Loading...
HomeMy WebLinkAbout20090940 Ver 1_More Info Received_200910080q-oql+a OCT 19@20WA, 8 2009 DENR-WATER QUAUTy KTIANDS AND StORA1WATER BRANCH DUKE ENERGY DAN RIVER COMBINED CYCLE PROJECT STORM WATER MANAGEMENT PLAN EDEN, ROCKINGHAM COUNTY, NC SUBMITTED TO: NCDENR DIVISION OF WATER QUALITY 2321 CRABTREE BLVD., SUITE 250 RALEIGH, NC 27604-2260 PREPARED BY: jmmmWSPm SELLS F-0891 128 Overhill Drive, Suite 105, Mooresville, NC 28117 %Itstoot #Ito Phone: (704) 662-0100 CA/? ( Asa Fax: (704) 662-0101 0 r r s? I 001 oq - oq ??o DWQ USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FOP @R a V S This form may be photocopied for use as an original OC T 8 2009 1. GENERAL INFORMATION DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Duke Energy Carolinas, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Mark Landseidel 3. Mailing Address for person listed in item 2 above: P.O. Box 1006 City:Charlotte State:NC Zip:28201 Phone: (704 ) 382-4759 Fax: (704 ) 382-5827 Email:melandseidel@duke-enerav.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Dan River Combined Cycle Project 5. Location of Project (street address): 900 South Edgewood Road City:Eden County:Rockingham Zip:27288 6. Directions to project (from nearest major intersection): East 1.5 miles on Stadium Drive from the intersection of Van Buren Road (NC 14) and Stadium Drive Turn south on Edeewood Road, plant is at the end of the road 7. Latitude:36029' 30" N Longitude:79° 42' 35" W of project 8. Contact person who can answer questions about the project: Name:Robert Wylie Telephone Number: (704 ) 382-4669 Email:robert.wylie@duke-energy.com II. PERMIT INFORMATION: • 1. Specify whether project is (check one): ®New ?Renewal Modification Form SWU-101 Version 09.25.08 Page 1 of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): • ®Low Density OHigh Density []Redevelop []General Permit []Universal SMP []Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): OCAMA Major ®Sedimentation/Erosion Control ®404/401 Permit ONPDES Industrial Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater from the project will be treated by BMP #1 (Bioretention Area) and BMP#2 (Wet Detention Pond) the post development peak flow for the 1-year and 10-year peak flow is equal to or less than the gredevelopment flow. The BMP's will also treat the first inch of rainfall to 90 percent TSS Pollutant Removal Efficiency. 2. Stormwater runoff from this project drains to the Roanoke River basin. 3. Total Property Area: 377.79 acres 4. Total Coastal Wetlands Area: 0 acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**:377.79 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA):3.00 /o 7. How many drainage areas does the project have?2 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, com lete the table with one draina e area for each engineered stormwater device. • Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Dan River Dan River Stream Class & Index No. C 22 - (39) C 22 - (39) Total Drainage Area (sf) 203,457 790,614 On-site Drainage Area (sf) 203,457 790,614 Off-site Drainage Area (so 0 0 Existing Impervious* Area (sf) 98,010 0 Proposed Impervious*Area (sf) 94,961 399,009.6 % Impervious* Area (total) 42.3 50.5 Impervious* Surface Area E On-site Buildings (sf) Drainage Area 1 66,646.8 Drainage Area 2 142,005.6 On-site Streets (sf) 28,314 254,826 On-site Parking (sf) 0 0 On-site Sidewalks (sf) 0 2,178 Other on-site (sf) 0 0 Off-site (sf) 0 0 Total (sf): 94,961 399,009.6 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. • **Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BUA). Form SWU-101 Version 09.25.08 Page 2 of 4 9. How was the off-site impervious area listed above derived?Existing features were from on-site survey and proposed feature were supplied by Shaw. Projects in Union County: Contact the DWQ Central Office staff to check to see if you project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmo forms htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. • V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http://,12o.enr.state.i-ic.us/suibmr) forms htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Form SW401-Cistern • Low Density Supplement Curb Outlet System Supplement Off-Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/mg_!Raps htin) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. tials • Original and one copy of the Stormwater Management Permit Application Form C • Original and one copy of the Deed Restrictions & Protective Covenants Form (if WA required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP ?r • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management C • Copy of any applicable soils report C • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures • - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Ionathan Carter of WSP Sells Mailing Address:128 Overhill Drive, Suite 105 City:Mooresville State:NC Zip:28117 Phone: (704 ) 662-0100 Fax: (704 ) 662-0101 Email:jonathan.carter@wspsells.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Mark Landseidel certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. i Signature: Date: 1-16-61 Form SWU-101 Version 09.25.08 Page 4 of 4 • DUKE ENERGY DAN RIVER COMBINED CYCLE PROJECT STORM WATER MANAGEMENT PLAN EDEN, ROCKINGHAM COUNTY, NC SUBMITTED TO: • NCDENR DIVISION OF WATER QUALITY 2321 CRABTREE BLVD., SUITE 250 RALEIGH, NC 27604-2260 PREPARED BY: p?mmpWSP• SELLS F-0891 128 Overhill Drive, Suite 105, Mooresville, NC 28117 a«««,««««««ar,,,P' Phone: (704) 662-0100 "o?'•S?0 ??ie?'<sr Fax: (704) 662-0101 r r ?i ? 'Msaew• • Q s Q?e • PROJECT NARRATIVE The Duke Energy Dan River Steam Station in Eden, Rockingham County, NC will undergo a plant expansion to include combined cycle combustion turbines. The project will require disturbance of approximately 65 acres of the 378 acre facility. Earthwork proposed for the project includes filling a 0.133 acre of wetland area. A 401 permit (NCDENR DWQ) and 404 permit (US Army Corp. of Engineers) have been submitted. The enclosed storm water management plan includes the entire plant expansion area which is comprised of two general drainage areas: Drainage Area #1 and Drainage Area #2. In drainage area #1 a bioretention area is proposed. Drainage area #2 will incorporate a wet detention pond. The stockpile area within Drainage Area #3 will be established with vegetation as shown on the erosion and sediment control plan. There is no impervious area proposed for the stockpile area, and the runoff from this drainage area discharges into the existing ash basins. The proposed BMP(s) are denoted as Bioretention Area #1 and Wet Pond #2 for the Plant Expansion Area. The BMP(s) are designed in accordance with the North Carolina BMP Manual (2007 edition). The bioretention area is designed for 85% TSS removal and the wet detention basin is designed for 90% TSS removal with a permanent pool minimum average depth of 3 feet. • The hydrologic calculations include pre and post discharge rates for the 1-yr, 2-yr, 10-yr, 50-yr, and 100-yr, 24 hour events. These calculations are based upon SCS TR20 method using HydroCAD computer modeling. The water quality drawdown is based upon the 1-inch storm event per the BMP guidelines. As shown in the calculations, the post development discharge rates are below predevelopment discharge rates for the 1-yr, 2-yr, and 10-yr storm events. The emergency spillway is sized for the 100-yr storm event. Soil testing was performed by S&ME, Inc. (see attached soil test reports). Temporary observation wells were installed in the general areas of Bioretention Area #1 and Wet Pond 2. Based upon the average depths to groundwater in the test locations, a seasonal high groundwater level was determined for each of the wet detention ponds. The proposed excavated depths are a minimum 2 feet above the seasonal high groundwater in all areas. The BMP(s) will be constructed after the site construction is completed and the site is stabilized in accordance with the erosion and sediment control plan. Following construction of the BMP(s) and establishment of vegetation, the BMP(s) will be maintained in accordance with the Operations and Maintenance Agreements included in this Plan. Permit Number: (to be provided by DWQ) Drainage Area Number: • Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). c: Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 E • BMP element: Potential problems: How I will remediate the problem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new lantin media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 .7 i • BMP element: Potential problems: How I will remediate the problem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) • I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Dan River Combined Cycle Project BMP drainage area number:Bioretention Area #1 Print name:Mark Landseidel Title:General Manager Address:P.O. Box 1006, Charlotte, NC 28201 Phone:(704) 382-4759 Signature: Date: g -1 (?'- O g Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. • I, ??? 1 ?(?DD !Cf rr( , a Notary Public for the State of 1 'rtfi )r t j1A , County of &O2n ou of , do hereby certify that trkh„(? ; ?j?o personally appeared before me this j? day of A6 , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, \?? ?, G;?o6nburg •. q?? ??i • .fie ?? ? -?. '???pe•;Northtoil ??• SEAL My commission expires 14, 96 11 Form SW40 I -Bioretention I&M-Rev. 2 Page 4 of 4 Permit Number: is (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not This system (check one): ® does ? does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. • - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: • • • BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: • BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 529.50 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 532.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) • 0 Permanent Pool Elevation 530.50 Sediment Removal . 532.25 /Pe anen Pool - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 529.50 Volume Bottom Elevatio 531.25 Min. --------------------------------------ediment Bottom Elevation 528.50 1-ft Storage Sedimei Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) . I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Dan River Combined Cycle Project BMP drainage area number: Wet Pond #2 Print name:Mark Landseidel Title:General Manager Address:P.O. Box 1006, Charlotte, NC 28201 Phone:(704) 382-4759 Signature: Date: Ii- J(. O Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I 'T. 60 ((L r? , a Notary Public for the State of 14 r 4i i r(f'i fin County of ftoelen hur , do hereby certify that personally appeared before me this 164 day of 2ecl , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, \\EV !a J,???? oii ?,ecWen6???00 ® 9 . •m r ? 0 0 i SEAL My commission expires at) / Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) OF W ATF9 ©. my 0? OG WDENR • STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Dan River Combined Cycle Project Contact name Robert Wylie Phone number 704-3824669 Date 10-Sep-09 Drainage area number Rain Garden #1 II. DESIGN INFORMATION ` Site Characteristics Drainage area 203,457 ft2 Impervious area 86,142 ft2 Percent impervious 42.3% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 2.81 in 1-yr, 24-hr intensity 0.12 in/hr Pre-development 1-yr, 24-hr peak flow 11.810 ft'/sec Post-development 1-yr, 24-hr peak flow 11.540 ft'/sec Pre/Post 1-yr, 24-hr peak control -0.270 ft' /sec Storage Volume: Non-SA Waters Minimum volume required 7,301.0 ft' Volume provided 7,318.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume ft' Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 7,635.0 ft2 OK Length: ft Width: ft -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 1 hr OK Drawdown time, to 24 inches below surface hr Drawdown time, total: 1 hr In-situ soil: Soil permeability 2.00 in/hr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 86% OK % Fines (by weight) 9% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media (unitless) Form SW401-Bioretention-Rev.8 July 30, 2009 Parts I and II. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation 525.00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions): . Is this a grassed cell? N (Y or N) Is this a cell with trees/shrubs? Y (Y or N) Planting elevation (top of the mulch or grass sod layer) 525 fmsl Depth of mulch 4 inches Bottom of the planting media soil 522 fmsl Planting media depth 3 ft Depth of washed sand below planting media soil 0.33 ft Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains 0 ft Bottom of the cell required 521.67 fmsl SHWT elevation 518.8 fmsl Distance from bottom to SHWT 2.87 ft Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 525 ft Planting Plan Number of tree species 1 Number of shrub species 35 Number of herbaceous groundcover species 35 Additional Information Does volume in excess of the design volume bypass the bioretention cell? Y (Y or N) Does volume in excess of the design volume flow evenly distributed through a vegetated filter? Y (Y or N) What is the length of the vegetated filter? 30 ft OK media depth OK OK OK OK OK Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 1 fusec OK N (Y or N) OK Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (81inches gravel followed by 3-5 ft of grass) Grassed swale Forebay • Other OK A Form SW401-Bioretention-Rev.8 July 30, 2009 Parts I and II. Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) __- Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to • indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan In' 'als Sheet No. 1.0 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and C-74 Boundaries of drainage easement. " ' 2. Plan details (1 = 30 or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build-out, Off-site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. • C 7• -Indicate the P-Index between 10 and 30 " ' 3. Section view of the bioretention cell (1 = 20 or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers (ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] CO 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and C _7.2 - x. . 5. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. G?• C7 7. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. . S 8. The supporting calculations (including underdrain calculations, if applicable). 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Part III, Page 1 of 1 Bioretention facility (NCDENR BMP MANUAL 2007 CHAPTER 12) Drainage Area (Ad) = 4.67 acres Imperviouness (IA)= 42.3% Rain Depth (Rd)= 1 inch Runoff Volume by Shueler Method Rv= 0.05+0.9*IA = 0.43 V(1 inch)= 3630*Rp*Rv*A WQV= 7,301 Surface Area Required SA (ft)= WQV/d SA (ft)= 7301.3 d = ponding depth (ft) = 1 Infiltration Rate of Media Infiltration Rate- k (in/hr) = 2.0 Underdrain System Design (BMP Manual Section 5-7) Q (cfs)=CIA 0.60xk x Ad = 5.60 (Safety Factor of 10) Q (cfs)= 56.04 (Internal Slope) s = 0.50% (roughness factor) n = 0.011 Diameter of Single Pipe D (inches) = 16 x Q x n s 0.5 = 6.37 From Table 5-1 D is less than 6.66 use 4- 4" pipes 9 Precipitation Frequency Data Server Page 1 of 3 ' POINT PRECIPITATION FREQUENCY ESTIMATES ?? FROM NOAA ATLAS 14 "? W' EDEN, NORTH CAROLINA (31-2631) 36.4742 N 79.7433 W 498 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Thu Sep 10 2009 Confidence Limits Seasonality Location Maps Other Info. GIS data Maps Docs Return to State Map • • Precipitation Frequency Estimates (inches) ARI* [2j 10 min 15 min 3 0 F min 60 --l min 120 [ min 3 hr 6 hr 12 ht, 24 hr 48 hr 4 dom. 7 day da da 30 da 45 d--.y 1 60 1 da =1 0.36 0.58 0.72 0.99 1.24 1.47 1.59 1.96 2.37 2.81 3.30 3.68 4.22 4.77 6.43 7.96 10.02 11.98 0 0.43 0.69 0.87 1.20 1.51 1.79 1.93 2.38 2.87 3.40 3.99 4.45 5.07 5.71 7.66 9.41 11.82 14.06 0 0.51 0.82 ].04 1.47 1.89 2.25 2.44 2.99 3.64 4.33 5.04 5.61 6.29 7.01 9.21 11.09 13.76 16.16 10 0.57 0.91 1.15 1.66 2.17 2.61 2.82 3.48 4.26 5.10 5.90 6.57 7.30 8.06 10.44 12.37 15.23 17.74 25 0.63 1.01 1.28 1.89 2.52 3.08 3.33 4.15 5.16 6.22 7.12 7.92 8.72 9.54 12.11 14.04 17.11 19.75 50 0.68 1.07 1.36 2.05 2.78 3.44 3.72 4.70 5.89 7.17 8.14 9.05 9.89 10.74 13.42 15.32 18.52 21.23 100 0.72 1.14 1.44 2.20 3.03 3.82 4.13 5.27 6.70 8.21 9.22 10.25 11.13 11.99 14.76 16.56 19.87 22.64 200 0.75 1.19 1.50 2.34 3.28 4.19 4.53 5.86 7.55 9.34 10.38 11.54 12.46 13.30 16.11 17.78 21.17 23.98 500 0.79 1.25 1.58 2.51 3.60 4.69 5.07 6.70 8.80 11.00 12.07 13.39 14.35 15.15 17.95 19.38 22.85 25.67 1000 92 1.29 1.62 2.63 3.84 5.08 5.48 7.36 9.82 941 13.46 HE HE 16.63 19.37 957 24.08 26.89 These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting forces estimates near zero to appear as zero. The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are greater than. ° These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAH Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 5 10 [XF1 0 60120 3 6 F 12 24 8 4 7 10 20 30 45 60 (years) min min min11 min min hr hr hr hr hr F ay day day 11 day 11 day 11 day 11 day 0.40 0.63 0.79 1.09 1.35 1.61 1.73 2.15 2.59 3.04 3.55 3.97 4.51 5.10 6.85 8.42 10.60 12.61 0.47 0.76 0.95 1.31 1.65 1.96 2.11 2.61 3.14 3.67 4.30 4.80 5.42 6.10 8.16 9.96 12.50 14.81 0 0.56 0.90 1.14 1.61 2.07 2.46 2.66 3.28 3.96 4.66 5.41 6.05 6.72 7.48 9.81 11.73 14.54 17.01 10 0.62 0.99 1.25 1.81 2.36 2.84 3.07 3.80 4.62 5.48 6.32 7.06 7.78 8.60 11.11 13.07 16.07 18.67 25 0.69 1.09 1.39 2.06 2.74 3.35 3.62 4.52 5.57 6.68 7.63 8.51 9.28 10.16 12.89 14.85 18.06 20.77 50 0.73 1.17 1.48 2.23 3.02 3.74 4.04 5.11 6.36 7.69 8.71 9.72 10.53 11.43 14.30 16.19 19.56 22.34 100 0.78 1.24 1.56 2.40 3.30 4.15 4.47 5.72 7.20 8.80 9.88 11.02 11.87 12.79 15.73 17.52 21.01 23.83 200 0.82 1.30 1.64 2.55 3.58 4.55 4.90 6.36 8.10 10.01 11.14 12.43 13.30 14.21 17.20 18.84 22.42 25.27 500 0.86 1.37 1.72 2.74 3.93 5.10 5.49 7.27 9.45 11.80 13.00 14.46 15.37 16.23 19.21 20.59 24.24 27.11 1000 0.90 1.41 1.77 2.87 4.19 5.53 5.95 7.99 10.55 13.34 14.55 16.16 17.08 17.88 20.79 21.93 25.61 28.46 The lower bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are less than. * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 10 1? 30 60 120 3 6 12 24 48 4 10 20 30 45 60 11 min min min min min hr hr hr hr hr dy dday 11 day day day 11 day 0.33 0.53 0.66 0.91 1.13 1.35 1.46 1.80 2.18 2.61 3.08 3.43 3.96 4.48 6.05 7.54 9.48 11.39 0 0.40 0.63 0.80 1.10 1.38 1.64 1.78 2.19 2.64 3.16 3.72 4.15 4.75 5.37 7.21 8.91 11.18 13.37 0 0.47 0.75 0.95 1.35 1.73 2.06 2.24 2.74 3.33 4.02 4.70 5.23 5.89 6.58 8.66 10.49 - F13 01 15.36 FRO-] 70831E] 1.52 1.98 2.38 2.58 3.18 3.88 4.72 5.48 6.10 6.82 7.55 9.79 11.68 14.38 16.84 25 0.57 0.92 1.16 1.72 2.29 2.80 3.03 3.76 4.66 5.73 6.59 7.33 8.11 8.89 11.32 13.23 16.13 18.71 50 0.61 0.97 1.23 1.85 2.51 3.12 3.38 4.22 5.29 6.56 7.49 8.32 9.15 9.97 12.51 14.39 F17 .42 20.06 100 0.65 1.02 1.30 1.99 2.73 3.43 3.72 4.70 5.94 7.45 8.43 9.37 10.25 11.08 13.70 15.52 18.64 21.36 200 0.68 1.07 1.35 2.10 2.95 3.74 4.05 5.17 6.62 8.41 9.42 10.46 11.39 12.21 14.88 16.62 19.81 22.57 500 0.71 1.12 1741 2724 3.21 4.14 4.48 5.82 7.56 9.77 10.83 12.02 12.96 13.79 16.44 18.00 21.29 24.07 1000 0.73 1.14 1.44 2.33 3.39 4.44 4.80 6.30 8.30 10.89 11.96 13.27 14.24 15.02 17.64 19.03 22.35 25.13 http://dipper.nws.noaa. gov/cgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&state... 9/10/2009 E • • D I Pre Subca# Reach on Link Drainage Diagram for Pond I Pre Prepared by WSP SELLS, Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Pond-1-Pre Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchm ent-numbers) 8.890 74 >75% Grass cover, Good, HSG C (DA1) 2.250 98 Paved parking, HSG C (DA1) 11.140 TOTAL AREA • 0 Pond-1-Pre Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Goup Numbers 0.000 HSG A 0.000 HSG B 11.140 HSG C DA1 0.000 HSG D 0.000 Other 11.140 TOTAL AREA 0 Pond-1-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 . HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Pre Runoff Area=11.140 ac 20.20% Impervious Runoff Depth=1.05" Flow Length=414' Tc=22.4 min CN=79 Runoff=11.79 cfs 0.976 of Total Runoff Area =11.140 ac Runoff Volume = 0.976 of Average Runoff Depth =1.05" 79.80% Pervious = 8.890 ac 20.20% Impervious = 2.250 ac 0 E Pond-1-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DA1: Pre Runoff = 11.79 cfs @ 12.17 hrs, Volume= 0.976 af, Depth= 1.05" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 1 year Rainfall=2.81" Area (ac) CN Description 2.250 98 Paved parking, HSG C 8.890 74 >75% Grass cover, Good, HSG C 11.140 79 Weighted Average 8.890 79.80% Pervious Area 2.250 20.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.8 249 0.0400 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 0.6 165 0.0900 4.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.4 414 Total Subcatchment DA1: Pre Hydrograph 13 ' 12 -, -- ,- ---- ----i? 11 10 9 , 8 ? . V. 7 3 6 LL 5 4 3 2 1 ----- ' --- -I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 4,10-4,12'', 0 42 44 46 48 Time (hours) • Pond-1-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment DA1: Pre • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.02 0.00 0.00 1.20 0.04 0.00 0.00 1.80 0.06 0.00 0.00 2.40 0.08 0.00 0.00 3.00 0.10 0.00 0.00 3.60 0.12 0.00 0.00 4.20 0.14 0.00 0.00 4.80 0.17 0.00 0.00 5.40 0.20 0.00 0.00 6.00 0.22 0.00 0.00 6.60 0.26 0.00 0.00 7.20 0.29 0.00 0.00 7.80 0.32 0.00 0.00 8.40 0.36 0.00 0.00 9.00 0.41 0.00 0.00 9.60 0.47 0.00 0.00 10.20 0.53 0.00 0.00 10.80 0.62 0.00 0.05 11.40 0.76 0.02 0.26 12.00 1.86 0.44 6.37 12.60 2.09 0.58 3.34 13.20 2.20 0.64 1.35 13.80 2.28 0.70 0.97 14.40 2.34 0.73 0.75 15.00 2.40 0.77 0.67 15.60 2.45 0.80 0.59 16.20 2.49 0.83 0.50 16.80 2.52 0.85 0.46 17.40 2.56 0.88 0.43 18.00 2.59 0.90 0.40 18.60 2.62 0.92 0.37 19.20 2.64 0.94 0.34 19.80 2.67 0.95 0.31 20.40 2.69 0.97 0.29 21.00 2.71 0.98 0.28 21.60 2.73 1.00 0.27 22.20 2.75 1.01 0.27 22.80 2.77 1.02 0.26 23.40 2.79 1.04 0.26 24.00 2.81 1.05 0.25 24.60 2.81 1.05 0.02 25.20 2.81 1.05 0.00 25.80 2.81 1.05 0.00 26.40 2.81 1.05 0.00 27.00 2.81 1.05 0.00 27.60 2.81 1.05 0.00 28.20 2.81 1.05 0.00 28.80 2.81 1.05 0.00 29.40 2.81 1.05 0.00 30.00 2.81 1.05 0.00 30.60 2.81 1.05 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 2.81 1.05 0.00 31.80 2.81 1.05 0.00 32.40 2.81 1.05 0.00 33.00 2.81 1.05 0.00 33.60 2.81 1.05 0.00 34.20 2.81 1.05 0.00 34.80 2.81 1.05 0.00 35.40 2.81 1.05 0.00 36.00 2.81 1.05 0.00 36.60 2.81 1.05 0.00 37.20 2.81 1.05 0.00 37.80 2.81 1.05 0.00 38.40 2.81 1.05 0.00 39.00 2.81 1.05 0.00 39.60 2.81 1.05 0.00 40.20 2.81 1.05 0.00 40.80 2.81 1.05 0.00 41.40 2.81 1.05 0.00 42.00 2.81 1.05 0.00 42.60 2.81 1.05 0.00 43.20 2.81 1.05 0.00 43.80 2.81 1.05 0.00 44.40 2.81 1.05 0.00 45.00 2.81 1.05 0.00 45.60 2.81 1.05 0.00 46.20 2.81 1.05 0.00 46.80 2.81 1.05 0.00 47.40 2.81 1.05 0.00 48.00 2.81 1.05 0.00 Pond-1-Pre Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 7 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Pre Runoff Area=11.140 ac 20.20% Impervious Runoff Depth=2.89" Flow Length=414' Tc=22.4 min CN=79 Runoff=33.47 cfs 2.681 of Total Runoff Area =11.140 ac Runoff Volume = 2.681 of Average Runoff Depth = 2.89" 79.80% Pervious = 8.890 ac 20.20% Impervious = 2.250 ac • 0 Pond-1-Pre Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DA1: Pre 0 Runoff = 33.47 cfs @ 12.15 hrs, Volume= 2.681 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 10 year Rainfall=5.10" Area (ac) CN Description 2.250 98 Paved parking, HSG C 8.890 74 >75% Grass cover, Good, HSG C 11.140 79 Weighted Average 8.890 79.80% Pervious Area 2.250 20.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.8 249 0.0400 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 0.6 165 0.0900 4.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.4 414 Total Subcatchment DA1: Pre Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) E • Pond-1-Pre Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment DA1: Pre • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.03 0.00 0.00 1.20 0.06 0.00 0.00 1.80 0.10 0.00 0.00 2.40 0.14 0.00 0.00 3.00 0.18 0.00 0.00 3.60 0.22 0.00 0.00 4.20 0.26 0.00 0.00 4.80 0.31 0.00 0.00 5.40 0.35 0.00 0.00 6.00 0.41 0.00 0.00 6.60 0.46 0.00 0.00 7.20 0.53 0.00 0.00 7.80 0.59 0.00 0.02 8.40 0.66 0.01 0.08 9.00 0.75 0.02 0.19 9.60 0.85 0.03 0.31 10.20 0.97 0.06 0.49 10.80 1.13 0.11 0.86 11.40 1.38 0.21 1.70 12.00 3.38 1.47 20.57 12.60 3.79 1.80 8.49 13.20 4.00 1.96 3.22 13.80 4.14 2.08 2.27 14.40 4.25 2.17 1.75 15.00 4.35 2.25 1.54 15.60 4.44 2.32 1.35 16.20 4.51 2.39 1.15 16.80 4.58 2.44 1.05 17.40 4.64 2.49 0.99 18.00 4.70 2.54 0.92 18.60 4.75 2.59 0.84 19.20 4.80 2.63 0.77 19.80 4.84 2.67 0.70 20.40 4.88 2.70 0.64 21.00 4.92 2.73 0.62 21.60 4.96 2.77 0.61 22.20 4.99 2.80 0.59 22.80 5.03 2.83 0.58 23.40 5.07 2.86 0.57 24.00 5.10 2.89 0.55 24.60 5.10 2.89 0.04 25.20 5.10 2.89 0.00 25.80 5.10 2.89 0.00 26.40 5.10 2.89 0.00 27.00 5.10 2.89 0.00 27.60 5.10 2.89 0.00 28.20 5.10 2.89 0.00 28.80 5.10 2.89 0.00 29.40 5.10 2.89 0.00 30.00 5.10 2.89 0.00 30.60 5.10 2.89 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 5.10 2.89 0.00 31.80 5.10 2.89 0.00 32.40 5.10 2.89 0.00 33.00 5.10 2.89 0.00 33.60 5.10 2.89 0.00 34.20 5.10 2.89 0.00 34.80 5.10 2.89 0.00 35.40 5.10 2.89 0.00 36.00 5.10 2.89 0.00 36.60 5.10 2.89 0.00 37.20 5.10 2.89 0.00 37.80 5.10 2.89 0.00 38.40 5.10 2.89 0.00 39.00 5.10 2.89 0.00 39.60 5.10 2.89 0.00 40.20 5.10 2.89 0.00 40.80 5.10 2.89 0.00 41.40 5.10 2.89 0.00 42.00 5.10 2.89 0.00 42.60 5.10 2.89 0.00 43.20 5.10 2.89 0.00 43.80 5.10 2.89 0.00 44.40 5.10 2.89 0.00 45.00 5.10 2.89 0.00 45.60 5.10 2.89 0.00 46.20 5.10 2.89 0.00 46.80 5.10 2.89 0.00 47.40 5.10 2.89 0.00 48.00 5.10 2.89 0.00 Pond-1-Pre Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 10 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Pre Runoff Area=11.140 ac 20.20% Impervious Runoff Depth=3.88" Flow Length=414' Tc=22.4 min CN=79 Runoff=44.83 cfs 3.599 of Total Runoff Area =11.140 ac Runoff Volume = 3.599 of Average Runoff Depth = 3.88" 79.80% Pervious = 8.890 ac 20.20% Impervious = 2.250 ac • 0 • Pond-1-Pre Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DA1: Pre • Runoff = 44.83 cfs @ 12.15 hrs, Volume= 3.599 af, Depth= 3.88" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 25 year Rainfall=6.22" Area (ac) CN Description 2.250 98 Paved parking, HSG C 8.890 74 >75% Grass cover, Good, HSG C 11.140 79 Weighted Average 8.890 79.80% Pervious Area 2.250 20.