Loading...
HomeMy WebLinkAboutSW3190704_Calcs_20191011Skyland Drive Townhomes Site Address: South Skyland Drive Mt. Pleasant, NC 28124 Developer: Coulston Enterprises Inc. 8332 Regent Parkway Fort Mill, SC 29715 Stormwater Calculations FOR: Skyland Drive Townhomes October 2019 American Engineering Associates — Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 www.American-EA.com AMERICAN Engineering AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com ENGINEER CERTIFICATION I HEREBY CERTIFY THAT SPECIFICATIONS CONTAINED HEREIN AND THE ACCOMPANYING CALCULATIONS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION. SIGNED, SEALED AND DATED THIS DAY OF 0�'x0,i'U� ,;�?tlNG.ASS ,oGINEr,y1' C y lV Q 0 .o O Co. Q CERT.N0 C-3881 \ v BY: BARRY M. FAY, PE COMPANY: AMERICAN ENGINEERING ASSOCIA SOUTHEAST. PA TITLE: VICE PRESIDENT AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Table of Contents American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Title Page No. Narrative 1 Construction Sequence 4 Vicinity Map 7 Soils Map 8 USGS Quad Map 12 Flood Map ..................................................................................................................... 13 Storm Drain Calculations ..................................................................................................................... System A - 10-Year Analysis Hydraflow Results System B - 10-Year Analysis Hydraflow Results ...................................................................................................................... Time of Concentration Calculations ...................................................................................................................... Sand Filter Calculations ..................................................................................................................... Sand Filter HydroCAD Results and Pond Report ...................................................................................................................... Erosion and Sediment Control Calculations ...................................................................................................................... Sediment Basin No. 1 - Phase 1 Sediment Basin No. 1 - Phase 2 Skimmer Sediment Basin No. 2 - Phase 1 ...................................................................................................................... Sediment Basin Detail Skimmer Sediment Basin ...................................................................................................................... Riprap Apron Calculations ...................................................................................................................... AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Appendices ...................................................................................................................... Storm Drainage Area Map Erosion and Sediment Control Plan Phase 1 Erosion and Sediment Control Plan Phase 2 Erosion and Sediment Control Plan Phase 3 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Site Narrative American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com The proposed project, Skyland Drive Townhomes, is a 16-lot townhome development located in Mt. Pleasant, North Carolina. The proposed project is a 4.335-acre development, with approximately 2.93 acres of denuded area. The proposed development is located at 991 Skyland Drive. The site's northern boundary across Skyland Drive is an existing multi -family development. The eastern, western and southern boundaries of the site are existing single family residential homes. This construction site includes the clearing and grubbing of existing brush and wooded land, grading of the existing site, and the construction of 3 multi -family townhome buildings for a total of 16 units, roads, sidewalks, and associated improvements. Site development and grading will occur in one stage. That stage will have three phases of erosion control. All sediment basins have been designed for phases 1 and 2 of construction, while phase 3 will use inlet protection and the final proposed BMPs. Erosion and sediment control measures were sized using North Carolina Department of Environmental Quality (NCDEQ) requirements. Pre -Development Conditions The project site is located within an area having a zone designation X by the Federal Emergency Management Agency (FEMA) on Flood Insurance Rate Map (FIRM) Number 3710566000K, with a date of identification of November 16, 2018. The existing site consists mainly of an undeveloped brush and wooded land. Stormwater runoff drains primarily toward an existing pond located in the center of the property on the southwestern edge. There are no known flooding problems located either downstream or immediately adjacent to the site. Pre -developed drainage conditions can be reviewed on the drainage area maps located in the Appendix. The existing drainage patterns consists of primarily sheet flow to the center of the property to the existing pond. Stormwater runoff from Skyland Drive is directed to grassed swales and culverts discharging to the northwest. The soil types identified within the project area are EnB (Enon sandy loams); and EnD (Enon sandy loams). The soil types identified were used in determining Curve Numbers (CNs) for the onsite and offsite runoff. AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Post -Development Conditions American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com The proposed site will consist of paved streets with curb & gutter and concrete sidewalks. The 16 townhomes will consist of varying size homes with concrete driveways. Common open areas and buffers are located throughout the proposed development. The site will be mass graded and the denuded area is approximately 3.09 acres. The hydrologic analysis conducted for the proposed project included the study of both onsite and offsite drainage areas for the temporary sediment basins as well as silt fence control measures. The offsite drainage areas include a portion of the developed and undeveloped properties north of the site. Beyond these areas, it was assumed that drainage from other offsite areas will not route through the property. The analysis was conducted using the Soil Conservation Service (SCS) Hydrograph Method, as outlined in SCS Technical Release 55 (TR-55). Hydrographs calculated using Hydraflow software were used to compute peak rates of runoff for the pre -development and post -development conditions. The temporary sediment basins have been designed to meet pre -construction conditions for the 2-year and 1-year storm events and minimum 80% trapping efficiency as required by the NCDEQ and the City of Charlotte. Development of the site will include a sand filter to account for water quality and channel protection requirements as well as providing storage for the 10-year, 25-year and 50-year storm events. POND TRIBUTARY AREAS Impervious Area (AC) Disturbed Pervious Area (AC) Undisturbed Pervious Area (AC) Total Area (AC) Sand Filter 1.335 0.906 0.00 2.241 The contents of this Stormwater Pollution Prevention Plan (SWPPP) were prepared for Coulston Enterprises Inc. as the primary permittee seeking coverage under North Carolina's National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Construction (CGP). Unless required by the owner, this plan may also be used by secondary permittees to obtain coverage under the CGP. AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Summary American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com The temporary sediment basin has been designed to meet pre- and post -development requirements for the 2- year and 10-year storm events. Furthermore, the sediment basin has been designed to achieve a minimum 80% trapping efficiency as required by the NCDEQ and meet the latest NPDES General Permit for Stormwater Discharge requirements. Upon removal of the sediment basin, a level spreader device shall be installed at the proposed storm drainage outfall. Upon exiting the level spreader device, stormwater from the various systems will discharge into an existing Swale and eventually to the existing onsite pond. In conclusion, due to the existing site conditions and proposed runoff control measures, the proposed project is not anticipated to have any negative impacts on any downstream or adjacent properties. 3 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Construction Sequence American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com 1. Obtain all required permits. 2. Set up an on -site pre construction conference with the erosion control inspector to discuss erosion control measures. Failure to schedule such conference 48 hours prior to any land disturbing activity is a violation of the town code and is subject to fine. 3. Make any required modifications to the erosion and sediment control plans. All modifications to the erosion and sediment control plans shall be documented on the on -site approved plans. 4. Install gravel construction entrance on S. Skyland Drive. 5. Install perimeter silt fence, inlet protection, sediment basins, temporary diversion ditches and other measures as shown on the plans clearing only as necessary to install these devices. 6. Call for on -site inspection by the erosion control inspector. When approved, the inspector issues the grading permit and clearing and grubbing may begin. 7. Limit clearing and grubbing of the site to areas that will be mass graded. Whenever possible, existing vegetation shall remain in place to prevent erosion of the site. 8. Begin mass grading activities. As site is graded and pads built up, contractor shall minimize the amount of stormwater flowing over fill slopes by using diversion ditches and slope drains. Ditches and slope drains shown on plans depict the required diversion ditches and slope drains at final pad grade. Additional measures may be needed as progresses. Contractor shall limit drainage areas flowing to each of the proposed basins to the maximum area that is designated for each basin. This shall be accomplished by adjusting the proposed diversion ditches as the site is graded. 9. Contractor shall meet with the erosion control inspector prior to commencing with phase 2 erosion control measures. 10. Install remaining silt fence, diversion ditches and other measures as shown on the phase 2 plans, clearing only as necessary to install these devices. 11. Continue mass grading activities. As site is graded and pads built up, contractor shall minimize the amount of stormwater flowing overfill slopes by using diversion ditches and slope drains. Ditches and slope drains shown on plans depict the required diversion ditches and slope drains at final pad grade. Additional measures may be needed as grading progresses. Contractor shall limit drainage areas flowing to each of the proposed basins to the maximum area that is designated for each basin. This shall be accomplished by adjusting the proposed diversion ditches as the site is graded. 12. Limit clearing and grubbing of site to areas that will be mass graded. Whenever possible, existing vegetation shall remain in place to prevent erosion of the site. 13. Construction of the streets, the associated utilities, including laterals, to the completed and inspected. 14. Reconfigure silt fence as necessary. 4 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com 15. Install inlet protection and other measures as shown on phase 2 plans as the proposed storm system is installed. 16. All areas that will go unworked for 14 days or more must be stabilized immediately. Stabilization standards should be maintained throughout the construction process. 17. Stripped topsoil shall be stockpiled in designated areas with silt fence provided around the perimeter of the stockpile. 18. Maintain and adjust the erosion and sediment control measures as mass grading progresses to maintain proper erosion and sediment control. 19. The contractor shall diligently and continuously maintain all erosion control devices and structures. 20. Stabilize the site as areas are brought to grade. 21. Inspect BMPs once per every calendar week, per the NCDEQ requirements. All inspection and reporting shall be in compliance with the NCDEQ general permit NCG010000, latest edition. 22. Contractor shall meet with the erosion control inspector prior to commencing with phase 3 erosion control measures. 23. Install any remaining silt fence, diversion ditches and other measures as shown on the phase 3 plans, clearing only as necessary to install these devices. 24. Townhome construction shall commence. Contractor to install any additional erosion control measures for the individual lot construction. 25. Contractor to ensure that occupied homes be protected from erosion and sediment from the remainder of the site. 26. Finalize grading activities. 27. Limit clearing and grubbing of the site to areas that will be mass graded. Whenever possible, existing vegetation shall remain in place to prevent erosion of the site. 28. All areas that go unworked for 14 days or more must be stabilized immediately. Stabilization standards shall be maintained throughout the construction process. 29. Maintain an adjust erosion and sediment control measures as grading and construction progresses. 30. The contractor shall diligently and continuously maintain all erosion control devices and structures. 31. Stabilize site as areas are brought to grade. 32. Coordinate with erosion control inspector prior to removal of erosion control measures. Upon inspector's approval, contractor is to remove all erosion control measures, including any approved sediment basins. 33. Conversion of sediment basins to permanent stormwater basins to be completed per approved construction plans. Bring areas outside of permanent stormwater basins, previously occupied by sediment basins and associated grading to finished grade or where applicable back to the approximate existing grade and replanted. 34. All erosion control measures shall be constructed in accordance with NCDEQ standards. 5 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com 35. When vegetation is established, call for final site inspection and file a notice of termination with the town of Mt. Pleasant/NCDEQ. lA AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations q9 N W. ira^kti' SRC N L=T" MA! Nvnvxw American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com 7 American Engineering Associates -Southeast, PA. AM E RICAN 8008 Corporate Center Drive, Suite110 Charlotte, NC 28226226 E n g i n e e r i n g OFFICE: 704.375.2438 www.American-EA.com Skyland Drive Townhomes Stormwater Calculations e i �f�Lwrwref���k..rry+ww w A r a a Nowo Amew M 4r6 w N� •� Cw�w . fwVkw 1row.Mirorrrww Ss/ S.rwr w AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations A/AP LEGEND w K tr.r.d NOa .... d aw l•On 0 ■ 0 C a C3 AO C3 C E3 it0 o� 0 wweRr..rrr f.a Rawy r�rr � � A � Ap .. C .V LA M 0 • � .r.w.rK/MYt'r ra awn 0 . D A B Am � f .. �>r IO.asataa y Ca...ra.tn'kdl. 0 0 0 t� � L..arw wu Car. ...a1 y.a .aW �ti /.L S•d iylwl tibr �ra.tt :! S.rati American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com MAP INFORMATION Stirs rr tn. r. r ean,r .tv AM w..rra Sol u.0 rrar � a. ..at r r wmi.- r too - of r-+. 2-, a ra =. of r-W an ww T.r.!Aa Ya.�p d T *,Us to -%taq art tcrarrfor or ravaw. 7.r ..R a. ra rf.s. r.wd . —d .-0 of avr+awq 1.M"ar M %* + t~ a+a n at -.tea ftedo/ bc.4 rua +Mr« wa t.r.cw � ww" am rra enr..p %.LA Pb.s.04 Qmur+.~ UnAft +1,ae sot 5...r7 MR' o...•a...s s,.ar.: r.%b u cAw am'scartri u pa"n"+p. sod' ft w 1f.r.l � so Y1M U.arr .'Aar% ram. per. r d0a4a � I.l. OW ft1 ra M A trgryan fra 7'+•naf .t% amp = f.f Apa..�ar dZ pq.Ctf1 !/aw16. raa! 6. .nar.r at+J...� rarr•a v ..... r.qo-i u-AA-wc s —ft.4 ara w d fwr a..01 M.cob. Sa Swr VA..: CA C*�w.n C.rcrn. --" Arr Or< lta.v� t `, S.p 'Li, 7O!■ Sd+w wd .. rry {u .ao A —Oft' m .e b- 15wMy.0 :3, :Or 7 '.. weaa 0e a. at.. ❑a. RK, a d.tl' f. wd ww .r. Q-t:- - " aa+- nwt,, dr. P— M w..2*N 7♦t96WW M f� n.a A. a r A. rowv d n Va 1..�� +..r 70.AfaR JY.0' 0 r-.,j.'d4 9 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations �•r.r� 11.o.arcrr..arSU•riti rrwwCa9s.. Hydrologic Sol[ Group American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Me#.se grew U., UM w Rom,.. Atn A Aa ow"M of AM w C..w+ sw,ati ftwR : o a s-100M rV" C ;A :vies gre CAW%uMar 1mvr6.1 m is, r4« C :A 4&T% W WwPft0jA tin dtia oas�Air 1 AD r..�.r rar■w C M a-IM TMM fte MM at &OMW lA Iola% Description ► 4ftbg't fob groutt an pared on asarratas d AsVff pdowrsai Sdbf are asrgnid w on9 or taw pbups .icCordihl w 7�i ride of widfu ki'TLraeior+ r.r'.rr+ 7'4 sort W* no prof1cb16 by ■o4 ors ' are 7w *.%j* we. ow t o %-a pradaLm cn Morn iWeAwa6cn worms. The sobs n #ra Ufewd Sias are asaQnrd to fw V u ps iA. B. C. art Dj and 7+r6p dual C"Sws (A10. M. and CJD1 the grouts are dirirrW a4 idMC+.ut Qr*4 A. Sobs harnq a hagh rogwasw rasa 4ow r.raff potwrtwq wFwn S*w*4riy mat. Th m& coraw n%w* of deep. wed draryd to ascoui.dy martiud sarws or grarsrf sane. Thew *a& haw* a Poo rasa d wafer 4ransmK4.an. ar*,p a Sobs h&AN a Mw ride Rdwaw r.T4 ohm TSoroLq* wet. Thew oordw chw*0 of mgdwalLlr deep or deap, rriodir"p mW drama or wad d►aned sobs 71.at have ffo6waUN few la.iura as iY0-%waWf cow" tisaare. These fobs have a ++odrara rate of waste rw&rksran Qrb 4 C. Sobs hrviry a a ke nrirado+ rat when trKrdugNy r9L T NH4 [antes Chi*% of soh PwAeq a sstvr ww 10063" ms d**oMwd motwYan! of Mara a soft or m diraralf sns laarure or its wdure. Mesa soft hka" a siow raw of warwr owum Is0w, 0104 D. Sdb haviry a Mart slow kdVaidn rips (W runoff polw"j rA"4n ?torooly mot, TINN& oar" 0'6^ of Clays VW h.7v9 a ryo shrlN-um4 po I.A soft %at have a rwgh w" Labia, saes that hate a dijflan ar cfay Lip at or star V* ski . ww sobs !rail are fr%waa over namy ift"h#4L6 ntitGeM1tl. Tharw sobs have a vary floe rasa of w+aim rarrrneslm If a spa is assaw4od to a dual rrrdrdorfC 9rgp (NO. W. or CJD� the rru toter s for drams areas and 75e U"td It 1b u"MA d Arbi4 00r Tye sGk labs in row aw ral ❑wrtilon are in group Dan A&Og wr 10 dual dlss" � ..Y..... r•cn W +c ■ �aitrM CttaraM !ra frrrar L•�. 