested Analysts Filtered (YIN) r z Preservatives `Y Z r } 1� C s t U cc Pace Proect i� ADDITIONAL COMMENTS FILIATION DATE / / TTIIM+EE CCFPTED 8Y i AF ILIATtON DA 4 1 TIME SAMPLE CQND1TIONS (�(� /'� I (� SAMPLER NAME AND SIGNATURE ORIGINAL PRINT Name of SAMPLER SIGNATURE of SA linporlan7 Noto By aiDning Iris% Ieim you -Ire accepting Pecos NET AD day payment Ierma and agreeing la late eharltus or I m, per mo,,W for any mvoices not 3D days U = p 'x m A �Cz C E v p a �z F ALL Q 020rev 07 15 May 2007 -- — PAT MCCItOItY Governor R VAN DER VAART ~ �DONALD Secretary Energy, Mineral and Land Resources TRACY DAVIS ENVIRONMENTAL QUALITY w Director October 5, 2016 Asheville Oil Company Smoky Mountain Heating & Air ATTN Drew Thorp 4 Fairview Street Asheville, NC 28803 SUBJECT NPDES Stormwater Permit Compliance Inspection Asheville Oil Company Permit No NCGO80811 Buncombe County Dear Mr Thorp This letter is in follow-up to the NPDES Stormwater Permit Compliance Inspection conducted on September 29, 2016 The facility was found to be in compliance with permit NCG080811 Enclosed is a copy of the Compliance Inspection Report, which contains additional observations and comments for your reference If I can be of any further assistance, please contact me at (828) 296-4500 Sincerely, Darlene Kucken Environmental Specialist Land Quality Section Enclosure Compliance Inspection Report State of North Carolma j Enwonmental Quality I Energy Mineral and Land Resources 2090 US 70 Highway I Swannanoa NC 28778 8211 828 296 4500 T I Permit NCG08081 t SOC County Buncombe Region Asheville Contact Person Cliff Wells Directions to Facility System Classifications Primary QRC Secondary ORC(s) On Site Representative(s) Relater! Permits Compliance Inspection Repor# Effective 11101/12 Expiration 10131/17 Owner Asheville Oil Company Effective Expiration Facility Asheville Oil Company 4 Fairview St Inspection Date 09/29/2016 Primary Inspector Dariene J Kucken Secondary Inspector(s) Title Entry Time 02 15PM Certification Asheville NC 28803 Phone Phone Exit Time 03 15PM Phone Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehicle MalntenancelPelroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status Compliant Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 • Permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 09129/2016 Inspection Type Compliance Evaluation Inspection Summary Reason for Visit Routine 1 This inspection was conducted as a follow up to a December 2015 flooding event and discharge of petroleum and release of petroleum materials The inspection was also conducted as a routine inspection of the Stormwater Pollution Prevention Plan and associated documentation 2 A Notice of Violation (NOV-2016 OC-0001) was issued by the Division of Water Resources related to the flooding and discharge event 3 An inspection of the facility was conducted after this event by the Division of Energy Mineral and Land Resources and several issues were identified at that time that needed to be addressed 4 These issues included providing additional storage and function capacity for the on -site oil/water separator and installing a back -flow preventor on the outlet drain The oiltwater separator capacity and function have been increased and there is frequent monitoring being conducted on the separator Pump outs are being cinducted as needed to assure there is ample capacity prior to any predicted rain events and as needed The back flow valve is on site and has not yet been installed 5 The SWPPP is onsite and in good condition Minor updates are needed 6 The analytical monitoring has not yet been conducted due to inadequate rainfall events during the year to date 7 The site is deemed to be in compliance with its permit conditions Page 2 i permit NCGO80811 owner Facility Asheville Oil Company Inspection Rate 09/2012016 Inspection Type Compliance Evaluation Reason for Visit Routine Analytical Morntorin Has the facility conducted Its Analytical monitoring? # Has the facility conducted its Analytical mondonng from Vehicle Maintenance areas? Yes No NA NE ❑ e ❑ ❑ ❑❑ME] Comment The weather conditions have been very dry and it has not been possible to collect the monitorin sample Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed dunng the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? ❑ ❑ S ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? i ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? M ❑ ❑ ❑ # Does the Plan include a Narrative Description of Practices ? M ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ #f Does the Plan include a list of signficant spills occurring dunng the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practloes? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Page 3 S Permit N'CGO80811 Owner Facility Asheville Oil Company Inspection Date 0912912018 Inspection Type Compliance Evaluation Reason for Visit Routine Stormwater Pollution Prevention Plan Yes No NA NE Comment Page 4 Facility & u \� 0. Date 42(,,-, Location Address COC# pg Contact Name"_�)t ,\ r Phone # Contact Mailing Address County Directions Routine Compliance Inspection Rescission Request Complaint Investigation Other- Explain A Storm Water Pollution Prevention Plan Yes No N/A Comments Is a copy of the permit and the Certificate of Coverage available 1 at the site? 2 Is a copy of the signed and certified SWPPP at the facility? 3 Does the Plan include a "Narrative Description of Practices"? t/ 4 Does the plan include a general location (USGS) map? S Does the plan include a detailed site map including outfall locations and drainage areas? n ��� z 6 Does the plan include a Spill Prevention and Response Plan? (SPRP) 7 Does the plan include a Preventative Maintenance and Good Housekeeping Plan? -VrX3L rVW 8 Does the plan include a Stormwater Facility Inspection Program? 1 9 Does the Plan include a BMP Summary? 10 Does the plan include a list of Responsible Party(s)? 11 Has the SWPPP been implemented? B Monitoring and Records Yes No N/A Does list during 1 the plan include a of significant spills occurring kv\ the past 3 years? �� 1a� c,Q0 z Does the facility provide and document employee training? Has the facility conducted its Qualitative Monitoring? (semi- / 3 annual) 4 Has the facility conducted its Analytical Monitoring? (s-a) 5 Is the facility meeting all permit specified benchmark goals? j� 1 6 Is the facility following the tiered response? 7 Has the facility conducted its Analytical Monitoring from vehicle Maintenance areas? C Waste Management Yes No N/A 1 Does the facility provide all necessary secondary containment? \ - X101 2 Are current BMPs in material storage areas adequate? 3 Are appropriate spill containment and cleanup materials kept on site and in convenient locations? D Outfalls Yes No N/A 1 Were all outfalls observed during the inspection? 2 if the facility has representative outfall status, is it properly documented by the Division? 3 Has the facility evaluated all illicit (non stormwater) discharges? y� E Sector specific questions Yes No N/A 1 Have zinc or copper benchmarks been exceeded in the past 3 sampling periods? �( 2 Have potential sources for copper and zinc been evaluated at your facility? 3 2 5 Comments Kucken, Darlene , From Kucken, Darlene Sent Thursday September 08, 2016 10 04 AM To Drew Thorp Subject RE stormwater inspection Hi Drew, I'd like to schedule a Stormwater inspection with you and I'm hoping we can conduct this inspection on Monday, Sept 12 My preferred time is after 1 00pm, but I can also make it there in the morning Will Monday work for you or your representative Darlene Kucken - Darlene Kucken@ncdenr gov North Carolina Dept of Environmental Quality Asheville Regional Office Division of Energy, Mineral, and Land Resources 2090 US 70 Highway Swannanoa, NC 28778 Tel 828-296-4500 Fax 828-299-7043 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties AGo Greene Print this email only when necessary Thank you for helping NCDENR be environmentally responsible From Drew Thorp [mailto Drew@ashevilleoil com] Sent Thursday, May 19, 2016 8 29 AM To Kucken, Darlene <darlene kucken@ncdenr gov> Cc Aiken, Stan E <stan aiken@ncdenr gov>, Karl Koon <Karl@ashevilleoil com>, Steve Hairston <Steve@ashevalleoil com>, Brian Bauer <bbauer@mtnenv corn>, dwalker@mtnenv com Subject RE stormwater inspection Good Morning Darlene, As discussed, we absolutely want to do all we canto prevent a similar incident from happening in future I have copied Brian with Mountain Environmental on this e-mail so he is aware of the timeline we are shooting for with the testing We will plan on the first part of July for the inspection I've also attached a picture of the containment we had built around the separator I think it turned out well Thank you for reaching out and if there is anything we can do for you or further information you need prior to early July, please let us know We will have our written response to the NOV mailed before its deadline Thanks, Drew S Thorp Asheville Oil Company Smoky Mountain Heating & Air Phone (828) 274-7978 Email drew[dashevilleoil com From Kucken, Darlene fmailto darlene kucken@ncdenr gov] Sent Wednesday, May 18, 2016 3 27 PM To Drew Thorp Cc Aiken, Stan E Subject stormwater inspection Hi Drew, Thanks for speaking with me today and for being responsive to the issues noted in the Division of Water Resources' NOV As we discussed, please let me know when you have the analytical results from Mountain Environmental Group and we will set up a stormwater inspection and review of site conditions If possible, I would like to do this sometime the first two weeks of July Have a good day Darlene Kucken - Darlene Kucken@ncdenr gov North Carolina Dept of Environmental Quality Asheville Regional Office Division of Energy, Mineral, and Land Resources 2090 US 70 Highway Swannanoa, NC 28778 Tel 828-296-4500 Fax 828-299-7043 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties bA Go Green I Print this email only when necessary Thank you for helping NCDENR be environmentally responsible 2 Asheville Oki Company Asheville Oil Company Smoky Mountain Heating & Air State of North Carolina Environmental Quality Water Resources 2090 U S Highway 70 Swannanoa NC 28778 Attention G Landon Davidson, P G , Regional Supervisor Water Quality Regional Operations Asheville Regional Office Subject NOV-2016-OC-0001 (Incident # 201600911) Gentlemen Z�a Smoky Mountain Heating & Air Good People Great Service May 26 2016 Received MAY 3 1 2016 - Land Quality Section Asheville Please find attached our response to the questions in your letter dated May 5, 2016 concerning the above referenced Notice Of Violation which occurred the evening of April 18, 2016 We have attempted to answer the questions to the best of our ability based upon the facts that we have rather than conjecture We trust that our responses answer your questions completely, but we are happy to provide whatever additional information you may require Thank you for your understanding that this was an unfortunate accident and that it was not intentional Once we became aware of the problem, we acted responsibly and contracted with professionals to rectify the situation We are also implementing additional preventive measure to avoid a problem in the future Sincerely, Asheville Oil Company Karl N Koon President Cc Mr Stan Aikenr State of North Carolina Division of Energy Mineral & Land Resources 828/274 7978 • Pax 828/274 6673 • HVAC 828/274 7277 4 Fairview Road • PO Box 5377 Asheville NC 28813 5377 • aoc@ashevilleod com • www aslievilleoil com I After a review of Incident 4201600911, we have determined that the cause of the discharge was petroleum migrating from the oil side to the water side of an on -site oil/water separator This migrated petroleum was then forced out a drain line when water from several empty drums and washing on the afternoon of April 18 drained into the separator There are no inventory records or other means of determining the amount of petroleum that may have migrated onto the water discharge side of the separator Any guess as to the amount or extent of the release would be purely speculative We first learned of the incident a little before 7 00 pm on Monday, April 18`h when contacted by Buncombe County Emergency Management that the Asheville Fire Department had determined that petroleum was entering Sweeten Creek from near our location at 4 Fairview Road Our Operations Manager met the fire department at our bulk plant at about 7 10 pm and it was determined that source of the discharge was from the oil/water separator Within an hour of notification, the discharge was ceased by closing the valve on the discharge line from the separator, plugging the discharge pipe at Sweeten Creels and oil absorbent booms were deployed to catch any latent petroleum Our environmental contactor, Mountain Environmental, was contacted and they arrived on site shortly after 9 00 pm to set out additional booms and coordinate with the fire department The site was stabilized to the satisfaction of the parties around 10 00 pm that evening a little over 3'/z hours after the initial contact 2 On the morning of December 29, 2015, a flooding event occurred on Sweeten Creek causing our bulk facility to be inundated and up to six inches of mud to be deposited in low lying areas of the lot As December is our busy time serving the heating fuel needs of customers, clean-up began with what available manpower we could spare and this clean-up continued for several weeks While we tried to limit the mud that might enter the separator through our spill containment drains, we did not take into account what might have been deposited via the drain line from the creek or any solids that might have existed prior to the flooding event In hindsight, we were primarily focused on getting our delivery operations back on track and filling the needs of customers that the oil/water separator and the impacts that the flooding may have caused on it were secondary in our minds As for the petroleum products that might have existed on the oil side of the oil/water separator the night of the flooding, since the direction of flow was towards our containment walls and the flood level did not exceed the height of these walls, product could have been deposited within the containment area That said, there is no assurance that some product could not have found its way off site 3 As the level of petroleum product had never been inventoried in the oillwater separator, we can only speculate as to what a historical level might be We have a waste oil recycling company regularly remove product from both the oil side of the separator and an adjacent waste oil tank but they do not provide a detailed breakdown of the quantities pumped from each location Therefore, we cannot say if the 120 gals present the day of the release is normal or not Any product captured by the separator is product that we cannot sell so therefore it is in our best interests to minimize any product getting into the separator As to why the petroleum product in the separator could be fuel oil, during the winter heating season, the quantities of fuel oil that are unloaded at our facility then loaded into trucks for delivery increase substantially compared to other times of the year While spills are small and infrequent, these unloading and loading areas do receive rainwater which will car any etnyp Veil t into the separator _ M AY 3 1 2016 Land Quality Section Asheville 4 In discussions internally with Mountain Environmental, and with guidance from State regulators, the following operational changes are being implemented Place oil only absorbent products in the water side of the separator as an additional measure to prevent any petroleum product from flowing down the discharge pipe and into Sweeten Creek Done Weekly documented inventory of oil water separator levels including total level on both sides, level of oil on al side, condition of oil absorbent booms on water side of separator, and visual inspection of pipe discharge Implemented Install backflow preventer in discharge pipe to prevent Sweeten Creek from backing up into the separator causing it to overflow Valve on order Install a higher containment wall around oil -water separator to prevent any AST discharge from going straight into the separator and therefore into the creek Done Wash trucks only over gravel area where runoff will not enter