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.8 249 0.0400 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 0.6 165 0.0900 4.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fos 22.4 414 Total Subcatchment DA1: Pre Hydrograph .. 7- 50 ® Runoff 48 44.83 cfs - - - - - 46 - - - - - 44 I - Type II 24-hr Eden 42 - - 40 ... .. 25 Year 38 36 - - -- - --- -- --, --- Rainfall 6.23.x_ 34 32 ;- - ::Runoff 11 140 ac= 30 -r - - - - r -r - - F 28 _ . 26 - -- - - I?unoffNolume=3'5 of 24 22 - - RllaAOff Depth 3,88.. EM: 20 - - - - - 18 - _ _ - FIow.LengWt 414 16 - 14 , - Tc=224min 12 10 -- r -- - - - - - - - -, -- r C,-N=-7-9- 8 6 --- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 C7 Pond-1-Pre Type Il 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment DA1: Pre C, • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.08 0.00 0.00 1.80 0.12 0.00 0.00 2.40 0.17 0.00 0.00 3.00 0.21 0.00 0.00 3.60 0.26 0.00 0.00 4.20 0.32 0.00 0.00 4.80 0.37 0.00 0.00 5.40 0.43 0.00 0.00 6.00 0.50 0.00 0.00 6.60 0.57 0.00 0.00 7.20 0.64 0.00 0.07 7.80 0.72 0.01 0.14 8.40 0.81 0.03 0.24 9.00 0.91 0.05 0.41 9.60 1.03 0.08 0.58 10.20 1.18 0.13 0.84 10.80 1.38 0.20 1.38 11.40 1.69 0.35 2.58 12.00 4.12 2.06 28.26 12.60 4.62 2.48 11.10 13.20 4.87 2.69 4.14 13.80 5.05 2.85 2.92 14.40 5.19 2.97 2.25 15.00 5.31 3.07 1.97 15.60 5.41 3.16 1.72 16.20 5.50 3.24 1.47 16.80 5.58 3.31 1.35 17.40 5.66 3.38 1.26 18.00 5.73 3.44 1.17 18.60 5.79 3.50 1.08 19.20 5.85 3.55 0.98 19.80 5.90 3.59 0.89 20.40 5.95 3.64 0.81 21.00 6.00 3.68 0.79 21.60 6.05 3.72 0.77 22.20 6.09 3.76 0.75 22.80 6.14 3.80 0.74 23.40 6.18 3.84 0.72 24.00 6.22 3.88 0.70 24.60 6.22 3.88 0.05 25.20 6.22 3.88 0.00 25.80 6.22 3.88 0.00 26.40 6.22 3.88 0.00 27.00 6.22 3.88 0.00 27.60 6.22 3.88 0.00 28.20 6.22 3.88 0.00 28.80 6.22 3.88 0.00 29.40 6.22 3.88 0.00 30.00 6.22 3.88 0.00 30.60 6.22 3.88 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 6.22 3.88 0.00 31.80 6.22 3.88 0.00 32.40 6.22 3.88 0.00 33.00 6.22 3.88 0.00 33.60 6.22 3.88 0.00 34.20 6.22 3.88 0.00 34.80 6.22 3.88 0.00 35.40 6.22 3.88 0.00 36.00 6.22 3.88 0.00 36.60 6.22 3.88 0.00 37.20 6.22 3.88 0.00 37.80 6.22 3.88 0.00 38.40 6.22 3.88 0.00 39.00 6.22 3.88 0.00 39.60 6.22 3.88 0.00 40.20 6.22 3.88 0.00 40.80 6.22 3.88 0.00 41.40 6.22 3.88 0.00 42.00 6.22 3.88 0.00 42.60 6.22 3.88 0.00 43.20 6.22 3.88 0.00 43.80 6.22 3.88 0.00 44.40 6.22 3.88 0.00 45.00 6.22 3.88 0.00 45.60 6.22 3.88 0.00 46.20 6.22 3.88 0.00 46.80 6.22 3.88 0.00 47.40 6.22 3.88 0.00 48.00 6.22 3.88 0.00 Pond-1-Pre Type 11 24-hr Eden 50 year Rainfall= 7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 13 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Pre Runoff Area=11.140 ac 20.20% Impervious Runoff Depth=4.74" Flow Length=414' Tc=22.4 min CN=79 Runoff=54.61 cfs 4.400 of Total Runoff Area =11.140 ac Runoff Volume = 4.400 of Average Runoff Depth = 4.74" 79.80% Pervious = 8.890 ac 20.20% Impervious = 2.250 ac • .7 • Pond-1-Pre Type// 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment DA1: Pre • Runoff = 54.61 cfs @ 12.15 hrs, Volume= 4.400 af, Depth= 4.74" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 50 year Rainfall=7.17" Area (ac) CN Description 2.250 98 Paved parking, HSG C 8.890 74 >75% Grass cover, Good, HSG C 11.140 79 Weighted Average 8.890 79.80% Pervious Area 2.250 20.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.8 249 0.0400 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 0.6 165 0.0900 4.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.4 414 Total Subcatchment DA1: Pre Hydrograph ®Runoff 60 54.61 cf s - - 55- Type-44. 24-hr Eden. 50- 5Q year - 45 Rainfall...=7.1...7" 40 11..140 ac N 35 ? Runofif Area , Runoff Volume=4:400 of 3 30 ------ ?---- Runoff depth=4:74--- LL i i 25 - - - --- - - - - Flow Length=414'-- 20 Tc=22.4 min 15-- ' CN=79 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Pond _1_Pre Type 1124-hr Eden 50 year Rainfall= 7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment DA1: Pre • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.09 0.00 0.00 1.80 0.14 0.00 0.00 2.40 0.19 0.00 0.00 3.00 0.25 0.00 0.00 3.60 0.30 0.00 0.00 4.20 0.36 0.00 0.00 4.80 0.43 0.00 0.00 5.40 0.50 0.00 0.00 6.00 0.57 0.00 0.01 6.60 0.65 0.01 0.08 7.20 0.74 0.01 0.17 7.80 0.83 0.03 0.27 8.40 0.93 0.05 0.39 9.00 1.05 0.09 0.62 9.60 1.19 0.13 0.84 10.20 1.36 0.20 1.17 10.80 1.59 0.30 1.86 11.40 1.95 0.49 3.37 12.00 4.75 2.59 34.94 12.60 5.33 3.09 13.32 13.20 5.62 3.34 4.93 13.80 5.82 3.52 3.47 14.40 5.98 3.66 2.67 15.00 6.12 3.79 2.34 15.60 6.24 3.89 2.04 16.20 6.34 3.99 1.74 16.80 6.44 4.07 1.59 17.40 6.52 4.15 1.48 18.00 6.60 4.22 1.38 18.60 6.68 4.29 1.27 19.20 6.75 4.35 1.16 19.80 6.81 4.41 1.05 20.40 6.86 4.46 0.96 21.00 6.92 4.51 0.93 21.60 6.97 4.56 0.91 22.20 7.02 4.60 0.89 22.80 7.07 4.65 0.87 23.40 7.12 4.70 0.85 24.00 7.17 4.74 0.83 24.60 7.17 4.74 0.06 25.20 7.17 4.74 0.00 25.80 7.17 4.74 0.00 26.40 7.17 4.74 0.00 27.00 7.17 4.74 0.00 27.60 7.17 4.74 0.00 28.20 7.17 4.74 0.00 28.80 7.17 4.74 0.00 29.40 7.17 4.74 0.00 30.00 7.17 4.74 0.00 30.60 7.17 4.74 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 7.17 4.74 0.00 31.80 7.17 4.74 0.00 32.40 7.17 4.74 0.00 33.00 7.17 4.74 0.00 33.60 7.17 4.74 0.00 34.20 7.17 4.74 0.00 34.80 7.17 4.74 0.00 35.40 7.17 4.74 0.00 36.00 7.17 4.74 0.00 36.60 7.17 4.74 0.00 37.20 7.17 4.74 0.00 37.80 7.17 4.74 0.00 38.40 7.17 4.74 0.00 39.00 7.17 4.74 0.00 39.60 7.17 4.74 0.00 40.20 7.17 4.74 0.00 40.80 7.17 4.74 0.00 41.40 7.17 4.74 0.00 42.00 7.17 4.74 0.00 42.60 7.17 4.74 0.00 43.20 7.17 4.74 0.00 43.80 7.17 4.74 0.00 44.40 7.17 4.74 0.00 45.00 7.17 4.74 0.00 45.60 7.17 4.74 0.00 46.20 7.17 4.74 0.00 46.80 7.17 4.74 0.00 47.40 7.17 4.74 0.00 48.00 7.17 4.74 0.00 Pond _1_Pre Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 16 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Pre Runoff Area=11.140 ac 20.20% Impervious Runoff Depth=5.70" Flow Length=414' Tc=22.4 min CN=79 Runoff=65.39 cfs 5.295 of Total Runoff Area =11.140 ac Runoff Volume = 5.295 of Average Runoff Depth = 5.70" 79.80% Pervious = 8.890 ac 20.20% Impervious = 2.250 ac • r? • Pond-1-Pre Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment DA1: Pre • Runoff = 65.39 cfs @ 12.15 hrs, Volume= 5.295 af, Depth= 5.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 100 year Rainfall=8.21" Area (ac) CN Description 2.250 98 Paved parking, HSG C 8.890 74 >75% Grass cover, Good, HSG C 11.140 79 Weighted Average 8.890 79.80% Pervious Area 2.250 20.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.8 249 0.0400 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.40" 0.6 165 0.0900 4.83 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 22.4 414 Total Subcatchment DA1: Pre Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 • Pond-1-Pre Type 1124-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment DA1: Pre • is Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.05 0.00 0.00 1.20 0.10 0.00 0.00 1.80 0.16 0.00 0.00 2.40 0.22 0.00 0.00 3.00 0.28 0.00 0.00 3.60 0.35 0.00 0.00 4.20 0.42 0.00 0.00 4.80 0.49 0.00 0.00 5.40 0.57 0.00 0.01 6.00 0.66 0.01 0.09 6.60 0.75 0.02 0.19 7.20 0.85 0.03 0.31 7.80 0.95 0.06 0.43 8.40 1.06 0.09 0.58 9.00 1.21 0.14 0.87 9.60 1.37 0.20 1.14 10.20 1.56 0.28 1.55 10.80 1.82 0.42 2.41 11.40 2.23 0.66 4.27 12.00 5.44 3.19 42.35 12.60 6.10 3.77 15.76 13.20 6.43 4.07 5.79 13.80 6.67 4.28 4.06 14.40 6.85 4.45 3.12 15.00 7.01 4.59 2.73 15.60 7.14 4.72 2.39 16.20 7.26 4.82 2.04 16.80 7.37 4.92 1.86 17.40 7.47 5.02 1.73 18.00 7.56 5.10 1.61 18.60 7.65 5.18 1.48 19.20 7.72 5.25 1.36 19.80 7.79 5.32 1.23 20.40 7.86 5.38 1.12 21.00 7.92 5.43 1.09 21.60 7.98 5.49 1.06 22.20 8.04 5.55 1.04 22.80 8.10 5.60 1.01 23.40 8.16 5.65 0.99 24.00 8.21 5.70 0.96 24.60 8.21 5.70 0.07 25.20 8.21 5.70 0.00 25.80 8.21 5.70 0.00 26.40 8.21 5.70 0.00 27.00 8.21 5.70 0.00 27.60 8.21 5.70 0.00 28.20 8.21 5.70 0.00 28.80 8.21 5.70 0.00 29.40 8.21 5.70 0.00 30.00 8.21 5.70 0.00 30.60 8.21 5.70 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 8.21 5.70 0.00 31.80 8.21 5.70 0.00 32.40 8.21 5.70 0.00 33.00 8.21 5.70 0.00 33.60 8.21 5.70 0.00 34.20 8.21 5.70 0.00 34.80 8.21 5.70 0.00 35.40 8.21 5.70 0.00 36.00 8.21 5.70 0.00 36.60 8.21 5.70 0.00 37.20 8.21 5.70 0.00 37.80 8.21 5.70 0.00 38.40 8.21 5.70 0.00 39.00 8.21 5.70 0.00 39.60 8.21 5.70 0.00 40.20 8.21 5.70 0.00 40.80 8.21 5.70 0.00 41.40 8.21 5.70 0.00 42.00 8.21 5.70 0.00 42.60 8.21 5.70 0.00 43.20 8.21 5.70 0.00 43.80 8.21 5.70 0.00 44.40 8.21 5.70 0.00 45.00 8.21 5.70 0.00 45.60 8.21 5.70 0.00 46.20 8.21 5.70 0.00 46.80 8.21 5.70 0.00 47.40 8.21 5.70 0.00 48.00 8.21 5.70 0.00 • DA1 -{? B_1 Post FOREBAY 1 G-1 Rain Garden Subcat Reach on Link Rain Garden-1-Post Prepared by WSP SELLS Printed 9/10/2009 is HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-num bers) 2.700 74 >75% Grass cover, Good, HSG C (DA1) 0.440 98 Paved parking, HSG C (DA1) 1.530 98 Roofs, HSG C (DA1) 4.670 TOTAL AREA is 0 Rain Garden 1 Post Prepared by WS_P SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Goup Numbers 0.000 0.000 4.670 0.000 0.000 4.670 • HSG A HSG B HSG C HSG D Other DA1 TOTAL AREA • Rain Garden _1_Post Type 1124-hr Eden 1 year Rainfall=2.81" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Post Runoff Area=4.670 ac 42.18% Impervious Runoff Depth=1.36" Tc=5.0 min CN=84 Runoff=11.72 cfs 0.530 of Pond FB-1: FOREBAY 1 Peak Elev=526.16' Storage=3,802 cf Inflow=11.72 cfs 0.530 of Outflow=11.60 cfs 0.450 of Pond RG-1: Rain Garden Peak Elev=525.09' Storage=8,019 cf Inflow=11.60 cfs 0.450 of Outflow=1.38 cfs 0.282 of Total Runoff Area = 4.670 ac Runoff Volume = 0.530 of Average Runoff Depth =1.36" 57.82% Pervious = 2.700 ac 42.18% Impervious =1.970 ac lJ 0 Rain Garden-1-Post Type 1124-hr Eden 1 year Rainfall=2.81" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DA1: Post Runoff = 11.72 cfs @ 11.96 hrs, Volume= 0.530 af, Depth= 1.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 1 year Rainfall=2.81" Area (ac) CN Description 0.440 98 Paved parking, HSG C 1.530 98 Roofs, HSG C 2.700 74 >75% Grass cover, Good, HSG C 4.670 84 Weighted Average 2.700 57.82% Pervious Area 1.970 42.18% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: Post Hydrograph --------- -- -- --------- -------- ' ' ®Runoff 13 12 11.72 dg I - - - - - Type-11-24=hr,-Eden-- 11 I II ? I I ? I 1 year 10 I I i I I g I I I , Rainfa11'2'81 ; Runoff Area y --4.670 ac I _ - I Runoff, Volume ---- 0 of LL 6 Runoff Depth=1.36" 5 - ' - - - _ _ - Tc_'_5,0 , min _ 4 CN=84 3 I I I I 2 I I I I I I I 1 ' I I I II ? 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Rain Garden _1_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment DA1: Post • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.02 0.00 0.00 1.20 0.04 0.00 0.00 1.80 0.06 0.00 0.00 2.40 0.08 0.00 0.00 3.00 0.10 0.00 0.00 3.60 0.12 0.00 0.00 4.20 0.14 0.00 0.00 4.80 0.17 0.00 0.00 5.40 0.20 0.00 0.00 6.00 0.22 0.00 0.00 6.60 0.26 0.00 0.00 7.20 0.29 0.00 0.00 7.80 0.32 0.00 0.00 8.40 0.36 0.00 0.00 9.00 0.41 0.00 0.01 9.60 0.47 0.00 0.03 10.20 0.53 0.01 0.08 10.80 0.62 0.03 0.16 11.40 0.76 0.06 0.40 12.00 1.86 0.65 10.16 12.60 2.09 0.81 0.83 13.20 2.20 0.89 0.56 13.80 2.28 0.95 0.42 14.40 2.34 1.00 0.35 15.00 2.40 1.04 0.31 15.60 2.45 1.07 0.27 16.20 2.49 1.10 0.23 16.80 2.52 1.13 0.22 17.40 2.56 1.16 0.20 18.00 2.59 1.18 0.19 18.60 2.62 1.21 0.17 19.20 2.64 1.23 0.16 19.80 2.67 1.25 0.14 20.40 2.69 1.26 0.14 21.00 2.71 1.28 0.13 21.60 2.73 1.30 0.13 22.20 2.75 1.31 0.13 22.80 2.77 1.33 0.12 23.40 2.79 1.35 0.12 24.00 2.81 1.36 0.12 24.60 2.81 1.36 0.00 25.20 2.81 1.36 0.00 25.80 2.81 1.36 0.00 26.40 2.81 1.36 0.00 27.00 2.81 1.36 0.00 27.60 2.81 1.36 0.00 28.20 2.81 1.36 0.00 28.80 2.81 1.36 0.00 29.40 2.81 1.36 0.00 30.00 2.81 1.36 0.00 30.60 2.81 1.36 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 2.81 1.36 0.00 31.80 2.81 1.36 0.00 32.40 2.81 1.36 0.00 33.00 2.81 1.36 0.00 33.60 2.81 1.36 0.00 34.20 2.81 1.36 0.00 34.80 2.81 1.36 0.00 35.40 2.81 1.36 0.00 36.00 2.81 1.36 0.00 36.60 2.81 1.36 0.00 37.20 2.81 1.36 0.00 37.80 2.81 1.36 0.00 38.40 2.81 1.36 0.00 39.00 2.81 1.36 0.00 39.60 2.81 1.36 0.00 40.20 2.81 1.36 0.00 40.80 2.81 1.36 0.00 41.40 2.81 1.36 0.00 42.00 2.81 1.36 0.00 42.60 2.81 1.36 0.00 43.20 2.81 1.36 0.00 43.80 2.81 1.36 0.00 44.40 2.81 1.36 0.00 45.00 2.81 1.36 0.00 45.60 2.81 1.36 0.00 46.20 2.81 1.36 0.00 46.80 2.81 1.36 0.00 47.40 2.81 1.36 0.00 48.00 2.81 1.36 0.00 Rain Garden _1_Post Type// 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 7 Summary for Pond FBA: FOREBAY 1 Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 1.36" for Eden 1 year event Inflow = 11.72 cfs @ 11.96 hrs, Volume= 0.530 of Outflow = 11.60 cfs @ 11.97 hrs, Volume= 0.450 af, Atten= 1 %, Lag= 0.2 min Primary = 11.60 cfs @ 11.97 hrs, Volume= 0.450 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 526.16' @ 11.97 hrs Surf.Area= 2,121 sf Storage= 3,802 cf Plug-Flow detention time= 96.3 min calculated for 0.450 of (85% of inflow) Center-of-Mass det. time= 26.4 min ( 858.0 - 831.5) Volume Invert Avail.Storage Storage Description #1 523.00' 5,829 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 523.00 386 0 0 524.00 864 625 625 525.00 1,413 1,139 1,764 526.00 2,018 1,716 3,479 527.00 2,681 2,350 5,829 Device Routing Invert Outlet Devices #1 Primary 526.00' 70.0' long x 17.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=11.48 cfs @ 11.97 hrs HW=526.16' (Free Discharge) L1=13road-Crested Rectangular Weir (Weir Controls 11.48 cfs @ 1.06 fps) C Rain Garden _1_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 • HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 8 Pond FB-1: FOREBAY 1 Hydrograph .77 7,. 13 - ¦ Inflow Fl 172 - - ?r5, _ ¦ I of ? Primary 12 1160 cfs - -- - IOW Area=4VO-ac - „ Peak E lev-52 10 6.16' , - - Sb Orage-_ 3,802 cf - w 3 0 6-----,--- I -- --I- t ----- -- I - -- - U. , 5 q -- -- ---- '- - r - - r 3 r r • 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond FBA: FOREBAY 1 Stage-Discharge ¦ Primary w °' c 0 m w 0 - -? .. - ivv Ilu izu 115U 14U 1b0 160 170 180 Discharge (cfs) Rain Garden-1-Post Type 11 24-hr Eden Prepared by WSP SELLS HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC 1 year Rainfall=2.81 " Printed 9/10/2009 Page 9 Pond FBA: FOREBAY 1 Stage-Area-Storage Surface/HorizontaUwetted Area (5q-ft) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 ? Surface . . ¦ Storage 527 - - 526 - - - - - - - - - -- m - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 525 w 524 523- 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5 ,400, Storage (cubic-feet) Rain Garden-1-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 10 Hydrograph for Pond FB-1: FOREBAY 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 523.00 0.00 1.50 0.00 0 523.00 0.00 3.00 0.00 0 523.00 0.00 4.50 0.00 0 523.00 0.00 6.00 0.00 0 523.00 0.00 7.50 0.00 0 523.00 0.00 9.00 0.01 6 523.01 0.00 10.50 0.11 267 523.52 0.00 12.00 10.16 3,782 526.15 10.60 13.50 0.48 3,505 526.01 0.49 15.00 0.31 3,496 526.01 0.31 16.50 0.23 3,491 526.01 0.23 18.00 0.19 3,489 526.01 0.19 19.50 0.15 3,487 526.00 0.15 21.00 0.13 3,486 526.00 0.13 22.50 0.13 3,486 526.00 0.13 24.00 0.12 3,485 526.00 0.12 25.50 0.00 3,479 526.00 0.00 27.00 0.00 3,479 526.00 0.00 28.50 0.00 3,479 526.00 0.00 30.00 0.00 3,479 526.00 0.00 31.50 0.00 3,479 526.00 0.00 • 33.00 0.00 3,479 526.00 0.00 34.50 0.00 3,479 526.00 0.00 36.00 0.00 3,479 526.00 0.00 37.50 0.00 3,479 526.00 0.00 39.00 0.00 3,479 526.00 0.00 40.50 0.00 3,479 526.00 0.00 42.00 0.00 3,479 526.00 0.00 43.50 0.00 3,479 526.00 0.00 45.00 0.00 3,479 526.00 0.00 46.50 0.00 3,479 526.00 0.00 48.00 0.00 3,479 526.00 0.00 • • • Rain Garden _1_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 11 Elevation Primary (feet) (cfs) 523.00 0.00 523.02 0.00 523.04 0.00 523.06 0.00 523.08 0.00 523.10 0.00 523.12 0.00 523.14 0.00 523.16 0.00 523.18 0.00 523.20 0.00 523.22 0.00 523.24 0.00 523.26 0.00 523.28 0.00 523.30 0.00 523.32 0.00 523.34 0.00 523.36 0.00 523.38 0.00 523.40 0.00 523.42 0.00 523.44 0.00 523.46 0.00 523.48 0.00 523.50 0.00 523.52 0.00 523.54 0.00 523.56 0.00 523.58 0.00 523.60 0.00 523.62 0.00 523.64 0.00 523.66 0.00 523.68 0.00 523.70 0.00 523.72 0.00 523.74 0.00 523.76 0.00 523.78 0.00 523.80 0.00 523.82 0.00 523.84 0.00 523.86 0.00 523.88 0.00 523.90 0.00 523.92 0.00 523.94 0.00 523.96 0.00 523.98 0.00 524.00 0.00 524.02 0.00 Stage-Discharge for Pond FBA: FOREBAY 1 Elevation Primary (feet) (cfs) 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.00 525.04 0.00 525.06 0.00 Elevation Primary (feet) (cfs) 525.08 0.00 525.10 0.00 525.12 0.00 525.14 0.00 525.16 0.00 525.18 0.00 525.20 0.00 525.22 0.00 525.24 0.00 525.26 0.00 525.28 0.00 525.30 0.00 525.32 0.00 525.34 0.00 525.36 0.00 525.38 0.00 525.40 0.00 525.42 0.00 525.44 0.00 525.46 0.00 525.48 0.00 525.50 0.00 525.52 0.00 525.54 0.00 525.56 0.00 525.58 0.00 525.60 0.00 525.62 0.00 525.64 0.00 525.66 0.00 525.68 0.00 525.70 0.00 525.72 0.00 525.74 0.00 525.76 0.00 525.78 0.00 525.80 0.00 525.82 0.00 525.84 0.00 525.86 0.00 525.88 0.00 525.90 0.00 525.92 0.00 525.94 0.00 525.96 0.00 525.98 0.00 526.00 0.00 526.02 0.53 526.04 1.50 526.06 2.76 526.08 4.24 526.10 5.93 Elevation Primary (feet) (cfs) 526.12 7.80 526.14 9.83 526.16 12.01 526.18 14.33 526.20 16.78 526.22 19.37 526.24 22.09 526.26 24.93 526.28 27.88 526.30 30.94 526.32 34.11 526.34 37.39 526.36 40.76 526.38 44.24 526.40 47.81 526.42 51.44 526.44 55.16 526.46 58.97 526.48 62.85 526.50 66.82 526.52 70.87 526.54 75.00 526.56 79.20 526.58 83.48 526.60 87.84 526.62 92.06 526.64 96.34 526.66 100.66 526.68 105.04 526.70 109.46 526.72 113.93 526.74 118.44 526.76 123.00 526.78 127.59 526.80 132.23 526.82 137.17 526.84 142.16 526.86 147.22 526.88 152.32 526.90 157.49 526.92 162.70 526.94 167.97 526.96 173.30 526.98 178.67 527.00 184.10 • Rain Garden-1-Post Type 1124-hr Eden 1 year Rainfall=2.81" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 12 Stage-Area-Storage for Pond FB-1: FOREBAY 1 • • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 523.00 386 0 523.05 410 20 523.10 434 41 523.15 458 63 523.20 482 87 523.25 506 111 523.30 529 137 523.35 553 164 523.40 577 193 523.45 601 222 523.50 625 253 523.55 649 285 523.60 673 318 523.65 697 352 523.70 721 387 523.75 745 424 523.80 768 462 523.85 792 501 523.90 816 541 523.95 840 582 524.00 864 625 524.05 891 669 524.10 919 714 524.15 946 761 524.20 974 809 524.25 1,001 858 524.30 1,029 909 524.35 1,056 961 524.40 1,084 1,015 524.45 1,111 1,069 524.50 1,139 1,126 524.55 1,166 1,183 524.60 1,193 1,242 524.65 1,221 1,303 524.70 1,248 1,364 524.75 1,276 1,427 524.80 1,303 1,492 524.85 1,331 1,558 524.90 1,358 1,625 524.95 1,386 1,694 525.00 1,413 1,764 525.05 1,443 1,835 525.10 1,474 1,908 525.15 1,504 1,982 525.20 1,534 2,058 525.25 1,564 2,136 525.30 1,594 2,215 525.35 1,625 2,295 525.40 1,655 2,377 525.45 1,685 2,461 525.50 1,716 2,546 525.55 1,746 2,632 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 525.60 1,776 2,720 525.65 1,806 2,810 525.70 1,837 2,901 525.75 1,867 2,993 525.80 1,897 3,087 525.85 1,927 3,183 525.90 1,957 3,280 525.95 1,988 3,379 526.00 2,018 3,479 526.05 2,051 3,581 526.10 2,084 3,684 526.15 2,117 3,789 526.20 2,151 3,896 526.25 2,184 4,004 526.30 2,217 4,114 526.35 2,250 4,226 526.40 2,283 4,339 526.45 2,316 4,454 526.50 2,350 4,571 526.55 2,383 4,689 526.60 2,416 4,809 526.65 2,449 4,931 526.70 2,482 5,054 526.75 21515 5,179 526.80 2,548 5,306 526.85 2,582 5,434 526.90 2,615 5,564 526.95 2,648 5,695 527.00 2,681 5,829 Rain Garden-1-Post Type// 24-hr Eden 9 year Rainfall=2.89" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 13 Summary for Pond RG-1: Rain Garden Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 1.16" for Eden 1 year event Inflow = 11.60 cfs @ 11.97 hrs, Volume= 0.450 of Outflow = 1.38 cfs @ 12.33 hrs, Volume= 0.282 af, Atten= 88%, Lag= 21.6 min Primary = 1.38 cfs @ 12.33 hrs, Volume= 0.282 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 525.09'@ 12.33 hrs Surf.Area= 7,915 sf Storage= 8,019 cf Plug-Flow detention time= 219.6 min calculated for 0.282 of (63% of inflow) Center-of-Mass det. time= 96.8 min ( 954.8 - 858.0) Volume Invert Avail.Storage Storage Description #1 524.00' 25,073 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 524.00 6,816 0 0 525.00 7,820 7,318 7,318 526.00 8,882 8,351 15,669 527.00 9,925 9,404 25,073 • Device Routing Invert Outlet Devices #1 Primary 525.00' 20.0' long x 12.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max=1.37 cfs @ 12.33 hrs HW=525.09' (Free Discharge) t1=13road-Crested Rectangular Weir (Weir Controls 1.37 cfs @ 0.77 fps) 0 • 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond RGA: Rain Garden Stage-Discharge 0 d d c 0 m w Primary u Lu 40 60 80 100 120 140 Discharge (cfs) Rain Garden-1-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 15 Pond RG-1: Rain Garden Stage-Area-Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3.000 4.000 5 nnn a nnn 7 nnn n nnn nnn a? m c 0 m w 0 Surface ® Storage 0 iv,uvu 1b,000 20,000 25,000 Storage (cubic-feet) Rain Garden-1-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 16 Hydrograph for Pond RG-1: Rain Garden Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 524.00 0.00 1.50 0.00 0 524.00 0.00 3.00 0.00 0 524.00 0.00 4.50 0.00 0 524.00 0.00 6.00 0.00 0 524.00 0.00 7.50 0.00 0 524.00 0.00 9.00 0.00 0 524.00 0.00 10.50 0.00 0 524.00 0.00 12.00 10.60 5,133 524.72 0.00 13.50 0.49 7,683 525.05 0.53 15.00 0.31 7,570 525.03 0.32 16.50 0.23 7,521 525.03 0.23 18.00 0.19 7,501 525.02 0.19 19.50 0.15 7,480 525.02 0.16 21.00 0.13 7,462 525.02 0.13 22.50 0.13 7,454 525.02 0.13 24.00 0.12 7,447 525.02 0.12 25.50 0.00 7,319 525.00 0.00 27.00 0.00 7,318 525.00 0.00 28.50 0.00 7,318 525.00 0.00 30.00 0.00 7,318 525.00 0.00 31.50 0.00 7,318 525.00 0.00 33.00 0.00 7,318 525.00 0.00 34.50 0.00 7,318 525.00 0.00 36.00 0.00 7,318 525.00 0.00 37.50 0.00 7,318 525.00 0.00 39.00 0.00 7,318 525.00 0.00 40.50 0.00 7,318 525.00 0.00 42.00 0.00 7,318 525.00 0.00 43.50 0.00 7,318 525.00 0.00 45.00 0.00 7,318 525.00 0.00 46.50 0.00 7,318 525.00 0.00 48.00 0.00 7,318 525.00 0.00 t?J • r-] Rain Garden-1-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 17 Elevation Primary (feet) (cfs) 524.00 0.00 524.02 0.00 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.15 Stage-Discharge for Pond RG-1: Rain Garden Elevation Primary (feet) (cfs) 525.04 0.41 525.06 0.76 525.08 1.16 525.10 1.63 525.12 2.14 525.14 2.69 525.16 3.29 525.18 3.93 525.20 4.60 525.22 5.31 525.24 6.07 525.26 6.85 525.28 7.67 525.30 8.53 525.32 9.41 525.34 10.33 525.36 11.28 525.38 12.25 525.40 13.26 525.42 14.31 525.44 15.39 525.46 16.50 525.48 17.64 525.50 18.81 525.52 20.01 525.54 21.24 525.56 22.50 525.58 23.78 525.60 25.10 525.62 26.33 525.64 27.59 525.66 28.86 525.68 30.15 525.70 31.45 525.72 32.77 525.74 34.11 525.76 35.46 525.78 36.83 525.80 38.21 525.82 39.64 525.84 41.08 525.86 42.54 525.88 44.02 525.90 45.51 525.92 47.02 525.94 48.54 525.96 50.08 525.98 51.63 526.00 53.20 526.02 54.82 526.04 56.47 526.06 58.12 Elevation Primary (feet) (cfs) 526.08 59.80 526.10 61.49 526.12 63.20 526.14 64.92 526.16 66.67 526.18 68.42 526.20 70.20 526.22 71.93 526.24 73.68 526.26 75.44 526.28 77.22 526.30 79.00 526.32 80.80 526.34 82.61 526.36 84.44 526.38 86.28 526.40 88.13 526.42 89.95 526.44 91.79 526.46 93.64 526.48 95.50 526.50 97.37 526.52 99.25 526.54 101.13 526.56 103.03 526.58 104.94 526.60 106.86 526.62 108.87 526.64 110.89 526.66 112.93 526.68 114.97 526.70 117.03 526.72 119.10 526.74 121.19 526.76 123.28 526.78 125.39 526.80 127.51 526.82 129.64 526.84 131.78 526.86 133.94 526.88 136.10 526.90 138.28 526.92 140.47 526.94 142.67 526.96 144.88 526.98 147.11 527.00 149.34 • Rain Garden-1-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 18 Stage-Area-Storage for Pond RGA: Rain Garden • • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 524.00 6,816 0 524.05 6,866 342 524.10 6,916 687 524.15 6,967 1,034 524.20 7,017 1,383 524.25 7,067 1,735 524.30 7,117 2,090 524.35 7,167 2,447 524.40 7,218 2,807 524.45 7,268 3,169 524.50 7,318 3,534 524.55 7,368 3,901 524.60 7,418 4,270 524.65 7,469 4,642 524.70 7,519 5,017 524.75 7,569 5,394 524.80 7,619 5,774 524.85 7,669 6,156 524.90 7,720 6,541 524.95 7,770 6,928 525.00 7,820 7,318 525.05 7,873 7,710 525.10 7,926 8,105 525.15 7,979 8,503 525.20 8,032 8,903 525.25 8,086 9,306 525.30 8,139 9,712 525.35 8,192 10,120 525.40 8,245 10,531 525.45 8,298 10,945 525.50 8,351 11,361 525.55 8,404 11,780 525.60 8,457 12,201 525.65 8,510 12,625 525.70 8,563 13,052 525.75 8,617 13,482 525.80 8,670 13,914 525.85 8,723 14,349 525.90 8,776 14,786 525.95 8,829 15,226 526.00 8,882 15,669 526.05 8,934 16,114 526.10 8,986 16,562 526.15 9,038 17,013 526.20 9,091 17,466 526.25 9,143 17,922 526.30 9,195 18,381 526.35 9,247 18,842 526.40 9,299 19,305 526.45 9,351 19,772 526.50 9,404 20,240 526.55 9,456 20,712 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 526.60 9,508 21,186 526.65 9,560 21,663 526.70 9,612 22,142 526.75 9,664 22,624 526.80 9,716 23,108 526.85 9,769 23,595 526.90 9,821 24,085 526.95 9,873 24,578 527.00 9,925 25,073 0 • Rain Garden-1-Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 19 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Post Runoff Area=4.670 ac 42.18% Impervious Runoff Depth=3.36" Tc=5.0 min CN=84 Runoff=27.97 cfs 1.308 of Pond FB-1: FOREBAY 1 Peak Elev=526.28' Storage=4,071 cf Inflow=27.97 cfs 1.308 of Outflow=27.92 cfs 1.229 of Pond RG-1: Rain Garden Peak Elev=525.61' Storage=12,258 cf Inflow=27.92 cfs 1.229 of Outflow=25.50 cfs 1.061 of Total Runoff Area = 4.670 ac Runoff Volume =1.308 of Average Runoff Depth = 3.36" 57.82% Pervious = 2.700 ac 42.18% Impervious =1.970 ac 0 Rain Garden-1-Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 is HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment DA1: Post Runoff = 27.97 cfs @ 11.96 hrs, Volume= 1.308 af, Depth= 3.36" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 10 year Rainfall=5.10" Area (ac) CN Description 0.440 98 Paved parking, HSG C 1.530 98 Roofs, HSG C 2.700 74 >75% Grass cover, Good, HSG C 4.670 84 Weighted Average 2.700 57.82% Pervious Area 1.970 42.18% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: Post Hydrograph ,..,. 