HomeMy WebLinkAbout20191035 Ver 1_Incomplete Notice SAW-2018-00574_20191003Strickland, Bev
From:
Jay Keller <jay@kellerenvironmental.com>
Sent:
Thursday, October 03, 2019 2:52 PM
To:
Lastinger, James C CIV USARMY CESAW (USA)
Cc:
Goss, Stephanie
Subject:
[External] RE: Arlington Meadows, Incomplete Notice, SAW -2018-00574
Attachments:
Sht2.0-ExistOverall.pdf, ArlMead AngRd Culy S Viewjpg; ArlMead AngRd Culy S
View2jpg; ArlMead E Trib Downstream View at Proposed Road Xingjpg; ArlMead E
Trib Upstream View at Proposed Road Xingjpg; ArlMead E Trib Upstream View at
Proposed Road Xing2jpg; ArlMead FarmPath N Upstream View at Stream- Proposed
Sewer Xingjpg; ArlMead FarmPath NW View at Stream- Proposed Sewer Xingjpg;
ArlMead W Trib SE View at Proposed Sewer Xingjpg; ArlMead W Trib SW View at
Proposed Sewer Xingjpg; ArlMead AngRd Culy Downstream W Viewjpg;
Arlington Meadows NC SAM Rating Calculator v2.1.xlsm; Arlington Meadows DWR
PCN 9-30-19.pdf, Arlington Meadows Stream Form Map.png
External email. Do
not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good afternoon James, hope you're also in the office & avoiding this heat. I would appreciate if you can please call me
after reviewing the attached items.
• Sht2.0-ExistOverall- this survey was provided to us when were first contacted in Oct 2016. It shows the existing
soil/farm paths that we were able to use traversing the site. The proposed sewer line crossing of the main
(perennial) stream is being placed at the pathway crossing. The entrance road between the high power line &
main stream is also being placed where the pathway crosses that north tributary.
• Stream form with map location
• Photos
• Revised 9-30-19 PCN
Thanks for your help. Jay
-----Original Message -----
From: Lastinger, James C CIV USARMY CESAW (USA) <James.C.Lastinger@usace.army.mil>
Sent: Thursday, September 26, 2019 8:32 AM
To: Jay Keller <jay@kellerenvironmental.com>
Cc: Goss, Stephanie <stephanie.goss@ncdenr.gov>
Subject: RE: Arlington Meadows, Incomplete Notice, SAW -2018-00574
Jay,
A few issues that still need to be addressed further,
1. You need to submit the results of the NCSAM form as well. Until the results have been submitted, I am unable to
determine if mitigation will be required. Please fill out the attached, Once it is filled out in excel it will give you the
rating.
2. You state that proposed sewer line corridors will not be maintained. I have never seen a sewer line corridor that is not
maintained. Typically sewer line corridors are mowed and do not remain forested in perpetuity during initial
construction or during long term maintenance/mowing by the municipality or other governing agency. This helps to
prevent tree roots from causing issues with the sewer line as well as for access and maintenance purposes. Please
submit further information from the municipality or other governing agency stating that the sewer corridors will not be
clear during initial construction and will not be maintained as you have stated.
Your application is still considered incomplete until the above items have been addressed.
James Lastinger
Regulatory Project Manager
Raleigh Regulatory Field Office
US Army Corps of Engineers, Wilmington District
ADDRESS: 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587
Tel: (919) 554-4884, x32
Cell: (919) 428-0806
Fax: (919) 562-0421
-----Original Message -----
From: Jay Keller [mailto:jay@kellerenvironmental.com]
Sent: Wednesday, September 25, 2019 11:30 PM
To: Lastinger, James C CIV USARMY CESAW (USA) <James.C.Lastinger@usace.army.mil>
Cc:'Stephanie.Goss@ncdenr.gov' <Stephanie.Goss@ncdenr.gov>
Subject: [Non-DoD Source] RE: Arlington Meadows, Incomplete Notice, SAW -2018-00574
Good evening James, hope you're having a good week. Please review the attached items at your earliest convenience &
let me know if you have any questions. Thanks for your help. Jay
-----Original Message -----
From: Lastinger, James C CIV USARMY CESAW (USA) <James.C.Lastinger@usace.army.mil>
Sent: Tuesday, August 27, 2019 3:07 PM
To: Jay Keller <jay@kellerenvironmental.com>
Cc:'Stephanie.Goss@ncdenr.gov' <Stephanie.Goss@ncdenr.gov>
Subject: Arlington Meadows, Incomplete Notice, SAW -2018-00574
Jay,
Please see the attached incomplete notice for the above referenced project. Please let me know if you have any
questions or concerns regarding the notice.
James Lastinger
Regulatory Project Manager
Raleigh Regulatory Field Office
US Army Corps of Engineers, Wilmington District
ADDRESS: 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587
Tel: (919) 554-4884, x32
Cell: (919) 428-0806
Fax: (919) 562-0421