the separator drains Implemented Invest in cleaning agents that pull oil from concrete so that washing unloading/loading areas with a hose is not necessary Testing products at this time Store empty drums upside down with drum plugs in place Rainwater that might enter empty drums that previously held petroleum product should be drained into plastic totes separate from the oil water separator so there is limited risk of any petroleum product entering the separator from empty drums Implemented Record the incident in our Spill Prevention, Control and Countermeasures plan as per direction from the Environmental Protection Agency Done Meet with North Carolina Water Resources concerning our Stormwater Permit and review of our Stormwater Pollution Prevention Plan Initial meeting held and follow-up meeting scheduled for early July 5 Copy of this report will be mailed to Stan Aiken at the Division of Energy, Mineral and Land Resources Any release of product whether at our site at a customer's site, in public areas, or anywhere, is a cause for concern Asheville Oil Company is committed to limiting the risk of a release occurring in the first place and, should any event occur, responding with the proper professional support to clean up and minimize the impact We are a fourth generation family owned and operated business, who has served this community and provided local employment since 1930 Officers of this company have served on many local boards and commissions to ensure our local community is a healthy and thriving community for all who live and visit here While we did not intend for this release to occur, we trust that our response with both immediate action and in formulating preventative measures to keep this from happening again, are satisfactorily received by the state Kucken, Darlene From Drew Thorp <Drew@ashevilleoil com> Sent Thursday, May 19, 2016 8 29 AM To Kucken, Darlene Cc Aiken, Stan E, Karl Koon, Steve Hairston, Brian Bauer, dwalker@mtnenvcom Subject RE stormwater inspection Attachments 20160518_172851_resizedjpg Good Morning Darlene, As discussed, we absolutely want to do all we can to prevent a similar incident from happening in future I have copied Brian with Mountain Environmental on this e-mail so he is aware of the timeline we are shooting for with the testing We will plan on the first part of July for the inspection I've also attached a picture of the containment we had built around the separator I thank it turned out well Thank you for reaching out and if there is anything we can do for you or further information you need prior to early July, please let us know We will have our written response to the NOV mailed before its deadline Thanks, Drew S Thorp Asheville Oil Company Smoky Mountain Heating & Air Phone (828) 274-7978 Email drew@ashevilleoil corn From Kucken, Darlene [mailto darlene kucken@ncdenr gov] Sent Wednesday, May 18, 2016 3 27 PM To Drew Thorp Cc Aiken, Stan E Subject stormwater inspection Hi Drew, Thanks for speaking with me today and for being responsive to the issues noted in the Division of Water Resources' NOV As we discussed, please let me know when you have the analytical results from Mountain Environmental Group and we will setup a stormwater inspection and review of site conditions If possible, I would like to do this sometime the first two weeks of July Have a good day Darlene Kucken - Darlene Kucken(Pncdenr gov North Carolina Dept of Environmental Quality Asheville Regional Office Division of Energy, Mineral, and Land Resources Water R esources ENVIRONMENTAL QUALITY May 5, 2016 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7012 10100002 196S 5464 Karl Koon - President Asheville Oil Company P 0 Box 5377 Asheville, NC 28813 PAT MCCRORY Governor DONALD R VAN DER VAART Secretary S JAY ZIMMERMAN Director a!I1Aagsy uoypaS A111enZ) pUel 910Z q - 4 A paA1a0a`d Subject NOTICE OF VIOLATION and RECOMMENDATION FOR ENFORCEMENT NOV-2016-OC-0001 (Incident #201600911) Illegal Discharge of Fuel Oil Asheville Oil Company - 4 Fairview Road Buncombe County, NC Dear Mr Koon Chapter 143, Article 21 of the North Carolina General Statutes (G S ) authorizes and directs the Environmental Management Commission of the Department of Environmental Quality to protect and preserve the water resources of the State The Division of Water Resources (DWR) has the delegated authority to enforce adopted water pollution control rules and regulations According to the Asheville Fire Department, Hazmat Unit HM2 was crossing the Biltmore Avenue Bridge at approximately 6 15 PM on Monday April 18, 2016 They became aware of a strong smell of petroleum and a visible sheen on the surface of the Swannanoa River HM2 and other first responder units followed Sweeten Creek upstream to a partially -buried drain pipe located on the property of the Asheville Oil Company (4 Fairview Road), which was determined to be the source of the petroleum discharge DWR emergency response was activated at 8 45 PM on April 18, 2016 and inspected the release site verifying impact from the discharge pipe associated with the onsite oil/water separator As a result of the release and subsequent impact to Sweeten Creek, a recreational -use advisory was issued for Sweeten Creek and the Swannanoa River for the period April 20, 2016 thru April 25, 2016 The public was advised to refrain from a number of outdoor activities including swimming, wading, fishing, or boating Violations The following violations are noted State of North Carolina I Environmental Quahty j Water Resources 2090 U 5 Hwy 70 Swannanoa, North Carolina 28778 828 296-4500 Karl Koon May 5 2016 j Page 2 of 3 v:20,221 Pollution and Hazardous Substances Control Act - Unlawful Discharge tl�v 6n,(2) j0`ther&,aster Item I Unlawful Discharge ) ,le The unauthorized discharge of petroleum to Sweeten Creek (Class C Waters) and the SwrWiv%r (Class C Waters), as confirmed on April 20, 2016, is a violation of North Carolina Statute G S 143-215 83 According to this statute, it shall be unlawful, except as otherwise provided in this Part, for any person to discharge, or cause to be discharged, oil or other hazardous substances into or upon any waters, tidal flats, beaches, or lands within this State, or into any sewer, surface water drain or other waters that drain into the waters of this State, regardless of the fault of the person having control over the oil or other hazardous substances, or regardless of whether the discharge was the result of intentional or negligent conduct, accident or other cause Item II Other Wastes The unauthorized discharge of petroleum to Sweeten Creek (Class C Waters) and the Swannanoa River (Class C Waters), as confirmed on April 20, 2016, is a violation of Title 15A North Carolina Administrative Code 02B 0211 (12) This statute requires oils, deleterious substances, colored, or other wastes only such amounts as shall not render the waters injurious to public health, secondary recreation, or to aquatic life and wildlife, or adversely affect the palatability of fish, aesthetic quality, or impair the waters for any designated uses For the purpose of implementing this Rule, oils, deleterious substances, colored, or other wastes shall include substances that cause a film or sheen upon or discoloration of the surface of the water or adjoining shorelines pursuant to 40 CFR 110 3(a)-(b) which are hereby incorporated by reference including any subsequent amendments and additions Required Response This Office requests that you respond to this letter in writing within 30 days of receipt of this Notice Your response should be sent to this Office at the letterhead address Your response should address the following items 1 Please submit a report assessing the cause, significance, and extent of the release In this report, provide a description of your initial response and when you ceased discharging all "oil" or other hazardous substances on the land or waters of the state 2 Asheville Oil Company indicated that a flooding event in December 2015 inundated the oil/water separator and likely deposited approximately 2 5 feet of sediment Why was a — Karl Koon May 5 2016 Page 3 of 3 the separator not inspected or serviced after the flooding event? To the best of your knowledge, what happened to the petroleum products that were present in the oil/water separator prior to the flooding event? 3 More than 120 gallons of fuel oil was present in the oil/water separator on the day of the release Please provide an explanation as to whether this volume is normal or excessive Why does it mainly consist of fuel oil? 4 Submit a description of operational changes or modifications including revisions to your SPPP that will prevent releases from this unit in the future You are to provide a copy of the report to the Division of Energy, Mineral and Land Resources at address listed below, attention Stan Aiken Thank you for your attention to this matter This office requires that the violations, as detailed above, be abated immediately and properly resolved This Office is considering sending a recommendation for enforcement to the Director of the Division of Water Resources regarding these issues and any future/continued violations that may be encountered Your above - mentioned response to this correspondence will be considered in this process These violations and any future violations are subject to civil penalty assessments The violations of the Oil Pollution and Hazardous Substances Control Act are subject to civil penalties of up to $5,000 per violation as per G S 143-215 88A The violations are subject to civil penalties up to $25,000 00 per day for each violation as per G S 143-215 6A Should you have any questions regarding these matters, please contact Brett Laverty at (828) 246-4500 Sincerely, G Landon Davidson, P G , Regional Superviso Water quality Regional Operations Asheville Regional Office cc ARO Files Stan Aiken DMLR ARO Steve Lewis DWR — PERCS Unit Received MAY - 5 2416 Land quality Section Asheville 1 Kucken, Darlene From King, Melissa Sent Tuesday, April 19, 2016 1146 AM To Kucken, Darlene Subject FW NCG080811 Oil/Petroleum sheen Swannanoa River/French Broad River Importance High FYI FSSE QUAM VIDERI Melissa ] King, PE - Melissa King@ancdenr gov North Carolina Dept of Environmental Quality Asheville Regional Office Division of Energy, Mineral and Land Resources - Land Quality 2090 U S 70 Highway Swannanoa, NC 28778 Tel 828-296-4500 Fax 828-299-7043 Notice E-mail correspondence to and from this address may be sub]ect to the North Carolina Public Records Law and therefore may be disclosed to third parties From Davidson, Landon Sent Tuesday, April 19, 2016 10 36 AM To Aiken, Stan E <stan aiken@ncdenr gov>, Pickle, Ken <ken pickle@ncdenr gov>, Walker, Fred <fred walker@ncdenr gov>, King, Melissa <Melissa King@ncdenr gov> Cc Price, Zan (George) <Zan Price@ncdenr gov>, Andersen, Jan <jan andersen@ncdenr gov>, Laverty, Brett <brett laverty@ncdenr gov> Subject NCG080811 Oil/Petroleum sheen Swannanoa River/French Broad River Importance High DEMLR staff Last night we were notified of an oil/petroleum release to Sweeten Creek that flows to Swannanoa and then to the French Broad River from Asheville Oil Company (4 Fairview Rd , Asheville) Based on first responder reports, an oil/water separator failed that was piped to discharge to the creek (NPDES SW COC) Last night we noted no sheen in any surface water but booms were present in Sweeten Creek (4 orange booms) Reports of sheen and odors were called in from 2 miles downstream yesterday afternoon in the French Broad River and into early evening although DWR was not notified until 9pm or so last night The source was stopped by Asheville Fire yesterday late afternoon by plugging the oil/water separator The contractor (Mtn Env ) has also installed booms and is onsite currently to remove contaminated soil around the separator and maintain booms Staff have reported alight sheen in Sweeten Creek and in minor pockets of Swannanoa, none observed in french Broad River Sweeten Creek does have a sheen and has a petroleum odor I've been in contact with Brian Combs regarding a health warning/swim advisory I hope to have a UST Section person address/manage the soil aspect today I am requesting that your agency please inspect the site and make recommendations to avoid a similar event in the future Asheville Oil Co staff indicate that the separator is not checked daily and can flush petroleum products when it runs out of water I'm also requesting that DEMLR staff discuss with me Notice of Violation options and potential enforcement options if necessary Please advise as well who to contact in DEMLR if there are media inquiries I'll provide more information as it comes to me Thanks Landon G Landon Davidson, P G Regional Supervisor - Asheville Regional Office Water Quality Regional Operations Section NCDEQ - Division of Water Resources 828 296 4680 office 828 230 4057 mobile Landon Davidson(a)ncdenr gov 2090 U S Hwy 70 Swannanoa, N C 28711 ric�- !-" 'Nothing Compares --%-,- Email correspondence to and from this address is subject to the North Carolina Public Records Lave and may be disclosed to third parties IL Compliance Inspection Report Permit NCGO80811 Effective 03/07/08 Expiration 10/31/12 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville oil Company County Buncombe 4 Fairview St Region Asheville Asheville NC 28803 Contact Person Cliff Wells Title Phone Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On -Site Representative(s) Related Permits Inspection Date 02/19/2010 Entry Time 12 40 PM Exit Time 12 55 PM Primary Inspector Susan A Wilson Phone 828-294-4500 Secondary Inspector(s) Reason for Inspection Follow-up Inspection Type Stormwater Permit Inspection Type Transportation wNehrcle Maintenance/Petroleum Bulk/Oil Water Se orator Stormwater Discharge COC Facility Status ■ Compliant Not Compliant Question Areas 0 Storm Water (See attachment summary) Page 1 A. A Permit NCGO80811 Owner Facility Asheville Ori Company Inspection Date 02/1912010 Inspection Type Stormwater Reason for Visit Follow up Inspection Summary (Susan Wilson) conducted a brief follow-up site visit to Asheville Oil on 2/12/2010 1 met with Mr Steve Hairston The purpose of the visit was to follow-up on the NOV sent 5/21/2010 DWQ received no written response to the NOV dated 5/21/2010 although some phone and e-mail discussions were conducted with their consultant Mtn Environmental The facility does have a SWPPP in place - however it was not signed and dated Qualitative monitoring was not available for review on -site (Mr Hairston said Mtn Enviro was doing that and they had copies') I spoke w/Judd Mahan (Mtn Environmental) - I told him he needs to make sure Mr Hairston reads the plan (then signs/dates it) He said he'd check on the qualitative monitoring - he wasn't sure they had that He also stated with re to the analytical monitoring - that they were only able to get samples from the outfall of the oil/water separator (and not the pipe discharging from the main loading area - there was no flow during times of sampling) I told him to make sure he noted that on the analytical and qualitative forms Based on the above information - I will not send another NOV but will follow-up again Page 2 Permit NCG080$11 Owner Facility Asheville Oil Company Inspection Date 0211912010 Inspection Type Stormwater Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (t1SGS) map? # Does the Plan include a Narrative Description of Practices ? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a SMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible f'arty(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Reason for Visit Follow up Has the Stormwater Pollution Prevention Plan been implemented? Comment I very briefly reviewed the plan - mainly to make sure they had one since we had received no response to the NOV from 5/2009 They did have one in place (Mtn Envlro had worked it up for them) However - it had not been signed and dated Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitonng semi-annually? ❑ ■ ❑ ❑ Comment Per Mr Hairston -Mtn Envlro has been performing the analytical and qualitative monitoring However - it was not available at the time of my site visit (Mr Hairston could not lay hands on it - he though Mtn Envlro was retaining a copy) Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment The facility has been performing the analytical monitoring and reporting to the DWQ Monitoring Is being conducted from the olw separator right now Permit and Outfalls # is a copy of the Permit and the Certificate of Coverage available at the site? Yes No NA NE ■ ❑ ❑ ❑ ■n❑❑ Yes No NA NE 01300 Page 3 a) 7 Permit NCGO80811 Owner Facility Asheville Oil Company Inspection gate 02/1912010 Inspection Type Stormwater Reason for Visit Fallow up # Were all outfalls observed dunng the Inspection) 11 ❑ 0 0 # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ Q ■ # Has the fatality evaluated all Iillcit (non stormwater) discharges? Comment Page 4 21 0 � �� �. i� w_ctJ_� j_t wf�s N`:Z`: 51 f� Gt7r> 1- o!ES 1� ILA i dN " S c_i c1 '�� t�•x `Dt i� /JC7 iu G tcA c/. r_i L; (J A-/J /i\ i �u_'J CSEb A—k A— r-tArN Z_� Z S� (e-c— A4- , 7to t7 �.4n3 �T�4�c 11i atii r3�2+^tS `� f r S� (f..3_9-( - A i_e—u-J P- r D_u'i� �-- i� —5-P(- a q I J i 1 1 s • 1 E r I 5 H + l r ' al ' r i 1' r f f r 4 a 11 .J' 1 1 iyS r Y ff F 1 � r � .1 ff • j 1 ya 7 4 '1 i i t r ` 1 1 * I 1 � A 1 r _ Y� � C, 1 t T ! f . — 1 CIC11 Y MODE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Dee Freeman Governor Director Secretary May 21, 2009 Steve Hairston Asheville Oil Company 4 1 anview Rd Ashevillc NC 28803 Subject Notice of Violation Asheville Oil Company NPDEI) General Stormwater Permit - NCGO808I 1 Buncombe County Response deadline Junc 24 2009 Deai Mr I lair stop I his letter is in follow-up to the NPDES Stormwater Permit Compliance Inspection conducted on May 15 2009 I he facility was found to be in violation of permit NCGO8081 I Findings 1 he following pet mit condition violations were noted during the Division of Watca Quality inspection and follo"'-up file icvtew 1 Stormwater Pollution Prevention Plan {SPPP} i A SPPP has not been developed and properly miplcmcnted 2 Qrialrtative Monitoring Qualitative momtonng has not been conducted and recorded in accordance NN ith pet nut reyuiicments 3 Analytical Monitoring ➢ Analytical monitoring has not been conducted and recoided in accordance with permit requirements Enclosed is a copy of the Compliance Inspection Report, which contains additional observations and comments 1oi your reference Location 2090 U S Hqhway 70 5uannanoa North Caroima 28778 o le q Phone 828 296 45W FAX 828 299 70431 Cuslomer Service 1-877-623 6748 N oI � Caro ilna Internet w%m rimaterquahly org Naturally An Equal OpNtItuxiy 1 4ifinn9live AcUoo Lmpl4yer Steve I nrston May 2t 2009 rage 2 of 2 0 _.% Required Response Please see to the development and implementation of a SPPP for the facility by the response deadline noted above Upon completion, notify the DWQ and a folloW-up site vt5it can be scheduled Please contact Susan Wilson at (828) 296-4665 or Susan A WilsonLy)ncdenr gov , if you have any questions regarding these matters Sincerely ` C Z�ZA Roger Edwards Regional Office `Yupervtsor Surface \N7ater P , cction Sc(-,,, En(,IOSLne cc Central Files Asheville Tiles Judd Mahan — Mountain hnvironmental (electronic copy) G 1WPDAI A\Dt.%lWQIE3uncortibelStonnuiterTransit fransportauon NCG0KAVI Oil\CLl_NOV_� 1.) 09 doe. Compliance Inspection Report Permit NCG080811 Effective 03/07/08 Expiration 10131/12 Owner Asheville Oil Company SOC Effective Expiration Facility Asheville Oil Company County Buncombe 4 Fairview bt Region Asheville Asheville NC 28803 Contact Person Cliff Wells Title Phone Directions to Facility System Classifications Primary ORC Certification Phone Secondary ORC(s) On Site Representative(s) Related Permits Inspection hate 05/15/2009 Entry T4mL 02 00 PM Exit Time 03 00 PM Primary Inspector Chuck Cranford Phone Secondary Inspector(s) Susan A Wilson Phone Reason for Inspection Routine Inspection Type Compliance Evaluation Permit Inspection Type Transportation wNehscle Maintenance/Petroleum Bulk/Oil Water Separator Stcrmwater Discharge COC Facility Status 1_l Compliant ® Not Compliant Question Areas ® Storm Water (See attachment summary) Page 1 Permit NCG080811 Owner Facility Asheville Oil Company Inspection Date 05/15/2009 Inspection Type Compliance Evaluation Reason for Visit Routine Inspection Summary DWQ staff was met on site by Mr Steve Hairston During the visit available records --as presented by Mr Hairston -were reviewed permit requirements were discussed and a site tour was conducted Current facility operations were communicated to Include residential and commercial distribution of on -road diesel heating oil gasoline and kerosene involving bulk truck and drum deliveries stormwater outfalls conveyances and general site conditions were observed The site visit revealed that a stormwater pollution prevention plan (SPPP) had not been developed nor implemented at the site neither qualitative or quantitative analytical records were available Therefore the facility was found to be non compliant with the permit To return to compliance the permittee must develop and implement a SPPP Please be advised the DWQ considers there to be two (2) stormwater discharge outfalls at the site 1 The pipe discharging stormwater from the system draining the main industrial area of the site (I e around the overhead r, k and loadingloff loading area) he pipe discharging stormwater from the oil water separator Page 2 Permit NCGO80811 Owner Facility Asheville Oil Company Inspection Date 051150009 Inspection Type Corn; o ince Evaluation Reason for Visa Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? n ® ❑ ❑ # Does the Plan include a General Location (USGS) map? n ® D ❑ # Does the Plan include a Narrative Description of Practices ? n >� n n # Does the Plan include a detailed site map Including outfall locations and drainage areas? ❑ ® n ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? n ® n n # Has the facility evaluated feasible alternatives to current practices? n n n # Does the facility provide all necessary secondary containment? ❑ ® n ❑ # Does the Plan include a SMP summary? ❑ ® n n # Does the Plan Include a Spill Prevention and Response Plan (SPRP)? n ® ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ M n n # Does the facility provide and document Employee "raining? ❑ ® ❑ ❑ # Does the Plan include a Irst of Responsible Party(s)? I! ® n n # Is the Plan reviewed and updated annually? n ® n n # Does the Plan include a Stormwater Facility Inspection Program? n ® n n Has the Stormwater Pollution Prevention Plan been implemented? n ® n n Comment Permittee has not developed a SPPP for the site Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitonng semi-annually? ❑ M ❑ ❑ Comment No monitoring records were presented to the Inspector Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? n D ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ® ❑ ❑ Comment DWQ records indicate analytical monitoring was conducted on January 28. 2009 No record of the required sampling for the first or second periods of 2008 were noted Permit and ©utfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® n n n # Were all outtalis observed during the inspection? ® n ❑ n # If the facility has representative outfall status is it properly documented by the Division? ❑ ❑ no ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? n ® 00 Page 3 Permit NCO080811 Inspection Date 05115/2009 Owner Facility Asheville Oil Company Inspection Type Compliance Evaluation Comment Permlttee has not developed or Implemented a SPPP for the site Reason for Visit Routine Page 4 Asheville Oil Company - G000'- Maps F Page 1 of 2 Goggle Maps Asheville Oil Company OtYE..,et l7vr 1 HrF,ntat Irk i M.rsl Y � J'� j S L Fafa.Ylr lraxM Tu . ill 7d jS4 � sf IAn./. SOIRhwrs! Gr,r1 YS r� Hr +r s,%W 3 r F Me n,�. ea i c=+r SDI fI fl Qdh.P/' la,'Axula� i1 rt C+ �f H ❑ N `3 Q � 3 tr' &Itz�or 'J,iEnp "Shevdl• 04 Camparry l Ix I.F Ik BrMr[fl'iM I R s+ ati ^rRW ? fr (. 1 rr n Wir*zwC E Ej rr I fiw3 dwmt w tr �G aC 4 Cry 4 Ps.hsChru Steak llnu.r +I � � ..E.It•4Ji,pbIlM urtiit Ul Rs k d+r..a A �4fl .Pr: A EJ � 1 t I fraspCe eesVe' R N � rPrj L'v R 'i !✓ -fu T F� J .� aKif�N. Vltlaq. irn �f r�1r Map data 02016 GGD61e 200 ft r e n ir� Ida IINE v'"'� � '1"`''•v"�..' JCr�," , h` er.;. f�� �I * i� � „� / rt E r iE•ti t4 `'lh'a-R�<. �y[eT �*� �i�.I`�iM4';C `Mf►If",.J 1u^/' 4 x��w~ �"�"" 1 h"ps //www google com/maps/place/Asheville+Oil+Company/@35 5669991,-82 5411665 z 22/2016 Asheville Oil Company L�Ooc flaps r h Asheville Oil Company S i Heating oil Supplier �Y, t J � 4 Fairview Rd Asheville, NC 28803 ashevilleoil com (828) 274 7978 ' tJ Add missing Information Google Maps - . S 1 I11), (,t A,! Page 2 of 2 baps //www google com/maps/place/Asheville+Oil+Company/@35 5669991 -82 5411665 4/22/2016 County BUNCOMBE Rier Basidt'- Report To AROSP Collector C CRANFORD Region ARO Sample Matrix Surf�c water Loc Type EfFluent Emergency YeslNo COC Yes/No Sample ID A628132 �p� rtN r 17/ � PO Number tt SW2082 O G Date Received 0312512008 fr`y r r Time Received 11 15 bLabvrarks LoginlD MMATNIS Date Reported 4/4108 Report Generated 0410412008 VlsitlD Loc Descr AVLOILt3w5 Location ID AROSPNLC Collect Date 03119/2008 Collect Time 1330 Sample Depth Sample Qualifiers and Comments Routine Qualifiers For a more detailed description of these qualifier codes refer to www dwglab org under Staff Access A Value reported is the average of two or more determinations B1 Countable membranes with <20 colonies Estimated 32 Counts from all filters were zero 133 Countable membranes ninth more than 60 of 80 colonies Estimated 54 Fitters have counts of both >60 or 80 and < 20 Estimated 85 Too many colonies were present too numerous to count (TNTC) J2 Reported value faded to meet QC criteria for either precision or accuracy Estimated J3 The sample matrix interfered with the ability to make any accurate determination Estimated J6 The lab anatysis was from an unpreserved or improperly chemically preserved sample Estimated N1 The component has been tentatively identified based on mass spectral library search and has an estimated value LAB N3 Estimated concentration is < PQL and >MDL NE No established PQL P Elevated PQL due to matrix interference and/or sample dilution 01 Holding time exceeded prior to receipt at lab 02 Holding time exceeded following receipt by lab PQL Practical Quantltation Limit subject to change due to Instrument sensitivity U Samples analyzed for this compound but not detected X1 Sample not analyzed for this compound - ,Ar. _ _ 1, i� i' I APR 18 2008 l i Laboratory Section>> 1623 Mail Service Center Raleigh NC 27699 1623 (919) 733 3908 { LLPage_1 of 2---- WATER QUALITY SECTION } ASciEVILLE nt-G GVHL OFli ks XC DWQQ Laboratory Section XesuCts Sample ID AB28132 Location ID AROSPNLC Collect Date G311912008 Loc Descr AVLOILOWS CclieVL Tame 13 30 Visit ID Analyte Name iple temperature at recell Method Reference POL Result Qualifier Units DSAU 3125108 Approved By Date MMATHIS 3125108 WET Grease and Oil In liquld 10 44 mg1L MIBRAHIM1 MOVERMAN MethW Reference EPA1664A 3131109 414108 Laboratory Section» 1623 Mail Service Center Raleigh NC 27699 1623 {9191 733 3908 Page 2 of 2 DIVISION OF WATER QUALITY Chemistry LAboratury Report I Water Quality ❑ SAMPLETYPE COUN FY Buncombc PRIORITY RIVER BASIN Fnsnch_BPOad Q AMBIENT QA STREAM LFFLULNf REPORT TO Chuck Cranford Asheville Regional Off" COMPLIANCE El CHAIN OF CUSTODY � LAKE � iNrLUENT Other EMERGENCY VISIT ID ESTUARY COLLECTOR(S) Chuck Cranford 'Lob 17um6er n I ") Date i2aetYed J a 5 O$ Tune Received f �' Receved By ! Estimated DOD Range Station Location V V r Ij 'I Seed Chlorinated Remarks Station Of/Location Code Date Begin (yy/mns/dd) Date End (yy/mmldd) Time Begin IT..,, End Depth DM DB DUM Value Type A 11 L Composile T S It Sample Type AVL OIL OWS 08103/19 09/03/19 0130 pm 0130 lim I Grab BOD 310 mg/L COD M h 340 mg/L COD Low 335 mg/L Coliform MFFecal31616 AoOml Coliform MFTotal31504 1100ml Colifurm lobe Fecal3i615 1100m1 Conform FecalSwe 31673 /100m1 P esid us Total 500 mg/L Volatile 505 mg/L Fixed 510 m Residue Sua ended 510 m Volatile 535 mg/l. Fixed 540 m L H 403 units Aeiduy to pH 4 5 436 m Acidity to pH 8 J 435 mg/L A1kalim to pH g 3 41 S m l- Alkalinity to pH 4 5 410 mPJL TOC 680 mg/L Turbidtt 76 NTU Cohrotm Toiai Tube /100 rril COMMENIS Chloride 940 myL Chlorophyll a EPA 445 0 modiied option ug/I Color True80 cu Color (pH) 87 H- c u Color PH 7 6 82 c u C amdc 720 MVL Fluoride 951 mg/L Formaldehyde 71880 m L Grease and Oils 556 m Hardness Total900 m $ eciic Cond 95 umhoslcm MBAS 39260 m Phenols 32730 u Sulfate 945 mg/L Sulfide 745 mg/L Boron Tammn & Li mn Hexavaleat Chromium ugfL Btcarbonatc -g/L Carbonate mg/L Total Dissulve4 Solids mg1L 1— F NH3 as N 610 -EfL TKN an N 625 m 1 NO2 plus NO3 as N 630 mg/L P Total as P 665 mb/L "as P 10507 mg/L P Dissolved as P 666 mg/L K Potassium mt/L Cu Cadmium 1027 ugJL Cr Chromium Total 1034 ug/L Cu Copper 1042 u L Ni Nickel 1067 ug/L Pb Lead 1051 ug/L zn zinc 1092 ug/L V Vanadium u L A& Silver1077 ug/L At Aluminum 1105 u L Be Beryll Pum 1012 ug/L Ca Calcium 916 mgrL Co Cobalt 1037 ug/L Fe lion 1045 UUL Me Molybdenum ugl( Sb Antimony ug/L Sn Tin ug/L TI Thallium UWL 1, Ttianrum ug/L Hg 1631 ng)L Li Lithium 1132 u8/1 Mg Ma esium 927 m Mn Mampricze 1055 ug/L No Sodium 929 m Arsenic Total 1007 Se Selenium 1147 u 1I IMvcti'X 71900 ur 1l Ba Barium uglL OrLanOchlOrine Pesticides Or,anonitro en Pesticides Acid Herbicides Fias"eulral&Acid hxtractable Organics TPH Diesel Ranhc Pur eable Organics (VOA bottle rer d) TPH 0anohne Ranee Report to _MRO Sample Anomaly Report (SAR) Lab Number Station Location AB28132 Dallas W WTP I mple Type Effluent Date collected 4/1/08 Affected Parameter(s) BOD Sample ID NCO068888eff County Gaston Region Mooresville Priority Compliance/COC Collector D Hood Date received 4/2/08 Date analyzed 4/2/08 Analytical Area (check one) ❑ WCH ❑METALS ❑ NUT ®MICRO The following anomalies occurred (check all that apply) ❑samples ❑Improper container used ❑VOA vials with headspace ❑Sulfide samples with headspace ❑Samples not received but listed on fieldsheet ❑Samples received but not listed on fieldsheet ❑Mislabeled as to tests preservatives etc ❑Holding time expired ❑Prior to receipt in lab El After receipt in lab ❑insufficient quantity for analysis ❑Sample exhibits gross non homogeneity ❑Sample not chemically preserved properly ❑pH out of range (record pH) ❑Improper chemical ❑Residual chlorine present in sample ❑Color interference ❑Heavy emulsion formed during extraction ❑Sample battle broken in lab no reportable results ❑Other (specify) ❑VOA ❑SVGA ❑PEST ®Quality Control ❑Instrument failure — no reportable results ❑Analyst error — no reportable results ❑Surrogates ❑None added ❑Recovery outside acceptance limits ❑Spike recovery ❑None added ❑Recovery outside acceptance limits ❑)~ailed to meet criteria for precision ❑Internal standards FIB lank contamination ®QC data reported outside of controls (e g QCS LCS) El Incorrect procedure used ❑SOP intentionally modified with QA and Branch Head approval ❑Invalid instrument calibration ❑Elevated detection limits due to ❑Insufficient sample volume Comments One of the two glucose glutamic acid standards was below the acceptable range of 167 5 to 228 8 mg/L at 160 55mg/L The oxidation-reduction test required 6 drops of bi-iodate to netralize the reducing agents to the sample This indicates that the sample contains reducing agents The sample was seeded Corrective Action Ongoing in,,estigation to determine the cause of low GGA standard results ❑Samples were rejected by DWQ Lab Authorized by Date ❑Accepted and analyzed after notifying the collector or contact person and determining that another sample could not be secured ❑Sample(s) on hold until ®Sample reported with qualification Data qualification code used G5 ❑Other (explain) Notification Required ❑ Yes ❑ No Person Contacted Date Form completed by JAngela Dexte argo& Date 4/812008 Lead Chemist Rene initial) M8IOCHl~M ❑MErALS 0 PEST ❑VOA Branch HLad Renew (initial) A.4 r `i v' 4 r QA/QC Review (inn t✓ ! � t fi a QA%Formtl AWriiary%5AR ❑SVGA Logged into database by (initial) INUffiidht North Carolina Michael f= Easley Governor William G Ross Jr, Secretary Attn Car I Koon Asheville Oil Companv P O Box 5377 Asheville, NC 28813 Dear Mr Koon A PWA CDENR Department of Environment and Division of Waste Management Underground Storage Tank Section March 19 2008 COJPD'�Y/ Natural Resources Dexter R Matthews Direcic�r Re Notice of Regulatory Requirements 15A NCAC 2L 0105(c) and (h) Cot rective Action Asheville Oil Companv 