0 2 4 6 8 10 12 14 16 18 210-2,12 2'4'-'2'6'-2'i8- 4 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 • Rain Garden _1_Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 21 Hydrograph for Subcatchment DA1: Post • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.03 0.00 0.00 1.20 0.06 0.00 0.00 1.80 0.10 0.00 0.00 2.40 0.14 0.00 0.00 3.00 0.18 0.00 0.00 3.60 0.22 0.00 0.00 4.20 0.26 0.00 0.00 4.80 0.31 0.00 0.00 5.40 0.35 0.00 0.00 6.00 0.41 0.00 0.01 6.60 0.46 0.00 0.03 7.20 0.53 0.01 0.06 7.80 0.59 0.02 0.09 8.40 0.66 0.04 0.14 9.00 0.75 0.06 0.22 9.60 0.85 0.09 0.27 10.20 0.97 0.14 0.42 10.80 1.13 0.21 0.69 11.40 1.38 0.35 1.38 12.00 3.38 1.84 23.72 12.60 3.79 2.19 1.82 13.20 4.00 2.37 1.22 13.80 4.14 2.50 0.91 14.40 4.25 2.60 0.74 15.00 4.35 2.68 0.66 15.60 4.44 2.76 0.57 16.20 4.51 2.83 0.49 16.80 4.58 2.89 0.46 17.40 4.64 2.94 0.43 18.00 4.70 2.99 0.40 18.60 4.75 3.04 0.36 19.20 4.80 3.09 0.33 19.80 4.84 3.13 0.30 20.40 4.88 3.16 0.28 21.00 4.92 3.20 0.27 21.60 4.96 3.23 0.27 22.20 4.99 3.27 0.26 22.80 5.03 3.30 0.26 23.40 5.07 3.33 0.25 24.00 5.10 3.36 0.24 24.60 5.10 3.36 0.00 25.20 5.10 3.36 0.00 25.80 5.10 3.36 0.00 26.40 5.10 3.36 0.00 27.00 5.10 3.36 0.00 27.60 5.10 3.36 0.00 28.20 5.10 3.36 0.00 28.80 5.10 3.36 0.00 29.40 5.10 3.36 0.00 30.00 5.10 3.36 0.00 30.60 5.10 3.36 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 5.10 3.36 0.00 31.80 5.10 3.36 0.00 32.40 5.10 3.36 0.00 33.00 5.10 3.36 0.00 33.60 5.10 3.36 0.00 34.20 5.10 3.36 0.00 34.80 5.10 3.36 0.00 35.40 5.10 3.36 0.00 36.00 5.10 3.36 0.00 36.60 5.10 3.36 0.00 37.20 5.10 3.36 0.00 37.80 5.10 3.36 0.00 38.40 5.10 3.36 0.00 39.00 5.10 3.36 0.00 39.60 5.10 3.36 0.00 40.20 5.10 3.36 0.00 40.80 5.10 3.36 0.00 41.40 5.10 3.36 0.00 42.00 5.10 3.36 0.00 42.60 5.10 3.36 0.00 43.20 5.10 3.36 0.00 43.80 5.10 3.36 0.00 44.40 5.10 3.36 0.00 45.00 5.10 3.36 0.00 45.60 5.10 3.36 0.00 46.20 5.10 3.36 0.00 46.80 5.10 3.36 0.00 47.40 5.10 3.36 0.00 48.00 5.10 3.36 0.00 Rain Garden-1-Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 22 Summary for Pond F13-1: FOREBAY 1 Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 3.36" for Eden 10 year event Inflow = 27.97 cfs @ 11.96 hrs, Volume= 1.308 of Outflow = 27.92 cfs @ 11.96 hrs, Volume= 1.229 af, Atten= 0%, Lag= 0.2 min Primary = 27.92 cfs @ 11.96 hrs, Volume= 1.229 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 526.28'@ 11.96 hrs Surf.Area= 2,204 sf Storage= 4,071 cf Plug-Flow detention time= 49.9 min calculated for 1.229 of (94% of inflow) Center-of-Mass det. time= 15.8 min ( 821.6 - 805.7 ) Volume Invert Avail.Storage Storage Description #1 523.00' 5,829 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 523.00 386 0 0 524.00 864 625 625 525.00 1,413 1,139 1,764 526.00 2,018 1,716 3,479 527.00 2,681 2,350 5,829 Device Routing Invert Outlet Devices #1 Primary 526.00' 70.0' long x 17.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=27.51 cfs @ 11.96 hrs HW=526.28' (Free Discharge) 't1=Broad-Crested Rectangular Weir (Weir Controls 27.51 cfs @ 1.42 fps) 0 Rain Garden-1-Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 23 Pond FB-1: FOREBAY 1 Hydrograph = = --- - - IN Inflow 30 2Ze7 ae I I 27.e2d5 ? Inflow Area=4 670-ac O Primary 28 : 26 L - - - r - - - - .. - 6 v= 2-- Peak E a 29 ' I 24 . 1 - .. . e _. - - I - 1 22 I Storage=4,071 cf 20 --, 1 -L - - - ---- -, - - ----- ---- H 18 w - 1 ..._.?. _ .. _I. __._... --,-_._...... .._ .. .. ?- 16 3 1 0 14 LL ---,- -1 - - - -- -. - - - - - - - - - - - - -- 12 - I , I 10 8 -- -'--- I , - - - - - --- - - - - -- -'- -- -- - -- 4 I 1 I I ' I I ? 1 2 , , I I 0 0 2 4 6 8 10 12 14 16 ... 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond FB-1: FOREBAY 1 Stage-Discharge 527 ? ? I ,:, ° ®Primary r 1 I , I : I I ci?r?asf R. - - - - - ed . qtari9u7ar Weir - - 526 I I ; I I I I I 1 w ' I I I I I I I i : , r I I ?i I 0 525 ?.. W .. 524 _ _ _ _ - - _ _ - _ 1 L _ _ _.- _ _ _ _ - _ 1 - _ - - - _ _ . , -- --- , - - - ; - 1 I I , I ? I 1 1 I I I I 523 • , 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Discharge (cfs) Rain Garden_1_Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 24 Pond FBA: FOREBAY 1 Stage-Area-Storage Surface/HorizontalMetted Area (sq-ft) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 p Surface ® Storage 527 - - -, - - ;---- - - - - ---- -- - - -- ------:-, 526 ---- ---- ----------- ------------ -------- --------------------- 0 525 ' d W - - -- -- ----- - - -- - -'-------------------------------- --'--- • 0ala` 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 Storage (cubic-feet) • Rain Garden _1_Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 25 Hydrograph for Pond FB-1: FOREBAY 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 523.00 0.00 1.50 0.00 0 523.00 0.00 3.00 0.00 0 523.00 0.00 4.50 0.00 0 523.00 0.00 6.00 0.01 4 523.01 0.00 7.50 0.08 231 523.46 0.00 9.00 0.22 952 524.34 0.00 10.50 0.53 2,725 525.60 0.00 12.00 23.72 4,019 526.26 24.51 13.50 1.04 3,536 526.03 1.05 15.00 0.66 3,515 526.02 0.66 16.50 0.47 3,505 526.01 0.48 18.00 0.40 3,500 526.01 0.40 19.50 0.32 3,496 526.01 0.32 21.00 0.27 3,494 526.01 0.27 22.50 0.26 3,493 526.01 0.26 24.00 0.24 3,492 526.01 0.24 25.50 0.00 3,479 526.00 0.00 27.00 0.00 3,479 526.00 0.00 28.50 0.00 3,479 526.00 0.00 30.00 0.00 3,479 526.00 0.00 31.50 0.00 3,479 526.00 0.00 33.00 0.00 3,479 526.00 0.00 34.50 0.00 3,479 526.00 0.00 36.00 0.00 3,479 526.00 0.00 37.50 0.00 3,479 526.00 0.00 39.00 0.00 3,479 526.00 0.00 40.50 0.00 3,479 526.00 0.00 42.00 0.00 3,479 526.00 0.00 43.50 0.00 3,479 526.00 0.00 45.00 0.00 3,479 526.00 0.00 46.50 0.00 3,479 526.00 0.00 48.00 0.00 3,479 526.00 0.00 0 • • Rain Garden _1_Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 26 Elevation Primary (feet) (cfs) 523.00 0.00 523.02 0.00 523.04 0.00 523.06 0.00 523.08 0.00 523.10 0.00 523.12 0.00 523.14 0.00 523.16 0.00 523.18 0.00 523.20 0.00 523.22 0.00 523.24 0.00 523.26 0.00 523.28 0.00 523.30 0.00 523.32 0.00 523.34 0.00 523.36 0.00 523.38 0.00 523.40 0.00 523.42 0.00 523.44 0.00 523.46 0.00 523.48 0.00 523.50 0.00 523.52 0.00 523.54 0.00 523.56 0.00 523.58 0.00 523.60 0.00 523.62 0.00 523.64 0.00 523.66 0.00 523.68 0.00 523.70 0.00 523.72 0.00 523.74 0.00 523.76 0.00 523.78 0.00 523.80 0.00 523.82 0.00 523.84 0.00 523.86 0.00 523.88 0.00 523.90 0.00 523.92 0.00 523.94 0.00 523.96 0.00 523.98 0.00 524.00 0.00 524.02 0.00 Stage-Discharge for Pond FB-1: FOREBAY 1 Elevation Primary (feet) (cfs) 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.00 525.04 0.00 525.06 0.00 Elevation Primary (feet) (cfs) 525.08 0.00 525.10 0.00 525.12 0.00 525.14 0.00 525.16 0.00 525.18 0.00 525.20 0.00 525.22 0.00 525.24 0.00 525.26 0.00 525.28 0.00 525.30 0.00 525.32 0.00 525.34 0.00 525.36 0.00 525.38 0.00 525.40 0.00 525.42 0.00 525.44 0.00 525.46 0.00 525.48 0.00 525.50 0.00 525.52 0.00 525.54 0.00 525.56 0.00 525.58 0.00 525.60 0.00 525.62 0.00 525.64 0.00 525.66 0.00 525.68 0.00 525.70 0.00 525.72 0.00 525.74 0.00 525.76 0.00 525.78 0.00 525.80 0.00 525.82 0.00 525.84 0.00 525.86 0.00 525.88 0.00 525.90 0.00 525.92 0.00 525.94 0.00 525.96 0.00 525.98 0.00 526.00 0.00 526.02 0.53 526.04 1.50 526.06 2.76 526.08 4.24 526.10 5.93 Elevation Primary (feet) (cfs) 526.12 7.80 526.14 9.83 526.16 12.01 526.18 14.33 526.20 16.78 526.22 19.37 526.24 22.09 526.26 24.93 526.28 27.88 526.30 30.94 526.32 34.11 526.34 37.39 526.36 40.76 526.38 44.24 526.40 47.81 526.42 51.44 526.44 55.16 526.46 58.97 526.48 62.85 526.50 66.82 526.52 70.87 526.54 75.00 526.56 79.20 526.58 83.48 526.60 87.84 526.62 92.06 526.64 96.34 526.66 100.66 526.68 105.04 526.70 109.46 526.72 113.93 526.74 118.44 526.76 123.00 526.78 127.59 526.80 132.23 526.82 137.17 526.84 142.16 526.86 147.22 526.88 152.32 526.90 157.49 526.92 162.70 526.94 167.97 526.96 173.30 526.98 178.67 527.00 184.10 • • • Rain Garden _1_Post Type // 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 27 Stage-Area-Storage for Pond FB-1: FOREBAY 1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 523.00 386 0 523.05 410 20 523.10 434 41 523.15 458 63 523.20 482 87 523.25 506 111 523.30 529 137 523.35 553 164 523.40 577 193 523.45 601 222 523.50 625 253 523.55 649 285 523.60 673 318 523.65 697 352 523.70 721 387 523.75 745 424 523.80 768 462 523.85 792 501 523.90 816 541 523.95 840 582 524.00 864 625 524.05 891 669 524.10 919 714 524.15 946 761 524.20 974 809 524.25 1,001 858 524.30 1,029 909 524.35 1,056 961 524.40 1,084 1,015 524.45 1,111 1,069 524.50 1,139 1,126 524.55 1,166 1,183 524.60 1,193 1,242 524.65 1,221 1,303 524.70 1,248 1,364 524.75 1,276 1,427 524.80 1,303 1,492 524.85 1,331 1,558 524.90 1,358 1,625 524.95 1,386 1,694 525.00 1,413 1,764 525.05 1,443 1,835 525.10 1,474 1,908 525.15 1,504 1,982 525.20 1,534 2,058 525.25 1,564 2,136 525.30 1,594 2,215 525.35 1,625 2,295 525.40 1,655 2,377 525.45 1,685 2,461 525.50 1,716 2,546 525.55 1,746 2,632 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 525.60 1,776 2,720 525.65 1,806 2,810 525.70 1,837 2,901 525.75 1,867 2,993 525.80 1,897 3,087 525.85 1,927 3,183 525.90 1,957 3,280 525.95 1,988 3,379 526.00 2,018 3,479 526.05 2,051 3,581 526.10 2,084 3,684 526.15 2,117 3,789 526.20 2,151 3,896 526.25 2,184 4,004 526.30 2,217 4,114 526.35 2,250 4,226 526.40 2,283 4,339 526.45 2,316 4,454 526.50 2,350 4,571 526.55 2,383 4,689 526.60 2,416 4,809 526.65 2,449 4,931 526.70 2,482 5,054 526.75 2,515 5,179 526.80 2,548 5,306 526.85 2,582 5,434 526.90 2,615 5,564 526.95 2,648 5,695 527.00 2,681 5,829 Rain Garden _1Post Type ll 24-hr Eden 10 year Rainfall=5.10" Prepared by WS_P SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 28 Summary for Pond RG-1: Rain Garden Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 3.16" for Eden 10 year event Inflow = 27.92 cfs @ 11.96 hrs, Volume= 1.229 of Outflow = 25.50 cfs @ 11.99 hrs, Volume= 1.061 af, Atten= 9%, Lag= 1.8 min Primary = 25.50 cfs @ 11.99 hrs, Volume= 1.061 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 525.61'@ 11.99 hrs Surf.Area= 8,464 sf Storage= 12,258 cf Plug-Flow detention time= 91.4 min calculated for 1.060 of (86% of inflow) Center-of-Mass det. time= 28.0 min ( 849.5 - 821.6 ) Volume Invert Avail.Storage Storage Description #1 524.00' 25,073 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 524.00 6,816 0 0 525.00 7,820 7,318 7,318 526.00 8,882 8,351 15,669 527.00 9,925 9,404 25,073 Device Routing Invert Outlet Devices #1 Primary 525.00' 20.0' long x 12.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max=25.25 cfs @ 11.99 hrs HW=525.60' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 25.25 cfs @ 2.10 fps) Rain Garden _1Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WS_P SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 29 Pond RG-1: Rain Garden Hydrograph ? I I I I I I ' ¦ Inflow 27.92 cfs - - - '--L --- - - -- ® Primary . 30 ,' I 28 _ _ Inflow'-Area=4.670 ac ---- ,- _ , - - 26 ? ? II ? _ _ 25.50 cfs - - - - P+?ak.. E.lev-52 5.61:' 24 I _ Storage-12,258 cf 22 - -- -1-- ---- - - -- - 20 I- -I- _ I -I- - - - I --; --- -- - -II- --- y 18 "- I i I I I_-_I 16 - - - -I - - : --r -- r -- -- 3 - - - - - - - - - - o 14 - LL I I I I I 12 10 I I _ _ _ - _.- _ - _ _ _ _ - _ _ - _ _ _ g i 6 I I 4 I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond RG-1: Rain Garden Stage-Discharge ® Primary m m c 0 m w 0 0 20 40 60 80 100 120 140 Discharge (cfs) Rain Garden _1_Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 30 Pond RG-1: Rain Garden Stage-Area-Storage Surface/Horizonta[Metted Area (sq-ft) 1,000 2,000 3.000 4.000 5.000 6.000 7 000 A nnn a nnn a? m c 0 m w • 0 Surface ¦ Storage • u o,uuu 1u,uuu 15,000 20,000 25,000 Storage (cubic-feet) Rain Garden-1-Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 31 Hydrograph for Pond RG-1: Rain Garden Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 524.00 0.00 1.50 0.00 0 524.00 0.00 3.00 0.00 0 524.00 0.00 4.50 0.00 0 524.00 0.00 6.00 0.00 0 524.00 0.00 7.50 0.00 0 524.00 0.00 9.00 0.00 0 524.00 0.00 10.50 0.00 0 524.00 0.00 12.00 24.51 12,249 525.61 25.43 13.50 1.05 7,927 525.08 1.11 15.00 0.66 7,751 525.06 0.67 16.50 0.48 7,661 525.04 0.48 18.00 0.40 7,617 525.04 0.40 19.50 0.32 7,573 525.03 0.32 21.00 0.27 7,547 525.03 0.28 22.50 0.26 7,538 525.03 0.26 24.00 0.24 7,529 525.03 0.24 25.50 0.00 7,320 525.00 0.00 27.00 0.00 7,318 525.00 0.00 28.50 0.00 7,318 525.00 0.00 30.00 0.00 7,318 525.00 0.00 31.50 0.00 7,318 525.00 0.00 • 33.00 0.00 7,318 525.00 0.00 34.50 0.00 7,318 525.00 0.00 36.00 0.00 7,318 525.00 0.00 37.50 0.00 7,318 525.00 0.00 39.00 0.00 7,318 525.00 0.00 40.50 0.00 7,318 525.00 0.00 42.00 0.00 7,318 525.00 0.00 43.50 0.00 7,318 525.00 0.00 45.00 0.00 7,318 525.00 0.00 46.50 0.00 7,318 525.00 0.00 48.00 0.00 7,318 525.00 0.00 0 Rain Garden _1_Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 32 • L Elevation Primary (feet) (cfs) 524.00 0.00 524.02 0.00 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.15 Stage-Discharge for Pond RG-1: Rain Garden Elevation Primary (feet) (cfs) 525.04 0.41 525.06 0.76 525.08 1.16 525.10 1.63 525.12 2.14 525.14 2.69 525.16 3.29 525.18 3.93 525.20 4.60 525.22 5.31 525.24 6.07 525.26 6.85 525.28 7.67 525.30 8.53 525.32 9.41 525.34 10.33 525.36 11.28 525.38 12.25 525.40 13.26 525.42 14.31 525.44 15.39 525.46 16.50 525.48 17.64 525.50 18.81 525.52 20.01 525.54 21.24 525.56 22.50 525.58 23.78 525.60 25.10 525.62 26.33 525.64 27.59 525.66 28.86 525.68 30.15 525.70 31.45 525.72 32.77 525.74 34.11 525.76 35.46 525.78 36.83 525.80 38.21 525.82 39.64 525.84 41.08 525.86 42.54 525.88 44.02 525.90 45.51 525.92 47.02 525.94 48.54 525.96 50.08 525.98 51.63 526.00 53.20 526.02 54.82 526.04 56.47 526.06 58.12 Elevation Primary (feet) (cfs) 526.08 59.80 526.10 61.49 526.12 63.20 526.14 64.92 526.16 66.67 526.18 68.42 526.20 70.20 526.22 71.93 526.24 73.68 526.26 75.44 526.28 77.22 526.30 79.00 526.32 80.80 526.34 82.61 526.36 84.44 526.38 86.28 526.40 88.13 526.42 89.95 526.44 91.79 526.46 93.64 526.48 95.50 526.50 97.37 526.52 99.25 526.54 101.13 526.56 103.03 526.58 104.94 526.60 106.86 526.62 108.87 526.64 110.89 526.66 112.93 526.68 114.97 526.70 117.03 526.72 119.10 526.74 121.19 526.76 123.28 526.78 125.39 526.80 127.51 526.82 129.64 526.84 131.78 526.86 133.94 526.88 136.10 526.90 138.28 526.92 140.47 526.94 142.67 526.96 144.88 526.98 147.11 527.00 149.34 • 0 • Rain Garden-1-Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 33 Stage-Area-Storage for Pond RG-1: Rain Garden Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 524.00 6,816 0 524.05 6,866 342 524.10 6,916 687 524.15 6,967 1,034 524.20 7,017 1,383 524.25 7,067 1,735 524.30 7,117 2,090 524.35 7,167 2,447 524.40 7,218 2,807 524.45 7,268 3,169 524.50 7,318 3,534 524.55 7,368 3,901 524.60 7,418 4,270 524.65 7,469 4,642 524.70 7,519 5,017 524.75 7,569 5,394 524.80 7,619 5,774 524.85 7,669 6,156 524.90 7,720 6,541 524.95 7,770 6,928 525.00 7,820 7,318 525.05 7,873 7,710 525.10 7,926 8,105 525.15 7,979 8,503 525.20 8,032 8,903 525.25 8,086 9,306 525.30 8,139 9,712 525.35 8,192 10,120 525.40 8,245 10,531 525.45 8,298 10,945 525.50 8,351 11,361 525.55 8,404 11,780 525.60 8,457 12,201 525.65 8,510 12,625 525.70 8,563 13,052 525.75 8,617 13,482 525.80 8,670 13,914 525.85 8,723 14,349 525.90 8,776 14,786 525.95 8,829 15,226 526.00 8,882 15,669 526.05 8,934 16,114 526.10 8,986 16,562 526.15 9,038 17,013 526.20 9,091 17,466 526.25 9,143 17,922 526.30 9,195 18,381 526.35 9,247 18,842 526.40 9,299 19,305 526.45 9,351 19,772 526.50 9,404 20,240 526.55 9,456 20,712 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 526.60 9,508 21,186 526.65 9,560 21,663 526.70 9,612 22,142 526.75 9,664 22,624 526.80 9,716 23,108 526.85 9,769 23,595 526.90 9,821 24,085 526.95 9,873 24,578 527.00 9,925 25,073 Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 34 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Post Runoff Area=4.670 ac 42.18% Impervious Runoff Depth=4.40" Tc=5.0 min CN=84 Runoff=36.06 cfs 1.713 of Pond FB-1: FOREBAY 1 Peak Elev=526.33' Storage=4,185 cf Inflow=36.06 cfs 1.713 of Outflow=36.03 cfs 1.634 of Pond RG-1: Rain Garden Peak Elev=525.73' Storage=13,290 cf Inflow=36.03 cfs 1.634 of Outflow=33.28 cfs 1.466 of Total Runoff Area = 4.670 ac Runoff Volume =1.713 of Average Runoff Depth = 4.40" 57.82% Pervious = 2.700 ac 42.18% Impervious =1.970 ac E 0 • Rain Garden-1-Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment DA1: Post Runoff = 36.06 cfs @ 11.96 hrs, Volume= 1.713 af, Depth= 4.40" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 25 year Rainfall=6.22" Area (ac) CN Description 0.440 98 Paved parking, HSG C 1.530 98 Roofs, HSG C 2.700 74 >75% Grass cover, Good, HSG C 4.670 84 Weighted Average 2.700 57.82% Pervious Area 1.970 42.18% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: Post • Hydrograph -------- -- -------- -----'--------------- -- ----------- ------------- -- - - Runoff 36 - - - - - -i 36.06 _ _ _ - - _ _ _ _ _ _ _ _. _ _ - - - _ - ? --- 36 --- - -- ---; - -- -- - TYPell24-hr Eden-- 34 -- --- ----- - ----- ---- -- - - ------ -------'---'-- - 32 1-1 ----I-- --'- --- --- - - - - -- -- 25 _year - 30 -- L - -- °- --'-- -L - - -- --fZainfall-=6:22"-- zs -- -- L-- -- -- ---'-- 26 -Run6ff area=4.670 ac- 24 L _ _ ... _ ._.._ _ 22 -- Runoff V' olume=1:11 a# 3 20 LL 18 Runoff Depth=4,40 16 14 - - '_.._ - -- - - 0 min_ 12 CN=84 _ 10 a s - - a - i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Rain Garden _1Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WS_P SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 36 Hydrograph for Subcatchment DA1: Post • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.08 0.00 0.00 1.80 0.12 0.00 0.00 2.40 0.17 0.00 0.00 3.00 0.21 0.00 0.00 3.60 0.26 0.00 0.00 4.20 0.32 0.00 0.00 4.80 0.37 0.00 0.00 5.40 0.43 0.00 0.02 6.00 0.50 0.01 0.05 6.60 0.57 0.02 0.09 7.20 0.64 0.03 0.13 7.80 0.72 0.05 0.17 8.40 0.81 0.08 0.24 9.00 0.91 0.12 0.35 9.60 1.03 0.17 0.42 10.20 1.18 0.24 0.62 10.80 1.38 0.34 1.00 11.40 1.69 0.53 1.92 12.00 4.12 2.48 30.43 12.60 4.62 2.93 2.30 13.20 4.87 3.16 1.54 13.80 5.05 3.32 1.14 14.40 5.19 3.44 0.94 15.00 5.31 3.55 0.82 15.60 5.41 3.65 0.71 16.20 5.50 3.73 0.62 16.80 5.58 3.81 0.58 17.40 5.66 3.88 0.54 18.00 5.73 3.94 0.50 18.60 5.79 4.00 0.46 19.20 5.85 4.06 0.42 19.80 5.90 4.11 0.37 20.40 5.95 4.15 0.35 21.00 6.00 4.20 0.34 21.60 6.05 4.24 0.34 22.20 6.09 4.28 0.33 22.80 6.14 4.32 0.32 23.40 6.18 4.36 0.31 24.00 6.22 4.40 0.30 24.60 6.22 4.40 0.00 25.20 6.22 4.40 0.00 25.80 6.22 4.40 0.00 26.40 6.22 4.40 0.00 27.00 6.22 4.40 0.00 27.60 6.22 4.40 0.00 28.20 6.22 4.40 0.00 28.80 6.22 4.40 0.00 29.40 6.22 4.40 0.00 30.00 6.22 4.40 0.00 30.60 6.22 4.40 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 6.22 4.40 0.00 31.80 6.22 4.40 0.00 32.40 6.22 4.40 0.00 33.00 6.22 4.40 0.00 33.60 6.22 4.40 0.00 34.20 6.22 4.40 0.00 34.80 6.22 4.40 0.00 35.40 6.22 4.40 0.00 36.00 6.22 4.40 0.00 36.60 6.22 4.40 0.00 37.20 6.22 4.40 0.00 37.80 6.22 4.40 0.00 38.40 6.22 4.40 0.00 39.00 6.22 4.40 0.00 39.60 6.22 4.40 0.00 40.20 6.22 4.40 0.00 40.80 6.22 4.40 0.00 41.40 6.22 4.40 0.00 42.00 6.22 4.40 0.00 42.60 6.22 4.40 0.00 43.20 6.22 4.40 0.00 43.80 6.22 4.40 0.00 44.40 6.22 4.40 0.00 45.00 6.22 4.40 0.00 45.60 6.22 4.40 0.00 46.20 6.22 4.40 0.00 46.80 6.22 4.40 0.00 47.40 6.22 4.40 0.00 48.00 6.22 4.40 0.00 • Rain Garden-1-Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 37 Summary for Pond FBA: FOREBAY 1 C7 Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 4.40" for Eden 25 year event Inflow = 36.06 cfs @ 11.96 hrs, Volume= 1.713 of Outflow = 36.03 cfs @ 11.96 hrs, Volume= 1.634 af, Atten= 0%, Lag= 0.2 min Primary = 36.03 cfs @ 11.96 hrs, Volume= 1.634 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 526.33' @ 11.96 hrs Surf.Area= 2,238 sf Storage= 4,185 cf Plug-Flow detention time= 41.4 min calculated for 1.633 of (95% of inflow) Center-of-Mass det. time= 14.4 min ( 812.5 - 798.1 ) Volume Invert Avail.Storage Storag e Description #1 523.00' 5,829 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 523.00 386 0 0 524.00 864 625 625 525.00 1,413 1,139 1,764 526.00 2,018 1,716 3,479 527.00 2,681 2,350 5,829 Device Routing Invert Outlet Devices #1 Primary 526.00' 70.0' long x 17.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=35.43 cfs @ 11.96 hrs HW=526.33' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 35.43 cfs @ 1.54 fps) is Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 38 Pond FBA: FOREBAY 1 Hydrograph 40 ' -- --- --- -- ¦Inflow 38 ' - - = - 36,06 cis - -- - - - - - - - - - - ? ? - - ¦ Primary - _ - 36.03 ds - -. ;.. Inflow Area=4 670 36 . ac 34 32 ' - - - - - Peak Elev=526.33` 30 28 -- - - -- - - Storage=4'1185 cf . - --- - 26 ; , ---- --- ---, ---------- 24 w 22 - 3 20 , O 16 14 - - - 12 10 g ? I , I 6 1 4 2 0 0 2 4 6 8 10 12 14 . .,...... 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 • Time (hours) Pond FBA: FOREBAY 1 Stage-Discharge ® Primary m m c 0 m w C? - ?? vu ivu Ilu JZU isu 14U 1b0 160 170 180 Discharge (cfs) • 0 Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 39 Rain Garden_1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 40 Hydrograph for Pond FB-1: FOREBAY 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 523.00 0.00 1.50 0.00 0 523.00 0.00 3.00 0.00 0 523.00 0.00 4.50 0.00 0 523.00 0.00 6.00 0.05 98 523.22 0.00 7.50 0.15 644 524.02 0.00 9.00 0.35 1,879 525.08 0.00 10.50 0.77 3,520 526.02 0.77 12.00 30.43 4,120 526.30 31.37 13.50 1.32 3,551 526.04 1.33 15.00 0.82 3,524 526.02 0.83 16.50 0.60 3,511 526.02 0.60 18.00 0.50 3,506 526.01 0.50 19.50 0.39 3,500 526.01 0.40 21.00 0.34 3,498 526.01 0.34 22.50 0.32 3,497 526.01 0.32 24.00 0.30 3,495 526.01 0.30 25.50 0.00 3,479 526.00 0.00 27.00 0.00 3,479 526.00 0.00 28.50 0.00 3,479 526.00 0.00 30.00 0.00 3,479 526.00 0.00 31.50 0.00 3,479 526.00 0.00 • 33.00 0.00 3,479 526.00 0.00 34.50 0.00 3,479 526.00 0.00 36.00 0.00 3,479 526.00 0.00 37.50 0.00 3,479 526.00 0.00 39.00 0.00 3,479 526.00 0.00 40.50 0.00 3,479 526.00 0.00 42.00 0.00 3,479 526.00 0.00 43.50 0.00 3,479 526.00 0.00 45.00 0.00 3,479 526.00 0.00 46.50 0.00 3,479 526.00 0.00 48.00 0.00 3,479 526.00 0.00 0 Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 41 • • Elevation Primary (feet) (cfs) 523.00 0.00 523.02 0.00 523.04 0.00 523.06 0.00 523.08 0.00 523.10 0.00 523.12 0.00 523.14 0.00 523.16 0.00 523.18 0.00 523.20 0.00 523.22 0.00 523.24 0.00 523.26 0.00 523.28 0.00 523.30 0.00 523.32 0.00 523.34 0.00 523.36 0.00 523.38 0.00 523.40 0.00 523.42 0.00 523.44 0.00 523.46 0.00 523.48 0.00 523.50 0.00 523.52 0.00 523.54 0.00 523.56 0.00 523.58 0.00 523.60 0.00 523.62 0.00 523.64 0.00 523.66 0.00 523.68 0.00 523.70 0.00 523.72 0.00 523.74 0.00 523.76 0.00 523.78 0.00 523.80 0.00 523.82 0.00 523.84 0.00 523.86 0.00 523.88 0.00 523.90 0.00 523.92 0.00 523.94 0.00 523.96 0.00 523.98 0.00 524.00 0.00 524.02 0.00 Stage-Discharge for Pond FB-1: FOREBAY 1 Elevation Primary (feet) (cfs) 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.00 525.04 0.00 525.06 0.00 Elevation Primary (feet) (cfs) 525.08 0.00 525.10 0.00 525.12 0.00 525.14 0.00 525.16 0.00 525.18 0.00 525.20 0.00 525.22 0.00 525.24 0.00 525.26 0.00 525.28 0.00 525.30 0.00 525.32 0.00 525.34 0.00 525.36 0.00 525.38 0.00 525.40 0.00 525.42 0.00 525.44 0.00 525.46 0.00 525.48 0.00 525.50 0.00 525.52 0.00 525.54 0.00 525.56 0.00 525.58 0.00 525.60 0.00 525.62 0.00 525.64 0.00 525.66 0.00 525.68 0.00 525.70 0.00 525.72 0.00 525.74 0.00 525.76 0.00 525.78 0.00 525.80 0.00 525.82 0.00 525.84 0.00 525.86 0.00 525.88 0.00 525.90 0.00 525.92 0.00 525.94 0.00 525.96 0.00 525.98 0.00 526.00 0.00 526.02 0.53 526.04 1.50 526.06 2.76 526.08 4.24 526.10 5.93 Elevation Primary (feet) (cfs) 526.12 7.80 526.14 9.83 526.16 12.01 526.18 14.33 526.20 16.78 526.22 19.37 526.24 22.09 526.26 24.93 526.28 27.88 526.30 30.94 526.32 34.11 526.34 37.39 526.36 40.76 526.38 44.24 526.40 47.81 526.42 51.44 526.44 55.16 526.46 58.97 526.48 62.85 526.50 66.82 526.52 70.87 526.54 75.00 526.56 79.20 526.58 83.48 526.60 87.84 526.62 92.06 526.64 96.34 526.66 100.66 526.68 105.04 526.70 109.46 526.72 113.93 526.74 118.44 526.76 123.00 526.78 127.59 526.80 132.23 526.82 137.17 526.84 142.16 526.86 147.22 526.88 152.32 526.90 157.49 526.92 162.70 526.94 167.97 526.96 173.30 526.98 178.67 527.00 184.10 • Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 42 Stage-Area-Storage for Pond FB-1: FOREBAY 1 • • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 523.00 386 0 523.05 410 20 523.10 434 41 523.15 458 63 523.20 482 87 523.25 506 111 523.30 529 137 523.35 553 164 523.40 577 193 523.45 601 222 523.50 625 253 523.55 649 285 523.60 673 318 523.65 697 352 523.70 721 387 523.75 745 424 523.80 768 462 523.85 792 501 523.90 816 541 523.95 840 582 524.00 864 625 524.05 891 669 524.10 919 714 524.15 946 761 524.20 974 809 524.25 1,001 858 524.30 1,029 909 524.35 1,056 961 524.40 1,084 1,015 524.45 1,111 1,069 524.50 1,139 1,126 524.55 1,166 1,183 524.60 1,193 1,242 524.65 1,221 1,303 524.70 1,248 1,364 524.75 1,276 1,427 524.80 1,303 1,492 524.85 1,331 1,558 524.90 1,358 1,625 524.95 1,386 1,694 525.00 1,413 1,764 525.05 1,443 1,835 525.10 1,474 1,908 525.15 1,504 1,982 525.20 1,534 2,058 525.25 1,564 2,136 525.30 1,594 2,215 525.35 1,625 2,295 525.40 1,655 2,377 525.45 1,685 2,461 525.50 1,716 2,546 525.55 1,746 2,632 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 525.60 1,776 2,720 525.65 1,806 2,810 525.70 1,837 2,901 525.75 1,867 2,993 525.80 1,897 3,087 525.85 1,927 3,183 525.90 1,957 3,280 525.95 1,988 3,379 526.00 2,018 3,479 526.05 2,051 3,581 526.10 2,084 3,684 526.15 2,117 3,789 526.20 2,151 3,896 526.25 2,184 4,004 526.30 2,217 4,114 526.35 2,250 4,226 526.40 2,283 4,339 526.45 2,316 4,454 526.50 2,350 4,571 526.55 2,383 4,689 526.60 2,416 4,809 526.65 2,449 4,931 526.70 2,482 5,054 526.75 2,515 5,179 526.80 2,548 5,306 526.85 2,582 5,434 526.90 2,615 5,564 526.95 2,648 5,695 527.00 2,681 5,829 Rain Garden-1-Post Type// 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 • HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 43 Summary for Pond RG-1: Rain Garden Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 4.20" for Eden 25 year event Inflow = 36.03 cfs @ 11.96 hrs, Volume= 1.634 of Outflow = 33.28 cfs @ 11.99 hrs, Volume= 1.466 af, Atten= 8%, Lag= 1.7 min Primary = 33.28 cfs @ 11.99 hrs, Volume= 1.466 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 525.73'@ 11.99 hrs Surf.Area= 8,593 sf Storage= 13,290 cf Plug-Flow detention time= 75.2 min calculated for 1.466 of (90% of inflow) Center-of-Mass det. time= 23.5 min ( 836.1 - 812.5 ) Volume Invert Avail.Storage Storage Description #1 524.00' 25,073 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 524.00 6,816 0 0 525.00 7,820 7,318 7,318 526.00 8,882 8,351 15,669 527.00 9,925 9,404 25,073 Device Routing Invert Outlet Devices #1 Primary 525.00' 20.0' long x 12.