Loading...
HomeMy WebLinkAboutSW3191103_Poplin Meadows Ph III -Stormwater Report - 191028_11/18/2019B011LER E N G I N E E R I N G STORMWATER MANAGEMENT REPORT PREPARED FOR: LIQUID MANAGEMENT, LLC 231 POST OFFICE DRIVE SUITE B-8 INDIAN TRAIL, NC 28079 UNION COUNTY BEPC #NCC191800 October 28, 2019 PREPARED BY: BOHLER ENGINEERING, NC, PLLC 1927 S. TYRON ST. SUITE 310 CHARLOTTE, NC 28203 (980) 272-3400 ■ NORTH CAROLINA LICENSE #043610 MICHAEL THEBERGE, P.E. PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA CIVIL & CONSULTING ENGINEERS• SURVEYORS -TRAFFIC CONSULTANTS www.bohlereng.com Table of Contents GeneralProject Description................................................................................................................. 3 Stormwater Management Analysis and BMP Calculations.................................................................. 4 Appendix............................................................................................................................................... 5 HydroCADOutput.......................................................................................................................... StormsewerOutput....................................................................................................................... 2 General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The subject site is located along Bonterra Village Way, in Union County. The project site currently contains a single residence and two sports fields and consists of approximately 21.48 acres. The proposed project will include approximately 99 single family lots. There is existing wetlands on the north eastern side of the parcel and an existing pondon the northwestern property line. The site is majority pasture with woods along the northern property line (type D soils), with average existing slopes of 3% to 8%. There is currently no stormwater measure provided on the site. There is no off -site area examined in this analysis. STORMWATER REQUIREMENTS AND DESIGN OVERVIEW This project is located in the Eastern Catawba district and is adjacent to North Fork Crooked Creek. This project is classified as a high -density project because the largest drainage area has greater than 12% built upon area. Stormwater quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural stormwater treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for total suspended solids and 70% average annual removal for total phosphorus. General engineering design criteria shall be accordance with 15 A NCAC 2H. 1008(c) in the design manual. The peak discharge is attenuated for both the 2-year, 24-hr storm and the 25-year, 24-hr storm events. The 100-year, 24-hr storm event has been analyzed to provide 1' of freeboard to the top of berm. Areas not controlled by systems due to topographic challenges are sheet flowing through the vegetated buffer, but all proposed impervious areas are treated within the proposed stormwater control measures. Please note that all runoff from the roofs of the homes is to be routed to underground storm drains that discharge into the wet detention pond. Some homes will have direct tie-ins of their roof drains to nearby structures and some will flow overland and in channels to nearby inlets. STORMSEWER DESIGN Stormwater run-off from the site will be directed to the existing outfall locations via a system of storm sewer pipes. The storm sewer was modeled in Hydraflow Storm Sewers Extension for Autodesk AutoCAD Civil 3D. The storm sewer pipes were modeled to ensure their adequate capacity with a minimum slope of 0.5% to promote flushing of the pipes. Stormwater Management and BMP Calculations PRE VS. POST ANALYSIS PEAK ATTENUATION See table below for final flow calculations for the pre and post conditions. It should be noted that time of concentration is accounted for in the summation of the combined peak discharge values. 2-YR 24 25-YR 24 DRAINAGE AREA HR(cfs) HR(cfs) POI 1 COMBINED: Pre DA 1 38.31 92.09 Post Pond 1, Post DA1 Bypass 29.00 60.16 All associated calculations have been provided within the Appendix section of this report. WATER QUALITY Water quality treatment of the 1" water quality volume, is also provided within the proposed above -ground wet detention pond, and is to be detained between 2-5days (See appendix for calculations). Appendix WET POND 1 Poplin Meadows Phase III DESIGN: WATER QUALI GIVEN: DRAINAGE AREA TO FACILITY = -Ac. LAND USE = Shopping Center ESTIMATED PERCENT IMPERVIOUS = - 1) SA/DA RATIO: AVERAGE POOL DEPTH = W.40 FEET = Vpp/SA MDC2 PERCENT IMPERVIOUS = 65% SA/DA = 2.09 % = 0.0209 MDC 1 SA REQUIRED = 13.50 Ac. X 0.0209 = 0.28 Ac. = 12,290 SF SA PROVIDED = 14,535 SF 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS PROVIDE VOLUME TO DETAIN THE 1" SIVM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL THE VOLUME FORS" STORM EVENT CAN BE CALCULATED AS: V, _ (Design Rainfall)(Rv)(Drainage Area) Design Rainfall = -Inch Drainage Area = 13.50 Acres Rv = 0.05 + 0.9(1) 1 = Percent Impervious = 65% Rv = 0.64 in./in. V, = 0.714 acre-feet = 31,118 W 3) Pond Drawdown Time Pond Height above Orifice =_feet Orifice Invert Elevation = feet Orifice Diameter (D) _- inches = 0.21 feet Orifice Area (a) = 0.0341 square feet Gravitational Constant (g) = 32.2 fUsec2 Head (H) = 1.60 feet Driving Head (Ho) = 0.800 feet Discharge Coefficient (CD) = 0.6 Drawdown rate (Q) = 0.147 cfs Time (t) = 211,967 seconds = 2.45 days 58.8796248 Note: The above calculation is based on the orifice equation where: y[ = (, 2gH 10/28/2019 5:52 AM Page 1 of 1 Wet Pond Design Wet Pond PP - Main Pool Elev Area (so Inc Storage (co Total Storage (co 612.50 8,704 0 0 613.50 9,491 9,098 9,098 614.50 10,307 9,899 18,997 615.50 11,152 10,730 29,726 616.50 12,024 11,588 41,314 617.50 14,535 13,280 54,594 Wet Pond PP - Forebay Elev Area (so Inc Storage (co Total Storage (co 613.50 1,700 0 0 614.50 2,073 1,887 1,887 615.50 2,480 2,277 4,163 616.50 2,921 2,701 6,864 617.50 4,147 3,534 10,398 -Bottom of veg. shelf \-Top of veg. shelf Stage Storage Above Permanent Pool Elevation 617.50 18,682 0 0 618.50 20,394 19,538 19,538 619.50 22,162 21,278 40,816 620.50 23,987 23,075 63,891 621.50 25,869 24,928 88,819 622.50 27,807 26,838 115,657 623.50 29,801 28,804 144,461 624.50 31,853 30,827 175,288 ,-Temporary WQV @ elev. 619.10' 1S Pre POI 1 2S (3jS 6 P Post POND 1 POI 1 Bypass PP Vol 44P Pond 1 5L Post POI 1 Subcat Reach on Link Routing Diagram for Poplin Phase 3-191023 Prepared by Bohler Engineering, Printed 10/28/2019 ydroCAD® 10.00-20 s/n 09920 © 2017 HydroCAD Software Solutions LLC EH_ C Poplin Phase 3 - 191023 Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 4.870 80 >75% Grass cover, Good, HSG D (2S) 0.160 96 Gravel surface, HSG D (1 S) 3.730 98 Paved parking, HSG D (2S) 4.556 98 Roofs, HSG D (1 S, 2S) 0.270 98 Unconnected pavement, HSG D (1S) 0.094 98 Water Surface, 0% imp, HSG D (1 S) 0.500 98 Water Surface, HSG D (2S) 27.780 79 Woods/grass comb., Good, HSG D (1 S, 3S) 41.960 83 TOTAL AREA Poplin Phase 3 - 191023 Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 41.960 HSG D 1 S, 2S, 3S 0.000 Other 41.960 TOTAL AREA Poplin Phase 3 - 191023 Prepared by Bohler Engineering HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Printed 10/28/2019 Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 4.870 0.000 4.870 >75% Grass cover, Good 2S 0.000 0.000 0.000 0.160 0.000 0.160 Gravel surface is 0.000 0.000 0.000 3.730 0.000 3.730 Paved parking 2S 0.000 0.000 0.000 4.556 0.000 4.556 Roofs 1 S, 2S 0.000 0.000 0.000 0.270 0.000 0.270 Unconnected pavement is 0.000 0.000 0.000 0.500 0.000 0.500 Water Surface 2S 0.000 0.000 0.000 0.094 0.000 0.094 Water Surface, 0% imp is 0.000 0.000 0.000 27.780 0.000 27.780 Woods/grass comb., Good 1 S, 3S 0.000 0.000 0.000 41.960 0.000 41.960 TOTAL AREA Poplin Phase 3 - 191023 Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 5 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 2S 0.00 0.00 247.0 0.0140 0.013 18.0 0.0 0.0 2 4P 617.50 617.20 60.5 0.0050 0.012 24.0 0.0 0.0 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 6 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre POI 1 Runoff Area=20.980 ac 2.03% Impervious Runoff Depth=1.60" Flow Length=937' Tc=18.8 min UI Adjusted CN=79 Runoff=38.31 cfs 2.806 of Subcatchment2S: Post POND 1 Runoff Area=13.500 ac 63.93% Imperious Runoff Depth=2.68" Flow Length=572' Tc=9.5 min CN=92 Runoff=53.42 cfs 3.020 of Subcatchment3S: POI 1 Bypass Runoff Area=7.480 ac 0.00% Imperious Runoff Depth=1.60" Flow Length=2,279' Tc=25.7 min CN=79 Runoff=11.33 cfs 1.000 of Pond 4P: Pond 1 Peak EIev=620.45' Storage=62,725 cf Inflow=53.42 cfs 3.020 of Primary=17.78 cfs 2.993 of Secondary=0.00 cfs 0.000 of Outflow=17.78 cfs 2.993 of Pond 6P: PP Vol Peak EIev=0.00' Storage=0 cf Link 5L: Post POI 1 Inflow=29.00 cfs 3.993 of Primary=29.00 cfs 3.993 of Total Runoff Area = 41.960 ac Runoff Volume = 6.827 of Average Runoff Depth = 1.95" 78.42% Pervious = 32.904 ac 21.58% Impervious = 9.056 ac Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: Pre POI 1 Runoff = 38.31 cfs @ 12.12 hrs, Volume= 2.806 af, Depth= 1.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr Rainfall=3.55" Area (ac) CN Adi Description 20.300 79 Woods/grass comb., Good, HSG D 0.156 98 Roofs, HSG D 0.094 98 Water Surface, 0% imp, HSG D 0.270 98 Unconnected pavement, HSG D 0.160 96 Gravel surface, HSG D 20.980 80 79 Weighted Average, UI Adjusted 20.554 97.97% Pervious Area 0.426 2.03% Impervious Area 0.270 63.38% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 100 0.0300 0.48 Sheet Flow, Fallow n= 0.050 P2= 3.12" 3.0 315 0.0315 1.77 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps 12.3 522 0.0200 0.71 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.8 937 Total Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 8 Subcatchment 1S: Pre POI 1 Hydrograph 42-----------'i-- I'i--'i --'i --'i--------'i-- I'i-- I'i-- --'i --'i --'i-----'i-- I'i-- I'i --'i --'i -- ■Runoff I I I 40 -- 38.31 cfs —'-- -- -- --————— — — —'—— -- -- -- -- -- — —---- -- -- -- -- 38 -------+--+--+--+----------+--+--+--+--+--+-----TY Tr ,i 36 --r—I --rI --rI --r--r---r--r--r--r--r--r-- 34 r-—-- ' I I ——2y-rR--a--in--f-arl-IJ--.r5-5 32 r-- - ---- -- ---------------------------------------- Ruftoff rida",2D,980 -ac - 28 ---- --- -- --+------------+----+R�#nQ gIpme- ,i —i 26 --r- ---r--r--r--r----------r--r--r- u- -I_- -��► 22 -------------------------------kunoff I,De th 'I. 0'-- o 20 LL 'I J1iLJ111L- +1dIItG t-1 --7r3— 18 —r'--- 16 --+--r----------T---TO- &S-mfp-- — 14 I —I--7--7—T-7—---- 7--- 7--- T--- ---II--,— 12 ----------7U Ad}usted N��� _ 10 --'---1--J--1--i--L--'---'-----J--1--1--1--L--r--------'----1--L--r-- �I I I I I I I I I I I I I I I I I I I I I I I 8 --I-- -i-- -- -- ----------i-- -- -- --+-- ----------i-- --+-- -- -- 6 --I-- -I-- ----+--r--------I-- -- -- --+--r--+----------1--+--+--r-- 4 --r- ----7--T--r--r-------7--7--7--T--r--r--r-------,--T--r--r-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 1S: Pre POI 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.39 0.00 0.00 10.00 0.64 0.00 0.14 12.50 2.61 0.91 10.01 15.00 3.03 1.21 1.76 17.50 3.24 1.36 1.13 20.00 3.38 1.47 0.79 22.50 3.49 1.56 0.69 25.00 3.55 1.60 0.00 27.50 3.55 1.60 0.00 30.00 3.55 1.60 0.00 32.50 3.55 1.60 0.00 35.00 3.55 1.60 0.00 37.50 3.55 1.60 0.00 40.00 3.55 1.60 0.00 42.50 3.55 1.60 0.00 45.00 3.55 1.60 0.00 47.50 3.55 1.60 0.00 50.00 3.55 1.60 0.00 52.50 3.55 1.60 0.00 55.00 3.55 1.60 0.00 57.50 3.55 1.60 0.00 60.00 3.55 1.60 0.00 62.50 3.55 1.60 0.00 65.00 3.55 1.60 0.00 67.50 3.55 1.60 0.00 70.00 3.55 1.60 0.00 72.50 3.55 1.60 0.00 75.00 3.55 1.60 0.00 77.50 3.55 1.60 0.00 80.00 3.55 1.60 0.00 82.50 3.55 1.60 0.00 85.00 3.55 1.60 0.00 87.50 3.55 1.60 0.00 90.00 3.55 1.60 0.00 92.50 3.55 1.60 0.00 95.00 3.55 1.60 0.00 97.50 3.55 1.60 0.00 100.00 3.55 1.60 0.00 102.50 3.55 1.60 0.00 105.00 3.55 1.60 0.00 107.50 3.55 1.60 0.00 110.00 3.55 1.60 0.00 112.50 3.55 1.60 0.00 115.00 3.55 1.60 0.00 117.50 3.55 1.60 0.00 120.00 3.55 1.60 0.00 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 2S: Post POND 1 Runoff = 53.42 cfs @ 12.00 hrs, Volume= 3.020 af, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr Rainfall=3.55" Area (ac) CN Description 4.400 98 Roofs, HSG D 3.730 98 Paved parking, HSG D 0.500 98 Water Surface, HSG D 4.870 80 >75% Grass cover, Good, HSG D 13.500 92 Weighted Average 4.870 36.07% Pervious Area 8.630 63.