3 d • 10 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations Description American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.• None Specified Tie -break Rule: Higher 11 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com USGS Topographic Map Portion of MT. PLEASANT QUADRANGLE — 7.5 Minute Series 12 AMERICAN Engineering Skyland Drive Townhomes Stormwater Calculations A,pplmanate 10011 i baead Oh r -V d nd does not Iepreseet an aud� PIF ;goPMrw ' Selected FWadF.rap Boundary ocgtw oars m-aamv tW ftwm%4 Ikk aegv F+ANELS IY.mapped ® "a of u—mat Mood ward m+e x IIRame [ONFn Arta of IAndaterllaed Flood ward F o dthars$e protected area OTHER AREAS cu" Ba Fl9oara! "tlm 0f American Engineering Associates -Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 OFFICE: 704.375.2438 www.American-EA.com C Wnhwr Bafv Fgad Ele.aslon IBFEI SPEL7RL FLOOD with elFE a Oapin WIZARD AR FAS RetulatoFy Flocaw.y � aF; V. ae, w[ aR 0.1%An hual Chanoa Food Kmrd. Atom ut 1%annua4 chance fl vvd with arerap depth teas than one tout vc wm dralna�e arvaf of'M [hen ow epuen mile Fwwe Coedlllarn 1%Annuat Chanoa Flood Hamm! , I Arm mLh Reddoed Flood Rnk due IG OTHER AREAS OF Levee Sot Mtn. FLOOD W VAR9 Area wm fwod Rek Oaa to Lnca: .. � FEMA Flood Map a aoa Golf SFtltaliwn111%Rnawl Cllenof walvr $urfaov FJ vrapon — — Coastal Tron ... BaFe Flwd Elegtlon Line IBFE1 emit a Study lmedtcrlon Boundary -- — Coastal U.ne Ba-1— OTHER _ Pmhle Basdne FCLTuISS HydraClaphrc Featwo GENERAL I —` -- Channel Cur.e". w $tam%Sewer STRLICTVRE$ I I I I I I L[ 0. pike. a Fk'M"M Portion of Panel No. 3710566000K 13 STORM DRAIN CALCULATIONS Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan A13 15 A14 A1514 13 A48 A3 7 10 Al 9 A5 A2 6 AA7'1 A16 A6 5 12 4 A8 A9 3 A10 A11 2 1 Outfall Project File: Storm A.stm Number of lines: 15 Date: 10/7/2019 Storm Sewers 02.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 41.646 0.00 1.74 0.00 0.00 1.40 0.0 11.3 5.8 8.08 7.80 5.44 18 0.55 666.09 666.32 667.19 667.59 667.88 678.59 All-Al2 2 1 37.250 0.10 1.74 0.80 0.08 1.40 5.0 11.2 5.8 8.11 7.50 4.59 18 0.51 666.32 666.51 667.93 668.16 678.59 677.58 All 0-A11 3 2 69.864 0.03 1.64 0.80 0.02 1.32 5.0 11.0 5.9 7.70 7.43 4.36 18 0.50 666.51 666.86 668.43 668.80 677.58 677.74 A9-Al0 4 3 26.500 0.23 1.61 0.80 0.18 1.29 5.0 10.9 5.9 7.58 7.36 4.29 18 0.49 666.86 666.99 669.00 669.14 677.74 677.74 A8-A9 5 4 114.489 0.22 1.24 0.80 0.18 0.98 5.0 10.4 6.0 5.86 7.41 3.31 18 0.50 666.99 667.56 669.42 669.78 677.74 675.21 A7-AB 6 5 52.208 0.07 0.89 0.80 0.06 0.70 5.0 10.1 6.0 4.23 7.55 2.39 18 0.52 667.56 667.83 669.93 670.01 675.21 674.15 A5-A7 7 6 26.500 0.06 0.45 0.80 0.05 0.36 5.0 8.2 6.4 2.31 4.52 1.95 15 0.49 668.86 668.99 670.08 670.11 674.15 674.24 A4-A5 8 7 52.208 0.21 0.39 0.80 0.17 0.31 5.0 7.7 6.5 2.04 4.56 1.88 15 0.50 668.99 669.25 670.16 670.19 674.24 676.14 A3-A4 9 8 26.500 0.06 0.18 0.80 0.05 0.14 5.0 7.2 6.7 0.96 6.52 3.39 15 1.02 670.98 671.25 671.30 671.63 676.14 676.14 A2-A3 10 9 74.014 0.12 0.12 0.80 0.10 0.10 5.0 5.0 7.2 0.69 6.46 2.45 15 1.00 671.25 671.99 671.63 672.32 676.14 676.96 Al-A2 11 5 31.371 0.13 0.13 0.80 0.10 0.10 5.0 5.0 7.2 0.75 6.42 3.15 15 0.99 670.97 671.28 671.26 671.62 675.21 675.16 A6-A7 12 4 102.750 0.14 0.14 0.90 0.13 0.13 5.0 5.0 7.2 0.91 6.89 3.42 15 1.14 669.50 670.67 669.81 671.04 677.74 679.09 A16-A8 13 6 89.065 0.14 0.37 0.80 0.11 0.29 5.0 8.8 6.3 1.80 7.38 1.02 18 0.49 667.83 668.27 670.08 670.11 674.15 671.89 All5-A5 14 13 32.853 0.13 0.23 0.80 0.10 0.17 5.0 8.0 6.5 1.12 7.33 0.64 18 0.49 668.27 668.43 670.13 670.13 671.89 671.89 A14-A15 15 14 51.916 0.10 0.10 0.70 0.07 0.07 5.0 5.0 7.2 0.51 23.50 1.36 18 5.01 668.47 671.07 670.13 671.33 671.89 672.86 A13-A14 Project File: Storm A.stm Number of lines: 15 Run Date: 101712019 NOTES:Intensity = 88.24 / (Inlet time + 15.50) ^ 0.83; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers 02.00 Storm Sewer Profile Proj. file: Storm A.stm Elev. (ft) 687.00 682.00 677.00 672.00 667.00 662.00 0 N M � co C J 0 C J 0 C J OC J OC CO r— co M C) LO C 0 C J 0 C J O C J 0 C J O C C 0 . . . . . . . ■�■ . ■ milli I■�■�■ ■ ■III■I■IIIIII IIII■1■-IIIIII IN■111111111■111111MA �M1■ M. 50 HGL 687.00 682.00 677.00 672.00 1.00% 667.00 662.00 100 150 200 250 300 350 400 450 500 550 - EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Storm A.stm Elev. (ft) OE CO I-- NU')M o CO � oWww . E > > cnSS J O CO � �N M �°CO o Ww m E cn �_ 684.00 684.00 681.00 678.00 681.00 678.00 675.00 675.00 672.00 -------- ---------------- -- 672.00 3 .3 - 669.00 669.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Storm A.stm Elev. (ft) 685.00 681.00 O C J Q C a 5 J Q C 2 E J COO '685.00 681.00 677.00 677.00 673.00 669.00 665.00 673.00 669.00 665.00 0 25 50 75 HGL EGL 100 125 150 Reach (ft) 175 ■ � I1 �Z1l:7Zft� :n � . • � . Storm Sewers Storm Sewer Profile Proj. file: Storm A.stm Elev. (ft) 686.00 OS Arno � M C? o �° CO (D +Lu :° E > > c75 of S S N 73 O rnr- o� � o o (OCO + Ww CO cn of S 686.00 682.00 678.00 682.00 678.00 674.00 670.00 666.00 ------------------------------------- -- -------------------------------------------- --- u 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) 674.00 670.00 666.00 110 Storm Sewers Hydraflow Storm Sewers Extension for Autodesk® AutoCAD® Civil 3D® Plan Outfall 1 B3 2 B2 3 B1 Project File: Storm B.stm Number of lines: 3 Date: 10/8/2019 Storm Sewers 02.00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vol Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 40.118 0.00 0.54 0.00 0.00 0.33 0.0 5.2 7.2 2.34 21.00 3.72 18 4.00 666.20 667.80 666.78 668.38 668.00 669.61 133-134 2 1 6.564 0.00 0.54 0.00 0.00 0.33 0.0 5.2 7.2 2.35 21.00 3.72 18 4.00 667.80 668.06 668.38 668.64 669.61 672.82 132-133 3 2 12.875 0.54 0.54 0.60 0.33 0.33 5.0 5.0 7.2 2.36 23.48 6.12 18 5.00 669.02 669.66 669.34 670.24 672.82 671.45 131-132 Project File: Storm B.stm Number of lines: 3 Run Date: 101812019 NOTES:Intensity = 88.24 / (Inlet time + 15.50) ^ 0.83; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers 02.00 GUTTER SPREAD CALCULATIONS GUTTER SPREAD CALCULATIONS PROJECT: Skyland Drive Townhomes COMPUTED BY: BMF LOCATION: Charlotte, NC RAINFALL INTENSITY = 4.0 in/hr (On Grade Conditions - Roadway) RAINFALL INTENSITY = 8.21 in/hr (Sag Conditions - Roadway 25 year) CHECKED BY: BMF DATE: 10/4/2019 Trib. C Sag St SI Single/Double Struct. Number Area Factor Condition Cul-de-sac Flow Cross Slope Long. Slope Grate T D K Qcap Qbypass Contributing Structures / Flow Qadd (ac) (Y/N) (Y/N) (cfs) (ft/ft) (ft/ft) (S/D) (ft) (in) (cfs) (cfs) (cfs) (cfs) Al 0.12 0.80 Y N 0.79 0.02000 --- S 5.29 0.11 0.00 A2 0.06 0.80 N N 0.19 0.02000 0.0260 S 3.25 0.06 24.85 0.26 0.00 0.00 A3 0.21 0.80 N N 0.67 0.02000 0.0260 S 5.19 0.10 24.85 0.57 0.10 0.00 A4 0.06 0.80 N N 0.29 0.02000 0.0340 S 3.62 0.07 26.85 0.34 0.00 0) 0.10 (0 A5 0.07 0.80 N N 0.45 0.02000 0.0340 S 4.24 0.08 26.85 0.44 0.01 0.22 (0 22) A6 0.13 0.80 Y N 0.85 0.02000 --- S 5.58 0.11 A2 A9 0.00 (0.00) (0.00) A7 0.22 0.80 N N 0.86 0.02000 0.0060 S 7.48 0.15 14.98 0.63 0.22 5) 0.15 (0 A8 0.24 0.80 N N 0.77 0.02000 0.0300 S 5.31 0.11 25.85 0.62 0.15 0.00 A9 0.03 0.80 N N 0.10 0.02000 0.0300 S 2.44 0.05 25.85 0.17 0.00 0.00 A10 0.10 0.80 N N 0.32 0.02000 0.0300 S 3.83 0.08 25.85 0.36 0.00 0.00 A14 0.13 0.80 Y N 0.85 0.02000 --- S 5.58 0.11 4 0.00 00) (0 A15 0.14 0.80 Y N 0.93 0.02000 --- S 5.90 0.12 5 0.01 01) (0 B2 0.21 0.80 Y N 1.38 0.02000 --- S 7.68 0.15 0.00 (0.00) B3 0.15 0.80 Y N 0.99 0.02000 --- S 6.17 0.12 0.01 (0 0 ) 0.00 0.00 0.00 0.00 Pagel of 2 TIME OF CONCENTRATION CALCULATIONS � R%, INV.666.2 _ R/W� (PARTIALLY O Bus _ — BURIED) �N ✓ SHELTER - - _ R/W — — R — — R/W — — R/W — — R/W — R/W� — R/W — — R W ___OE-� __ / — — R/W - -_� -� PP --_ — OE — OE — OE OE OE OE —0 — —OE— —OE— —OE— OE-� — —OE— — R W — — 0E— O OEOE E_,.oEOE OEOEOE R/W —OE--/db PP OE — —OE— —OE— — INV. �667.2 �� R OE--OE--OE--OE — — �, EDGE OF PAVEME — — _ ; ; (60' PUBLIC R/W -MAINTAINED) — — W — — — — — — — — „ b — \—w--w--w--w--w--w--w— --w— w-- — —--w--w—;;mow--w--w--W--W--W--W— W--'W R--W--W-- \ °F EDG OF PAVEMENT V NV. 670.2 i i IN 670.E �OF=� — pp— -0E--OE--w'OE---OE— X X X X X --� X X X �( X X R '- -X x G TE E$ — OE _ OE — OE-- — — Q�®— — — ����. / — R/W — R/W — — R — — R/W — R/ -- A�� -_ -_ \ f - 6,fo f k ROD l N r \ \ \ 43, 11 sf \ x 0. 4 a res \ NO \ \ \ ` N \ \ V,-rdJ \ \ R \ \ \ � j �\ \ \ \ � --0.1955 acres k ` ` PEh \ \ x \ / R 1 1 NOW OR FORMERLY I k It \ \ .JOHNNIE F SULLIVANOR 7447, AS 58 x \ \ PIN:5550-94-0591 ' TRACT 1 AND PART OF TRACT 2 x \ \ \ \ \ R 35, PG 33 947. SKYLAND OR, 1 J f I f MT OER PLEASANT, NC 2R124 l -_ I �9. — =T R/W I I Ex -A -- RA GE q� a Qo- —0E— ; NOW OR FORMERLY TERRY R TUCKER & ROSE P TUCKER DR 12430, PG 43 PIN: 5EE0-95-53.92 TRACT 1 MR 72, PG 107 3435 HIGHWAY 73 E CONCORD NC 28025 ZONED "RFJ" She Flow L=63 S = 9.50,0 n = 0.24 Shallow Conce L=45' S = 4.4% Wooded /, Woo PRO,�� m F --- �'`.�' ON �� r ✓ , f NOW OR FORMERLY x �� 1 III III 1I I GF DA SHOES `~ d✓ ✓ �✓ �� ��d� / / 330 EXISTING POND OR 545r -95PG. 714 I } PIN: LOTS 395-7144 r���� / LOTS 35-40 s R b, F'Cx 63 d + MT: PLEASANT; NC28124 Rom, ,,,/' ✓` � � � ��� �°� �� \ / � � � � � � � � I ZONED rGHe, x x x� x R/W — — R —pE R�`n/ — — CONCRETE "E OE x _ OE �E - -__ / X X X X X X x X j JpP 0—OE--OET—OE— —OE— — E— PP DRIVE / � � O � � �� � �� X � ABBOTT STREET �. �, IAN PUBLIC R/W) \ (PB 8/63, DB 350/510) \ R/W — — R/W — — R/W — — R/W — — R/W — — R/W — — R/W GRAPHIC SCALE 30 0 15 30 60 ( IN FEET) finch =30ft. 4Z8.cL R/W — u 011— u— — ou — ou— gDGE OF PA VEMFNT --W EDGE OF PAVEMENT 1 �V.669.112 Lu OE� LP TANK - R/W — — on i r Flow W. FranklinV LOCATION MAP NOT TO SCALE LEGEND - - - —> TIME OF CONCENTRATION FLOW LINE EnB ENON SANDY LOAM - GROUP C EnD ENON SANDY LOAM - GROUP C PRE-DEV POA-1 TOTAL AREA = 4.406 AC CN 70 Tc=7.4min. Pre Development CN (Onsite) COVERAGE AND CN VALUES LAND USE AREA (ac) GROUP CN AREA x CN B (ac/CN) C (ac/CN) D (ac/CN) IMPERV. 0.000 0.00 0.00 0.00 0 0.00 98 98 98 WOODS* 2.203 0.00 2.20 0.00 70 154.21 55 70 77 BRUSH** 2.203 0.00 2.20 0.00 70 154.21 56 70 77 TOTAL 4.406 70 308.42 *** 3 Days Before Digging *** North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc8l l.org/remoteticketentry.hbn w a) c 2 Z ```III\11111111/,,,, SS/ / 33046 STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, NC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 4/12/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. V 1 W 'o U z � co co O w� Q-' U a q Z W H Z Z M-1 W U1 E- av�al MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 4-12-2019 689E-0 # W2i1=1 Z Q °° a It N a N CM V L4 co CD m o� W._ 2 bbQo rnN aW� OCjcN�l C N 4; Lu `0 Z 0 CU 0 0 CO m E co: L Qao0 PRE EVELOPMEN DRAINAGE MAP SHEET: mmmm ' � n ••' -1 .Y M.FP�� /111111111IIIII \ Raw INV:666.2 R/W (PARTIALLY Bus BURIED) p�D� / SHEL TER - - _ R/W - - R - - R/W - - R/W - - R/� R/W� - R/W - - R/W - - R/W - pp - - - -OE- -OE- OF -O--OE- OE - OE - OE$r--OE- -OE- _R/W_ - _ OE �E OE- OE OF �-GE DOE OE OE OE OE OE OE R/W pp - OE - -OE- - -OE- INV: -6672 �- !zw 2 R/W \ EDGE OF PA VEME OE - - OE - - OE - - - - - - _ -w \-W--W--W OE-_ -OU - \ W--W--W- _-W-ii�W--W--W--W--W--W--W--W- - - -� \- �U OU-i4J��-OU OU w--W--W- -W--W � --�M- 1 LbV= �11--W--W--W�� - OU--OU/OU -W--W-- �L EDG OF PAVEMENT / SSKYL ND DRIVE(S.R.2657 !! - - - _ _ - - _ - w--w--wl,a w w__+w GE OF PAVEMN w w i-w--w-- _ / I pp - - ( ' PUB REW - MAWAINED) IJ R/W- --6€a,g.�-OE--OE--OE--OE_-0E-�E-- \ �i)i - _ -�E OE - p - D - pP �� i i EDGE OF PAVEMENT - O OE - --QE OE- E 0 -MV-66 1 _ _ V: 6159, 82 --R/W,- R/W R/ R/W - - - - �OE� B€-- �_ -0E - - Or�o E - OE --OE-UNDETAINED ° -°E- �-R/WPTANKWR/W - R/ \ \ \ \ m \ 0 un NOW OR FORMERLY JOHNNIE F SULLIVAN DB 7447, PG 58 PIN:5660-94-0591 TRACT 1 AND PART OF TRACT 2 MB 35, PG 33 997. SKYLAND DR. MT. PLEASANT, NC 28124 ZONED "RL" \ 1 2 3� D)4 5\ 1 R /Ind wrl m 0 x x / x \ R/W R/W I„ 11 ►.1 W WIINA • ����� �ra o � TRI UNDETAINED /%/ / r_rry \\ x x I -,�� \ X x x x / NOW OR FORMERLY GEORGE A SHOE & \ / / FREDAE EXISTING POND ` \ \ I IDB 545, PG. 33 PIN. 5660-95 7144 LOTS 35-40 MB 8, PG 63 1010 ABBOTT ST. / I MT. PLEASANT, NC 28124 ZONED "RH" / + + -R/W-- - bE _ R4V - / I I � / X X X X X �X x �x x x /PP 0 -OE--OE,T-OE--OE-- E- �OE /ABBOTT STREE / o (40' PUBLIC R/W) / (PB 8/63, DB 350/510) / FM FM M / CFI 1� FM R/W - R/W - - R/NY R/W - - R/W �T rv/ vv /�/ / �C � o OE T' PP -�-IOE - _ OE WLu 3 I�m00 a O Q W S GRAPHIC SCALE 30 0 15 30 60 ( IN FEET) 1 inch = 30 ft. W. Franklin Street LOCATION MAP NOT TO SCALE LEGEND - - - -> TIME OF CONCENTRATION FLOW LINE En B ENON SANDY LOAM - GROUP C En D ENON SANDY LOAM - GROUP C POST-DEV POA-1 TOTAL AREA 4.405 AC DETAINED AREA IMPERVIOUS: 1.335 AC PERVIOUS: 0.906 AC TOTAL: 2.241 AC CN = 87 TIC =5.0MIN UNDETAINED AREA IMPERVIOUS: 0.232 AC PERVIOUS: 1.932 AC TOTAL: 2.164 AC CN = 70 TIC =10.0 MIN Post Development Undetained CN COVERAGE AND CN VALUES LAND USE AREA (ac) GROUP CN AREA x CN B (ac/CN) C (ac/CN) D (ac/CN) IMPERV. 0.232 0.00 0.23 0.00 98 22.74 98 98 98 OPEN 1.302 0.00 1.30 0.00 74 96.35 r 61 74 80 WOODS 0.63 0.00 0.63 0.00 70 44.10 55 1 70 77 TOTAL 2,164 75 163.18 Post Development Detained CN COVERAGE AND CN VALUES LAN D USE AREA (ac) GROUP CN AREA x CN B (ac/CN) C (ac/CN) D (ac/CN) IMPERV. 1.335 0.00 1.34 0.00 98 130.83 98 98 98 OPEN 0.906 0.00 0.91 0.00 74 67.04 61 74 80 WOODS 0 0.00 0.00 0.00 0 0.00 55 70 77 TOTAL 2.241 88 1197.87 2 *** 3 Days Before Digging 0-07-19 North Carolina 811 811 or 1-800-632-4949 - �- '% � �� .•�•�• -� Rcalote Ticket Entry �.�` http://nc8I I org/ emotet cke entry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMESI S. SKYLAND DRIVE, MT. PLEASANT, NC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. V ) w M'® Cq W co ®w� Cn W W Z I E 04 U) M-� MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,88E-0 # W2il� Z b.0 00 Q00 a N • ti N co �° CD ~ U) g U CO W �a 50) D - m l �N a W oU CIO a) N Lu O Z Q O N -6 2V .` o a) C L E.(OD L Qoo0 POST EVELOPMEN DRAINAGE MAP SHEET: MIMMM SAND FILTER CALCULATIONS STORM WATER 4.8.7 Design Procedure Form Design Procedure Form: Sand Filter BIORETENTION FEASIBILITY NOTES: 1 Is the use of a sand filter appropriate? 2 Confirm other design criteria and applicability. Pollutant Removal Effectiveness Required Optimal PRELIMINARY HYDROLOGIC CALCULATIONS 3 Compute site hydrologic input parameters Development Conditions Pre -developed Post -developed Area 4.405 acres 2.25 acres CN (SCS curve number) 70 88 Adjusted CN (curve number adjusted for 1-inch storm) 94.98 Time of concentration 7.4 min 5 min 0.12 hours 0.08 hours 4 Compute,WQv water quality volume requirements Compute Runoff Coefficient, Rv Rv = 0.56 Compute WQv Volume requirements WQV = 0.11 acre-ft 5 Compute WQp peak flow using SCS WQP = cfs Compute modified SCS curve number CN = 95.0 6 Compute CPv Compute S (maximum retention) S = 1.36 Compute 1-yr, 24-hrtotal rainfall depth Rainfall Depth = 2.58 inches Compute Qd (runoff volume) Qd = 1.45 inches Compute CPv (chnnnel protection volume) CPV = 0.27 acre-ft 7 Size Flow Diversion Structure 8 Compute release rates Compute WQv release rate Release Rate = 0.025 cfs Compute CPv release rate Release Rate = 0.055 cfs SAND FILTER DESIGN 9 Compute sediment chamber volume Volpfe = 0.021 acre-ft Volpfe = (0.20)(WQv) 10 Average height of water above filter bed hf = 1_0 ft Determine Area of Sand ponding/filter area Af= 440.8 ft2 11 Set design eleveations and dimensions of facility Length = 42 ft Width = 12.0000 ft Top Elevation = 666 ft 12 Develop stage -discharge and sta a stora e Elevation Area (ft) Volume Acc. Vol Q (ft) ft3 (cfs) 666 2,385 0 0 667 2,881 2,629 0.03 668 3,404 5,768 0.26 669 3,956, 9,445, 0.37 670 4,5361 13,6871 0.45 671 5,3281 1 18,6141 13.62 STORM WATER 13 Route flows through bioretention area. Resize the footprint area, if desired. Step is most effective for facilities with flow diverters. Ensure detention time requirements and maximum ponding depth requirements are met. 14 Design conveyance to facility 15 Size underdrain system Length = 90 ft 16 Design emergency overflow Length of Weir (if used) 17 Prepare vegetation and landscaping plan Sand Filter Underdrain System Calculations Project Name: Skyland Dr Townhomes Project Number: C190010 Designed By: BMF Date: 3/26/2019 Checked By: BMF Date: 3/26/2019 Number of Pipes 2 Pipe Length 40 ft Pipe Slope 0.005 ft/ft Pipe Diameter 6 in Perforation Diameter 0.375 in WQv 0.028 cfs Number of Perforations 1216 holes 50% Perforations 608 holes Capacity of one hole 0.0083 cfs Total Capacity 5.018 cfs Capacity of Pipe 0.513 cfs 50% Assuming Clogging 0.257 cfs Design Discharge Rate for the Sand Filter: 0.028 cfs (from BMP sizing) Calculate the Sand Filter discharge rate: Qo = Af (k)(hf+df)/(df)) Where: Af = surface area of filter bed (ft2) df = filter bed depth (ft), length of flow k = coefficient of permeability of filter media (ft/day) hf = average height of water above filter bed (ft), change in pressure head Sand Filter No.: Sand Filter Area (Af): k: Sand Filter Depth (df): 1 504 sf 3.5 ft/day per ft depth 2.5 ft Stage (hf) Elev Discharge (ft) (ft) (cfs) 0 667 0 1 668 0.029 2 669 0.037 3 670 0.045 4 671 0.053 5 672 0.061 6 673 0.069 Pre -Development Subcat Reach on Link Post- ined Post-Un Jetained 47 2A � Sand Filter Post Total Skyland Drive Townhomes_Sand Filter Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {enter your company name here} Printed 4/2/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Events for Subcatchment 1: PRE Event Rainfall (inches) Runoff (cfs) Volume (cubic -feet) Depth (inches) 1-inch 1.00 0.01 74 0.00 2-yr 2.28 2.64 5,671 0.35 10-yr 3.72 9.22 18,333 1.15 25-yr 4.38 12.79 25,414 1.59 50-yr 4.92 15.73 31,616 1.98 100-yr 5.34 18.57 36,647 2.29 27 Post-D ined Post-Undetained Sand Filter Post Total S4 Reach on Link Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (sq-ft) (s u bcatch me nt- n u m be rs) 86,859 88 Post -Development Detained Areas (2) 93,698 70 Post -Development Undetained Areas (3) 11,326 98 Roofs, HSG B (2) 191,882 80 TOTAL AREA Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 3 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=0.28" Tc=5.0 min CN=89 Runoff=1.47 cfs 2,332 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=0.00" Tc=10.0 min CN=70 Runoff=0.01 cfs 36 cf Pond 2A: Sand Filter Peak Elev=666.86' Storage=2,224 cf Inflow=1.47 cfs 2,332 cf Outflow=0.01 cfs 2,114 cf Link 4: Post Total Inflow=0.02 cfs 2,150 cf Primary=0.02 cfs 2,150 cf Total Runoff Area = 191,882 sf Runoff Volume = 2,368 cf Average Runoff Depth = 0.15" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: Post -Detained Runoff = 1.47 cfs @ 3.17 hrs, Volume= 2,332 cf, Depth= 0.