Loading...
HomeMy WebLinkAboutNCC192196_NOI Application_20191008Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/4/2019 11:02:19 AM (NCG01 NOI Submission) Approve by EADS\Ivgarcia 10/7/2019 8:36:23 AM (Review- Construction NOI 16745) • The task was assigned to EADS\Ivgarcia by round robin distribution 10/4/2019 11:02 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 8, 2019 5:00 PM 10/4/2019 11:02 AM Submit by McCoy, Suzanne 10/8/2019 7:22:25 AM (Payment Verification for NCC192196) * April Chianese • McCoy, Suzanne assigned the task to McCoy, Suzanne 10/8/2019 7:21 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 18, 2019 5:00 PM 10/7/2019 8:36 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Honeycutt Farm Phase 11 2. County* Wake 3. Highway or Street 1000 Piney Grove Wilbon Road Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Town of Holly Springs 5. State * NC 1r-i)iTII1T7i1)MfiTi(-_ToIa10141 6. Zip Code* 27540 7. Latitude * Enter the latitude in decirral degrees 35.6242 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -78.8453 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/04/2019 Estimated Construction Project Start Date 10. Date to End* 12/31 /2021 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Development 12. Acres to be 13.70 disturbed* (including off -site borrow and waste areas) 13. Total site area 16.39 (acres)* 14. Post- 7.16 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2019-Honeycutt Farm Phase 11 Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find Waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Buckhorn Creek Waterbody* I\brre of waterbody into which stornwater runoff will discharge 15b. Waterbody 18-7-(1) Index No. * NCWaterbody Index Nurrber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization AV Homes of Raleigh, LLC Name * 2. First Name* Jeremy ff Corporation, enter Registered Agent First l\b e 3. Last Name * Medlin ff Corporation, enter Registered Agent Last Barre 3b. Title VP of Land Acquisition & Development 4. Permitee E-mail jmedlin@taylormorrison.com Address* 5. Permittee 919-291-3819 Telephone No.* 6. Permittee Mailing Street Address Address* 15501 Weston Parkway Address Line 2 Suite 100 City Cary Pastal / Zip Code 27513 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 15501 Weston Parkway Address Line 2 Suite 100 City Cary Pastal / Zip Code 27513 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Christian Contact - First Name * 3. Primary Site Sheppard Contact - Last Name * 4. Title 5. Site Contact E- csheppard@taylormorrison.com mail Address* 6. Site Contact 910-638-1877 Telephone No.* 7. Organization Taylor Morrison Name 8. Site Contact Street Address Mailing Address* 15501 Weston Parkway Address Line 2 Suite 100 aty Cary Pbstal/ Zip Code 27513 9. Consultant Name (optional) Jeremy Finch First and Last narre 10. Consultant E- jfinch@mcadamsco.com mail This person will be copied on all correspondence. 11. Consultant 919.361-5000 Telephone No. State / Province / Pegion NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/03/2019 Approved * 2. E&SC Plan Project 14-2019 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* Town of Holly Springs Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Honeycutt Farm Phase 11 Letter of Plan Approval 975.6KB Approval.pdf letter/documentation EDP Ph 11 7-3-19.pdf 228.87KB Wst be POF format 6. NOI Certification Honeycutt PH11 NCG01.pdf 92.55KB Form Wst be RDFformat This is an Express r No Review Project* f Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Jeremy Dowd Medlin Title VP, Land Acquisition and Development Organization AV Homes of Raleigh, LLC Date * 10/04/2019 F. Tracking and COC Info NOI Tracking No. 16745 NC Reference No. NCG01-2019-2196 Uses 'count number variable (incremrented by SP) Certificate of NCC192196 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 2196 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)