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 1.6 300 0.0100 3.12 9.36 Channel Flow, Area= 3.0 sf Perim= 6.0' r= 0.50' n= 0.030 Short grass 0.6 247 0.0140 7.03 12.43 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 9.5 572 Total Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 11 Subcatchment 2S: Post POND 1 Hydrograph � � � � � � � � � � � � � � � � � � � � � � � ■Runoff 55 53.42 cfs =----------- -+ =--- ITYpP+-E�+�t_ 50 2y� - - �- - r Rain al l-r3.5 ' - -------------------------------------- 45 -- - - -- 1-- -- -- Ru"f-Air16a"13.500 at - 40 --t-- --r--'--t--tR-pnpff;VpI4m;e=;3.0-20-cjf - 35 -- -'-- -- -- ----------'-- -- ----+--kgnai#�Depth-2.68`'-- 3 30 a 25 --II-- — --t--t--+--t----------t--t——t——t——t——t—---------t—\Y\ib=9- 15 10 51 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 2S: Post POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.07 7.50 0.39 0.04 0.34 10.00 0.64 0.16 1.03 12.50 2.61 1.79 5.41 15.00 3.03 2.19 1.42 17.50 3.24 2.39 0.90 20.00 3.38 2.52 0.62 22.50 3.49 2.63 0.55 25.00 3.55 2.68 0.00 27.50 3.55 2.68 0.00 30.00 3.55 2.68 0.00 32.50 3.55 2.68 0.00 35.00 3.55 2.68 0.00 37.50 3.55 2.68 0.00 40.00 3.55 2.68 0.00 42.50 3.55 2.68 0.00 45.00 3.55 2.68 0.00 47.50 3.55 2.68 0.00 50.00 3.55 2.68 0.00 52.50 3.55 2.68 0.00 55.00 3.55 2.68 0.00 57.50 3.55 2.68 0.00 60.00 3.55 2.68 0.00 62.50 3.55 2.68 0.00 65.00 3.55 2.68 0.00 67.50 3.55 2.68 0.00 70.00 3.55 2.68 0.00 72.50 3.55 2.68 0.00 75.00 3.55 2.68 0.00 77.50 3.55 2.68 0.00 80.00 3.55 2.68 0.00 82.50 3.55 2.68 0.00 85.00 3.55 2.68 0.00 87.50 3.55 2.68 0.00 90.00 3.55 2.68 0.00 92.50 3.55 2.68 0.00 95.00 3.55 2.68 0.00 97.50 3.55 2.68 0.00 100.00 3.55 2.68 0.00 102.50 3.55 2.68 0.00 105.00 3.55 2.68 0.00 107.50 3.55 2.68 0.00 110.00 3.55 2.68 0.00 112.50 3.55 2.68 0.00 115.00 3.55 2.68 0.00 117.50 3.55 2.68 0.00 120.00 3.55 2.68 0.00 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 3S: POI 1 Bypass Runoff = 11.33 cfs @ 12.20 hrs, Volume= 1.000 af, Depth= 1.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 2yr Rainfall=3.55" Area (ac) CN Description 7.480 79 Woods/grass comb., Good, HSG D 7.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 18.4 2,254 0.0100 2.05 6.14 Channel Flow, Area= 3.0 sf Perim= 18.0' r= 0.17' n= 0.022 25.7 2,279 Total Subcatchment 3S: POI 1 Bypass Hydrograph -----I---1-- --7--r--r---------- -- ----T--r--r----------,--7--r--r-- i i i i i ■Runoff 12 11 11.33 cfs ---- � ---r--r--r--r--r--r----r--r--r--t--r--r--r----- � � � � � I--r— —r-- r-- � � � � � � I I 1 11 �TypQ II 2 -1�r 107 --i-- ----- -------------- ------------ 2yr RainfallT3.55" 9 Rwnbff Area=7.480 ac RkinpffLVpIL;me=1.000-E(f 7 --'-- ---J--i-- --L--'---'-----J--1--1--1--Ru-noff-�De - - #h�1.�60�'-- �° 6 i l -'---'-- ' --' --'--'---'---'---'-- I I I -- -- --' 16WI-L6nOft =2,279'-- 5 --'�,-- -'�,--J--i--�--L--'�---'�---'1--J--1--1--1--L--'L--'�---'���,��:7-wai�- 4V --'-- -'---'---'--------'---'---'---'---------------------------tN=79-- 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 3S: POI 1 Bypass Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.10 0.00 0.00 5.00 0.22 0.00 0.00 7.50 0.39 0.00 0.00 10.00 0.64 0.00 0.04 12.50 2.61 0.91 5.20 15.00 3.03 1.21 0.64 17.50 3.24 1.36 0.41 20.00 3.38 1.47 0.29 22.50 3.49 1.56 0.25 25.00 3.55 1.60 0.00 27.50 3.55 1.60 0.00 30.00 3.55 1.60 0.00 32.50 3.55 1.60 0.00 35.00 3.55 1.60 0.00 37.50 3.55 1.60 0.00 40.00 3.55 1.60 0.00 42.50 3.55 1.60 0.00 45.00 3.55 1.60 0.00 47.50 3.55 1.60 0.00 50.00 3.55 1.60 0.00 52.50 3.55 1.60 0.00 55.00 3.55 1.60 0.00 57.50 3.55 1.60 0.00 60.00 3.55 1.60 0.00 62.50 3.55 1.60 0.00 65.00 3.55 1.60 0.00 67.50 3.55 1.60 0.00 70.00 3.55 1.60 0.00 72.50 3.55 1.60 0.00 75.00 3.55 1.60 0.00 77.50 3.55 1.60 0.00 80.00 3.55 1.60 0.00 82.50 3.55 1.60 0.00 85.00 3.55 1.60 0.00 87.50 3.55 1.60 0.00 90.00 3.55 1.60 0.00 92.50 3.55 1.60 0.00 95.00 3.55 1.60 0.00 97.50 3.55 1.60 0.00 100.00 3.55 1.60 0.00 102.50 3.55 1.60 0.00 105.00 3.55 1.60 0.00 107.50 3.55 1.60 0.00 110.00 3.55 1.60 0.00 112.50 3.55 1.60 0.00 115.00 3.55 1.60 0.00 117.50 3.55 1.60 0.00 120.00 3.55 1.60 0.00 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 15 Summary for Pond 4P: Pond 1 Inflow Area = 13.500 ac, 63.93% Impervious, Inflow Depth = 2.68" for 2yr event Inflow = 53.42 cfs @ 12.00 hrs, Volume= 3.020 of Outflow = 17.78 cfs @ 12.17 hrs, Volume= 2.993 af, Atten= 67%, Lag= 10.1 min Primary = 17.78 cfs @ 12.17 hrs, Volume= 2.993 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 620.45' @ 12.17 hrs Surf.Area= 23,898 sf Storage= 62,725 cf Plug -Flow detention time= 661.0 min calculated for 2.993 of (99% of inflow) Center -of -Mass det. time= 655.2 min ( 1,449.4 - 794.1 ) Volume Invert Avail.Storage Storage Description #1 617.50' 175,246 cf Temporary Pool (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 617.50 18,682 561.0 0 0 18,682 618.50 20,394 580.0 19,532 19,532 20,499 619.50 22,162 598.0 21,272 40,804 22,286 620.50 23,987 618.0 23,068 63,872 24,315 621.50 25,869 636.0 24,922 88,794 26,217 622.50 27,807 655.0 26,832 115,626 28,273 623.50 29,801 674.0 28,798 144,425 30,390 624.50 31,853 693.0 30,821 175,246 32,567 Device Routing Invert Outlet Devices #1 Primary 617.50' 24.0" Round Culvert L= 60.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 617.50' / 617.20' S= 0.0050'/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 617.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 619.10' 48.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 621.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Secondary 622.75' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=17.68 cfs @ 12.17 hrs HW=620.44' (Free Discharge) L1=Culvert (Passes 17.68 cfs of 20.70 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.28 cfs @ 8.11 fps) 3=Orifice/Grate (Orifice Controls 17.40 cfs @ 4.35 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=617.50' (Free Discharge) L5= Broad -crested Rectangular Weir( Controls 0.00 cfs) Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 16 '1 11L• EMA'1 1 gfff Hyd rog raph _I-- _I-- _I-- -- N Inflow 53.42 cfs W Outflow --I- -I------------I,--I--I,--I--I,--lnflowArea=13.500 at- ❑Primary _Secondary 55 Re�a1t �1ev�62fY5 50-:- Sfor+a- a=62. 25 c,f - 45 --I- r--r--I--t--I--r--r-r--r-r--r-r--r--I--+--I--r--I--r--r-r-- 40 -1 T----T----T-- -7-- --1 F-1--T----T----T----T----T-- w 35 --- ---,I ---- ---- --,I - --,I ---,I ----,I ---- ----,I ---- ---- -- 3 30 --I- -I-- --I----I---I --II --I --II -I-- -I--II -I-- --I----I---I--I---I -- LL 2S 17.78 cfs J--L--1--1----L----L------L—L--L----L--I--L----L----L-- 17.78 cfs 20 I I I I I I I I I I I I I I I I I I I I 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) 624 623 622 w w 0 621 w w 620 619 618 Pond 4P: Pond 1 Stage -Discharge 0 50 100 150 200 250 Discharge (cfs) — Total ❑ Primary Secondary Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 17 w Pond 4P: Pond 1 Stage -Area -Storage Surface/Horizontal/wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,00016,000 18,00020,000 22,000 24,00026,000 28,000 30,000 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 Storage (cubic -feet) Surface ■ Storage Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 18 Hydrograph for Pond 4P: Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 617.50 0.00 0.00 0.00 2.50 0.00 0 617.50 0.00 0.00 0.00 5.00 0.07 93 617.50 0.00 0.00 0.00 7.50 0.34 1,832 617.60 0.02 0.02 0.00 10.00 1.03 6,984 617.87 0.08 0.08 0.00 12.50 5.41 54,311 620.10 12.99 12.99 0.00 15.00 1.42 37,327 619.34 1.76 1.76 0.00 17.50 0.90 35,455 619.26 1.01 1.01 0.00 20.00 0.62 34,541 619.21 0.72 0.72 0.00 22.50 0.55 34,058 619.19 0.57 0.57 0.00 25.00 0.00 32,710 619.13 0.29 0.29 0.00 27.50 0.00 30,826 619.04 0.20 0.20 0.00 30.00 0.00 29,081 618.96 0.19 0.19 0.00 32.50 0.00 27,388 618.88 0.19 0.19 0.00 35.00 0.00 25,746 618.80 0.18 0.18 0.00 37.50 0.00 24,156 618.72 0.17 0.17 0.00 40.00 0.00 22,619 618.65 0.17 0.17 0.00 42.50 0.00 21,135 618.58 0.16 0.16 0.00 45.00 0.00 19,703 618.51 0.16 0.16 0.00 47.50 0.00 18,326 618.44 0.15 0.15 0.00 50.00 0.00 17,002 618.38 0.14 0.14 0.00 52.50 0.00 15,732 618.31 0.14 0.14 0.00 55.00 0.00 14,516 618.25 0.13 0.13 0.00 57.50 0.00 13,356 618.19 0.13 0.13 0.00 60.00 0.00 12,250 618.14 0.12 0.12 0.00 62.50 0.00 11,199 618.08 0.11 0.11 0.00 65.00 0.00 10,204 618.03 0.11 0.11 0.00 67.50 0.00 9,265 617.99 0.10 0.10 0.00 70.00 0.00 8,382 617.94 0.10 0.10 0.00 72.50 0.00 7,555 617.90 0.09 0.09 0.00 75.00 0.00 6,784 617.86 0.08 0.08 0.00 77.50 0.00 6,071 617.82 0.08 0.08 0.00 80.00 0.00 5,414 617.79 0.07 0.07 0.00 82.50 0.00 4,814 617.75 0.06 0.06 0.00 85.00 0.00 4,274 617.73 0.06 0.06 0.00 87.50 0.00 3,788 617.70 0.05 0.05 0.00 90.00 0.00 3,366 617.68 0.04 0.04 0.00 92.50 0.00 3,004 617.66 0.04 0.04 0.00 95.00 0.00 2,692 617.64 0.03 0.03 0.00 97.50 0.00 2,425 617.63 0.03 0.03 0.00 100.00 0.00 2,194 617.62 0.02 0.02 0.00 102.50 0.00 1,996 617.61 0.02 0.02 0.00 105.00 0.00 1,825 617.60 0.02 0.02 0.00 107.50 0.00 1,678 617.59 0.02 0.02 0.00 110.00 0.00 1,551 617.58 0.01 0.01 0.00 112.50 0.00 1,442 617.58 0.01 0.01 0.00 115.00 0.00 1,348 617.57 0.01 0.01 0.00 117.50 0.00 1,266 617.57 0.01 0.01 0.00 120.00 0.00 1,190 617.56 0.01 0.01 0.00 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 19 Stage -Discharge for Pond 4P: Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 617.50 0.00 0.00 0.00 617.60 0.02 0.02 0.00 617.70 0.05 0.05 0.00 617.80 0.07 0.07 0.00 617.90 0.09 0.09 0.00 618.00 0.10 0.10 0.00 618.10 0.12 0.12 0.00 618.20 0.13 0.13 0.00 618.30 0.14 0.14 0.00 618.40 0.15 0.15 0.00 618.50 0.16 0.16 0.00 618.60 0.16 0.16 0.00 618.70 0.17 0.17 0.00 618.80 0.18 0.18 0.00 618.90 0.19 0.19 0.00 619.00 0.19 0.19 0.00 619.10 0.20 0.20 0.00 619.20 0.61 0.61 0.00 619.30 1.36 1.36 0.00 619.40 2.33 2.33 0.00 619.50 3.47 3.47 0.00 619.60 4.77 4.77 0.00 619.70 6.21 6.21 0.00 619.80 7.76 7.76 0.00 619.90 9.44 9.44 0.00 620.00 11.22 11.22 0.00 620.10 13.10 13.10 0.00 620.20 14.67 14.67 0.00 620.30 16.00 16.00 0.00 620.40 17.20 17.20 0.00 620.50 18.30 18.30 0.00 620.60 19.33 19.33 0.00 620.70 20.31 20.31 0.00 620.80 21.23 21.23 0.00 620.90 22.12 22.12 0.00 621.00 22.97 22.97 0.00 621.10 25.44 25.44 0.00 621.20 26.27 26.27 0.00 621.30 26.92 26.92 0.00 621.40 27.55 27.55 0.00 621.50 28.17 28.17 0.00 621.60 28.77 28.77 0.00 621.70 29.37 29.37 0.00 621.80 29.95 29.95 0.00 621.90 30.52 30.52 0.00 622.00 31.08 31.08 0.00 622.10 31.63 31.63 0.00 622.20 32.17 32.17 0.00 622.30 32.70 32.70 0.00 622.40 33.23 33.23 0.00 622.50 33.74 33.74 0.00 622.60 34.25 34.25 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 622.70 34.75 34.75 0.00 622.80 36.35 35.24 1.11 622.90 41.51 35.73 5.79 623.00 48.74 36.21 12.54 623.10 57.74 36.68 21.06 623.20 68.48 37.15 31.33 623.30 81.09 37.61 43.48 623.40 94.61 38.06 56.54 623.50 108.47 38.51 69.95 623.60 123.20 38.96 84.24 623.70 138.75 39.40 99.35 623.80 155.28 39.84 115.45 623.90 172.84 40.27 132.57 624.00 190.79 40.69 150.10 624.10 208.95 41.11 167.84 624.20 227.48 41.53 185.95 624.30 246.30 41.94 204.36 624.40 266.17 42.35 223.82 624.50 287.23 42.76 244.47 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 20 Stage -Area -Storage for Pond 4P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 617.50 18,682 0 617.60 18,850 1,877 617.70 19,018 3,770 617.80 19,188 5,680 617.90 19,358 7,608 618.00 19,529 9,552 618.10 19,700 11,513 618.20 19,873 13,492 618.30 20,046 15,488 618.40 20,219 17,501 618.50 20,394 19,532 618.60 20,567 21,580 618.70 20,742 23,645 618.80 20,917 25,728 618.90 21,092 27,829 619.00 21,269 29,947 619.10 21,446 32,082 619.20 21,624 34,236 619.30 21,803 36,407 619.40 21,982 38,596 619.50 22,162 40,804 619.60 22,341 43,029 619.70 22,521 45,272 619.80 22,702 47,533 619.90 22,883 49,812 620.00 23,065 52,110 620.10 23,248 54,425 620.20 23,432 56,759 620.30 23,616 59,112 620.40 23,801 61,483 620.50 23,987 63,872 620.60 24,172 66,280 620.70 24,358 68,707 620.80 24,544 71,152 620.90 24,731 73,615 621.00 24,919 76,098 621.10 25,108 78,599 621.20 25,297 81,119 621.30 25,487 83,659 621.40 25,678 86,217 621.50 25,869 88,794 621.60 26,060 91,391 621.70 26,251 94,006 621.80 26,443 96,641 621.90 26,636 99,295 622.00 26,829 101,968 622.10 27,023 104,661 622.20 27,218 107,373 622.30 27,414 110,104 622.40 27,610 112,856 622.50 27,807 115,626 622.60 28,003 118,417 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 622.70 28,200 121,227 622.80 28,398 124,057 622.90 28,596 126,907 623.00 28,795 129,776 623.10 28,995 132,666 623.20 29,196 135,575 623.30 29,397 138,505 623.40 29,598 141,455 623.50 29,801 144,425 623.60 30,003 147,415 623.70 30,206 150,425 623.80 30,409 153,456 623.90 30,614 156,507 624.00 30,818 159,579 624.10 31,024 162,671 624.20 31,230 165,784 624.30 31,437 168,917 624.40 31,645 172,071 624.50 31,853 175,246 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 21 Summary for Pond 6P: PP Vol [43] Hint: Has no inflow (Outflow=Zero) Volume Invert Avail.Storage Storage Description #1 613.50' 10,371 cf Forebay (Irregular)Listed below (Recalc) #2 612.50' 54,563 cf Main Pool (Irregular)Listed below (Recalc) 64,933 cf Total Available Storage Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 613.50 1,700 177.0 0 0 1,700 614.50 2,073 195.0 1,883 1,883 2,264 615.50 2,480 212.0 2,273 4,157 2,851 616.50 2,921 228.0 2,697 6,854 3,453 617.50 4,147 266.0 3,516 10,371 4,967 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 612.50 