4 Fair% ie« Road, AsheE iIle Buncombe County Ranking Intermediate The Conecti%e Action Plan (CAP) recened on March 17, 2008 has been revie«ed by the Underground Storage Tank (UST) Section, Asheville Regional Office 1 he plan and the schedule are hereby appro\ cd as outlined in the report including submission of seiiii-annual rei•iiedial actioii reports A modification to the CAP shall include immediate and on -going updates to the UST Section and Surface Water Section addressing the product release to SN;eeten Creek and boom maintenance as needed Failure to implement the plan and schedule in the manner and time specified rna� result in the assessment of civil penalties and/or the use of other enforcerntnt mechanisms If � ou have am questions regarding the actions that must be taken or the rules mentioned ill this letter please contact meat the address or telephone number listed beloA Sincerelv, %i\ PWP,4 Dan Murphy, L G I lydrogeologist Asheville Regional Office cc Judd. Mahan, Mountain En\ ironmental Group Buncombe County Health Department Chuck Cranford ARO oppor in-4 w inative Employer z,0 Re--\ lea ii' Post Ca=t5uI e Raper UST Regional Offices Ashes the (ARO) — 2090 US Highway 70 Swannanoa NC 28778 (828) 296-4500 FnN etteN ille (FAY) — 225 Green Street Suite 714 Systel Building, Fayetteville NC 28301 (910) 433 3300 Mooresville (A70R) — 610 East Center Avenue, Suite 301 Mooresville NC 28115 (704) 663-1699 Raleigh (RRO) — 1628 Mail Service Center Raleigh NC 27699 (919) 791-4200 Washington (NIVAS) — 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 Wilmington (WIL) — 127 Cardinal Drive Extension, Wilmington NC 28405 (910) 796-7215 Winston-Salem (WS)— 585 Waughtown Street Winston Salem NC 27107 (336) 771 5000 Guilford County Environmental Health, 1203 Maple Street Greensboro NC 27405 (336) 641 3771 FTP CAP appry nonustNOR0507 dot l f` March 7, 2008 Mr Karl N Koon, V P Asheville Oil Company PO Box 5377 Asheville, NC 28813-5377 Sys f Milo F i asle GovernorZQ-" Witham G Ross Jr secretary North Carohna Department of Environment and Natural Rehources Coleen Fl Sullins Director � � t D,'vtsl�On 0l _Water Quality IIII 11j MAR 1 2 2008 WATti3 CU,,LITY SE-"-r N' AR� �V+LLB QCC CN,L C-I �iCE SuLiect General Permit No NCG080000 A,,hevtlle Ott Company 00C NCGO80311 RunLomhe County Dear Mr Koon In accordance with your application for a discharge permit receir,ed on February 25 2008, vke are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit This permit is issued pursuant to the requirements of North Carolina General Statute 143- 215 1 and the Memorandum of Agreement between North Carolina and the US EnvironnILTItal Prott ction Agency dated May 9, 1994 (or as Subsequently amended) Please note that fueling of vehicles is considered vehicle mairiterianc.e (40 CFR 1.22 26 b 14 vin) This will require analytical monitoring of stormwater discharged frorn the vehicle maintenance area as stated in the permit text of NCG080000 Please take notice that this certificate of coverage is not transferable except after not cc to the Division of Water Qualitv The Division of Water Quali'N may requu, modification or revocation and reissuance of the certificate of coverage This permit does not affect the legal rc.gwrernents to obtain other permits whicti rna� be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local govemmental permit that may be required If you have any questiors concerning this peirmt, please contart 11obeit Pattesoo at telephone number (919) 733-5083 ext 30 Sint;,erely ORIGINAL SIGNED BY FtRADLEY BENNETT nor Coleori H Sullins cc Asheville Regional OtfiLe Central Files Stormwater Pii-rmitbng Uwt Fil. s tNo hCarohn i A711rrnlly North Carolina Div,s, sn oL Water Qu tH 1617 Mail aM u e r c t..r R a eigh NC 27699 1617 Phone (919) 733 5081 Customer 5er ice Internet nr %a i ciu,lil ,rr, Lc-atwn , N S il(.,hw-v St kaletgh NC 27604 Fax (919) 733 9612 1 S77.623 6748 An z-xi4 Cpror b- yin13 0i, , a �%.t o, Emp,�)er— 50 10 RcL-,ydW10% Post Consumer Paper STATE OF NORTH CAROLiNA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG080000 CERTIFICATE OF COVERAGE No NCG080811 STORMWATFR DISCHARGES NATIONAL POLLU TANT DISCHARGE ELIMINATION SYSTEM In compliance watt the provision of Nonti Carolina Oenerd, Statute i 4-)-215 1, oiner la�lful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Asheville Oil Company is hereby authonzed to discharge stormwate- from a facility located at Asneville Oil Comparnv 4 Fainrncw Road Asheville Buacombe County to receiving waters designated as 5weetc II CreLk, a class C water in the Fiench Broad River Basin, in accordance with the effluent limitations, monitoring requiienients, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No NCG080000 as attached This certificate of coverage shall become effective March 7, 20�S This Certificate of Coverage shall remain in efiect for the duration of the General Oermit Signed this 7`h aa� of 1vlarch 2008 ORIGINAL SIGNED BY BRADLEY BENNETT for Coleen H Sullins, Director Doasion of Water Quality By thy. Authority of the Environmental Management Commission FM V®R JSUSI I I I Asheville Oil Comp Adrkxz%#HIx%n;i ro%m"im Nam 4 Asheville Oil NOI Subject Asheville Oil NOI From Chuck Cranford <Chuck Cranford@ncmazl net> Date Tue, 04 Mar 2008 12 22 43 -0500 To Robert Patterson <Robert Patterson@ncmail net> CC Starr Silvis <Starr Silvis@nctnatl net> Robert I reviewed the Asheville Oil NOI and I would only make one change Question 12 should have been marked "Yes " They do fuel their vehicles on -site, so they are conducting "Vehicle Maintenance Activities " Be advised, they do have an oil/water separator Thanks, Chuck Chuck Cranford - Chug. Cranford@ncmail net. North Carolina Dept of Environment and Natural Resources Asheville Regional Office Division of Water Quality - Surface Water Protection Section 2090 U S 70 Highway Swannanoa, NC 28778 Tel 828-296-4500 Fax 828-299-7043 Chuck Cranford <Chuel. Craniatd a nc mail net> NC DENR Asheville Regional Office Div of Water Quality - Surface Water Protection I of 1 3/5/2008 7 23 AM _.'4 !A NCDENR Ew+K .� — N— NClOU - NOTICE OF INTENT Division of Water Quality / Water Quality Section National Pollutant Discharge Elimination System NCG080000 FOR AGENCY USE ONLY Dart Recewtd Year I Ylonlh Dav c CRUffcale Or COrera c v it Ctrcck N 1 Arr ,M tea 2 r Pcrrrul Assi tied to A rLO--� National Pollutant Discharge Elimination System application for coverage under General Permit 0 NCG080000 �0 -rt STORMWATER DISCHARGES from Vehicle Maintenance Areas (including vehicle rehabilitation, W mechanical repairs, painting, fueling, lubrication and equipment cleaning operations areas) asso'', d tt�m j�lfit with activities classified as SIC 40 Rail Transportation g a SIC 41 Local and Suburban Transit and interurban Highway Passenger Transportation SIC 42 Motor Freight Transportation and Warehousing (except SIC 4221 4225)� SIC 43 Postal Service The following activities are also included Other industrial activities where the vehicle maintenance area(s) is the only area requiring permitting Petroleum Bulk Stations and Terminals (SIC 5171) with total petroleum site storage capacity of less than 1 million gallons Stormwater discharges from oil water separators and/or from secondary containment structures associated with petroleum storage facilities with less than 1 million gallons of total petroleum site storage capacity Discharges associated with vehicle maintenance operations at activities which are otherwise designated on a case by case basis as being required to be permitted (Please print or type) 1) Mailing address of owner/operator Standard Industrial Classification Code Name Asheville Oil Company Street Address 4 Fairview Road C ram- ("Y' 5zf5 City Ashevilie State NC ZIP Coda 28813 --� Telephone No 828 274-7976 Fax f� i; r :'- !•'r .("Iw —1 Address to which all permit correspondence will be mailed 2) Location of facility producing discharge Facility Name Asheville Oil Company Facility Contact Cliff Wells Street Address 4 Fairview Road City Asheville State NC ZIP Code 28803 County Buncombe Telephone No 828 274 - 792_B Fax F' e= f-S 3) Physical Location Information Please provide a narrative description of how to get to the facility (use street names state road numbers and distance and direction from a roadway intersection) The site is located on Fairview Rd --250 ft east of the intersection of Fairview and Sweeten Cr Roads (A copy of a county map or USGS quad sheet with tacrhty clearly located on the map is required zo be submtlted with this application) Page 1 of 3 SWU 223 1017o1 NCG080000 N O 1 4) This NPDES Permil Application applies to which of the following ❑ New or Proposed Facility Date operation is to begin ® Existing 5) Standard Industrial Classification Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code 5 1 7 1 6) Provide a brief narrative description of the types of industrial activities and products manufactured at thlsfacihty The facility is a bulk petroleum distributor Motor fuel, heating oil, lube, etc -is stored on site for local distrubution_ 7) Discharge points I Receiving waters How many discharge points (ditches, pipes, channels, etc) convey stormwater from the property? One What is the name of the body or bodies of water (creek, stream, river lake etc ) that the facility stormwater discharges end up in? Sweeten Creek If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e g City of Raleigh municipal storm sewer) S) Does this facility have any other NPDES permits) ® No ❑ Yes If yes list the permit numbers for all current NPDES permits for this facility 9) Does this facility have any Non Discharge permits (ex recycle permits)) ® No ❑ Yes If yes list the permit numbers for all current Non Discharge permits for this facility 10) Does this facility employ any best management practices for stormwater control) ❑ No ® Yes If yes please briefly describe Concrete_ curbing prevents runoff from reaching the adjacent creek Secondary containment is utilized for ASTs 11) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No Stormwater Pollution Prevention Plan is in prep ❑ Yes If yes when was it implemented? 12) Are vehicle maintenance activities occurring at this facility? ® No ❑ Yes 13) Hazardous Waste a) Is this facility a Hazardous Waste Treatment Storage or Disposal Facility? ® No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg of hazardous waste generated per month) of hazardous waste? El No ❑ Yes Page 2 of 3 SWu 223 1ol7ol NCGO80000 N O 1 c) Is this facility a Large Quantity Generator (1000 kg or more of hazardous waste generated per month) of hazardous waste? ® No ❑ Yes d) If you answered yes to questions b or c please provide the following Information Type(s) of waste How is material stored Where is material stored How many disposal shipments per year Name of transport / disposal vendor Vendor address 14) Certification North Carolina General Statute 143-215 6 b (i) provides that Any person who knowingly makes any false statement representation or certification in any application record report plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission imptementing that Article or who falsifies tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article shall be guilty of a misdemeanor punishable by a fine not to exceed $10 000 or by imprisonment not to exceed six months or by both (18 U S C Section 1001 provides a punishment by a fine of not more than $10 000 or imprisonment not more than 5 years or both for a similar offense ) hereby request coverage under the referenced General Permit I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true complete and accurate Printed Name of Person Signing ,t��� J�� -��o j Title V' (Signature of Applicant) (Date Signed) Notice of Intent must be accompanied by a check or money order for $100 00 made payable to NCDENR Final Checklist This application will be returned as incomplete unless all of the following items have been included 0 Check for $100 made payable to NCDENR ❑ This completed application and all supporting documents ❑ Copy of county map or USGS quad sheet with location of facility clearly marked on map Mail the entire package to Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh North Carolina 27699 1617 Note The submission of this document does not guarantee the issuance of an NPDES permit Page 3 of 3 SWU 223 101701 ASHEVILLE QUADRANGLE NORTH CAROLINA-BUNCOMBE: CO 7 5 MINUTE SERIES (TOPOGRAPHIC) 102-SE ��y�� { i•' �Y— �M1�� c 1 1 ` t ' i �°OF �•. � T ; I + � �� - / ,-- a +Half ' t SsY1kA I p A lie ',`a� �.{t�• r ��_ �, t��f��•i" ��• `,�ft�,� �1�` -� o- •r,Y 1 Itronv IeAVA 439.3 —� Asheville Oil f ram. ►'� _ r .r ,� r .�/,�t»/"= Company apu�a[� �i� �Yoasisttrs JKliwo T 'V�'r �� r! 1 II`,, I •�t� +\ �,L �� 71 I SCALE 124000 � o i wLE �000 0 1C00 2000 3000 �cw 5000 6400 7000 FEET uF==I_ - 1 5 D 1 KFLG$M4 ER NH � ASHEVILLE, N C o es 35082 E5 TF 024 4+� G MIL$ SO M11.5 Tg6T DMA 4455 11 SE -SERIES V842 VTN GRID A140 1991 MAGNETIC NORI`•, DECLINAT,ON AT CENTER OF %"(:ET Figure I Site Vicinity Map Asheville Oil Company - 4 Fairview Street Asheville, NC ILL 1`40 K-141UCKY VA TEtmESSEE , Tic MI5S ! ALA GA 5 C GUlDFRAGLE LOCATION b%OUNTAIN Environmental Sarvlces Inc _Q / ` r 1 Facility Date Location Address COC# Contact Name Phone # Contact Mailing Address County Directions Routine Compliance inspection Rescission Request Complaint Investigation Other - Explain A Storm Water Pollution Prevention Plan Yes No N/A Comments 1 Is a copy of the permit and the Certificate of Coverage available at the site? 2 Is a copy of the signed and certified SWPPP at the facility? 3 Does the Plan include a "Narrative Description of Practices"? 4 Does the plan include a general location (USGS) mapa 5 Does the plan include a detailed site map including outfall locations and drainage areas? 6 Does the plan include a Spill Prevention and Response Plan? (SPRP) 7 Does the plan include a Preventative Maintenance and Good Housekeeping Plan? 8 Does the plan include a Stormwater Facility Inspection Program? 9 Does the Plan include a BMP Summary? 10 Does the plan include a list of Responsible Party(s)? 11 Has the SWPPP been implemented? B Monitoring and Records Yes No N/A 1 Does the plan include a list of significant spills occurring during the past 3 years? 2 Does the facility provide and document employee training? ? Has the facility conducted its Qualitative Monitoring? (semi- annual) 4 Has the facility conducted its Analytical Monitoring? (s-a) 5 Is the facility meeting all permit specified benchmark goals? 6 Is the facility following the tiered response? 7 Has the facility conducted its Analytical Monitoring from vehicle Maintenance areas? C Waste Management Yes No N/A 1 Does the facility provide all necessary secondary containment? 2 Are current BMPs in material storage areas adequate? 3 Are appropriate spill containment and cleanup materials kept on site and in convenient locations? D Outfalls Yes No N/A 1 were all outfalls observed during the inspection? 2 If the facility has representative outfall status, is it properly documented by the Division? 3 Has the facility evaluated all illicit (non stormwater) discharges? E Sector specific questions Yes No N/A 1 Have zinc or copper benchmarks been exceeded in the past 3 sampling periods? 2 Have potential sources for copper and zinc been evaluated at your facility? 3 4 5 Comments Facility Date Location Address COC# Contact Name Phone # Contact Mailing Address County Directions Routine Compliance Inspection Rescission Request Complaint Investigation Other - Explain A Storm Water Pollution Prevention Plan Yes No N/A Comments 1 Is a copy of the permit and the Certificate of Coverage available at the site? z Is a copy of the signed and certified SWPPP at the facility? 3 Does the Plan include a "Narrative Description of Practices"? 4 Does the plan include a general location (USGS) map? 5 Does the plan include a detailed site map including outfall locations and drainage areas? 6 Does the plan include a Spill Prevention and Response Plan? (SPRP) 7 Does the plan include a Preventative Maintenance and Good Housekeeping Plan? 8 Does the plan include a Stormwater Facility Inspection Program? 9 Does the Plan include a BMP Summary? 10 Does the plan include a list of Responsible Party(s)? 11 Has the SWPPP been implemented? B Monitoring and Records Yes No N/A 1 Does the plan include a list of significant spills occurring during the past 3 years? 