Loading...
HomeMy WebLinkAboutNCC192472_NOI Application_20191025Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/21/2019 5:26:12 PM (NCG01 NOI Submission) Approve by Clark, Paul 10/23/2019 9:01:06 AM (Review- Construction NOI 17459) • The task was assigned to Clark, Paul by round robin distribution 10/21/2019 5:26 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 23, 2019 5:00 PM 10/21/2019 5:26 PM Submit by McCoy, Suzanne 10/25/2019 8:18:14 AM (Payment Verification for NCC192472) * &tar S Grewal • McCoy, Suzanne assigned the task to McCoy, Suzanne 10/25/2019 8:17 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 4, 2019 5:00 PM 10/23/2019 9:01 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Lafayette Park 2. County* Wake 3. Highway or Street 0 Evans Road Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Cary 5. State * NC 1r-i)iTII1T7G)MFali(-_ToIa10141 6. Zip Code* 27513 7. Latitude * Enter the latitude in decirral degrees 38.8153 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -78.8016 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/18/2019 Estimated Construction Project Start Date 10. Date to End* 11/15/2021 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial Gassification for Development 12. Acres to be 19.89 disturbed* (including off -site borrow and waste areas) 13. Total site area 22.02 (acres)* 14. Post- 10.34 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2019-Lafayette Park Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Crabtree Creek Wate rbody* %rre of waterbody into which stormuater runoff will discharge 15b. Waterbody 27-33-(1) Index No.* NC Waterbody Index Nanber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Singh Development LLC Name * 2. First Name* Avi ff Corporation, enter Registered Agent First l\b e 3. Last Name * Grewal ff Corporation, enter Registered Agent Last Barre 3b. Title Manager 4. Permitee E-mail avi@singhmail.com Address* 5. Permittee 248-865-1039 Telephone No.* 6. Permittee Mailing Street Address Address* 2601 Weston Parkway Address Line 2 Suite 203 City Cary Pastal / Zip Code 27513 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 2601 Weston Parkway Address Line 2 Suite 203 City Cary Pastal / Zip Code 27513 State / Province / Region NC Country Wake State / Province / Region NC Country USA C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Chris Contact - First Name * 3. Primary Site Jenkins Contact - Last Name * 4. Title Senior Project Manager 5. Site Contact E- cjenkins@sametcorp.com mail Address* 6. Site Contact 919-703-4848 Telephone No.* 7. Organization Samet Corporation Name 8. Site Contact Street Address Mailing Address* 5420 Wade Park Boulevard Address Line 2 Siute 104 city Raleigh Fbstal / Zip Code 27607 9. Consultant Name (optional) Z. Nathan Bales First and Last narre 10. Consultant E- bales@mcadamsco.com mail This person will be copied on all correspondence. 11.Consultant 919-361-5000 Telephone No. State / Province / Fbgion NC Country USA D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/03/2019 Approved * 2. E&SC Plan Project 18-DP-0616 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Town of Cary Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Approval Letter (LON) - Development Plans_01.pdf 56.4KB Approval Mist be RDF format letter/documentation 6. NOI Certification SGH16000 - NCDEQ NOI Form - Signed.pdf 82.11KB Form Mist be RDFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Avi Grewal Title Manager Organization Singh Development LLC Date * 10/21 /2019 F. Tracking and COC Info NOI Tracking No. 17459 NC Reference No. NCG01-2019-2472 Uses 'count _nunber'variable (increrrented by SP) Certificate of NCC192472 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 2472 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)