8,704 386.0 0 0 8,704 613.50 9,491 400.0 9,095 9,095 9,664 614.50 10,307 415.0 9,896 18,991 10,719 615.50 11,152 429.0 10,727 29,718 11,749 616.50 12,024 443.0 11,585 41,303 12,814 617.50 14,535 480.0 13,260 54,563 15,571 Pond 6P: PP Vol Stage -Discharge -------- ---------------- -- - 617 616 w w 0 615 w w 614 613 0 Discharge (cfs) Total Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 22 61 61 w w 0 61 w w 61 61 Pond 6P: PP Vol Stage -Area -Storage 0 10,000 20,000 30,000 40,000 50,000 60,000 Storage (cubic -feet) ❑ Storage Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 23 Elevation Discharge (feet) (cfs) 612.50 0.00 612.55 0.00 612.60 0.00 612.65 0.00 612.70 0.00 612.75 0.00 612.80 0.00 612.85 0.00 612.90 0.00 612.95 0.00 613.00 0.00 613.05 0.00 613.10 0.00 613.15 0.00 613.20 0.00 613.25 0.00 613.30 0.00 613.35 0.00 613.40 0.00 613.45 0.00 613.50 0.00 613.55 0.00 613.60 0.00 613.65 0.00 613.70 0.00 613.75 0.00 613.80 0.00 613.85 0.00 613.90 0.00 613.95 0.00 614.00 0.00 614.05 0.00 614.10 0.00 614.15 0.00 614.20 0.00 614.25 0.00 614.30 0.00 614.35 0.00 614.40 0.00 614.45 0.00 614.50 0.00 614.55 0.00 614.60 0.00 614.65 0.00 614.70 0.00 614.75 0.00 614.80 0.00 614.85 0.00 614.90 0.00 614.95 0.00 615.00 0.00 615.05 0.00 Stage -Discharge for Pond 6P: PP Vol Elevation Discharge (feet) (cfs) 615.10 0.00 615.15 0.00 615.20 0.00 615.25 0.00 615.30 0.00 615.35 0.00 615.40 0.00 615.45 0.00 615.50 0.00 615.55 0.00 615.60 0.00 615.65 0.00 615.70 0.00 615.75 0.00 615.80 0.00 615.85 0.00 615.90 0.00 615.95 0.00 616.00 0.00 616.05 0.00 616.10 0.00 616.15 0.00 616.20 0.00 616.25 0.00 616.30 0.00 616.35 0.00 616.40 0.00 616.45 0.00 616.50 0.00 616.55 0.00 616.60 0.00 616.65 0.00 616.70 0.00 616.75 0.00 616.80 0.00 616.85 0.00 616.90 0.00 616.95 0.00 617.00 0.00 617.05 0.00 617.10 0.00 617.15 0.00 617.20 0.00 617.25 0.00 617.30 0.00 617.35 0.00 617.40 0.00 617.45 0.00 617.50 0.00 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 24 Elevation Storage (feet) (cubic -feet) 612.50 0 612.55 436 612.60 874 612.65 1,314 612.70 1,756 612.75 2,200 612.80 2,646 612.85 3,094 612.90 3,544 612.95 3,995 613.00 4,449 613.05 4,905 613.10 5,362 613.15 5,822 613.20 6,283 613.25 6,747 613.30 7,212 613.35 7,680 613.40 8,150 613.45 8,621 613.50 9,095 613.55 9,656 613.60 10,220 613.65 10,786 613.70 11,356 613.75 11,929 613.80 12,504 613.85 13,083 613.90 13,664 613.95 14,248 614.00 14,836 614.05 15,426 614.10 16,019 614.15 16,616 614.20 17,215 614.25 17,817 614.30 18,423 614.35 19,031 614.40 19,642 614.45 20,257 614.50 20,874 614.55 21,495 614.60 22,118 614.65 22,745 614.70 23,375 614.75 24,007 614.80 24,643 614.85 25,282 614.90 25,924 614.95 26,570 615.00 27,218 615.05 27,869 Stage -Area -Storage for Pond 6P: PP Vol Elevation Storage (feet) (cubic -feet) 615.10 28,524 615.15 29,182 615.20 29,842 615.25 30,506 615.30 31,174 615.35 31,844 615.40 32,518 615.45 33,194 615.50 33,874 615.55 34,558 615.60 35,244 615.65 35,934 615.70 36,627 615.75 37,323 615.80 38,022 615.85 38,724 615.90 39,430 615.95 40,139 616.00 40,852 616.05 41,567 616.10 42,286 616.15 43,009 616.20 43,734 616.25 44,463 616.30 45,195 616.35 45,931 616.40 46,669 616.45 47,412 616.50 48,157 616.55 48,909 616.60 49,669 616.65 50,439 616.70 51,217 616.75 52,004 616.80 52,801 616.85 53,606 616.90 54,421 616.95 55,245 617.00 56,078 617.05 56,921 617.10 57,772 617.15 58,634 617.20 59,505 617.25 60,385 617.30 61,275 617.35 62,175 617.40 63,085 617.45 64,004 617.50 64,933 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 25 Summary for Link 5L: Post POI 1 Inflow Area = 20.980 ac, 41.13% Impervious, Inflow Depth > 2.28" for 2yr event Inflow = 29.00 cfs @ 12.19 hrs, Volume= 3.993 of Primary = 29.00 cfs @ 12.19 hrs, Volume= 3.993 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 5L: Post POI 1 Hyd rog raph C Inflow 32 zs.00 ofs T T T 1 T ❑ Primary 30 29.00 cfs —r —r--r--i--r--r--r--i--r--r— r —r--r r--i— r r--i-- �oW Area=,40=9(50 ac 28 -- - -- ------- -- ------- -- -� - 24 -- �--r--li---li--�--r--r--li--�--r--r--li--r--r--r--Ir--li--r--r--r--li-- 22 20 U18- 3 16 O -- 1— -1 L--1---1--J--1--L--1--J--1--L-------1--L--L--'-- FL 14 rr 10 ----r------- --r------- ——r--r — -- — — -----r--r--------- — — g 1 -- L-----'-- 1 -- L--' — — —'-- L -- L--L --'-- L-- 1 -- L--' — — —'-- 1 -- L--L --'-- 61 4 I I I I 60 65 70 75 :0 85 90 95 100 Poplin Phase 3 - 191023 Type // 24-hr 2yrRainfall=3.55" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 26 Hydrograph for Link 5L: Post POI 1 Time Inflow Elevation Primary (hours) (Cfs) (feet) (Cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.00 0.00 0.00 7.50 0.02 0.00 0.02 10.00 0.12 0.00 0.12 12.50 18.20 0.00 18.20 15.00 2.40 0.00 2.40 17.50 1.42 0.00 1.42 20.00 1.01 0.00 1.01 22.50 0.82 0.00 0.82 25.00 0.29 0.00 0.29 27.50 0.20 0.00 0.20 30.00 0.19 0.00 0.19 32.50 0.19 0.00 0.19 35.00 0.18 0.00 0.18 37.50 0.17 0.00 0.17 40.00 0.17 0.00 0.17 42.50 0.16 0.00 0.16 45.00 0.16 0.00 0.16 47.50 0.15 0.00 0.15 50.00 0.14 0.00 0.14 52.50 0.14 0.00 0.14 55.00 0.13 0.00 0.13 57.50 0.13 0.00 0.13 60.00 0.12 0.00 0.12 62.50 0.11 0.00 0.11 65.00 0.11 0.00 0.11 67.50 0.10 0.00 0.10 70.00 0.10 0.00 0.10 72.50 0.09 0.00 0.09 75.00 0.08 0.00 0.08 77.50 0.08 0.00 0.08 80.00 0.07 0.00 0.07 82.50 0.06 0.00 0.06 85.00 0.06 0.00 0.06 87.50 0.05 0.00 0.05 90.00 0.04 0.00 0.04 92.50 0.04 0.00 0.04 95.00 0.03 0.00 0.03 97.50 0.03 0.00 0.03 100.00 0.02 0.00 0.02 102.50 0.02 0.00 0.02 105.00 0.02 0.00 0.02 107.50 0.02 0.00 0.02 110.00 0.01 0.00 0.01 112.50 0.01 0.00 0.01 115.00 0.01 0.00 0.01 117.50 0.01 0.00 0.01 120.00 0.01 0.00 0.01 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 27 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre POI 1 Runoff Area=20.980 ac 2.03% Impervious Runoff Depth=3.84" Flow Length=937' Tc=18.8 min UI Adjusted CN=79 Runoff=92.09 cfs 6.715 of Subcatchment2S: Post POND 1 Runoff Area=13.500 ac 63.93% Imperious Runoff Depth=5.25" Flow Length=572' Tc=9.5 min CN=92 Runoff=100.25 cfs 5.902 of Subcatchment3S: POI 1 Bypass Runoff Area=7.480 ac 0.00% Imperious Runoff Depth=3.84" Flow Length=2,279' Tc=25.7 min CN=79 Runoff=27.42 cfs 2.394 of Pond 4P: Pond 1 Peak Elev=622.32' Storage=110,634 cf Inflow=100.25 cfs 5.902 of Primary=32.80 cfs 5.875 of Secondary=0.00 cfs 0.000 of Outflow=32.80 cfs 5.875 of Pond 6P: PP Vol Riilnmm:me eis Peak Elev=0.00' Storage=0 cf Inflow=60.16 cfs 8.269 of Primary=60.16 cfs 8.269 of Total Runoff Area = 41.960 ac Runoff Volume = 15.011 of Average Runoff Depth = 4.29" 78.42% Pervious = 32.904 ac 21.58% Impervious = 9.056 ac Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 1S: Pre POI 1 Runoff = 92.09 cfs @ 12.11 hrs, Volume= 6.715 af, Depth= 3.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr Rainfall=6.18" Area (ac) CN Adi Description 20.300 79 Woods/grass comb., Good, HSG D 0.156 98 Roofs, HSG D 0.094 98 Water Surface, 0% imp, HSG D 0.270 98 Unconnected pavement, HSG D 0.160 96 Gravel surface, HSG D 20.980 80 79 Weighted Average, UI Adjusted 20.554 97.97% Pervious Area 0.426 2.03% Impervious Area 0.270 63.38% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 100 0.0300 0.48 Sheet Flow, Fallow n= 0.050 P2= 3.12" 3.0 315 0.0315 1.77 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps 12.3 522 0.0200 0.71 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.8 937 Total Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 29 Subcatchment 1S: Pre POI 1 Hydrograph -----I-- r -- Y -- r -- r--r --I-- r-- r -- Y -- r--------I-- r -- r -- r————— — — — I -- r -- Y -- 100 I I I I ■Runoff r--Y--r--r--r--i--r--r--Y--r--r--r--i--r--r--r--r--r--i--r--r -- 95 92.09 cfs--L--T--r---------- -- ------------ -- ------------ -- -- r — — 90 --'-- -',-------------'---'-- -------------'--------�Y�e 85 --'-------'--'------------'--'-----'--J 80 - - I- - - 25 r Ra-i-r� fail h.'f 8' r - 75 ---- L--1--1--L------L--L--L--L---jRm1toff Arda,20.-980-at- 70 ---- -- -- -- -- ---- -- -- ----1---I---I--�--�---�-----I-�--I--4--�-- / I- " 60 --1--__,__Y__r__I___I__�u,p�►ff rDeptl��3.84�' - -� 55 r--Y--r--r--r----r--r——Y--r--I----- 0 50 - a 45 --,-- ---L-- i --i --i-------L--L--i --i-------rlciW _ n g#?57/ r- 40 -- -- ------------ -- --------- ------ i - t AAjusf@d-O-N=7$- 25 --------------------+--------------------------+-- 20--r- r--Y--r--r--r----r--r--Y--r--r------r--r--r--r-------r--Y-- 15 --r- 1 0 --�i - -�----L--�r --�r-----------L--�i---------L--�r --�r--------- -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 30 Hydrograph for Subcatchment 1S: Pre POI 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.39 0.00 0.00 7.50 0.68 0.01 0.20 10.00 1.12 0.11 1.40 12.50 4.54 2.41 22.24 15.00 5.27 3.04 3.64 17.50 5.63 3.35 2.30 20.00 5.88 3.58 1.60 22.50 6.07 3.75 1.39 25.00 6.18 3.84 0.00 27.50 6.18 3.84 0.00 30.00 6.18 3.84 0.00 32.50 6.18 3.84 0.00 35.00 6.18 3.84 0.00 37.50 6.18 3.84 0.00 40.00 6.18 3.84 0.00 42.50 6.18 3.84 0.00 45.00 6.18 3.84 0.00 47.50 6.18 3.84 0.00 50.00 6.18 3.84 0.00 52.50 6.18 3.84 0.00 55.00 6.18 3.84 0.00 57.50 6.18 3.84 0.00 60.00 6.18 3.84 0.00 62.50 6.18 3.84 0.00 65.00 6.18 3.84 0.00 67.50 6.18 3.84 0.00 70.00 6.18 3.84 0.00 72.50 6.18 3.84 0.00 75.00 6.18 3.84 0.00 77.50 6.18 3.84 0.00 80.00 6.18 3.84 0.00 82.50 6.18 3.84 0.00 85.00 6.18 3.84 0.00 87.50 6.18 3.84 0.00 90.00 6.18 3.84 0.00 92.50 6.18 3.84 0.00 95.00 6.18 3.84 0.00 97.50 6.18 3.84 0.00 100.00 6.18 3.84 0.00 102.50 6.18 3.84 0.00 105.00 6.18 3.84 0.00 107.50 6.18 3.84 0.00 110.00 6.18 3.84 0.00 112.50 6.18 3.84 0.00 115.00 6.18 3.84 0.00 117.50 6.18 3.84 0.00 120.00 6.18 3.84 0.00 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 2S: Post POND 1 Runoff = 100.25 cfs @ 12.00 hrs, Volume= 5.902 af, Depth= 5.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr Rainfall=6.18" Area (ac) CN Description 4.400 98 Roofs, HSG D 3.730 98 Paved parking, HSG D 0.500 98 Water Surface, HSG D 4.870 80 >75% Grass cover, Good, HSG D 13.500 92 Weighted Average 4.870 36.07% Pervious Area 8.630 63.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 1.6 300 0.0100 3.12 9.36 Channel Flow, Area= 3.0 sf Perim= 6.0' r= 0.50' n= 0.030 Short grass 0.6 247 0.0140 7.03 12.43 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 9.5 572 Total Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 32 Subcatchment 2S: Post POND 1 Hydrograph 110--1---1--J--1--i-- ------J--1--1--L---------- --i------------1--1-- ■Runoff 105 — 100.25 cfs +__+__+__+--+----+--+--+--t----------+--+--+--,___,___,--+--+-- 100 - ------ +------ - -,- -- +-- -- -- --,,gyp 95 90 -- J--1--1--L----1--J--1--1--L--1------25yr Rain fal[=*.-I81' - �i t i 85 --r- r--r--r--r--r--i--r--r--r--r--r--i---i--r--r--r--r--i---i--r--+-- 80 --, - -,-- --, --, --,-----,-- -- --, --,-R-u"ff A rd&13.500-ac 75 �' --------L------------i--L-----------L--------------+-- 70--------------------+----a#ire-��f - w 65 --r- r--r--r--r--r----r--r--Y-- r-----i---- r--r--r--r--r--1--r-- -- 60----------------------------pc�ff�epl�=5.-25'- 3 55 --�i - J--1--1--L--+--------+--L------------L--------------+-- F]aw Ld-nEoth —57-2 - 0 45 --r---7--r--r--Ir--li--7----7--r--Ir--Ir--li-- --r--r -r C--r--r-- 40 --,-----+--------------,----+-----------,---------�'I�i=�tV-IR- 35 --'-- J--1--1--L----1--J--1--1--L--1------'-- ---L L --- - - i-- 1- 30 --r- r--+--+--r--r----r--r--+--r--r-------r--+--r--r----_�/ - 25 --,-----,--, --,-----------,--,---------,--, --,---------,-- 20 --- --- -- ------------ -- ------------ -- ------------ -- -- 15 --- -- -- -- -- ---- -- --+------------ -- ------------ --+-- 10 --r- r--r--r--r--r----r--r--r--r--r-------r--r--r--r-------r--+-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 33 Hydrograph for Subcatchment 2S: Post POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.39 0.04 0.45 7.50 0.68 0.18 1.02 10.00 1.12 0.49 2.41 12.50 4.54 3.64 9.85 15.00 5.27 4.36 2.55 17.50 5.63 4.71 1.62 20.00 5.88 4.95 1.10 22.50 6.07 5.14 0.98 25.00 6.18 5.25 0.00 27.50 6.18 5.25 0.00 30.00 6.18 5.25 0.00 32.50 6.18 5.25 0.00 35.00 6.18 5.25 0.00 37.50 6.18 5.25 0.00 40.00 6.18 5.25 0.00 42.50 6.18 5.25 0.00 45.00 6.18 5.25 0.00 47.50 6.18 5.25 0.00 50.00 6.18 5.25 0.00 52.50 6.18 5.25 0.00 55.00 6.18 5.25 0.00 57.50 6.18 5.25 0.00 60.00 6.18 5.25 0.00 62.50 6.18 5.25 0.00 65.00 6.18 5.25 0.00 67.50 6.18 5.25 0.00 70.00 6.18 5.25 0.00 72.50 6.18 5.25 0.00 75.00 6.18 5.25 0.00 77.50 6.18 5.25 0.00 80.00 6.18 5.25 0.00 82.50 6.18 5.25 0.00 85.00 6.18 5.25 0.00 87.50 6.18 5.25 0.00 90.00 6.18 5.25 0.00 92.50 6.18 5.25 0.00 95.00 6.18 5.25 0.00 97.50 6.18 5.25 0.00 100.00 6.18 5.25 0.00 102.50 6.18 5.25 0.00 105.00 6.18 5.25 0.00 107.50 6.18 5.25 0.00 110.00 6.18 5.25 0.00 112.50 6.18 5.25 0.00 115.00 6.18 5.25 0.00 117.50 6.18 5.25 0.00 120.00 6.18 5.25 0.00 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 3S: POI 1 Bypass Runoff = 27.42 cfs @ 12.19 hrs, Volume= 2.394 af, Depth= 3.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 25yr Rainfall=6.18" Area (ac) CN Description 7.480 79 Woods/grass comb., Good, HSG D 7.