2 Does the facility provide and document employee training? 3 Has the facility conducted its Qualitative Monitoring? (semi- annual) 4 Has the facility conducted its Analytical Monitoring? (s-a) S Is the facility meeting all permit specified benchmark goals? 6 Is the facility following the tiered response? 7 Has the facility conducted its Analytical Monitoring from vehicle Maintenance areas? C Waste Management Yes No N/A 1 Does the facility provide all necessary secondary containment? 2 Are current BMPs in material storage areas adequate? 3 Are appropriate spill containment and cleanup materials kept on site and in convenient locations? D Outfalls Yes No N/A 1 Were all outfalls observed during the inspection? If the facility has representative outfall status, is it properly 2 documented by the Division? 3 Has the facility evaluated all illicit (non stormwater) discharges? E Sector specific questions Yes I No N/A I Have zinc or copper benchmarks been exceeded in the past 3 sampling periods? 2 Have potential sources for copper and zinc been evaluated at your facility? 3 4 5 Comments STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG080000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM for establishments primarily engaged in the following activities Vehicle Maintenance Areas In compliance with the provision of North Carolina General Statute 143-215 1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission and the Federal Water Pollution Control Act, as amended, this permit is hereby issued to all owners or operators, hereafter permittees, which are covered by this permit as evidenced by receipt of a Certificate of Coverage by the Environmental Management Commission to allow the discharge of stormwater to the surface waters of North Carolina or to a separate storm sewer systems conveying stormwater to surface waters in accordance with the terms and conditions set forth herein Coverage under this general permit is applicable to All owners or operators of stormwater point source discharges associated with activities that have Vehicle Maintenance Areas (including vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication and equipment cleaning operation areas) associated with activities classified as Rail Transportation [Standard Industrial Classification (SIC) 40], Local and Suburban Transit and Interurban Highway Passenger Transportation [SIC 41], Motor Freight Transportation and Warehousing [SIC 42], except Public Warehousing and Storage [SIC 4221-4225], Postal Service [SIC 43], and Petroleum Bulk Stations and Terminals [SIC 5171] with total petroleum storage capacity of less than 1 million gallons On a case -by -case bans, the State may require other industrial activities to be permitted under this general permit that are not categorically required to be permitted These other activities may include stormwater discharges from oil water separators, secondary containments structures at petroleum storage facilities, and/or vehicle maintenance areas at any facilities other than those listed above Discharge limitations in Part II Section C. only apply to such activities when designated by the Division Except upon DWQ determination of similarity as provided immediately above, the following activities and associated discharges are excluded from coverage under this General Permit Vehicle maintenance areas at activities classified as Water Transportation [SIC 44] and Transportation by Air [SIC 45] and Wash water from steam cleaning operations or other equipment cleaning operations The General Permit shall become effective on November 1, 2012 The General Permit shall expire at midnight on October 31, 2017 Signed this day October 25, 2012 Orrgjnal srgned by Matt Matthews for Charles Wakild, P E , Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No NCG080000 TABLE OF CONTENTS PART 1 INTRODUCTION Section A General Permit Coverage Section B Permitted Activities PART II MONITORING CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A Stormwater Pollution Prevention Plan Section B Analytical Monitoring Requirements - Vehicle Maintenance Activities Section C Discharge Limitations and Analytical Monitoring Requirements - Oil Water Separators and/or Petroleum Bulk Stations and Terminals Section D Qualitative Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS Section A Compliance and Liability 1 Compliance Schedule 2 Duty to Comply 3 Duty to Mitigate 4 Civil and Criminal Liability S Oil and Hazardous Substance Liability 5 Property Rights 7 Severabihty 8 Duty to Provide Information 9 Penalties for Tampering 10 Penalties for Falsification of Reports 11 Onshore or Offshore Construction 12 Duty to Reapply Section B General Conditions 1 General Permit Expiration 2 Transfers 3 When an Individual Permit May be Required 4 When an Individual Permit May be Requested 5 Signatory Requirements i Permit No NCGO80000 6 General Permit Modification, Revocation and Reissuance, or Termination 7 Certificate of Coverage Actions S Annual Administering and Compliance Monitoring Fee Requirements Section C Operation and Maintenance of Pollution Controls 1 Proper Operation and Maintenance 2 Need to Malt or Reduce not a Defense 3 Bypassing of Stormwater Control Facilities Section D Monitoring and Records 1 Representative Sampling 2 Recording Results 3 Flow Measurements 4 Test Procedures 5 Representative Outfall 6 Records Retention 7 Inspection and Entry Section E Reporting Requirements 1 Discharge Monitoring Reports 2 Submitting Reports 3 Availability of Reports 4 Non-Stormwater Discharges 5 Planned Changes 6 Anticipated Noncompliance 7 Spills 7 Bypass S Twenty-four Hour Reporting 9 Other Noncompliance 10 Other Information PART IV DEFINITIONS Permit No NCGO80000 PART I INTRODUCTION SECTION A GENERAL PERMIT COVERAGE All persons desiring to have facilities covered by this General Permit must register with the Division of Water Quality by the filing of a Notice of Intent (NOI) and applicable fees The N01 shall be submitted and a certificate of coverage issued prior to any point source discharge of stormwater associated with industrial activity to the surface waters of the state Any owner or operator not wishing to be covered or limited by this General Permit may make application For an individual NPDES permit in accordance with NPDES procedures in 15A NCAC 2H 0100, stating the reasons supporting the request Any application for an individual permit should be made at least 180 days prior to commencement of discharge This General Permit does not cover activities or discharges covered by an individual NPDES permit until the individual permit has expired or has been revoked Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be revoked and coverage under this General Permit be provided If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122 26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements Any owner or operator wishing to obtain a No Exposure Exclusion must submit a No Exposure Certification Notice of Intent (NOI) form to the Division, must receive approval by the Division, must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit, and must recertify the No Exposure Exclusion annually Any facility may apply for new or continued coverage under this permit until a Total Maximum Daily Load (TMDL) for pollutants for stormwater is established A TMDL sets a pollutant -loading limit that affects a watershed, or portion of a watershed, draining to a specific impaired water For discharges to watersheds affected by a TMDL, coverage under this permit may depend on the facility demonstrating it does not have reasonable potential to violate applicable water quality standards for those pollutants as a result of discharges If DWQ determines that discharges have reasonable potential to cause water quality standard violations, the facility shall apply for an individual permit 180 days prior to the expiration date of this General Permit Once that individual permit is effective, the facility will no longer have coverage under this General Permit Note that the permittee must identify impaired waters (scheduled for TMDL development) and waters already subject to a TMDL in the Site Plan as outlined in the Stormwater Pollution Prevention Plan, Part 11, Section A During the period beginning on the effective date of the permit and lasting until expiration the permittee is authorized to discharge stormwater associated with industrial activity Such discharges shall be controlled, limited, and monitored as specified in this permit Part I Page 1 of 2 Permit No NCG080000 SECTION S PERMITTED ACTIVITIES Until coverage under this permit expires or is modified or revoked, the permtttee is authorized to discharge stormwater to the surface waters of North Carolina or separate storm sewer system which has been adequately treated and managed in accordance with the terms and conditions of this General Permit Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization or approval The stormwater discharges allowed by this General Permit shall not cause or contribute to violations of Water Quality Standards This permit does not relieve the permittee s responsibility for compliance with any other applicable federal state, or local law, rule, standard, ordinance, order, or decree Part 1 Page 2 of 2 Permit No NCG080000 PART 11 MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A STORMWATER POLLUTION PREVENTION PLAN The permittee shall develop and implement a Stormwater Pollution Prevention Plan (SPPP) The SPPP shall be maintained on site unless exempted from this requirement by the Division The SPPP is public information in accordance with Part I11, Standard Conditions, Section E, paragraph 3 of this permit The SPPP shall include, at a minimum, the following items 1 Site Overview The Site Overview shall provide a description of the physical facility and the potential pollutant sources that may be expected to contribute to contamination of stormwater discharges The Site Overview shall contain the following a A general location map (USGS quadrangle map or appropriately drafted equivalent map) showing the facility's location in relation to transportation routes and surface waters, the name of the receiving waters to which the stormwater outfalls discharge, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters, and accurate latitude and longitude of the points of stormwater discharge associated with industrial activity The general location map (or alternatively the site map) shall identify whether any receiving waters are impaired (on the state's 303(d) list of impaired waters) or if the site is located in a watershed for which a TMDL has been established and what the parameters of concern are b A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices A narrative description of the potential pollutants that could be expected to be present in the stormwater discharge from each outfall A site map drawn at a scale sufficient to clearly depict the site property boundary, the stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands industrial activity areas (including storage of materials disposal areas, process areas, loading and unloading areas, and haul roads), site topography and finished grade, all drainage features and structures drainage area boundaries and total contributing area for each outfall, direction of flow in each drainage area, industrial activities occurring in each drainage area, buildings, stormwater Best Management Practices (BMPs) and impervious surfaces The site map must indicate the percentage of each drainage area that is impervious, and the site map must include a graphic scale indication and north arrow d A list of significant spills or leaks of pollutants during the previous three (3) years and any corrective actions taken to mitigate spill impacts e Certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges The certification statement will be signed in accordance with the requirements found in Part 111, Standard Conditions, Section B, Paragraph 5 Part 11 Page 1 of 10 Permit No NCGO80000 2 Stormwater Management Strategy The Stormwater Management Strategy shall contain a narrative description of the materials management practices employed which control or minimize the stormwater exposure of significant materials, including structural and nonstructural measures The Stormwater Management Strategy, at a minimum, shall incorporate the following Feasibility Study A review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to rainfall and run-on flows Wherever practical, the permittee shall prevent exposure of all storage areas material handling operations, and manufacturing or fueling operations In areas where elimination of exposure is not practical, this review shall document the feasibility of diverting the stormwater run-on away from areas of potential contamination b Secondary Containment Requirements and Records Secondary containment is required for bulk storage of liquid materials, storage in any amount of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water 12rigrity chemicals, and storage in any amount of hazardoUssubstances, in order to prevent leaks and spills from contaminating stormwater runoff A table or summary of all such tanks and stored materials and their associated secondary containment areas shall be maintained If the secondary containment devices are connected to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices (which shall be secured closed with a locking mechanism) Any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater Accumulated stormwater shall be released if found to be uncontaminated by any material Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five (5) years For facilities subject to a federal oil Spill Prevention, Control, and Countermeasure (SPCC) plan any portion of the SPCC plan fully compliant with the requirements of this permit may be used to demonstrate compliance with this permit BMP Summary A listing of site structural and non-structural Best Management Practices (BMPs) shall be provided The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and on data collected through monitoring of stormwater discharges The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs The BMP Summary shall be reviewed and updated annually d Locomotive Sanding Areas (applicable to Rail Transportation only) The plan must describe measures that prevent or minimize contamination of the stormwater runoff from areas used for locomotive sanding: The facility shall consider covering sanding areas, minimizing stormwater runon/runoff, appropriate sediment removal practices to minimize the offsite transport of sanding material by stormwater, or other equivalent measures e Vehicle and Equipment Cleaning Areas The plan must describe measures that prevent or minimize contamination of the stormwater runoff from all areas used for vehicle and equipment cleaning The facility shall consider performing all cleaning operations indoors, covering the cleaning operation, ensuring that all wash waters drain to the sanitary sewer Part 11 Page 2 of 10 Permit No NCGO80000 system (i e , not the stormwater drainage system, unless permitted by another NPDES general or individual permit), collecting the stormwater runoff from the cleaning area and providing treatment or recycling, or other equivalent measures If sanitary sewer is not available to the facility and cleaning operations take place outdoors, the cleaning operations shall take place on grassed or graveled areas to prevent point source discharges of the wash water into the storm drains or surface waters Where cleaning operations cannot be performed as described above and when operations are performed in the vicinity of a storm drainage collection system, the drain shall be covered with a portable drain cover during cleaning activities Any excess ponded water shall be removed and properly handled by pump to a sanitary sewer system prior to removing the drain cover Detergents used outdoors shall be biodegradable and the pH adjusted to be in the range of 5 to 9 standard units The point source discharge of vehicle and equipment wash waters, including tank cleaning operations, are not authorized by this permit and must be covered under a separate NPDES general or individual permit or discharged to a sanitary sewer in accordance with applicable industrial