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs. HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained ❑ Runoff Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 5 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.11 0.00 0.00 4.00 0.88 0.22 0.14 6.00 1.00 0.28 0.05 8.00 1.00 0.28 0.00 10.00 1.00 0.28 0.00 12.00 1.00 0.28 0.00 14.00 1.00 0.28 0.00 16.00 1.00 0.28 0.00 18.00 1.00 0.28 0.00 20.00 1.00 0.28 0.00 22.00 1.00 0.28 0.00 24.00 1.00 0.28 0.00 26.00 1.00 0.28 0.00 28.00 1.00 0.28 0.00 30.00 1.00 0.28 0.00 32.00 1.00 0.28 0.00 34.00 1.00 0.28 0.00 36.00 1.00 0.28 0.00 38.00 1.00 0.28 0.00 40.00 1.00 0.28 0.00 42.00 1.00 0.28 0.00 44.00 1.00 0.28 0.00 46.00 1.00 0.28 0.00 48.00 1.00 0.28 0.00 50.00 1.00 0.28 0.00 52.00 1.00 0.28 0.00 54.00 1.00 0.28 0.00 56.00 1.00 0.28 0.00 58.00 1.00 0.28 0.00 60.00 1.00 0.28 0.00 62.00 1.00 0.28 0.00 64.00 1.00 0.28 0.00 66.00 1.00 0.28 0.00 68.00 1.00 0.28 0.00 70.00 1.00 0.28 0.00 72.00 1.00 0.28 0.00 74.00 1.00 0.28 0.00 76.00 1.00 0.28 0.00 78.00 1.00 0.28 0.00 80.00 1.00 0.28 0.00 82.00 1.00 0.28 0.00 84.00 1.00 0.28 0.00 86.00 1.00 0.28 0.00 88.00 1.00 0.28 0.00 90.00 1.00 0.28 0.00 92.00 1.00 0.28 0.00 94.00 1.00 0.28 0.00 96.00 1.00 0.28 0.00 98.00 1.00 0.28 0.00 100.00 1.00 0.28 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 1.00 0.28 0.00 104.00 1.00 0.28 0.00 106.00 1.00 0.28 0.00 108.00 1.00 0.28 0.00 110.00 1.00 0.28 0.00 112.00 1.00 0.28 0.00 114.00 1.00 0.28 0.00 116.00 1.00 0.28 0.00 118.00 1.00 0.28 0.00 120.00 1.00 0.28 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3: Post-Undetained Runoff = 0.01 cfs @ 5.66 hrs, Volume= 36 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ■ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.11 0.00 0.00 4.00 0.88 0.00 0.00 6.00 1.00 0.00 0.00 8.00 1.00 0.00 0.00 10.00 1.00 0.00 0.00 12.00 1.00 0.00 0.00 14.00 1.00 0.00 0.00 16.00 1.00 0.00 0.00 18.00 1.00 0.00 0.00 20.00 1.00 0.00 0.00 22.00 1.00 0.00 0.00 24.00 1.00 0.00 0.00 26.00 1.00 0.00 0.00 28.00 1.00 0.00 0.00 30.00 1.00 0.00 0.00 32.00 1.00 0.00 0.00 34.00 1.00 0.00 0.00 36.00 1.00 0.00 0.00 38.00 1.00 0.00 0.00 40.00 1.00 0.00 0.00 42.00 1.00 0.00 0.00 44.00 1.00 0.00 0.00 46.00 1.00 0.00 0.00 48.00 1.00 0.00 0.00 50.00 1.00 0.00 0.00 52.00 1.00 0.00 0.00 54.00 1.00 0.00 0.00 56.00 1.00 0.00 0.00 58.00 1.00 0.00 0.00 60.00 1.00 0.00 0.00 62.00 1.00 0.00 0.00 64.00 1.00 0.00 0.00 66.00 1.00 0.00 0.00 68.00 1.00 0.00 0.00 70.00 1.00 0.00 0.00 72.00 1.00 0.00 0.00 74.00 1.00 0.00 0.00 76.00 1.00 0.00 0.00 78.00 1.00 0.00 0.00 80.00 1.00 0.00 0.00 82.00 1.00 0.00 0.00 84.00 1.00 0.00 0.00 86.00 1.00 0.00 0.00 88.00 1.00 0.00 0.00 90.00 1.00 0.00 0.00 92.00 1.00 0.00 0.00 94.00 1.00 0.00 0.00 96.00 1.00 0.00 0.00 98.00 1.00 0.00 0.00 100.00 1.00 0.00 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 1.00 0.00 0.00 104.00 1.00 0.00 0.00 106.00 1.00 0.00 0.00 108.00 1.00 0.00 0.00 110.00 1.00 0.00 0.00 112.00 1.00 0.00 0.00 114.00 1.00 0.00 0.00 116.00 1.00 0.00 0.00 118.00 1.00 0.00 0.00 120.00 1.00 0.00 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 0.28" for 1-inch event Inflow = 1.47 cfs @ 3.17 hrs, Volume= 2,332 cf Outflow = 0.01 cfs @ 6.10 hrs, Volume= 2,114 cf, Atten= 99%, Lag= 175.9 min Primary = 0.01 cfs @ 6.10 hrs, Volume= 2,114 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 666.86' @ 6.10 hrs Surf.Area= 2,807 sf Storage= 2,224 cf Plug -Flow detention time= 2,275.6 min calculated for 2,114 cf (91 % of inflow) Center -of -Mass det. time= 2,264.4 min ( 2,487.8 - 223.4 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=0.01 cfs @ 6.10 hrs HW=666.86' (Free Discharge) 1=Sand Filter (Custom Controls 0.01 cfs) 2=CP-Bleeder ( Controls 0.00 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) L4=Culvert ( Controls 0.00 cfs) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 9 Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 10 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 0.14 1,698 666.67 0.01 8.00 0.00 2,145 666.83 0.01 12.00 0.00 1,983 666.77 0.01 16.00 0.00 1,833 666.72 0.01 20.00 0.00 1,694 666.67 0.01 24.00 0.00 1,565 666.62 0.01 28.00 0.00 1,445 666.57 0.01 32.00 0.00 1,334 666.53 0.01 36.00 0.00 1,231 666.49 0.01 40.00 0.00 1,135 666.46 0.01 44.00 0.00 1,047 666.42 0.01 48.00 0.00 965 666.39 0.01 52.00 0.00 890 666.36 0.01 56.00 0.00 820 666.33 0.00 60.00 0.00 756 666.31 0.00 64.00 0.00 696 666.28 0.00 68.00 0.00 641 666.26 0.00 72.00 0.00 590 666.24 0.00 76.00 0.00 544 666.22 0.00 80.00 0.00 500 666.21 0.00 84.00 0.00 461 666.19 0.00 88.00 0.00 424 666.17 0.00 92.00 0.00 390 666.16 0.00 96.00 0.00 359 666.15 0.00 100.00 0.00 330 666.14 0.00 104.00 0.00 304 666.13 0.00 108.00 0.00 280 666.12 0.00 112.00 0.00 257 666.11 0.00 116.00 0.00 237 666.10 0.00 120.00 0.00 218 666.09 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 11 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 12 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 0.13" for 1-inch event Inflow = 0.02 cfs @ 5.67 hrs, Volume= 2,150 cf Primary = 0.02 cfs @ 5.67 hrs, Volume= 2,150 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs N U 3 0 LL Link 4: Post Total Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ❑ Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 14 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 0.01 0.00 0.01 6.00 0.02 0.00 0.02 8.00 0.01 0.00 0.01 10.00 0.01 0.00 0.01 12.00 0.01 0.00 0.01 14.00 0.01 0.00 0.01 16.00 0.01 0.00 0.01 18.00 0.01 0.00 0.01 20.00 0.01 0.00 0.01 22.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.00 0.00 0.00 56.00 0.00 0.00 0.00 58.00 0.00 0.00 0.00 60.00 0.00 0.00 0.00 62.00 0.00 0.00 0.00 64.00 0.00 0.00 0.00 66.00 0.00 0.00 0.00 68.00 0.00 0.00 0.00 70.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 27 Post-D ined Post-Undetained Sand Filter Post Total S4 Reach on Link Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (sq-ft) (s u bcatch me nt- n u m be rs) 86,859 88 Post -Development Detained Areas (2) 93,698 70 Post -Development Undetained Areas (3) 11,326 98 Roofs, HSG B (2) 191,882 80 TOTAL AREA Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 3 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=1.52" Tc=5.0 min CN=89 Runoff=5.13 cfs 12,477 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=0.49" Tc=10.0 min CN=70 Runoff=1.24 cfs 3,857 cf Pond 2A: Sand Filter Peak Elev=668.38' Storage=7,092 cf Inflow=5.13 cfs 12,477 cf Outflow=0.31 cfs 12,099 cf Link 4: Post Total Inflow=1.51 cfs 15,957 cf Primary=1.51 cfs 15,957 cf Total Runoff Area = 191,882 sf Runoff Volume = 16,334 cf Average Runoff Depth = 1.02" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: Post -Detained Runoff = 5.13 cfs @ 11.99 hrs, Volume= 12,477 cf, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 24-hr 1-yr Rainfall=2.58" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs. HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained ■ Runoff Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 5 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.06 0.00 0.00 4.00 0.12 0.00 0.00 6.00 0.20 0.00 0.00 8.00 0.31 0.00 0.01 10.00 0.46 0.03 0.06 12.00 1.59 0.70 5.10 14.00 2.11 1.12 0.20 16.00 2.27 1.25 0.12 18.00 2.38 1.35 0.09 20.00 2.46 1.42 0.07 22.00 2.52 1.47 0.06 24.00 2.58 1.52 0.06 26.00 2.58 1.52 0.00 28.00 2.58 1.52 0.00 30.00 2.58 1.52 0.00 32.00 2.58 1.52 0.00 34.00 2.58 1.52 0.00 36.00 2.58 1.52 0.00 38.00 2.58 1.52 0.00 40.00 2.58 1.52 0.00 42.00 2.58 1.52 0.00 44.00 2.58 1.52 0.00 46.00 2.58 1.52 0.00 48.00 2.58 1.52 0.00 50.00 2.58 1.52 0.00 52.00 2.58 1.52 0.00 54.00 2.58 1.52 0.00 56.00 2.58 1.52 0.00 58.00 2.58 1.52 0.00 60.00 2.58 1.52 0.00 62.00 2.58 1.52 0.00 64.00 2.58 1.52 0.00 66.00 2.58 1.52 0.00 68.00 2.58 1.52 0.00 70.00 2.58 1.52 0.00 72.00 2.58 1.52 0.00 74.00 2.58 1.52 0.00 76.00 2.58 1.52 0.00 78.00 2.58 1.52 0.00 80.00 2.58 1.52 0.00 82.00 2.58 1.52 0.00 84.00 2.58 1.52 0.00 86.00 2.58 1.52 0.00 88.00 2.58 1.52 0.00 90.00 2.58 1.52 0.00 92.00 2.58 1.52 0.00 94.00 2.58 1.52 0.00 96.00 2.58 1.52 0.00 98.00 2.58 1.52 0.00 100.00 2.58 1.52 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 2.58 1.52 0.00 104.00 2.58 1.52 0.00 106.00 2.58 1.52 0.00 108.00 2.58 1.52 0.00 110.00 2.58 1.52 0.00 112.00 2.58 1.52 0.00 114.00 2.58 1.52 0.00 116.00 2.58 1.52 0.00 118.00 2.58 1.52 0.00 120.00 2.58 1.52 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3: Post-Undetained Runoff = 1.24 cfs @ 12.10 hrs, Volume= 3,857 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 24-hr 1-yr Rainfall=2.58" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ❑ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.06 0.00 0.00 4.00 0.12 0.00 0.00 6.00 0.20 0.00 0.00 8.00 0.31 0.00 0.00 10.00 0.46 0.00 0.00 12.00 1.59 0.11 0.79 14.00 2.11 0.28 0.09 16.00 2.27 0.35 0.06 18.00 2.38 0.40 0.05 20.00 2.46 0.43 0.04 22.00 2.52 0.47 0.03 24.00 2.58 0.49 0.03 26.00 2.58 0.49 0.00 28.00 2.58 0.49 0.00 30.00 2.58 0.49 0.00 32.00 2.58 0.49 0.00 34.00 2.58 0.49 0.00 36.00 2.58 0.49 0.00 38.00 2.58 0.49 0.00 40.00 2.58 0.49 0.00 42.00 2.58 0.49 0.00 44.00 2.58 0.49 0.00 46.00 2.58 0.49 0.00 48.00 2.58 0.49 0.00 50.00 2.58 0.49 0.00 52.00 2.58 0.49 0.00 54.00 2.58 0.49 0.00 56.00 2.58 0.49 0.00 58.00 2.58 0.49 0.00 60.00 2.58 0.49 0.00 62.00 2.58 0.49 0.00 64.00 2.58 0.49 0.00 66.00 2.58 0.49 0.00 68.00 2.58 0.49 0.00 70.00 2.58 0.49 0.00 72.00 2.58 0.49 0.00 74.00 2.58 0.49 0.00 76.00 2.58 0.49 0.00 78.00 2.58 0.49 0.00 80.00 2.58 0.49 0.00 82.00 2.58 0.49 0.00 84.00 2.58 0.49 0.00 86.00 2.58 0.49 0.00 88.00 2.58 0.49 0.00 90.00 2.58 0.49 0.00 92.00 2.58 0.49 0.00 94.00 2.58 0.49 0.00 96.00 2.58 0.49 0.00 98.00 2.58 0.49 0.00 100.00 2.58 0.49 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 2.58 0.49 0.00 104.00 2.58 0.49 0.00 106.00 2.58 0.49 0.00 108.00 2.58 0.49 0.00 110.00 2.58 0.49 0.00 112.00 2.58 0.49 0.00 114.00 2.58 0.49 0.00 116.00 2.58 0.49 0.00 118.00 2.58 0.49 0.00 120.00 2.58 0.49 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 1.52" for 1-yr event Inflow = 5.13 cfs @ 11.99 hrs, Volume= 12,477 cf Outflow = 0.31 cfs @ 13.10 hrs, Volume= 12,099 cf, Atten= 94%, Lag= 66.5 min Primary = 0.31 cfs @ 13.10 hrs, Volume= 12,099 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 668.38' @ 13.10 hrs Surf.Area= 3,608 sf Storage= 7,092 cf Plug -Flow detention time= 686.2 min calculated for 12,097 cf (97% of inflow) Center -of -Mass det. time= 669.2 min ( 1,487.6 - 818.4 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=0.31 cfs @ 13.10 hrs HW=668.38' (Free Discharge) 1=Sand Filter (Custom Controls 0.03 cfs) 2=CP-Bleeder (Orifice Controls 0.27 cfs @ 5.60 fps) 3=Orifice/Grate ( Controls 0.00 cfs) L4=Culvert ( Controls 0.00 cfs) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 9 Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 10 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 0.00 0 666.00 0.00 8.00 0.01 19 666.01 0.00 12.00 5.10 4,278 667.55 0.19 16.00 0.12 5,946 668.05 0.27 20.00 0.07 4,039 667.47 0.18 24.00 0.06 3,016 667.13 0.09 28.00 0.00 2,445 666.94 0.02 32.00 0.00 2,247 666.87 0.01 36.00 0.00 2,079 666.81 0.01 40.00 0.00 1,922 666.75 0.01 44.00 0.00 1,777 666.70 0.01 48.00 0.00 1,641 666.65 0.01 52.00 0.00 1,516 666.60 0.01 56.00 0.00 1,400 666.56 0.01 60.00 0.00 1,292 666.51 0.01 64.00 0.00 1,192 666.48 0.01 68.00 0.00 1,099 666.44 0.01 72.00 0.00 1,014 666.41 0.01 76.00 0.00 935 666.38 0.01 80.00 0.00 861 666.35 0.00 84.00 0.00 794 666.32 0.00 88.00 0.00 731 666.30 0.00 92.00 0.00 674 666.27 0.00 96.00 0.00 620 666.25 0.00 100.00 0.00 571 666.23 0.00 104.00 0.00 526 666.22 0.00 108.00 0.00 484 666.20 0.00 112.00 0.00 446 666.18 0.00 116.00 0.00 410 666.17 0.00 120.00 0.00 377 666.16 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 11 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 12 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 1.00" for 1-yr event Inflow = 1.51 cfs @ 12.10 hrs, Volume= 15,957 cf Primary = 1.51 cfs @ 12.10 hrs, Volume= 15,957 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs ❑ Inflow ❑ Primary N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 24-hr 1-yr Rainfall=2.58" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 14 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 0.00 0.00 0.00 6.00 0.00 0.00 0.00 8.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 12.00 0.99 0.00 0.99 14.00 0.39 0.00 0.39 16.00 0.33 0.00 0.33 18.00 0.27 0.00 0.27 20.00 0.21 0.00 0.21 22.00 0.16 0.00 0.16 24.00 0.12 0.00 0.12 26.00 0.03 0.00 0.03 28.00 0.02 0.00 0.02 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 62.00 0.01 0.00 0.01 64.00 0.01 0.00 0.01 66.00 0.01 0.00 0.01 68.00 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.00 0.01 0.00 0.01 74.00 0.01 0.00 0.01 76.00 0.01 0.00 0.01 78.00 0.01 0.00 0.01 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 27 Post-D ined Post-Undetained Sand Filter Post Total S4 Reach on Link Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (sq-ft) (s u bcatch me nt- n u m be rs) 86,859 88 Post -Development Detained Areas (2) 93,698 70 Post -Development Undetained Areas (3) 11,326 98 Roofs, HSG B (2) 191,882 80 TOTAL AREA Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 3 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=2.56" Tc=5.0 min CN=89 Runoff=11.45 cfs 20,956 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=1.15" Tc=10.0 min CN=70 Runoff=4.12 cfs 8,952 cf Pond 2A: Sand Filter Peak Elev=670.30' Storage=15,096 cf Inflow=11.45 cfs 20,956 cf Outflow=1.22 cfs 20,632 cf Link 4: Post Total Inflow=4.51 cfs 29,584 cf Primary=4.51 cfs 29,584 cf Total Runoff Area = 191,882 sf Runoff Volume = 29,908 cf Average Runoff Depth = 1.87" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: Post -Detained Runoff = 11.45 cfs @ 3.15 hrs, Volume= 20,956 cf, Depth= 2.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs. HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained Subcatchment 2: Post -Detained Hydrograph N U 3 0 LL ■ Runoff Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 5 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.39 0.02 0.12 4.00 3.29 2.16 1.00 6.00 3.72 2.56 0.28 8.00 3.72 2.56 0.00 10.00 3.72 2.56 0.00 12.00 3.72 2.56 0.00 14.00 3.72 2.56 0.00 16.00 3.72 2.56 0.00 18.00 3.72 2.56 0.00 20.00 3.72 2.56 0.00 22.00 3.72 2.56 0.00 24.00 3.72 2.56 0.00 26.00 3.72 2.56 0.00 28.00 3.72 2.56 0.00 30.00 3.72 2.56 0.00 32.00 3.72 2.56 0.00 34.00 3.72 2.56 0.00 36.00 3.72 2.56 0.00 38.00 3.72 2.56 0.00 40.00 3.72 2.56 0.00 42.00 3.72 2.56 0.00 44.00 3.72 2.56 0.00 46.00 3.72 2.56 0.00 48.00 3.72 2.56 0.00 50.00 3.72 2.56 0.00 52.00 3.72 2.56 0.00 54.00 3.72 2.56 0.00 56.00 3.72 2.56 0.00 58.00 3.72 2.56 0.00 60.00 3.72 2.56 0.00 62.00 3.72 2.56 0.00 64.00 3.72 2.56 0.00 66.00 3.72 2.56 0.00 68.00 3.72 2.56 0.00 70.00 3.72 2.56 0.00 72.00 3.72 2.56 0.00 74.00 3.72 2.56 0.00 76.00 3.72 2.56 0.00 78.00 3.72 2.56 0.00 80.00 3.72 2.56 0.00 82.00 3.72 2.56 0.00 84.00 3.72 2.56 0.00 86.00 3.72 2.56 0.00 88.00 3.72 2.56 0.00 90.00 3.72 2.56 0.00 92.00 3.72 2.56 0.00 94.00 3.72 2.56 0.00 96.00 3.72 2.56 0.00 98.00 3.72 2.56 0.00 100.00 3.72 2.56 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 3.72 2.56 0.00 104.00 3.72 2.56 0.00 106.00 3.72 2.56 0.00 108.00 3.72 2.56 0.00 110.00 3.72 2.56 0.00 112.00 3.72 2.56 0.00 114.00 3.72 2.56 0.00 116.00 3.72 2.56 0.00 118.00 3.72 2.56 0.00 120.00 3.72 2.56 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 3: Post-Undetained Runoff = 4.12 cfs @ 3.24 hrs, Volume= 8,952 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ■ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.39 0.00 0.00 4.00 3.29 0.88 0.65 6.00 3.72 1.15 0.19 8.00 3.72 1.15 0.00 10.00 3.72 1.15 0.00 12.00 3.72 1.15 0.00 14.00 3.72 1.15 0.00 16.00 3.72 1.15 0.00 18.00 3.72 1.15 0.00 20.00 3.72 1.15 0.00 22.00 3.72 1.15 0.00 24.00 3.72 1.15 0.00 26.00 3.72 1.15 0.00 28.00 3.72 1.15 0.00 30.00 3.72 1.15 0.00 32.00 3.72 1.15 0.00 34.00 3.72 1.15 0.00 36.00 3.72 1.15 0.00 38.00 3.72 1.15 0.00 40.00 3.72 1.15 0.00 42.00 3.72 1.15 0.00 44.00 3.72 1.15 0.00 46.00 3.72 1.15 0.00 48.00 3.72 1.15 0.00 50.00 3.72 1.15 0.00 52.00 3.72 1.15 0.00 54.00 3.72 1.15 0.00 56.00 3.72 1.15 0.00 58.00 3.72 1.15 0.00 60.00 3.72 1.15 0.00 62.00 3.72 1.15 0.00 64.00 3.72 1.15 0.00 66.00 3.72 1.15 0.00 68.00 3.72 1.15 0.00 70.00 3.72 1.15 0.00 72.00 3.72 1.15 0.00 74.00 3.72 1.15 0.00 76.00 3.72 1.15 0.00 78.00 3.72 1.15 0.00 80.00 3.72 1.15 0.00 82.00 3.72 1.15 0.00 84.00 3.72 1.15 0.00 86.00 3.72 1.15 0.00 88.00 3.72 1.15 0.00 90.00 3.72 1.15 0.00 92.00 3.72 1.15 0.00 94.00 3.72 1.15 0.00 96.00 3.72 1.15 0.00 98.00 3.72 1.15 0.00 100.00 3.72 1.15 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 3.72 1.15 0.00 104.00 3.72 1.15 0.00 106.00 3.72 1.15 0.00 108.00 3.72 1.15 0.00 110.00 3.72 1.15 0.00 112.00 3.72 1.15 0.00 114.00 3.72 1.15 0.00 116.00 3.72 1.15 0.00 118.00 3.72 1.15 0.00 120.00 3.72 1.15 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 8 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 2.56" for 10-yr event Inflow = 11.45 cfs @ 3.15 hrs, Volume= 20,956 cf Outflow = 1.22 cfs @ 3.79 hrs, Volume= 20,632 cf, Atten= 89%, Lag= 38.3 min Primary = 1.22 cfs @ 3.79 hrs, Volume= 20,632 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 670.30' @ 3.79 hrs Surf.Area= 4,769 sf Storage= 15,096 cf Plug -Flow detention time= 589.9 min calculated for 20,632 cf (98% of inflow) Center -of -Mass det. time= 587.6 min ( 795.0 - 207.4 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=1.11 cfs @ 3.79 hrs HW=670.30' (Free Discharge) 1=Sand Filter (Custom Controls 0.05 cfs) 2=CP-Bleeder (Orifice Controls 0.43 cfs @ 8.72 fps) 3=Orifice/Grate (Weir Controls 0.64 cfs @ 0.75 fps) L4=Culvert (Passes 0.64 cfs of 3.48 cfs potential flow) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 9 FL-1 n —fI o—w ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 10 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 1.00 15,057 670.29 1.06 8.00 0.00 11,301 669.45 0.41 12.00 0.00 6,304 668.16 0.28 16.00 0.00 3,335 667.24 0.13 20.00 0.00 2,500 666.96 0.02 24.00 0.00 2,281 666.88 0.01 28.00 0.00 2,110 666.82 0.01 32.00 0.00 1,951 666.76 0.01 36.00 0.00 1,803 666.71 0.01 40.00 0.00 1,666 666.66 0.01 44.00 0.00 1,539 666.61 0.01 48.00 0.00 1,421 666.56 0.01 52.00 0.00 1,312 666.52 0.01 56.00 0.00 1,210 666.48 0.01 60.00 0.00 1,116 666.45 0.01 64.00 0.00 1,029 666.41 0.01 68.00 0.00 949 666.38 0.01 72.00 0.00 875 666.35 0.00 76.00 0.00 806 666.33 0.00 80.00 0.00 743 666.30 0.00 84.00 0.00 684 666.28 0.00 88.00 0.00 630 666.26 0.00 92.00 0.00 580 666.24 0.00 96.00 0.00 534 666.22 0.00 100.00 0.00 492 666.20 0.00 104.00 0.00 453 666.19 0.00 108.00 0.00 417 666.17 0.00 112.00 0.00 383 666.16 0.00 116.00 0.00 353 666.15 0.00 120.00 0.00 325 666.13 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 11 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 12 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 13 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 1.85" for 10-yr event Inflow = 4.51 cfs @ 3.24 hrs, Volume= 29,584 cf Primary = 4.51 cfs @ 3.24 hrs, Volume= 29,584 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs ❑ Inflow ❑ Primary N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 14 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 1.71 0.00 1.71 6.00 0.66 0.00 0.66 8.00 0.41 0.00 0.41 10.00 0.35 0.00 0.35 12.00 0.28 0.00 0.28 14.00 0.21 0.00 0.21 16.00 0.13 0.00 0.13 18.00 0.05 0.00 0.05 20.00 0.02 0.00 0.02 22.