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 18.4 2,254 0.0100 2.05 6.14 Channel Flow, Area= 3.0 sf Perim= 18.0' r= 0.17' n= 0.022 25.7 2,279 Total Subcatchment 3S: POI 1 Bypass Hydrograph -----------,-- -- + --,------------- -- -- + --+------------- -- + -- + --, -- ' 27.42 cfs 28 I I I I I I I I I I I I I I I I ITy ---- 26 24- 126 r RainfaIIT6.I118" — —I— — 22---------------- b#4KeA= 8II�� - i1LJ--1--1-- L #- I I I I I I I I zo- --;-----t--r-------------- -- R1 nOffll-VQI Me=;2.$-94- - -I-- 18 'I w--II------II-------------------II-- -- -- -- ---- -- I- 16 Run off DepthT3.841I LL 14----I-- - - ---------I-- -- -- --I-[bW_Lbnoth=2,279'-- 12 --+- +-- -- --+-- --------II-- -- ----+--}--+----- TC,-=�3:7-iI�t r- 10 --+- +--+--+--+--+----------+--+--+--+--+--+--+-+--+--+--+-"-1+--+-- 6 --- ---J-- -- - _-------- - - _I -- - ----- -- - -- 4 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 35 Hydrograph for Subcatchment 3S: POI 1 Bypass Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.17 0.00 0.00 5.00 0.39 0.00 0.00 7.50 0.68 0.01 0.06 10.00 1.12 0.11 0.46 12.50 4.54 2.41 11.90 15.00 5.27 3.04 1.33 17.50 5.63 3.35 0.83 20.00 5.88 3.58 0.58 22.50 6.07 3.75 0.50 25.00 6.18 3.84 0.01 27.50 6.18 3.84 0.00 30.00 6.18 3.84 0.00 32.50 6.18 3.84 0.00 35.00 6.18 3.84 0.00 37.50 6.18 3.84 0.00 40.00 6.18 3.84 0.00 42.50 6.18 3.84 0.00 45.00 6.18 3.84 0.00 47.50 6.18 3.84 0.00 50.00 6.18 3.84 0.00 52.50 6.18 3.84 0.00 55.00 6.18 3.84 0.00 57.50 6.18 3.84 0.00 60.00 6.18 3.84 0.00 62.50 6.18 3.84 0.00 65.00 6.18 3.84 0.00 67.50 6.18 3.84 0.00 70.00 6.18 3.84 0.00 72.50 6.18 3.84 0.00 75.00 6.18 3.84 0.00 77.50 6.18 3.84 0.00 80.00 6.18 3.84 0.00 82.50 6.18 3.84 0.00 85.00 6.18 3.84 0.00 87.50 6.18 3.84 0.00 90.00 6.18 3.84 0.00 92.50 6.18 3.84 0.00 95.00 6.18 3.84 0.00 97.50 6.18 3.84 0.00 100.00 6.18 3.84 0.00 102.50 6.18 3.84 0.00 105.00 6.18 3.84 0.00 107.50 6.18 3.84 0.00 110.00 6.18 3.84 0.00 112.50 6.18 3.84 0.00 115.00 6.18 3.84 0.00 117.50 6.18 3.84 0.00 120.00 6.18 3.84 0.00 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 36 Summary for Pond 4P: Pond 1 Inflow Area = 13.500 ac, 63.93% Impervious, Inflow Depth = 5.25" for 25yr event Inflow = 100.25 cfs @ 12.00 hrs, Volume= 5.902 of Outflow = 32.80 cfs @ 12.17 hrs, Volume= 5.875 af, Atten= 67%, Lag= 10.2 min Primary = 32.80 cfs @ 12.17 hrs, Volume= 5.875 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 622.32' @ 12.17 hrs Surf.Area= 27,452 sf Storage= 110,634 cf Plug -Flow detention time= 373.3 min calculated for 5.875 of (100% of inflow) Center -of -Mass det. time= 370.2 min ( 1,146.3 - 776.1 ) Volume Invert Avail.Storage Storage Description #1 617.50' 175,246 cf Temporary Pool (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 617.50 18,682 561.0 0 0 18,682 618.50 20,394 580.0 19,532 19,532 20,499 619.50 22,162 598.0 21,272 40,804 22,286 620.50 23,987 618.0 23,068 63,872 24,315 621.50 25,869 636.0 24,922 88,794 26,217 622.50 27,807 655.0 26,832 115,626 28,273 623.50 29,801 674.0 28,798 144,425 30,390 624.50 31,853 693.0 30,821 175,246 32,567 Device Routing Invert Outlet Devices #1 Primary 617.50' 24.0" Round Culvert L= 60.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 617.50' / 617.20' S= 0.0050'/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 617.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 619.10' 48.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 621.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Secondary 622.75' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=32.73 cfs @ 12.17 hrs HW=622.30' (Free Discharge) L1=Culvert (Barrel Controls 32.73 cfs @ 10.42 fps) 2=Orifice/Grate (Passes < 0.36 cfs potential flow) 3=Orifice/Grate (Passes < 31.63 cfs potential flow) 4=Sharp-Crested Rectangular Weir(Passes < 77.95 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=617.50' (Free Discharge) L5= Broad -crested Rectangular Weir( Controls 0.00 cfs) Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 37 '1 11L• EMA'10 1 qff Hyd rog raph —y--Ir—y--Ir—y--r—y--r—y--Ir--li--r—y--r--li--r--li--r--li--r--li--r--li-- ■Inflow 100.25 cfs —--— ----— ----— -------— ------------------------------- iiiio Outflow —1— �--r—�--r—�--r—�--r--I--r - rpp r�qr + 1� V�� ❑Primary 110 --'- ---I IIII-_-__I-----III-_-__�---- - - - /�i_ 1 J+. �_�v _ --I 1 ^ Secondary 105 -+- +--+-+--+-+--+-+--+-+--+-+--+ + Peek-aP_V�2,Z.32F- 100 - - ---i ---_-__--i ------------ --r- - -- 95 -+- +--+-+--+-+--+-+--+----+-+--+ + - + Qrae1� 90 -,- --- -----------J-- ----r_---r r 85 -+- +--+-+--+-+--+-+--+----+-+--+----+----+----+----+---- 80 - - -,--,---,--,---,--,---,--,---,--,----------------------------,-- 75 - - -- - -- - -- - -- ---- - -- ---- ------------- ---- 70 --- ----------------------------------------------------- N 65 - - -- - -- - -- - -- ---- - -- ---- ------------- -t - V 6055 - - -- - --L- -- - ----'--L- --i----L--'------L----i--'-- LL 45 +�i 32.80 cfs--—--—--—------—----�--—_�--—_�--—_�--—_�-- 32.80 cfs — — — — — — — — — — — — —I — — — — — — —I — — — —I — — — —I — — — —I — — — —I — — 40 35 1 r J--L-J--L-J-- 1 r 1 r 1 r -J--L----L-J--L----L--I-- r 1 1 r r r 1 ----L----L--I-- 30 -- - ---- ---- -- ------ --------------------------- 25 -I-- ---L-J--L- -- -J--L-J--L----L-J--L----L-J--L--I-- 20 15 10 624 623 622 w w 0 621 w w 620 619 618 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 4P: Pond 1 Stage -Discharge 0 50 100 150 200 250 Discharge (cfs) — Total ❑ Primary Secondary Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 38 w Pond 4P: Pond 1 Stage -Area -Storage Surface/Horizontal/wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,00016,000 18,00020,000 22,000 24,00026,000 28,000 30,000 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 Storage (cubic -feet) Surface ■ Storage Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 39 Hydrograph for Pond 4P: Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 617.50 0.00 0.00 0.00 2.50 0.00 0 617.50 0.00 0.00 0.00 5.00 0.45 1,814 617.60 0.02 0.02 0.00 7.50 1.02 7,896 617.91 0.09 0.09 0.00 10.00 2.41 21,131 618.58 0.16 0.16 0.00 12.50 9.85 92,536 621.64 29.04 29.04 0.00 15.00 2.55 40,035 619.47 3.06 3.06 0.00 17.50 1.62 37,360 619.34 1.77 1.77 0.00 20.00 1.10 36,091 619.29 1.25 1.25 0.00 22.50 0.98 35,466 619.26 1.01 1.01 0.00 25.00 0.00 33,374 619.16 0.42 0.42 0.00 27.50 0.00 31,200 619.06 0.20 0.20 0.00 30.00 0.00 29,444 618.98 0.19 0.19 0.00 32.50 0.00 27,740 618.90 0.19 0.19 0.00 35.00 0.00 26,087 618.82 0.18 0.18 0.00 37.50 0.00 24,486 618.74 0.17 0.17 0.00 40.00 0.00 22,938 618.67 0.17 0.17 0.00 42.50 0.00 21,442 618.59 0.16 0.16 0.00 45.00 0.00 20,000 618.52 0.16 0.16 0.00 47.50 0.00 18,611 618.45 0.15 0.15 0.00 50.00 0.00 17,276 618.39 0.15 0.15 0.00 52.50 0.00 15,994 618.33 0.14 0.14 0.00 55.00 0.00 14,768 618.26 0.13 0.13 0.00 57.50 0.00 13,595 618.21 0.13 0.13 0.00 60.00 0.00 12,478 618.15 0.12 0.12 0.00 62.50 0.00 11,416 618.09 0.11 0.11 0.00 65.00 0.00 10,409 618.04 0.11 0.11 0.00 67.50 0.00 9,458 618.00 0.10 0.10 0.00 70.00 0.00 8,563 617.95 0.10 0.10 0.00 72.50 0.00 7,724 617.91 0.09 0.09 0.00 75.00 0.00 6,942 617.87 0.08 0.08 0.00 77.50 0.00 6,216 617.83 0.08 0.08 0.00 80.00 0.00 5,548 617.79 0.07 0.07 0.00 82.50 0.00 4,936 617.76 0.06 0.06 0.00 85.00 0.00 4,383 617.73 0.06 0.06 0.00 87.50 0.00 3,885 617.71 0.05 0.05 0.00 90.00 0.00 3,450 617.68 0.04 0.04 0.00 92.50 0.00 3,075 617.66 0.04 0.04 0.00 95.00 0.00 2,754 617.65 0.03 0.03 0.00 97.50 0.00 2,478 617.63 0.03 0.03 0.00 100.00 0.00 2,240 617.62 0.02 0.02 0.00 102.50 0.00 2,035 617.61 0.02 0.02 0.00 105.00 0.00 1,859 617.60 0.02 0.02 0.00 107.50 0.00 1,707 617.59 0.02 0.02 0.00 110.00 0.00 1,576 617.58 0.01 0.01 0.00 112.50 0.00 1,464 617.58 0.01 0.01 0.00 115.00 0.00 1,367 617.57 0.01 0.01 0.00 117.50 0.00 1,283 617.57 0.01 0.01 0.00 120.00 0.00 1,206 617.56 0.01 0.01 0.00 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 40 Stage -Discharge for Pond 4P: Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 617.50 0.00 0.00 0.00 617.60 0.02 0.02 0.00 617.70 0.05 0.05 0.00 617.80 0.07 0.07 0.00 617.90 0.09 0.09 0.00 618.00 0.10 0.10 0.00 618.10 0.12 0.12 0.00 618.20 0.13 0.13 0.00 618.30 0.14 0.14 0.00 618.40 0.15 0.15 0.00 618.50 0.16 0.16 0.00 618.60 0.16 0.16 0.00 618.70 0.17 0.17 0.00 618.80 0.18 0.18 0.00 618.90 0.19 0.19 0.00 619.00 0.19 0.19 0.00 619.10 0.20 0.20 0.00 619.20 0.61 0.61 0.00 619.30 1.36 1.36 0.00 619.40 2.33 2.33 0.00 619.50 3.47 3.47 0.00 619.60 4.77 4.77 0.00 619.70 6.21 6.21 0.00 619.80 7.76 7.76 0.00 619.90 9.44 9.44 0.00 620.00 11.22 11.22 0.00 620.10 13.10 13.10 0.00 620.20 14.67 14.67 0.00 620.30 16.00 16.00 0.00 620.40 17.20 17.20 0.00 620.50 18.30 18.30 0.00 620.60 19.33 19.33 0.00 620.70 20.31 20.31 0.00 620.80 21.23 21.23 0.00 620.90 22.12 22.12 0.00 621.00 22.97 22.97 0.00 621.10 25.44 25.44 0.00 621.20 26.27 26.27 0.00 621.30 26.92 26.92 0.00 621.40 27.55 27.55 0.00 621.50 28.17 28.17 0.00 621.60 28.77 28.77 0.00 621.70 29.37 29.37 0.00 621.80 29.95 29.95 0.00 621.90 30.52 30.52 0.00 622.00 31.08 31.08 0.00 622.10 31.63 31.63 0.00 622.20 32.17 32.17 0.00 622.30 32.70 32.70 0.00 622.40 33.23 33.23 0.00 622.50 33.74 33.74 0.00 622.60 34.25 34.25 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 622.70 34.75 34.75 0.00 622.80 36.35 35.24 1.11 622.90 41.51 35.73 5.79 623.00 48.74 36.21 12.54 623.10 57.74 36.68 21.06 623.20 68.48 37.15 31.33 623.30 81.09 37.61 43.48 623.40 94.61 38.06 56.54 623.50 108.47 38.51 69.95 623.60 123.20 38.96 84.24 623.70 138.75 39.40 99.35 623.80 155.28 39.84 115.45 623.90 172.84 40.27 132.57 624.00 190.79 40.69 150.10 624.10 208.95 41.11 167.84 624.20 227.48 41.53 185.95 624.30 246.30 41.94 204.36 624.40 266.17 42.35 223.82 624.50 287.23 42.76 244.47 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 41 Stage -Area -Storage for Pond 4P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 617.50 18,682 0 617.60 18,850 1,877 617.70 19,018 3,770 617.80 19,188 5,680 617.90 19,358 7,608 618.00 19,529 9,552 618.10 19,700 11,513 618.20 19,873 13,492 618.30 20,046 15,488 618.40 20,219 17,501 618.50 20,394 19,532 618.60 20,567 21,580 618.70 20,742 23,645 618.80 20,917 25,728 618.90 21,092 27,829 619.00 21,269 29,947 619.10 21,446 32,082 619.20 21,624 34,236 619.30 21,803 36,407 619.40 21,982 38,596 619.50 22,162 40,804 619.60 22,341 43,029 619.70 22,521 45,272 619.80 22,702 47,533 619.90 22,883 49,812 620.00 23,065 52,110 620.10 23,248 54,425 620.20 23,432 56,759 620.30 23,616 59,112 620.40 23,801 61,483 620.50 23,987 63,872 620.60 24,172 66,280 620.70 24,358 68,707 620.80 24,544 71,152 620.90 24,731 73,615 621.00 24,919 76,098 621.10 25,108 78,599 621.20 25,297 81,119 621.30 25,487 83,659 621.40 25,678 86,217 621.50 25,869 88,794 621.60 26,060 91,391 621.70 26,251 94,006 621.80 26,443 96,641 621.90 26,636 99,295 622.00 26,829 101,968 622.10 27,023 104,661 622.20 27,218 107,373 622.30 27,414 110,104 622.40 27,610 112,856 622.50 27,807 115,626 622.60 28,003 118,417 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 622.70 28,200 121,227 622.80 28,398 124,057 622.90 28,596 126,907 623.00 28,795 129,776 623.10 28,995 132,666 623.20 29,196 135,575 623.30 29,397 138,505 623.40 29,598 141,455 623.50 29,801 144,425 623.60 30,003 147,415 623.70 30,206 150,425 623.80 30,409 153,456 623.90 30,614 156,507 624.00 30,818 159,579 624.10 31,024 162,671 624.20 31,230 165,784 624.30 31,437 168,917 624.40 31,645 172,071 624.50 31,853 175,246 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 42 Summary for Pond 6P: PP Vol [43] Hint: Has no inflow (Outflow=Zero) Volume Invert Avail.Storage Storage Description #1 613.50' 10,371 cf Forebay (Irregular)Listed below (Recalc) #2 612.50' 54,563 cf Main Pool (Irregular)Listed below (Recalc) 64,933 cf Total Available Storage Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 613.50 1,700 177.0 0 0 1,700 614.50 2,073 195.0 1,883 1,883 2,264 615.50 2,480 212.0 2,273 4,157 2,851 616.50 2,921 228.0 2,697 6,854 3,453 617.50 4,147 266.0 3,516 10,371 4,967 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 612.50 8,704 386.0 0 0 8,704 613.50 9,491 400.0 9,095 9,095 9,664 614.50 10,307 415.0 9,896 18,991 10,719 615.50 11,152 429.0 10,727 29,718 11,749 616.50 12,024 443.0 11,585 41,303 12,814 617.50 14,535 480.0 13,260 54,563 15,571 Pond 6P: PP Vol Stage -Discharge -------- ---------------- -- - 617 616 w w 0 615 w w 614 613 0 Discharge (cfs) Total Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 43 61 61 w w 0 61 w w 61 61 Pond 6P: PP Vol Stage -Area -Storage 0 10,000 20,000 30,000 40,000 50,000 60,000 Storage (cubic -feet) ❑ Storage Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 44 Elevation Discharge (feet) (cfs) 612.50 0.00 612.55 0.00 612.60 0.00 612.65 0.00 612.70 0.00 612.75 0.00 612.80 0.00 612.85 0.00 612.90 0.00 612.95 0.00 613.00 0.00 613.05 0.00 613.10 0.00 613.15 0.00 613.20 0.00 613.25 0.00 613.30 0.00 613.35 0.00 613.40 0.00 613.45 0.00 613.50 0.00 613.55 0.00 