wastewater pretreatment requirements f Remote Fueling Operations If remote fueling (or other vehicle maintenance activities) are conducted at off site locations but coordinated from the permitted facility, the plan shall include a component that describes the stormwater management practices and BMPs used to prevent and/or minimize the contamination of stormwater from such activities Spill Prevention and Response Procedures The Spill Prevention and Response Procedures (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility Facility personnel responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan A responsible person shall be on -site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations The SPRP must be site stormwater specific Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP 4 Preventative Maintenance and Good Housekeeping Program A preventative maintenance and good housekeeping program shall be developed and implemented The program shall address all stormwater control systems (if applicable) stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including material storage areas, material handling areas disposal areas process areas loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs The program shall establish schedules of inspections, maintenance, and housekeeping activities of stormwater control systems, as well as facility equipment, facility areas and facility systems that present a potential for stormwater exposure or stormwater pollution where not already addressed under another element of the SPPP Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program Timely compliance with the established schedules for inspections, maintenance, and housekeeping shall be recorded and maintained in the SPPP Employee Training Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff The facility personnel responsible for Part 11 Page 3 of 10 Permit No NCGO80000 implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained 6 Responsible Party The SPPP shall identify a specific position or positions responsible for the overall coordination, development implementation, and revision of the SPPP Responsibilities for all components of the SPPP shall be documented and position assignments provided 7 SPPP Amendment and Annual Update The permittee shall amend the SPPP whenever there is a change in design, construction, operation, site drainage, maintenance, or configuration of the physical features which may have a significant effect on the potential for the discharge of pollutants to surface waters All aspects of the SPPP shall be reviewed and updated on an annual basis The annual update shall include (a) an updated list ofsignifrcant spills or leaks of pollutants for the previous three (3) years, or the notation that no spills have occurred (element of the Site Overview), (b) a written re -certification that the stormwater outfalls have been evaluated for the presence of non stormwater discharges (element of the Site Overview), (c) a documented re-evaluation of the effectiveness of the on -site stormwater BMPs (BMP Summary element of the Stormwater Management Strategy) (d) a review and comparison of sample analytical data to benchmark values (if applicable) over the past year including a discussion about Tiered Response status The permittee shall use the Division's Annual Summary Data Monitoring Report (DMR) form, available from the Stormwater Permitting Unit s website (See Monitoring Forms' here l,Lto //portal ncdenr org/web/wq/ws/si/nodessw) The Director may notify the permittee when the SPPP does not meet one or more of the minimum requirements of the permit Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the SPPP to meet minimum requirements The permittee shall provide certification in writing (in accordance with Part Ill, Standard Conditions Section B, Paragraph 5) to the Director that the changes have been made 8 Facility Inspection Program Inspections of the facility and all stormwater systems shall occur at a minimum on a semi-annual schedule, once during the first half of the year (January to June) and once during the second half (July to December), with at least 60-days separating inspection dates (unless performed more frequently) The inspection and any subsequent maintenance activities performed shall be documented, recording date and time of inspection, individuals) making the inspection and a narrative description of the facility's stormwater control systems, plant equipment and systems Records of these inspections shall be incorporated into the stormwater Pollution Prevention Plan These facility inspections are different from, and in addition to the stormwater discharge characteristic monitoring required in Part Il of this permit 9 SPPP implementation The permittee shall implement the Stormwater Pollution Prevention Plan and all appropriate BMPs to prevent contaminants from entering surface waters via stormwater Implementation of the SPPP shall include documentation of all monitoring measurements inspections, maintenance activities and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities Such documentation shall be kept on -site for a period of five (5) years and made available to the Director or the Director s authorized representative immediately upon request Part 11 Page 4 of 10 Permit No NCG080000 SECTION B ANALYTICAL MONITORING REQUIREMENTS - VEHICLE MAINTENANCE ACTIVITIES Analytical monitoring of stormwater discharges shall be performed as specified in Table 1 for those facilities conducting vehicle maintenance activities and utilizing more than 55 gallons new motor oil per month when averaged over the year (those vehicle maintenance activities not utilizing more than 55 gallons of new motor oil per month are not required to conduct analytical monitoring) Table 1 Analytical Monitoring Requirements Discharge Characteristics Units Measurement Frequencyl Sample Type2 Sample Location3 H standard semi-annual Grab SDO Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM mg/I semi-annual Grab SDO Total Suspended Solids m I semi-annual Grab SDO Total Ramfa]14 inches semi-annual Ram gauge New Motor Oil Usage gallons/month I semi-annual Estimate - Footnotes 1 Measurement Frequency Twice per year during a measureable storm event 2 Sample collection must begin within the first 30 minutes of discharge and continue to all outfalls until completed 3 Sample Location Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (ROS) has been granted A copy of the DWQ letter granting ROS must be kept on site DWQ s ROS letter remains in effect through the subsequent reissuance of this permit and as long as the pertinent site conditions and operations remain unchanged, unless the ROS letter provides for other conditions or duration 4 For each sampled measureable storm event the total precipitation must be recorded An on -site rain gauge or local rain gauge reading must be recorded All analytical monitoring shall be performed during a measurable storm event at each stormwater discharge outfall (SDO) A measurable storm event is a storm event that results in an actual discharge from the permitted site outfall The previous measurable storm event must have been at least 72 hours prior The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office See Definitions The permittee shall complete the analytical samplings in accordance with the schedule specified in Table 2, unless adverse weather conditions prevent sample collection (see Adverse Weather in Definitions) A minimum of 60 days must separate Period 1 and Period 2 sample dates, unless monthly monitoring has been instituted as part of other requirements of this permit Inability to sample because of adverse weather conditions must be documented in the SPPP and recorded on the DMR The permittee must report the results from each sample taken within the monitoring period (see Part III, Section E) Sampling is not required outside of the facility's normal operating hours Part 11 Page 5 of 10 Permit No NCG080000 Table 2 Monitoring Schedule Sample Number Start End Year 1 - Period 1 1 January 1, 2013 June 30, 2013 Year 1- Period 2 2 July 1, 2013 December 31, 2013 Year 2 - Period 1 3 January 1, 2014 June 30 2014 Year 2 - Period 2 4 July 1, 2014 December 31, 2014 Year 3 - Period 1 5 January 1, 2015 June 30, 2015 Year 3 - Period 2 6 July 1, 201S December 31, 2015 Year 4 - Period 1 7 January 1, 2016 June 30, 2016 Year 4 - Period 2 8 July 1, 2016 December 31, 2016 Year 5 - Period 1 9 January 1 2017 June 30 2017 Year 5 - Period 2 10 July 1 2017 October 31, 2017 Footnotes 1 Maintain semi-annual analytical monitoring throughout the permit renewal process (unless other provisions of this permit prompt monthly sampling) It no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating No Flow or No Discharge within 30 days of the end of the sampling period Failure to monitor semi- annually per permit terms may result in the Division requiring monthly monitoring for all parameters for a specified time period No discharge' from an outfall or inability to collect a sample because of adverse weather conditions during a monitoring period does not constitute failure to monitor as long as it is properly reported The permittee shall compare monitoring results to the benchmark values in Table 3 The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP) Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping and/or install stormwater Best Management Practices (BMPs) in a tiered program See below the descriptions of Tier One, Tier Two, and Tier Three response actions below In the event that DWQ releases the permittee from continued monthly monitoring under Tier Three, DWQ's release letter remains in effect through the subsequent reissuance of this permit, unless the release letter provides for other conditions or duration Table 3 Benchmark Values for Analytical Monitoring Requirements Discharge Characteristics Benchmark Value pH l 6 - 9 standard unitsl Non -Polar Oil & Grease TPH by EPA Method 1664 SGT HEM 15m 1 Total Sus ended Solids CORW, H W, Trout & PNA waters SO m I Total Suspended Solids 1 100 mg/1 FootnQtes 1 If pH values outside this range are recorded in sampled stormwater discharges but ambient precipitation pH levels are lower then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S U Readings from an on-stte or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6-9 Part H Page 6 of 10 Permit No NCGO80000 Tier One I If The first valid sampling results are above a benchmark value or outside of the benchmark range for any I parameter at anv outfall Then The permittee shall 1 Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results 2 Identify and evaluate possible causes of the benchmark value exceedance 3 Identify potential and select the specific source controls operational controls or physical improvements to reduce concentrations of the parameters of concern, and/or to bring concentrations within the benchmark range 4 Implement the selected actions within two months of the inspection S Record each instance of a Tier One response in the SPPP Include the date and value of the benchmark exceedence the inspection date the personnel conducting the inspection the selected actions and the date the selected actions were implemented Tier Two If During the term of this permit the first valid sampling results from two consecutive monitoring periods are above the benchmark values or outside of the benchmark range for any specific parameter at a specific discharge outfall Then The permittee shall 1 Repeat all the required actions outlined above in Tier One 2 Immediately institute monthly monitoring for all parameters The permittee shall conduct monthly monitoring at every outfall where a sampling result exceeded the benchmark value for two consecutive s-imples Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values or within benchmark range 3 If no discharge occurs during the sampling period the permittee is required to submit a monthly monitoring report indicating No Flow to comply with reporting requirements 4 Benchmark exceedances for a different parameter separately trigger a tiered response 5 Maintain a record of the Tier Two response in the SPPP Tier Three If During the term of this permit if the valid sampling results required for the permit monitoring periods exceed the benchmark value or are outside the benchmark range, for any specific parameter at any specific outfall on four occasions the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results DWQ may but is not limited to • require that the permittee revise increase, or decrease monitoring frequency for some or all parameters, • rescind coverage under the General Permit and require that the permittee apply for an individual stormwater discharge permit • require the permittee to install structural stormwater controls • require the permittee to implement other stormwater control measures • require the permittee to perform upstream and downstream monitoring to characterize impacts on receiving waters, or • require the permittee implement site modifications to qualify for a No Exposure Exclusion Part 11 Page 7 of 10 Permit No NCGO80000 SECTION C DISCHARGE LIMITATIONS AND ANALYTICAL MONITORING REQUIREMENTS - OIL WATER SEPARATORS AND/OR PETROLEUM BULK STATIONS AND TERMINALS During the period beginning on the effective date of the permit and lasting until expiration, unless otherwise prohibited, the permittee is authorized to discharge stormwater from oil water separators and/or petroleum bulk stations and terminals secondary containment areas subject to the provisions of this permit If such activities have been designated by the Division, discharges shall be monitored and limited as specified in Table 4, and sampled in accordance with the schedule presented in Table 2 Clarification The limitations in Table 4 only apply to oil water separators, secondary containment structures at petroleum bulk stations and terminals with a total petroleum storage capacity of less than 1 million gallons or other stormwater discharges that have been specifically designated by the Division as subject to these discharge requirements in the permit This means that, unless specified differently by the Division, discharges from oil/water separators or from secondary containment areas that are associated with vehicle maintenance activities at facilities categorically captured by the federal NPDES Stormwater Program are otherwise subject to Part II Section B (Stormwater Analytical Monitoring Requirements) of this general permit Table 4 Discharge Limitations and Analytical Monitoring Requirements for Stormwater Discharges as Designated by the Division Discharge Characteristics Limitations and Units Measurement Fre uen 1 Sample Type2 Sample Location3 H 6 0 to 9 0 s u semi-annual Grab SDO Non -Polar Oil & Grease / TPH EPA Method 1664 SGT-HEM 15mg/l semi-annual Grab SDO Total Suspended Solids TSS) 100 mg/1 semi-annual Grab SDO TSS CORW, HQW Trout & PNA waters 50 m Total Rainfall4 inches semi-annual Rain gauge I- Footnotes 1 Measurement Frequency Twice per year during a measureable storm event 2 Sample collection must begin within the first 30 minutes of discharge and continue to all outfalls until completed 3 Sample Location Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status (R05) has been granted A copy of the DWQ letter granting ROS must be kept on site DWQ s ROS letter remains in effect through the subsequent reissuance of this permit and as long as the pertinent site conditions and operations remain unchanged unless the ROS letter provides for other conditions or duration 4 For each sampled measureable storm event the total precipitation must be recorded An on -site rain gauge or local rain gauge reading must be recorded Part 11 Page 8 of 10 Permit No NCG080000 Section D Stormwater Discharges Qualitative Monitoring Requirements The purpose of qualitative monitoring is to evaluate the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assess new sources of stormwater pollution Qualitative monitoring of stormwater outfalls must be performed during a measurable storm event Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified in Table 5, during the analytical monitoring event Inability to sample because of adverse weather conditions must be documented in the SPPP and recorded on the DMR (see Adverse Weather in Definitions) Only SDOs discharging stormwater associated