Loading...
HomeMy WebLinkAboutNCS000559_Clayton 2019 Annual Report Transmittal_20191029TOWN OF CLAYTON Public Services - Engineering 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone:919-553-5002 Fax:919-553-1720 October 29, 2019 Jeanette Powell, CPSWQ, CPESC MS4 Program Coordinator - Stormwater Program North Carolina Department of Environmental Quality (NC DEQ) Division of Energy, Mineral & Land Resources (DEMLR) 512 N. Salisbury Street, 9' Floor 1612 Mail Service Center Raleigh, NC 27699-1612 Submitted via Email: Jeanette.PoweII(a)ncdenr.Qov Re: 2019 NPDES Ph. II Annual Report Dear Mrs. Powell, I want to thank you for taking the time to meet with Engineering staff on October 2, 2019 and discuss the Town's National Pollutant Discharge Elimination System (NPDES) Phase II Permit. The Town of Clayton understands the importance of our NPDES Phase II Permit and seeks to keep NC DEQ staff updated on our efforts to fully implement all aspects of the permit. Over the past two and a half years, the Town's Director of Public Services has been evaluating the current stormwater program, plans, processes, and initiatives. The Town has also hired a consultant to help with the evaluation. Based on that evaluation, the Town began a revamp of the implementation strategy. To date, the Town has hired a part-time engineer to aid in implementing the program and hired a full-time Town Engineer position to provide oversight and direction of the program. Town Council has also approved a Stormwater Engineer Position beginning January 1, 2020. This position will be dedicated to updating and developing stormwater ordinances, policies, plans and SOPs to enhance the NPDES program. Furthermore, over the next 6 months Town staff will be seeking to transfer implementation of Construction Site Runoff Controls and Post -Construction Site Runoff Controls from Johnston County to the Town with the goal of the Town fully implementing all 6 minimum measures in-house by July 1, 2020. Additionally, the Town is in the early stages of considering establishing a Stormwater Enterprise with dedicated funding stream to support the program. On October 29, 2019, staff submitted the NPDES Phase Il Annual Report via the online BIMS reporting tool. Staff have indicated practices and initiatives that are currently in place, noted areas for improvement, and indicated action plans moving forward. Think CEWb*PO Box 879 • Clayton, NC 27528 •919-553-5002 Fax 919-553-1720 • TownofClaytonNC.org The Town appreciates your understanding as we revamp our program and implementation strategy. As we move forward over the next 6 months, we will engage your office, provides updates and request guidance as needed. If you have any questions, please contact me at (919) 359-9379 or jbairdL&TownofClaytonNC.org. We appreciate your understanding and willingness to work with us on this matter. Sincerely. Joshua Baird, PE Town Engineer Cc: Adam Lindsay — Town Manager Rich Cappola, PE — Director of Public Services File