613.60 0.00 613.65 0.00 613.70 0.00 613.75 0.00 613.80 0.00 613.85 0.00 613.90 0.00 613.95 0.00 614.00 0.00 614.05 0.00 614.10 0.00 614.15 0.00 614.20 0.00 614.25 0.00 614.30 0.00 614.35 0.00 614.40 0.00 614.45 0.00 614.50 0.00 614.55 0.00 614.60 0.00 614.65 0.00 614.70 0.00 614.75 0.00 614.80 0.00 614.85 0.00 614.90 0.00 614.95 0.00 615.00 0.00 615.05 0.00 Stage -Discharge for Pond 6P: PP Vol Elevation Discharge (feet) (cfs) 615.10 0.00 615.15 0.00 615.20 0.00 615.25 0.00 615.30 0.00 615.35 0.00 615.40 0.00 615.45 0.00 615.50 0.00 615.55 0.00 615.60 0.00 615.65 0.00 615.70 0.00 615.75 0.00 615.80 0.00 615.85 0.00 615.90 0.00 615.95 0.00 616.00 0.00 616.05 0.00 616.10 0.00 616.15 0.00 616.20 0.00 616.25 0.00 616.30 0.00 616.35 0.00 616.40 0.00 616.45 0.00 616.50 0.00 616.55 0.00 616.60 0.00 616.65 0.00 616.70 0.00 616.75 0.00 616.80 0.00 616.85 0.00 616.90 0.00 616.95 0.00 617.00 0.00 617.05 0.00 617.10 0.00 617.15 0.00 617.20 0.00 617.25 0.00 617.30 0.00 617.35 0.00 617.40 0.00 617.45 0.00 617.50 0.00 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 45 Elevation Storage (feet) (cubic -feet) 612.50 0 612.55 436 612.60 874 612.65 1,314 612.70 1,756 612.75 2,200 612.80 2,646 612.85 3,094 612.90 3,544 612.95 3,995 613.00 4,449 613.05 4,905 613.10 5,362 613.15 5,822 613.20 6,283 613.25 6,747 613.30 7,212 613.35 7,680 613.40 8,150 613.45 8,621 613.50 9,095 613.55 9,656 613.60 10,220 613.65 10,786 613.70 11,356 613.75 11,929 613.80 12,504 613.85 13,083 613.90 13,664 613.95 14,248 614.00 14,836 614.05 15,426 614.10 16,019 614.15 16,616 614.20 17,215 614.25 17,817 614.30 18,423 614.35 19,031 614.40 19,642 614.45 20,257 614.50 20,874 614.55 21,495 614.60 22,118 614.65 22,745 614.70 23,375 614.75 24,007 614.80 24,643 614.85 25,282 614.90 25,924 614.95 26,570 615.00 27,218 615.05 27,869 Stage -Area -Storage for Pond 6P: PP Vol Elevation Storage (feet) (cubic -feet) 615.10 28,524 615.15 29,182 615.20 29,842 615.25 30,506 615.30 31,174 615.35 31,844 615.40 32,518 615.45 33,194 615.50 33,874 615.55 34,558 615.60 35,244 615.65 35,934 615.70 36,627 615.75 37,323 615.80 38,022 615.85 38,724 615.90 39,430 615.95 40,139 616.00 40,852 616.05 41,567 616.10 42,286 616.15 43,009 616.20 43,734 616.25 44,463 616.30 45,195 616.35 45,931 616.40 46,669 616.45 47,412 616.50 48,157 616.55 48,909 616.60 49,669 616.65 50,439 616.70 51,217 616.75 52,004 616.80 52,801 616.85 53,606 616.90 54,421 616.95 55,245 617.00 56,078 617.05 56,921 617.10 57,772 617.15 58,634 617.20 59,505 617.25 60,385 617.30 61,275 617.35 62,175 617.40 63,085 617.45 64,004 617.50 64,933 Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 46 Summary for Link 5L: Post POI 1 Inflow Area = 20.980 ac, 41.13% Impervious, Inflow Depth > 4.73" for 25yr event Inflow = 60.16 cfs @ 12.19 hrs, Volume= 8.269 of Primary = 60.16 cfs @ 12.19 hrs, Volume= 8.269 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 5L: Post POI 1 Hyd rog raph E Inflow 65 - so.fscfs --r--Ir--li--,--r--li---li----r--Ir--Ir-7--7--r--Ir--li--7--r--Ir--li-- ❑ Primary 60.16 w f�h(u _ 0��9 cfs !_rJ� jRf t�/ 60 ------I-------I--; _ �p rea— I I I I I I I I I I I I I I I I I I I I 55 ' --I -L--L-----I----L-----I-- --L------J------------------- --I-- 50 I -- I -- -----I-- -- -----I-- -- -- --I-- - - - - - - - - ---- - - - - - -- --I-- I I I I I I I I I I I I I I I I I I I I I 45 -- rt--r--+--li-- --r--Ir--li--y--+--Ir--Ir-y--+--r--li---li--rt--r--Ir-T- 40 y � I -----------------------1-------------------------------I-- I I I I I I I I I I I I I I I I I I I I I -- 35 �I I ------------------------------------------------I-_ I I I I I I I I I I I I I I I I I I I I I 3 0a 30 ' I I I I I I I I I I I I I I I I I I I I I I LLLLL-LJL-L-L-L--I-- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 25 --I +--r-------+--+-------+--+--+----+--+--+-------+--r--+--I-- 20 , I -- 7--7-------7--r--I --I----+--IF-----1--+--r-------7--r--Ir--I-- I I I I I I I I I I I I I I I I I I I I I 15 I ,I , I I I I I I I I I I I I I I I I I I I I I --I-- --I-- - -----I-- --I-- I I I I I I I I I I I I I I I I I I I I 10 ' -- -L--I-----L--L--1---1--J--1--L----J--L--L-------L--L--L--I-- - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type/1 24-hr 25yr Rainfall=6.18" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 47 Hydrograph for Link 5L: Post POI 1 Time Inflow Elevation Primary (hours) (Cfs) (feet) (Cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.02 0.00 0.02 7.50 0.15 0.00 0.15 10.00 0.63 0.00 0.63 12.50 40.94 0.00 40.94 15.00 4.39 0.00 4.39 17.50 2.60 0.00 2.60 20.00 1.83 0.00 1.83 22.50 1.51 0.00 1.51 25.00 0.42 0.00 0.42 27.50 0.20 0.00 0.20 30.00 0.19 0.00 0.19 32.50 0.19 0.00 0.19 35.00 0.18 0.00 0.18 37.50 0.17 0.00 0.17 40.00 0.17 0.00 0.17 42.50 0.16 0.00 0.16 45.00 0.16 0.00 0.16 47.50 0.15 0.00 0.15 50.00 0.15 0.00 0.15 52.50 0.14 0.00 0.14 55.00 0.13 0.00 0.13 57.50 0.13 0.00 0.13 60.00 0.12 0.00 0.12 62.50 0.11 0.00 0.11 65.00 0.11 0.00 0.11 67.50 0.10 0.00 0.10 70.00 0.10 0.00 0.10 72.50 0.09 0.00 0.09 75.00 0.08 0.00 0.08 77.50 0.08 0.00 0.08 80.00 0.07 0.00 0.07 82.50 0.06 0.00 0.06 85.00 0.06 0.00 0.06 87.50 0.05 0.00 0.05 90.00 0.04 0.00 0.04 92.50 0.04 0.00 0.04 95.00 0.03 0.00 0.03 97.50 0.03 0.00 0.03 100.00 0.02 0.00 0.02 102.50 0.02 0.00 0.02 105.00 0.02 0.00 0.02 107.50 0.02 0.00 0.02 110.00 0.01 0.00 0.01 112.50 0.01 0.00 0.01 115.00 0.01 0.00 0.01 117.50 0.01 0.00 0.01 120.00 0.01 0.00 0.01 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 48 Time span=0.00-120.00 hrs, dt=0.05 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre POI 1 Runoff Area=20.980 ac 2.03% Impervious Runoff Depth=5.32" Flow Length=937' Tc=18.8 min UI Adjusted CN=79 Runoff=126.57 cfs 9.305 of Subcatchment2S: Post POND 1 Runoff Area=13.500 ac 63.93% Imperious Runoff Depth=6.85" Flow Length=572' Tc=9.5 min CN=92 Runoff=128.71 cfs 7.701 of Subcatchment3S: POI 1 Bypass Runoff Area=7.480 ac 0.00% Imperious Runoff Depth=5.32" Flow Length=2,279' Tc=25.7 min CN=79 Runoff=37.77 cfs 3.317 of Pond 4P: Pond 1 Peak EIev=623.10' Storage=132,576 cf Inflow=128.71 cfs 7.701 of Primary=36.67 cfs 7.435 of Secondary=20.78 cfs 0.239 of Outflow=57.44 cfs 7.673 of Pond 6P: PP Vol Riilnmm:me eis Peak EIev=0.00' Storage=0 cf Inflow=94.42 cfs 10.991 of Primary=94.42 cfs 10.991 of Total Runoff Area = 41.960 ac Runoff Volume = 20.323 of Average Runoff Depth = 5.81" 78.42% Pervious = 32.904 ac 21.58% Impervious = 9.056 ac Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment 1S: Pre POI 1 Runoff = 126.57 cfs @ 12.11 hrs, Volume= 9.305 af, Depth= 5.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr Rainfall=7.80" Area (ac) CN Adi Description 20.300 79 Woods/grass comb., Good, HSG D 0.156 98 Roofs, HSG D 0.094 98 Water Surface, 0% imp, HSG D 0.270 98 Unconnected pavement, HSG D 0.160 96 Gravel surface, HSG D 20.980 80 79 Weighted Average, UI Adjusted 20.554 97.97% Pervious Area 0.426 2.03% Impervious Area 0.270 63.38% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 100 0.0300 0.48 Sheet Flow, Fallow n= 0.050 P2= 3.12" 3.0 315 0.0315 1.77 Shallow Concentrated Flow, Nearly Bare & Untilled Kv= 10.0 fps 12.3 522 0.0200 0.71 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 18.8 937 Total Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 50 Subcatchment 1S: Pre POI 1 Hydrograph ------- -- -- -- -- ---- -- --------------- -------- -------------- 140 I I I I I I I I I I ■Runoff - -r--I--t--t--t--r--r----t--t--t--r--r-------t--t--r----------t --t-- 130 126.57 CIS i 120 -�, -- -- �,I --�,I --,I -----,-- -- --,I --,I -----,-- --,I--�YPe I(24-Ijr - -'- - - 110 100yr Rain a11=�7.-801v - - - - - - - - - - - - - - - - - - - - - + - - L - - I- - - I - - -I - - � - - - � - - I- - - I - - -I - - � - - + - - 100 Ruhoff AraaT20.980 ac --T----T--r--P�-npf#;V414me=9 �O�Af - u 80 ' ------------------------------------Ownoff bepth=5.-332," - 3 70 * �iy�� iy o --'-- J--1--1--L--'--1--J--1--1--L--1--------r�VVV Ldinh--9&7�- 60 50 Y� 8•, 'm111 40 - -- - - - -- - - -- UI', A'djuS e- -- - 30 20f� -r- t--t--r--r--r--i--t--t--t--r--r--i---i--t--r--r--r--i---i--t--t-- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 51 Hydrograph for Subcatchment 1S: Pre POI 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.22 0.00 0.00 5.00 0.49 0.00 0.00 7.50 0.85 0.03 0.60 10.00 1.41 0.22 2.39 12.50 5.73 3.44 29.89 15.00 6.66 4.27 4.79 17.50 7.11 4.69 3.02 20.00 7.43 4.98 2.09 22.50 7.67 5.20 1.82 25.00 7.80 5.32 0.00 27.50 7.80 5.32 0.00 30.00 7.80 5.32 0.00 32.50 7.80 5.32 0.00 35.00 7.80 5.32 0.00 37.50 7.80 5.32 0.00 40.00 7.80 5.32 0.00 42.50 7.80 5.32 0.00 45.00 7.80 5.32 0.00 47.50 7.80 5.32 0.00 50.00 7.80 5.32 0.00 52.50 7.80 5.32 0.00 55.00 7.80 5.32 0.00 57.50 7.80 5.32 0.00 60.00 7.80 5.32 0.00 62.50 7.80 5.32 0.00 65.00 7.80 5.32 0.00 67.50 7.80 5.32 0.00 70.00 7.80 5.32 0.00 72.50 7.80 5.32 0.00 75.00 7.80 5.32 0.00 77.50 7.80 5.32 0.00 80.00 7.80 5.32 0.00 82.50 7.80 5.32 0.00 85.00 7.80 5.32 0.00 87.50 7.80 5.32 0.00 90.00 7.80 5.32 0.00 92.50 7.80 5.32 0.00 95.00 7.80 5.32 0.00 97.50 7.80 5.32 0.00 100.00 7.80 5.32 0.00 102.50 7.80 5.32 0.00 105.00 7.80 5.32 0.00 107.50 7.80 5.32 0.00 110.00 7.80 5.32 0.00 112.50 7.80 5.32 0.00 115.00 7.80 5.32 0.00 117.50 7.80 5.32 0.00 120.00 7.80 5.32 0.00 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 2S: Post POND 1 Runoff = 128.71 cfs @ 12.00 hrs, Volume= 7.701 af, Depth= 6.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr Rainfall=7.80" Area (ac) CN Description 4.400 98 Roofs, HSG D 3.730 98 Paved parking, HSG D 0.500 98 Water Surface, HSG D 4.870 80 >75% Grass cover, Good, HSG D 13.500 92 Weighted Average 4.870 36.07% Pervious Area 8.630 63.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 1.6 300 0.0100 3.12 9.36 Channel Flow, Area= 3.0 sf Perim= 6.0' r= 0.50' n= 0.030 Short grass 0.6 247 0.0140 7.03 12.43 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 9.5 572 Total Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 53 Subcatchment 2S: Post POND 1 Hydrograph --r--i--r--r--r--r--r--i--r--r--r--r--r--i--r--r--r--r--r--r--i--r--r-- 140130- ■Runoff 128.71 cfs ------------------- 120 -- -- -- -- -- ---- -- ----r-------100yrRainfalW7.-W`- 110 -- — ------ -- -- ----Runoff ArdaT13.500 ac 90 ' gnWVOlt'mo= %701- of - u 80 - - - - - - - - - - - - - - - - Ownoff Depth-6-SE - 70 0 -------------------------------------- flow Ldnoth=572' - a 60 --'-- -- -- -- -- --'-- -- --+------- - - -'-- -- -- - 50 c=-M 111 --i— -- -- -- -- ---- -- -- ------------ -- --—------—— -- -- 40 1 N=92 - 30 20 --r- r--r--r--r--r--i--r--r--r--r--r--i--r--r--r--r--r--r--i--r--r-- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 54 Hydrograph for Subcatchment 2S: Post POND 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.22 0.00 0.09 5.00 0.49 0.08 0.74 7.50 0.85 0.30 1.48 10.00 1.41 0.73 3.29 12.50 5.73 4.81 12.56 15.00 6.66 5.72 3.25 17.50 7.11 6.16 2.06 20.00 7.43 6.48 1.40 22.50 7.67 6.71 1.24 25.00 7.80 6.85 0.00 27.50 7.80 6.85 0.00 30.00 7.80 6.85 0.00 32.50 7.80 6.85 0.00 35.00 7.80 6.85 0.00 37.50 7.80 6.85 0.00 40.00 7.80 6.85 0.00 42.50 7.80 6.85 0.00 45.00 7.80 6.85 0.00 47.50 7.80 6.85 0.00 50.00 7.80 6.85 0.00 52.50 7.80 6.85 0.00 55.00 7.80 6.85 0.00 57.50 7.80 6.85 0.00 60.00 7.80 6.85 0.00 62.50 7.80 6.85 0.00 65.00 7.80 6.85 0.00 67.50 7.80 6.85 0.00 70.00 7.80 6.85 0.00 72.50 7.80 6.85 0.00 75.00 7.80 6.85 0.00 77.50 7.80 6.85 0.00 80.00 7.80 6.85 0.00 82.50 7.80 6.85 0.00 85.00 7.80 6.85 0.00 87.50 7.80 6.85 0.00 90.00 7.80 6.85 0.00 92.50 7.80 6.85 0.00 95.00 7.80 6.85 0.00 97.50 7.80 6.85 0.00 100.00 7.80 6.85 0.00 102.50 7.80 6.85 0.00 105.00 7.80 6.85 0.00 107.50 7.80 6.85 0.00 110.00 7.80 6.85 0.00 112.50 7.80 6.85 0.00 115.00 7.80 6.85 0.00 117.50 7.80 6.85 0.00 120.00 7.80 6.85 0.00 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 3S: POI 1 Bypass Runoff = 37.77 cfs @ 12.19 hrs, Volume= 3.317 af, Depth= 5.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Type II 24-hr 100yr Rainfall=7.80" Area (ac) CN Description 7.480 79 Woods/grass comb., Good, HSG D 7.480 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 25 0.0200 0.06 Sheet Flow, Grass: Bermuda n= 0.410 P2= 3.12" 18.4 2,254 0.0100 2.05 6.14 Channel Flow, Area= 3.0 sf Perim= 18.0' r= 0.17' n= 0.022 25.7 2,279 Total Subcatchment 3S: POI 1 Bypass Hydrograph 42 --r-------+--+--+--r--r--r----+--+--+--+--r--r--r-------+--+--+--r-- 40 + 37.77 cfs—i--�--7--+--7--i--i---i--7--�--�--+--+--F--i—— i———i-- --+__+__�__ 38 ---- -----------------------ITY ------------------- �7y�p F 36 --'------'--------------------- ----------------`'r-------hT- + p/i i Doi i i �,.i� i i 34 ( --'---1--J--1--+--L----------J--1--1--1- 1 VW f��f��IT7.e7� _ �i 32 T --+-+--+--+--+--+--+--+-+--+--+--+--+--+--y+-- +--- j --+--+--+--+--y+,-- 30 - Idfl�?-Ir- -li-- ----r--r--Ir--li---li--7-- -- �fp -/-IFe},-7.