with industrial activity must be monitored (See Definitions) Qualitative monitoring is not required outside of the facility s normal operating hours Tattle S Qualitative Monitoring Requirements Discharge Characteristics LFrequencyl Monitoring Location2 Color semi-annual SDO Odor semi-annual SDO Clara semi-annual SDO Floating Solids semi-annual SDO Suspended Solids semi-annual SDO Foam semi-annual SDO Oil Sheen semi-annual SDO Erosion or deposition at the outfall semi-annual SDO Other obvious indicators of stormwater pol.lution semi-annual SDO F t�Q, notes Frequency Twice per year during a measureable storm event See Table 2 for schedule of monitoring periods through the end of this permitting cycle The permittee must continue qualitative monitoring throughout the permit renewal process Monitoring Location Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status A minimum of 60 days must separate monitoring dates, unless additional sampling has been instituted as part of other analytical monitoring requirements in this permit If the permittee s qualitative monitoring indicates that existing stormwater SMPs are ineffective, or that significant stormwater contamination is present, the permittee shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those corrective actions within 60 days per the Qualitative Monitoring Response, below A written record of the permittee s investigation, evaluation and response actions shall be kept in the Stormwater Pollution Prevention Plan Part 11 Page 9 of 10 Permit No NCG080000 Qualitative monitoring Is for the purposes of evaluating SPPP effectiveness, assessing new sources of stormwater pollution, and prompting the permittee's response to pollution If the permlttee repeatedly falls to respond effectively to correct problems identified by qualitative monitoring, or if the discharge causes or contributes to a water quality standard violation ©WQ may but is not limited to • require that the permlttee revise, increase, or decrease monitoring frequency for some or all parameters (analytical or qualitative), • require the permlttee to Install structural stormwater controls, • require the permlttee to Implement other stormwater control measures • require the permlttee to perform upstream and downstream monitoring to characterize impacts on receiving waters, or • require the permlttee Implement site modifications to qualify for a No Exposure Exclusion Part 11 Page 10 of 10 Permit No NCGO80000 PART III STANDARD CONDITIONS FOR NPDES STORMWATER GENERAL PERMITS SECTION A COMPLIANCE AND LIABILITY 1 Compliance Schedule The perm►ttee shall comply with Limitations and Controls specified for stormwater discharges in accordance with the following schedule Existing Facilities already operating but applying for permit coverage for the first time The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the Certificate of Coverage and updated thereafter on an annual basis Secondary containment, as specified in Part It, Section A, Paragraph 2(b) of this general permit, shall be accomplished within 12 months of the effective date of the issuance of the Certificate of Coverage New Facilities applying for coverage for the first time The Stormwater Pollution Prevention Plan shall be developed and implemented prior to the beginning of discharges from the operation of the industrial activity and be updated thereafter on an annual basis Secondary containment, as specified in Part II, Section A, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity Existing facilities previously permitted and applying for renewal under this General Permit All requirements conditions, limitations, and controls contained in this permit (except new SPPP elements in this permit renewal) shall become effective immediately upon issuance of the Certificate of Coverage New elements of the Stormwater Pollution Prevention Plan for this permit renewal shall be developed and implemented within 6 months of the effective date of this general permit and updated thereafter on an annual basis Secondary containment, as specified in Part III, Paragraph 2(b) of this general permit shall be accomplished prior to the beginning of discharges from the operation of the industrial activity 2 Duty to Comply The perm►ttee must comply with all conditions of this general permit Any permit noncompliance constitutes a violation of the Clean Water Act (CWA) and is grounds for enforcement action, for permit termination, revocation and re►ssuance, or modification, or denial of a permit upon renewal application [40 CFR 122 41] The perm►ttee shall comply with standards or prohibitions established under section 307(a) of the CWA for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the general permit has not yet been modified to incorporate the requirement b The CWA provides that any person who violates section[s] 301, 302, 306, 307, 308, 318 or 405 of the Act or any permit condition or limitation implementing any such sections in a permit issued under section 402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(b)(8) of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation [33 USC 1319(d) and 40 CFR 122 41(a)(2)] Part II I Page 1 of 12 Permit No NCGO80000 The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308, 318, or 405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under section 402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation or imprisonment of not more than 1 year, or both In the case of a second or subsequent conviction for a negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of violation, or by imprisonment of not more than 2 years or both [33 USC 1319(c)(1) and 40 CFR 122 41(a)(2)] d Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal penalties of $5,000 to $50 000 per day of violation, or imprisonment for not more than 3 years, or both In the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or both [33 USC 1319(c)(2) and 40 CFR 122 41(a)(2)] Any person who knowingly violates section 301, 302 303, 306, 307, 308 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act and who knows at that time that he thereby places another person in imminent danger of death or serious bodily injury, shall, upon conviction be subject to a fine of not more than $250,000 or imprisonment of not more than 15 years, or both In the case of a second or subsequent conviction for a knowing endangerment violation, a person shall be subject to a fine of not more than $500 000 or by imprisonment of not more than 30 years, or both An organization as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction of violating the imminent danger provision be subject to a fine of not more than $1,000,000 and can be fined up to $2,000,000 for second or subsequent convictions [40 CFR 122 41(a)(2)] f Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit [North Carolina General Statutes § 143-215 6A] g Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302, 306 307 308, 318 or 405 of this Act or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act Administrative penalties for Class I violations are not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $37,500 Penalties for Class II violations are not to exceed $16,000 per day for each day during which the violation continues, with the maximum amount of any Class lI penalty not to exceed $177,500 (33 USC 1319(g)(2) and 40 CFR 122 41(a)(3)] The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this general permit which has a reasonable likelihood of adversely affecting human health or the environment [40 CFR 122 41(d)] Part II l Page 2 of 12 Permit No NCGO80000 4 Civil ind Criminal Liability Except as provided in Part 111, Section C of this general permit regarding bypassing of stormwater control facilities, nothing in this permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215 3, 143-215 6, or Section 309 of the Federal Act, 33 USC 1319 Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended 5 Oil and Hazardous Substance Liabil Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215 75 et seq or Section 311 of the Federal Act, 33 USC 1321 6 Property Rights The issuance of this general permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights nor any infringement of Federal, State or local laws or regulations [40 CFR 122 41(g)] 7 $Qverability The provisions of this general permit are severable and if any provision of this general permit or the application of any provision of this general permit to any circumstances is held invalid the application of such provision to other circumstances, and the remainder of this general permit, shall not be affected thereby [NCGS 1506-23] 8 Duty to Provide Information The permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the general permit issued pursuant to this general permit or to determine compliance with this general permit The permittee shall also furnish to the Permit Issuing Authority upon request, copies of records required to be kept by this general permit [40 CFR 122 41(h)] 9 Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with or knowingly renders inaccurate, any monitoring device or method required to be maintained under this general permit shall upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years or both [40 CFR 122 41] Part III Page 3 of 12 Permit No NCG080000 10 Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this general permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both [40 CFR 122 41] 11 Onshore or Offshore Construction This general permit does not authorize or approve the construction of any onshore or offshore physical structures or facilities or the undertaking of any work in any navigable waters 12 Duty to Reap& Dischargers covered by this general permit need not submit a new Notice of Intent (N01) or renewal request unless so directed by the Division If the Division chooses not to renew this general permit, the permittee will be notified to submit an application for an individual permit [15A NCAC 02H 0127(e)] SECTION B GENERAL CONDITIONS 1 General Permit Expiration General permits will be effective for a term not to exceed five years, at the end of which the Division may renew them after all public notice requirements have been satisfied If a general permit is renewed, existing permittees do not need to submit a renewal request or pay a renewal fee unless directed by the Division New applicants seeking coverage under a renewed general permit must submit a Notice of Intent to be covered and obtain a Certificate of Coverage under the renewed general permit [15A NCAC 02H 0127(e)] 2 Transfers This general permit is not transferable to any person without prior written notice to and approval from the Director in accordance with 40 CFR 122 61 The Director may condition approval in accordance with NCGS 143-215 1, in particular NCGS 143-215 1(b)(4)b 2, and may require modification or revocation and reissuance of the Certificate of Coverage, or a minor modification to identify the new permittee and incorporate such other requirements as may be necessary under the CWA [40 CFR 122 41(l)(3), 122 61] or state statute The PermLttee is required to notify the Division in writing jn the event the permitted facility is sold or closed Part II[ Page 4 of 12 Permit No NCG080000 3 When an Individual Permit May be Required The Director may require any owner/operator authorized to discharge under a certificate of coverage issued pursuant to this general permit to apply for and obtain an individual permit or an alternative general permit Any interested person may petition the Director to take action under this paragraph Cases where an individual permit may be required include, but are not limited to, the following a The discharger is a significant contributor of pollutants, b Conditions at the permitted site change, altering the constituents and/or characteristics of the discharge such that the discharge no longer qualifies for a general permit, c The discharge violates the terms or conditions of this general permit, d A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source, e Effluent limitations are promulgated for the point sources covered by this general permit f A water quality management plan containing requirements applicable to such point sources is approved after the issuance of this general permit g The Director determines at his or her own discretion that an individual permit is required 4 When an Individual Permit Maybe Req e Any permittee operating under this general permit may request to be excluded from the coverage of this general permit by applying for an individual permit When an individual permit is issued to an owner/operator the applicability of this general permit is automatically terminated on the effective date of the individual permit S na _Qry,Reauirements All applications, reports, or information submitted to the Permitting Issuing Authority shall be signed and certified [40 CFR 122 41(k)] a All Notices of Intent to be covered under this general permit shall be signed as follows (1) For a corporation by a responsible corporate officer For the purpose of this Section, a responsible corporate officer means (a) a president, secretary treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing, production or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements, and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures (2) For a partnership or sole proprietorship by a general partner or the proprietor, respectively, or Part IH Page 5 of 12 Permit No NCGO80000 (3) For a municipality State, Federal or other public agency by either a principal executive officer or ranking elected official [40 CFR 122 22] b All reports required by the general permit and other information requested by the Permit Issuing Authority shall be signed by a person described in paragraph a above or by a duly authorized representative of that person A person is a duly authorized representative only if (1) The authorization is made in writing by a person described above, (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager operator of a well or well field, superintendent, a position of equivalent responsibility or an individual or position having overall responsibility for environmental matters for the company (A duly authorized representative may thus be either a named individual or any individual occupying a named position ), and (3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122 22] Changes to authorization If an authorization under paragraph (b) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director prior to or together with any reports information, or applications to be signed by an authorized representative (40 CFR 122 22] Certification Any person signing a document under paragraphs a or b of this section shall make the following certification [40 CFR 122 22] NO OTHER STATEMENTS OF CERTIFICATION WILL BE ACCEPTED "I certify, under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations 6 General Permit Modification, Revocation and Reissuance, or Termination The issuance of this general permit does not prohibit the Permit Issuing Authority from reopening and modifying the general permit, revoking and reissuing the general permit, or terminating the general permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations Parts 122 and 123 Title 15A of the North Carolina Administrative Code Subchapter 2H 0100, and North Carolina General Statute 143-215 1 etal After public notice and opportunity for a hearing, the general permit may be terminated for cause The filing of a request for a general permit modification, revocation and reissuance, or termination does not stay any general permit condition The Certificate of Coverage shall expire when the general permit is terminated Part][[ Page 6 of 12 Permit No NCGO80000 7 Certificate of Coverage Actions The general permit may be modified revoked and reissued, or terminated for cause The notification of planned changes or anticipated noncompliance does not stay any general permit condition [40 CFR 122 41(o] 8 Annual Administering and Comolt ce Monitoring Fee Requirements The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division Failure to pay the fee in timely manner in accordance with 15A NCAC 2H 0105(b)(2) may cause this Division to initiate action to revoke coverage under the general permit SECTION C OPERATION AND MAINTENANCE OF POLLUTION CONTROLS 1 Proper