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max=32.83 cfs @ 11.99 hrs HW=525.72' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 32.83 cfs @ 2.28 fps) it • 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond RG-1: Rain Garden Stage-Discharge m m c 0 m w oU iuu 120 140 • Discharge (cfs) ® Primary Rain Garden _1Post Type 1124-hr Eden 25 year Rainfall=6.22" Prepared by WS_P SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 45 Pond RG-1: Rain Garden Stage-Area-Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8.000 9.000 d m w c 0 .4 m w E 0 Surface 0 Storage 0 0 5,000 10,000 15,000 20,000 25,000 Storage (cubic-feet) Rain Garden_1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 . HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 46 Hydrograph for Pond RG-1: Rain Garden Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 524.00 0.00 1.50 0.00 0 524.00 0.00 3.00 0.00 0 524.00 0.00 4.50 0.00 0 524.00 0.00 6.00 0.00 0 524.00 0.00 7.50 0.00 0 524.00 0.00 9.00 0.00 0 524.00 0.00 10.50 0.77 1,046 524.15 0.00 12.00 31.37 13,262 525.72 33.07 13.50 1.33 8,024 525.09 1.39 15.00 0.83 7,820 525.06 0.85 16.50 0.60 7,722 525.05 0.60 18.00 0.50 7,673 525.05 0.51 19.50 0.40 7,618 525.04 0.41 21.00 0.34 7,585 525.03 0.35 22.50 0.32 7,574 525.03 0.33 24.00 0.30 7,563 525.03 0.31 25.50 0.00 7,320 525.00 0.00 27.00 0.00 7,318 525.00 0.00 28.50 0.00 7,318 525.00 0.00 30.00 0.00 7,318 525.00 0.00 31.50 0.00 7,318 525.00 0.00 33.00 0.00 7,318 525.00 0.00 34.50 0.00 7,318 525.00 0.00 36.00 0.00 7,318 525.00 0.00 37.50 0.00 7,318 525.00 0.00 39.00 0.00 7,318 525.00 0.00 40.50 0.00 7,318 525.00 0.00 42.00 0.00 7,318 525.00 0.00 43.50 0.00 7,318 525.00 0.00 45.00 0.00 7,318 525.00 0.00 46.50 0.00 7,318 525.00 0.00 48.00 0.00 7,318 525.00 0.00 0 • • • Rain Garden-1-Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD@)9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 47 Elevation Primary (feet) (cfs) 524.00 0.00 524.02 0.00 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.15 Stage-Discharge for Pond RG-1: Rain Garden Elevation Primary (feet) (cfs) 525.04 0.41 525.06 0.76 525.08 1.16 525.10 1.63 525.12 2.14 525.14 2.69 525.16 3.29 525.18 3.93 525.20 4.60 525.22 5.31 525.24 6.07 525.26 6.85 525.28 7.67 525.30 8.53 525.32 9.41 525.34 10.33 525.36 11.28 525.38 12.25 525.40 13.26 525.42 14.31 525.44 15.39 525.46 16.50 525.48 17.64 525.50 18.81 525.52 20.01 525.54 21.24 525.56 22.50 525.58 23.78 525.60 25.10 525.62 26.33 525.64 27.59 525.66 28.86 525.68 30.15 525.70 31.45 525.72 32.77 525.74 34.11 525.76 35.46 525.78 36.83 525.80 38.21 525.82 39.64 525.84 41.08 525.86 42.54 525.88 44.02 525.90 45.51 525.92 47.02 525.94 48.54 525.96 50.08 525.98 51.63 526.00 53.20 526.02 54.82 526.04 56.47 526.06 58.12 Elevation Primary (feet) (cfs) 526.08 59.80 526.10 61.49 526.12 63.20 526.14 64.92 526.16 66.67 526.18 68.42 526.20 70.20 526.22 71.93 526.24 73.68 526.26 75.44 526.28 77.22 526.30 79.00 526.32 80.80 526.34 82.61 526.36 84.44 526.38 86.28 526.40 88.13 526.42 89.95 526.44 91.79 526.46 93.64 526.48 95.50 526.50 97.37 526.52 99.25 526.54 101.13 526.56 103.03 526.58 104.94 526.60 106.86 526.62 108.87 526.64 110.89 526.66 112.93 526.68 114.97 526.70 117.03 526.72 119.10 526.74 121.19 526.76 123.28 526.78 125.39 526.80 127.51 526.82 129.64 526.84 131.78 526.86 133.94 526.88 136.10 526.90 138.28 526.92 140.47 526.94 142.67 526.96 144.88 526.98 147.11 527.00 149.34 • Rain Garden _1_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 48 Stage-Area-Storage for Pond RG-1: Rain Garden • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 524.00 6,816 0 524.05 6,866 342 524.10 6,916 687 524.15 6,967 1,034 524.20 7,017 1,383 524.25 7,067 1,735 524.30 7,117 2,090 524.35 7,167 2,447 524.40 7,218 2,807 524.45 7,268 3,169 524.50 7,318 3,534 524.55 7,368 3,901 524.60 7,418 4,270 524.65 7,469 4,642 524.70 7,519 5,017 524.75 7,569 5,394 524.80 7,619 5,774 524.85 7,669 6,156 524.90 7,720 6,541 524.95 7,770 6,928 525.00 7,820 7,318 525.05 7,873 7,710 525.10 7,926 8,105 525.15 7,979 8,503 525.20 8,032 8,903 525.25 8,086 9,306 525.30 8,139 9,712 525.35 8,192 10,120 525.40 8,245 10,531 525.45 8,298 10,945 525.50 8,351 11,361 525.55 8,404 11,780 525.60 8,457 12,201 525.65 8,510 12,625 525.70 8,563 13,052 525.75 8,617 13,482 525.80 8,670 13,914 525.85 8,723 14,349 525.90 8,776 14,786 525.95 8,829 15,226 526.00 8,882 15,669 526.05 8,934 16,114 526.10 8,986 16,562 526.15 9,038 17,013 526.20 9,091 17,466 526.25 9,143 17,922 526.30 9,195 18,381 526.35 9,247 18,842 526.40 9,299 19,305 526.45 9,351 19,772 526.50 9,404 20,240 526.55 9,456 20,712 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 526.60 9,508 21,186 526.65 9,560 21,663 526.70 9,612 22,142 526.75 9,664 22,624 526.80 9,716 23,108 526.85 9,769 23,595 526.90 9,821 24,085 526.95 9,873 24,578 527.00 9,925 25,073 • Rain Garden _1_Post Type 1124-hr Eden 50 year Rainfall=7.1 T' Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 49 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Post Runoff Area=4.670 ac 42.18% Impervious Runoff Depth=5.30" Tc=5.0 min CN=84 Runoff=42.92 cfs 2.063 of Pond FB-1: FOREBAY 1 Peak Elev=526.37' Storage=4,276 cf Inflow=42.92 cfs 2.063 of Outflow=42.88 cfs 1.983 of Pond RG-1: Rain Garden Peak Elev=525.82' Storage=14,112 cf Inflow=42.88 cfs 1.983 of Outflow=39.82 cfs 1.815 of Total Runoff Area = 4.670 ac Runoff Volume = 2.063 of Average Runoff Depth = 5.30" 57.82% Pervious = 2.700 ac 42.18% Impervious =1.970 ac 0 Rain Garden-1-Post Type 1124-hr Eden 50 year Rainfa&7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment DA1: Post Runoff = 42.92 cfs @ 11.96 hrs, Volume= 2.063 af, Depth= 5.30" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 50 year Rainfall=7.17" Area (ac) CN Description 0.440 98 Paved parking, HSG C 1.530 98 Roofs, HSG C 2.700 74 >75% Grass cover, Good, HSG C 4.670 84 Weighted Average 2.700 57.82% Pervious Area 1.970 42.18% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: Post • Hydrograph 48 - - -- - - --- - 46 - ®Runoff 42 44 sz cfs j - - - r r - - - -i - - - - - _ r - - ?- - r - - - - - _ - - - - - - - - i 42 - Type-II 24-hr, Eden ... 40 _ -- --- -------------------- -- -- --------------'---' --- 38 - 5Q year- _. 36 - - -- -- ---- -r-- - -- r - - r-- 34 Rainfall 7:17" 32 --- --- - -- --- - - ----F - -------- -------------- 30 µ Runoff Area=4.670 ac- -- - - - - - - ?. 28 _ _ - - - - - - - - - - - - - - - - - I - - - ---- --- 26 - Runoff; Volume =2.063 of 24 c 22 Runoff Depth _5:30''_ a 20 __ - __ _ 18 Tc=5A min - - ------------ 16 - -' --' - - - - - - - - ---- CN=84 12 r - - - - r - -. 10 ..... ..........---i. . .T-f 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 • Rain Garden-1-Post Type// 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 51 Hydrograph for Subcatchment DA1: Post • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.09 0.00 0.00 1.80 0.14 0.00 0.00 2.40 0.19 0.00 0.00 3.00 0.25 0.00 0.00 3.60 0.30 0.00 0.00 4.20 0.36 0.00 0.00 4.80 0.43 0.00 0.02 5.40 0.50 0.01 0.06 6.00 0.57 0.02 0.10 6.60 0.65 0.03 0.15 7.20 0.74 0.06 0.19 7.80 0.83 0.09 0.24 8.40 0.93 0.12 0.33 9.00 1.05 0.18 0.47 9.60 1.19 0.24 0.55 10.20 1.36 0.33 0.81 10.80 1.59 0.47 1.27 11.40 1.95 0.71 2.39 12.00 4.75 3.05 36.10 12.60 5.33 3.57 2.71 13.20 5.62 3.84 1.80 13.80 5.82 4.03 1.34 14.40 5.98 4.18 1.10 15.00 6.12 4.31 0.97 15.60 6.24 4.42 0.84 16.20 6.34 4.52 0.72 16.80 6.44 4.61 0.67 17.40 6.52 4.69 0.63 18.00 6.60 4.76 0.58 18.60 6.68 4.83 0.53 19.20 6.75 4.90 0.49 19.80 6.81 4.96 0.44 20.40 6.86 5.01 0.41 21.00 6.92 5.06 0.40 21.60 6.97 5.11 0.39 22.20 7.02 5.16 0.38 22.80 7.07 5.21 0.37 23.40 7.12 5.26 0.36 24.00 7.17 5.30 0.35 24.60 7.17 5.30 0.00 25.20 7.17 5.30 0.00 25.80 7.17 5.30 0.00 26.40 7.17 5.30 0.00 27.00 7.17 5.30 0.00 27.60 7.17 5.30 0.00 28.20 7.17 5.30 0.00 28.80 7.17 5.30 0.00 29.40 7.17 5.30 0.00 30.00 7.17 5.30 0.00 30.60 7.17 5.30 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 7.17 5.30 0.00 31.80 7.17 5.30 0.00 32.40 7.17 5.30 0.00 33.00 7.17 5.30 0.00 33.60 7.17 5.30 0.00 34.20 7.17 5.30 0.00 34.80 7.17 5.30 0.00 35.40 7.17 5.30 0.00 36.00 7.17 5.30 0.00 36.60 7.17 5.30 0.00 37.20 7.17 5.30 0.00 37.80 7.17 5.30 0.00 38.40 7.17 5.30 0.00 39.00 7.17 5.30 0.00 39.60 7.17 5.30 0.00 40.20 7.17 5.30 0.00 40.80 7.17 5.30 0.00 41.40 7.17 5.30 0.00 42.00 7.17 5.30 0.00 42.60 7.17 5.30 0.00 43.20 7.17 5.30 0.00 43.80 7.17 5.30 0.00 44.40 7.17 5.30 0.00 45.00 7.17 5.30 0.00 45.60 7.17 5.30 0.00 46.20 7.17 5.30 0.00 46.80 7.17 5.30 0.00 47.40 7.17 5.30 0.00 48.00 7.17 5.30 0.00 Rain Garden _1_Post Type// 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 52 Summary for Pond FBA: FOREBAY 1 Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 5.30" for Eden 50 year event Inflow = 42.92 cfs @ 11.96 hrs, Volume= 2.063 of Outflow = 42.88 cfs @ 11.96 hrs, Volume= 1.983 af, Atten= 0%, Lag= 0.2 min Primary = 42.88 cfs @ 11.96 hrs, Volume= 1.983 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 526.37'@ 11.96 hrs Surf.Area= 2,265 sf Storage= 4,276 cf Plug-Flow detention time= 36.4 min calculated for 1.982 of (96% of inflow) Center-of-Mass det. time= 13.4 min ( 806.3 - 792.9 ) Volume Invert Avail.Storage Storage Description #1 523.00' 5,829 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 523.00 386 0 0 524.00 864 625 625 525.00 1,413 1,139 1,764 526.00 2,018 1,716 3,479 527.00 2,681 2,350 5,829 Device Routing Invert Outlet Devices #1 Primary 526.00' 70.0' long x 17.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=42.15 cfs @ 11.96 hrs HW=526.37' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 42.15 cfs @ 1.64 fps) 0 Rain Garden _1Post Type // 24-hr Eden 50 year Rainfall=7.17" Prepared by WS_P SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 53 Pond FBA: FOREBAY 1 Hydrograph ----:- -'_,- --_ _ .... _. -..... _..- - ... ....,. . _ _._._, ..-.__. - , - - - '-- 48 . - -- ' -- --- - - - - - - - - - nflow 46 - - 42.92 cfs - - - - - - - - - - - _ - - - - - - - ¦ Primary 44 I i .. I A az.eeas r Inflow Mrea= 467o ac 42 i 40 - - - - - - --- ' - --Pea - - Ele 6 ` 38 v=x2 -.37 34 -Stora a-4 276 I 32 , -- - ... - _.,__....I H 28 - , I I I I I I v 26 -, - - - r - : - 3 24 _- - - --- '- -- '-- - - r ----- ', - - I - ------- _0 22 -,. ---1-...-I - FL 20 -. I I - -- r -: ------ i- --- . r -. --- : - - - - -- - - - - I 18 16 -r 14 - - -----; - -- I---------I- --------- ---- ------ --- 12 I 10 I I I I I . 8 ?" i '. I I I i I I I I_ I : I I - I I I ? I I r 4 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond FB-1: FOREBAY 1 Stage-Discharge ® Primary m m w 00 m W 0 V Iu Lu bu 4u 5V bu tu du 90 100 110 120 130 140 150 160 170 180 Discharge (cfs) Rain Garden-1-Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 54 Pond FB-1: FOREBAY 1 Stage-Area-Storage Surface/Horizontal/Wetted Area (sq-ft) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 m m w c 0 m m w • 2,000 2,200 2,400 2,600 p Surface ¦ Storage ?JJ 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 Storage (cubic-feet) Rain Garden-1-Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 is HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 55 Hydrograph for Pond FB-1: FOREBAY 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 523.00 0.00 1.50 0.00 0 523.00 0.00 3.00 0.00 0 523.00 0.00 4.50 0.00 1 523.00 0.00 6.00 0.10 271 523.53 0.00 7.50 0.22 1,128 524.50 0.00 9.00 0.47 2,846 525.67 0.00 10.50 0.99 3,532 526.03 0.98 12.00 36.10 4,200 526.34 37.18 13.50 1.54 3,562 526.04 1.55 15.00 0.97 3,532 526.03 0.97 16.50 0.70 3,517 526.02 0.70 18.00 0.58 3,510 526.02 0.58 19.50 0.46 3,504 526.01 0.46 21.00 0.40 3,501 526.01 0.40 22.50 0.38 3,499 526.01 0.38 24.00 0.35 3,498 526.01 0.35 25.50 0.00 3,479 526.00 0.00 27.00 0.00 3,479 526.00 0.00 28.50 0.00 3,479 526.00 0.00 30.00 0.00 3,479 526.00 0.00 31.50 0.00 3,479 526.00 0.00 33.00 0 0.00 3,479 526.00 0.00 34.50 0.00 3,479 526.00 0.00 36.00 0.00 3,479 526.00 0.00 37.50 0.00 3,479 526.00 0.00 39.00 0.00 3,479 526.00 0.00 40.50 0.00 3,479 526.00 0.00 42.00 0.00 3,479 526.00 0.00 43.50 0.00 3,479 526.00 0.00 45.00 0.00 3,479 526.00 0.00 46.50 0.00 3,479 526.00 0.00 48.00 0.00 3,479 526.00 0.00 0 • • • Rain Garden _1_Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 56 Elevation Primary (feet) (cfs) 523.00 0.00 523.02 0.00 523.04 0.00 523.06 0.00 523.08 0.00 523.10 0.00 523.12 0.00 523.14 0.00 523.16 0.00 523.18 0.00 523.20 0.00 523.22 0.00 523.24 0.00 523.26 0.00 523.28 0.00 523.30 0.00 523.32 0.00 523.34 0.00 523.36 0.00 523.38 0.00 523.40 0.00 523.42 0.00 523.44 0.00 523.46 0.00 523.48 0.00 523.50 0.00 523.52 0.00 523.54 0.00 523.56 0.00 523.58 0.00 523.60 0.00 523.62 0.00 523.64 0.00 523.66 0.00 523.68 0.00 523.70 0.00 523.72 0.00 523.74 0.00 523.76 0.00 523.78 0.00 523.80 0.00 523.82 0.00 523.84 0.00 523.86 0.00 523.88 0.00 523.90 0.00 523.92 0.00 523.94 0.00 523.96 0.00 523.98 0.00 524.00 0.00 524.02 0.00 Stage-Discharge for Pond FB-1: FOREBAY 1 Elevation Primary (feet) (cfs) 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.00 525.04 0.00 525.06 0.00 Elevation Primary (feet) (cfs) 525.08 0.00 525.10 0.00 525.12 0.00 525.14 0.00 525.16 0.00 525.18 0.00 525.20 0.00 525.22 0.00 525.24 0.00 525.26 0.00 525.28 0.00 525.30 0.00 525.32 0.00 525.34 0.00 525.36 0.00 525.38 0.00 525.40 0.00 525.42 0.00 525.44 0.00 525.46 0.00 525.48 0.00 525.50 0.00 525.52 0.00 525.54 0.00 525.56 0.00 525.58 0.00 525.60 0.00 525.62 0.00 525.64 0.00 525.66 0.00 525.68 0.00 525.70 0.00 525.72 0.00 525.74 0.00 525.76 0.00 525.78 0.00 525.80 0.00 525.82 0.00 525.84 0.00 525.86 0.00 525.88 0.00 525.90 0.00 525.92 0.00 525.94 0.00 525.96 0.00 525.98 0.00 526.00 0.00 526.02 0.53 526.04 1.50 526.06 2.76 526.08 4.24 526.10 5.93 Elevation Primary (feet) (cfs) 526.12 7.80 526.14 9.83 526.16 12.01 526.18 14.33 526.20 16.78 526.22 19.37 526.24 22.09 526.26 24.93 526.28 27.88 526.30 30.94 526.32 34.11 526.34 37.39 526.36 40.76 526.38 44.24 526.40 47.81 526.42 51.44 526.44 55.16 526.46 58.97 526.48 62.85 526.50 66.82 526.52 70.87 526.54 75.00 526.56 79.20 526.58 83.48 526.60 87.84 526.62 92.06 526.64 96.34 526.66 100.66 526.68 105.04 526.70 109.46 526.72 113.93 526.74 118.44 526.76 123.00 526.78 127.59 526.80 132.23 526.82 137.17 526.84 142.16 526.86 147.22 526.88 152.32 526.90 157.49 526.92 162.70 526.94 167.97 526.96 173.30 526.98 178.67 527.00 184.10 • Rain Garden _1_Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 57 Stage-Area-Storage for Pond FB-1: FOREBAY 1 • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 523.00 386 0 523.05 410 20 523.10 434 41 523.15 458 63 523.20 482 87 523.25 506 111 523.30 529 137 523.35 553 164 523.40 577 193 523.45 601 222 523.50 625 253 523.55 649 285 523.60 673 318 523.65 697 352 523.70 721 387 523.75 745 424 523.80 768 462 523.85 792 501 523.90 816 541 523.95 840 582 524.00 864 625 524.05 891 669 524.10 919 714 524.15 946 761 524.20 974 809 524.25 1,001 858 524.30 1,029 909 524.35 1,056 961 524.40 1,084 1,015 524.45 1,111 1,069 524.50 1,139 1,126 524.55 1,166 1,183 524.60 1,193 1,242 524.65 1,221 1,303 524.70 1,248 1,364 524.75 1,276 1,427 524.80 1,303 1,492 524.85 1,331 1,558 524.90 1,358 1,625 524.95 1,386 1,694 525.00 1,413 1,764 525.05 1,443 1,835 525.10 1,474 1,908 525.15 1,504 1,982 525.20 1,534 2,058 525.25 1,564 2,136 525.30 1,594 2,215 525.35 1,625 2,295 525.40 1,655 2,377 525.45 1,685 2,461 525.50 1,716 2,546 525.55 1,746 2,632 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 525.60 1,776 2,720 525.65 1,806 2,810 525.70 1,837 2,901 525.75 1,867 2,993 525.80 1,897 3,087 525.85 1,927 3,183 525.90 1,957 3,280 525.95 1,988 3,379 526.00 2,018 3,479 526.05 2,051 3,581 526.10 2,084 3,684 526.15 2,117 3,789 526.20 2,151 3,896 526.25 2,184 4,004 526.30 2,217 4,114 526.35 2,250 4,226 526.40 2,283 4,339 526.45 2,316 4,454 526.50 2,350 4,571 526.55 2,383 4,689 526.60 2,416 4,809 526.65 2,449 4,931 526.70 2,482 5,054 526.75 2,515 5,179 526.80 2,548 5,306 526.85 2,582 5,434 526.90 2,615 5,564 526.95 2,648 5,695 527.00 2,681 5,829 Rain Garden _1_Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 58 Summary for Pond RG-1: Rain Garden Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 5.10" for Eden 50 year event Inflow = 42.88 cfs @ 11.96 hrs, Volume= 1.983 of Outflow = 39.82 cfs @ 11.99 hrs, Volume= 1.815 af, Atten= 7%, Lag= 1.6 min Primary = 39.82 cfs @ 11.99 hrs, Volume= 1.815 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 525.82'@ 11.99 hrs Surf.Area= 8,694 sf Storage= 14,112 cf Plug-Flow detention time= 66.5 min calculated for 1.815 of (92% of inflow) Center-of-Mass det. time= 22.0 min ( 828.3 - 806.3 ) Volume Invert Avail.Storage Storage Description #1 524.00' 25,073 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 524.00 6,816 0 0 525.00 7,820 7,318 7,318 526.00 8,882 8,351 15,669 527.00 9,925 9,404 25,073 Device Routing Invert Outlet Devices #1 Primary 525.00' 20.0' long x 12.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max=39.23 cfs @ 11.99 hrs HW=525.81' (Free Discharge) t1=Broad-Crested Rectangular Weir (Weir Controls 39.23 cfs @ 2.41 fps) E Rain Garden _1_Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 59 Pond RG-1: Rain Garden Hydrograph 48 - - ,- - - - -- - - - - - - ¦ Inflow 46 - - - - az.es as - - - - - --- --- --- - - ¦ Primary 44 r Infid w Area-4.670 ac InfidwArea 4 670 ac 42 . as.ez ds - ea E 5 38 P k- 1ev= 25.82 - 36 34 C - #orage=14 112 cf 32 , - 30 - .- --,---, - ------ - -- - - - - - - - - - - - - - -r -, ---, -,--- -- 28 26 - - - 3 24 ----------------- 0 22 u 20 ______ ____ _____,--------------- - r 16 14 - - - - - - - - - - -- ; -- - - - - -------- --------------------- 12 10 ML 6 - A. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0 Time (hours) Pond RG-1: Rain Garden Stage-Discharge ® Primary d m w c 0 v W 0 u cu 4u 60 80 100 120 140 Discharge (cfs) Rain Garden _1_Post Type 11 24-hr Eden 50 year Rainfall= 7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 60 Pond RG-1: Rain Garden Stage-Area-Storage Surface/Horizontal wetted Area (sq-ft) 0 1,000 2,000 3,000 4,000 5.000 6.000 7.000 8 000 s onn m m w c 0 m w • 0 Surface ¦ Storage 0 u 5,000 10,000 15,000 20,000 25,000 Storage (cubic-feet) Rain Garden-1-Post Type// 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 61 Hydrograph for Pond RG-1: Rain Garden Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 524.00 0.00 1.50 0.00 0 524.00 0.00 3.00 0.00 0 524.00 0.00 4.50 0.00 0 524.00 0.00 6.00 0.00 0 524.00 0.00 7.50 0.00 0 524.00 0.00 9.00 0.00 0 524.00 0.00 10.50 0.98 2,829 524.40 0.00 12.00 37.18 14,068 525.82 39.48 13.50 1.55 8,104 525.10 1.63 15.00 0.97 7,879 525.07 0.99 16.50 0.70 7,764 525.06 0.71 18.00 0.58 7,717 525.05 0.59 19.50 0.46 7,656 525.04 0.48 21.00 0.40 7,617 525.04 0.40 22.50 0.38 7,604 525.04 0.38 24.00 0.35 7,591 525.03 0.36 25.50 0.00 7,320 525.00 0.00 27.00 0.00 7,318 525.00 0.00 28.50 0.00 7,318 525.00 0.00 30.00 0.00 7,318 525.00 0.00 31.50 0.00 7,318 525.00 0.00 33.00 0.00 7,318 525.00 0.00 34.50 0.00 7,318 525.00 0.00 36.00 0.00 7,318 525.00 0.00 37.50 0.00 7,318 525.00 0.00 39.00 0.00 7,318 525.00 0.00 40.50 0.00 7,318 525.00 0.00 42.00 0.00 7,318 525.00 0.00 43.50 0.00 7,318 525.00 0.00 45.00 0.00 7,318 525.00 0.00 46.50 0.00 7,318 525.00 0.00 48.00 0.00 7,318 525.00 0.00 • • • • Rain Garden_1_Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 sh 04719 0 2009 HydroCAD Software Solutions LLC Page 62 Elevation Primary (feet) (cfs) 524.00 0.00 524.02 0.00 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.15 Stage-Discharge for Pond RG-1: Rain Garden Elevation Primary (feet) (cfs) 525.04 0.41 525.06 0.76 525.08 1.16 525.10 1.63 525.12 2.14 525.14 2.69 525.16 3.29 525.18 3.93 525.20 4.60 525.22 5.31 525.24 6.07 525.26 6.85 525.28 7.67 525.30 8.53 525.32 9.41 525.34 10.33 525.36 11.28 525.38 12.25 525.40 13.26 525.42 14.31 525.44 15.39 525.46 16.50 525.48 17.64 525.50 18.81 525.52 20.01 525.54 21.24 525.56 22.50 525.58 23.78 525.60 25.10 525.62 26.33 525.64 27.59 525.66 28.86 525.68 30.15 525.70 31.45 525.72 32.77 525.74 34.11 525.76 35.46 525.78 36.83 525.80 38.21 525.82 39.64 525.84 41.08 525.86 42.54 525.88 44.02 525.90 45.51 525.92 47.02 525.94 48.54 525.96 50.08 525.98 51.63 526.00 53.20 526.02 54.82 526.04 56.47 526.06 58.12 Elevation Primary (feet) (cfs) 526.08 59.80 526.10 61.49 526.12 63.20 526.14 64.92 526.16 66.67 526.18 68.42 526.20 70.20 526.22 71.93 526.24 73.68 526.26 75.44 526.28 77.22 526.30 79.00 526.32 80.80 526.34 82.61 526.36 84.44 526.38 86.28 526.40 88.13 526.42 89.95 526.44 91.79 526.46 93.64 526.48 95.50 526.50 97.37 526.52 99.25 526.54 101.13 526.56 103.03 526.58 104.94 526.60 106.86 526.62 108.87 526.64 110.89 526.66 112.93 526.68 114.97 526.70 117.03 526.72 119.10 526.74 121.19 526.76 123.28 526.78 125.39 526.80 127.51 526.82 129.64 526.84 131.78 526.86 133.94 526.88 136.10 526.90 138.28 526.92 140.47 526.94 142.67 526.96 144.88 526.98 147.11 527.00 149.34 L` Rain Garden _1_Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 63 Stage-Area-Storage for Pond RG-1: Rain Garden • • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 524.00 6,816 0 524.05 6,866 342 524.10 6,916 687 524.15 6,967 1,034 524.20 7,017 1,383 524.25 7,067 1,735 524.30 7,117 2,090 524.35 7,167 2,447 524.40 7,218 2,807 524.45 7,268 3,169 524.50 7,318 3,534 524.55 7,368 3,901 524.60 7,418 4,270 524.65 7,469 4,642 524.70 7,519 5,017 524.75 7,569 5,394 524.80 7,619 5,774 524.85 7,669 6,156 524.90 7,720 6,541 524.95 7,770 6,928 525.00 7,820 7,318 525.05 7,873 7,710 525.10 7,926 8,105 525.15 7,979 8,503 525.20 8,032 8,903 525.25 8,086 9,306 525.30 8,139 9,712 525.35 8,192 10,120 525.40 8,245 10,531 525.45 8,298 10,945 525.50 8,351 11,361 525.55 8,404 11,780 525.60 8,457 12,201 525.65 8,510 12,625 525.70 8,563 13,052 525.75 8,617 13,482 525.80 8,670 13,914 525.85 8,723 14,349 525.90 8,776 14,786 525.95 8,829 15,226 526.00 8,882 15,669 526.05 8,934 16,114 526.10 8,986 16,562 526.15 9,038 17,013 526.20 9,091 17,466 526.25 9,143 17,922 526.30 9,195 18,381 526.35 9,247 18,842 526.40 9,299 19,305 526.45 9,351 19,772 526.50 9,404 20,240 526.55 9,456 20,712 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 526.60 9,508 21,186 526.65 9,560 21,663 526.70 9,612 22,142 526.75 9,664 22,624 526.80 9,716 23,108 526.85 9,769 23,595 526.90 9,821 24,085 526.95 9,873 24,578 527.00 9,925 25,073 Rain Garden-1-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 64 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA1: Post Runoff Area=4.670 ac 42.18% Impervious Runoff Depth=6.30" Tc=5.0 min CN=84 Runoff=50.41 cfs 2.451 of Pond FIB-1: FOREBAY 1 Peak Elev=526.41' Storage=4,371 cf Inflow=50.41 cfs 2.451 of Outflow=50.36 cfs 2.371 of Pond RG-1: Rain Garden Peak Elev=525.92' Storage=14,965 cf Inflow=50.36 cfs 2.371 of Outflow=47.03 cfs 2.203 of Total Runoff Area = 4.670 ac Runoff Volume = 2.451 of Average Runoff Depth = 6.30" 57.82% Pervious= 2.700 ac 42.18% Impervious= 1.970ac • 0 Rain Garden-1-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment DA1: Post Runoff = 50.41 cfs @ 11.96 hrs, Volume= 2.451 af, Depth= 6.30" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 100 year Rainfall=8.21" Area (ac) CN Description 0.440 98 Paved parking, HSG C 1.530 98 Roofs, HSG C 2.700 74 >75% Grass cover, Good, HSG C 4.670 84 Weighted Average 2.700 57.82% Pervious Area 1.970 42.18% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA1: Post • 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 • Rain Garden _1_Post Type // 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 66 Hydrograph for Subcatchment DA1: Post • is Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.05 0.00 0.00 1.20 0.10 0.00 0.00 1.80 0.16 0.00 0.00 2.40 0.22 0.00 0.00 3.00 0.28 0.00 0.00 3.60 0.35 0.00 0.00 4.20 0.42 0.00 0.02 4.80 0.49 0.01 0.06 5.40 0.57 0.02 0.11 6.00 0.66 0.03 0.16 6.60 0.75 0.06 0.21 7.20 0.85 0.09 0.27 7.80 0.95 0.13 0.33 8.40 1.06 0.18 0.44 9.00 1.21 0.25 0.61 9.60 1.37 0.34 0.70 10.20 1.56 0.45 1.01 10.80 1.82 0.62 1.57 11.40 2.23 0.91 2.92 12.00 5.44 3.68 42.28 12.60 6.10 4.29 3.15 13.20 6.43 4.60 2.10 13.80 6.67 4.83 1.56 14.40 6.85 5.00 1.27 15.00 7.01 5.15 1.12 15.60 7.14 5.28 0.97 16.20 7.26 5.39 0.84 16.80 7.37 5.49 0.78 17.40 7.47 5.59 0.73 18.00 7.56 5.68 0.67 18.60 7.65 5.76 0.62 19.20 7.72 5.83 0.56 19.80 7.79 5.90 0.51 20.40 7.86 5.96 0.48 21.00 7.92 6.02 0.46 21.60 7.98 6.08 0.45 22.20 8.04 6.13 0.44 22.80 8.10 6.19 0.43 23.40 8.16 6.24 0.42 24.00 8.21 6.30 0.41 24.60 8.21 6.30 0.00 25.20 8.21 6.30 0.00 25.80 8.21 6.30 0.00 26.40 8.21 6.30 0.00 27.00 8.21 6.30 0.00 27.60 8.21 6.30 0.00 28.20 8.21 6.30 0.00 28.80 8.21 6.30 0.00 29.40 8.21 6.30 0.00 30.00 8.21 6.30 0.00 30.60 8.21 6.30 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 8.21 6.30 0.00 31.80 8.21 6.30 0.00 32.40 8.21 6.30 0.00 33.00 8.21 6.30 0.00 33.60 8.21 6.30 0.00 34.20 8.21 6.30 0.00 34.80 8.21 6.30 0.00 35.40 8.21 6.30 0.00 36.00 8.21 6.30 0.00 36.60 8.21 6.30 0.00 37.20 8.21 6.30 0.00 37.80 8.21 6.30 0.00 38.40 8.21 6.30 0.00 39.00 8.21 6.30 0.00 39.60 8.21 6.30 0.00 40.20 8.21 6.30 0.00 40.80 8.21 6.30 0.00 41.40 8.21 6.30 0.00 42.00 8.21 6.30 0.00 42.60 8.21 6.30 0.00 43.20 8.21 6.30 0.00 43.80 8.21 6.30 0.00 44.40 8.21 6.30 0.00 45.00 8.21 6.30 0.00 45.60 8.21 6.30 0.00 46.20 8.21 6.30 0.00 46.80 8.21 6.30 0.00 47.40 8.21 6.30 0.00 48.00 8.21 6.30 0.00 Rain Garden _1_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADD 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 67 Summary for Pond F13-1: FOREBAY 1 Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 6.30" for Eden 100 year event Inflow = 50.41 cfs @ 11.96 hrs, Volume= 2.451 of Outflow = 50.36 cfs @ 11.96 hrs, Volume= 2.371 af, Atten= 0%, Lag= 0.2 min Primary = 50.36 cfs @ 11.96 hrs, Volume= 2.371 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 526.41'@ 11.96 hrs Surf.Area= 2,292 sf Storage= 4,371 cf Plug-Flow detention time= 32.2 min calculated for 2.369 of (97% of inflow) Center-of-Mass det. time= 12.5 min ( 800.6 - 788.1 ) Volume Invert Avail.Storage Storage Description #1 523.00' 5,829 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 523.00 386 0 0 524.00 864 625 625 525.00 1,413 1,139 1,764 526.00 2,018 1,716 3,479 527.00 2,681 2,350 5,829 Device Routing Invert Outlet Devices #1 Primary 526.00' 70.0' long x 17.