�'Fw �4��- �i 26 ' � - --- - - -- ----'+---------------- -- ��iPvpnOff-V-PI0Me=3.:w-CI# - 22 ---1--�--' �----1_-R�noff�iDOt�w32Lv= 18 --r- ---+--+--+--r--r--r----+--+--+--+--r--r--r--i- 16 -- - --- ----r--r--------- -- ----T--r-- -- -- Tq—&T1 OI-- i 14 --i ---------+--i --i--------------+--i --i --i-----i-- i--- - - - - -- 12 -- - ------ -- -- ------------ -- -- -- -- ----------tN=79-- 10 ---- ------ --+--------------- ----+--+---------------+--+-- -- �i 6 --+- ---+--+--+--r--+--+----+--+--+--+--+--+-------+--+--+--+--+-- 4 2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 56 Hydrograph for Subcatchment 3S: POI 1 Bypass Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.50 0.22 0.00 0.00 5.00 0.49 0.00 0.00 7.50 0.85 0.03 0.20 10.00 1.41 0.22 0.80 12.50 5.73 3.44 16.13 15.00 6.66 4.27 1.75 17.50 7.11 4.69 1.09 20.00 7.43 4.98 0.76 22.50 7.67 5.20 0.65 25.00 7.80 5.32 0.01 27.50 7.80 5.32 0.00 30.00 7.80 5.32 0.00 32.50 7.80 5.32 0.00 35.00 7.80 5.32 0.00 37.50 7.80 5.32 0.00 40.00 7.80 5.32 0.00 42.50 7.80 5.32 0.00 45.00 7.80 5.32 0.00 47.50 7.80 5.32 0.00 50.00 7.80 5.32 0.00 52.50 7.80 5.32 0.00 55.00 7.80 5.32 0.00 57.50 7.80 5.32 0.00 60.00 7.80 5.32 0.00 62.50 7.80 5.32 0.00 65.00 7.80 5.32 0.00 67.50 7.80 5.32 0.00 70.00 7.80 5.32 0.00 72.50 7.80 5.32 0.00 75.00 7.80 5.32 0.00 77.50 7.80 5.32 0.00 80.00 7.80 5.32 0.00 82.50 7.80 5.32 0.00 85.00 7.80 5.32 0.00 87.50 7.80 5.32 0.00 90.00 7.80 5.32 0.00 92.50 7.80 5.32 0.00 95.00 7.80 5.32 0.00 97.50 7.80 5.32 0.00 100.00 7.80 5.32 0.00 102.50 7.80 5.32 0.00 105.00 7.80 5.32 0.00 107.50 7.80 5.32 0.00 110.00 7.80 5.32 0.00 112.50 7.80 5.32 0.00 115.00 7.80 5.32 0.00 117.50 7.80 5.32 0.00 120.00 7.80 5.32 0.00 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 57 Summary for Pond 4P: Pond 1 Inflow Area = 13.500 ac, 63.93% Impervious, Inflow Depth = 6.85" for 100yr event Inflow = 128.71 cfs @ 12.00 hrs, Volume= 7.701 of Outflow = 57.44 cfs @ 12.15 hrs, Volume= 7.673 af, Atten= 55%, Lag= 8.6 min Primary = 36.67 cfs @ 12.15 hrs, Volume= 7.435 of Secondary = 20.78 cfs @ 12.15 hrs, Volume= 0.239 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 623.10' @ 12.15 hrs Surf.Area= 28,989 sf Storage= 132,576 cf Plug -Flow detention time= 301.4 min calculated for 7.673 of (100% of inflow) Center -of -Mass det. time= 298.9 min ( 1,068.3 - 769.4 ) Volume Invert Avail.Storage Storage Description #1 617.50' 175,246 cf Temporary Pool (Irregular)Listed below (Recalc) Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 617.50 18,682 561.0 0 0 18,682 618.50 20,394 580.0 19,532 19,532 20,499 619.50 22,162 598.0 21,272 40,804 22,286 620.50 23,987 618.0 23,068 63,872 24,315 621.50 25,869 636.0 24,922 88,794 26,217 622.50 27,807 655.0 26,832 115,626 28,273 623.50 29,801 674.0 28,798 144,425 30,390 624.50 31,853 693.0 30,821 175,246 32,567 Device Routing Invert Outlet Devices #1 Primary 617.50' 24.0" Round Culvert L= 60.5' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 617.50' / 617.20' S= 0.0050'/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 617.50' 2.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 619.10' 48.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 621.00' 16.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) #5 Secondary 622.75' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=36.64 cfs @ 12.15 hrs HW=623.09' (Free Discharge) L1=Culvert (Barrel Controls 36.64 cfs @ 11.66 fps) 2=Orifice/Grate (Passes < 0.38 cfs potential flow) 3=Orifice/Grate (Passes < 35.95 cfs potential flow) 4=Sharp-Crested Rectangular Weir(Passes < 158.18 cfs potential flow) Secondary OutFlow Max=20.24 cfs @ 12.15 hrs HW=623.09' (Free Discharge) L5= Broad -crested Rectangular Weir(Weir Controls 20.24 cfs @ 1.48 fps) Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 58 N 3 0 LL 14 13 12 11 10 III 624 623 622 w w 0 621 w w 620 619 618 Pond 4P: Pond 1 Hyd rog raph -,--r-�--r-�--r-�--r-�--r--I--r-�--r--I--r--I--r--I--r--I--r--I-- 1I I I I I I I I I I I I I I I I I I I I 128.71 +--r—--r—+--r—--r----r—+--+----r----r----+----+--I-- cfs I I I I I I I I I I , I I I ' - --I-- ---- ---- -- - -Inflolwl�Ateaa l31�.5Oel� ai�- I —r— r--r—r--r—r--r—r--r--I--r—r--r r r ' -Peak-EleV�23.fiaf- -�- J--r-J--r-J--�-J--L--I--r-J--�--I--L--I--�--I--L--I--�--I-- , I I I I I I I I I I I I IS I I I I I Sao rake-137 - —y— y--Ir—y--r—y--r—y--Ir--li--r—y--r--li--r--li--r--li--r-7—r— ' I I I I I I I I I I I I I I I I I I I I I I -�- �--r-�--r-�--r-�--r--I--r-�--T--I--r--I--r--I--r--I--T--I-- ' , 57.44cfs , � , 1--r—�--r-1--r—�--r-1--r-1--T-1--r-1--r-1--T-1--T--I-- , 36.67 cfs 20.78 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 4P: Pond 1 Stage -Discharge 0 50 100 150 200 250 Discharge (cfs) ■ Inflow E Outflow ❑ Primary Secondary — Total ❑ Primary Secondary Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 59 w Pond 4P: Pond 1 Stage -Area -Storage Surface/Horizontal/wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,00016,000 18,00020,000 22,000 24,00026,000 28,000 30,000 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 Storage (cubic -feet) Surface ■ Storage Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 60 Hydrograph for Pond 4P: Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 617.50 0.00 0.00 0.00 2.50 0.09 56 617.50 0.00 0.00 0.00 5.00 0.74 3,629 617.69 0.05 0.05 0.00 7.50 1.48 12,855 618.17 0.12 0.12 0.00 10.00 3.29 31,498 619.07 0.20 0.20 0.00 12.50 12.56 110,635 622.32 32.80 32.80 0.00 15.00 3.25 41,480 619.53 3.85 3.85 0.00 17.50 2.06 38,377 619.39 2.22 2.22 0.00 20.00 1.40 36,902 619.32 1.57 1.57 0.00 22.50 1.24 36,177 619.29 1.28 1.28 0.00 25.00 0.00 33,651 619.17 0.47 0.47 0.00 27.50 0.00 31,325 619.06 0.20 0.20 0.00 30.00 0.00 29,565 618.98 0.19 0.19 0.00 32.50 0.00 27,857 618.90 0.19 0.19 0.00 35.00 0.00 26,201 618.82 0.18 0.18 0.00 37.50 0.00 24,596 618.75 0.18 0.18 0.00 40.00 0.00 23,044 618.67 0.17 0.17 0.00 42.50 0.00 21,545 618.60 0.16 0.16 0.00 45.00 0.00 20,099 618.53 0.16 0.16 0.00 47.50 0.00 18,706 618.46 0.15 0.15 0.00 50.00 0.00 17,367 618.39 0.15 0.15 0.00 52.50 0.00 16,082 618.33 0.14 0.14 0.00 55.00 0.00 14,851 618.27 0.13 0.13 0.00 57.50 0.00 13,675 618.21 0.13 0.13 0.00 60.00 0.00 12,554 618.15 0.12 0.12 0.00 62.50 0.00 11,488 618.10 0.12 0.12 0.00 65.00 0.00 10,477 618.05 0.11 0.11 0.00 67.50 0.00 9,523 618.00 0.10 0.10 0.00 70.00 0.00 8,624 617.95 0.10 0.10 0.00 72.50 0.00 7,781 617.91 0.09 0.09 0.00 75.00 0.00 6,995 617.87 0.08 0.08 0.00 77.50 0.00 6,265 617.83 0.08 0.08 0.00 80.00 0.00 5,593 617.80 0.07 0.07 0.00 82.50 0.00 4,976 617.76 0.07 0.07 0.00 85.00 0.00 4,420 617.73 0.06 0.06 0.00 87.50 0.00 3,918 617.71 0.05 0.05 0.00 90.00 0.00 3,478 617.68 0.05 0.05 0.00 92.50 0.00 3,100 617.66 0.04 0.04 0.00 95.00 0.00 2,775 617.65 0.03 0.03 0.00 97.50 0.00 2,496 617.63 0.03 0.03 0.00 100.00 0.00 2,255 617.62 0.02 0.02 0.00 102.50 0.00 2,048 617.61 0.02 0.02 0.00 105.00 0.00 1,870 617.60 0.02 0.02 0.00 107.50 0.00 1,717 617.59 0.02 0.02 0.00 110.00 0.00 1,585 617.58 0.01 0.01 0.00 112.50 0.00 1,471 617.58 0.01 0.01 0.00 115.00 0.00 1,373 617.57 0.01 0.01 0.00 117.50 0.00 1,289 617.57 0.01 0.01 0.00 120.00 0.00 1,211 617.56 0.01 0.01 0.00 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 61 Stage -Discharge for Pond 4P: Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 617.50 0.00 0.00 0.00 617.60 0.02 0.02 0.00 617.70 0.05 0.05 0.00 617.80 0.07 0.07 0.00 617.90 0.09 0.09 0.00 618.00 0.10 0.10 0.00 618.10 0.12 0.12 0.00 618.20 0.13 0.13 0.00 618.30 0.14 0.14 0.00 618.40 0.15 0.15 0.00 618.50 0.16 0.16 0.00 618.60 0.16 0.16 0.00 618.70 0.17 0.17 0.00 618.80 0.18 0.18 0.00 618.90 0.19 0.19 0.00 619.00 0.19 0.19 0.00 619.10 0.20 0.20 0.00 619.20 0.61 0.61 0.00 619.30 1.36 1.36 0.00 619.40 2.33 2.33 0.00 619.50 3.47 3.47 0.00 619.60 4.77 4.77 0.00 619.70 6.21 6.21 0.00 619.80 7.76 7.76 0.00 619.90 9.44 9.44 0.00 620.00 11.22 11.22 0.00 620.10 13.10 13.10 0.00 620.20 14.67 14.67 0.00 620.30 16.00 16.00 0.00 620.40 17.20 17.20 0.00 620.50 18.30 18.30 0.00 620.60 19.33 19.33 0.00 620.70 20.31 20.31 0.00 620.80 21.23 21.23 0.00 620.90 22.12 22.12 0.00 621.00 22.97 22.97 0.00 621.10 25.44 25.44 0.00 621.20 26.27 26.27 0.00 621.30 26.92 26.92 0.00 621.40 27.55 27.55 0.00 621.50 28.17 28.17 0.00 621.60 28.77 28.77 0.00 621.70 29.37 29.37 0.00 621.80 29.95 29.95 0.00 621.90 30.52 30.52 0.00 622.00 31.08 31.08 0.00 622.10 31.63 31.63 0.00 622.20 32.17 32.17 0.00 622.30 32.70 32.70 0.00 622.40 33.23 33.23 0.00 622.50 33.74 33.74 0.00 622.60 34.25 34.25 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 622.70 34.75 34.75 0.00 622.80 36.35 35.24 1.11 622.90 41.51 35.73 5.79 623.00 48.74 36.21 12.54 623.10 57.74 36.68 21.06 623.20 68.48 37.15 31.33 623.30 81.09 37.61 43.48 623.40 94.61 38.06 56.54 623.50 108.47 38.51 69.95 623.60 123.20 38.96 84.24 623.70 138.75 39.40 99.35 623.80 155.28 39.84 115.45 623.90 172.84 40.27 132.57 624.00 190.79 40.69 150.10 624.10 208.95 41.11 167.84 624.20 227.48 41.53 185.95 624.30 246.30 41.94 204.36 624.40 266.17 42.35 223.82 624.50 287.23 42.76 244.47 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 62 Stage -Area -Storage for Pond 4P: Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 617.50 18,682 0 617.60 18,850 1,877 617.70 19,018 3,770 617.80 19,188 5,680 617.90 19,358 7,608 618.00 19,529 9,552 618.10 19,700 11,513 618.20 19,873 13,492 618.30 20,046 15,488 618.40 20,219 17,501 618.50 20,394 19,532 618.60 20,567 21,580 618.70 20,742 23,645 618.80 20,917 25,728 618.90 21,092 27,829 619.00 21,269 29,947 619.10 21,446 32,082 619.20 21,624 34,236 619.30 21,803 36,407 619.40 21,982 38,596 619.50 22,162 40,804 619.60 22,341 43,029 619.70 22,521 45,272 619.80 22,702 47,533 619.90 22,883 49,812 620.00 23,065 52,110 620.10 23,248 54,425 620.20 23,432 56,759 620.30 23,616 59,112 620.40 23,801 61,483 620.50 23,987 63,872 620.60 24,172 66,280 620.70 24,358 68,707 620.80 24,544 71,152 620.90 24,731 73,615 621.00 24,919 76,098 621.10 25,108 78,599 621.20 25,297 81,119 621.30 25,487 83,659 621.40 25,678 86,217 621.50 25,869 88,794 621.60 26,060 91,391 621.70 26,251 94,006 621.80 26,443 96,641 621.90 26,636 99,295 622.00 26,829 101,968 622.10 27,023 104,661 622.20 27,218 107,373 622.30 27,414 110,104 622.40 27,610 112,856 622.50 27,807 115,626 622.60 28,003 118,417 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 622.70 28,200 121,227 622.80 28,398 124,057 622.90 28,596 126,907 623.00 28,795 129,776 623.10 28,995 132,666 623.20 29,196 135,575 623.30 29,397 138,505 623.40 29,598 141,455 623.50 29,801 144,425 623.60 30,003 147,415 623.70 30,206 150,425 623.80 30,409 153,456 623.90 30,614 156,507 624.00 30,818 159,579 624.10 31,024 162,671 624.20 31,230 165,784 624.30 31,437 168,917 624.40 31,645 172,071 624.50 31,853 175,246 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 63 Summary for Pond 6P: PP Vol [43] Hint: Has no inflow (Outflow=Zero) Volume Invert Avail.Storage Storage Description #1 613.50' 10,371 cf Forebay (Irregular)Listed below (Recalc) #2 612.50' 54,563 cf Main Pool (Irregular)Listed below (Recalc) 64,933 cf Total Available Storage Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 613.50 1,700 177.0 0 0 1,700 614.50 2,073 195.0 1,883 1,883 2,264 615.50 2,480 212.0 2,273 4,157 2,851 616.50 2,921 228.0 2,697 6,854 3,453 617.50 4,147 266.0 3,516 10,371 4,967 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (cubic -feet) (cubic -feet) (sq-ft) 612.50 8,704 386.0 0 0 8,704 613.50 9,491 400.0 9,095 9,095 9,664 614.50 10,307 415.0 9,896 18,991 10,719 615.50 11,152 429.0 10,727 29,718 11,749 616.50 12,024 443.0 11,585 41,303 12,814 617.50 14,535 480.0 13,260 54,563 15,571 Pond 6P: PP Vol Stage -Discharge -------- ---------------- -- - 617 616 w w 0 615 w w 614 613 0 Discharge (cfs) Total Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 64 61 61 w w 0 61 w w 61 61 Pond 6P: PP Vol Stage -Area -Storage 0 10,000 20,000 30,000 40,000 50,000 60,000 Storage (cubic -feet) ❑ Storage Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 65 Elevation Discharge (feet) (cfs) 612.50 0.00 612.55 0.00 612.60 0.00 612.65 0.00 612.70 0.00 612.75 0.00 612.80 0.00 612.85 0.00 612.90 0.00 612.95 0.00 613.00 0.00 613.05 0.00 613.10 0.00 613.15 0.00 613.20 0.00 613.25 0.00 613.30 0.00 613.35 0.00 613.40 0.00 613.45 0.00 613.50 0.00 613.55 0.00 613.60 0.00 613.65 0.00 613.70 0.00 613.75 0.00 613.80 0.00 613.85 0.00 613.90 0.00 613.95 0.00 614.00 0.00 614.05 0.00 614.10 0.00 614.15 0.00 614.20 0.00 614.25 0.00 614.30 0.00 614.35 0.00 614.40 0.00 614.45 0.00 614.50 0.00 614.55 0.00 614.60 0.00 614.65 0.00 614.70 0.00 614.75 0.00 614.80 0.00 614.85 0.00 614.90 0.00 614.95 0.00 615.00 0.00 615.05 0.00 Stage -Discharge for Pond 6P: PP Vol Elevation Discharge (feet) (cfs) 615.10 0.00 615.15 0.00 615.20 0.00 615.25 0.00 615.30 0.00 615.35 0.00 615.40 0.00 615.45 0.00 615.50 0.00 615.55 0.00 615.60 0.00 615.65 0.00 615.70 0.00 615.75 0.00 615.80 0.00 615.85 0.00 615.90 0.00 615.95 0.00 616.00 0.00 616.05 0.00 616.10 0.00 616.15 0.00 616.20 0.00 616.25 0.00 616.30 0.00 616.35 0.00 616.40 0.00 616.45 0.00 616.50 0.00 616.55 0.00 616.60 0.00 