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 62.00 0.01 0.00 0.01 64.00 0.01 0.00 0.01 66.00 0.01 0.00 0.01 68.00 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 15 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=3.18" Tc=5.0 min CN=89 Runoff=13.82 cfs 26,030 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=1.59" Tc=10.0 min CN=70 Runoff=5.73 cfs 12,410 cf Pond 2A: Sand Filter Peak Elev=670.42' Storage=15,662 cf Inflow=13.82 cfs 26,030 cf Outflow=4.18 cfs 25,704 cf Link 4: Post Total Inflow=8.08 cfs 38,114 cf Primary=8.08 cfs 38,114 cf Total Runoff Area = 191,882 sf Runoff Volume = 38,440 cf Average Runoff Depth = 2.40" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 2: Post -Detained Runoff = 13.82 cfs @ 3.15 hrs, Volume= 26,030 cf, Depth= 3.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 25-yr Rainfall=4.38" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs, HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained N U 3 0 LL Subcatchment 2: Post -Detained Hydrograph Time (hours) ■ Runoff Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 17 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.48 0.04 0.22 4.00 3.87 2.70 1.22 6.00 4.38 3.18 0.37 8.00 4.38 3.18 0.00 10.00 4.38 3.18 0.00 12.00 4.38 3.18 0.00 14.00 4.38 3.18 0.00 16.00 4.38 3.18 0.00 18.00 4.38 3.18 0.00 20.00 4.38 3.18 0.00 22.00 4.38 3.18 0.00 24.00 4.38 3.18 0.00 26.00 4.38 3.18 0.00 28.00 4.38 3.18 0.00 30.00 4.38 3.18 0.00 32.00 4.38 3.18 0.00 34.00 4.38 3.18 0.00 36.00 4.38 3.18 0.00 38.00 4.38 3.18 0.00 40.00 4.38 3.18 0.00 42.00 4.38 3.18 0.00 44.00 4.38 3.18 0.00 46.00 4.38 3.18 0.00 48.00 4.38 3.18 0.00 50.00 4.38 3.18 0.00 52.00 4.38 3.18 0.00 54.00 4.38 3.18 0.00 56.00 4.38 3.18 0.00 58.00 4.38 3.18 0.00 60.00 4.38 3.18 0.00 62.00 4.38 3.18 0.00 64.00 4.38 3.18 0.00 66.00 4.38 3.18 0.00 68.00 4.38 3.18 0.00 70.00 4.38 3.18 0.00 72.00 4.38 3.18 0.00 74.00 4.38 3.18 0.00 76.00 4.38 3.18 0.00 78.00 4.38 3.18 0.00 80.00 4.38 3.18 0.00 82.00 4.38 3.18 0.00 84.00 4.38 3.18 0.00 86.00 4.38 3.18 0.00 88.00 4.38 3.18 0.00 90.00 4.38 3.18 0.00 92.00 4.38 3.18 0.00 94.00 4.38 3.18 0.00 96.00 4.38 3.18 0.00 98.00 4.38 3.18 0.00 100.00 4.38 3.18 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 4.38 3.18 0.00 104.00 4.38 3.18 0.00 106.00 4.38 3.18 0.00 108.00 4.38 3.18 0.00 110.00 4.38 3.18 0.00 112.00 4.38 3.18 0.00 114.00 4.38 3.18 0.00 116.00 4.38 3.18 0.00 118.00 4.38 3.18 0.00 120.00 4.38 3.18 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 3: Post-Undetained Runoff = 5.73 cfs @ 3.23 hrs, Volume= 12,410 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 25-yr Rainfall=4.38" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ■ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 19 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.48 0.00 0.00 4.00 3.87 1.24 0.86 6.00 4.38 1.59 0.27 8.00 4.38 1.59 0.00 10.00 4.38 1.59 0.00 12.00 4.38 1.59 0.00 14.00 4.38 1.59 0.00 16.00 4.38 1.59 0.00 18.00 4.38 1.59 0.00 20.00 4.38 1.59 0.00 22.00 4.38 1.59 0.00 24.00 4.38 1.59 0.00 26.00 4.38 1.59 0.00 28.00 4.38 1.59 0.00 30.00 4.38 1.59 0.00 32.00 4.38 1.59 0.00 34.00 4.38 1.59 0.00 36.00 4.38 1.59 0.00 38.00 4.38 1.59 0.00 40.00 4.38 1.59 0.00 42.00 4.38 1.59 0.00 44.00 4.38 1.59 0.00 46.00 4.38 1.59 0.00 48.00 4.38 1.59 0.00 50.00 4.38 1.59 0.00 52.00 4.38 1.59 0.00 54.00 4.38 1.59 0.00 56.00 4.38 1.59 0.00 58.00 4.38 1.59 0.00 60.00 4.38 1.59 0.00 62.00 4.38 1.59 0.00 64.00 4.38 1.59 0.00 66.00 4.38 1.59 0.00 68.00 4.38 1.59 0.00 70.00 4.38 1.59 0.00 72.00 4.38 1.59 0.00 74.00 4.38 1.59 0.00 76.00 4.38 1.59 0.00 78.00 4.38 1.59 0.00 80.00 4.38 1.59 0.00 82.00 4.38 1.59 0.00 84.00 4.38 1.59 0.00 86.00 4.38 1.59 0.00 88.00 4.38 1.59 0.00 90.00 4.38 1.59 0.00 92.00 4.38 1.59 0.00 94.00 4.38 1.59 0.00 96.00 4.38 1.59 0.00 98.00 4.38 1.59 0.00 100.00 4.38 1.59 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 4.38 1.59 0.00 104.00 4.38 1.59 0.00 106.00 4.38 1.59 0.00 108.00 4.38 1.59 0.00 110.00 4.38 1.59 0.00 112.00 4.38 1.59 0.00 114.00 4.38 1.59 0.00 116.00 4.38 1.59 0.00 118.00 4.38 1.59 0.00 120.00 4.38 1.59 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 20 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 3.18" for 25-yr event Inflow = 13.82 cfs @ 3.15 hrs, Volume= 26,030 cf Outflow = 4.18 cfs @ 3.38 hrs, Volume= 25,704 cf, Atten= 70%, Lag= 13.7 min Primary = 4.18 cfs @ 3.38 hrs, Volume= 25,704 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 670.42' @ 3.38 hrs Surf.Area= 4,861 sf Storage= 15,662 cf Plug -Flow detention time= 485.0 min calculated for 25,704 cf (99% of inflow) Center -of -Mass det. time= 483.1 min (689.3 - 206.2 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=4.15 cfs @ 3.38 hrs HW=670.42' (Free Discharge) 1=Sand Filter (Custom Controls 0.05 cfs) 2=CP-Bleeder (Orifice Controls 0.44 cfs @ 8.87 fps) 3=Orifice/Grate (Weir Controls 3.67 cfs @ 1.35 fps) L4=Culvert (Passes 3.67 cfs of 6.24 cfs potential flow) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 21 I A Pond 2A: Sand Filter Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) L Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 22 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 1.22 15,116 670.31 1.30 8.00 0.00 11,614 669.53 0.42 12.00 0.00 6,520 668.22 0.29 16.00 0.00 3,435 667.27 0.14 20.00 0.00 2,517 666.96 0.02 24.00 0.00 2,290 666.88 0.01 28.00 0.00 2,118 666.82 0.01 32.00 0.00 1,959 666.76 0.01 36.00 0.00 1,811 666.71 0.01 40.00 0.00 1,673 666.66 0.01 44.00 0.00 1,546 666.61 0.01 48.00 0.00 1,427 666.57 0.01 52.00 0.00 1,317 666.52 0.01 56.00 0.00 1,215 666.49 0.01 60.00 0.00 1,121 666.45 0.01 64.00 0.00 1,034 666.42 0.01 68.00 0.00 953 666.38 0.01 72.00 0.00 879 666.36 0.00 76.00 0.00 810 666.33 0.00 80.00 0.00 746 666.30 0.00 84.00 0.00 687 666.28 0.00 88.00 0.00 633 666.26 0.00 92.00 0.00 583 666.24 0.00 96.00 0.00 537 666.22 0.00 100.00 0.00 494 666.20 0.00 104.00 0.00 455 666.19 0.00 108.00 0.00 419 666.17 0.00 112.00 0.00 385 666.16 0.00 116.00 0.00 354 666.15 0.00 120.00 0.00 326 666.13 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 23 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 24 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 25 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 2.38" for 25-yr event Inflow = 8.08 cfs @ 3.35 hrs, Volume= 38,114 cf Primary = 8.08 cfs @ 3.35 hrs, Volume= 38,114 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs ❑ Inflow ❑ Primary N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 25-yr Rainfall=4.38" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 26 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 2.16 0.00 2.16 6.00 0.73 0.00 0.73 8.00 0.42 0.00 0.42 10.00 0.35 0.00 0.35 12.00 0.29 0.00 0.29 14.00 0.22 0.00 0.22 16.00 0.14 0.00 0.14 18.00 0.05 0.00 0.05 20.00 0.02 0.00 0.02 22.00 0.01 0.00 0.01 24.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 62.00 0.01 0.00 0.01 64.00 0.01 0.00 0.01 66.00 0.01 0.00 0.01 68.00 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 27 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=3.70" Tc=5.0 min CN=89 Runoff=15.64 cfs 30,236 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=1.98" Tc=10.0 min CN=70 Runoff=7.06 cfs 15,438 cf Pond 2A: Sand Filter Peak Elev=670.52' Storage=16,131 cf Inflow=15.64 cfs 30,236 cf Outflow=7.48 cfs 29,909 cf Link 4: Post Total Inflow=13.87 cfs 45,347 cf Primary=13.87 cfs 45,347 cf Total Runoff Area = 191,882 sf Runoff Volume = 45,674 cf Average Runoff Depth = 2.86" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 2: Post -Detained Runoff = 15.64 cfs @ 3.15 hrs, Volume= 30,236 cf, Depth= 3.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 50-yr Rainfall=4.92" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs, HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained 6 1 U 3 0 LL Subcatchment 2: Post -Detained Hydrograph Time (hours) ■ Runoff Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 29 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.55 0.06 0.33 4.00 4.32 3.13 1.41 6.00 4.92 3.70 0.42 8.00 4.92 3.70 0.00 10.00 4.92 3.70 0.00 12.00 4.92 3.70 0.00 14.00 4.92 3.70 0.00 16.00 4.92 3.70 0.00 18.00 4.92 3.70 0.00 20.00 4.92 3.70 0.00 22.00 4.92 3.70 0.00 24.00 4.92 3.70 0.00 26.00 4.92 3.70 0.00 28.00 4.92 3.70 0.00 30.00 4.92 3.70 0.00 32.00 4.92 3.70 0.00 34.00 4.92 3.70 0.00 36.00 4.92 3.70 0.00 38.00 4.92 3.70 0.00 40.00 4.92 3.70 0.00 42.00 4.92 3.70 0.00 44.00 4.92 3.70 0.00 46.00 4.92 3.70 0.00 48.00 4.92 3.70 0.00 50.00 4.92 3.70 0.00 52.00 4.92 3.70 0.00 54.00 4.92 3.70 0.00 56.00 4.92 3.70 0.00 58.00 4.92 3.70 0.00 60.00 4.92 3.70 0.00 62.00 4.92 3.70 0.00 64.00 4.92 3.70 0.00 66.00 4.92 3.70 0.00 68.00 4.92 3.70 0.00 70.00 4.92 3.70 0.00 72.00 4.92 3.70 0.00 74.00 4.92 3.70 0.00 76.00 4.92 3.70 0.00 78.00 4.92 3.70 0.00 80.00 4.92 3.70 0.00 82.00 4.92 3.70 0.00 84.00 4.92 3.70 0.00 86.00 4.92 3.70 0.00 88.00 4.92 3.70 0.00 90.00 4.92 3.70 0.00 92.00 4.92 3.70 0.00 94.00 4.92 3.70 0.00 96.00 4.92 3.70 0.00 98.00 4.92 3.70 0.00 100.00 4.92 3.70 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 4.92 3.70 0.00 104.00 4.92 3.70 0.00 106.00 4.92 3.70 0.00 108.00 4.92 3.70 0.00 110.00 4.92 3.70 0.00 112.00 4.92 3.70 0.00 114.00 4.92 3.70 0.00 116.00 4.92 3.70 0.00 118.00 4.92 3.70 0.00 120.00 4.92 3.70 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 3: Post-Undetained Runoff = 7.06 cfs @ 3.23 hrs, Volume= 15,438 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 50-yr Rainfall=4.92" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ■ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 31 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.55 0.00 0.00 4.00 4.32 1.55 1.05 6.00 4.92 1.98 0.32 8.00 4.92 1.98 0.00 10.00 4.92 1.98 0.00 12.00 4.92 1.98 0.00 14.00 4.92 1.98 0.00 16.00 4.92 1.98 0.00 18.00 4.92 1.98 0.00 20.00 4.92 1.98 0.00 22.00 4.92 1.98 0.00 24.00 4.92 1.98 0.00 26.00 4.92 1.98 0.00 28.00 4.92 1.98 0.00 30.00 4.92 1.98 0.00 32.00 4.92 1.98 0.00 34.00 4.92 1.98 0.00 36.00 4.92 1.98 0.00 38.00 4.92 1.98 0.00 40.00 4.92 1.98 0.00 42.00 4.92 1.98 0.00 44.00 4.92 1.98 0.00 46.00 4.92 1.98 0.00 48.00 4.92 1.98 0.00 50.00 4.92 1.98 0.00 52.00 4.92 1.98 0.00 54.00 4.92 1.98 0.00 56.00 4.92 1.98 0.00 58.00 4.92 1.98 0.00 60.00 4.92 1.98 0.00 62.00 4.92 1.98 0.00 64.00 4.92 1.98 0.00 66.00 4.92 1.98 0.00 68.00 4.92 1.98 0.00 70.00 4.92 1.98 0.00 72.00 4.92 1.98 0.00 74.00 4.92 1.98 0.00 76.00 4.92 1.98 0.00 78.00 4.92 1.98 0.00 80.00 4.92 1.98 0.00 82.00 4.92 1.98 0.00 84.00 4.92 1.98 0.00 86.00 4.92 1.98 0.00 88.00 4.92 1.98 0.00 90.00 4.92 1.98 0.00 92.00 4.92 1.98 0.00 94.00 4.92 1.98 0.00 96.00 4.92 1.98 0.00 98.00 4.92 1.98 0.00 100.00 4.92 1.98 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 4.92 1.98 0.00 104.00 4.92 1.98 0.00 106.00 4.92 1.98 0.00 108.00 4.92 1.98 0.00 110.00 4.92 1.98 0.00 112.00 4.92 1.98 0.00 114.00 4.92 1.98 0.00 116.00 4.92 1.98 0.00 118.00 4.92 1.98 0.00 120.00 4.92 1.98 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 32 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 3.70" for 50-yr event Inflow = 15.64 cfs @ 3.15 hrs, Volume= 30,236 cf Outflow = 7.48 cfs @ 3.29 hrs, Volume= 29,909 cf, Atten= 52%, Lag= 8.5 min Primary = 7.48 cfs @ 3.29 hrs, Volume= 29,909 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 670.52' @ 3.29 hrs Surf.Area= 4,937 sf Storage= 16,131 cf Plug -Flow detention time= 420.4 min calculated for 29,904 cf (99% of inflow) Center -of -Mass det. time= 419.8 min (625.2 - 205.4 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=7.59 cfs @ 3.29 hrs HW=670.51' (Free Discharge) 1=Sand Filter (Custom Controls 0.05 cfs) 2=CP-Bleeder (Orifice Controls 0.44 cfs @ 8.99 fps) 3=Orifice/Grate (Weir Controls 7.10 cfs @ 1.68 fps) L4=Culvert (Passes 7.10 cfs of 7.77 cfs potential flow) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 33 Pond 2A: Sand Filter Hydrograph FL-1 n —fI o—w ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 34 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 1.41 15,166 670.32 1.50 8.00 0.00 11,734 669.56 0.42 12.00 0.00 6,603 668.24 0.29 16.00 0.00 3,474 667.29 0.14 20.00 0.00 2,524 666.96 0.02 24.00 0.00 2,293 666.88 0.01 28.00 0.00 2,122 666.82 0.01 32.00 0.00 1,962 666.76 0.01 36.00 0.00 1,814 666.71 0.01 40.00 0.00 1,676 666.66 0.01 44.00 0.00 1,548 666.61 0.01 48.00 0.00 1,429 666.57 0.01 52.00 0.00 1,319 666.53 0.01 56.00 0.00 1,217 666.49 0.01 60.00 0.00 1,123 666.45 0.01 64.00 0.00 1,036 666.42 0.01 68.00 0.00 955 666.39 0.01 72.00 0.00 880 666.36 0.00 76.00 0.00 811 666.33 0.00 80.00 0.00 747 666.30 0.00 84.00 0.00 688 666.28 0.00 88.00 0.00 634 666.26 0.00 92.00 0.00 584 666.24 0.00 96.00 0.00 538 666.22 0.00 100.00 0.00 495 666.20 0.00 104.00 0.00 455 666.19 0.00 108.00 0.00 419 666.17 0.00 112.00 0.00 386 666.16 0.00 116.00 0.00 355 666.15 0.00 120.00 0.00 327 666.14 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 35 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 36 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 37 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 2.84" for 50-yr event Inflow = 13.87 cfs @ 3.27 hrs, Volume= 45,347 cf Primary = 13.87 cfs @ 3.27 hrs, Volume= 45,347 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs 1 1 1 1 1 1 N U 3 0 LL Link 4: Post Total Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ❑ Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-19 Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 38 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 2.55 0.00 2.55 6.00 0.79 0.00 0.79 8.00 0.42 0.00 0.42 10.00 0.36 0.00 0.36 12.00 0.29 0.00 0.29 14.00 0.22 0.00 0.22 16.00 0.14 0.00 0.14 18.00 0.06 0.00 0.06 20.00 0.02 0.00 0.02 22.00 0.02 0.00 0.02 24.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 62.00 0.01 0.00 0.01 64.00 0.01 0.00 0.01 66.00 0.01 0.00 0.01 68.00 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 39 Time span=0.00-120.00 hrs, dt=0.02 hrs, 6001 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 2: Post -Detained Runoff Area=2.254 ac Runoff Depth=4.10" Tc=5.0 min CN=89 Runoff=17.52 cfs 33,532 cf Subcatchment 3: Post-Undetained Runoff Area=2.151 ac Runoff Depth=2.29" Tc=10.0 min CN=70 Runoff=8.33 cfs 17,895 cf Pond 2A: Sand Filter Peak Elev=670.62' Storage=16,655 cf Inflow=17.52 cfs 33,532 cf Outflow=9.70 cfs 33,205 cf Link 4: Post Total Inflow=17.83 cfs 51,100 cf Primary=17.83 cfs 51,100 cf Total Runoff Area = 191,882 sf Runoff Volume = 51,427 cf Average Runoff Depth = 3.22" Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 2: Post -Detained Runoff = 17.52 cfs @ 3.15 hrs, Volume= 33,532 cf, Depth= 4.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 100-yr Rainfall=5.34" Area (ac) CN Description 1.624 88 Post -Development Detained Areas 0.370 88 Post -Development Detained Areas 0.260 98 Roofs, HSG B 2.254 89 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Post -Detained Subcatchment 2: Post -Detained Hydrograph ■ Runoff Time (hours) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 41 Hydrograph for Subcatchment 2: Post -Detained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.59 0.07 0.38 4.00 4.70 3.49 1.51 6.00 5.34 4.10 0.47 8.00 5.34 4.10 0.00 10.00 5.34 4.10 0.00 12.00 5.34 4.10 0.00 14.00 5.34 4.10 0.00 16.00 5.34 4.10 0.00 18.00 5.34 4.10 0.00 20.00 5.34 4.10 0.00 22.00 5.34 4.10 0.00 24.00 5.34 4.10 0.00 26.00 5.34 4.10 0.00 28.00 5.34 4.10 0.00 30.00 5.34 4.10 0.00 32.00 5.34 4.10 0.00 34.00 5.34 4.10 0.00 36.00 5.34 4.10 0.00 38.00 5.34 4.10 0.00 40.00 5.34 4.10 0.00 42.00 5.34 4.10 0.00 44.00 5.34 4.10 0.00 46.00 5.34 4.10 0.00 48.00 5.34 4.10 0.00 50.00 5.34 4.10 0.00 52.00 5.34 4.10 0.00 54.00 5.34 4.10 0.00 56.00 5.34 4.10 0.00 58.00 5.34 4.10 0.00 60.00 5.34 4.10 0.00 62.00 5.34 4.10 0.00 64.00 5.34 4.10 0.00 66.00 5.34 4.10 0.00 68.00 5.34 4.10 0.00 70.00 5.34 4.10 0.00 72.00 5.34 4.10 0.00 74.00 5.34 4.10 0.00 76.00 5.34 4.10 0.00 78.00 5.34 4.10 0.00 80.00 5.34 4.10 0.00 82.00 5.34 4.10 0.00 84.00 5.34 4.10 0.00 86.00 5.34 4.10 0.00 88.00 5.34 4.10 0.00 90.00 5.34 4.10 0.00 92.00 5.34 4.10 0.00 94.00 5.34 4.10 0.00 96.00 5.34 4.10 0.00 98.00 5.34 4.10 0.00 100.00 5.34 4.10 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 5.34 4.10 0.00 104.00 5.34 4.10 0.00 106.00 5.34 4.10 0.00 108.00 5.34 4.10 0.00 110.00 5.34 4.10 0.00 112.00 5.34 4.10 0.00 114.00 5.34 4.10 0.00 116.00 5.34 4.10 0.00 118.00 5.34 4.10 0.00 120.00 5.34 4.10 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 3: Post-Undetained Runoff = 8.33 cfs @ 3.23 hrs, Volume= 17,895 cf, Depth= 2.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Charlotte 6-hr 100-yr Rainfall=5.34" Area (ac) CN Description 2.151 70 Post -Development Undetained Areas Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Post-Undetained ■ Runoff N U 3 0 LL Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 43 Hydrograph for Subcatchment 3: Post-Undetained Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.59 0.00 0.00 4.00 4.70 1.82 1.16 6.00 5.34 2.29 0.36 8.00 5.34 2.29 0.00 10.00 5.34 2.29 0.00 12.00 5.34 2.29 0.00 14.00 5.34 2.29 0.00 16.00 5.34 2.29 0.00 18.00 5.34 2.29 0.00 20.00 5.34 2.29 0.00 22.00 5.34 2.29 0.00 24.00 5.34 2.29 0.00 26.00 5.34 2.29 0.00 28.00 5.34 2.29 0.00 30.00 5.34 2.29 0.00 32.00 5.34 2.29 0.00 34.00 5.34 2.29 0.00 36.00 5.34 2.29 0.00 38.00 5.34 2.29 0.00 40.00 5.34 2.29 0.00 42.00 5.34 2.29 0.00 44.00 5.34 2.29 0.00 46.00 5.34 2.29 0.00 48.00 5.34 2.29 0.00 50.00 5.34 2.29 0.00 52.00 5.34 2.29 0.00 54.00 5.34 2.29 0.00 56.00 5.34 2.29 0.00 58.00 5.34 2.29 0.00 60.00 5.34 2.29 0.00 62.00 5.34 2.29 0.00 64.00 5.34 2.29 0.00 66.00 5.34 2.29 0.00 68.00 5.34 2.29 0.00 70.00 5.34 2.29 0.00 72.00 5.34 2.29 0.00 74.00 5.34 2.29 0.00 76.00 5.34 2.29 0.00 78.00 5.34 2.29 0.00 80.00 5.34 2.29 0.00 82.00 5.34 2.29 0.00 84.00 5.34 2.29 0.00 86.00 5.34 2.29 0.00 88.00 5.34 2.29 0.00 90.00 5.34 2.29 0.00 92.00 5.34 2.29 0.00 94.00 5.34 2.29 0.00 96.00 5.34 2.29 0.00 98.00 5.34 2.29 0.00 100.00 5.34 2.29 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 102.00 5.34 2.29 0.00 104.00 5.34 2.29 0.00 106.00 5.34 2.29 0.00 108.00 5.34 2.29 0.00 110.00 5.34 2.29 0.00 112.00 5.34 2.29 0.00 114.00 5.34 2.29 0.00 116.00 5.34 2.29 0.00 118.00 5.34 2.29 0.00 120.00 5.34 2.29 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 44 Summary for Pond 2A: Sand Filter Inflow Area = 98,184 sf, Inflow Depth = 4.10" for 100-yr event Inflow = 17.52 cfs @ 3.15 hrs, Volume= 33,532 cf Outflow = 9.70 cfs @ 3.26 hrs, Volume= 33,205 cf, Atten= 45%, Lag= 6.9 min Primary = 9.70 cfs @ 3.26 hrs, Volume= 33,205 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs Peak Elev= 670.62' @ 3.26 hrs Surf.Area= 5,021 sf Storage= 16,655 cf Plug -Flow detention time= 381.6 min calculated for 33,205 cf (99% of inflow) Center -of -Mass det. time= 380.1 min ( 584.7 - 204.6 ) Volume Invert Avail.Storage Storage Description #1 666.00' 34,734 cf Sand Filter (Conic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (cubic -feet) (cubic -feet) (sq-ft) 666.00 2,385 0 0 2,385 667.00 2,881 2,629 2,629 2,913 668.00 3,404 3,139 5,768 3,473 669.00 3,956 3,677 9,445 4,065 670.00 4,536 4,243 13,687 4,689 671.00 5,328 4,927 18,614 5,519 672.00 6,203 5,760 24,374 6,435 673.00 7,142 6,667 31,041 7,417 673.50 7,635 3,694 34,734 7,933 Device Routing Invert Outlet Devices #1 Primary 666.00' Sand Filter Elev. (feet) 666.00 667.00 668.00 669.00 670.00 671.00 672.00 673.00 Disch. (cfs) 0.000 0.014 0.029 0.037 0.045 0.053 0.061 0.069 #2 Primary 666.90' 3.0" Vert. CP-Bleeder C= 0.600 #3 Primary 670.25' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 3 662.47' 24.0" Round Culvert L= 93.8' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 662.47' / 662.00' S= 0.0050 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf Primary OutFlow Max=9.70 cfs @ 3.26 hrs HW=670.62' (Free Discharge) 1=Sand Filter (Custom Controls 0.05 cfs) 2=CP-Bleeder (Orifice Controls 0.45 cfs @ 9.13 fps) 3=Orifice/Grate (Passes 9.21 cfs of 11.79 cfs potential flow) L4=Culvert (Inlet Controls 9.21 cfs @ 2.93 fps) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 45 Pond 2A: Sand Filter Hydrograph FL-1 n —fI o—w ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 46 Hydrograph for Pond 2A: Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 666.00 0.00 4.00 1.51 15,193 670.32 1.61 8.00 0.00 11,769 669.56 0.42 12.00 0.00 6,628 668.25 0.29 16.00 0.00 3,486 667.29 0.14 20.00 0.00 2,526 666.96 0.02 24.00 0.00 2,294 666.88 0.01 28.00 0.00 2,123 666.82 0.01 32.00 0.00 1,963 666.76 0.01 36.00 0.00 1,815 666.71 0.01 40.00 0.00 1,677 666.66 0.01 44.00 0.00 1,549 666.61 0.01 48.00 0.00 1,430 666.57 0.01 52.00 0.00 1,320 666.53 0.01 56.00 0.00 1,218 666.49 0.01 60.00 0.00 1,123 666.45 0.01 64.00 0.00 1,036 666.42 0.01 68.00 0.00 955 666.39 0.01 72.00 0.00 880 666.36 0.00 76.00 0.00 811 666.33 0.00 80.00 0.00 748 666.30 0.00 84.00 0.00 689 666.28 0.00 88.00 0.00 634 666.26 0.00 92.00 0.00 584 666.24 0.00 96.00 0.00 538 666.22 0.00 100.00 0.00 495 666.20 0.00 104.00 0.00 456 666.19 0.00 108.00 0.00 419 666.17 0.00 112.00 0.00 386 666.16 0.00 116.00 0.00 355 666.15 0.00 120.00 0.00 327 666.14 0.00 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 47 Elevation Primary (feet) (cfs) 666.00 0.00 666.04 0.00 666.08 0.00 666.12 0.00 666.16 0.00 666.20 0.00 666.24 0.00 666.28 0.00 666.32 0.00 666.36 0.01 666.40 0.01 666.44 0.01 666.48 0.01 666.52 0.01 666.56 0.01 666.60 0.01 666.64 0.01 666.68 0.01 666.72 0.01 666.76 0.01 666.80 0.01 666.84 0.01 666.88 0.01 666.92 0.01 666.96 0.02 667.00 0.03 667.04 0.05 667.08 0.07 667.12 0.09 667.16 0.10 667.20 0.12 667.24 0.13 667.28 0.14 667.32 0.15 667.36 0.16 667.40 0.16 667.44 0.17 667.48 0.18 667.52 0.19 667.56 0.20 667.60 0.20 667.64 0.21 667.68 0.22 667.72 0.22 667.76 0.23 667.80 0.23 667.84 0.24 667.88 0.25 667.92 0.25 667.96 0.26 668.00 0.26 Stage -Discharge for Pond 2A: Sand Filter Elevation Primary (feet) (cfs) 668.04 0.27 668.08 0.27 668.12 0.28 668.16 0.28 668.20 0.29 668.24 0.29 668.28 0.30 668.32 0.30 668.36 0.30 668.40 0.31 668.44 0.31 668.48 0.32 668.52 0.32 668.56 0.33 668.60 0.33 668.64 0.33 668.68 0.34 668.72 0.34 668.76 0.35 668.80 0.35 668.84 0.35 668.88 0.36 668.92 0.36 668.96 0.37 669.00 0.37 669.04 0.37 669.08 0.38 669.12 0.38 669.16 0.38 669.20 0.39 669.24 0.39 669.28 0.39 669.32 0.40 669.36 0.40 669.40 0.40 669.44 0.41 669.48 0.41 669.52 0.41 669.56 0.42 669.60 0.42 669.64 0.42 669.68 0.43 669.72 0.43 669.76 0.43 669.80 0.44 669.84 0.44 669.88 0.44 669.92 0.45 669.96 0.45 670.00 0.45 670.04 0.46 Elevation Primary (feet) (cfs) 670.08 0.46 670.12 0.46 670.16 0.46 670.20 0.47 670.24 0.47 670.28 0.75 670.32 1.45 670.36 2.39 670.40 3.52 670.44 4.82 670.48 6.26 670.52 7.83 670.56 8.92 670.60 9.45 670.64 9.95 670.68 10.42 670.72 10.88 670.76 11.31 670.80 11.73 670.84 12.13 670.88 12.52 670.92 12.90 670.96 13.27 671.00 13.62 671.04 13.97 671.08 14.31 671.12 14.64 671.16 14.96 671.20 15.28 671.24 15.59 671.28 15.89 671.32 16.19 671.36 16.48 671.40 16.77 671.44 17.05 671.48 17.33 671.52 17.61 671.56 17.87 671.60 18.14 671.64 18.40 671.68 18.66 671.72 18.91 671.76 19.16 671.80 19.41 671.84 19.65 671.88 19.89 671.92 20.13 671.96 20.37 672.00 20.60 672.04 20.83 672.08 21.06 Elevation Primary (feet) (cfs) 672.12 21.28 672.16 21.50 672.20 21.72 672.24 21.94 672.28 22.16 672.32 22.37 672.36 22.58 672.40 22.79 672.44 23.00 672.48 23.21 672.52 23.41 672.56 23.61 672.60 23.81 672.64 24.01 672.68 24.21 672.72 24.40 672.76 24.60 672.80 24.79 672.84 24.98 672.88 25.17 672.92 25.36 672.96 25.55 673.00 25.73 673.04 25.92 673.08 26.10 673.12 26.28 673.16 26.46 673.20 26.64 673.24 26.82 673.28 26.99 673.32 27.17 673.36 27.34 673.40 27.52 673.44 27.69 673.48 27.86 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 48 Stage -Area -Storage for Pond 2A: Sand Filter Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 666.00 2,385 0 666.10 2,432 241 666.20 2,480 487 666.30 2,529 737 666.40 2,578 992 666.50 2,627 1,253 666.60 2,677 1,518 666.70 2,727 1,788 666.80 2,778 2,063 666.90 2,829 2,344 667.00 2,881 2,629 667.10 2,931 2,920 667.20 2,982 3,215 667.30 3,033 3,516 667.40 3,085 3,822 667.50 3,137 4,133 667.60 3,190 4,449 667.70 3,243 4,771 667.80 3,296 5,098 667.90 3,350 5,430 668.00 3,404 5,768 668.10 3,457 6,111 668.20 3,511 6,459 668.30 3,565 6,813 668.40 3,620 7,173 668.50 3,675 7,537 668.60 3,730 7,907 668.70 3,786 8,283 668.80 3,842 8,665 668.90 3,899 9,052 669.00 3,956 9,445 669.10 4,012 9,843 669.20 4,069 10,247 669.30 4,126 10,657 669.40 4,183 11,072 669.50 4,241 11,493 669.60 4,299 11,920 669.70 4,358 12,353 669.80 4,417 12,792 669.90 4,476 13,237 670.00 4,536 13,687 670.10 4,612 14,145 670.20 4,689 14,610 670.30 4,767 15,082 670.40 4,845 15,563 670.50 4,924 16,052 670.60 5,004 16,548 670.70 5,084 17,052 670.80 5,165 17,565 670.90 5,246 18,085 671.00 5,328 18,614 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 671.10 5,413 19,151 671.20 5,498 19,696 671.30 5,584 20,250 671.40 5,670 20,813 671.50 5,757 21,385 671.60 5,845 21,965 671.70 5,934 22,554 671.80 6,023 23,151 671.90 6,113 23,758 672.00 6,203 24,374 672.10 6,294 24,999 672.20 6,386 25,633 672.30 6,478 26,276 672.40 6,571 26,928 672.50 6,664 27,590 672.60 6,758 28,261 672.70 6,853 28,942 672.80 6,949 29,632 672.90 7,045 30,331 673.00 7,142 31,041 673.10 7,239 31,760 673.20 7,337 32,489 673.30 7,436 33,227 673.40 7,535 33,976 673.50 7,635 34,734 Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 49 Summary for Link 4: Post Total Inflow Area = 191,882 sf, Inflow Depth > 3.20" for 100-yr event Inflow = 17.83 cfs @ 3.24 hrs, Volume= 51,100 cf Primary = 17.83 cfs @ 3.24 hrs, Volume= 51,100 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.02 hrs 1 1 1 1 1 1 1 1 w 1 U 3 1 0 LL Link 4: Post Total Hydrograph 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ❑ Inflow ❑ Primary Skyland Drive 10-4-2019 Skyland Drive Townhomes_Sand Filter_BMP Rev 9-6-1 Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by {American Engineering Associates} Printed 10/4/2019 HydroCAD® 10.00-24 s/n 10674 © 2018 HydroCAD Software Solutions LLC Page 50 Hydrograph for Link 4: Post Total Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 2.00 0.00 0.00 0.00 4.00 2.78 0.00 2.78 6.00 0.85 0.00 0.85 8.00 0.42 0.00 0.42 10.00 0.36 0.00 0.36 12.00 0.29 0.00 0.29 14.00 0.22 0.00 0.22 16.00 0.14 0.00 0.14 18.00 0.06 0.00 0.06 20.00 0.02 0.00 0.02 22.00 0.02 0.00 0.02 24.00 0.01 0.00 0.01 26.00 0.01 0.00 0.01 28.00 0.01 0.00 0.01 30.00 0.01 0.00 0.01 32.00 0.01 0.00 0.01 34.00 0.01 0.00 0.01 36.00 0.01 0.00 0.01 38.00 0.01 0.00 0.01 40.00 0.01 0.00 0.01 42.00 0.01 0.00 0.01 44.00 0.01 0.00 0.01 46.00 0.01 0.00 0.01 48.00 0.01 0.00 0.01 50.00 0.01 0.00 0.01 52.00 0.01 0.00 0.01 54.00 0.01 0.00 0.01 56.00 0.01 0.00 0.01 58.00 0.01 0.00 0.01 60.00 0.01 0.00 0.01 62.00 0.01 0.00 0.01 64.00 0.01 0.00 0.01 66.00 0.01 0.00 0.01 68.00 0.01 0.00 0.01 70.00 0.01 0.00 0.01 72.00 0.00 0.00 0.00 74.00 0.00 0.00 0.00 76.00 0.00 0.00 0.00 78.00 0.00 0.00 0.00 80.00 0.00 0.00 0.00 82.00 0.00 0.00 0.00 84.00 0.00 0.00 0.00 86.00 0.00 0.00 0.00 88.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 92.00 0.00 0.00 0.00 94.00 0.00 0.00 0.00 96.00 0.00 0.00 0.00 98.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 102.00 0.00 0.00 0.00 104.00 0.00 0.00 0.00 106.00 0.00 0.00 0.00 108.00 0.00 0.00 0.00 110.00 0.00 0.00 0.00 112.00 0.00 0.00 0.00 114.00 0.00 0.00 0.00 116.00 0.00 0.00 0.00 118.00 0.00 0.00 0.00 120.00 0.00 0.00 0.00 EROSION AND SEDIMENT CONTROL CALCULATIONS SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Skyland Drive Townhomes Project #: C190010 Designed by: BHE Date: 4/10/2019 Revised by: Date: Revised by: Date: Basin # Basin Type = Drainage Area (ac) = Disturbed Area (ac) = Runoff Coefficient (c) = Rainfall Intensity "i" (in/hr) = Flow (Q10) (cfs) = Required surface area (so = Reauired Storaae (cf) = Schematic Storage Dimensions: Basin Side Slopes ( x: 1 ) = Storage Depth "Z" (ft) = Bottom Dimension = Top Dimension (sediment storage elevation) = Top of Dam Dimension = Storage Provided (cf) = Surface Area Provided (so = Designed Storage Dimensions: 1 Phase 1 Sediment (Per NCDNER EC Manual Ch. 6, Sec. 6.61) 1.10 1.03 0.50 (Smooth bare packed soil) 0.30 (Undeveloped) 7.03 (5 min time of concentration - 10 Year Storm) 3.9 (Q=c*i*drainage area) 1,682 (435 sf per cfs of Q10 peak inflow) 1.980 (1800 cf per acre of disturbed area) (may not be actual size or rectangular shape) 3.0 3.20 65.0ft x 32.0ft 84.2 ft x 51.2 ft 101.0 ft x 68.0 ft 10,225.7 4,311.0 Elev (ft) Area (SF) Volume (CF) 667 2,108 0 668 2,700 2,404 669 3,352 5,430 670 4,064 9,138 671 4,837 13,589 672 5,669 18,842 673 6,562 24,957 Designed Storage Elevation (ft)= 670.20 Designed Surface Area (so= 4,219 O.K. > Minimum Minimum Surface Area Designed Storage Volume (co= 10,028 O.K. > Minimum Required Storage Bottom Elevation (ft)= 667.0 Top of Dam Elevation (ft)= 673.0 Emergency Spillway Elevation (ft)= 670.2 Riser to be emergency overflow Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch. 6, Sec. 6.64 Skimmer Head on Size Skimmer Inches Feet Skimmer Size (in) = 2 1.5 0.125 Head on Skimmer (ft) = 0.167 2 0.167 Dewatered Volume (co = 1,980 2.5 0.208 Dewatering Time (days) = 3 3 0.25 Calculated Orifice Size (in) = 0.84 4 0.333 Actual Orifice Size (in) = 1.00 5 0.333 8 0.5 Sizing of Riser Overflow: Qriser (cfs) = Riser Diameter (in) _ Spillway Length (ft) = Spillway Crest Elevation (ft) = Design High Water Depth Over Spillway (in) = Velocity Over Spillway (fps) = Emergency Spillway Elevation (ft) = Freeboard (ft) = Filter Width (ft) = Top of Berm Elevation (ft) = 3.9 16.0 670.2 2 1.3 670.2 2.6 n/a 673.0 (Q10) (Use permanent control structure dimensions) (4' x 4' pre -cast structure) (spillway set from permanent pond design) (Cw=3.0) Riser to be emergency overflow (1 ft minimum to top of basin) (8 ft minimum) (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft) = 4 Inside width (ft) = 4 Wall Thickness (in) = 6 Top of Structure = 670.2 Bottom of Structure = 662.5 Bottom Slab Lip (in) = 6 Bottom Slab Thickness (in) = 6 Volume of Structure (cf) = 70 Weight of Structure (lb) = 10,436 Volume of Water Displaced (cf) = 193.3 Weight of Water Displaced (lb) = 12,059 Bottom Slab Size: Bottom Slab Lip (in) = 8 Thickness (in) = 8.00 Weight of Anchor (lb) = 2,844 Factor of Safety = 1.1 Check Culvert Capacity: Invert Elevation Down (ft): 662.00 Invert Elevation Up (ft): 662.47 Pipe Length (ft): 93.8 Slope (ft/ft): 0.0050 Pipe Diameter (in): 24 Mannings: 0.013 Q10 (cfs): 3.9 See attached Culvert Analysis Velocity Q10 (fps): 1.7 O.K. Velocity < 10 fps Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. SB1 PH1 Invert Elev Dn (ft) = 662.00 Calculations Pipe Length (ft) = 93.79 Qmin (cfs) Slope (%) = 0.50 Qmax (cfs) Invert Elev Up (ft) = 662.47 Tailwater Elev (ft) Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 673.00 Hw/D (ft) Top Width (ft) = 12.00 Flow Regime Crest Width (ft) = 0.00 Ele (R) 674.00 672.00 670.00 66300 66a 00 664.00 662.00 660.00 SB1 PHI 10 20 30 40 50 60 70 50 90 100 110 120 130 Di-Iw C.I-t HGL Embank Wednesday, Apr 10 2019 = 3.90 = 3.90 _ (dc+D)/2 = 3.90 = 3.90 = 0.00 = 1.73 = 4.04 = 663.35 = 663.16 = 663.43 = 0.48 = Inlet Control ft Depth (R) 11.53 963 7M 5.53 353 1.53 -0.47 -2.47 140 Reach (ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Skyland Drive Townhomes Project #: C190010 Designed by: BHE Date: 10/4/2019 Revised by: Date: Revised by: Date: Basin # 1 Phase 2 Basin Type = Sediment (Per NCDNER EC Manual Ch. 6, Sec. 6.61) Drainage Area (ac) = 2.25 Disturbed Area (ac) = 2.25 Runoff Coefficient (c) = 0.50 (Smooth bare packed soil) Rainfall Intensity "i" (in/hr) = 7.03 (5 min time of concentration - 10 Year Storm) Flow (Q10) (cfs) = 7.9 (Q=c"i"drainage area) Required surface area (sf) = 3,440 (435 sf per cfs of Q10 peak inflow) Required Storage (cf) = 4.050 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes ( x: 1 ) = 3.0 Storage Depth "Z" (ft) = 3.20 Bottom Dimension = 70.0 ft x 36.0 ft Top Dimension (sediment storage elevation) = 89.2 ft x 55.2 ft Top of Dam Dimension = 148.0 ft x 114.0 ft Storage Provided (cf) = 11,910.1 Surace Area Provided (sf) = 4,923.8 Designed Storage Dimensions: Elev (ft) Area (SF) Volume (CF) 666 2,383 0 667 2,878 668 3,398 5,781 669 3,949 9,455 670 4,532 13,695 671 5,327 18,625 672 1 6,208 1 24,392 673 7,126 31,059 Designed Storage Elevation (ft)= 670.20 Designed Surface Area (sf)= 4,691 O.K. > Minimum Minimum Surface Area Designed Storage Volume (cf)= 14,681 O.K. > Minimum Required Storage Bottom Elevation (ft)= 660.00 Top of Dam Elevation (ft)= 673.0 Emergency Spillway Elevation (ft)= 670.2 Riser to be emergency overflow Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch. 6, Sec. 6.64 Skimmer Head on Size Skimmer Inches Feet Skimmer Size (in) = 2 1.5 0.125 Head on Skimmer (ft) = 0.167 2 0.167 Dewatered Volume (cf) = 4,050 2.5 0.208 Dewatering Time (days) = 3 3 0.25 Calculated Orifice Size (in) = 1.20 4 0.333 Actual Orifice Size (in) = 1.00 5 0.333 in #1 - Phase 2 Sizing of Riser Overflow: Qriser (cfs) = Riser Diameter (in) _ Spillway Length (ft) = Spillway Crest Elevation (ft) = Design High Water Depth Over Spillway (in) = Velocity Over Spillway (fps) = Emergency Spillway Elevation (ft) = Freeboard (ft) = Filter Width (ft) = Top of Berm Elevation (ft) = 5.7 16.0 670.2 3 1.5 670.2 2.6 n/a 673.0 (Q10) (Use permanent control structure dimensions) (4' x 4' pre -cast structure) (spillway set from permanent pond design) (Cw=3.0) Riser to be emergeny overflow (1 ft minimum to top of basin) (8 ft minimum) (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft) = 4 Inside width (ft) = 4 Wall Thickness (in) = 6 Top of Structure = 670.2 Bottom of Structure = 662.5 Bottom Slab Lip (in) = 8 Bottom Slab Thickness (in) = 8 Volume of Structure (cf) = 70 Weight of Structure (lb) = 10,436 Volume of Water Displaced (cf) = 193.3 Weight of Water Displaced (lb) = 12,059 Bottom Slab Size: Bottom Slab Lip (in) = 8 Thickness (in) = 8.00 Weight of Anchor (lb) = 2,844 Factor of Safety = 1.1 Check Culvert Capacity: Invert Elevation Down (ft): 662.00 Invert Elevation Up (ft): 662.47 Pipe Length (ft): 93.8 Slope (ft/ft): 0.0050 Pipe Diameter (in): 24 Mannings: 0.013 Q10 (cfs): 5.7 See attached Culvert Analysis Velocity Q10 (fps): 2.4 O.K. Velocity < 10 fps Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. SB1 PH2 Invert Elev Dn (ft) = 662.00 Calculations Pipe Length (ft) = 93.79 Qmin (cfs) Slope (%) = 0.50 Qmax (cfs) Invert Elev Up (ft) = 662.47 Tailwater Elev (ft) Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 673.00 Hw/D (ft) Top Width (ft) = 12.00 Flow Regime Crest Width (ft) = 0.00 Ele (R) 674.00 672.00 670.00 66300 666 00 664.00 662.00 660.00 SB1 PH2 10 20 30 40 50 60 70 60 90 10❑ 110 120 130 Di-Iw C.I-t HGL Embank Wednesday, Apr 10 2019 = 5.70 = 5.70 _ (dc+D)/2 = 5.70 = 5.70 = 0.00 = 2.39 = 4.53 = 663.42 = 663.31 = 663.66 = 0.59 = Inlet Control ft Depth (R) 11.53 963 7M 5.53 353 1.53 -0.47 -2.47 140 Reach (ft) SKIMMER SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.64) Project Information Project Name: Skyland Drive Townhomes Project #: C190010 Designed by: BHE Date: 4/10/2019 Revised by: Date: Revised by: Date: Basin # Basin Type = Drainage Area (ac) = Disturbed Area (ac) = Runoff Coefficient (c) = Rainfall Intensity "i" (in/hr) = Flow (Q10) (cfs) = Required surface area (sf) = Reauired Storaae (cf) = Schematic Storage Dimensions: Basin Side Slopes ( x : 1 ) = Storage Depth "Z" (ft) = Bottom Dimension = Top Dimension (sediment storage elevation) = Top of Dam Dimension = Storage Provided (cf) = Surface Area Provided (sf) = Designed Storage Dimensions: 2 Phase 1 Skimmer (Per NCDNER EC Manual Ch. 6, Sec. 6.64) 1.17 1.05 0.50 (Smooth bare packed soil) 0.30 (Undeveloped) 7.03 (5 min Tc - 10 Year Storm, Rural Sub use 30 min.) 3.9 (Q=c*i*drainage area) 1,282 (325 sf per cfs of Q10 peak inflow) 2.106 (1800 cf per acre of disturbed area) (may not be actual size or rectangular shape) 2.0 2.00 25.0 ft x 53.0 ft 33.0ft x 61.0ft 41.0ft x 69.0ft 3,338.0 2,013.0 Elev (ft) Area (SF) Volume (CF) 657 1,237 0 658 1,526 1,382 659 1,840 3,065 660 2,180 5,075 661 2,544 Designed Storage Elevation (ft)= 659.00 Designed Surface Area (sf)= 1,840 Designed Storage Volume (cf)= 3,065 Bottom Elevation (ft)= 657.0 Top of Dam Elevation (ft)= 661.0 Emergency Spillway Elevation (ft)= 659.5 O.K. > Minimum Minimum Surface Area O.K. > Minimum Required Storage Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch. 6, Sec. 6.64 Skimmer Head on Size Skimmer Inches Feet Skimmer Size (in) = 2 1.5 0.125 Head on Skimmer (ft) = 0.167 2 0.167 Dewatered Volume (cf) = 2,106 2.5 0.208 Dewatering Time (days) = 3 3 0.25 Calculated Orifice Size (in) = 0.86 4 0.333 Actual Orifice Size (in) = 0.90 5 0.333 6 0.417 8 0.5 Sizing of Emergency Spillway: Qspillway (cfs) = 3.9 (Q10) Spillway Length (ft) = 20.0 (20 ft minimum spillway length, Cw=3.0) Spillway Crest Elevation (ft) = 659.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway (in) = 2 (6 in. maximum, Cw=3.0) Velocity Over Spillway (fps) = 1.2 Freeboard (ft) = 1.3 (1 ft minimum) Filter Width (ft) = n/a (8 ft minimum) Top of Berm Elevation (ft) = 661.0 (Top of Basin Elevation) SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO 1800 MIN. (CU. FT. VOLUME PER AC. REQUIRED DISTURBED) 435 SURFACE (SQ.FT. PER AREA CFS Q10) REQUIRED DATA BLOCK PLAN VIEW INFLOW STRUCTURE AVERAGE AREA` WIDTH W = L * AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY CROSS-SECTION VIEW SEE NOTE #3 T FREEBOARD INFLOW 6" MIN. INVERT ELEVATION STRUCTURE OF EMERGENCY SPILLWAY PRIMARY SPILLWAY 2' 1MIN(RISER) w Il DEWATERING ZONE - FILTER FABRIC SEDIMENT STORAGE ZONE BAFFLE L=20' MIN. 3RD BAFFLE: HARDWARE CLOTH SURROUNDING SKIMMER SER NOTES: 1. REFER TO NCESCPDM SECTION #6.61 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING SEDIMENT BASINS. 2. REFER TO BAFFLE INSTALLATION DETAIL FOR BAFFLE SPACING AND INSTALLATION. 3. FIRST BAFFLE IS TO BE CONSTRUCTED OF RIP -RAP AND #5 WASHED STONE, WITH A MIN. HEIGHT OF 3' AND MIN. TOPWIDTH OF 2'. 4. FLASHBOARD RISER NOT PERMITTED FOR USE ANTI -SEEP COLLAR NOT TO SCALE PHASE BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 (CFS) BASIN VOLUME SURFACE AREA CLEANOUT DEPTH H/2 (FT) H (FT) Z (FT) L (FT) T (FT) W (FT) SKIMMER PIPE DIA. SKIMMER ORIFICE DIA. REQUIRED (CF) PROVIDED (CF) REQUIRED (SF) PROVIDED (SF) 1 1 1.10 1.03 3.87 1,980 10,435 1,682 4,638 1.4 2.80 6 35 83.2 10 2 1.00 2 1 1 1 1.62 1 1.56 1 5.69 1 2,916 10,435 1 2,477 4,638 1 1.4 1 2.80 6 1 35 183.7 1 10 1 2 1 1.00 SEDIMENT BASIN N.T.S. SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA < 10 AC. (ACRES) MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO MIN. 1800 VOLUME (CU. FT. REQUIRED PER AC. DISTURBED) 325 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED DATA BLOCK PLAN VIEW IN AVERAGE_ AREA* 1 1 WIDTH LENGTH \ * AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY CROSS-SECTION VIEW INFLOW DEWATERING ZONE - FILTER FABRIC BAFFLES 10, MIN. SKIMMER DEWATERING DEVICE v� BAFFLES (CLDS #30.19) 1' FREEBOARD 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY Z=5' MAX. CLEANOUT SKIMMER AF DEPTH LENGTH = (H/2) 1' SEDIMENT H x 1.5 STORAGE (MIN. 5') NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN EMBANKMENT SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO BAFFLE INSTALLATION DETAIL FO BAFFLE SPACING AND INSTALLATION. 3. TURBIDITY CURTAIN MAY BE USED IN LIEU OF POROUS BAFFLES. 4. SKIMMER INVERT ELEVATION = BASIN EMERGENCY BOTTOM + 1' MIN. SPILLWAY 5. H = SPILLWAY ELEVATION - SKIMMER INVERT L ELEVATION W=5' MIN. EMBANKMENT T=1.5' MIN. H=Z MIN. EMERGENCY SPILLWAY SPECIFY SEEPAGE CONTROL NOT TO SCALE MEASURES PHASE BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 (CFS) BASIN VOLUME SURFACE AREA CLEANOUT DEPTH Hl2 (FT) H (FT) Z (FT) L (FT) T (FT) W (FT) SKIMMER PIPE DIA. SKIMMER ORIFICE DIA. REQUIRED (CF) PROVIDED (CF) REQUIRED (SF) PROVIDED (SF) 1 2 1.17 1.05 3.94 2,106 3,065 1,282 1,840 1 2.00 4 20 1.5 5 2 0.90 SKIMMER SEDIMENT BASIN N.T.S. RIPRAP APRON CALCULATIONS 20 10 R 3 0 l�l Outlet IW = Do + La pipe i diameter (Do) La --•1 �,: T ilwater - 0.5Do Al2-FES 18" Diameter Q10=5.80cfs La = 10' d5O = 6" W = 11.5' 3Do = 4.5' t = 1.5' 1 toy` r o,� p.P 60 L Qf i Appendices " I.,...I '.I....I 11'I.I IIII.I:'I.I....I I I I I 1 1 1 1 1 ' I I I I l I I'.I 'I I I I I.'i 10 3 5 10 20 50 100 200 500 1000 5.80 cfs Discharge (0/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 3 0 l�l Outlet IW = Do + La pipe i diameter (Do) La --•1 �,: T ilwater - 0.5Do FES-C2 24" Diameter Q10=1.33cfs La = 13' d5O = 6" W = 15' 3Do = 6' t = 1.5' toy` r o,� p.P 60 L Qf i 20 10 R 1 Appendices "i_... I.,...I '.I....I I I I I I I '.I I I I''i10 3 5 10 20 50 100 200 500 1000 1.33 cfs Discharge (0/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 APPENDICES \ Raw INV:666.2 R/W (PARTIALLY Bus BURIED) D�D� SHEL TER — — _ —R/W-- — R/W — — R/W — — R/W — — R/� R/W — — —R/W-- — R/W — �___ R/W R/W — — N v: 66 z 2 —�— R /W — — w —w w--w n \----\ w— III �— --� ——w--w--w——w--w-- ——--w—I—w--w--w--w--w--w— W— w w— w— w--w v—,N--w--ate—— I' —w-- �/W--W--w--w-- w — — w — — w ! — I I GE PA vEM�N NV: 70.2 INV:670.6 ED w W— IWj—W--Wof -- —w— W--VJ 675 R/W -� A13-FES — ICo / — EDGE OF PAVEMENT — D PP — x �x�x � —lx x x x x z TE � 9y�� QV: 669.82 ��/V�, B1 = — R/W — 8/ / R/W — ���� 18 o A15-CB 68p 0.54 AC B1-FES 62-JB —� ` A13 R I -Cr x 675 /W LP TANK \ A14-CB 0.10 AC \ i R/W — — R/ l \ / 8" HD lk\ \ 8" HDPE 8" E / R F DRA IN \ \ ROOF DRAIN I / I D AIN S=2. % \ S=1.0% S= ° 0 ol \ A15 \ AD 0.14 Ac �a / Al RED 0.13c _ I A5-CB A4-CB \ \ I I I NOW OR FORMERLY I AS I / / / /A j JOHNNIE F SULLIVAN x I DB 7447, PG 58 I FO.24 Ac A7 ° PIN:5660-94-0591 TRACT 1 AND PART OF TRACT 2 MB 35, PG 33 AC 997. SKYLAND DR. A3 l / I \ MT. PLEASANT, NC 28124 x k / 6 A4 0.21 AC 0 ZONED "RL" / I� ° AS a , .06 AC rw/A3-CB _ 0.07 Ac �` NOW OR FORMERLY A8-CB/ A7-CB I I I \ qp JERRY R TUCKER & O /1 I cp ROSE P TUCKER DB 12430, PG 49 °O PIN:5660-95-6392 i A9 A9-CB / // l �� A6 I A2 1 1 TRACT 1 / / / / 0.13 AC / 3435 HIGHWAY 73 E \ ��h 0.03 AC A6 CB A2-CB 0.06 Ac CONCORD, NC 28025 x R/W R R W I I I ZONED "RH" DR 1 \ .00 OF \ A10 / / / � \ \ / Al 5 x o.10 AC � /��1h / 1 1 1 III ,\ 660 10.12 AC \ I I x Al2-HW / \ \ \ \ \ \ \ \ / x x / — x c) C2-FES / \ \— r/iceC1-CS NOWOOR RGE FORMERLY HOE& FREDA E. SHOE PIN. 5660-95 7144 LOTS 35 40 1MB 08, OT P LEA ANT, N 2 / T. MT. PLEASANT, NC 28124 ZONED "RH" _ x- X /X x x x _ _ _ R W / _ _ R� / R/ R/W — — R/W — — R/W R/—� -- W —x — x /xW x— x x x— x xR/W x x x x/ x x I I CONCRETE 41 ORlVE —w — w — \ / R/W R/W — — R/W R/W —Ce>- — R/W — R/W — — R/V� s GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. LEGEND PROPOSED CONCRETE AREAS ° PROPOSED PAVEMENT PROPOSED MILL & RESURFACE RIP RAP DI DROP INLET CB CATCH BASIN RCP REINFORCED CONCRETE PIPE FES FLARED END SECTION SSE SANITARY SEWER EASEMENT SIDE STORM DRAIN EASEMENT SWE SIDEWALK EASEMENT UE UTILITY EASEMENT BMP BEST MANAGEMENT PRACTICE EX. CATCH BASIN & PIPE EX. STORM DRAIN & PIPE R/W RIGHT OF WAY LINE PROPERTY LINE ADJACENT PROPERTY LINE EASEMENT LINE —PCCE — —PCCE POST CONSTR. ACCESS EASEMENT ss ss EX. G RAVITY S EW E R UTUTUT EX. UNDERGROUND TELEPHONE LINE G G EX. GAS LINE UGE UGE EX. UNDERGROUND ELECTRIC LINES OE OE OE EX. OVERHEAD ELECTRIC www EX. WATER LINE STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMESI S. SKYLAND DRIVE, MT. PLEASANT, INC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. lJ 1 W M'® Cq W '--I Co ® W Cn �' U 1/ W 0 a Coo MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,88E-0 # W2il� Z t 10 00 Q00 CL N a�CoL0 • N C) i U ) O ~ U (1 W b-0a1) L � �� ��Co aW oU Co �m LLI Q z L Co-6 .` V o a) CO L E Q <CoU SHEET: C49 1 \ Raw _R/W_- - R - - R/W - - R/W - - R/W NN - R/W - R/W - - - -R/W-- _ R/W / OE-OE-OEOEOE OE -O - _ - OE �E -OE� OE OE -eE DOE OE OE OE OE � R/W _ - - `' ('-OE-OE-OE--OEM- _ R W _ \ _- - IVE S•R• OE-OE--OE--OE--OE--OE-- OE - -OE - - OE - U-- W_- W �� I \ _ - w - - w - w - - (60 PUBLIC R/W -MAINTAINED) ou- - \ � W--w- yq� w--w=-7nt- -- � w--w--w----w--w--v�wv� -w w--;�w--w--w--w--w--w--w--w-- - �-w--w--w- � w--w--w--w;�w _R/W �\-o�-°€- -� - --of-�oL-�s- -�-�s-�s- I OEOE - OE - /\�__----�- dS BENCHMARK �- -OE - OE---- OF= - OE -�OE I E n E - OE _ OE OE- °E - - OE - NAIL IN PP _ \ \ \ _ ELV. 6B0.32 K/W� \ K/W� R/W 9� /\_ J J ,, _ - 0� = II�-ODE - E - --OE -- (NAVDBB) soft\ V A / \ �\ LL �_ _ - °€- o_E -�� TEMPORARY R/W CONSTRUCTION R/W - \ ENTRANCE ROCK PIPE INLET PROTECTION \ � v � 40a CONCR TE SILT FEK"TYP ) LIMITS OF WAS LIT LL SILT FENCE (TYP.) DISTURBANCE (TYP.) ' �\� ` I � ` ) S RAINAGE AREA a LIMITS OF v B P.) B IN Nl)�A\BER 1 PHA E\ \ BASIN TYPE: SKIMMER \ \ v / DRAINAGE AREA: 1.17 AC- \ DISTURBED AREA: 1.05 AC lwoo x \ \ 9�` \ ' / / / \ \ ago ova REQD. SURFA�E ARE :T 1,28 FS- \ PROV. SURFACE AREA 1840 SSF I - x /„ J / E n B �TORAG OL: 2,106 CF NOW OR FORMERLY I \ I / / / PROM STORAGE VOL: 3,065 CF \ BOTTOM ELEV: 657.00 JOHNNIE F SULLIVAN x a / / STORAGE ELEV: 659.00 _ DB 7447, PG 58 ( SOIL STOCK ILE AREA I i / / CLEAN OUT DEPTH 1.00, EV': \ PIN: 5660-94-0591 I / \ I / / / TOP OF BERM EL61. 0 TRACT 1 AND PART OF TRACT 2 EMER. SPILLWAY ELEV:6 5 \ ` MB 35, PG 33 \ / % / / / / EMER. SPILLWAY WIDTH: 20' \ I 997. SKYLAND DR. l ) I / / / \ SKIMMER PIPE DIlk- 9 0\ MT. PLEASANT, NC 28124 x ROCK CHECK DAM (TYP.) / / SKIMMER ORIFICE DIA: \ ZONED "RL" -2-SKIM-MB ER SKIM- WIT-W INV UP: 6 7. 0.9"ORIFICE \ INV DOWN: 6 .0� SB2 1 D AIN E AREA ( BASIN NUMBER: 1 x I / / / / I I \ \ I NOW OR FORMERLY PHASE: 1 / ) / TEMPORARY DIVERSION S JERRY R TUCKER & DITCH (TYP.) / ROSE P TUCKER BASIN TYPE: SEDIMENT x / / 66� �MIN.10' I I I I I I \ \ \ \ I DB 12430, PG 49 DRAINAGE AREA: 1.10 AC / / � \ PIN: 5660-95-6392 DISTURBED AREA: 1.03 AC SILT FENCE (TYP.) RIP AP A PRO I I I \ 1 I TRACT 1 Q10: 3.9 CFS x MB 72, PG 107 REQD. SURFACE AREA: 1,682 SF T / / h 3435 HIGHWAY 73 E PROV. SURFACE AREA: 4,219 SF I I / CONCORD, NC 28025 READ. STORAGE VOL: 1,9 80 CF �� / / / /\ TEMPORARY I I / I I I I i I ZONED "RH" PROV. STORAGE VOL: 10,028 CF �� / / / / / SLOPE DRAINELEV: 667.00 1 I I STOORAGE TTOM ELEV: 670.20 /\ / / / / AzR K PIPE INLET P TECIO I \ I \ I I ) CLEAN OUT DEPTH: 1.60' - TOP OF BERM ELEV: 673.00 �� / / c / 660 SKIMMER PIPE DIA: - 2.0" / TEMP RWRY DIV ON I I X SKIMMER ORIFICE DIA: 1.0" \\ - �� 1 ROCK PIPE INLET TEMP ARY / / / 660 0 I C I RISER TOP ELEV: 670.20 �� / / / / / o o PE DRAIN RISER DIA: 4' X 4' PRECAST STRUCTURE \/ 685 PROTECTION / � CULVERT DIA: 24" RCP �I ITSF �/ ISTURB C P RAP RON � I L1DIS URBED CULVER LENGTH: 94' / / 655 0' E ER EN Y SPILLW V CK CH DA TV INV UP: 657.00 x / /gyp- / / /s( I INV DOWN: 654.00 RIPRAP APRON x BAFFLES MIN. 10'SPACING x / / / '- / �X \X / � X 24 RCPF (S�,� // \ EXISTING POND i 4' X 4' PRECAST STRUCTURE / SEE SHEET C5.1 FOR DETAILS SKIMMER WITH 1�. .0" ORIFICE \. i F x= - '� =x - x R/xW x- x x x- x xR/W x x EROSION AND SEDIMENT CONTROL NOTES: 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MAT, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED DAILY UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED UNTIL A GOOD STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET C7.4. ALL SEEDING WILL BE MULCHED. 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICABLE OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) OR WATERS OF THE UNITED STATES (WOU.S.). 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL MEASURE NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND B FIELD VERIFIED. 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN ENGINEERING DEPARTMENT. 12. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING 13. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY APPROVED. 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN ON -SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE TOWN/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 16. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT PRE -CONSTRUCTION MEETING. 17. A PREWORK MEETING SHALL BE SCHEDULED WITH THE TOWN INSPECTOR PRIOR TO CONSTRUCTION. 18. APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLANS BY THE TOWN OF MT. PLEASANT GRANTS COVERAGE THE DEVELOPMENT UNDER THE STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY RESOUR (NCDEQ) DIVISION OF WATER QUALITY (DWQ) GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UND THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES. THE FINANCIALLY RESPONSIBLE PARTY FOR THIS DEVELOPMENT IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF THE GENERA PERMIT. 19. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 20. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS PERM( ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, STORM DRA OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. PERMIT ELEV. �59 x �\ \I (SILT FENCE (TYP.) x F x TR P OT\T ON \\ \� \ /I \ \\ \ \-x x x x \x \\ 0 V / I� I I NOW OR FORMERLY GEORGE A SHOE & I FREDA E. SHOE DB 545, PG. 330 PIN:5660-95-7144 I \ 1 I I LOTS 35-40 MB 8, PG 63 1010 ABBOTT ST. MT. PLEASANT, NC 28124 ZONED "RH" i II l/1 I�I I I I I I I I I R/W - _ R� / R/W - - R/\n/ - p�\n/ / / + + bE"--� OE - OE 'OE " -OE - 7 E- OE -pE- X X X X -x / 0- OE--OET- OE- -OE- ABBOTT STREET / M 7`1x (40' PUBLIC R/W) (PB 8/63, DB 350/510) �w - �, Z_ CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: / DESIGNATED AREA THAT WILL LATER BE BACKFILLED (SLURRY PIT) I \ l RIM 690, 77 DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. INV: 685.12 LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A STORM DRAIN, / o ( / (HEAD OF LINE) OPEN DITCH, OR RECEIVING WATER WAY. PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. o I CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER TRUCKS AND - oe DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF OFFSITE. -�I°E- - oe _ A Ljj 21. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR EMERGENCY N M RESPONSE LINE AT 1-800-858-0368.Lij m 22. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS IN I \ a a ACCORDANCE WITH 2O06 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. PORTABLE N 0, Q, c FACILITIES SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH N W BASINS, ETC.). DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH STATE AND LOCAL REQUIREMENTS. 23. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-6" OF CLEAN TOP SOIL, FREE SSMH OF DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. S RIM: 688.83 INV: 683.73 24. SILT FENCE AND TREE PROTECTION SHOWN OFFSET FROM LIMITS OF DISTURBANCE FOR CLARIFICATION PURPOSES. TO CES 25. CONCRETE WASHOUT STATION AND STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAINS, ER BASINS, OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. L 26. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE TO MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. 27. PER SECTION 6.20 OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, DIVERSIONS THAT WILL STAY IN PLACE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON AS THEY ARE CONSTRUCTED TO PRESERVE DIKE HEIGHT AND REDUCE MAINTENANCE. GRAPHIC SCALE 30 0 15 30 60 ( IN FEET) 1 inch = 30 ft. LEGEND WETLANDS _SF SILT FENCE -sF SF - SILT FENCE OUTLET TP TREE PROTECTION FENCE ■ TRIBUTARY AREA HE LIMITS OF DISTURBANCE ARK ROCK CHECK DAM rl INLET PROTECTION GENERAL NOTES 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH CURRENT TOWN OF MT. PLEASANT AND NCDENR STANDARD SPECIFICATIONS AND DETAILS. 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @ 811 OR 800-632-4949 AND TOWN OF MT. PLEASANT, A MINIMUM OF 72 HOURS BEFORE DIGGING. 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL DEVELOPMENT GRADING AND DRAINAGE PLANS. 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE WRITTEN CONSENT OF THE PROPERTY OWNER AND THE TOWN OF MT. PLEASANT. 6. THE NCDENR EROSION CONTROL MANUAL AND TOWN OF MT. PLEASANT STANDARDS SHALL BE USED AS A GUIDELINE FOR IMPPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: • SURFACE ROUGHENING • STABILIZED CONSTRUCTION ENTRANCE • SILT FENCE • HARDWARE FABRIC AND STONE INLET PROTECTION • CHECK DAMS • TEMPORARY SEEDING • PERMANENT SEEDING • MULCHING • SOD SITE INFO CONSTRUCTION START DATE: AUGUST, 2019 DISTURBED AREA: 3.09 ACRES CONSTRUCTION SEQUENCE 1. OBTAIN ALL REQUIRED PERMITS. 2. SET UP AN ON -SITE PRE CONSTRUCTION CONFERENCE WITH THE EROSION CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF THE TOWN CODE AND IS SUBJECT TO FINE. 3. MAKE ANY REQUIRED MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLANS. ALL MODIFICATIONS TO THE EROSION AND SEDIMENT CONTROL PLANS SHALL BE DOCUMENTED ON THE ON -SITE APPROVED PLANS. 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE ON S. SKYLAND DRIVE. 5. INSTALL PERIMETER SILT FENCE, INLET PROTECTION, SEDIMENT BASINS, TEMPORARY DIVERSION DITCHES AND OTHER MEASURES AS SHOWN ON THE PLANS CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 6. CALL FOR ON -SITE INSPECTION BY THE EROSION CONTROL INSPECTOR. WHEN APPROVED, THE INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. 7. LIMIT CLEARING AND GRUBBING OF THE SITE TO AREAS THAT WILL BE MASS GRADED. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF THE SITE. 8. BEGIN MASS GRADING ACTIVITIES. AS SITE IS GRADED AND PADS BUILT UP, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORMWATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT THE REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS PROGRESSES. CONTRACTOR SHALL LIMIT DRAINAGE AREAS FLOWING TO EACH OF THE PROPOSED BASINS TO THE MAXIMUM AREA THAT IS DESIGNATED FOR EACH BASIN. THIS SHALL BE ACCOMPLISHED BY ADJUSTING THE PROPOSED DIVERSION DITCHES AS THE SITE IS GRADED. SOIL MAP LEGEND E n D Enon Sandy Loam E n B Enon Sandy Loam STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, INC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. lJ 1 W M'® Cq W T--I co ® W Cn � M--�--� W H 1/ W 1.4 E � v) l.! 1 MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,98E-0 # IN211=1 Z 0 Q 000 CL N co� a�co •� ti N M , U ) CD ~ c� CO U W �a 1 L O N a W CD00 a)U 00 0) N �O W QZ L co •` O 0 a) C L I_ Q QooU EROSION CONTROL PLAN PHASE 1 SHEET: C7e0 \ Raw - INV. R/w� (PARTIALLY Bus _ BURIED) 2�c`� � sHEL TER R/W - - R - - R/W - - R/W - - R/W - R/W - R/W - - _ - R/W - - R/W- OE _ -OE- OE -O - -_R/W__ OE - E -OEM OE OE �OE DOE OE OE OE OE R/W _ i-OE-OE-OE-OE$r--OE- IV 7 57 PP - OE - - OE - - OE - INV-6672 R 1 68, a- \-OE--OE-- _ OE - - OE - - OE -- R/W EDGE DE PAVEME (60' PUBLIC R/W -MAINTAINED) _ - °U- -I4- ou ou- \ ��-W--W--W--ro� -V- -W--W =w�- - OU-- W--W--W--W- - W--W--W--W--W--W--W�-W--V--�U--OV-E I W--W--w- -W--W� -W - \-W--W--W--W EDG OF PAVEMENSW OG'E _ / \ OF PA VEMEN7 T p - W - W - - C_ I I PP R/W �- °€- S. I� �I� -0E-- - \ - OE - O� of OE BENCHMARK o °- E E g\ w W - w NAIL IN PP \ V ( - OE _ - - - ,. 9.82 ELV. 6B0.32 K/W�/\N\ _ _ _ R/W _ _ / �OF= o€-- - - (NAVDBB)ut LIMITS OF \ �- A \ �� I I _ - R W - o DISTURBANCE (TYP.) -LI s - _ _ R/W - LP TANK - j- �A V 68p S LT FENCE (TYP.) R/ 8" HD E\ \ 8" HD EMPORA 8" E RO F N \ ROOF DRAIN CONSTRU I� D AIN S=2. % \ S=1.056 ENT AN S= A I LIMI OF \ > v -680 DIS RBIANCE (TYP.) R CONCRETE I+ WASHOUT t - __SB1 PH2 DRAINAGE A SILT FENC TYP.) oCe - x \ /„ E n B RAGE NOW OR FORMERLY I I I / / / / 80 16 ' r JOHNNIE F SULLIVAN x l PIDB N. 7447, 4G58 0591 I I ( SOIL STOIC ILE AREA TRACT 1 AND PART OF TRACT 2 99M SKYLAND DR. I MT. PLEASANT, NC 28124 k - ® ® ® ® _ ZONED "RL" / R/ /W / I I w w f. tv w R w w NOW OFORMERLY R TUCKER & BASIN NUMBER: 1 PHASE: 2 / / ( / / / \ \ DB 12430 PG 49 BASIN TYPE: SEDIMENT PIN: 5660 95 6392 DRAINAGE AREA: 2.25 AC / DISTURBED AREA: 2.19 AC S $ f TRACT 1 Q10: 7.9 CFS x ( INLET P OTETION �� UGAR TREE �R�VE �� a6 I o 7MB 72, PG 107 3,440 SF (TYP.) p 3435 HIGHWAY E READ. SURFACE AREA: �h � / / / \(PROP. 7iU' Ut3LIC R W � � SBl PH2 � � CONCORD, NC 28025 PROV. SURFACE AREA: 4,219 SF p / DRAINAG R A ZONED "RH" READ. STORAGE VOL: 4,050 CF / m PROV. STORAGE VOL: 10,028 CF / I BOTTOM ELEV: 666.00 _ R/ R/ s / R W - STORAGE ELEV: 670.20 CLEAN OUT DEPTH: 1.60' 7y TOP OF BERM ELEV: 673.00 SKIMMER PIPE DIA: 2.0" SKIMMER ORIFICE DIA: 1.0"RISER 1 % I RISER DOA ELEV: 670.20 4' X 4' PRECAST STRUCTURE / / / / / / �IX X Fb I I UNDISTURBE / \ /SIFENCE YP CULVERT DIA: 24" RCP , / / / / / / LENGTH: 94' INV UP: INV UP: 662.47 INV DOWN: 662.00 RIPRAP APRON x R/ //,o \SF 5`5F F_ NSF SF � DISTURBANCE x / / TREE PR TECT \ \ - X X 60 4" F�� �x x 0 NOW OR FORMERLY GEORGE A SHOE & BAFFLES / / / / I \ \ I I I I I I FREDA E. SHOE MIN. 10 SPACING X / // / / \ \ \ I ' �I DB 545, PG. 330 PIN:5660-95-7144 EXISTING POND \ I I I I I- I LOTS35-40 MB 8, PG 63 PLEASANT, N 2 / MT. PLEASANT, NC 28124 ZONED "RH" x 675 / 4' X 4' PRECAST TRUCTURE SEE SHEET C5.1 FOkDETAILS j/ O SKIMMER WITH 1.0\ - / R W - - R _ � x � X � X F / ORIFICE \/ / _ _ - - p �\n/ - - / R� / p OE" of `• I/ o /\n, R/W R/W E - OE - E - �- CONCRETCE R/Y� �� /) 5 7� �X X /X " X X X X X X X X X X X �X X I PP 0 - OE - - OE - OE - - OE - - PP DRNE /ABBOTT STREET 0% I / (40' PUBLIC R/W) (PB 8/63, DB 350/510) \ W -w M�� FM FM FM EROSION AND SEDIMENT CONTROL NOTES: /. 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MAT, 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: / IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING MEASURE NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE / CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED DAILY UNTIL THE SLOPE IS BROUGHT TO GRADE. FIELD VERIFIED. DESIGNATED AREA THAT WILL LATER BE BACKFILLED (SLURRY PIT) /� I RIM 690,77 DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. I I �INV: 685,12 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A STORM DRAIN, / o i (HEAD DE LINE) CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN TOWN ENGINEERING DEPARTMENT. OPEN DITCH, OR RECEIVING WATER WAY. (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. o I 12. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. - CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER TRUCKS AND P`D - oe OE ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF OFFSITE. of VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON 13. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY I LN.,1 AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL APPROVED. 21. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR EMERGENCY OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND RESPONSE LINE AT 1-800-858-0368. COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN _� LLI M oo LAND DISTURBING ACTIVITY. ON -SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. 22. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS IN ° a a ACCORDANCE WITH 2O06 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. PORTABLE 10, Q, o 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED UNTIL A GOOD 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE FACILITIES SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH W STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET C7.4. ALL SEEDING WILL BE TOWN/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. BASINS, ETC.). DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH STATE AND LOCAL MULCHED. REQUIREMENTS. 16. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS PRE -CONSTRUCTION MEETING. 23. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-6" OF CLEAN TOP SOIL, FREE SSMH AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT OF DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. S RIM: 688,5,1, ARE DAMAGED OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICABLE OR 17. A FIREWORK MEETING SHALL BE SCHEDULED WITH THE TOWN INSPECTOR PRIOR TO CONSTRUCTION. �INV: 68I3 AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. 24. SILT FENCE AND TREE PROTECTION SHOWN OFFSET FROM LIMITS OF DISTURBANCE FOR CLARIFICATION PURPOSES. 18. APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLANS BY THE TOWN OF MT. PLEASANT GRANTS COVERAGE TO 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS THE DEVELOPMENT UNDER THE STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY RESOURCES 25. CONCRETE WASHOUT STATION AND STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAINS, BEFORE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) (NCDEQ) DIVISION OF WATER QUALITY (DWQ) GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UNDER BASINS, OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. OR WATERS OF THE UNITED STATES (WOU.S.). THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES. THE FINANCIALLY RESPONSIBLE PARTY FOR THIS DEVELOPMENT IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF THE GENERAL 26. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE PERMIT. EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE 19. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND THE SITE IS STABILIZED. STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. REGULATIONS. 7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY 20. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: 27. PER SECTION 6.20 OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL DIVERSIONS THAT WILL STAY IN PLACE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON FROM PAVEMENT, AS MAY BE REQUIRED. CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS PERMITTED AS THEY ARE CONSTRUCTED TO PRESERVE DIKE HEIGHT AND REDUCE MAINTENANCE. ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, STORM DRAIN 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. GRAPHIC SCALE 30 0 15 30 60 ( IN FEET) 1 inch = 30 ft. LEGEND WETLANDS _SF SILT FENCE -sF SF - SILT FENCE OUTLET TP TREE PROTECTION FENCE � M m m m � TRIBUTARY AREA or LIMITS OF DISTURBANCE ARK ROCK CHECK DAM INLET PROTECTION GENERAL NOTES 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH CURRENT TOWN OF MT. PLEASANT AND NCDENR STANDARD SPECIFICATIONS AND DETAILS. 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @ 811 OR 800-632-4949 AND TOWN OF MT. PLEASANT, A MINIMUM OF 72 HOURS BEFORE DIGGING. 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL DEVELOPMENT GRADING AND DRAINAGE PLANS. 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE WRITTEN CONSENT OF THE PROPERTY OWNER AND THE TOWN OF MT. PLEASANT. 6. THE NCDENR EROSION CONTROL MANUAL AND TOWN OF MT. PLEASANT STANDARDS SHALL BE USED AS A GUIDELINE FOR IMPPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: • SURFACE ROUGHENING • STABILIZED CONSTRUCTION ENTRANCE • SILT FENCE • HARDWARE FABRIC AND STONE INLET PROTECTION • CHECK DAMS • TEMPORARY SEEDING • PERMANENT SEEDING • MULCHING • SOD SITE INFO CONSTRUCTION START DATE: AUGUST, 2019 DISTURBED AREA: 3.09 ACRES CONSTRUCTION SEQUENCE 1. CONTRACTOR SHALL MEET WITH THE EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH PHASE 2 EROSION CONTROL MEASURES. 2. INSTALL REMAINING SILT FENCE, DIVERSION DITCHES AND OTHER MEASURES AS SHOWN ON THE PHASE 2 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 3. CONTINUE MASS GRADING ACTIVITIES. AS SITE IS GRADED AND PADS BUILT UP, CONTRACTOR SHALL MINIMIZE THE AMOUNT OF STORMWATER FLOWING OVER FILL SLOPES BY USING DIVERSION DITCHES AND SLOPE DRAINS. DITCHES AND SLOPE DRAINS SHOWN ON PLANS DEPICT THE REQUIRED DIVERSION DITCHES AND SLOPE DRAINS AT FINAL PAD GRADE. ADDITIONAL MEASURES MAY BE NEEDED AS GRADING PROGRESSES. CONTRACTOR SHALL LIMIT DRAINAGE AREAS FLOWING TO EACH OF THE PROPOSED BASINS TO THE MAXIMUM AREA THAT IS DESIGNATED FOR EACH BASIN. THIS SHALL BE ACCOMPLISHED BY ADJUSTING THE PROPOSED DIVERSION DITCHES AS THE SITE IS GRADED. 4. LIMIT CLEARING AND GRUBBING OF SITE TO AREAS THAT WILL BE MASS GRADED. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF THE SITE. 5. CONSTRUCTION OF THE STREETS, THE ASSOCIATED UTILITIES, INCLUDING LATERALS, TO THE COMPLETED AND INSPECTED. 6. RECONFIGURE SILT FENCE AS NECESSARY. 7. INSTALL INLET PROTECTION AND OTHER MEASURES AS SHOWN ON PHASE 2 PLANS AS THE PROPOSED STORM SYSTEM IS INSTALLED. 8. ALL AREAS THAT WILL GO UNWORKED FOR 14 DAYS OR MORE MUST BE STABILIZED IMMEDIATELY. STABILIZATION STANDARDS SHOULD BE MAINTAINED THROUGHOUTTHE CONSTRUCTION PROCESS. 9. STRIPPED TOPSOIL SHALL BE STOCKPILED IN DESIGNATED AREAS WITH SILT FENCE PROVIDED AROUND THE PERIMETER OF THE STOCKPILE. 10. MAINTAIN AND ADJUST THE EROSION AND SEDIMENT CONTROL MEASURES AS MASS GRADING PROGRESSES TO MAINTAIN PROPER EROSION AND SEDIMENT CONTROL. 11. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 12. STABILIZE THE SITE AS AREAS ARE BROUGHT TO GRADE. 13. INSPECT BMPS ONCE PER EVERY CALENDAR WEEK, PER THE NCDEQ REQUIREMENTS. ALL INSPECTION AND REPORTING SHALL BE IN COMPLIANCE WITH THE NCDEQ GENERAL PERMIT NCGO10000, LATEST EDITION. SOIL MAP LEGEND E n D Enon Sandy Loam E n B Enon Sandy Loam _- *** 3 Days Before Digging *** - 0-07-19 North Carolina 811 811 or 1-800-632-4949 . �- '% � C�� .•�•�• -� Remote �.�` ����''llll111���������� 11M http://nc8I I org/ emotet cke entry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, NC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. Y) w M'® Cq ,-I co Cn a A Z Iw W Z E-1 1/ W 0 kid 04 l.! 1 MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,88E-0 # W2J1� Z b.0 Q00 00 CL N a�coL0 •� co ti N M U) CD ~ N 4) � g� U CO W O L s� N a W CN CD00 oU 00 N s� o W QZ C: L co 0 .` o a (0 L I_ Q QooU EROSION CONTROL PLAN PHASE 2 SHEET: C791 R/v � Rn, INV; 666.2 R/W (PARTIALL r Bus BURIED) N�G� SHEL TER _R/W_- - R - - R/W - - R/W - - ��.R/W R/W7- R/W - R W/ R/W OE-OE-OEOEOE OE -0 --OF-R/WOE OE �OE� OE OE �9E DOE OE OE OE OE R/W OE -OE -OE$ --OE- \ --�• _ \ ii DRIVE S•R• 2�57 --0=- =0E\ OE--OE--OE- -OE _ n - --_ - of - -OE- INV: -667 2 -IPo 68, R/W 60' PUBLIC R W -MAINTAINED �6> - - ou- - ou- _ �_ oU V \ w--w-- W--w- - ii� - _-W--w-- ---Gt� \ w--w-- _/ii / 0V- / w-- w--w--w--w- w--w--w--w-- - - � \ w--w--w- �-w--w-�iv� -w _ -�� -- - � ou-- /��,A �O� - - - - - \- - \ - - - -w- - W- - W - !�V - w - w DCE of PAVEM NT \o �- - „a w-4I�-w--w-- F� �673 � -w- w--w R/tti� y-s€�`e€-OF of -woe aE=-of-oE- ��IIITS�f°e-_- - W ..� III V( BENCHMARK -SILT FENLE j,TYP.} - TURB�NCE (TYR;)E OE - - D - - o o - o� of - E w NAIL PP v v / s9.82 ELV. 680.32 � � li/ 675 v R/W - LP TANK R/W - - R/ 8" HD E\ \ 8" HD 8" E \ ROOF N \ ROOF DRAIN 67s \ D AIN \ S=2. % \ \ S=1.0% I S= A T a \ III 6s I , 1 2 3-, 4 6 7 \ 8/ 9 10 0� NOW OR FORMERLY DB 7447, PG 58 5660-94-0591 TRACT I AND PART OF TRACT 2 1 997. SKYLAND •• MT. PLEASANT, NC28124 ZONED "RL" 2 'all I - 680 1 2 13 14 15 T_ ---16 SILT FENCE p.) I LIMITS DISTU ANCE I NOW OR FORMERLY JERRY R TUCKER & ROSE P TUCKER DB 12430, PG 49 PIN: 5660-95-6392 x /C \ \ U A R I E \ \\ I I \ TRACTI INLET PR CTIO � � � 1 MB 72, PG 107 \ �� \ (7) V / (P16 . S{h B IC O 3435 HIGHWAY73 E \ CONCORD,ZONED"RH" _ LR/W - R/ \ / �\R W �j �Ix �, x �i \ 7 SI TFF�E NCP. O \ �NDIS URB D IS U AN7/// D T EPR TEECT N(TYPI It x x x x / v //-X NOWOOR RGE FORMERLY HO& E i FREDA E. SHOE \ x // DB 545, PG. 330 BMP ro PIN:5660-95-7144 SEESHIETC / / / / /\ / EXISTING POND I \ \ I I I I - I- I / I I Ix \ \ LOTS 35 40 8, o 10OT MT. PLEASANT, NC 28124 ZONED „RH„ X_ \X _ R/�✓- f -/��� R/W -X - X /vn/ - o / - - R/W - R/W �- _ _ �R -� \ R/W - - -OE- - �R6 of - DE R6 of - - X"" X X j X X X X X X X X X OE -- OE -- E- °E CONCRE7t - \\\ \\ X x ,� 0-OE--7T i DRIVE x / /ABBOTT STREE / a % I (40' PUBLIC R/W) (PB 8/63, DB 350/510) � � III II II II I II III w - w - � M Jam' FM FM� FM EROSION AND SEDIMENT CONTROL NOTES: 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MAT, 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: / IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING MEASURE NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE I \ CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED DAILY UNTIL THE SLOPE IS BROUGHT TO GRADE. FIELD VERIFIED. DESIGNATED AREA THAT WILL LATER BE BACKFILLED (SLURRY PIT) \\ RIM 690 77 DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. I I �\ IINV: 685.12 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A STORM DRAIN, / o (HEAD of LINE) CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN TOWN ENGINEERING DEPARTMENT. OPEN DITCH, OR RECEIVING WATER WAY. A (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. \ I W 12. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER TRUCKS AND - of c, ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF OFFSITE. °E- - of VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON 13. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT PREVIOUSLY AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL APPROVED. 21. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR EMERGENCY N M OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND RESPONSE LINE AT 1-800-858-0368. COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN _\ LLI m oo LAND -DISTURBING ACTIVITY. ON -SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. 22. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS IN a a ACCORDANCE WITH 2O06 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. PORTABLE I \ o o 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED UNTIL A GOOD 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE FACILITIES SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH N W STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET C7.4. ALL SEEDING WILL BE TOWN/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. BASINS, ETC.). DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH STATE AND LOCAL MULCHED. REQUIREMENTS. 16. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS PRE -CONSTRUCTION MEETING. 23. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-6" OF CLEAN TOP SOIL, FREE SSMH AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT OF DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. S RIM: 685.83 ARE DAMAGED OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICABLE OR 17. A FIREWORK MEETING SHALL BE SCHEDULED WITH THE TOWN INSPECTOR PRIOR TO CONSTRUCTION. �INV: 683.13 AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. 24. SILT FENCE AND TREE PROTECTION SHOWN OFFSET FROM LIMITS OF DISTURBANCE FOR CLARIFICATION PURPOSES. 18. APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLANS BY THE TOWN OF MT. PLEASANT GRANTS COVERAGE TO 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS THE DEVELOPMENT UNDER THE STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY RESOURCES 25. CONCRETE WASHOUT STATION AND STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAINS, BEFORE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) (NCDEQ) DIVISION OF WATER QUALITY (DWQ) GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UNDER BASINS, OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. OR WATERS OF THE UNITED STATES (WOU.S.). THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES. THE FINANCIALLY RESPONSIBLE PARTY FOR THIS DEVELOPMENT IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF THE GENERAL 26. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE PERMIT. EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE 19. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND THE SITE IS STABILIZED. STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. REGULATIONS. 7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY 20. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: 27. PER SECTION 6.20 OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL DIVERSIONS THAT WILL STAY IN PLACE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON FROM PAVEMENT, AS MAY BE REQUIRED. CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS PERMITTED AS THEY ARE CONSTRUCTED TO PRESERVE DIKE HEIGHT AND REDUCE MAINTENANCE. ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, STORM DRAIN 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. GRAPHIC SCALE 30 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. LEGEND WETLANDS _SF SILT FENCE -sF SF - SILT FENCE OUTLET TP TREE PROTECTION FENCE � M m m m � TRIBUTARY AREA or LIMITS OF DISTURBANCE ARK ROCK CHECK DAM INLET PROTECTION GENERAL NOTES 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH CURRENT TOWN OF MT. PLEASANT AND NCDENR STANDARD SPECIFICATIONS AND DETAILS. 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @ 811 OR 800-632-4949 AND TOWN OF MT. PLEASANT, A MINIMUM OF 72 HOURS BEFORE DIGGING. 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL DEVELOPMENT GRADING AND DRAINAGE PLANS. 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE WRITTEN CONSENT OF THE PROPERTY OWNER AND THE TOWN OF MT. PLEASANT. 6. THE NCDENR EROSION CONTROL MANUAL AND TOWN OF MT. PLEASANT STANDARDS SHALL BE USED AS A GUIDELINE FOR IMPPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: • SURFACE ROUGHENING • STABILIZED CONSTRUCTION ENTRANCE • SILT FENCE • HARDWARE FABRIC AND STONE INLET PROTECTION • CHECK DAMS • TEMPORARY SEEDING • PERMANENT SEEDING • MULCHING • SOD SITE INFO CONSTRUCTION START DATE: AUGUST, 2019 DISTURBED AREA: 3.09 ACRES CONSTRUCTION SEQUENCE 1. CONTRACTOR SHALL MEET WITH THE EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH PHASE 3 EROSION CONTROL MEASURES. 2. INSTALL ANY REMAINING SILT FENCE, DIVERSION DITCHES AND OTHER MEASURES AS SHOWN ON THE PHASE 3 PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 3. TOWNHOME CONSTRUCTION SHALL COMMENCE. CONTRACTOR TO INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES FOR THE INDIVIDUAL LOT CONSTRUCTION. 4. CONTRACTOR TO ENSURE THAT OCCUPIED HOMES BE PROTECTED FROM EROSION AND SEDIMENT FROM THE REMAINDER OF THE SITE. 5. FINALIZE GRADING ACTIVITIES. 6. LIMIT CLEARING AND GRUBBING OF THE SITE TO AREAS THAT WILL BE MASS GRADED. WHENEVER POSSIBLE, EXISTING VEGETATION SHALL REMAIN IN PLACE TO PREVENT EROSION OF THE SITE. 7. ALL AREAS THAT GO UNWORKED FOR 14 DAYS OR MORE MUST BE STABILIZED IMMEDIATELY. STABILIZATION STANDARDS SHALL BE MAINTAINED THROUGHOUTTHE CONSTRUCTION PROCESS. 8. MAINTAIN AN ADJUST EROSION AND SEDIMENT CONTROL MEASURES AS GRADING AND CONSTRUCTION PROGRESSES. 9. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 10. STABILIZE SITE AS AREAS ARE BROUGHT TO GRADE. 11. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. UPON INSPECTOR'S APPROVAL, CONTRACTOR IS TO REMOVE ALL EROSION CONTROL MEASURES, INCLUDING ANY APPROVED SEDIMENT BASINS. 12. CONVERSION OF SEDIMENT BASINS TO PERMANENT STORMWATER BASINS TO BE COMPLETED PER APPROVED CONSTRUCTION PLANS. BRING AREAS OUTSIDE OF PERMANENT STORMWATER BASINS, PREVIOUSLY OCCUPIED BY SEDIMENT BASINS AND ASSOCIATED GRADING TO FINISHED GRADE OR WHERE APPLICABLE BACK TO THE APPROXIMATE EXISTING GRADE AND REPLANTED. 13. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH NCDEQ STANDARDS. 14. WHEN VEGETATION IS ESTABLISHED, CALL FOR FINAL SITE INSPECTION AND FILE A NOTICE OF TERMINATION WITH THE TOWN OF MT. PLEASANT/NCDEQ. SOIL MAP LEGEND E n D Enon Sandy Loam E n B Enon Sandy Loam I � 1 *** 3 Days Before Digging *** North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc8 I I .org/remoteticketentry.htm STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, NC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 10/07/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. Y) W M'® z� Cq ® �W� W I�-1 a A Z E � v) l.! 1 MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 10-07-2019 1,98E-0 # IN211=1 Z 0 Q 000 CL N X) a�U) • ICU ti (D co ti U)o W In g� W W _ �a o L N � a W oU N 00 � � N s� W QZ i_ L coV 0 .` o a (0 L I_ 2- Q aeoU EROSION CONTROL PLAN PHASE 3 SHEET: C71 PLAN VIEW SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA < 10 AC. (ACRES) LENGTH Y-:-: MIN. I LENGTH TO 2:1 INFLOW WIDTH RATIO 10, MIN. MAX. I- - LENGTH TO 61 WIDTH RATIO SKIMMER DEWATERING MIN. 1800 AVERAGE- AREA* DEVICE VOLUME (CU. FT. WIDTH LENGTH REQUIRED PER AC. DISTURBED) AREA OF BASIN WATER SURFACE AT TOP OF PRIMARY SPILLWAY 325 L SKAREA (SQ. FT. PER CFS Q10)R CROSS-SECTION VIEW BAFFLES (CLDS #30.19) V FREEBOARD VV-S MIN. 6" MAX. DEPTH OF FLOW OVER INFLOW BAFFLES EMERGENCY SPILLWAY Z=5' MAX. DEWATERING ZONE _/, - - Z; H=2' MIN. 1 11 FILTER FABRIC CLEANOUT SKIMMER ARM DEPTH LENGTH= (H/2) V SEDIMENT H x 1.5 STORAGE (MIN. 5') DATA BLOCK NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN EMBANKMENT SPECIFICATIONS REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO BAFFLE INSTALLATION DETAIL FO BAFFLE SPACING AND INSTALLATION. 3. TURBIDITY CURTAIN MAY BE USED IN LIEU OF POROUS BAFFLES. 4. SKIMMER INVERT ELEVATION = BASIN EMERGENCY BOTTOM + 1' MIN. SPILLWAY 5. H = SPILLWAY ELEVATION - SKIMMER INVERT ELEVATION - EMBANKMENT T=1.5' MIN. EMERGENCY SPILLWAY - SPECIFY SEEPAGE CONTROL NOT TO SCALE MEASURES PHASE BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 (CFS) BASIN VOLUME SURFACE AREA CLEANOUT DEPTH H/2 (FT) H (FT) Z (FT) L (FT) T (FT) W (FT) SKIMMER PIPE DIA. SKIMMER ORIFICE DIA. REQUIRED (CF) PROVIDED (CF) REQUIRED (SF) PROVIDED (SF) 1 2 1.17 1.05 3.94 2,106 3,065 1,282 1 1,840 1 2.00 4 20 1.5 5 2 0.90 PVC EN PVC SKIMMER SEDIMENT BASIN N.T.S. BACKFILL AND COMPACT FENCE AND FABRIC BURIED IN TRENCH BAFFLE INSTALLATION N.T.S. PERSPECTIVE VIEW END VIEW PVC VENT FRONT VIEW GENERAL NOTES: 1. DRIVE 5' STEEL POST AT LEAST 24" INTO SOLID GROUND. 2. USE STAPLES 1' APART HORIZONTALLY AND VERTICALLY TO ATTACH THE FILTER FABRIC TO THE WIRE FENCE. 3. MINIMUM BAFFLE SPACING IS 10'. 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. 5. REFER TO NCESCPDM SECTION #6.65 FOR ADDITIONAL SPECIFIATIONS. "C" ENCLOSURE %TFR FNTRY HNIT SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. SEDIMENT BASIN SKIMMER N.T.S. onu 11 E 40 SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA >10 AC. (ACRES) <100 AC. MIN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6:1 WIDTH RATIO 1800 MIN. (CU. FT. VOLUME PER AC. REQUIRED DISTURBED) 435 SURFACE (SQ. FT. PER AREA CFS Q10) REQUIRED PLAN VIEW INFLOW STRUCTURE AVERAGE AREA* WIDTH W = L * AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY CROSS-SECTION VIEW INFLOW STRUCTURE amm DEWATERING ZONE FILTER FABRIC SEDIMENT STORAGE ZONE DATA BLOCK SEE NOTE #3 V FREEBOARD 6" MIN. INVERT ELEVATION OF EMERGENCY SPILLWAY PRIMARY SPILLWAY 2' MIN(RISER) 14 BAFFLE GENTLE SLOPES STEEP SLOPES 3RD BAFFLE: HARDWARE CLOTH 100 Ibs/acre tall fescue SURROUNDING SEEDING 30lbs/acre Sericea lespedeza SKIMMER NOTES: MIXTURE 80 Ibs/acre of tall fesue (unscarified after August 15) 10 Ibs/acre Kobe lespedeza 1. REFER TO NCESCPDM SECTION #6.61 FOR FALL: August 25 - October FALL: August 25 - October 15 ADDITIONAL DESIGN SPECIFICATIONS Late winter: February 15 -April 15 Late winter: February 15 -April 15 REGARDING SEDIMENT BASINS. SEEDING To extends spring seeding into June, add To extends spring seeding into June, add p� 9 9� p� 9 9 15 Ibs/acre hulled Bermudagrass 15 Ibs/acre hulled Bermudagrass DATES - 2. REFER TO BAFFLE INSTALLATION DETAIL FOR Overseeding of Kobe lespedeza over fall -seeded Overseeding of Kobe lespedeza over fall -seeded RISER BAFFLE SPACING AND tall fescue is very effective. tall fescue is very effective. INSTALLATION. 3. FIRST BAFFLE IS TO BE SEEDING Apply lime and fertilizer per soil rests, or 4000 Apply lime and fertilizer per soil rests, or 4000 CONSTRUCTED OF AMENDMENTS Ibs/acre limestone and 1000 Ibs/acre 10-10-10 Ibs/acre limestone and 1000 Ibs/acre 10-10-10 RIP -RAP AND #5 WASHED fertilizer. fertilizer. STONE, WITH A MIN. L=20' HEIGHT OF 3' AND MIN. MIN. TOPWIDTH OF 2'. NOTE 1 Ground Cover-- Protective cover must be established on all disturbed areas within 21 calendar days after 4. FLASHBOARD RISER NOT land disturbing activity is completed or has temporarily ceased. PERMITTED FOR USE NOTE 2 w Graded slopes and fills-- Protective cover must be established on all graded slopes and fills within 21 calendar days after a phase of grading is completed or has temporarily ceased. FEMBANKMENT iT SEEDING SCHEDULE EMERGENCY SPILLWAY ANTI -SEEP COLLAR NOT TO SCALE PHASE BASIN DRAINAGE AREA (ACRES) DENUDED AREA (ACRES) Q10 (CFS) BASIN VOLUME SURFACE AREA CLEANOUT DEPTH H/2 (FT) H (FT) Z (FT) L (FT) T (FT) W (FT) SKIMMER PIPE DIA. SKIMMER ORIFICE DIA. REQUIRED (CF) PROVIDED (CF) REQUIRED (SF) PROVIDED (SF) 1 1 1.10 1.03 3.87 1,980 10,435 1,682 4,638 1.4 2.80 6 35 83.2 10 2 1.00 2 1 1 1 1.62 1 1.56 1 5.69 2,916 10,435 1 2,477 4,638 1 1.4 1 2.80 1 6 1 35 1 83.7 1 10 2 1.00 SEDIMENT BASIN N.T.S. GENERAL NOTES: 1. AREA UNDER EMBANKMENT SHALL BE CLEARED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT MATERIAL. THE BASIN AREA SHALL BE CLEARED. 2. THE FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION AS WELL AS OVERSIZED STONES, ROCKS, ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. THE EMBANKMENT SHALL BE COMPACTED BY TRAVERSING WITH EQUIPMENT WHILE BEING CONSTRUCTED. SPILLWAYS SHOULD NOT BE CONSTRUCTED THROUGH FILL SECTIONS. ALL SPILLWAYS SHOULD BE LINED AND/OR RIPRAPPED. 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO DEPTH SHOWN ON STANDARD. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE. 4. THE TRAP SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NECESSARY. 5. CONSTRUCTION OPERATION SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. 6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER, UNLESS CERTIFIED BY REGISTERED GEOTECHICAL ENGINEER. 7. SEDIMENT BASIN EMBANKMENTS SHOULD BE PROVIDED WITH EROSION CONTROL AND STABILIZATION. 8. STORAGE AREA IS SHOWN AS RECTANGULAR FOR ILLUSTRATIVE PURPOSES ONLY, AND MAY BE CONSTRUCTED IN ANY SHAPE PROVIDED THE MINIMUM STORAGE VOLUME REQUIREMENT IS MET. THE BASIN SHOULD ALSO BE ORIENTED SUCH THAT THE FILTER AND THE MAIN FLOW OF WATER AND SEDIMENT ARE ON OPPOSITE ENDS ON THE LONGER BASIN DIMENSIONS. 9. REQUIRED STORAGE IS 1800 CUBIC FEET OF STORAGE VOLUME PER ACRES OF DRAINAGE AREA. IF CLEAR WATER FROM UNDISTURBED AREAS IN DRAINAGE BASIN ARE TAKEN AROUND OR THROUGH THE DENUDED AREA BY NON EROSIVE MEASURES THEN BASINS MAY BE SIZED BY DENUDED ACRES. RECOMMENDED STORAGE IS 1800 CUBIC FEET OF STORAGE PER ACRE OF DRAINAGE AREA. 10.THE LENGTH OF THE STONE OUTLET (SPILLWAY) IS TO BE BASED ON A 10 YEAR STORM. 11. WHENEVER TOPOGRAPHY ALLOWS, THE BASIN LENGTH SHOULD BE TWICE (2X) THE BASIN WIDTH, TO ALLOW FOR SETTLING. BAFFLES SHALL BE INSTALLED IN ALL BASINS. 12.CLEANOUT STAKES SHALL BE PLACED IN ALL SEDIMENT BASINS AT THE LOW POINT IN THE BASIN. THE STAKES SHALL BE MARKED SHOWING THE HALF FULL, CLEANOUT POINT, OF THE BASIN. 13.SAFETY FENCING 3' HIGH SHOULD BE PLACED AROUND ALL SEDIMENT BASINS. 14.FOR DESIGN OF RISER TYPE SEDIMENT BASINS, REFER TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES, EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 15.FOR SLOPES GREATER THAN 10' IN LENGTH AND PROTECTED BY SILT FENCE AT THE TOE OF THE SLOPE, SLOPE TERRACING WILL BE REQUIRED. 16.THE BERM ON SEDIMENT BASINS SHALL BE SEEDED ONCE FINAL GRADE HAS BEEN REACHED. THE SILT FENCE MAY BE REMOVED IF PERMISSION HAS BEEN GRANTED BY THE CITY LAND DEVELOPMENT INSPECTOR AFTER THE GRASS HAS GERMINATED AND STABLE GROUND HAS BEEN ESTABLISHED. 17. WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACE AT THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE WHERE 50' OF BUFFER IS NOT PROVIDED. SEDIMENT BASIN GENERAL NOTES N.T.S. NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 51 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 8. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIP RAP. 9. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL FOR DESIGN DATA. NATURAL GRADE d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 T = 1.5 X dmax. RIPRAP APRON AT PIPE OUTFALLS PLAN (IF NEEDED) ELEVATION MINIMUM H=2/3 PIPE DIAMETER THICKNESS) TEMPORARY SEEDING FOR WARM AND COOL SEASON EARLY SUMMER SEASON STEEP SLOPES SEEDING 40 Ibs/acre of German millet 120 Ibs/acre Rye (grain) MIXTURE 80 Ibs/acre oftall fesue 80 Ibs/acre tall fesue May 1 -August 15 October 25 - December 30 SEEDING Refertilize if growth is not fully adequate. Between December 30 - February 15, add 50 Ibs/acre of annual Kobe lespedeza. DATES Apply 4000 Ibs/acre straw or equivalent Apply 4000 Ibs/acre straw or equivalent hydroseeding. hydroseeding. SEEDING Apply lime and fertilizer per soil rests, or 2000 Apply lime and fertilizer per soil rests, or 2000 AMENDMENTS Ibs/acre limestone and 750 Ibs/acre 10-10-10 Ibs/acre limestone and 750 Ibs/acre 10-10-10 fertilizer. fertilizer. SEEDING SCHEDULE (SEASONAL) SEEDING SCHEDULES N.T.S. GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAYBE USED IN SLOPING DITCHES 2 OR CHANNELS TO SLOW VELOCITY OR TO CREATE CLASS B RIP RAP 1 SEDIMENT TRAPS. 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). 70.0' B A AND B ARE AT EQUAL ELEVATIONS V-6" MIN. PLAN TEMPORARY ROCK CHECK DAM N.T.S. V-6" MIN. # 5 WASHED STONE iS,-JrLvvv 2' MAX �a AT CENTER CROSS SECTION :LOTH STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, INC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 4/12/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. V L W O E-4 W coo � � U a = A z W E z M--1 W U2 E- a Cn o E-; MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 4-12-2019 [99£-0 # N&-j Z l0- Q 00 't - LO v Q CU M ce) i � O �O 1,_ CU (n W . - O U) L Q Uj O N 00 SUN 00 (1) N CCU W O Z Q CU O LU o N 00 " E O QcoU EROSION CONTROL DETAILS N.T.S. SHEET: C793 HOOD GRATE 1" REBAR FOR BAG REMOVAL FROM INLET FILTER BAG DUMP LOOPS CATCH BASIN SECTION NOTES 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE TOWN INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING TOWN OR NCDOT ROADS. CATCH BASIN INLET PROTECTION N.T.S. DEFLECTOR 36" MIN. SPACING TYP.* CUTLET I N STA L LAT I O N NOTE: 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1%. 2. SILT FENCE MAY BE REQUIRED BEHIND BERM TEMPORARY SILT DITCH N.T.S. Z O co H Q Q HO~C�U NOTES oo63=z 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE Lu ac z o TRUCKS. = ~ z w 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION u) I­-u- O BY ALL CONSTRUCTION VEHICLES. o �cn 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT z •j TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. a o PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. o 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO W BE DETERMINED BY THE ENGINEER. v 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED Z BY THE ENGINEER. o B. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. z W H Z � O Cr V � z Z 0 <" O Q J W � a NOTE: PLACE GEOTEXTILE FOR DRAINAGE BENEATH STONE SHEET 1 OF 1 1607.01 12" MIN. 114- SPACING TYP.* t t t t t t t t t t t t t \ t /1 t t t JMET WATER TABLE L 6" OVERLAP IN SLICE KEY/ANCHOR MATERIAL AT TOP OF SLOPE. GENERAL NOTES: 1. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH. 2. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE MET. 3. SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. 4. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. NON -WOVEN GEOTEXTILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL V MAX. WOVEN FILTER FABRIC 0 N GENERAL NOTES: N.T.S. 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE T-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 3. TURN SILT FENCE UP SLOPE AT ENDS. 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. SILT FENCE N.T.S. STEEL POST z_ FILTER FABRIC LuV O [O Q� M < FLOW 0 4 MIN. MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. LENGTH AS NECESSARY TO GO THRU DIKE 4' MIN. 1.5' MIN. 1 r2 FLEXIBLE PIPE TIE DOWN 10' MAX. SPACING TIE DOWN AT END 4' (MIN)' i * AT LESS THAN 1 % SLOPE DIAMETER (D) PIPE RIP -RAP AP I� <tlq►l�lCUgKelxi7��7691�1: RIP RAP & WASHED STONE FILTER BERM -SEDIMENT PIT • a • i :-� a � • ' a a • a STAKES' - ' EARTH DIKE CONSTRUCTION SPECIFICATIONS: 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1.5 FEET HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE. 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE. 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF EMPTYING INTO A DISTURBED AREA. STEEL WIRE FENCING _ (IF APPLICABLE) WOVEN FILTER FABRIC -SEDIMENT PIT NOT REQUIRED IF BASIN IS LOCATED DOWNSTREAM OF PIPE OUTLET. 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE HAND TAMPED IN 4" LIFTS TO THE TOP OF THE EARTH DIKE. 5. FOLLOW-UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT. 6. OUTLET PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE. FLEXIBLE PIPE SLOPE DRAIN N.T.S. 4' MAX. WASHED STONE HARDWARE CLOTH (NCDOT #5 OR BETWEEN POSTS AND #57) `COVERED BY STONE GENERAL NOTES: 1. SEDIMENT FILTER OUTLET AND HARDWARE CLOTH SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED IN A MINIMUM OF 12 INCHES IN LENGTH AND BACKFILLED PROPERLY AS SHOWN IN ABOVE DETAIL. 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTION OF THE INSPECTOR. SILT FENCE OUTLET N.T.S. STEEL POST HARDWARE CLOTH WASHED STONE (NCDOT #5 OR #57) FLOW II ANCHOR SKIRT; u EXCAVATE TRENCH AND COMPACT MAINTENANCE NOTES: BACKFILL 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED IT. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. * * * 3 Days Before Digging North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc811.org/remoteticketentry.htm '• SSI 33046 4-12-19 � •G• P STIPULATION FOR REUSE THIS DRAWING WAS PREPARED FOR USE ON A SPECIFIC SITE, SKYLAND DRIVE TOWNHOMES, S. SKYLAND DRIVE, MT. PLEASANT, INC, CONTEMPORANEOUSLY WITH ITS ISSUE DATE ON 4/12/19. AND IT IS NOT SUITABLE FOR USE ON A DIFFERENT PROJECT SITE OR AT A LATER TIME. USE OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE ON ANOTHER PROJECT IS NOT AUTHORIZED AND MAY BE CONTRARY TO THE LAW. V L W O ~ W O U a A z w Ew Z Z N� F-I--1 W d' M� EO- 1.4 ^ ~ Cn O F r ' V 1 MODIFICATION LOG JOB NUMBER: C190010 CHECKED BY: BMF DRAWN BY: BHE DATE: 4-12-2019 [99£-0 # N&-4 Z 0- °° LO - N � Q Cu r- N M � o w o ~ Ix C go (1 .- O N L rn� Q W (1)00 SUN 00 � N 0)CU w oz Cu o LU o CD 00 Eon <000 EROSION CONTROL DETAILS EEC C794