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=49.48 cfs @ 11.96 hrs HW=526.41' (Free Discharge) L1=Broad-Crested Rectangular Weir (Weir Controls 49.48 cfs @ 1.73 fps) 0 Rain Garden-1-Post Type Il 24-hr Eden 100 year Rainfall=8.21" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 68 Pond FBA: FOREBAY 1 Hydrograph _________,i_____._- _r--_____..,________._________I___.._-_..__ - l ¦ Inflow 55 - 5o aI Ms 1 ?. - -? - - - - - -- - - - - - ? ? - - - - ¦ Primary 50.36 ds InflowlArea=4 tiT ac 50 - i H 45 Peak_ E.lev52.6-.41' 40 g 71 cf Story a=4 3 35- 30- 3 -° 25- ,- 20- 15' 10 --- - L----------------- - L----------- - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 • Time (hours) Pond FB-1: FOREBAY 1 Stage-Discharge ® Primary m m c 0 m w 0 cu ou +U ou ou to uu y0 100 110 120 130 140 150 160 170 180 Discharge (cfs) Rain Garden _1_Post Type 1124-hr Eden 100 year Rainfall=8.21" Prepared by WSP SELLS Printed 9110/2009 . HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 69 Pond FBA: FOREBAY 1 Stage-Area-Storage Surface/Horizontal/wetted Area (sq-ft) 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 2,200 2,400 2,600 ? Surface ® Storage 527 i ------------------- --------- - ------------ ------------ 526 --- 0 525 ' w ----------- ------ . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 524- 523 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 • Storage (cubic-feet) is Rain Garden-1-Post Type Il 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD@ 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 70 Hydrograph for Pond FB-1: FOREBAY 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 523.00 0.00 1.50 0.00 0 523.00 0.00 3.00 0.00 0 523.00 0.00 4.50 0.04 35 523.09 0.00 6.00 0.16 547 523.91 0.00 7.50 0.30 1,780 525.01 0.00 9.00 0.61 3,512 526.02 0.61 10.50 1.24 3,545 526.03 1.23 12.00 42.28 4,284 526.38 43.51 13.50 1.79 3,569 526.04 1.80 15.00 1.12 3,540 526.03 1.13 16.50 0.81 3,523 526.02 0.81 18.00 0.67 3,515 526.02 0.67 19.50 0.53 3,508 526.01 0.54 21.00 0.46 3,504 526.01 0.47 22.50 0.44 3,503 526.01 0.44 24.00 0.41 3,501 526.01 0.41 25.50 0.00 3,479 526.00 0.00 27.00 0.00 3,479 526.00 0.00 28.50 0.00 3,479 526.00 0.00 30.00 0.00 3,479 526.00 0.00 31.50 0.00 3,479 526.00 0.00 33.00 0.00 3,479 526.00 0.00 34.50 0.00 3,479 526.00 0.00 36.00 0.00 3,479 526.00 0.00 37.50 0.00 3,479 526.00 0.00 39.00 0.00 3,479 526.00 0.00 40.50 0.00 3,479 526.00 0.00 42.00 0.00 3,479 526.00 0.00 43.50 0.00 3,479 526.00 0.00 45.00 0.00 3,479 526.00 0.00 46.50 0.00 3,479 526.00 0.00 48.00 0.00 3,479 526.00 0.00 0 Rain Garden-1-Post Type ll 24-hr Eden 100 year Rainfall=8.29" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 71 C • Elevation Primary (feet) (cfs) 523.00 0.00 523.02 0.00 523.04 0.00 523.06 0.00 523.08 0.00 523.10 0.00 523.12 0.00 523.14 0.00 523.16 0.00 523.18 0.00 523.20 0.00 523.22 0.00 523.24 0.00 523.26 0.00 523.28 0.00 523.30 0.00 523.32 0.00 523.34 0.00 523.36 0.00 523.38 0.00 523.40 0.00 523.42 0.00 523.44 0.00 523.46 0.00 523.48 0.00 523.50 0.00 523.52 0.00 523.54 0.00 523.56 0.00 523.58 0.00 523.60 0.00 523.62 0.00 523.64 0.00 523.66 0.00 523.68 0.00 523.70 0.00 523.72 0.00 523.74 0.00 523.76 0.00 523.78 0.00 523.80 0.00 523.82 0.00 523.84 0.00 523.86 0.00 523.88 0.00 523.90 0.00 523.92 0.00 523.94 0.00 523.96 0.00 523.98 0.00 524.00 0.00 524.02 0.00 Stage-Discharge for Pond FB-1: FOREBAY 1 Elevation Primary (feet) (Cfs) 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.00 525.04 0.00 525.06 0.00 Elevation Primary (feet) (cfs) 525.08 0.00 525.10 0.00 525.12 0.00 525.14 0.00 525.16 0.00 525.18 0.00 525.20 0.00 525.22 0.00 525.24 0.00 525.26 0.00 525.28 0.00 525.30 0.00 525.32 0.00 525.34 0.00 525.36 0.00 525.38 0.00 525.40 0.00 525.42 0.00 525.44 0.00 525.46 0.00 525.48 0.00 525.50 0.00 525.52 0.00 525.54 0.00 525.56 0.00 525.58 0.00 525.60 0.00 525.62 0.00 525.64 0.00 525.66 0.00 525.68 0.00 525.70 0.00 525.72 0.00 525.74 0.00 525.76 0.00 525.78 0.00 525.80 0.00 525.82 0.00 525.84 0.00 525.86 0.00 525.88 0.00 525.90 0.00 525.92 0.00 525.94 0.00 525.96 0.00 525.98 0.00 526.00 0.00 526.02 0.53 526.04 1.50 526.06 2.76 526.08 4.24 526.10 5.93 Elevation Primary (feet) (cfs) 526.12 7.80 526.14 9.83 526.16 12.01 526.18 14.33 526.20 16.78 526.22 19.37 526.24 22.09 526.26 24.93 526.28 27.88 526.30 30.94 526.32 34.11 526.34 37.39 526.36 40.76 526.38 44.24 526.40 47.81 526.42 51.44 526.44 55.16 526.46 58.97 526.48 62.85 526.50 66.82 526.52 70.87 526.54 75.00 526.56 79.20 526.58 83.48 526.60 87.84 526.62 92.06 526.64 96.34 526.66 100.66 526.68 105.04 526.70 109.46 526.72 113.93 526.74 118.44 526.76 123.00 526.78 127.59 526.80 132.23 526.82 137.17 526.84 142.16 526.86 147.22 526.88 152.32 526.90 157.49 526.92 162.70 526.94 167.97 526.96 173.30 526.98 178.67 527.00 184.10 Rain Garden _1_Post Type // 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 72 Stage-Area-Storage for Pond FB-1: FOREBAY 1 • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 523.00 386 0 523.05 410 20 523.10 434 41 523.15 458 63 523.20 482 87 523.25 506 111 523.30 529 137 523.35 553 164 523.40 577 193 523.45 601 222 523.50 625 253 523.55 649 285 523.60 673 318 523.65 697 352 523.70 721 387 523.75 745 424 523.80 768 462 523.85 792 501 523.90 816 541 523.95 840 582 524.00 864 625 524.05 891 669 524.10 919 714 524.15 946 761 524.20 974 809 524.25 1,001 858 524.30 1,029 909 524.35 1,056 961 524.40 1,084 1,015 524.45 1,111 1,069 524.50 1,139 1,126 524.55 1,166 1,183 524.60 1,193 1,242 524.65 1,221 1,303 524.70 1,248 1,364 524.75 1,276 1,427 524.80 1,303 1,492 524.85 1,331 1,558 524.90 1,358 1,625 524.95 1,386 1,694 525.00 1,413 1,764 525.05 1,443 1,835 525.10 1,474 1,908 525.15 1,504 1,982 525.20 1,534 2,058 525.25 1,564 2,136 525.30 1,594 2,215 525.35 1,625 2,295 525.40 1,655 2,377 525.45 1,685 2,461 525.50 1,716 2,546 525.55 1,746 2,632 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 525.60 1,776 2,720 525.65 1,806 2,810 525.70 1,837 2,901 525.75 1,867 2,993 525.80 1,897 3,087 525.85 1,927 3,183 525.90 1,957 3,280 525.95 1,988 3,379 526.00 2,018 3,479 526.05 2,051 3,581 526.10 2,084 3,684 526.15 2,117 3,789 526.20 2,151 3,896 526.25 2,184 4,004 526.30 2,217 4,114 526.35 2,250 4,226 526.40 2,283 4,339 526.45 2,316 4,454 526.50 2,350 4,571 526.55 2,383 4,689 526.60 2,416 4,809 526.65 2,449 4,931 526.70 2,482 5,054 526.75 2,515 5,179 526.80 2,548 5,306 526.85 2,582 5,434 526.90 2,615 5,564 526.95 2,648 5,695 527.00 2,681 5,829 Rain Garden _1_Post Type 1124-hr Eden 100 year Rainfall=8.21" Prepared by WSP SELLS Printed 9/10/2009 . HydroCAD® 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 73 Summary for Pond RG-1: Rain Garden Inflow Area = 4.670 ac, 42.18% Impervious, Inflow Depth = 6.09" for Eden 100 year event Inflow = 50.36 cfs @ 11.96 hrs, Volume= 2.371 of Outflow = 47.03 cfs @ 11.99 hrs, Volume= 2.203 af, Atten= 7%, Lag= 1.6 min Primary = 47.03 cfs @ 11.99 hrs, Volume= 2.203 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Peak Elev= 525.92'@ 11.99 hrs Surf.Area= 8,797 sf Storage= 14,965 cf Plug-Flow detention time= 59.4 min calculated for 2.201 of (93% of inflow) Center-of-Mass det. time= 21.1 min ( 821.6 - 800.6 ) Volume Invert Avail.Storage Storage Description #1 524.00' 25,073 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 524.00 6,816 0 0 525.00 7,820 7,318 7,318 526.00 8,882 8,351 15,669 527.00 9,925 9,404 25,073 is Device Routing Invert Outlet Devices #1 Primary 525.00' 20.0' long x 12.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.57 2.62 2.70 2.67 2.66 2.67 2.66 2.64 Primary OutFlow Max=46.30 cfs @ 11.99 hrs HW=525.91' (Free Discharge) L1=13road-Crested Rectangular Weir (Weir Controls 46.30 cfs @ 2.54 fps) C, Rain Garden _1Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WS_P SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 74 Pond RG-1: Rain Garden Hydrograph - -------- ----- -- -- - --r------- - --------- --- ¦Inflow 55 50.36 cfs - - - - - -- - ¦ Primary Inflow Area=42.67 0 ac cfs P ? -ii.- ... 50 47.03 45 ?" - :Peak- Elev..=525.92' ' 40 t0ra a=14'965 g ;-cf 35 ;. 30 3 o - FL 2520 15 _ _ r r -- ; 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond RGA: Rain Garden Stage-Discharge ® Primary m m w c 0 m w 0 0 20 40 60 80 100 120 140 Discharge (cfs) Rain Garden _1_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 75 Pond RG-1: Rain Garden Stage-Area-Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3,000 4,000 5.000 6.000 7.000 8.000 9000 m m c 0 m w • El Surface ® Storage 0 u 5,000 10,000 15,000 20,000 25,000 Storage (cubic-feet) Rain Garden _1_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 76 Hydrograph for Pond RG-1: Rain Garden Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 524.00 0.00 1.50 0.00 0 524.00 0.00 3.00 0.00 0 524.00 0.00 4.50 0.00 0 524.00 0.00 6.00 0.00 0 524.00 0.00 7.50 0.00 0 524.00 0.00 9.00 0.61 550 524.08 0.00 10.50 1.23 4,977 524.69 0.00 12.00 43.51 14,901 525.91 46.49 13.50 1.80 8,188 525.11 1.89 15.00 1.13 7,942 525.08 1.15 16.50 0.81 7,809 525.06 0.82 18.00 0.67 7,754 525.06 0.68 19.50 0.54 7,697 525.05 0.55 21.00 0.47 7,652 525.04 0.47 22.50 0.44 7,637 525.04 0.44 24.00 0.41 7,622 525.04 0.41 25.50 0.00 7,320 525.00 0.00 27.00 0.00 7,318 525.00 0.00 28.50 0.00 7,318 525.00 0.00 30.00 0.00 7,318 525.00 0.00 31.50 0.00 7,318 525.00 0.00 33.00 0.00 7,318 525.00 0.00 34.50 0.00 7,318 525.00 0.00 36.00 0.00 7,318 525.00 0.00 37.50 0.00 7,318 525.00 0.00 39.00 0.00 7,318 525.00 0.00 40.50 0.00 7,318 525.00 0.00 42.00 0.00 7,318 525.00 0.00 43.50 0.00 7,318 525.00 0.00 45.00 0.00 7,318 525.00 0.00 46.50 0.00 7,318 525.00 0.00 48.00 0.00 7,318 525.00 0.00 0 • • 17_? Rain Garden _1_Post Type 11 24-hr Eden 100 year Rainfall=8.21" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 77 Elevation Primary Stage-Discharge for Pond RG-1: Rain Garden Elevation Primary Elevation Primary (feet) (cfs) 524.00 0.00 524.02 0.00 524.04 0.00 524.06 0.00 524.08 0.00 524.10 0.00 524.12 0.00 524.14 0.00 524.16 0.00 524.18 0.00 524.20 0.00 524.22 0.00 524.24 0.00 524.26 0.00 524.28 0.00 524.30 0.00 524.32 0.00 524.34 0.00 524.36 0.00 524.38 0.00 524.40 0.00 524.42 0.00 524.44 0.00 524.46 0.00 524.48 0.00 524.50 0.00 524.52 0.00 524.54 0.00 524.56 0.00 524.58 0.00 524.60 0.00 524.62 0.00 524.64 0.00 524.66 0.00 524.68 0.00 524.70 0.00 524.72 0.00 524.74 0.00 524.76 0.00 524.78 0.00 524.80 0.00 524.82 0.00 524.84 0.00 524.86 0.00 524.88 0.00 524.90 0.00 524.92 0.00 524.94 0.00 524.96 0.00 524.98 0.00 525.00 0.00 525.02 0.15 (feet) (cfs) 525.04 0.41 525.06 0.76 525.08 1.16 525.10 1.63 525.12 2.14 525.14 2.69 525.16 3.29 525.18 3.93 525.20 4.60 525.22 5.31 525.24 6.07 525.26 6.85 525.28 7.67 525.30 8.53 525.32 9.41 525.34 10.33 525.36 11.28 525.38 12.25 525.40 13.26 525.42 14.31 525.44 15.39 525.46 16.50 525.48 17.64 525.50 18.81 525.52 20.01 525.54 21.24 525.56 22.50 525.58 23.78 525.60 25.10 525.62 26.33 525.64 27.59 525.66 28.86 525.68 30.15 525.70 31.45 525.72 32.77 525.74 34.11 525.76 35.46 525.78 36.83 525.80 38.21 525.82 39.64 525.84 41.08 525.86 42.54 525.88 44.02 525.90 45.51 525.92 47.02 525.94 48.54 525.96 50.08 525.98 51.63 526.00 53.20 526.02 54.82 526.04 56.47 526.06 58.12 (feet) (cfs) 526.08 59.80 526.10 61.49 526.12 63.20 526.14 64.92 526.16 66.67 526.18 68.42 526.20 70.20 526.22 71.93 526.24 73.68 526.26 75.44 526.28 77.22 526.30 79.00 526.32 80.80 526.34 82.61 526.36 84.44 526.38 86.28 526.40 88.13 526.42 89.95 526.44 91.79 526.46 93.64 526.48 95.50 526.50 97.37 526.52 99.25 526.54 101.13 526.56 103.03 526.58 104.94 526.60 106.86 526.62 108.87 526.64 110.89 526.66 112.93 526.68 114.97 526.70 117.03 526.72 119.10 526.74 121.19 526.76 123.28 526.78 125.39 526.80 127.51 526.82 129.64 526.84 131.78 526.86 133.94 526.88 136.10 526.90 138.28 526.92 140.47 526.94 142.67 526.96 144.88 526.98 147.11 527.00 149.34 • Rain Garden _1_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 78 Stage-Area-Storage for Pond RG-1: Rain Garden • • Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 524.00 6,816 0 524.05 6,866 342 524.10 6,916 687 524.15 6,967 1,034 524.20 7,017 1,383 524.25 7,067 1,735 524.30 7,117 2,090 524.35 7,167 2,447 524.40 7,218 2,807 524.45 7,268 3,169 524.50 7,318 3,534 524.55 7,368 3,901 524.60 7,418 4,270 524.65 7,469 4,642 524.70 7,519 5,017 524.75 7,569 5,394 524.80 7,619 5,774 524.85 7,669 6,156 524.90 7,720 6,541 524.95 7,770 6,928 525.00 7,820 7,318 525.05 7,873 7,710 525.10 7,926 8,105 525.15 7,979 8,503 525.20 8,032 8,903 525.25 8,086 9,306 525.30 8,139 9,712 525.35 8,192 10,120 525.40 8,245 10,531 525.45 8,298 10,945 525.50 8,351 11,361 525.55 8,404 11,780 525.60 8,457 12,201 525.65 8,510 12,625 525.70 8,563 13,052 525.75 8,617 13,482 525.80 8,670 13,914 525.85 8,723 14,349 525.90 8,776 14,786 525.95 8,829 15,226 526.00 8,882 15,669 526.05 8,934 16,114 526.10 8,986 16,562 526.15 9,038 17,013 526.20 9,091 17,466 526.25 9,143 17,922 526.30 9,195 18,381 526.35 9,247 18,842 526.40 9,299 19,305 526.45 9,351 19,772 526.50 9,404 20,240 526.55 9,456 20,712 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 526.60 9,508 21,186 526.65 9,560 21,663 526.70 9,612 22,142 526.75 9,664 22,624 526.80 9,716 23,108 526.85 9,769 23,595 526.90 9,821 24,085 526.95 9,873 24,578 527.00 9,925 25,073 woo sllasdsnn-Nam OOLO'Z99'hOL • LI I9Z ON 'aplAS0i00jN got apS anu4 1114iaA0 9Zt ein?onilseilul v uons?jodsusil S-1 -13S•dSM! Z0Z9Z ON'apoPeyO I-Is W-40 's 9Z9 Oll 'S`dNII0bJV0 ,kM:J3N3 3>ina VNIIMJV0 H1210N 'N343 NV-Id 10?UNOO 1N3WId3S V NOISO213 31OA0 Q3N19NOO 213A N Nda g@ 8 a ~ U) z LU w¢0 a a> OzL Fcnoa O O 51135 dSM WOH1 NOISSWItl3d tlOpd 1NOH1lM llJ3Wro00 SNl d0 350 tl?1110 tl0 HpLL'.J(YI. OMd3tl'N0553SSOd ANV 03Ai1353tl 3W S1HOW llV 91135 dSM Q a ? ? 0 W N ¢ _ ? Oo O ZII vU 2 i/ I \ 1 \ I \ ao <' \ Liz: \\ ? ? z y A - tU) ate „a \ \ d In F N •l .. N dp'' !t 04 Vl N r i 1 uvmr ..e w?stio ?w y woo'spasdsm,mmm 0M0'Z99'b0L • Ll WZ ON '8i!!ASai00yy . gol apS aA!j0 !!!4JaAO 9Z l einlonjlsei?ul 4 uolleljodsuejl S 1 1 3 S• d S/VM Z0Z8Z ON 'eU0Ue40 hi7S 4-47 S ZS 01l 'SVNI10?1`d0 l.0b3N3 3>inci `dNll08ld0 HIHON 'N303 NV-Id 10?I1NOO 1N3W1a3S'8 NOISO E 3?OAO a3N181N0O ?JDMJ Nba Ha%3SI'S1138 d4M WOH3 NOISSIWH3d W'8d In-M M3WMM SHt 30340- 0HONOH0000Hd3HN01443 -AW 03AH3S383W S1H018lltl B113S dW 00 O Y F W Ii H O O O O (Fig ? ZII O vU O Z O I \ \ ? F \ 1 4, , I ` 1 \\ rik I rN , 1 ? \ 1 g 1 \ a I iaot w 1 1 ' rv 3 ' n - ' I ? O I'r' CL N 1 3 w - a ?? ''^^ VJ (Y it ¢- w O ?Q O ? IL 0 Z ~ ¢ 10 ? 2<u' - F 0- - 0 9 Permit (to be provided by DWQ) OBOE W AT?c9QG ems. NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Dan River Combined Cycle Project Contact person Robert Wylie Phone number 704-382-4669 Date 9/10/2009 Drainage area number Wet Detention Pond #2 II. DESIGN INFORMATION Site Characteristics Drainage area 790,614 ft2 Impervious area, post-development 399,099 ft2 % impervious 50.48 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 33,139 ft3 Insufficient required volume. Volume provided 35,421 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Y (Y or N) 2.8 in 0.38 (unitless) 0.50 (unitless) 4.36 in/hr OK 2.46 ft3/sec 49.89 ft3/sec 47.43 ft3/sec 531.88 fmsl 530.50 fmsl 519.30 fmsl 531.00 fmsl 530.00 fmsl Data not needed for calculation option #1, but OK if provided. 526.50 fmsl 525.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.50 ft Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume f ?JJ Y (Y or N) 531.8 fmsl Insufficient. Must equal the temp. pool elev. previously entered. Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II DESIGN INFORMATION Surface Areas Z Area, temporary pool 29,588 ft Area REQUIRED, permanent pool 21,742 ft2 SAIDA ratio 2.75 (unitless) Area PROVIDED, permanent pool, Aperm-pool 24,906 ft OK Area, bottom of 1 Oft vegetated shelf, Abot_shelf 22,095 ft Area, sediment cleanout, top elevation (bottom of pond). Abol-pond 11,352 ft2 Volumes Volume, temporary pool 35,421 ft3 OK Volume, permanent pool, Vpermyod 86,832 ft3 Volume, forebay (sum of forebays if more than one forebay) 16,628 ft3 Forebay % of permanent pool volume 19.1% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.75 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vperm pool 86,832 ft' OK Area provided, permanent pool, Apeno-pool 24,906 ft2 OK Average depth calculated 3.48 ft OK Average depth used in SAIDA, d., (Round to nearest 0.5ft) 3.5 ft OK Calculation option 2 used? (See Figure 10-2b) (Y or N) Area provided, permanent pool, Apermjod ft2 Area, bottom of 1 Oft vegetated shelf, Abot_shelf ft2 Area, sediment cleanout, top elevation (bottom of pond), Abol-pond 1 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) ft Average depth calculated ft Average depth used in SAIDA, d,v, (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.43 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) It Driving head (H) It Pre-development 1-yr, 24-hr peak flow 2.46 ft3/sec Insufficient pre-development peak flow. Post-development 1-yr, 24-hr peak flow 2.27 ft3/sec OK Storage volume discharge rate (through discharge orifice or weir) 0.19 ft3/sec Storage volume drawdown time 2.31 days OK, draws down in 2-5 days. Drawdown time varying from expected value by more than a half day. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies 8" DIP Form SW401-Wet Detention Basin-Rev.6-2/20/09 Parts I. & il. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) • Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. • • Page/ Plan in' ' Is Sheet No. ?. 1• 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and JW_ C ?• 3 - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, - Basin cross-section, Vegetation specification for planting shelf, and C^74 - Filter strip. 3 S " ' . ection view of the wet detention basin (1 = 20 or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. C^7.0 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified CALL on the plans prior to use as a wet detention basin. 5 A table of l ti i • . e eva ons, areas, ncremental volumes & accumulated volumes for overall pond and for forebay, ' to verify volume provided. ]•0 C' 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. CC 45 7. The supporting calculations. ` 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9 A f . copy o the deed restrictions (if required). / C 9 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.6-2/20/09 Part III. Required Items Checklist, Page 1 of 1 • DAN RIVER COMBINED CYCLE PROJECT DATE: September 10, 2009 WET POND 2 PRE area 4.61 ac. CN 74 tc 36.5 min. RUNOFF CFS VOLUME AC-FT 1-Y 2.46 0.304 10-Y 8.46 0.939 25-Y 11.78 1.295 50-Y 14.69 1.610 100-Y 17.95 1.965 POST area 18.15 ac. CN 86 tc 5.0 min. MAXIMUM RUNOFF CFS RUNOFF VOLUME AC-FT OUTFLOW CFS OUTFLOW VOLUME AC-FT 22 STORAGE AC-FT 381 3 WATER ELEVATION FT 59 532 1-Y 49.89 2.270 1.84 1.5 . 033 5 . 69 534 Y 10 73 113 5.385 8.07 4.615 . . - 25-Y . 145.16 6.986 13.72 6.209 5.921 369 6 535.65 12 536 50-Y 171.71 8.363 43.54 7.582 . 782 6 . 54 536 100-Y 200.66 9.884 92.49 9.100 . . • • E F- U W 7 Q' rn ao J N U c O Q Z E N Y CL c 0O fA O U ri.i a" L,j (D R Z Q O ? 4- 0 O - a + C L C O Q Q. E E O O O " O 0-0 N C + E N -0 O C C 0 E O > a) c a (B (0 N O O O O + E Q. -a O O O Q. O C ca E C O 0- 9 m (B .Q 2 O 4- LO co 0) O co O V r t() m ui n U N (0 LO 00 a ` ° N m rn O O r a O O O W N N O N N N ? O O O O ? O O O O O O W It co N O O M M N O 0 J co M co M co co N N N N N W LO LO LO LO V) V) O Lo (f) LO M m T O M LO m M W 00 N O m i f ? U M N r ? N o ?n 0 N co co co O m m co N LL) m O M 0p m O O 00 ' LO N O n d N O W N O co co M N N N N O O O O 4) O O O O O O W It M N O O M M rl- (O M J co co co M M M N N N (N N W In U') LL) U') Lr) Lr) M u) u) u) LO LO r- O r- m m O r- N V to LO M to O (t7 L O M ( n M O r? v LL V Cl) 00 (O V (`? N O (n (p N N N N O O O O U? O O O O O O W M N O O of OD CO In J M M M M M M (N N N N N W V) 10 to In LO M LO in (n (n LO v o °D co O (O aD W C6 Ln Sri C U ? r O O ? M v M O V 00 - LQ N m M 00 co W 00 t` t` O (D to to ? I F O O O U? O O O O O O W d' M O O M M to M M M M M M N N N N N W LO rn LO rn LO Lo LO u) (n in LL U N V LO co U- U N co W co U- 0 V M 0 U co N O M 0 0 Q 0 CL N `m U tl1 ~ ? LL O 00 Q d' Cl) Ea? a E 11 I I L .C N Oa m m m m m N E 7 0 0 a c a> rm C a> a 0 0 m m 4 N 0 ¦WSPmSELLS Transportation & Infrastructure Comp. By ....? .. ..................... Date ...:t..... ....o.o.... Project ...................... . ? ............................................................. Chkd. By ............? ...................... Date .....?. ...9.............. Subject ........... ..?.:.?........<:....'....?w ............................................. cc ?' ............................................................................................................. ............................................................................................................. ) A Prey, "Je t,;) ? e /,Az f 4 % C .5 A. C, ix A? = X1`7'5 'PA,h-Ai e, i i I r*WAw , 143 Ua-r-,!#4Li t 4? .'? TQ 2,7 U -lE SIM-PL.E ME7 t?t> l5ra3 v ? Sheet No......'.......... of ..........:....... Job No. ........sC!ti? ............................................................. m I ^ 3,5 F7 N- cr= P pSELLS Transportation & Infrastructure q 4,c. Comp. By ........................................... Date .............................5. Project .....................y..................................................................... Sheet No. ..... Of .................. ..?..'.." . Chkd. By ...................... Date .... subject 'V............? :....................................... Job No. ................... ........................... .......................... ............................................................................................................. ............................................................................................................. ............................................................. Z3, TIC1,F 33 ` F -T!? 3 C')R I P 1 C E C t? o, 051 z ?z,? Ol 2..3 ?e,4 2 3. (0 ?-, ZCN CY is • r? pjmWSP m SELLS Transportation & Infrastructure 1) Date ....1.....3...¢x............ Project ..... Comp. By .?A;7?? ........................ T Chkd. By ..... D : ......................... Date ..... '?.-..1..k.- l..... Subject ....... ............................................................................................................. ............................ ...... .. ...................................... ...... :.. ?? ......: ............................................... ................................................................................. q( f ,?stKrz-) 2, 7/1 0ZI FIc E o,-1433 (0,0341 7.) 199 (V?l < Z31 D4 2 T . ..' Otto Sheet No............ of ........... fob No. ...v y....... ............................................................. 0 m mSELLS Transportation & Infrastructure Comp. By .'. Date ... . ? ..!.? ."..! .... Project..' v g ...................................... Chkd. By .......lh? ....................... Date ...... ).-..... Subject ............... ....:`... )....... ...... :.................................. ............................................................................................................. ............................................................................................................. 7,59 /3 70 ?) " BRA+O\1 1 ] Sheet No........... of ............. job No. .a2C ;."?....... ............................................................. )- J;A2 4. ?-A hut- S ca C7 Precipitation Frequency Data Server Page 1 of 3 (i) POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 EDEN, NORTH CAROLINA (31-2631) 36.4742 N 79.7433 W 498 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jun 24 2009 Confidence Limits Seasonality Location Maps Other Info. GIS data Maps Docs Return to State Map • • Precipitation Frequency Estimates (inches) ARI* (years) 5 min _ min10 _ 15 mun 30 min 60 min 120 min. 3 hr 6 hr 12 hr 24_hr 48_hr 4 day_ 7_day 10 day 20 day 30 day_ 45 aay_ 60 _d.ay 0.36 0.58 0.72 0.99 1.24 1.47 1.59 1.96 237 2.81 3.30 3.68 4.22 4.77 6.43 7.96 10.02 11.98 0 0.43 0.69 0.87 1.20 1.51 1.79 1.93 2.38 2.87 3.40 3.99 4.45 5.07 5.71 7.66 9.41 11.82 14.06 5 0.51 0.82 1.04 1.47 1.89 2.25 2.44 2.99 3.64 4.33 5.04 5.61 6.29 7.01 9.21 11.09 13.76 16.16 10 0.57 0.91 1.15 1.66 2.17 2.61 2.82 3.48 4.26 5.10 5.90 6.57 7.30 8.06 10.44 12.37 15.23 17.74 25 0.63 1.01 1.28 1.89 2.52 3.08 3.33 4.15 5.16 6.22 7.12 7.92 8.72 9.54 12.11 14.04 17.11 19.75 50 0.68 1.07 1.36 2.05 2.78 3.44 3.72 4.70 5.89 7.17 8.14 9.05 9.89 10.74 13.42 15.32 18.52121 23 100 0.72 1.14 1.44 2.20 3.03 3.82 4.13 5.27 6.70 8.21 9.22 10.25 11.13 11.99 14.76 16.56 19.87 22.64 200 0.75 1.19 1.50 2.34 3.28 4.19 4.53 5.86 7.55 9.34 10.38 11.54 12.46 13.30 16.11 17.78 21.17 23.98 500 0.79 1.25 F15-8]E] 3.60 4.69 5.07 6.70 8.80 11.00 12.07 13.39 14.35 15.15 17.95 19.38 22.85 25.67 1000 0.82 1.29 1.62 2.63 3.84 5.08 5.48 7.36 9.82 12.41 13.46 14.93 15.89 16.63 19.37 20.57 24.08 26.89 ' These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 5 10 15 30 60 120 F G12 24 4F -1 8 4 7 10 20 30 45 60 F -1 F miin min jjjj min min r hr hr hr hr h ay day day 11 day 11 day 11 day 11 day 0.40 0.63 0.79 1.09 1.35 1.61 1.73 2.15 2.59 3.04 3.55 3.97 4.51 5.10 6.85 8.42 10.60 12.61 0.47 0.76 0.95 1.31 1.65 1.96 2.11 2.61 3.14 3.67 4.30 4.80 5.42 6.10 8.16 9.96 12.50 14.81 0.56 0.90 1.14 1.61 2.07 2.46 2.66 3.28 F396-][4 66 5.41 6.05 6.72 7.48 9.81 11.73 14.54 17.01 10 0.62 0.99 1.25 1.81 2.36 2.84 3.07 3.80 4.62 5.48 6.32 7.06 7.78 8.60 11.11 13.07 16.07 18.67 25 0.69 1.09 1.39 2.06 2.74 3.35 3.62 4.52 5.57 6.68 7.63 8.51 9.28 10.16 12.89 14.85 18.06 20.77 50 0.73 1.17 1.48 2.23 3.02 3.74 4.04 5.11 6.36 7.69 8.71 9.72 10.53 11.43 14.30 16.19 19.56 22.34 100 0.78 1.24 1.56 2.40 3.30 4.15 4.47 5.72 7.20 8.80 9.88 11.02 11.87 12.79 15.73 17.52 21.01 23.83 200 0.82 1.30 1.64 2.55 3.58 4.55 4.90 6.36 8.10 10.01 11.14 12.43 13.30 14.21 17.20 18.84 22.42 25.27 500 0.86 1.37 1.72 2.74 3.93 5.10 5.49 7.27 9.45 11.80 13.00 14.46 15.37 16.23 19.21 20.59 24.24 27.11 1000 0.90 1.41 1.77 2.87 4.19 5.53 5.95 7.99 10.55 13.34 14.55 16.16 17.08 17.88 20.79 21.93 25.61 28.46 i de upper uuunu ui the confidence mtervai at 90% confidence level is the value wnicn b% or the simulated quantile values for a given frequency are greater than. "These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI** 5 10 15 30 60 120 Fh 6 12 24 48 4 7 10 20 30 45 60 (years) min in min min min min hr hr 11 11 J[ I hr hr day day day 11 day 11 day 11 day 11 day 0.33 0.53 0.66 0.91 1.13 1.35 1.46 1.80 2.18 2.61 3.08 3.43 3.96 4.48 6.05 7.54 9.48 11.39 0.40 0.63 0.80 1.10 1.38116 4 1.78 2.19 2.64 3.16 3.72 4.15 4.75 5.37 7.21 8.91 11.18 13.37 0 0.47 0.75 0.95 1.35 1.73 2.06 2.24 2.74 3.33 4.02 4.70 5.23 5.89 6.58 8.66 10.49 13.01 15.36 10 0.52 0.83 1.05 1.52 1798 2.38 2.58 3.18 3.88 4.72 5.48 6.10 6.82 7.55 9.79 11.68 14.38 16.84 25 0.57 0.92 1.16 1.72 2.29 2.80 3.03 3.76 4.66 5.73 6.59 7.33 8.11 8.89 11.32 13.23 16.13 18.71 50 0.61 0.97 1.23 1.85 2.51 3.12 3.38 4.22 5.29 6.56 7.49 8.32 9.15 9.97 12.51 14.39 17.42 20.06 100 0.65 1.02 1.30 1.99 2.73 3.43 3.72 4.70 5.94 7.45 8.43 9.37 10.25 11.08 13.70 15.52 18.64 21.36 200 0.68 1.07 1.35 2.10 2.95 3.74 4.05 5.17 6.62 8.41 9.42 10.46 11.39 12.21 14.88 16.62 19.81 22.57 500 0.71 1.12 1.41 2.24 3.21 4.14 4.48 5.82 7.56 9.77 10.83 12.02 12.96 13.79 16.44 18.00 21.29 24.07 1000 0.73 1.14 1.44 2.33 3.39 4.44 4.80 6.30 8.30 10.89 11.96 13.27 14.24 15.02 17.64 19.03 22.35 25.13 fie rower uuunu ui me uun idence mtervai at au% connpence level is the value which 5% of the simulated quanhle values for a given frequency are less than. http://dipper.nws.noaa. gov/cgi-binlhdsc/buildout.perl?type=pf&units=us&series=pd&state... 6/24/2009 NCDENR Stormwater BMP Manual Chapter Revised 09-28-07 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Mountain and Piedmont Regions, Adapted from Driscoll, 1986 Percent Impervious Cover 3.0 4.0 Permanent Pool Average Depth (ft) 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Table 10-2 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Coastal Region, Adapted from Driscoll, 1986 • Percent Impervious Cover 3.0 3.5 4.0 Permanent Pool Average Depth (ft) 4.5 5.0 5.5 6.0 6.5 7.0 7.5' 10% 0.9 0.8 0.7 0.6 0.5 0 0 0 0 0 20% 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.3a 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 Table 10-3 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 90 Percent TSS Pollutant Removal Efficiency in the Mountain and Piedmont Regions, Adapted from Driscoll, 1986 Percent Impervious Cover 3.0 3.5 4.0 Permanent Pool Average Depth (ft) 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 10% 0.9 0.8 0.8 0.7 0.6 0.6 0.5 0.5 0.5 0.5 0.4 0.4 0.4 20% 1.5 1.3 1.1 1.0 1.0 0.9 0.9 0.9 0.8 0.8 0.8 0.7 0.7 30% 1.9 1.8 1.7 1.5 1.4 1.4 1.3 1.1 1.0 1.0 1.0 0.9 0.9 40% 2.5 2.3 2.0 1.9 1.8 1.7 1.6 1.6 1.5 1.4 1.3 1.2 1.1 50% 3.0 2.8 2.5 2.3 2.0 1.9 1.9 1.8 1.7 1.6 1.6 1.5 1.5 60% 3.5 3.2 2.8 2.7 2.5 2.4 2.2 2.1 1.9 1.9 1.8 1.8 1.7 70% 4.0 3.7 3.3 3.1 2.8 2.7 2.5 2.4 2.2 2.1 2.0 2.0 1.9 80% 4.5 4.1 3.8 3.5 3.3 3.0 2.8 2.7 2.6 2.4 2.3 2.1 2.0 90% 5.0 4.5 4.0 3.8 3.5 3.3 3.0 2.9 2.8 2.7 2.6 2.5 2.4 Wet Detention Basin 10-9 July 2007 • • E DA2 Pre Subca# Reach on Link Drainage Diagram for Pond _2_Pre Prepared by WSP SELLS, Printed 7/7/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Pond-2-Pre Printed 7/7/2009 Prepared by WSP SELLS Page 2 is HydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 4.610 74 >75% Grass cover, Good, HSG C (DA2) 4.610 TOTAL AREA • 0 Pond 2 Pre Prepared by WSP SELLS Printed 7/7/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area (acres) Soil Goup Subcatchment Numbers 0.000 HSG A 0.000 HSG B 4.610 HSG C DA2 0.000 HSG D 0.000 Other 4.610 TOTAL AREA • 0 Pond-2-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 7/7/2009 HydroCAD®9 00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Pre Runoff Area=4.610 ac 0.00% Impervious Runoff Depth=0.79" Flow Length=516' Tc=36.5 min CN=74 Runoff=2.46 cfs 0.304 of Total Runoff Area = 4.610 ac Runoff Volume = 0.304 of Average Runoff Depth = 0.79" 100.00% Pervious= 4.610 ac 0.00% Impervious= 0.000 ac • 0 • Pond-2-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 7/7/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DA2: Pre Runoff = 2.46 cfs @ 12.36 hrs, Volume= 0.304 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 1 year Rainfall=2.81" Area (ac) CN Description 4.610 74 >75% Grass cover, Good, HSG C 4.610 100.00% Pervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft) (ft/sec) (cfs) 35.7 300 0.0467 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.40" 0.8 216 0.0780 4.50 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 36.5 516 Total Subcatchment DA2: Pre Hydrograph • N 3 0 C 2 Type 1124 hrEden 1 yea r Rainfall 2.81 Runoff Area=4.610 ac Runoff V61ume=;0.304 of Runoff Depth-0.79 Flow Length=516' Tc=36.5 min CN=74 ®Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 111, u Pond-2-Pre Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 7/7/2009 H ydroCADO 9.00 s/n 04719 C 2009 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment DA2: Pre • • Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.02 0.00 0.00 1.20 0.04 0.00 0.00 1.80 0.06 0.00 0.00 2.40 0.08 0.00 0.00 3.00 0.10 0.00 0.00 3.60 0.12 0.00 0.00 4.20 0.14 0.00 0.00 4.80 0.17 0.00 0.00 5.40 0.20 0.00 0.00 6.00 0.22 0.00 0.00 6.60 0.26 0.00 0.00 7.20 0.29 0.00 0.00 7.80 0.32 0.00 0.00 8.40 0.36 0.00 0.00 9.00 0.41 0.00 0.00 9.60 0.47 0.00 0.00 10.20 0.53 0.00 0.00 10.80 0.62 0.00 0.00 11.40 0.76 0.00 0.00 12.00 1.86 0.29 0.52 12.60 2.09 0.39 1.77 13.20 2.20 0.45 0.62 13.80 2.28 0.49 0.38 14.40 2.34 0.52 0.28 15.00 2.40 0.55 0.24 15.60 2.45 0.58 0.21 16.20 2.49 0.60 0.18 16.80 2.52 0.62 0.17 17.40 2.56 0.64 0.15 18.00 2.59 0.66 0.14 18.60 2.62 0.68 0.13 19.20 2.64 0.69 0.12 19.80 2.67 0.70 0.11 20.40 2.69 0.72 0.10 21.00 2.71 0.73 0.10 21.60 2.73 0.74 0.10 22.20 2.75 0.75 0.10 22.80 2.77 0.77 0.09 23.40 2.79 0.78 0.09 24.00 2.81 0.79 0.09 24.60 2.81 0.79 0.03 25.20 2.81 0.79 0.00 25.80 2.81 0.79 0.00 26.40 2.81 0.79 0.00 27.00 2.81 0.79 0.00 27.60 2.81 0.79 0.00 28.20 2.81 0.79 0.00 28.80 2.81 0.79 0.00 29.40 2.81 0.79 0.00 30.00 2.81 0.79 0.00 30.60 2.81 0.79 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 2.81 0.79 0.00 31.80 2.81 0.79 0.00 32.40 2.81 0.79 0.00 33.00 2.81 0.79 0.00 33.60 2.81 0.79 0.00 34.20 2.81 0.79 0.00 34.80 2.81 0.79 0.00 35.40 2.81 0.79 0.00 36.00 2.81 0.79 0.00 36.60 2.81 0.79 0.00 37.20 2.81 0.79 0.00 37.80 2.81 0.79 0.00 38.40 2.81 0.79 0.00 39.00 2.81 0.79 0.00 39.60 2.81 0.79 0.00 40.20 2.81 0.79 0.00 40.80 2.81 0.79 0.00 41.40 2.81 0.79 0.00 42.00 2.81 0.79 0.00 42.60 2.81 0.79 0.00 43.20 2.81 0.79 0.00 43.80 2.81 0.79 0.00 44.40 2.81 0.79 0.00 45.00 2.81 0.79 0.00 45.60 2.81 0.79 0.00 46.20 2.81 0.79 0.00 46.80 2.81 0.79 0.00 47.40 2.81 0.79 0.00 48.00 2.81 0.79 0.00 Pond-2-Pre Type // 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 7/7/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 7 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Pre Runoff Area=4.610 ac 0.00% Impervious Runoff Depth=2.44" Flow Length=516' Tc=36.5 min CN=74 Runoff=8.46 cfs 0.939 of Total Runoff Area = 4.610 ac Runoff Volume = 0.939 of Average Runoff Depth = 2.44" 100.00% Pervious = 4.610 ac 0.00% Impervious= 0.000 ac • 0 Pond-2-Pre Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 7/7/2009 . HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 88 Summary for Subcatchment DA2: Pre Runoff = 8.46 cfs @ 12.33 hrs, Volume= 0.939 af, Depth= 2.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 10 year Rainfall=5.10" Area (ac) CN Description 4.610 74 >75% Grass cover, Good, HSG C 4.610 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 35.7 300 0.0467 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.40" 0.8 216 0.0780 4.50 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 36.5 516 Total • • Fl- L-1 Pond-2-Pre Type // 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 7/7/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment DA2: Pre Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.03 0.00 0.00 1.20 0.06 0.00 0.00 1.80 0.10 0.00 0.00 2.40 0.14 0.00 0.00 3.00 0.18 0.00 0.00 3.60 0.22 0.00 0.00 4.20 0.26 0.00 0.00 4.80 0.31 0.00 0.00 5.40 0.35 0.00 0.00 6.00 0.41 0.00 0.00 6.60 0.46 0.00 0.00 7.20 0.53 0.00 0.00 7.80 0.59 0.00 0.00 8.40 0.66 0.00 0.00 9.00 0.75 0.00 0.00 9.60 0.85 0.01 0.02 10.20 0.97 0.02 0.07 10.80 1.13 0.05 0.16 11.40 1.38 0.11 0.35 12.00 3.38 1.16 2.76 12.60 3.79 1.45 5.57 13.20 4.00 1.59 1.74 13.80 4.14 1.70 0.99 14.40 4.25 1.79 0.72 15.00 4.35 1.86 0.61 15.60 4.44 1.92 0.54 16.20 4.51 1.98 0.46 16.80 4.58 2.03 0.41 17.40 4.64 2.08 0.38 18.00 4.70 2.13 0.36 18.60 4.75 2.17 0.33 19.20 4.80 2.20 0.31 19.80 4.84 2.24 0.28 20.40 4.88 2.27 0.25 21.00 4.92 2.30 0.24 21.60 4.96 2.33 0.23 22.20 4.99 2.36 0.23 22.80 5.03 2.39 0.22 23.40 5.07 2.42 0.22 24.00 5.10 2.44 0.21 24.60 5.10 2.44 0.08 25.20 5.10 2.44 0.01 25.80 5.10 2.44 0.00 26.40 5.10 2.44 0.00 27.00 5.10 2.44 0.00 27.60 5.10 2.44 0.00 28.20 5.10 2.44 0.00 28.80 5.10 2.44 0.00 29.40 5.10 2.44 0.00 30.00 5.10 2.44 0.00 30.60 5.10 2.44 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 5.10 2.44 0.00 31.80 5.10 2.44 0.00 32.40 5.10 2.44 0.00 33.00 5.10 2.44 0.00 33.60 5.10 2.44 0.00 34.20 5.10 2.44 0.00 34.80 5.10 2.44 0.00 35.40 5.10 2.44 0.00 36.00 5.10 2.44 0.00 36.60 5.10 2.44 0.00 37.20 5.10 2.44 0.00 37.80 5.10 2.44 0.00 38.40 5.10 2.44 0.00 39.00 5.10 2.44 0.00 39.60 5.10 2.44 0.00 40.20 5.10 2.44 0.00 40.80 5.10 2.44 0.00 41.40 5.10 2.44 0.00 42.00 5.10 2.44 0.00 42.60 5.10 2.44 0.00 43.20 5.10 2.44 0.00 43.80 5.10 2.44 0.00 44.40 5.10 2.44 0.00 45.00 5.10 2.44 0.00 45.60 5.10 2.44 0.00 46.20 5.10 2.44 0.00 46.80 5.10 2.44 0.00 47.40 5.10 2.44 0.00 48.00 5.10 2.44 0.00 Pond _2_Pre Type 1124-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 7/7/2009 HvdroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 10 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Pre Runoff Area=4.610 ac 0.00% Impervious Runoff Depth=3.37" Flow Length=516' Tc=36.5 min CN=74 Runoff=11.78 cfs 1.295 of Total Runoff Area = 4.610 ac Runoff Volume = 1.295 of Average Runoff Depth = 3.37' 100.00% Pervious= 4.610 ac 0.00% Impervious= 0.000 ac • 0 Pond _2_Pre Type 11 24-hr Eden 25 year Rainfall=6.22" 0 Prepared by WSP SELLS Printed 7/7/2009 HydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DA2: Pre Runoff = 11.78 cfs @ 12.32 hrs, Volume= 1.295 af, Depth= 3.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 25 year Rainfall=6.22" Area (ac) CN Description 4.610 74 >75% Grass cover, Good, HSG C 4.610 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7 35 300 0.0467 0.14 Sheet Flow, . Woods: Light underbrush n= 0.400 P2= 3.40" 0.8 216 0.0780 4.50 Shallow Concentrated Flow, Unsaved Kv= 16.1 fps 36.5 516 Total Subcatchment DA2: Pre Hydrograph 13 -- - - - -- -- ®Runoff 12 ff.?e? Ypfs -T a 11 24-hr,-Eden- 25 year 10 ` thw6-.22' Rarnfa 9 -- Runoff Area=4.610 ac H - -Runoff^Volum,e - -- ,1.295 of 0 6 Runoff Depth=3.37," - 5 Flow Length=516'_ 4 Tc=36.5 min 3 CN7 2 . 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond-2-Pre Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 7/7/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment DA2: Pre • • Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.08 0.00 0.00 1.80 0.12 0.00 0.00 2.40 0.17 0.00 0.00 3.00 0.21 0.00 0.00 3.60 0.26 0.00 0.00 4.20 0.32 0.00 0.00 4.80 0.37 0.00 0.00 5.40 0.43 0.00 0.00 6.00 0.50 0.00 0.00 6.60 0.57 0.00 0.00 7.20 0.64 0.00 0.00 7.80 0.72 0.00 0.00 8.40 0.81 0.00 0.01 9.00 0.91 0.01 0.05 9.60 1.03 0.03 0.10 10.20 1.18 0.06 0.17 10.80 1.38 0.11 0.31 11.40 1.69 0.22 0.60 12.00 4.12 1.69 4.09 12.60 4.62 2.07 7.62 13.20 4.87 2.26 2.33 13.80 5.05 2.41 1.31 14.40 5.19 2.52 0.95 15.00 5.31 2.61 0.80 15.60 5.41 2.70 0.70 16.20 5.50 2.77 0.60 16.80 5.58 2.84 0.54 17.40 5.66 2.90 0.50 18.00 5.73 2.96 0.46 18.60 5.79 3.01 0.43 19.20 5.85 3.06 0.40 19.80 5.90 3.11 0.36 20.40 5.95 3.15 0.33 21.00 6.00 3.19 0.31 21.60 6.05 3.22 0.30 22.20 6.09 3.26 0.30 22.80 6.14 3.30 0.29 23.40 6.18 3.34 0.28 24.00 6.22 3.37 0.28 24.60 6.22 3.37 0.10 25.20 6.22 3.37 0.01 25.80 6.22 3.37 0.00 26.40 6.22 3.37 0.00 27.00 6.22 3.37 0.00 27.60 6.22 3.37 0.00 28.20 6.22 3.37 0.00 28.80 6.22 3.37 0.00 29.40 6.22 3.37 0.00 30.00 6.22 3.37 0.00 30.60 6.22 3.37 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 6.22 3.37 0.00 31.80 6.22 3.37 0.00 32.40 6.22 3.37 0.00 33.00 6.22 3.37 0.00 33.60 6.22 3.37 0.00 34.20 6.22 3.37 0.00 34.80 6.22 3.37 0.00 35.40 6.22 3.37 0.00 36.00 6.22 3.37 0.00 36.60 6.22 3.37 0.00 37.20 6.22 3.37 0.00 37.80 6.22 3.37 0.00 38.40 6.22 3.37 0.00 39.00 6.22 3.37 0.00 39.60 6.22 3.37 0.00 40.20 6.22 3.37 0.00 40.80 6.22 3.37 0.00 41.40 6.22 3.37 0.00 42.00 6.22 3.37 0.00 42.60 6.22 3.37 0.00 43.20 6.22 3.37 0.00 43.80 6.22 3.37 0.00 44.40 6.22 3.37 0.00 45.00 6.22 3.37 0.00 45.60 6.22 3.37 0.00 46.20 6.22 3.37 0.00 46.80 6.22 3.37 0.00 47.40 6.22 3.37 0.00 48.00 6.22 3.37 0.00 Pond-2-Pre Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 7/7/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 13 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Pre Runoff Area=4.610 ac 0.00% Impervious Runoff Depth=4.19" Flow Length=516' Tc=36.5 min CN=74 Runoff=14.69 cfs 1.610 of Total Runoff Area = 4.610 ac Runoff Volume = 1.610 of Average Runoff Depth = 4.19" 100.00% Pervious =4.610 ac 0.00% Impervious= 0.000 ac C7 Pond _2_Pre Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 7/7/2009 HydroCAD89 00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment DA2: Pre Runoff = 14.69 cfs @ 12.32 hrs, Volume= 1.610 af, Depth= 4.19" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 50 year Rainfall=7.17" Area (ac) CN Description 4.610 74 >75% Grass cover, Good, HSG C 4.610 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 35.7 300 0.0467 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.40" 0.8 216 0.0780 4.50 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 36.5 516 Total Subcatchment DA2: Pre .7 Hydrograph - _ ®Runoff 16 15 14.69 ds -Type-11 24 hr-Eden- 14 - 50-year- - 13 12 Rainfall-=7.17" 11 ' Runoff Area=4.610 ac 10 "t 9* Runoff Volume=1.610 of 3 Runoff Depth-4.19 6 Flow Len tl .=516' .. 5- : i Tc=36:5 min 4 CN=74 0 2 4 6 8 10 12 1,4 1,6 1,8 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Pond _2_Pre Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 7/7/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment DA2: Pre r? L` Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.09 0.00 0.00 1.80 0.14 0.00 0.00 2.40 0.19 0.00 0.00 3.00 0.25 0.00 0.00 3.60 0.30 0.00 0.00 4.20 0.36 0.00 0.00 4.80 0.43 0.00 0.00 5.40 0.50 0.00 0.00 6.00 0.57 0.00 0.00 6.60 0.65 0.00 0.00 7.20 0.74 0.00 0.00 7.80 0.83 0.00 0.02 8.40 0.93 0.01 0.05 9.00 1.05 0.03 0.11 9.60 1.19 0.06 0.19 10.20 1.36 0.10 0.27 10.80 1.59 0.18 0.46 11.40 1.95 0.33 0.84 12.00 4.75 2.17 5.29 12.60 5.33 2.63 9.40 13.20 5.62 2.87 2.83 13.80 5.82 3.04 1.58 14.40 5.98 3.17 1.14 15.00 6.12 3.29 0.96 15.60 6.24 3.39 0.84 16.20 6.34 3.47 0.72 16.80 6.44 3.55 0.64 17.40 6.52 3.63 0.60 18.00 6.60 3.70 0.56 18.60 6.68 3.76 0.51 19.20 6.75 3.82 0.47 19.80 6.81 3.87 0.43 20.40 6.86 3.92 0.39 21.00 6.92 3.97 0.37 21.60 6.97 4.02 0.36 22.20 7.02 4.06 0.35 22.80 7.07 4.11 0.35 23.40 7.12 4.15 0.34 24.00 7.17 4.19 0.33 24.60 7.17 4.19 0.12 25.20 7.17 4.19 0.01 25.80 7.17 4.19 0.00 26.40 7.17 4.19 0.00 27.00 7.17 4.19 0.00 27.60 7.17 4.19 0.00 28.20 7.17 4.19 0.00 28.80 7.17 4.19 0.00 29.40 7.17 4.19 0.00 30.00 7.17 4.19 0.00 30.60 7.17 4.19 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 7.17 4.19 0.00 31.80 7.17 4.19 0.00 32.40 7.17 4.19 0.00 33.00 7.17 4.19 0.00 33.60 7.17 4.19 0.00 34.20 7.17 4.19 0.00 34.80 7.17 4.19 0.00 35.40 7.17 4.19 0.00 36.00 7.17 4.19 0.00 36.60 7.17 4.19 0.00 37.20 7.17 4.19 0.00 37.80 7.17 4.19 0.00 38.40 7.17 4.19 0.00 39.00 7.17 4.19 0.00 39.60 7.17 4.19 0.00 40.20 7.17 4.19 0.00 40.80 7.17 4.19 0.00 41.40 7.17 4.19 0.00 42.00 7.17 4.19 0.00 42.60 7.17 4.19 0.00 43.20 7.17 4.19 0.00 43.80 7.17 4.19 0.00 44.40 7.17 4.19 0.00 45.00 7.17 4.19 0.00 45.60 7.17 4.19 0.00 46.20 7.17 4.19 0.00 46.80 7.17 4.19 0.00 47.40 7.17 4.19 0.00 48.00 7.17 4.19 0.00 Pond-2-Pre Type II 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 7/7/2009 Page 16 HydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Pre Runoff Area=4.610 ac 0.00% Impervious Runoff Depth=5.11" Flow Length=516' Tc=36.5 min CN=74 Runoff=17.95 cfs 1.965 of Total Runoff Area = 4.610 ac Runoff Volume = 1.965 of Average Runoff Depth = 5.11" 100.00% Pervious= 4.610 ac 0.00% Impervious= 0.000 ac • 0 Pond-2-Pre Type ll 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 7/7/2009 Is HydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment DA2: Pre Runoff = 17.95 cfs @ 12.31 hrs, Volume= 1.965 af, Depth= 5.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 100 year Rainfall=8.21" Area ac CN Description 4.610 74 >75% Grass cover, Good, HSG C 4.610 100.00% Pervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs 35.7 300 0.0467 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.40" 8 216 0 0.0780 4.50 Shallow Concentrated Flow, . Unpaved Kv= 16.1 fps 36.5 516 Total Subcatchment DA2: Pre 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 4 Time (hours) 0 Pond-2-Pre Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 7/7/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment DA2: Pre • is Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.05 0.00 0.00 1.20 0.10 0.00 0.00 1.80 0.16 0.00 0.00 2.40 0.22 0.00 0.00 3.00 0.28 0.00 0.00 3.60 0.35 0.00 0.00 4.20 0.42 0.00 0.00 4.80 0.49 0.00 0.00 5.40 0.57 0.00 0.00 6.00 0.66 0.00 0.00 6.60 0.75 0.00 0.00 7.20 0.85 0.01 0.02 7.80 0.95 0.02 0.06 8.40 1.06 0.03 0.11 9.00 1.21 0.06 0.19 9.60 1.37 0.11 0.29 10.20 1.56 0.17 0.40 10.80 1.82 0.27 0.64 11.40 2.23 0.46 1.12 12.00 5.44 2.72 6.64 12.60 6.10 3.27 11.37 13.20 6.43 3.55 3.38 13.80 6.67 3.75 1.87 14.40 6.85 3.91 1.35 15.00 7.01 4.05 1.13 15.60 7.14 4.17 0.99 16.20 7.26 4.27 0.85 16.80 7.37 4.37 0.76 17.40 7.47 4.45 0.70 18.00 7.56 4.54 0.65 18.60 7.65 4.61 0.61 19.20 7.72 4.68 0.56 19.80 7.79 4.74 0.51 20.40 7.86 4.80 0.46 21.00 7.92 4.85 0.44 21.60 7.98 4.91 0.43 22.20 8.04 4.96 0.42 22.80 8.10 5.01 0.41 23.40 8.16 5.06 0.40 24.00 8.21 5.11 0.39 24.60 8.21 5.11 0.14 25.20 8.21 5.11 0.01 25.80 8.21 5.11 0.00 26.40 8.21 5.11 0.00 27.00 8.21 5.11 0.00 27.60 8.21 5.11 0.00 28.20 8.21 5.11 0.00 28.80 8.21 5.11 0.00 29.40 8.21 5.11 0.00 30.00 8.21 5.11 0.00 30.60 8.21 5.11 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 8.21 5.11 0.00 31.80 8.21 5.11 0.00 32.40 8.21 5.11 0.00 33.00 8.21 5.11 0.00 33.60 8.21 5.11 0.00 34.20 8.21 5.11 0.00 34.80 8.21 5.11 0.00 35.40 8.21 5.11 0.00 36.00 8.21 5.11 0.00 36.60 8.21 5.11 0.00 37.20 8.21 5.11 0.00 37.80 8.21 5.11 0.00 38.40 8.21 5.11 0.00 39.00 8.21 5.11 0.00 39.60 8.21 5.11 0.00 40.20 8.21 5.11 0.00 40.80 8.21 5.11 0.00 41.40 8.21 5.11 0.00 42.00 8.21 5.11 0.00 42.60 8.21 5.11 0.00 43.20 8.21 5.11 0.00 43.80 8.21 5.11 0.00 44.40 8.21 5.11 0.00 45.00 8.21 5.11 0.00 45.60 8.21 5.11 0.00 46.20 8.21 5.11 0.00 46.80 8.21 5.11 0.00 47.40 8.21 5.11 0.00 48.00 8.21 5.11 0.00 • • DA2 Post Pond 2 • Subcat Reach on Link D /2P Pond-2-Post Prepared by WSP SELLS Printed 9/10/2009 • H ydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 8.990 74 >75% Grass cover, Good, HSG C (DA2) 5.850 98 Paved parking, HSG C (DA2) 3.260 98 Roofs, HSG C (DA2) 0.050 98 Unconnected pavement, HSG C (DA2) 18.150 TOTAL AREA • 0 Pond-2-Post Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Goup Numbers 0.000 HSG A 0.000 HSG B 18.150 HSG C DA2 0.000 HSG D 0.000 Other 18.150 TOTAL AREA • 0 Pond-2-Post Prepared by WSP SELLS HydroCAD D 9.00 s/n 04719 © 2009 1 Line# Node In-Invert Number (feet) 1 2P 524.80 E Printed 9/10/2009 ?ydroCAD Software Solutions LLC Page 4 Pipe Listing (all nodes) Out-Invert Length Slope n DiamMidth Height (feet) (feet) (ft/ft) (inches) (inches) 523.00 104.0 0.0173 0.025 36.0 0.0 0 Pond _2_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 5 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Post Runoff Area=18.150 ac 50.47% Impervious Runoff Depth=1.50" Tc=5.0 min CN=86 Runoff=49.89 cfs 2.270 of Pond 2P: Pond 2 Peak Elev=532.59' Storage=3.381 of Inflow=49.89 cfs 2.270 of Primary=1.84 cfs 1.522 of Secondary=0.00 cfs 0.000 of Outflow=1.84 cfs 1.522 of Total Runoff Area =18.150 ac Runoff Volume = 2.270 of Average Runoff Depth =1.50" 49.53% Pervious = 8.990 ac 50.47% Impervious = 9.160 ac C 0 • Pond _2_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment DA2: Post Runoff = 49.89 cfs @ 11.96 hrs, Volume= 2.270 af, Depth= 1.50" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 1 year Rainfall=2.81" Area (ac) CN Description 5.850 98 Paved parking, HSG C 0.050 98 Unconnected pavement, HSG C 3.260 98 Roofs, HSG C 8.990 74 >75% Grass cover, Good, HSG C 18.150 86 Weighted Average 8.990 49.53% Pervious Area 9.160 50.47% Impervious Area 0.050 0.55% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Post • Hydrograph N w V 3 0 U. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Pond-2-Post Type // 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment DA2: Post • Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.02 0.00 0.00 1.20 0.04 0.00 0.00 1.80 0.06 0.00 0.00 2.40 0.08 0.00 0.00 3.00 0.10 0.00 0.00 3.60 0.12 0.00 0.00 4.20 0.14 0.00 0.00 4.80 0.17 0.00 0.00 5.40 0.20 0.00 0.00 6.00 0.22 0.00 0.00 6.60 0.26 0.00 0.00 7.20 0.29 0.00 0.00 7.80 0.32 0.00 0.00 8.40 0.36 0.00 0.05 9.00 0.41 0.00 0.15 9.60 0.47 0.01 0.25 10.20 0.53 0.02 0.45 10.80 0.62 0.05 0.86 11.40 0.76 0.09 1.93 12.00 1.86 0.75 42.98 12.60 2.09 0.92 3.44 13.20 2.20 1.00 2.32 13.80 2.28 1.07 1.73 14.40 2.34 1.12 1.43 15.00 2.40 1.16 1.27 15.60 2.45 1.20 1.10 16.20 2.49 1.23 0.95 16.80 2.52 1.26 0.89 17.40 2.56 1.29 0.83 18.00 2.59 1.32 0.77 18.60 2.62 1.34 0.71 19.20 2.64 1.36 0.65 19.80 2.67 1.38 0.59 20.40 2.69 1.40 0.55 21.00 2.71 1.42 0.54 21.60 2.73 1.44 0.53 22.20 2.75 1.45 0.51 22.80 2.77 1.47 0.50 23.40 2.79 1.49 0.49 24.00 2.81 1.50 0.48 24.60 2.81 1.50 0.00 25.20 2.81 1.50 0.00 25.80 2.81 1.50 0.00 26.40 2.81 1.50 0.00 27.00 2.81 1.50 0.00 27.60 2.81 1.50 0.00 28.20 2.81 1.50 0.00 28.80 2.81 1.50 0.00 29.40 2.81 1.50 0.00 30.00 2.81 1.50 0.00 30.60 2.81 1.50 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 2.81 1.50 0.00 31.80 2.81 1.50 0.00 32.40 2.81 1.50 0.00 33.00 2.81 1.50 0.00 33.60 2.81 1.50 0.00 34.20 2.81 1.50 0.00 34.80 2.81 1.50 0.00 35.40 2.81 1.50 0.00 36.00 2.81 1.50 0.00 36.60 2.81 1.50 0.00 37.20 2.81 1.50 0.00 37.80 2.81 1.50 0.00 38.40 2.81 1.50 0.00 39.00 2.81 1.50 0.00 39.60 2.81 1.50 0.00 40.20 2.81 1.50 0.00 40.80 2.81 1.50 0.00 41.40 2.81 1.50 0.00 42.00 2.81 1.50 0.00 42.60 2.81 1.50 0.00 43.20 2.81 1.50 0.00 43.80 2.81 1.50 0.00 44.40 2.81 1.50 0.00 45.00 2.81 1.50 0.00 45.60 2.81 1.50 0.00 46.20 2.81 1.50 0.00 46.80 2.81 1.50 0.00 47.40 2.81 1.50 0.00 48.00 2.81 1.50 0.00 Pond-2-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 2P: Pond 2 Inflow Area = 18.150 ac, 50.47% Impervious, Inflow Depth = 1.50" for Eden 1 year event Inflow = 49.89 cfs @ 11.96 hrs, Volume= 2.270 cif Outflow = 1.84 cfs @ 13.67 hrs, Volume= 1.522 af, Atten= 96%, Lag= 102.6 min Primary = 1.84 cfs @ 13.67 hrs, Volume= 1.522 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Starting Elev= 530.50' Surf.Area= 0.572 ac Storage= 1.993 of Peak Elev= 532.59' @ 13.67 hrs Surf.Area= 0.723 ac Storage= 3.381 of (1.387 of above start) Plug-Flow detention time= (not calculated: initial storage excedes outflow) Center-of-Mass det. time= 493.6 min ( 1,317.8 - 824.2 ) Volume Invert Avail.Storage Storage Description #1 525.00' 7.253 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 525.00 0.101 0.000 0.000 526.00 0.247 0.174 0.174 527.00 0.294 0.271 0.445 528.00 0.417 0.356 0.800 529.00 40 0.461 0.439 1.239 530.00 0.507 0.484 1.724 530.50 0.572 0.270 1.993 531.00 0.640 0.303 2.296 532.00 0.693 0.666 2.963 533.00 0.743 0.718 3.681 534.00 0.804 0.774 4.455 535.00 0.914 0.859 5.314 536.00 0.969 0.942 6.255 537.00 1.026 0.998 7.253 Device Routing Invert Outlet Devices #1 Primary 524.80' 36.0" Round Culvert L= 104.0' CMP, square edge headwall, Ke= 0.500 Outlet Invert= 523.00' S=0.0173'/' Cc= 0.900 n= 0.025 Corrugated metal #2 Device 1 530.