616.65 0.00 616.70 0.00 616.75 0.00 616.80 0.00 616.85 0.00 616.90 0.00 616.95 0.00 617.00 0.00 617.05 0.00 617.10 0.00 617.15 0.00 617.20 0.00 617.25 0.00 617.30 0.00 617.35 0.00 617.40 0.00 617.45 0.00 617.50 0.00 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 66 Elevation Storage (feet) (cubic -feet) 612.50 0 612.55 436 612.60 874 612.65 1,314 612.70 1,756 612.75 2,200 612.80 2,646 612.85 3,094 612.90 3,544 612.95 3,995 613.00 4,449 613.05 4,905 613.10 5,362 613.15 5,822 613.20 6,283 613.25 6,747 613.30 7,212 613.35 7,680 613.40 8,150 613.45 8,621 613.50 9,095 613.55 9,656 613.60 10,220 613.65 10,786 613.70 11,356 613.75 11,929 613.80 12,504 613.85 13,083 613.90 13,664 613.95 14,248 614.00 14,836 614.05 15,426 614.10 16,019 614.15 16,616 614.20 17,215 614.25 17,817 614.30 18,423 614.35 19,031 614.40 19,642 614.45 20,257 614.50 20,874 614.55 21,495 614.60 22,118 614.65 22,745 614.70 23,375 614.75 24,007 614.80 24,643 614.85 25,282 614.90 25,924 614.95 26,570 615.00 27,218 615.05 27,869 Stage -Area -Storage for Pond 6P: PP Vol Elevation Storage (feet) (cubic -feet) 615.10 28,524 615.15 29,182 615.20 29,842 615.25 30,506 615.30 31,174 615.35 31,844 615.40 32,518 615.45 33,194 615.50 33,874 615.55 34,558 615.60 35,244 615.65 35,934 615.70 36,627 615.75 37,323 615.80 38,022 615.85 38,724 615.90 39,430 615.95 40,139 616.00 40,852 616.05 41,567 616.10 42,286 616.15 43,009 616.20 43,734 616.25 44,463 616.30 45,195 616.35 45,931 616.40 46,669 616.45 47,412 616.50 48,157 616.55 48,909 616.60 49,669 616.65 50,439 616.70 51,217 616.75 52,004 616.80 52,801 616.85 53,606 616.90 54,421 616.95 55,245 617.00 56,078 617.05 56,921 617.10 57,772 617.15 58,634 617.20 59,505 617.25 60,385 617.30 61,275 617.35 62,175 617.40 63,085 617.45 64,004 617.50 64,933 Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 67 Summary for Link 5L: Post POI 1 Inflow Area = 20.980 ac, 41.13% Impervious, Inflow Depth = 6.29" for 100yr event Inflow = 94.42 cfs @ 12.15 hrs, Volume= 10.991 of Primary = 94.42 cfs @ 12.15 hrs, Volume= 10.991 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Link 5L: Post POI 1 Hyd rog raph --1--+--+--+--1--+--+--1---1--+--r--1--+- r--+--1--+--+--+--1-------- -T— --1-- r -- r--I---1-- 7 -- r --1-- r-- T -- r --I-- r -- r --r — —I— — r -- r — —I-- 105 —---------I 94.42 cfs T 1 i ——I— --I——I——I——I— 1 --I——I——I—I --I--I --1---I--1--I--I-- 1 T —pA T 1 1 1 100 94.42 cfs�- pM 95 ---+--+----+--+-------+--+----+- -+ -- +- 90Y--Y--Y----Y--t--Y----Y--Y--I-- 85 - - - - - - - - - - 80 75 r--I r--I -+--r----r--r------r--r--I 70--I-- 65 -----r--r - w 60 - - - - - - - - - - V 55 - - -- ---- --r------- --r---- ----r---- -- -- ---- --r---- 0 50----Y--Y--I-- a 45 -- r--r--1--T--r--i --1--T--r--r-T--T--r--1--T--r--r--1--T--r--i - 40 Z- - - - - - - - - - - 35 r--L--'--r--L--1---1--1--L--1--J--1--L--1--J--1--L--1--r--L--'-- 30 -- +--+--1-- --r--1---1-----r--1-----+--r--1-- --+--+--1-----+--1-- 25 -- r--r--1--r--r--1---1-- --r--r-r--T--r--1-- --r--r--1--r--r--1-- 20 -- ---� - -I- - �--II -- - - II -I-- - - - - - - 15 - --- -- ------- ------- -- ------- -----=--- -- ------- 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) C Inflow ❑ Primary Poplin Phase 3 - 191023 Type 1124-hr 100yr Rainfall=7.80" Prepared by Bohler Engineering Printed 10/28/2019 HydroCAD®10.00-20 s/n 09920 ©2017 HydroCAD Software Solutions LLC Page 68 Hydrograph for Link 5L: Post POI 1 Time Inflow Elevation Primary (hours) (Cfs) (feet) (Cfs) 0.00 0.00 0.00 0.00 2.50 0.00 0.00 0.00 5.00 0.05 0.00 0.05 7.50 0.32 0.00 0.32 10.00 1.00 0.00 1.00 12.50 48.93 0.00 48.93 15.00 5.60 0.00 5.60 17.50 3.32 0.00 3.32 20.00 2.32 0.00 2.32 22.50 1.94 0.00 1.94 25.00 0.48 0.00 0.48 27.50 0.20 0.00 0.20 30.00 0.19 0.00 0.19 32.50 0.19 0.00 0.19 35.00 0.18 0.00 0.18 37.50 0.18 0.00 0.18 40.00 0.17 0.00 0.17 42.50 0.16 0.00 0.16 45.00 0.16 0.00 0.16 47.50 0.15 0.00 0.15 50.00 0.15 0.00 0.15 52.50 0.14 0.00 0.14 55.00 0.13 0.00 0.13 57.50 0.13 0.00 0.13 60.00 0.12 0.00 0.12 62.50 0.12 0.00 0.12 65.00 0.11 0.00 0.11 67.50 0.10 0.00 0.10 70.00 0.10 0.00 0.10 72.50 0.09 0.00 0.09 75.00 0.08 0.00 0.08 77.50 0.08 0.00 0.08 80.00 0.07 0.00 0.07 82.50 0.07 0.00 0.07 85.00 0.06 0.00 0.06 87.50 0.05 0.00 0.05 90.00 0.05 0.00 0.05 92.50 0.04 0.00 0.04 95.00 0.03 0.00 0.03 97.50 0.03 0.00 0.03 100.00 0.02 0.00 0.02 102.50 0.02 0.00 0.02 105.00 0.02 0.00 0.02 107.50 0.02 0.00 0.02 110.00 0.01 0.00 0.01 112.50 0.01 0.00 0.01 115.00 0.01 0.00 0.01 117.50 0.01 0.00 0.01 120.00 0.01 0.00 0.01 Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan Outfall ►W A23 Project File: NGG191800_POPLIN PH III_191024.stm Dutfall 28 Ory Q' Number of lines: 28 1 Date: 10/28/2019 Storm Sewers v2018.30 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ftift) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 A2 2.05 1.44 3,49 0,00 Comb 6.0 8,00 7,33 6.00 2.00 Sag 1,00 0,060 0,020 0,000 0,17 6.67 0,34 6.67 2.0 Off 2 A3 1,66 0,23 1,09 0,80 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,20 7,97 0,32 5,64 2.0 1 3 A4 0,86 0,00 0,63 0,23 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,16 5,82 0,27 3,25 2.0 2 4 AS 2.24 0,48 2.72 0,00 Comb 6.0 4,00 3,66 3,00 2.00 Sag 1,00 0,060 0,020 0,000 0,18 7,05 0,35 7,05 2.0 M 5 A6 1,30 0,04 0,86 0,48 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,18 6.95 0,30 4,53 2.0 6 A7 0,00 0,00 0,00 0,00 MH 0,0 0,00 0,00 0,00 0,00 Sag 0,00 0,000 0,000 0,000 0,00 0,00 0,00 0,00 0,0 Off 7 A8 0,38 0,00 0,34 0,04 Comb 6.0 4,00 0,00 3,00 2.00 0,013 1,00 0,060 0,020 0,013 0,12 4,02 0,22 0,97 2.0 5 8 A9 0,79 0,94 1,73 0,00 Comb 6.0 4,00 3,66 3,00 2.00 Sag 1,00 0,060 0,020 0,000 0,16 6.05 0,33 6.05 2.0 ff 9 A10 1,66 0,44 1,16 0,94 Comb 6.0 4,00 0,00 3,00 2.00 0,013 1,00 0,060 0,020 0,013 0,20 8,18 0,32 5,92 2.0 B 10 All 1,26 0,00 0,82 0,44 Comb 6.0 4,00 0,00 3,00 2.00 0,013 1,00 0,060 0,020 0,013 0,17 6.68 0,29 4,28 2.0 9 11 Al2 1,26 0,00 0,82 0,44 Comb 6.0 4,00 0,00 3,00 2.00 1013 1,00 0,060 0,020 0,013 0,17 6.68 0,29 4,28 2.0 18 12 A20 0,40 1,20 0,95 0,64 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,18 6.87 0,30 4,70 2.0 1 13 A21 1,66 0,81 1.27 1,20 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,20 8,18 0,33 6.12 2.0 12 14 A22 1,08 0,80 1,06 0,81 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,19 7,34 0,31 5,22 2.0 13 15 A23 0,65 1.21 1,06 0,80 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,19 7,30 0,31 5,17 2.0 14 16 A24 2.48 0,00 1,28 1.21 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,20 8,20 0,33 6.14 2.0 15 17 A25 2.09 0,00 1.14 0,95 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,19 7,66 0,32 5,56 2.0 19 18 A10,1 1,66 0,44 1,16 0,94 Comb 6.0 4,00 0,00 3,00 2.00 1013 1,00 0,060 0,020 0,013 0,20 8,18 0,32 5,92 2.0 20 19 A22.1 1,01 0,95 1,09 0,86 Comb 6.0 4,00 0,00 3,00 2.00 1018 1,00 0,060 0,020 0,013 0,19 7,46 0,31 5,34 2.0 24 20 A6.1 0,61 0,94 0,95 0,60 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,19 7,37 0,31 4,99 2.0 22 21 A4.1 0,90 0,00 0,65 0,25 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,16 5,92 0,27 3,37 2.0 25 22 A5.1 1,15 0,60 1,75 0,00 Comb 6.0 4,00 3,66 3,00 2.00 Sag 1,00 0,060 0,020 0,013 0,16 6.12 0,33 6.12 2.0 Off 23 A5.2 0,82 0,00 0,82 0,00 DrCrb 6.0 12.00 0,00 0,00 0,00 rag 0,00 0,020 0,020 0,013 0,08 4,00 0,08 4,00 0,0 Off Project File: NCC191800-POPLIN PH III-191024.stm TNumber of lines: 28 Run Date: 10/28/2019 NOTES: Inlet N-Values = 0.016; Intensity = 4.04 / (Inlet time + 5.50) 10.00; Return period = 1 Yrs. Indicates Known Q added. All curb inlets are throat. Storm Sewers v2018.30 Inlet Report Page 2 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ftift) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 24 A21.1 1,26 0,86 1,15 0,97 Comb 6.0 4,00 0,00 3,00 2.00 3,018 1,00 0,060 0,020 0,013 0,19 7.71 0,32 5,61 2.0 26 25 A3.1 1,55 0,25 1,05 0,75 Comb 6.0 4,00 0,00 3,00 2.00 0,012 1,00 0,060 0,020 0,013 0,20 7,82 0,32 5,48 2.0 26 26 A2.1 1,04 1.71 2.76 0,00 Comb 6.0 4,00 3,66 3,00 2.00 Sag 1,00 0,060 0,020 0,013 0,18 7.14 0,35 7.14 2.0 Off 27 A2.2 2.11 0,00 2.11 0,00 DrCrb 6.0 12.00 0,00 0,00 0,00 Sag 0,00 0,020 0,020 0,013 0,15 7,54 0,15 7,54 0,0 Off 28 B2 4,68 0,00 4,68 0,00 Hdwl 0,0 0,00 0,00 0,00 0,00 Sag 0,00 0,000 0,000 0,013 0,00 0,00 0,00 0,00 0,0 Off Project File: NCC191800-POPLIN PH III-191024.stm TNumber of lines: 28 Run Date: 10/28/2019 NOTES: Inlet N-Values = 0.016; Intensity= 4.04 /(inlet time+ 5.50) 10.00; Return period= 1 Yrs. ; *Indicates Known Q added. All curb inlets are throat. Storm Sewers v2018.30 Storm Sewer Tabulation Page I Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Val Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line F(ac (ft) ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) I End 177.4 0,57 11.08 0,90 0,51 8,48 5,0 9,9 6.2 52.54 46.98 8,18 36 0,50 617.73 618.61 620.08 621.49 621.07 627.52 P-A2 2 1 181,7 0,46 5,51 0,90 0,41 4,52 5,0 9A 6.3 28,55 29,02 5,82 30 0,50 618.61 619.52 622.82 623.70 627.52 629.42 P-A3 3 2 187,8 0,24 4,62 0,90 0,22 3,72 5,0 8,8 6.5 24,05 28,86 4,90 30 0,50 620.13 621.06 624.49 625.13 629.42 631.61 P-A4 4 3 283.5 0,66 4,13 0,85 0,56 3,28 5,0 7.7 6.7 22,07 29,03 4,50 30 0,50 621.25 622.67 625.69 626.51 631.61 631.17 P-A5 5 4 95.5 0,36 2.47 0,90 0,32 2.23 5,0 7.4 6.8 15.18 15.87 4,83 24 0,49 622.78 623.25 626.98 627.41 631.17 632.03 P-A6 6 5 116,0 0,00 1,94 0,00 0,00 1,75 0,0 6.9 7,0 12.17 22,62 3,88 24 1,00 623.80 624.96 627.96 628.29 632.03 633.41 P-A7 7 6 40.5 0,10 1,94 0,95 0,10 1,75 5,0 6.8 7,0 12.22 7,56 6.92 18 0,52 625.60 625.81 628.43 628.97 633.41 633.72 P-A8 8 7 32.5 0,22 1,84 0,90 0,20 1,66 5,0 6.7 7,0 11.60 7,37 6.56 18 0,49 625.91 626.07 629.99 630.38 633.72 633.71 P-A9 9 8 67,7 0,46 1,62 0,90 0,41 1,46 5,0 6.5 7.1 10.29 9,55 5,83 18 0,83 626.10 626.66 631.36 632.01 633.71 634.50 P-A10 10 9 201.6 0,35 0,70 0,90 0,32 0,63 5,0 5,3 7,5 4,70 9,76 2.66 18 0,86 626.76 628.50 632.78 633.18 634.50 637.21 P-A11 11 10 32.5 0,35 0,35 0,90 0,32 0,32 5,0 5,0 7,5 2.38 7,37 2.34 18 0,49 632.42 632.58 633.34 633.35 637.21 637.20 P-A12 12 1 99.0 0,11 2.95 0,90 0,10 2.66 5,0 6.4 7.1 18.84 22,62 6.00 24 1,00 618.99 619.98 622.82 623.50 627.52 628.71 P-A20 13 12 69,0 0,46 2.84 0,90 0,41 2.56 5,0 6.2 7.2 18.29 30.56 5,82 24 1,83 620.27 621.53 623.96 624.41 628.71 629.83 P-A21 14 13 190,3 0,30 2.03 0,90 0,27 1,83 5,0 5,6 7,3 13.43 29,05 5,19 24 1,65 621.96 625.10 625.20 626.42 629.83 633.08 P-A22 15 14 114.1 0,18 1,45 0,90 0,16 1,31 5,0 5,3 7.4 9,70 13.11 7,26 18 1,56 625.66 627.44 626.62 628.64 633.08 634.98 P-A23 16 15 64,8 0,69 1.27 0,90 0,62 1.14 5,0 5,2 7,5 8,56 11.67 6.45 18 1.24 627.65 628.45 628.64 629.58 634.98 636.02 P-A24 17 16 39.5 0,58 0,58 0,90 0,52 0,52 5,0 5,0 7,5 3,94 7.47 4,28 18 0,51 631.59 631.79 632.36 632.56 636.02 635.85 P-A25 18 9 32.5 0,46 0,46 0,90 0,41 0,41 5,0 5,0 7,5 3,12 7,37 1.77 18 0,49 629.99 630.15 632.78 632.80 634.50 634.61 P-A10.1 19 14 32.9 0,28 0,28 0,90 0,25 0,25 5,0 5,0 7,5 1,90 7,32 3,47 18 0,49 628.78 628.94 629.30 629.46 633.08 633.15 P-A22.1 20 5 32.5 0,17 0,17 0,90 0,15 0,15 5,0 5,0 7,5 1,15 7,37 3,02 18 0,49 627.63 627.79 628.03 628.19 632.03 632.00 P-A6,1 21 3 32.5 0,25 0,25 0,90 0,23 0,23 5,0 5,0 7,5 1,70 7,37 3,37 18 0,49 627.24 627.40 627.73 627.89 631.61 631.61 P-A4.1 22 4 32.5 0,32 1,00 0,90 0,29 0,49 5,0 5,2 7,5 3,67 7,37 2.18 18 0,49 625.55 625.71 626.98 627.01 631.17 631.17 P-A5,1 I Project File: NGG191800—POPLIN PH III-191024.stm Number of lines: 28 Run Date: 10/28/2019 NOTES:Intensity = 68.81 / (Inlet time + 12.10) A 0.78; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Val Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line F(ac (ft) ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 23 22 15.0 0,68 0,68 0,30 0,20 0,20 5,0 5,0 7,5 1,54 7.17 1,04 18 0,47 625.84 625.91 627.05 627.05 631.17 630.30 P-A5,2 24 13 32.5 0,35 0,35 0,90 0,32 0,32 5,0 5,0 7,5 2.38 7,37 3,71 18 0,49 625.44 625.60 626.03 626.19 629.83 629.81 P-A21.1 25 2 32.6 0,43 0,43 0,90 0,39 0,39 5,0 5,0 7,5 2.92 7,36 3,92 18 0,49 625.02 625.18 625.68 625.84 629.42 629.39 P-A3,1 26 1 32.5 0,29 2.05 0,90 0,26 0,79 5,0 5,2 7,5 5,89 7,37 4,34 18 0,49 621.71 621.87 622.82 622.92 627.52 627.50 P-A2.1 27 26 36.8 1,76 1,76 0,30 0,53 0,53 5,0 5,0 7,5 3,98 7,34 2.51 18 0,49 621.96 622.14 623.30 623.33 627.50 626.75 P-A2.2 28 End 76.0 2.34 2.34 0,50 1.17 1.17 5,0 5,0 7,5 8,83 9,49 6.07 18 0,82 631.63 632.25 632.78 633.40 635.34 635.34 P-132 Project File: NGG191800—POPLIN PH III-191024.stm Number of lines: 28 Run Date: 10/28/2019 NOTES:Intensity = 68.81 / (Inlet time + 12.10) A 0.78; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2018.30 10/22/2019 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Indian Trail, North Carolina, USA* �'It Latitude: 35.0846*, Longitude:-80.6076* Elevation: 639.38 ft** *source: ESRI Maps 'w,�w, source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Duration Average recurrence interval (years) 1 2 5 10 25 50 1 100 100 200 500 1000 5-min 4.99 (4.61-5.42) 