Loading...
HomeMy WebLinkAboutNCC192701_NOI Application_20191108Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 11/7/2019 12:42:32 PM (NCG01 NOI Submission) Approve by Clark, Paul 11/7/2019 12:50:02 PM (Review- Construction NOI 18247) • The task was assigned to Clark, Paul by round robin distribution 11/7/2019 12:42 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 11, 2019 5:00 PM 11/7/2019 12:42 PM Submit by Garcia, Lauren V 11/8/2019 8:51:06 AM (Payment Verification for NCC192701) * Stancil Vineyards LLC • Garcia, Lauren V assigned the task to Garcia, Lauren V 11/8/2019 8:50 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 19, 2019 5:00 PM 11/7/2019 12:50 PM 1 r-i) iTiT 7i) M fiIi f_T1II a 10141 NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Panther Lake Rd Subdivision 2. County* Wake 3. Highway or Street Panther Lake Rd Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township * Middle Creek 5. State * NC 6. Zip Code* 27592 7. Latitude * Enter the latitude in decirral degrees 35.5871 8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative) -78.7109 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/18/2019 Estimated Construction Project Start Date 10. Date to End* 06/15/2020 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Development 12. Acres to be 8.85 disturbed* (including off -site borrow and waste areas) 13. Total site area 36.36 (acres)* 14. Post- 10.85 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2019-Panther Lake Rd Subdivision Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find Waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Black Creek Waterbody* Narre of waterbody into which stornwater runoff will discharge 15b. Waterbody 27-45-(1) Index No. * NCWaterbody Index N.arrber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Stancil Vineyards LLC Name * 2. First Name* Bradley ff Corporation, enter Registered Agent First l\b e 3. Last Name * Stancil ff Corporation, enter Registered Agent Last Barre 3b. Title Vice President 4. Permitee E-mail bradley@bradleybuiltnc.com Address* 5. Permittee 919-639-2073 Telephone No.* 6. Permittee Mailing Street Address Address* 466 Stancil Road Address Line 2 City State / Province / Region Angier NC Postal / Zip Code Country 27501-8342 us Check box if the r% Yes street address the same as mailing address 7. Permittee Street Street Address Address* 466 Stancil Road Address Line 2 City State / Province / Region Angier NC Pastal / Zip Code Country 27501-8342 us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Bo Contact - First Name * 3. Primary Site Bridgers Contact - Last Name * 4. Title Project Manager 5. Site Contact E- bo@bradleybuiltnc.com mail Address* 6. Site Contact 919-639-2073 Telephone No.* 7. Organization Bradley Built Inc. Name 8. Site Contact Street Address Mailing Address* 466 Stancil Road Address Line 2 oty Angier Rbstal / Zip Code 27501-8342 9. Consultant Name (optional) Jon Frazier First and Last narre 10. Consultant E- jfrazier@flmengineering.com mail This person will be copied on all correspondence. 11. Consultant 9196101051 Telephone No. State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/28/2019 Approved * 2. E&SC Plan Project SEC-016588-2019 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Panther Lake Road Approval Subdivision_WatershedManagementApproval_V.2_...322.25KB letter/documentation 28-19.pdf Mist be RCF format 6. NOI Certification Panther Lake Rd_NCG01-eNO1-Certification-Form- Form 629.52KB 20190507-DEMLR-SW. pdf Mist be RJFfornat This is an Express r No Review Project* f Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Bradley Stancil Title Vice Presient Organization Stancil Vineyards LLC Date * 11 /07/2019 F. Tracking and COC Info NOI Tracking No. 18247 NC Reference No. NCG01-2019-2701 Uses 'count_nunber variable (increrrented by SP) Certificate of NCC192701 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 2701 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)