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 532.10' 10.0" Vert. Orifice/Grate X 2.00 C=0.600 #4 Device 1 535.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 536.00' 12.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Pond-2-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 9 Primary OutFlow Max=1.83 cfs @ 13.67 hrs HW=532.59' (Free Discharge) L1=Culvert (Passes 1.83 cfs of 70.29 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 6.96 fps) 3=Orifice/Grate (Orifice Controls 1.59 cfs @ 2.38 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=530.50' (Free Discharge) L5=Broad-Crested Rectangular Weir (Controls 0.00 cfs) Pond 2P: Pond 2 • 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Type 1124 -hr Eden 1 year Rainfall=2.81 " Pond _2_Post Printed 9/10/2009 Prepared by WSP SELLS Page 10 HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Pond 2P: Pond 2 Stage -Discharge 0 Total ■ Primary 537 - ■ Secondary Bioad-on— ed Rectangular eir` 536 535 534 ,. 533 ani 532 MUMM 5 0 31 ._ 530 _ _ _ _ - ------ w 529 528 527 526 525 ,, ,.. ,�.. 0 10 20 30 40 '..: ', 120 50 60 70 80 90 100 110 Discharge (cfs) Pond 2P: Pond 2 Stage -Area -Storage Surface/Horizontal/Wetted Area (acres) 1 ❑Surface 0 ® Storage 537--- - - - T----------- - 536 535 534 533 w 532 0 531-- ---- - -- -- ---- -- - -- - --- - - m 530 LU 529 528 - - ---------- ' -- - 527 - - _ ---------_,- 526 525 0 1 2 3 4 5 6? Storage (acre-feet) Pond _2_Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 11 Hydrograph for Pond 2P: Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 1.993 530.50 0.00 0.00 0.00 1.50 0.00 1.993 530.50 0.00 0.00 0.00 3.00 0.00 1.993 530.50 0.00 0.00 0.00 4.50 0.00 1.993 530.50 0.00 0.00 0.00 6.00 0.00 1.993 530.50 0.00 0.00 0.00 7.50 0.00 1.993 530.50 0.00 0.00 0.00 9.00 0.15 1.999 530.51 0.00 0.00 0.00 10.50 0.61 2.037 530.58 0.03 0.03 0.00 12.00 42.98 2.911 531.92 0.20 0.20 0.00 13.50 1.99 3.380 532.59 1.83 1.83 0.00 15.00 1.27 3.352 532.55 1.61 1.61 0.00 16.50 0.92 3.304 532.48 1.28 1.28 0.00 18.00 0.77 3.267 532.43 1.03 1.03 0.00 19.50 0.62 3.236 532.39 0.86 0.86 0.00 21.00 0.54 3.209 532.35 0.71 0.71 0.00 22.50 0.51 3.192 532.33 0.62 0.62 0.00 24.00 0.48 3.181 532.31 0.57 0.57 0.00 25.50 0.00 3.126 532.23 0.37 0.37 0.00 27.00 0.00 3.087 532.18 0.27 0.27 0.00 28.50 0.00 3.055 532.13 0.24 0.24 0.00 30.00 0.00 3.028 532.09 0.21 0.21 0.00 31.50 0.00 3.003 532.06 0.20 0.20 0.00 33.00 0.00 2.977 532.02 0.20 0.20 0.00 34.50 0.00 2.952 531.99 0.20 0.20 0.00 36.00 0.00 2.928 531.95 0.20 0.20 0.00 37.50 0.00 2.903 531.91 0.20 0.20 0.00 39.00 0.00 2.879 531.88 0.19 0.19 0.00 40.50 0.00 2.856 531.84 0.19 0.19 0.00 42.00 0.00 2.832 531.81 0.19 0.19 0.00 43.50 0.00 2.809 531.78 0.19 0.19 0.00 45.00 0.00 2.786 531.74 0.18 0.18 0.00 46.50 0.00 2.764 531.71 0.18 0.18 0.00 48.00 0.00 2.742 531.68 0.18 0.18 0.00 0 Pond _2_Post Type 1124-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 10 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 12 Stage-Discharge for Pond 2P: Pond 2 • • Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 525.00 0.00 0.00 0.00 525.15 0.00 0.00 0.00 525.30 0.00 0.00 0.00 525.45 0.00 0.00 0.00 525.60 0.00 0.00 0.00 525.75 0.00 0.00 0.00 525.90 0.00 0.00 0.00 526.05 0.00 0.00 0.00 526.20 0.00 0.00 0.00 526.35 0.00 0.00 0.00 526.50 0.00 0.00 0.00 526.65 0.00 0.00 0.00 526.80 0.00 0.00 0.00 526.95 0.00 0.00 0.00 527.10 0.00 0.00 0.00 527.25 0.00 0.00 0.00 527.40 0.00 0.00 0.00 527.55 0.00 0.00 0.00 527.70 0.00 0.00 0.00 527.85 0.00 0.00 0.00 528.00 0.00 0.00 0.00 528.15 0.00 0.00 0.00 528.30 0.00 0.00 0.00 528.45 0.00 0.00 0.00 528.60 0.00 0.00 0.00 528.75 0.00 0.00 0.00 528.90 0.00 0.00 0.00 529.05 0.00 0.00 0.00 529.20 0.00 0.00 0.00 529.35 0.00 0.00 0.00 529.50 0.00 0.00 0.00 529.65 0.00 0.00 0.00 529.80 0.00 0.00 0.00 529.95 0.00 0.00 0.00 530.10 0.00 0.00 0.00 530.25 0.00 0.00 0.00 530.40 0.00 0.00 0.00 530.55 0.02 0.02 0.00 530.70 0.07 0.07 0.00 530.85 0.10 0.10 0.00 531.00 0.12 0.12 0.00 531.15 0.13 0.13 0.00 531.30 0.15 0.15 0.00 531.45 0.16 0.16 0.00 531.60 0.17 0.17 0.00 531.75 0.18 0.18 0.00 531.90 0.19 0.19 0.00 532.05 0.20 0.20 0.00 532.20 0.29 0.29 0.00 532.35 0.69 0.69 0.00 532.50 1.35 1.35 0.00 532.65 2.17 2.17 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 532.80 3.04 3.04 0.00 532.95 3.71 3.71 0.00 533.10 4.28 4.28 0.00 533.25 4.77 4.77 0.00 533.40 5.22 5.22 0.00 533.55 5.63 5.63 0.00 533.70 6.01 6.01 0.00 533.85 6.37 6.37 0.00 534.00 6.70 6.70 0.00 534.15 7.03 7.03 0.00 534.30 7.33 7.33 0.00 534.45 7.63 7.63 0.00 534.60 7.91 7.91 0.00 534.75 8.19 8.19 0.00 534.90 8.45 8.45 0.00 535.05 8.71 8.71 0.00 535.20 8.96 8.96 0.00 535.35 9.20 9.20 0.00 535.50 9.44 9.44 0.00 535.65 13.47 13.47 0.00 535.80 20.64 20.64 0.00 535.95 29.86 29.86 0.00 536.10 41.74 40.73 1.02 536.25 57.05 53.02 4.03 536.40 74.79 66.59 8.20 536.55 94.53 81.32 13.22 536.70 108.33 89.56 18.76 536.85 114.99 90.19 24.80 537.00 122.37 90.81 31.56 Pond-2-Post Type 11 24-hr Eden 1 year Rainfall=2.81 " Prepared by WSP SELLS Printed 9/10/2009 H ydroCAD®9 00 s/n 04719 02009 HvdroCAD Software Solutions LLC Page 13 Stage-Area-Storage for Pond 2P: Pond 2 • Elevation Surface Storage (feet) (acres) (acre-feet) 525.00 0.101 0.000 525.15 0.123 0.017 525.30 0.145 0.037 525.45 0.167 0.060 525.60 0.189 0.087 525.75 0.210 0.117 525.90 0.232 0.150 526.05 0.249 0.186 526.20 0.256 0.224 526.35 0.263 0.263 526.50 0.271 0.303 526.65 0.278 0.344 526.80 0.285 0.387 526.95 0.292 0.430 527.10 0.307 0.475 527.25 0.325 0.522 527.40 0.343 0.572 527.55 0.362 0.625 527.70 0.380 0.681 527.85 0.399 0.739 528.00 0.417 0.800 528.15 0.424 0.863 528.30 0.430 0.927 528.45 0.437 0.992 528.60 0.444 1.058 528.75 0.450 1.125 528.90 0.457 1.194 529.05 0.464 1.263 529.20 0.470 1.333 529.35 0.477 1.404 529.50 0.484 1.476 529.65 0.491 1.549 529.80 0.498 1.623 529.95 0.505 1.698 530.10 0.520 1.775 530.25 0.539 1.854 530.40 0.559 1.937 530.55 0.579 2.022 530.70 0.599 2.110 530.85 0.620 2.202 531.00 0.640 2.296 531.15 0.648 2.393 531.30 0.656 2.491 531.45 0.664 2.590 531.60 0.672 2.690 531.75 0.680 2.791 531.90 0.688 2.894 532.05 0.695 2.998 532.20 0.703 3.102 532.35 0.711 3.208 532.50 0.718 3.316 532.65 0.726 3.424 Elevation Surface Storage (feet) (acres) (acre-feet) 532.80 0.733 3.533 532.95 0.741 3.644 533.10 0.749 3.756 533.25 0.759 3.869 533.40 0.768 3.983 533.55 0.777 4.099 533.70 0.786 4.216 533.85 0.795 4.335 534.00 0.804 4.455 534.15 0.821 4.576 534.30 0.837 4.701 534.45 0.854 4.828 534.60 0.870 4.957 534.75 0.887 5.089 534.90 0.903 5.223 535.05 0.917 5.359 535.20 0.925 5.498 535.35 0.933 5.637 535.50 0.942 5.778 535.65 0.950 5.920 535.80 0.958 6.063 535.95 0.967 6.207 536.10 0.975 6.353 536.25 0.984 6.500 536.40 0.992 6.648 536.55 1.001 6.797 536.70 1.009 6.948 536.85 1.018 7.100 537.00 1.026 7.253 • Pond-2-Post Type 1124-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 14 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Post Runoff Area=18.150 ac 50.47% Impervious Runoff Depth=3.56" Tc=5.0 min CN=86 Runoff=113.73 cfs 5.385 of Pond 2P: Pond 2 Peak Elev=534.69' Storage=5.032 of Inflow=113.73 cfs 5.385 of Primary=8.07 cfs 4.615 of Secondary=0.00 cfs 0.000 of Outflow=8.07 cfs 4.615 of Total Runoff Area =18.150 ac Runoff Volume = 5.385 of Average Runoff Depth = 3.56" 49.53% Pervious = 8.990 ac 50.47% Impervious = 9.160 ac • 0 Pond-2-Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 H ydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment DA2: Post Runoff = 113.73 cfs @ 11.96 hrs, Volume= 5.385 af, Depth= 3.56" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 10 year Rainfall=5.10" Area ac CN Description 5.850 98 Paved parking, HSG C 0.050 98 Unconnected pavement, HSG C 3.260 98 Roofs, HSG C 8.990 74 >75% Grass cover, Good, HSG C 18.150 86 Weighted Average 8.990 49.53% Pervious Area 9.160 50.47% Impervious Area 0.050 0.55% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Post is 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Ll Pond _2_Post Type 1124-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment DA2: Post • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.03 0.00 0.00 1.20 0.06 0.00 0.00 1.80 0.10 0.00 0.00 2.40 0.14 0.00 0.00 3.00 0.18 0.00 0.00 3.60 0.22 0.00 0.00 4.20 0.26 0.00 0.00 4.80 0.31 0.00 0.00 5.40 0.35 0.00 0.04 6.00 0.41 0.00 0.14 6.60 0.46 0.01 0.26 7.20 0.53 0.02 0.38 7.80 0.59 0.04 0.51 8.40 0.66 0.06 0.72 9.00 0.75 0.09 1.06 9.60 0.85 0.13 1.27 10.20 0.97 0.18 1.91 10.80 1.13 0.27 3.08 11.40 1.38 0.42 5.97 12.00 3.38 1.99 96.05 12.60 3.79 2.36 7.29 13.20 4.00 2.54 4.86 13.80 4.14 2.68 3.61 14.40 4.25 2.78 2.96 15.00 4.35 2.87 2.61 15.60 4.44 2.95 2.26 16.20 4.51 3.01 1.95 16.80 4.58 3.07 1.83 17.40 4.64 3.13 1.70 18.00 4.70 3.19 1.57 18.60 4.75 3.23 1.45 19.20 4.80 3.28 1.32 19.80 4.84 3.32 1.19 20.40 4.88 3.36 1.12 21.00 4.92 3.39 1.09 21.60 4.96 3.43 1.06 22.20 4.99 3.46 1.04 22.80 5.03 3.50 1.01 23.40 5.07 3.53 0.99 24.00 5.10 3.56 0.96 24.60 5.10 3.56 0.00 25.20 5.10 3.56 0.00 25.80 5.10 3.56 0.00 26.40 5.10 3.56 0.00 27.00 5.10 3.56 0.00 27.60 5.10 3.56 0.00 28.20 5.10 3.56 0.00 28.80 5.10 3.56 0.00 29.40 5.10 3.56 0.00 30.00 5.10 3.56 0.00 30.60 5.10 3.56 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 5.10 3.56 0.00 31.80 5.10 3.56 0.00 32.40 5.10 3.56 0.00 33.00 5.10 3.56 0.00 33.60 5.10 3.56 0.00 34.20 5.10 3.56 0.00 34.80 5.10 3.56 0.00 35.40 5.10 3.56 0.00 36.00 5.10 3.56 0.00 36.60 5.10 3.56 0.00 37.20 5.10 3.56 0.00 37.80 5.10 3.56 0.00 38.40 5.10 3.56 0.00 39.00 5.10 3.56 0.00 39.60 5.10 3.56 0.00 40.20 5.10 3.56 0.00 40.80 5.10 3.56 0.00 41.40 5.10 3.56 0.00 42.00 5.10 3.56 0.00 42.60 5.10 3.56 0.00 43.20 5.10 3.56 0.00 43.80 5.10 3.56 0.00 44.40 5.10 3.56 0.00 45.00 5.10 3.56 0.00 45.60 5.10 3.56 0.00 46.20 5.10 3.56 0.00 46.80 5.10 3.56 0.00 47.40 5.10 3.56 0.00 48.00 5.10 3.56 0.00 Pond-2-Post Type// 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond 2P: Pond 2 Inflow Area = 18.150 ac, 50.47% Impervious, Inflow Depth = 3.56" for Eden 10 year event Inflow = 113.73 cfs @ 11.96 hrs, Volume= 5.385 of Outflow = 8.07 cfs @ 12.54 hrs, Volume= 4.615 af, Atten= 93%, Lag= 34.7 min Primary = 8.07 cfs @ 12.54 hrs, Volume= 4.615 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Starting Elev= 530.50' Surf.Area= 0.572 ac Storage= 1.993 of Peak Elev= 534.69'@ 12.54 hrs Surf.Area= 0.880 ac Storage= 5.032 of (3.039 of above start) Plug-Flow detention time= 581.9 min calculated for 2.622 of (49% of inflow) Center-of-Mass det. time= 267.0 min ( 1,066.6 - 799.7 ) Volume Invert Avail Storage Storage Description #1 525.00' 7.253 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 525.00 0.101 0.000 0.000 526.00 0.247 0.174 0.174 527.00 0.294 0.271 0.445 528.00 0.417 0.356 0.800 529.00 0.461 0.439 1.239 530.00 0.507 0.484 1.724 530.50 0.572 0.270 1.993 531.00 0.640 0.303 2.296 532.00 0.693 0.666 2.963 533.00 0.743 0.718 3.681 534.00 0.804 0.774 4.455 535.00 0.914 0.859 5.314 536.00 0.969 0.942 6.255 537.00 1.026 0.998 7.253 Device Routing Invert Outlet Devices #1 Primary 524.80' 36.0" Round Culvert L= 104.0' CMP, square edge headwall, Ke= 0.500 Outlet Invert= 523.00' S=0.0173'/' Cc= 0.900 n= 0.025 Corrugated metal #2 Device 1 530.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 532.10' 10.0" Vert. Orifice/Grate X 2.00 C=0.600 #4 Device 1 535.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 536.00' 12.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 0 Pond _2_Post Type 1124-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 18 Primary OutFlow Max=8.07 cfs @ 12.54 hrs HW=534.69' (Free Discharge) L1 =Culvert (Passes 8.07 cfs of 80.70 cfs potential flow) 2=0rifice/Grate (Orifice Controls 0.34 cfs @ 9.85 fps) 3=Orifice/Grate (Orifice Controls 7.74 cfs @ 7.09 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=530.50' (Free Discharge) L5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 2P: Pond 2 Hydrograph , , - - , - - - - - - - LInflow 113.73 cfs ow 8;150 ac ry Area=1 Inflowndary 120 Peak Elev..-534.69 110 I torage=5,03.2 of 100- 90- 80' --------------------- 70- -------------- c 60 _ __ I I LL 5O 40 30 8.07 cfs ZO 8.07 c 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Pond-2-Post Type 11 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 40 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 19 Pond 2P: Pond 2 Stage-Discharge Total ¦ Primary ® Secondary• • m 532 V-. 0 531 iu 53C w 0 10 20 30 40 50 60 70 Discharge (cfs) 80 90 100 110 120 Pond 2P: Pond 2 Stage-Area-Storage S u rface/H o rizonta Metted Area (acres) 0 1 ----------------- ------------------r---------- -- -: 537 --- - -- - 536 535 ' , - - - - - - - - - - - - - - - - - - -----------,-,- - -- - 534 533- 532- 0 531 - - ------ - - - - - - - - - - - - - -- ---. ---- - - - - - - - Startingllwglion y 530 w 529 ' ''- ------- ------------------ - - - 528 ------------------------------ -- 527 - - - - - - - ; - - - - - - - - - - - - - - - - - - - - - - ? 526 525 0 1 2 3 4 5 6 7 Storage (acre-feet) 10 Surface ® Storage Pond-2-Post Type // 24-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 H ydroCAD®9 00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 20 Hydrograph for Pond 2P: Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 00 0 0.00 1.993 530.50 0.00 0.00 0.00 . 50 1 0.00 1.993 530.50 0.00 0.00 0.00 . 00 3 0.00 1.993 530.50 0.00 0.00 0.00 . 4 50 0.00 1.993 530.50 0.00 0.00 0.00 . 00 6 0.14 1.998 530.51 0.00 0.00 0.00 . 50 7 0.44 2.033 530.57 0.03 0.03 0.00 . 00 9 1.06 2.111 530.70 0.07 0.07 0.00 . 50 10 2.38 2.288 530.99 0.11 0.11 0.00 . 12 00 96.05 4.469 534.02 6.74 6.74 0.00 . 50 13 4.16 4.848 534.47 7.68 7.68 0.00 . 00 15 2.61 4.363 533.89 6.45 6.45 0.00 . 50 16 1.89 3.924 533.32 4.99 4.99 0.00 . 00 18 1.57 3.611 532.91 3.54 3.54 0.00 . 50 19 1.25 3.433 532.66 2.25 2.25 0.00 . 00 21 1.09 3.345 532.54 1.56 1.56 0.00 . 50 22 1.03 3.302 532.48 1.27 1.27 0.00 . 24 00 0.96 3.279 532.45 1.11 1.11 0.00 . 50 25 0.00 3.184 532.32 0.58 0.58 0.00 . 00 27 0.00 3.126 532.23 0.38 0.38 0.00 . 50 28 0.00 3.087 532.18 0.28 0.28 0.00 . 30.00 0.00 3.055 532.13 0.24 0.24 0.00 31 50 0.00 3.028 532.09 0.21 0.21 0.00 . 00 33 0.00 3.003 532.06 0.20 0.20 0.00 . 34 50 0.00 2.978 532.02 0.20 0.20 0.00 . 00 36 0.00 2.953 531.99 0.20 0.20 0.00 . 50 37 0.00 2.928 531.95 0.20 0.20 0.00 . 00 39 0.00 2.904 531.91 0.20 0.20 0.00 . 50 40 0.00 2.880 531.88 0.19 0.19 0.00 . 42 00 0.00 2.856 531.84 0.19 0.19 0.00 . 50 43 0.00 2.832 531.81 0.19 0.19 0.00 . 00 45 0.00 2.809 531.78 0.19 0.19 0.00 . 50 46 0.00 2.786 531.74 0.18 0.18 0.00 . 48.00 0.00 2.764 531.71 0.18 0.18 0.00 0 • • • Pond _2_Post Type 1124-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 21 Stage-Discharge for Pond 2P: Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 525.00 0.00 0.00 0.00 525.15 0.00 0.00 0.00 525.30 0.00 0.00 0.00 525.45 0.00 0.00 0.00 525.60 0.00 0.00 0.00 525.75 0.00 0.00 0.00 525.90 0.00 0.00 0.00 526.05 0.00 0.00 0.00 526.20 0.00 0.00 0.00 526.35 0.00 0.00 0.00 526.50 0.00 0.00 0.00 526.65 0.00 0.00 0.00 526.80 0.00 0.00 0.00 526.95 0.00 0.00 0.00 527.10 0.00 0.00 0.00 527.25 0.00 0.00 0.00 527.40 0.00 0.00 0.00 527.55 0.00 0.00 0.00 527.70 0.00 0.00 0.00 527.85 0.00 0.00 0.00 528.00 0.00 0.00 0.00 528.15 0.00 0.00 0.00 528.30 0.00 0.00 0.00 528.45 0.00 0.00 0.00 528.60 0.00 0.00 0.00 528.75 0.00 0.00 0.00 528.90 0.00 0.00 0.00 529.05 0.00 0.00 0.00 529.20 0.00 0.00 0.00 529.35 0.00 0.00 0.00 529.50 0.00 0.00 0.00 529.65 0.00 0.00 0.00 529.80 0.00 0.00 0.00 529.95 0.00 0.00 0.00 530.10 0.00 0.00 0.00 530.25 0.00 0.00 0.00 530.40 0.00 0.00 0.00 530.55 0.02 0.02 0.00 530.70 0.07 0.07 0.00 530.85 0.10 0.10 0.00 531.00 0.12 0.12 0.00 531.15 0.13 0.13 0.00 531.30 0.15 0.15 0.00 531.45 0.16 0.16 0.00 531.60 0.17 0.17 0.00 531.75 0.18 0.18 0.00 531.90 0.19 0.19 0.00 532.05 0.20 0.20 0.00 532.20 0.29 0.29 0.00 532.35 0.69 0.69 0.00 532.50 1.35 1.35 0.00 532.65 2.17 2.17 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 532.80 3.04 3.04 0.00 532.95 3.71 3.71 0.00 533.10 4.28 4.28 0.00 533.25 4.77 4.77 0.00 533.40 5.22 5.22 0.00 533.55 5.63 5.63 0.00 533.70 6.01 6.01 0.00 533.85 6.37 6.37 0.00 534.00 6.70 6.70 0.00 534.15 7.03 7.03 0.00 534.30 7.33 7.33 0.00 534.45 7.63 7.63 0.00 534.60 7.91 7.91 0.00 534.75 8.19 8.19 0.00 534.90 8.45 8.45 0.00 535.05 8.71 8.71 0.00 535.20 8.96 8.96 0.00 535.35 9.20 9.20 0.00 535.50 9.44 9.44 0.00 535.65 13.47 13.47 0.00 535.80 20.64 20.64 0.00 535.95 29.86 29.86 0.00 536.10 41.74 40.73 1.02 536.25 57.05 53.02 4.03 536.40 74.79 66.59 8.20 536.55 94.53 81.32 13.22 536.70 108.33 89.56 18.76 536.85 114.99 90.19 24.80 537.00 122.37 90.81 31.56 Pond-2-Post Type 1124-hr Eden 10 year Rainfall=5.10" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 22 Stage-Area-Storage for Pond 2P: Pond 2 C7 • Elevation Surface Storage _(feet) (acres) (acre-feet) 525.00 0.101 0.000 525.15 0.123 0.017 525.30 0.145 0.037 525.45 0.167 0.060 525.60 0.189 0.087 525.75 0.210 0.117 525.90 0.232 0.150 526.05 0.249 0.186 526.20 0.256 0.224 526.35 0.263 0.263 526.50 0.271 0.303 526.65 0.278 0.344 526.80 0.285 0.387 526.95 0.292 0.430 527.10 0.307 0.475 527.25 0.325 0.522 527.40 0.343 0.572 527.55 0.362 0.625 527.70 0.380 0.681 527.85 0.399 0.739 528.00 0.417 0.800 528.15 0.424 0.863 528.30 0.430 0.927 528.45 0.437 0.992 528.60 0.444 1.058 528.75 0.450 1.125 528.90 0.457 1.194 529.05 0.464 1.263 529.20 0.470 1.333 529.35 0.477 1.404 529.50 0.484 1.476 529.65 0.491 1.549 529.80 0.498 1.623 529.95 0.505 1.698 530.10 0.520 1.775 530.25 0.539 1.854 530.40 0.559 1.937 530.55 0.579 2.022 530.70 0.599 2.110 530.85 0.620 2.202 531.00 0.640 2.296 531.15 0.648 2.393 531.30 0.656 2.491 531.45 0.664 2.590 531.60 0.672 2.690 531.75 0.680 2.791 531.90 0.688 2.894 532.05 0.695 2.998 532.20 0.703 3.102 532.35 0.711 3.208 532.50 0.718 3.316 532.65 0.726 3.424 Elevation Surface Storage (feet) (acres) (acre-feet) 532.80 0.733 3.533 532.95 0.741 3.644 533.10 0.749 3.756 533.25 0.759 3.869 533.40 0.768 3.983 533.55 0.777 4.099 533.70 0.786 4.216 533.85 0.795 4.335 534.00 0.804 4.455 534.15 0.821 4.576 534.30 0.837 4.701 534.45 0.854 4.828 534.60 0.870 4.957 534.75 0.887 5.089 534.90 0.903 5.223 535.05 0.917 5.359 535.20 0.925 5.498 535.35 0.933 5.637 535.50 0.942 5.778 535.65 0.950 5.920 535.80 0.958 6.063 535.95 0-967 6.207 536.10 0.975 6.353 536.25 0.984 6.500 536.40 0.992 6.648 536.55 1.001 6.797 536.70 1.009 6.948 536.85 1.018 7.100 537.00 1.026 7.253 Pond _2_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 is HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 23 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Post Runoff Area=18.150 ac 50.47% Impervious Runoff Depth=4.62" Tc=5.0 min CN=86 Runoff=145.16 cfs 6.986 of Pond 2P: Pond 2 Peak Elev=535.65' Storage=5.921 of Inflow=145.16 cfs 6.986 of Primary=13.72 cfs 6.209 of Secondary=0.00 cfs 0.000 of Outflow=13.72 cfs 6.209 of Total Runoff Area =18.150 ac Runoff Volume = 6.986 of Average Runoff Depth = 4.62" 49.53% Pervious = 8.990 ac 50.47% Impervious = 9.160 ac Pond-2-Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 H ydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment DA2: Post Runoff = 145.16 cfs @ 11.96 hrs, Volume= 6.986 af, Depth= 4.62" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 25 year Rainfall=6.22" Area ac CN Description 5.850 98 Paved parking, HSG C 0.050 98 Unconnected pavement, HSG C 3.260 98 Roofs, HSG C 8.990 74 >75% Grass cover, Good, HSG C 18.150 86 Weighted Average 8.990 49.53% Pervious Area 9.160 50.47% Impervious Area 0.050 0.55% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Post Hdroraph -.-- 160 _ ®Runoff 145.16 cfs _- '-- -- 24-h 150 ' -`-- - -- Type_ tl r Rden 140- 25 year . 1307: 120 _ - - - - - - - - - - - - - - - - Rainfal-I ? .? 2't 110 _ loo Runoff .Area 18.150 ac so - -Runoff'Volurne=6:989-af 3 80 - Runoff Depth=4.62" o , M 70 _ , - r _ Tc=6.0 inin 60 --- - ; -- - CN=8 50 - - -- - -- - -- - - ---- - 40 - - 30 20 ---- -------------- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond-2-Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 40 HydroCAD® 9.00 s/n 04719 02009 HydroCAD Software Solutions LLC Page 25 Hydrograph for Subcatchment DA2: Post • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.08 0.00 0.00 1.80 0.12 0.00 0.00 2.40 0.17 0.00 0.00 3.00 0.21 0.00 0.00 3.60 0.26 0.00 0.00 4.20 0.32 0.00 0.00 4.80 0.37 0.00 0.08 5.40 0.43 0.01 0.21 6.00 0.50 0.02 0.35 6.60 0.57 0.03 0.51 7.20 0.64 0.05 0.67 7.80 0.72 0.08 0.84 8.40 0.81 0.11 1.14 9.00 0.91 0.16 1.61 9.60 1.03 0.21 1.88 10.20 1.18 0.29 2.75 10.80 1.38 0.41 4.32 11.40 1.69 0.62 8.13 12.00 4.12 2.66 122.04 12.60 4.62 3.12 9.16 13.20 4.87 3.35 6.09 13.80 5.05 3.52 4.52 14.40 5.19 3.64 3.70 15.00 5.31 3.76 3.26 15.60 5.41 3.85 2.82 16.20 5.50 3.94 2.43 16.80 5.58 4.01 2.28 17.40 5.66 4.09 2.12 18.00 5.73 4.15 1.96 18.60 5.79 4.21 1.80 19.20 5.85 4.27 1.64 19.80 5.90 4.32 1.48 20.40 5.95 4.37 1.39 21.00 6.00 4.41 1.36 21.60 6.05 4.45 1.32 22.20 6.09 4.50 1.29 22.80 6.14 4.54 1.26 23.40 6.18 4.58 1.23 24.00 6.22 4.62 1.20 24.60 6.22 4.62 0.00 25.20 6.22 4.62 0.00 25.80 6.22 4.62 0.00 26.40 6.22 4.62 0.00 27.00 6.22 4.62 0.00 27.60 6.22 4.62 0.00 28.20 6.22 4.62 0.00 28.80 6.22 4.62 0.00 29.40 6.22 4.62 0.00 30.00 6.22 4.62 0.00 30.60 6.22 4.62 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 6.22 4.62 0.00 31.80 6.22 4.62 0.00 32.40 6.22 4.62 0.00 33.00 6.22 4.62 0.00 33.60 6.22 4.62 0.00 34.20 6.22 4.62 0.00 34.80 6.22 4.62 0.00 35.40 6.22 4.62 0.00 36.00 6.22 4.62 0.00 36.60 6.22 4.62 0.00 37.20 6.22 4.62 0.00 37.80 6.22 4.62 0.00 38.40 6.22 4.62 0.00 39.00 6.22 4.62 0.00 39.60 6.22 4.62 0.00 40.20 6.22 4.62 0.00 40.80 6.22 4.62 0.00 41.40 6.22 4.62 0.00 42.00 6.22 4.62 0.00 42.60 6.22 4.62 0.00 43.20 6.22 4.62 0.00 43.80 6.22 4.62 0.00 44.40 6.22 4.62 0.00 45.00 6.22 4.62 0.00 45.60 6.22 4.62 0.00 46.20 6.22 4.62 0.00 46.80 6.22 4.62 0.00 47.40 6.22 4.62 0.00 48.00 6.22 4.62 0.00 Pond _2_Post Type// 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 26 Summary for Pond 2P: Pond 2 Inflow Area = 18.150 ac, 50.47% Impervious, Inflow Depth = 4.62" for Eden 25 year event Inflow = 145.16 cfs @ 11.96 hrs, Volume= 6.986 of Outflow = 13.72 cfs @ 12.38 hrs, Volume= 6.209 af, Atten= 91 %, Lag= 25.6 min Primary = 13.72 cfs @ 12.38 hrs, Volume= 6.209 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Starting Elev= 530.50' Surf.Area= 0.572 ac Storage= 1.993 of Peak Elev= 535.65'@ 12.38 hrs Surf.Area= 0.950 ac Storage= 5.921 of (3.928 of above start) Plug-Flow detention time= 488.4 min calculated for 4.216 of (60% of inflow) Center-of-Mass det. time= 253.4 min ( 1,045.7 - 792.3 ) Volume Invert Avail Storage Storage Description #1 525.00' 7.253 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) ( acres) (acre-feet) (acre-feet) 525.00 0.101 0.000 0.000 526.00 0.247 0.174 0.174 527.00 0.294 0.271 0.445 • 528.00 0.417 0.356 0.800 529.00 0.461 0.439 1.239 530.00 0.507 0.484 1.724 530.50 0.572 0.270 1.993 531.00 0.640 0.303 2.296 532.00 0.693 0.666 2.963 533.00 0.743 0.718 3.681 534.00 0.804 0.774 4.455 535.00 0.914 0.859 5.314 536.00 0.969 0.942 6.255 537.00 1.026 0.998 7.253 Device Routing Invert Outlet Devices #1 Primary 524.80' 36.0" Round Culvert L= 104.0' CMP, square edge headwall, Ke= 0.500 Outlet Invert= 523.00' S= 0.0173T Cc= 0.900 n= 0.025 Corrugated metal #2 Device 1 530.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 532.10' 10.0" Vert. Orifice/Grate X 2.00 C=0.600 #4 Device 1 535.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 536.00' 12.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 0 Pond _2_Post Type II 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 H ydroCAD®9 00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 27 Primary OutFlow Max=13.53 cfs @ 12.38 hrs HW=535.65' (Free Discharge) t-1 =Culvert (Passes 13.53 cfs of 85.06 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.37 cfs @ 10.93 fps) 3=Orifice/Grate (Orifice Controls 9.30 cfs @ 8.53 fps) =Orifice/Grate (Weir Controls 3.86 cfs @ 1.27 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=530.50' (Free Discharge) t-5=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) ¦ Inflow Outflow ® Primary ¦ Secondary C7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond _2_Post Type I/ 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 28 Pond 2P: Pond 2 Stage-Discharge am °' c 0 m w 0 10 20 30 40 50 60 70 80 90 100 110 120 • Discharge (cfs) Pond 2P: Pond 2 Stage-Area-Storage Surface/Horizontal/Wetted Area (acres) 0 m m w c 0 m w 0 0 Total ® Primary ¦ Secondary 1 0 Surface 0 Storage 0 1 2 3 4 5 6 7 Storage (acre-feet) Pond-2-Post Type 1124-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/1012009 . HydroCAD®9 00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 29 Hydrograph for Pond 2P: Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 1.993 530.50 0.00 0.00 0.00 1 50 0.00 1.993 530.50 0.00 0.00 0.00 . 