5.90 (5.42-6.42) 11 6.85 (6.29-7.45) 1 7.55 8.33 1 (7.61-9.02) 8.87 1 (8.06-9.60) 9.36 1 (8.46-10.1) 9.79 1 (8.81-10.6) 10.3 1 (9.18-11.2) 10.6 1 (9.41-11.6) 3.99 4.72 5.48 6.03 6.64 7.06 7.43 7.76 8.14 8.38 10-min (3.68-4.33) 1 (5.04-5.97) 11 (5.53-6.55) 11 (6.06-7.19) 1 (6.42-7.65) 1 (6.73-8.05) 1 (6.98-8.42) 1 (7.25-8.84) 1 (7.41-9.11) 3.32 3.95 4.63 5.08 5.61 5.96 6.27 6.53 6.83 7.01 15-min (3.06-3.61) 11 (3.64-4.30) 11 (4.25-5.04) 11 (4.66-5.52) 11 (5.12-6.07) 1 (5.42-6.46) 1 (5.67-6.78) 1 (5.88-7.08) 1 (6.09-7.42) 1 (6.20-7.62) 2.28 2.73 3.29 3.68 4.15 4.49 4.80 5.08 5.43 5.67 30-min (2.10-2.47) (2.51-2.97) (3.02-3.58) 11 (3.38-4.00) 11 (3.79-4.50) 1 (4.08-4.86) 1 (4.34-5.20) 1 (4.57-5.51) 1 (4.84-5.90) 1 (5.02-6.1 7) 1.42 1.71 2.11 2.40 2.77 3.04 3.31 3.57 3.90 4.14 60-min (1.31-1.54) (1.58-1.87) (1.94-2.29) (2.20-2.60) 11 (2.52-3.00) 1 (2.76-3.29) 1 (2.99-3.58) 1 (3.21-3.87) 1 (3.48-4.23) 1 (3.67-4.51) 0.822 0.994 1.23 1.41 1.65 1.83 2.00 2.18 2.41 2.58 2-hr (0.754-0.898) (0.912-1.09) 1 1 (1.50-1.80) (1.65-1.99) 1 (1.80-2.18) 1 (1.94-2.37) 1 (2.13-2.62) 1 (2.26-2.82) 0.582 0.703 0.877 1.01 1.19 1.34 1.48 1.63 1.83 1.99 3-hr (0.532-0.639) (0.643-0.772) (0.801-0.962) (0.921-1.11) 11 (1.08-1.30) 1 (1.20-1.46) 1 (1.32-1.61) 1 (1.44-1.77) 1 (1.60-1.99) 1 (1.72-2.17) 0.351 0.423 0.529 0.611 0.723 0.812 F 0.903 F 0.997 1.13 1.23 6-hr (0.322-0.385) (0.388-0.464) (0.484-0.579) (0.558-0.668) (0.656-0.788) (0.732-0.884) (0.808-0.983) (0.884-1.08) (0.985-1.22) 1 (1.06-1.34) 0.207 0.250 0.313 0.364 0.434 0.490 0.549 0.610 0.696 0.766 12-hr (0.190-0.226) (0.229-0.274) (0.287-0.343) (0.332-0.398) (0.393-0.473) (0.441-0.534) (0.489-0.597) (0.537-0.663) (0.603-0.756) (0.655-0.832) 0.123 0.148 0.186 0.216 0.257 0.291 0.325 0.361 0.411 0.451 24-hr (0.113-0.133) (0.137-0.160) (0.172-0.202) (0.199-0.234) (0.236-0.279) (0.266-0.315) (0.297-0.352) (0.328-0.392) (0.371-0.446) (0.405-0.491) 0.072 0.087 0.108 0.125 0.149 0.168 0.187 0.207 0.235 0.258 2-day (0.067-0.078) (0.080-0.094) (0.100-0.117) (0.116-0.136) (0.137-0.161) (0.154-0.182) (0.171-0.203) (0.189-0.225) (0.213-0.256) (0.232-0.281) 0.051 0.061 0.076 0.088 0.104 0.117 0.130 0.144 0.163 0.179 3-day (0.047-0.055) (0.057-0.066) (0.070-0.082) (0.081-0.095) (0.096-0.112) (0.107-0.126) (0.119-0.141) (0.131-0.156) (0.148-0.177) (0.162-0.195) 0.040 0.048 0.060 0.069 0.081 0.091 0.102 0.112 0.128 0.140 4-day (0.038-0.044) (0.045-0.052) (0.055-0.065) (0.064-0.074) (0.075-0.088) (0.084-0.099) (0.093-0.110) (0.103-0.122) (0.116-0.138) (0.126-0.151) 0.027 0.032 0.039 0.044 0.052 0.058 0.064 0.071 0.080 0.088 7-day (0.025-0.029) (0.030-0.034) (0.036-0.042) (0.041-0.047) (0.048-0.056) (0.054-0.062) (0.060-0.069) (0.065-0.076) (0.074-0.086) (0.080-0.095) 0.021 0.026 0.031 0.035 0.040 0.045 0.049 0.054 0.060 0.065 10-day (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.048) (0.046-0.052) (0.050-0.057) (0.055-0.064) (0.059-0.070) 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.034 0.037 0.040 20-day (0.014-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.027-0.030) (0.029-0.033) (0.031-0.036) (0.035-0.040) (0.037-0.043) 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.030 30-day (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.027-0.032) 0.010 0.012 0.013 0.015 0.016 0.017 0.019 0.020 0.021 0.023 45-day (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 60-day (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?Iat=35.0846&Ion=-80.6076&data=intensity&units=english&series=pds 1 /4 10/22/2019 Precipitation Frequency Data Server I161616I6161 10.000 C 41 1.000 C GJ a-� C � 0.100 L Ld a 0.010 PD5-based intensity -duration -frequency (IDF) curves Latitude: 35.0846', Longitude:-80.6076' 0.0011 _ t t Jr t L N N r{4 N rq rq rq N rq O N Alb A q r, O O O Ln O ,1 r-1 rn w � N rn v Ln Duration 100.000 10.000 L k 1.000 w c e 0100 4.1 49 0.010 0.001 1 1 1 1 1 1 1 1 1 1 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Tue Oct 22 12:33:54 2D19 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 14-min — 3-day 15-min — d-dmy — 30-rnw — 7-day — 6 Wain — 10-day — 2fir — 20-day — "r — 30-day — 8fir — 45-day — 12fir — 60-day - 24--hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.0846&Ion=-80.6076&data=intensity&units=english&series=pds 2/4 lillYMaf IM, Precipitation Frequency Data Server Large scale terrain a .on City �4 Winston-Salem a a Durham Greensboro • r:u r.us,_i,�ll Rai( a Asheville NORTH C A R 0 L I N A ��otte Fayetteville # a _ I Greenville 1 + SOUTH CAROLINA _ Wil 100km 60mi lumhia Large scale map r� Jc+7r7e.cn •:::ir• f � � rrwswnv��Gm Greensboro v ❑ rham Rah North Carolina F' k km rhia BOmi ^ F uth Large scale aerial H https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.0846&Ion=-80.6076&data=intensity&units=english&series=pds 3/4 fllYPOWNIM, Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.0846&Ion=-80.6076&data=intensity&units=english&series=pds 4/4 Hydrologic Soil Group —Union County, North Carolina 3: (NCC191800_Poplin Meadows Ph III) kD 535540 535610 535680 535750 535820 535890 535960 35o 5' 15" N I I 1 . - I I 1 1 35o 515" N 4. Aft w JO �M i �r h r w � Soil MaN may not he valiel at this scale. 35o 4' 56" N 535540 535610 535680 535750 535820 Map Scale: 1:2,930 if printed on A portrait (8.5" x 11") sheet. Meters $ N 0 40 80 1E0 240 Feet 0 100 200 400 E00 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey \X 535960 m 10/22/2019 Pagel of 4 35o 4'56" N Hydrologic Soil Group —Union County, North Carolina (NCC191800_Poplin Meadows Ph III) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D 0 C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B r B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 19, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Nov 25, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 10/22/2019 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Union County, North Carolina NCC191800_Poplin Meadows Ph III Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CmB Cid channery silt loam, 1 to 5 percent slopes D 12.9 60.2% GsB Goldston-Badin complex, 2 to 8 percent slopes D 3.3 15.5% ScA Secrest-Cid complex, 0 to 3 percent slopes C 5.2 24.3% Totals for Area of Interest 21.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 10/22/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina NCC191800_Poplin Meadows Ph III Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 10/22/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 Non -rectangle Skimmer Basin 1 10.00 Disturbed Area (Acres) 42.18 Peak Flow from 10-year Storm (cfs) i = C= 18000.00 Required Volume ft3 13708.50 Required Surface Area ft2 82.79 Suggested Width ft 165.58 Suggested Length ft Elevation Area (so Inc Storage (co Total Storage 617.50 18682 0 0 618.50 20394 19538 19538 619.50 22162 21278 40816 620.50 23987 23074.5 63890.5 621.50 25869 48031 88847 622.50 27807 74953.5 115769.5 623.50 29801 125487.5 145025.5 624.50 31853 135037.5 175853.5 115769.50 Actual Volume ft3 27807.00 Actual Surface Area ft2 40.00 Trial Weir Length ft 1.00 Trial Depth of Flow ft 120.00 Spillway Capacity cfs 2.50 Skimmer Size (inches) 0.21 Head on Skimmer (feet) 2.25 Orifice Size (1/4 inch increments) 3.37 Dewatering Time (days) Suggest about 3 days Okay 7.03 in/hr 0.6 Temporary Sediment Trap 2 Okay 4.9 Disturbed Area (Acres) 20.67 Peak Flow from 10-year Storm (cfs) 17640 Required Volume ft3 9003 Required Surface Area ftZ 67.1 Suggested Width ft 134.2 Suggested Length ft i = 7.03 in/hr C = 0.6 75 Trial Top Width at Spillway Invert ft 150 Trial Top Length at Spillway Invert ft 3 Trial Side Slope Ratio Z:1 2 Trial Depth ft (1.5 feet below grade + 2 to 3.5 feet above grade) 63 Bottom Width ft 138 Bottom Length ft 8694 Bottom Area ftZ 19896 Actual Volume ft3 Okay 11250 Actual Surface Area ftZ Okay 5 Trial Weir Length ft 1.5 Trial Depth of Flow ft 27.6 Spillway Capacity cfs Okay Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. B1 Outfall Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 631.63 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 8.83 Elev (ft) Section 634.00 633.50 633.00 632.50 632.00 631.50 631.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Monday, Oct 28 2019 = 1.00 = 8.830 = 3.00 = 2.94 = 6.32 = 0.89 = 6.00 = 1.13 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Depth (ft) 2.37 1.87 1.37 0.87 0.37 -0.13 _n r1l Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. C1 Outfall Trapezoidal Bottom Width (ft) = 6.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 617.20 Slope (%) = 0.20 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 32.80 Elev (ft) Section 619.00 618.50 618.00 617.50 617.00 616.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Monday, Oct 28 2019 = 1.45 = 32.80 = 15.01 = 2.19 = 15.17 = 0.85 = 14.70 = 1.52 2 4 6 8 10 12 14 16 18 20 Reach (ft) Depth (ft) 1.80 1.30 1:R, 0.30 -0.20 _n 7n Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch A2.2 Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 626.75 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 3.98 Elev (ft) 628.00 627.50 627.00 626.50 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 1 2 3 4 5 6 7 Reach (ft) Monday, Oct 28 2019 = 0.74 = 3.980 = 1.64 = 2.42 = 4.68 = 0.65 = 4.44 = 0.83 Depth (ft) 1.25 0.75 0.25 -0.25 -0.75 8 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Monday, Oct 28 2019 Ditch A NCDOT OFFSITE IMPROVEMENTS Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.45 Total Depth (ft) = 1.00 Q (cfs) = 0.820 Area (sqft) = 0.40 Invert Elev (ft) = 631.69 Velocity (ft/s) = 2.02 Slope (%) = 1.00 Wetted Perim (ft) = 2.01 N-Value = 0.025 Crit Depth, Yc (ft) = 0.41 Top Width (ft) = 1.80 Calculations EGL (ft) = 0.51 Compute by: Known Q Known Q (cfs) = 0.82 Elev (ft) 633.00 632.50 632.00 631.50 631.00 Section .5 1 1.5 2 2.5 3 3.5 4 4.5 Reach (ft) Depth (ft) 1.31 0.81 0.31 -0.19 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Monday, Oct 28 2019 Ditch B NCDOT OFFSITE IMPROVEMENTS Triangular Highlighted Side Slopes (z:1) = 2.00, 2.00 Depth (ft) = 0.50 Total Depth (ft) = 1.00 Q (cfs) = 1.050 Area (sqft) = 0.50 Invert Elev (ft) = 638.98 Velocity (ft/s) = 2.10 Slope (%) = 1.00 Wetted Perim (ft) = 2.24 N-Value = 0.025 Crit Depth, Yc (ft) = 0.45 Top Width (ft) = 2.00 Calculations EGL (ft) = 0.57 Compute by: Known Q Known Q (cfs) = 1.05 Elev (ft) 640.00 639.50 639.00 638.50 5 1 1.5 2 Section 2.5 Reach (ft) 3 3.5 4 4.5 Depth (ft) 1.02 0.52 w o: -0.48 -0.98 5 m BOHLER E N G I N E E R I N G Riprap Outlet Protection Design Project: Poplin Subdivision Ph II Location: Indian Trail, NC Project Number: NCC191801 Date: Oct-28-2019 Designed: AM Checked: MT Outlet ID: Al Pipe diameter= 36 inches Pipe slope= 0.5 % Roughness Coef.= 0.013 Full Flow Capacity= 52.03 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 7.36 ft/sec 2 Figure 8.06.b.1 5 4 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 2 Is grade of apron 10% or more: Y Zone used = 3 Outlet pipe diameter= 36 in. Outlet flowrate= 52.0 cfs Outlet velocity= 7.36 ft/sec Material = Class I Y/N Length = 24.0 ft. Width at Outlet = 9.0 ft. Width at end of Pad= 36.7 ft. Stone diameter = 10 in. Thickness = 15 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual m BOHLER E N G I N E E R I N G Riprap Outlet Protection Design Project: Poplin Subdivision Ph II Location: Indian Trail, NC Project Number: NCC191801 Date: Oct-28-2019 Designed: AM Checked: MT Outlet ID: 131 Pipe diameter= 18 inches Pipe slope= 0.57 % Roughness Coef.= 0.013 Full Flow Capacity= 8.75 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 4.95 ft/sec 2 Figure 8.06.b.1 5 4 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 1 Is grade of apron 10% or more: N Zone used = 1 Outlet pipe diameter= 18 in. Outlet flowrate= 8.7 cfs Outlet velocity= 4.95 ft/sec Material =— Class A Y/N Length = 6.0 ft. Width at Outlet = 4.5 ft. Width at end of Pad= 11.4 ft. Stone diameter = 4 in. Thickness = 6 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual m BOHLER E N G I N E E R I N G Riprap Outlet Protection Design Project: Poplin Subdivision Ph II Location: Indian Trail, NC Project Number: NCC191801 Date: Oct-28-2019 Designed: AM Checked: MT Outlet ID: C1 Pipe diameter= 24 inches Pipe slope= 0.76 % Roughness Coef.= 0.013 Full Flow Capacity= 21.75 cfs Inlcudes 1.1 Factor of Safety Full flow velocity= 6.92 ft/sec 2 Figure 8.06.b.1 5 4 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 2 Is grade of apron 10% or more: N Zone used = 2 Outlet pipe diameter= 24 in. Outlet flowrate= 21.8 cfs Outlet velocity= 6.92 ft/sec Material = Class B Y/N Length = 12.0 ft. Width at Outlet = 6.0 ft. Width at end of Pad= 19.9 ft. Stone diameter = 8 in. Thickness = 12 in. Zone Material Diameter Thickness Length 1 Class A 4 6 4 x D(o) 2 Class B 8 12 6 x D(o) 3 Class 1 10 15 8 x D(o) 4 Class 1 10 15 8 x D(o) 5 Class 11 14 21 10 x D(o) 6 Class 11 14 21 10 x D(o) 7 1 Special study required Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual