HomeMy WebLinkAboutNCS000559_Clayton 2019 Annual Report Transmittal_20191029TOWN OF CLAYTON
Public Services - Engineering
111 E. Second St., P.O. Box 879
Clayton, NC 27528
Phone:919-553-5002
Fax:919-553-1720
October 29, 2019
Jeanette Powell, CPSWQ, CPESC
MS4 Program Coordinator - Stormwater Program
North Carolina Department of Environmental Quality (NC DEQ)
Division of Energy, Mineral & Land Resources (DEMLR)
512 N. Salisbury Street, 9' Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
Submitted via Email: Jeanette.PoweII(a)ncdenr.Qov
Re: 2019 NPDES Ph. II Annual Report
Dear Mrs. Powell,
I want to thank you for taking the time to meet with Engineering staff on October 2, 2019 and discuss the
Town's National Pollutant Discharge Elimination System (NPDES) Phase II Permit. The Town of
Clayton understands the importance of our NPDES Phase II Permit and seeks to keep NC DEQ staff
updated on our efforts to fully implement all aspects of the permit.
Over the past two and a half years, the Town's Director of Public Services has been evaluating the current
stormwater program, plans, processes, and initiatives. The Town has also hired a consultant to help with
the evaluation. Based on that evaluation, the Town began a revamp of the implementation strategy. To
date, the Town has hired a part-time engineer to aid in implementing the program and hired a full-time
Town Engineer position to provide oversight and direction of the program. Town Council has also
approved a Stormwater Engineer Position beginning January 1, 2020. This position will be dedicated to
updating and developing stormwater ordinances, policies, plans and SOPs to enhance the NPDES
program. Furthermore, over the next 6 months Town staff will be seeking to transfer implementation of
Construction Site Runoff Controls and Post -Construction Site Runoff Controls from Johnston County to
the Town with the goal of the Town fully implementing all 6 minimum measures in-house by July 1,
2020. Additionally, the Town is in the early stages of considering establishing a Stormwater Enterprise
with dedicated funding stream to support the program.
On October 29, 2019, staff submitted the NPDES Phase Il Annual Report via the online BIMS reporting
tool. Staff have indicated practices and initiatives that are currently in place, noted areas for improvement,
and indicated action plans moving forward.
Think
CEWb*PO Box 879 • Clayton, NC 27528 •919-553-5002 Fax 919-553-1720 • TownofClaytonNC.org
The Town appreciates your understanding as we revamp our program and implementation strategy. As we
move forward over the next 6 months, we will engage your office, provides updates and request guidance
as needed. If you have any questions, please contact me at (919) 359-9379 or
jbairdL&TownofClaytonNC.org. We appreciate your understanding and willingness to work with us on
this matter.
Sincerely.
Joshua Baird, PE
Town Engineer
Cc: Adam Lindsay — Town Manager
Rich Cappola, PE — Director of Public Services
File