Loading...
HomeMy WebLinkAboutNC0003425_Startup of new FGD Treatment Components_20191106(� DUKE ENERGY RECEIVED NOV 0 7 7019 November 6, 2019 NCDEQIDWRINPDES Ms. Sheila Holman Assistant Secretary NC Department of Environmental Quality 217 West Jones Street Raleigh, NC 27603 Subject: Startup of new FGD treatment components Internal process flow modifications Roxboro Steam Electric Plant NC0003425 Person County Dear Assistant Secretary Holman, Paul Draovitch, P.E. Senior Vice President Environmental, Health & Safety and Operations Support 526 S. Church Streel Mail Code: EC3XP Charlotte, NC 28202 (704) 373-0408 This letter is to provilt'e details and notice about the planned startup of required treatment components at the subject facility. Duke Energy has constructed a new wastewater system to replace the existing system used to treat flue gas desulfurization (FGD) wastewater since 2008. Details of this new system were shared with the Department in an application submittal dated August 15, 2016. That submittal is enclosed with this letter for ease of reference. Much of the existing system sits within the footprint of the west ash basin which will be closed resulting in the need for the new system. Duke Energy intends to commence commissioning activities for the new FGD wastewater system and place it into service after concurrence from your agency. Commissioning is expected to take between 6-8 weeks with tuning of the system taking up to 6 months to reach optimum treatment efficiencies of the biological system. As indicated in the 2016 submittal, flows from the new FGD wastewater treatment system will be directed to the lined retention basin for commingling with other wastewater sources and then to outfa11003, the same discharge point where current flows are directed. The internal flow path from the lined retention basin is currently in use as approved by the Department earlier this year. As described in the 2016 submittal, there will be a period where flows from both the old and new FGD wastewater treatment, system occur as the old system processes remaining flow in the FGD settling basin until that system is closed. Duke Energy -will continue to properly operate the old system and will sample as required while that system continues to function. www.duke-energy.com Ms. Sheila Holman Roxboro FGD startup concurrence request November 6, 2019 Duke will sample the new FGD treatment system in accordance with the existing permit requirements associated with outfall 010. These sample results will be reported as an attachment to our monthly required NPDES Discharge monitoring report much like our lined retention basin samples are currently reported. Duke Energy hereby requests your concurrence with this action with the understanding that this action is being taken under the conditions of the existing permit and is not intended in any way to be binding on the future permitting decisions or terms currently under review by the Department. If there are any questions about this matter please contact Mr. Shannon Langley at (919) 546- 2439 or shannon.langley@duke-energy.com. Sincer ly, Paul Draovitch Senior Vice President, Environmental, Health & Safety and Operations Support Duke Energy Enclosure cc: RRO DEQ WQ Supervisor w/enclosure 3800 Barrett Drive Raleigh, NC 27609 Jeff Poupart — DWQ Section Chief w/enclosure 1617 Mail Service Center Raleigh, NC 27699-1617 Lori Tollie - via email Shannon Langley — via email