Operation and Maintenalrg The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this permit [40 CFR 122 41(e)] 2 Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this general permit [40 CFR 122 41(c)] 3 Bypassing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless a Bypass was unavoidable to prevent loss of life, personal injury or severe property damage and There were no feasible alternatives to the bypass such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance, and The permittee submitted notices as required under, Part Ill, Section E of this general permit If the Director determines that it will meet the three conditions listed above the Director may approve an anticipated bypass after considering its adverse effects Part III Page 7 of 12 Permit No NCGO80000 SECTION D MONITORING AND RECORDS 1 Representative Sampling Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge Analytical sampling shall be performed during a measureable storm event Samples shall be taken on a day and time that is characteristic of the discharge All samples shall betaken before the discharge loins or is diluted by any other waste stream body of water, or substance Monitoring points as specified in this general permit shall not be changed without notification to and approval of the Permit Issuing Authority [40 CFR 122 41(l)] 2 Recording Results For each measurement or sample taken pursuant to the requirements of this general permit, the permittee shall record the following information [40 CFR 122 41] a The date, exact place, and time of sampling or measurements, b The individual(s) who performed the sampling or measurements, c The date(s) analyses were performed, d The individual(s) who performed the analyses e The analytical techniques or methods used, and f The results of such analyses 3 Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges 4 Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215 63 et seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g) 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136 To meet the intent of the monitoring required by this general permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure If no approved methods are determined capable of achieving minimum detection and reporting levels below general permit discharge requirements, then the most sensitive (method with the lowest possible detection and reporting level) approved method must be used Part III Page 8 of 12 Permit No NCG080000 5 Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status then sampling requirements may be performed at a reduced number of outfalls b Records Retention Qualitative monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan (SPPP) Copies of analytical monitoring results shall also be maintained on -site The permittee shall retain records of all monitoring information, including • all calibration and maintenance records, • all original strip chart recordings for continuous monitoring instrumentation, • copies of all reports required by this general permit, • copies of all data used to complete the Notice of Intent to be covered by this general permit These records or copies shall be maintained for a period of at least 5 years from the date of the sample, measurement, report or Notice of Intent application This period maybe extended by request of the Director at anytime [40 CFR 122 411 If this volume of records cannot be maintained on -site, the documents must be made available to an inspector upon request as immediately as possible 7 Inspection and Entry The permittee shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to a Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit, b Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit, c Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices or operations regulated or required under this general permit, and d Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location [40 CFR 122 41(1)] Part III Page 9 of 12 Permit No NCG080000 SECTION E REPORTING REQUIREMENTS 1 Discharge Monitoring Reports Samples analyzed in accordance with the terms of this general permit shall be submitted to the Division on Discharge Monitoring Report (DMR) forms provided by the Director DMR farms are available on the Division's website (http Hportal ncdenrorg/web/wq/ws/su/nl2dessw) Submittals shall be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory When no discharge has occurred from the facility during the report period, the permittee is required to submit a discharge monitoring report, within 30 days of the end of the specified sampling period, giving all required information and indicating "NO FLOW" as per NCAC T15A 02B 0506 If the permittee monitors any pollutant more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 and at a sampling location specified in this general permit or other appropriate instrument governing the discharge, the results of such monitoring shall be included in the data submitted on the DMA The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division and shall retain the completed forms on site Qualitative monitoring results should not be submitted to the Division except upon DWQ's specific requirement to do so Qualitative Monitoring Report forms are available at the website above 2 Submitting Reports Two signed copies of Discharge Monitoring Reports (DMRs) shall be submitted to Central Files Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699 1617 3 Availability of Reports Except for data determined to be confidential under NCGS 143-215 3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division As required by the Act, analytical data shall not be considered confidential Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215 6B or in Section 309 of the Federal Act 4 Non-Stormwater Discharges If the storm event monitored in accordance with this general permit coincides with a non- stormwater discharge, the permittee shall separately monitor all parameters as required under all other applicable discharge permits and provide this information with the stormwater discharge monitoring report Part III Page 10 of 12 Permit No NCG080000 5 Planned Changes The permittee shall give nonce to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged [40 CFR 122 41(l)] This notification requirement includes pollutants which are not specifically listed in the general permit or subject to notification requirements under 40 CFR Part 122 42 (a) 6 Anticipated Ngncoml2liance The permittee shall give advance notice to the Director of any planned changes at the permitted facility which may result in noncompliance with the general permit [40 CFR 122 41(1)(2)] �1� The permittee shall report to the local DWQ Regional Office within 24 hours, all significant spills as defined in Part IV of this general permit Additionally, the permittee shall report spills including any oil spill of 25 gallons or more, any spill regardless of amount that causes a sheen on surface waters, any oil spill regardless of amount occurring within 100 feet of surface waters and any oil spill less than 25 gallons that cannot be cleaned up within 24 hours Notice [40 CFR 122 41(m)(3)] a Anticipated bypass If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass, including an evaluation of the anticipated quality and affect of the bypass b Unanticipated bypass The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass 9 Twenty-four Hour Reporting a The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment Any information shall be provided orally within 24 hours frorii the time the permittee became aware of the circumstances A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances The written submission shall contain a description of the noncompliance, and its causes, the period of noncompliance including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue, and steps taken or planned to reduce eliminate, and prevent reoccurrence of the noncompliance [40 CFR 122 41(l)(6)] b The Director may waive the written report on a case -by -case basis for reports under this section if the oral report has been received within 24 hours c Occurrences outside normal business hours may also be reported to the Division s Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300 Part III Page 11 of 12 Permit No NCG080000 10 Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted [40 CFR 122 41(t)(7)] 11 Other Information Where the Permittee becomes aware that it failed to submit any relevant facts in a Notice of Intent to be covered under this general permit, or submitted incorrect information in that Notice of Intent application or in any report to the Director, it shall promptly submit such facts or information [40 CPR 122 41(1)(8)] Part [if Page 12 of 12 Permit No NCG080000 PART IV DEFINITIONS Act See Clean Water Act Adverse Weather Adverse conditions are those that are dangerous or create inaccessibility for personnel, such as local flooding, high winds, or electrical storms, or situations that otherwise make sampling impractical When adverse weather conditions prevent the collection of samples during the sample period, the permittee must take a substitute sample or perform a visual assessment during the next qualifying storm event Documentation of an adverse event (with date, time and written narrative) and the rationale must be included with your SPPP records Adverse weather does not exempt the permittee from having to file a monitoring report in accordance with the sampling schedule Adverse events and failures to monitor must also be explained and reported on the relevant DMR Allowable Non-Stormwater Discharges This general permit regulates stormwater discharges Non-stormwater discharges which shall be allowed in the stormwater conveyance system are All other discharges that are authorized by a non-stormwater NPDES permit Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings water from footing drains, irrigation waters, flows from riparian habitats and wetlands Discharges resulting from fire -fighting or fire -fighting training, or emergency shower or eye wash as a result of use in the event of an emergency 4 Best Management Practices CBMPsl Measures or practices used to reduce the amount of pollution entering surface waters BMPs may take the form of a process, activity, or physical structure More information on BM Ps can be found at http /Zi pgh ena goy/npdesjstormwaterjmenuofbm"f index cfm 5 Byl2ass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility 6 Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons Part IV Page 1 of 5 Permit No NCGO80000 7 Certificate of Coverage The Certificate of Coverage (COC) is the cover sheet which accompanies a general permit upon issuance and lists the facility name, location, receiving stream river basin, effective date of coverage under the general permit and is signed by the Director 8 Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended 33 USC 1251, et seq 9 Division or DWQ The Division of Water Quality Department of Environment and Natural Resources 10 Director The Director of the Division of Water Quality, the permit issuing authority 11 EMC The North Carolina Environmental Management Commission 12 Grab Sample An individual sample collected instantaneously Grab samples that will be analyzed (quantitatively or qualitatively) must be taken within the first 30 minutes of discharge 13 Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act 14 Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility 15 Measureable Storm Event A storm event that results in an actual discharge from the permuted site outfall The previous measurable storm event must have been at least 72 hours prior The 72-hour storm interval may not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and obtains approval from the local DWQ Regional Office Two copies of this information and a written request letter shall be sent to the local DWQ Regional Office After authorization by the DWQ Regional Office, a written approval letter must be kept on site in the permittee's SPPP Part IV Page 2 of 5 Permit No NCG080000 16 Municipal Separate Storm Sewtr System {MS4} A stormwater collection system within an incorporated area of local self-government such as a city or town 17 No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to ram, snow, snowmelt or runoff Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery raw materials, intermediate products, by-products, final products, or waste products DWQ may grant a No Exposure Exclusion from NPDES stormwater permitting requirements only if facility complies with the terms and conditions described in 40 CFR §122 26(g) 18 Notice of Intent The state application form which, when submitted to the Division, officially indicates the facility's notice of intent to seek coverage under a general permit 19 Permit Issuing Authority The Director of the Division of Water Quality (see 'Director above) 20 Permittee The owner or operator issued a Certificate of Coverage pursuant to this general permit 21 Pint Source Discharge of St rmw t r Any discernible confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state 22 Representative Outfall 5tatus When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status Representative outfall status allows the permtttee to perform analytical monitoring at a reduced number of outfalls 23 Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient Freeboard to allow for the 25-year 24-hour storm event Part IV Page 3 of 5 Permit No NCG080000 24 Section 313 Water Priority Chemical A chemical or chemical category which b Is listed in 40 CFR 372 65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right -to -Know Act of 1986, c Is present at or above threshold levels at a facility subject to SARA title III, Section 313 reporting requirements and d Meets at least one of the following criteria i Is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances), u Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116 4, or in Is a pollutant for which EPA has published acute or chronic water quality criteria 25 Severe Property Damage Substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass Severe property damage does not mean economic loss caused by delays in production 26 Significant Material Includes, but is not limited to raw materials fuels, materials such as solvents, detergents, and plastic pellets, finished materials such as metallic products, raw materials used in food processing or production hazardous substances designated under section 101(14) of CERCLA any chemical the facility is required to report pursuant to section 313 of Title III of SARA, fertilizers, pesticides and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges 27 Significant Spills Includes, but is not limited to releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act (Ref 40 CFR 110 3and 40 CFR 117 3) or section 102 of CERCLA (Ref 40 CFR 302 4) 28 Stormwater Discharge OutfalJ_(SDO] The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes drainage ditches, channels, spillways, or channelized collection areas from which stormwater flows directly or indirectly into waters of the State of North Carolina 29 Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt Part [V Page 4 of 5 Permit No NCGO80000 30 Stormwater Associated with I ndustEial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site Facilities considered to be engaged in "industrial activities include those activities defined in 40 CFR 122 26(b)(14) The term does not include discharges from facilities or activities excluded from the NPDES program 31 Stormwater Pollution Prevention Plan (SPPP) A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site 32 Total Maximum Daily Load_(TMDL) TMDLs are written plans for attaining and maintaining water quality standards, in all seasons for a specific water body and pollutant A list of approved TMDLs for the state of North Carolina can be found at httn //Vortal.ncdenr.org/web/ins/mtu/tmdl 33 Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act 34 Vehicle Maintenance Activity Vehicle rehabilitation, mechanical repairs painting fueling, lubrication, vehicle cleaning operations, or airport deicing operations 35 Visible Sedimentation Solid particulate matter both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye 36 25-year. 24 hour Storm Event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years Part IV Page 5 of 5