3.00 0.00 1.993 530.50 0.00 0.00 0.00 4.50 0.02 1.994 530.50 0.00 0.00 0.00 6.00 0.35 2.015 530.54 0.01 0.01 0.00 7.50 0.76 2.079 530.65 0.06 0.06 0.00 9.00 1.61 2.205 530.85 0.10 0.10 0.00 10.50 3.38 2.465 531.26 0.14 0.14 0.00 12.00 122.04 5.287 534.97 8.57 8.57 0.00 13.50 5.22 5.651 535.37 9.23 9.23 0.00 15.00 3.26 5.063 534.72 8.14 8.14 0.00 16.50 2.36 4.477 534.03 6.76 6.76 0.00 18.00 1.96 3.998 533.42 5.27 5.27 0.00 19.50 1.56 3.656 532.97 3.78 3.78 0.00 21.00 1.36 3.453 532.69 2.40 2.40 0.00 22.50 1.28 3.367 532.57 1.72 1.72 0.00 24.00 1.20 3.326 532.51 1.44 1.44 0.00 25.50 0.00 3.207 532.35 0.70 0.70 0.00 27.00 0.00 3.141 532.25 0.43 0.43 0.00 28.50 0.00 3.097 532.19 0.29 0.29 0.00 30.00 50 • 31 0.00 00 0 3.064 3.036 532.15 532.11 0.25 0.21 0.25 0.21 0.00 0.00 . 33.00 . 0.00 3.010 532.07 0.21 0.21 0.00 34.50 0.00 2.985 532.03 0.20 0.20 0.00 36.00 0.00 2.960 532.00 0.20 0.20 0.00 37.50 0.00 2.935 531.96 0.20 0.20 0.00 39.00 0.00 2.911 531.92 0.20 0.20 0.00 40.50 0.00 2.887 531.89 0.19 0.19 0.00 42.00 0.00 2.863 531.85 0.19 0.19 0.00 43.50 0.00 2.839 531.82 0.19 0.19 0.00 45.00 0.00 2.816 531.79 0.19 0.19 0.00 46.50 0.00 2.793 531.75 0.18 0.18 0.00 48.00 0.00 2.771 531.72 0.18 0.18 0.00 • Pond _2_Post Type 11 24-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 30 Stage-Discharge for Pond 2P: Pond 2 • • Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 525.00 0.00 0.00 0.00 525.15 0.00 0.00 0.00 525.30 0.00 0.00 0.00 525.45 0.00 0.00 0.00 525.60 0.00 0.00 0.00 525.75 0.00 0.00 0.00 525.90 0.00 0.00 0.00 526.05 0.00 0.00 0.00 526.20 0.00 0.00 0.00 526.35 0.00 0.00 0.00 526.50 0.00 0.00 0.00 526.65 0.00 0.00 0.00 526.80 0.00 0.00 0.00 526.95 0.00 0.00 0.00 527.10 0.00 0.00 0.00 527.25 0.00 0.00 0.00 527.40 0.00 0.00 0.00 527.55 0.00 0.00 0.00 527.70 0.00 0.00 0.00 527.85 0.00 0.00 0.00 528.00 0.00 0.00 0.00 528.15 0.00 0.00 0.00 528.30 0.00 0.00 0.00 528.45 0.00 0.00 0.00 528.60 0.00 0.00 0.00 528.75 0.00 0.00 0.00 528.90 0.00 0.00 0.00 529.05 0.00 0.00 0.00 529.20 0.00 0.00 0.00 529.35 0.00 0.00 0.00 529.50 0.00 0.00 0.00 529.65 0.00 0.00 0.00 529.80 0.00 0.00 0.00 529.95 0.00 0.00 0.00 530.10 0.00 0.00 0.00 530.25 0.00 0.00 0.00 530.40 0.00 0.00 0.00 530.55 0.02 0.02 0.00 530.70 0.07 0.07 0.00 530.85 0.10 0.10 0.00 531.00 0.12 0.12 0.00 531.15 0.13 0.13 0.00 531.30 0.15 0.15 0.00 531.45 0.16 0.16 0.00 531.60 0.17 0.17 0.00 531.75 0.18 0.18 0.00 531.90 0.19 0.19 0.00 532.05 0.20 0.20 0.00 532.20 0.29 0.29 0.00 532.35 0.69 0.69 0.00 532.50 1.35 1.35 0.00 532.65 2.17 2.17 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 532.80 3.04 3.04 0.00 532.95 3.71 3.71 0.00 533.10 4.28 4.28 0.00 533.25 4.77 4.77 0.00 533.40 5.22 5.22 0.00 533.55 5.63 5.63 0.00 533.70 6.01 6.01 0.00 533.85 6.37 6.37 0.00 534.00 6.70 6.70 0.00 534.15 7.03 7.03 0.00 534.30 7.33 7.33 0.00 534.45 7.63 7.63 0.00 534.60 7.91 7.91 0.00 534.75 8.19 8.19 0.00 534.90 8.45 8.45 0.00 535.05 8.71 8.71 0.00 535.20 8.96 8.96 0.00 535.35 9.20 9.20 0.00 535.50 9.44 9.44 0.00 535.65 13.47 13.47 0.00 535.80 20.64 20.64 0.00 535.95 29.86 29.86 0.00 536.10 41.74 40.73 1.02 536.25 57.05 53.02 4.03 536.40 74.79 66.59 8.20 536.55 94.53 81.32 13.22 536.70 108.33 89.56 18.76 536.85 114.99 90.19 24.80 537.00 122.37 90.81 31.56 Pond-2-Post Type 1124-hr Eden 25 year Rainfall=6.22" Prepared by WSP SELLS Printed 9/10/2009 • H ydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 31 Stage-Area-Storage for Pond 2P: Pond 2 • • Elevation Surface Storage (feet) (acres) (acre-feet) 525.00 0.101 0.000 525.15 0.123 0.017 525.30 0.145 0.037 525.45 0.167 0.060 525.60 0.189 0.087 525.75 0.210 0.117 525.90 0.232 0.150 526.05 0.249 0.186 526.20 0.256 0.224 526.35 0.263 0.263 526.50 0.271 0.303 526.65 0.278 0.344 526.80 0.285 0.387 526.95 0.292 0.430 527.10 0.307 0.475 527.25 0.325 0.522 527.40 0.343 0.572 527.55 0.362 0.625 527.70 0.380 0.681 527.85 0.399 0.739 528.00 0.417 0.800 528.15 0.424 0.863 528.30 0.430 0.927 528.45 0.437 0.992 528.60 0.444 1.058 528.75 0.450 1.125 528.90 0.457 1.194 529.05 0.464 1.263 529.20 0.470 1.333 529.35 0.477 1.404 529.50 0.484 1.476 529.65 0.491 1.549 529.80 0.498 1.623 529.95 0.505 1.698 530.10 0.520 1.775 530.25 0.539 1.854 530.40 0.559 1.937 530.55 0.579 2.022 530.70 0.599 2.110 530.85 0.620 2.202 531.00 0.640 2.296 531.15 0.648 2.393 531.30 0.656 2.491 531.45 0.664 2.590 531.60 0.672 2.690 531.75 0.680 2.791 531.90 0.688 2.894 532.05 0.695 2.998 532.20 0.703 3.102 532.35 0.711 3.208 532.50 0.718 3.316 532.65 0.726 3.424 Elevation Surface Storage (feet) (acres) (acre-feet) 532.80 0.733 3.533 532.95 0.741 3.644 533.10 0.749 3.756 533.25 0.759 3.869 533.40 0.768 3.983 533.55 0.777 4.099 533.70 0.786 4.216 533.85 0.795 4.335 534.00 0.804 4.455 534.15 0.821 4.576 534.30 0.837 4.701 534.45 0.854 4.828 534.60 0.870 4.957 534.75 0.887 5.089 534.90 0.903 5.223 535.05 0.917 5.359 535.20 0.925 5.498 535.35 0.933 5.637 535.50 0.942 5.778 535.65 0.950 5.920 535.80 0.958 6.063 535.95 0.967 6.207 536.10 0.975 6.353 536.25 0.984 6.500 536.40 0.992 6.648 536.55 1.001 6.797 536.70 1.009 6.948 536.85 1.018 7.100 537.00 1.026 7.253 Pond-2-Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 41 H ydroCAD®9 00 s/n 04719 @2009 HydroCAD Software Solutions LLC Page 32 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Post Runoff Area=18.150 ac 50.47% Impervious Runoff Depth=5.53" Tc=5.0 min CN=86 Runoff=171.71 cfs 8.363 of Pond 2P: Pond 2 Peak Elev=536.12' Storage=6.369 of Inflow=171.71 cfs 8.363 of Primary=42.13 cfs 7.571 of Secondary=1.41 cfs 0.011 of Outflow=43.54 cfs 7.582 of Total Runoff Area =18.150 ac Runoff Volume = 8.363 of Average Runoff Depth = 5.53" 49.53% Pervious = 8.990 ac 50.47% Impervious = 9.160 ac • C u Pond-2-Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment DA2: Post Runoff = 171.71 cfs @ 11.96 hrs, Volume= 8.363 af, Depth= 5.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 50 year Rainfall=7.17" Area (ac) CN Description 5.850 98 Paved parking, HSG C 0.050 98 Unconnected pavement, HSG C 3.260 98 Roofs, HSG C 8.990 74 >75% Grass cover, Good, HSG C 18.150 86 Weighted Average 8.990 49.53% Pervious Area 9.160 50.47% Impervious Area 0.050 0.55% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Post • Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 4 Time (hours) 0 Pond-2-Post Type // 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 34 Hydrograph for Subcatchment DA2: Post • • Time Precip. Excess Runoff (hours) ( inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.04 0.00 0.00 1.20 0.09 0.00 0.00 1.80 0.14 0.00 0.00 2.40 0.19 0.00 0.00 3.00 0.25 0.00 0.00 3.60 0.30 0.00 0.00 4.20 0.36 0.00 0.07 4.80 0.43 0.01 0.22 5.40 0.50 0.02 0.38 6.00 0.57 0.03 0.56 6.60 0.65 0.06 0.75 7.20 0.74 0.08 0.95 7.80 0.83 0.12 1.15 8.40 0.93 0.16 1.53 9.00 1.05 0.23 2.11 9.60 1.19 0.30 2.42 10.20 1.36 0.40 3.49 10.80 1.59 0.55 5.39 11.40 1.95 0.81 10.00 12.00 4.75 3.24 143.97 12.60 5.33 3.78 10.73 13.20 5.62 4.05 7.13 13.80 5.82 4.24 5.29 14.40 5.98 4.39 4.33 15.00 6.12 4.52 3.81 15.60 6.24 4.64 3.29 16.20 6.34 4.74 2.84 16.80 6.44 4.82 2.66 17.40 6.52 4.91 2.47 18.00 6.60 4.99 2.29 18.60 6.68 5.06 2.10 19.20 6.75 5.12 1.91 19.80 6.81 5.18 1.72 20.40 6.86 5.23 1.62 21.00 6.92 5.29 1.58 21.60 6.97 5.34 1.54 22.20 7.02 5.39 1.51 22.80 7.07 5.44 1.47 23.40 7.12 5.48 1.43 24.00 7.17 5.53 1.39 24.60 7.17 5.53 0.00 25.20 7.17 5.53 0.00 25.80 7.17 5.53 0.00 26.40 7.17 5.53 0.00 27.00 7.17 5.53 0.00 27.60 7.17 5.53 0.00 28.20 7.17 5.53 0.00 28.80 7.17 5.53 0.00 29.40 7.17 5.53 0.00 30.00 7.17 5.53 0.00 30.60 7.17 5.53 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 7.17 5.53 0.00 31.80 7.17 5.53 0.00 32.40 7.17 5.53 0.00 33.00 7.17 5.53 0.00 33.60 7.17 5.53 0.00 34.20 7.17 5.53 0.00 34.80 7.17 5.53 0.00 35.40 7.17 5.53 0.00 36.00 7.17 5.53 0.00 36.60 7.17 5.53 0.00 37.20 7.17 5.53 0.00 37.80 7.17 5.53 0.00 38.40 7.17 5.53 0.00 39.00 7.17 5.53 0.00 39.60 7.17 5.53 0.00 40.20 7.17 5.53 0.00 40.80 7.17 5.53 0.00 41.40 7.17 5.53 0.00 42.00 7.17 5.53 0.00 42.60 7.17 5.53 0.00 43.20 7.17 5.53 0.00 43.80 7.17 5.53 0.00 44.40 7.17 5.53 0.00 45.00 7.17 5.53 0.00 45.60 7.17 5.53 0.00 46.20 7.17 5.53 0.00 46.80 7.17 5.53 0.00 47.40 7.17 5.53 0.00 48.00 7.17 5.53 0.00 Pond-2-Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAM 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 35 Summary for Pond 2P: Pond 2 Inflow Area = 18.150 ac, 50.47% Impervious, Inflow Depth = 5.53" for Eden 50 year event Inflow = 171.71 cfs @ 11.96 hrs, Volume= 8.363 of Outflow = 43.54 cfs @ 12.09 hrs, Volume= 7.582 af, Atten= 75%, Lag= 8.1 min Primary = 42.13 cfs @ 12.09 hrs, Volume= 7.571 of Secondary = 1.41 cfs @ 12.09 hrs, Volume= 0.011 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Starting Elev= 530.50' Surf.Area= 0.572 ac Storage= 1.993 of Peak Elev= 536.12' @ 12.09 hrs Surf.Area= 0.976 ac Storage= 6.369 of (4.376 of above start) Plug-Flow detention time= 421.5 min calculated for 5.585 of (67% of inflow) Center-of-Mass det. time= 224.0 min ( 1,011.3 - 787.3 ) Volume Invert Avail Storage Storage Description #1 525.00' 7.253 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) ( acres) (acre-feet) (acre-feet) 525.00 0.101 0.000 0.000 526.00 0.247 0.174 0.174 527.00 528.00 0.294 0.417 0.271 0.445 0.356 0.800 529.00 0.461 0.439 1.239 530.00 0.507 0.484 1.724 530.50 0.572 0.270 1.993 531.00 0.640 0.303 2.296 532.00 0.693 0.666 2.963 533.00 0.743 0.718 3.681 534.00 0.804 0.774 4.455 535.00 0.914 0.859 5.314 536.00 0.969 0.942 6.255 537.00 1.026 0.998 7.253 Device Routing Invert Outlet Devices #1 Primary 524.80' 36.0" Round Culvert L= 104.0' CMP, square edge headwall, Ke= 0.500 Outlet Invert= 523.00' S= 0.01737' Cc= 0.900 n= 0.025 Corrugated metal #2 Device 1 530.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 532.10' 10.0" Vert. Orifice/Grate X 2.00 C=0.600 #4 Device 1 535.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 536.00' 12.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 0 Pond-2-Post Type 11 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9110/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 36 Primary OutFlow Max=41.91 cfs @ 12.09 hrs HW=536.12' (Free Discharge) t-1=Culvert (Passes 41.91 cfs of 87.08 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.39 cfs @ 11.41 fps) 3=Orifice/Grate (Orifice Controls 9.96 cfs @ 9.13 fps) 4=Orifice/Grate (Weir Controls 31.56 cfs @ 2.56 fps) Secondary OutFlow Max=1.26 cfs @ 12.09 hrs HW=536.12' (Free Discharge) t-5=Broad-Crested Rectangular Weir (Weir Controls 1.26 cfs @ 0.91 fps) ¦ Inflow 0 Outflow ¦ Primary ¦ Secondary • is Pond-2-Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 37 Pond 2P: Pond 2 Stage-Discharge 532 0 531 ?a 530 w • 0 Pond 2P: Pond 2 Stage-Area-Storage Surface/Horizontal/Wetted Area (acres) Storage (acre-feet) ? Total ¦ Primary ¦ Secondary 1 ? Surface ® Storage 0 10 20 30 40 50 60 70 80 90 100 110 120 Discharge (cfs) Pond _2_Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 38 Hydrograph for Pond 2P: Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 1.993 530.50 0.00 0.00 0.00 1.50 0.00 1.993 530.50 0.00 0.00 0.00 3.00 0.00 1.993 530.50 0.00 0.00 0.00 4.50 0.14 1.997 530.51 0.00 0.00 0.00 6.00 0.56 2.038 530.58 0.03 0.03 0.00 7.50 1.05 2.130 530.73 0.08 0.08 0.00 9.00 2.11 2.299 531.00 0.12 0.12 0.00 10.50 4.25 2.635 531.52 0.17 0.17 0.00 12.00 143.97 5.981 535.71 16.41 16.41 0.00 13.50 6.10 5.732 535.45 9.36 9.36 0.00 15.00 3.81 5.202 534.88 8.41 8.41 0.00 16.50 2.75 4.630 534.22 7.16 7.16 0.00 18.00 2.29 4.141 533.60 5.76 5.76 0.00 19.50 1.82 3.769 533.12 4.33 4.33 0.00 21.00 1.58 3.524 532.79 2.96 2.96 0.00 22.50 1.49 3.410 532.63 2.07 2.07 0.00 24.00 1.39 3.360 532.56 1.67 1.67 0.00 25.50 0.00 3.224 532.37 0.79 0.79 0.00 27.00 0.00 3.150 532.27 0.46 0.46 0.00 28.50 0.00 3.104 532.20 0.30 0.30 0.00 30.00 0.00 3.070 532.15 0.25 0.25 0.00 31.50 0.00 3.041 532.11 0.22 0.22 0.00 33.00 0.00 3.015 532.07 0.21 0.21 0.00 34.50 0.00 2.989 532.04 0.20 0.20 0.00 36.00 0.00 2.964 532.00 0.20 0.20 0.00 37.50 0.00 2.940 531.97 0.20 0.20 0.00 39.00 0.00 2.915 531.93 0.20 0.20 0.00 40.50 0.00 2.891 531.90 0.19 0.19 0.00 42.00 0.00 2.867 531.86 0.19 0.19 0.00 43.50 0.00 2.843 531.83 0.19 0.19 0.00 45.00 0.00 2.820 531.79 0.19 0.19 0.00 46.50 0.00 2.797 531.76 0.18 0.18 0.00 48.00 0.00 2.774 531.73 0.18 0.18 0.00 E • Pond-2-Post Type II 24-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 39 Stage-Discharge for Pond 2P: Pond 2 • C7 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 525.00 0.00 0.00 0.00 525.15 0.00 0.00 0.00 525.30 0.00 0.00 0.00 525.45 0.00 0.00 0.00 525.60 0.00 0.00 0.00 525.75 0.00 0.00 0.00 525.90 0.00 0.00 0.00 526.05 0.00 0.00 0.00 526.20 0.00 0.00 0.00 526.35 0.00 0.00 0.00 526.50 0.00 0.00 0.00 526.65 0.00 0.00 0.00 526.80 0.00 0.00 0.00 526.95 0.00 0.00 0.00 527.10 0.00 0.00 0.00 527.25 0.00 0.00 0.00 527.40 0.00 0.00 0.00 527.55 0.00 0.00 0.00 527.70 0.00 0.00 0.00 527.85 0.00 0.00 0.00 528.00 0.00 0.00 0.00 528.15 0.00 0.00 0.00 528.30 0.00 0.00 0.00 528.45 0.00 0.00 0.00 528.60 0.00 0.00 0.00 528.75 0.00 0.00 0.00 528.90 0.00 0.00 0.00 529.05 0.00 0.00 0.00 529.20 0.00 0.00 0.00 529.35 0.00 0.00 0.00 529.50 0.00 0.00 0.00 529.65 0.00 0.00 0.00 529.80 0.00 0.00 0.00 529.95 0.00 0.00 0.00 530.10 0.00 0.00 0.00 530.25 0.00 0.00 0.00 530.40 0.00 0.00 0.00 530.55 0.02 0.02 0.00 530.70 0.07 0.07 0.00 530.85 0.10 0.10 0.00 531.00 0.12 0.12 0.00 531.15 0.13 0.13 0.00 531.30 0.15 0.15 0.00 531.45 0.16 0.16 0.00 531.60 0.17 0.17 0.00 531.75 0.18 0.18 0.00 531.90 0.19 0.19 0.00 532.05 0.20 0.20 0.00 532.20 0.29 0.29 0.00 532.35 0.69 0.69 0.00 532.50 1.35 1.35 0.00 532.65 2.17 2.17 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 532.80 3.04 3.04 0.00 532.95 3.71 3.71 0.00 533.10 4.28 4.28 0.00 533.25 4.77 4.77 0.00 533.40 5.22 5.22 0.00 533.55 5.63 5.63 0.00 533.70 6.01 6.01 0.00 533.85 6.37 6.37 0.00 534.00 6.70 6.70 0.00 534.15 7.03 7.03 0.00 534.30 7.33 7.33 0.00 534.45 7.63 7.63 0.00 534.60 7.91 7.91 0.00 534.75 8.19 8.19 0.00 534.90 8.45 8.45 0.00 535.05 8.71 8.71 0.00 535.20 8.96 8.96 0.00 535.35 9.20 9.20 0.00 535.50 9.44 9.44 0.00 535.65 13.47 13.47 0.00 535.80 20.64 20.64 0.00 535.95 29.86 29.86 0.00 536.10 41.74 40.73 1.02 536.25 57.05 53.02 4.03 536.40 74.79 66.59 8.20 536.55 94.53 81.32 13.22 536.70 108.33 89.56 18.76 536.85 114.99 90.19 24.80 537.00 122.37 90.81 31.56 • Pond _2_Post Type 1124-hr Eden 50 year Rainfall=7.17" Prepared by WSP SELLS Printed 9/10/2009 HydroCAD®9 00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 40 Stage-Area-Storage for Pond 2P: Pond 2 • • Elevation Surface Storage (feet) (acres) (acre-feet) 525.00 0.101 0.000 525.15 0.123 0.017 525.30 0.145 0.037 525.45 0.167 0.060 525.60 0.189 0.087 525.75 0.210 0.117 525.90 0.232 0.150 526.05 0.249 0.186 526.20 0.256 0.224 526.35 0.263 0.263 526.50 0.271 0.303 526.65 0.278 0.344 526.80 0.285 0.387 526.95 0.292 0.430 527.10 0.307 0.475 527.25 0.325 0.522 527.40 0.343 0.572 527.55 0.362 0.625 527.70 0.380 0.681 527.85 0.399 0.739 528.00 0.417 0.800 528.15 0.424 0.863 528.30 0.430 0.927 528.45 0.437 0.992 528.60 0.444 1.058 528.75 0.450 1.125 528.90 0.457 1.194 529.05 0.464 1.263 529.20 0.470 1.333 529.35 0.477 1.404 529.50 0.484 1.476 529.65 0.491 1.549 529.80 0.498 1.623 529.95 0.505 1.698 530.10 0.520 1.775 530.25 0.539 1.854 530.40 0.559 1.937 530.55 0.579 2.022 530.70 0.599 2.110 530.85 0.620 2.202 531.00 0.640 2.296 531.15 0.648 2.393 531.30 0.656 2.491 531.45 0.664 2.590 531.60 0.672 2.690 531.75 0.680 2.791 531.90 0.688 2.894 532.05 0.695 2.998 532.20 0.703 3.102 532.35 0.711 3.208 532.50 0.718 3.316 532.65 0.726 3.424 Elevation Surface Storage (feet) (acres) (acre-feet) 532.80 0.733 3.533 532.95 0.741 3.644 533.10 0.749 3.756 533.25 0.759 3.869 533.40 0.768 3.983 533.55 0.777 4.099 533.70 0.786 4.216 533.85 0.795 4.335 534.00 0.804 4.455 534.15 0.821 4.576 534.30 0.837 4.701 534.45 0.854 4.828 534.60 0.870 4.957 534.75 0.887 5.089 534.90 0.903 5.223 535.05 0.917 5.359 535.20 0.925 5.498 535.35 0.933 5.637 535.50 0.942 5.778 535.65 0.950 5.920 535.80 0.958 6.063 535.95 0.967 6.207 536.10 0.975 6.353 536.25 0.984 6.500 536.40 0.992 6.648 536.55 1.001 6.797 536.70 1.009 6.948 536.85 1.018 7.100 537.00 1.026 7.253 Pond-2-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 H ydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 41 Time span=0.00-48.00 hrs, dt=0.03 hrs, 1601 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA2: Post Runoff Area=18.150 ac 50.47% Impervious Runoff Depth=6.54" Tc=5.0 min CN=86 Runoff=200.66 cfs 9.884 of Pond 2P: Pond 2 Peak Elev=536.54' Storage=6.782 of Inflow=200.66 cfs 9.884 of Primary=79.70 cfs 8.947 of Secondary=12.68 cfs 0.152 of Outflow=92.39 cfs 9.100 of Total Runoff Area =18.150 ac Runoff Volume = 9.884 of Average Runoff Depth = 6.54" 49.53% Pervious = 8.990 ac 50.47% Impervious = 9.160 ac • 0 Pond _2_Post Type // 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Pape 42 Summary for Subcatchment DA2: Post Runoff = 200.66 cfs @ 11.96 hrs, Volume= 9.884 af, Depth= 6.54" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Type II 24-hr Eden 100 year Rainfall=8.21" Area (ac) CN Description 5.850 98 Paved parking, HSG C 0.050 98 Unconnected pavement, HSG C 3.260 98 Roofs, HSG C 8.990 74 >75% Grass cover, Good, HSG C 18.150 86 Weighted Average 8.990 49.53% Pervious Area 9.160 50.47% Impervious Area 0.050 0.55% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Post • Hydrograph - 220 - - - - - _ ®Runoff 210 200.66 cfs .. -. ...J -. ; i. ?..- _ 200 - -- -- - - - - - Type 1l 24'hr-Eder' 1-0 190 - 'I- - - - *--;-_.,.-_.------------ -trRainfall=8.21,. 180-, 170 -- -ff --- 18 .150----- 160 - - - - R uno area=..15.ac 150 - Runoff Volume=9:884-af 140 --r-... -- -- -- i- - - - - - - - - - - - -- -- --- -- -- --?--r--------`--- --r--?-- y 130 -Runoff Depth=&54" 120 o - - - - - - - -- --- 3 110 --- - - ---' ----- --' ------ TC- al Q in - LL - - 100 CN=86 70 60 - 50 -- -- - - - - - - - - ----------------------------- 40 30 20 -- -:-- -- -------- ;- - ------- -} -- ------ ;- -- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • • Pond-2-Post Type// 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 43 Hydrograph for Subcatchment DA2: Post • • Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.60 0.05 0.00 0.00 1.20 0.10 0.00 0.00 1.80 0.16 0.00 0.00 2.40 0.22 0.00 0.00 3.00 0.28 0.00 0.00 3.60 0.35 0.00 0.04 4.20 0.42 0.00 0.20 4.80 0.49 0.02 0.39 5.40 0.57 0.03 0.59 6.00 0.66 0.06 0.81 6.60 0.75 0.09 1.04 7.20 0.85 0.13 1.27 7.80 0.95 0.17 1.52 8.40 1.06 0.23 1.97 9.00 1.21 0.31 2.69 9.60 1.37 0.41 3.03 10.20 1.56 0.53 4.32 10.80 1.82 0.71 6.60 11.40 2.23 1.03 12.06 12.00 5.44 3.88 167.86 12.60 6.10 4.51 12.44 13.20 6.43 4.82 8.26 13.80 6.67 5.05 6.12 14.40 6.85 5.22 5.01 15.00 7.01 5.37 4.41 15.60 7.14 5.50 3.81 16.20 7.26 5.62 3.29 16.80 7.37 5.72 3.07 17.40 7.47 5.82 2.86 18.00 7.56 5.91 2.64 18.60 7.65 5.99 2.42 19.20 7.72 6.06 2.21 19.80 7.79 6.13 1.99 20.40 7.86 6.19 1.87 21.00 7.92 6.25 1.83 21.60 7.98 6.31 1.78 22.20 8.04 6.37 1.74 22.80 8.10 6.43 1.70 23.40 8.16 6.48 1.65 24.00 8.21 6.54 1.61 24.60 8.21 6.54 0.00 25.20 8.21 6.54 0.00 25.80 8.21 6.54 0.00 26.40 8.21 6.54 0.00 27.00 8.21 6.54 0.00 27.60 8.21 6.54 0.00 28.20 8.21 6.54 0.00 28.80 8.21 6.54 0.00 29.40 8.21 6.54 0.00 30.00 8.21 6.54 0.00 30.60 8.21 6.54 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 31.20 8.21 6.54 0.00 31.80 8.21 6.54 0.00 32.40 8.21 6.54 0.00 33.00 8.21 6.54 0.00 33.60 8.21 6.54 0.00 34.20 8.21 6.54 0.00 34.80 8.21 6.54 0.00 35.40 8.21 6.54 0.00 36.00 8.21 6.54 0.00 36.60 8.21 6.54 0.00 37.20 8.21 6.54 0.00 37.80 8.21 6.54 0.00 38.40 8.21 6.54 0.00 39.00 8.21 6.54 0.00 39.60 8.21 6.54 0.00 40.20 8.21 6.54 0.00 40.80 8.21 6.54 0.00 41.40 8.21 6.54 0.00 42.00 8.21 6.54 0.00 42.60 8.21 6.54 0.00 43.20 8.21 6.54 0.00 43.80 8.21 6.54 0.00 44.40 8.21 6.54 0.00 45.00 8.21 6.54 0.00 45.60 8.21 6.54 0.00 46.20 8.21 6.54 0.00 46.80 8.21 6.54 0.00 47.40 8.21 6.54 0.00 48.00 8.21 6.54 0.00 Pond _2_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCAM 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 44 Summary for Pond 2P: Pond 2 Inflow Area = 18.150 ac, 50.47% Impervious, Inflow Depth = 6.54" for Eden 100 year event Inflow = 200.66 cfs @ 11.96 hrs, Volume= 9.884 of Outflow = 92.39 cfs @ 12.05 hrs, Volume= 9.100 af, Atten= 54%, Lag= 5.6 min Primary = 79.70 cfs @ 12.05 hrs, Volume= 8.947 of Secondary = 12.68 cfs @ 12.05 hrs, Volume= 0.152 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.03 hrs Starting Elev= 530.50' Surf.Area= 0.572 ac Storage= 1.993 of Peak Elev= 536.54'@ 12.05 hrs Surf.Area= 1.000 ac Storage= 6.782 of (4.789 of above start) Plug-Flow detention time= 368.6 min calculated for 7.106 of (72% of inflow) Center-of-Mass det. time= 200.6 min ( 983.3 - 782.7 ) Volume Invert Avail.Storage Storage Description #1 525.00' 7.253 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) ( acres) (acre-feet) (acre-feet) 525.00 0.101 0.000 0.000 526.00 0.247 0.174 0.174 . 527.00 528.00 0.294 0.417 0.271 0.445 0.356 0.800 529.00 0.461 0.439 1.239 530.00 0.507 0.484 1.724 530.50 0.572 0.270 1.993 531.00 0.640 0.303 2.296 532.00 0.693 0.666 2.963 533.00 0.743 0.718 3.681 534.00 0.804 0.774 4.455 535.00 0.914 0.859 5.314 536.00 0.969 0.942 6.255 537.00 1.026 0.998 7.253 Device Routing Invert Outlet Devices #1 Primary 524.80' 36.0" Round Culvert L= 104.0' CMP, square edge headwall, Ke= 0.500 Outlet Invert= 523.00' S= 0.01737' Cc= 0.900 n= 0.025 Corrugated metal #2 Device 1 530.50' 2.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 532.10' 10.0" Vert. Orifice/Grate X 2.00 C=0.600 #4 Device 1 535.50' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #5 Seconda ry 536.00' 12.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 C, Pond _2_Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydrOCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 45 Primary OutFlow Max=78.92 cfs @ 12.05 hrs HW=536.53' (Free Discharge) L1=Culvert (Passes 78.92 cfs of 88.83 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.40 cfs @ 11.82 fps) 3=Orifice/Grate (Orifice Controls 10.52 cfs @ 9.64 fps) 4=Orifice/Grate (Weir Controls 67.99 cfs @ 3.31 fps) Secondary OutFlow Max=12.38 cfs @ 12.05 hrs HW=536.53' (Free Discharge) t-5=Broad-Crested Rectangular Weir (Weir Controls 12.38 cfs @ 1.96 fps) ® Inflow O Outflow ® Primary ¦ Secondary / 1J l 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Pond-2-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HvdroCAD®9 00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 46 Pond 2P: Pond 2 Stage-Discharge ? Total ¦ Primary ¦ Secondary • • 532 0 531 (D 530 U.1 0 10 20 30 40 50 60 70 Discharge (cfs) 80 90 100 110 120 Pond 2P: Pond 2 Stage-Area-Storage Surface/Horizontal/Wetted Area (acres) 0 1 - -- -- - 537 - - - - - - - - - - - - - - , 536 535 ' ? -----?,-- _ - --- - - - - - - - - - - -?- - - - - - - 534 , -- 533 - w 532 0 531 - - - - - - - - - - - - - - - - - - iSt?Ie411' d 530. - w 529 - --------- ----------- --------- -------- 528' --' -' --------------- ----- 5277 526 525 7 0 1 2 3 4 5 6 Storage (acre-feet) ? Surface ® Storage Pond-2-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 10 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 47 Hydrograph for Pond 2P: Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 1.993 530.50 0.00 0.00 0.00 1.50 0.00 1.993 530.50 0.00 0.00 0.00 3.00 0.00 1.993 530.50 0.00 0.00 0.00 4.50 0.29 2.005 530.52 0.01 0.01 0.00 6.00 0.81 2.069 530.63 0.06 0.06 0.00 7.50 1.40 2.196 530.84 0.10 0.10 0.00 9.00 2.69 2.417 531.19 0.14 0.14 0.00 10.50 5.23 2.837 531.82 0.19 0.19 0.00 12.00 167.86 6.604 536.36 69.45 62.53 6.93 13.50 7.07 5.782 535.50 9.53 9.53 0.00 15.00 4.41 5.322 535.01 8.64 8.64 0.00 16.50 3.18 4.777 534.39 7.51 7.51 0.00 18.00 2.64 4.285 533.79 6.22 6.22 0.00 19.50 2.10 3.892 533.28 4.86 4.86 0.00 21.00 1.83 3.610 532.90 3.53 3.53 0.00 22.50 1.72 3.463 532.70 2.48 2.48 0.00 24.00 1.61 3.398 532.61 1.97 1.97 0.00 25.50 0.00 3.241 532.40 0.88 0.88 0.00 27.00 0.00 3.160 532.28 0.49 0.49 0.00 28.50 0.00 3.110 532.21 0.32 0.32 0.00 30.00 0.00 3.075 532.16 0.26 0.26 0.00 31.50 0.00 3.045 532.12 0.22 0.22 0.00 33.00 0.00 3.019 532.08 0.21 0.21 0.00 34.50 0.00 2.994 532.04 0.20 0.20 0.00 36.00 0.00 2.968 532.01 0.20 0.20 0.00 37.50 0.00 2.944 531.97 0.20 0.20 0.00 39.00 0.00 2.919 531.94 0.20 0.20 0.00 40.50 0.00 2.895 531.90 0.19 0.19 0.00 42.00 0.00 2.871 531.87 0.19 0.19 0.00 43.50 0.00 2.847 531.83 0.19 0.19 0.00 45.00 0.00 2.824 531.80 0.19 0.19 0.00 46.50 0.00 2.801 531.76 0.18 0.18 0.00 48.00 0.00 2.778 531.73 0.18 0.18 0.00 0 Pond-2-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 HydroCADO 9.00 s/n 04719 © 2009 HydroCAD Software Solutions LLC Page 48 Stage-Discharge for Pond 2P: Pond 2 • 0 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 525.00 0.00 0.00 0.00 525.15 0.00 0.00 0.00 525.30 0.00 0.00 0.00 525.45 0.00 0.00 0.00 525.60 0.00 0.00 0.00 525.75 0.00 0.00 0.00 525.90 0.00 0.00 0.00 526.05 0.00 0.00 0.00 526.20 0.00 0.00 0.00 526.35 0.00 0.00 0.00 526.50 0.00 0.00 0.00 526.65 0.00 0.00 0.00 526.80 0.00 0.00 0.00 526.95 0.00 0.00 0.00 527.10 0.00 0.00 0.00 527.25 0.00 0.00 0.00 527.40 0.00 0.00 0.00 527.55 0.00 0.00 0.00 527.70 0.00 0.00 0.00 527.85 0.00 0.00 0.00 528.00 0.00 0.00 0.00 528.15 0.00 0.00 0.00 528.30 0.00 0.00 0.00 528.45 0.00 0.00 0.00 528.60 0.00 0.00 0.00 528.75 0.00 0.00 0.00 528.90 0.00 0.00 0.00 529.05 0.00 0.00 0.00 529.20 0.00 0.00 0.00 529.35 0.00 0.00 0.00 529.50 0.00 0.00 0.00 529.65 0.00 0.00 0.00 529.80 0.00 0.00 0.00 529.95 0.00 0.00 0.00 530.10 0.00 0.00 0.00 530.25 0.00 0.00 0.00 530.40 0.00 0.00 0.00 530.55 0.02 0.02 0.00 530.70 0.07 0.07 0.00 530.85 0.10 0.10 0.00 531.00 0.12 0.12 0.00 531.15 0.13 0.13 0.00 531.30 0.15 0.15 0.00 531.45 0.16 0.16 0.00 531.60 0.17 0.17 0.00 531.75 0.18 0.18 0.00 531.90 0.19 0.19 0.00 532.05 0.20 0.20 0.00 532.20 0.29 0.29 0.00 532.35 0.69 0.69 0.00 532.50 1.35 1.35 0.00 532.65 2.17 2.17 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 532.80 3.04 3.04 0.00 532.95 3.71 3.71 0.00 533.10 4.28 4.28 0.00 533.25 4.77 4.77 0.00 533.40 5.22 5.22 0.00 533.55 5.63 5.63 0.00 533.70 6.01 6.01 0.00 533.85 6.37 6.37 0.00 534.00 6.70 6.70 0.00 534.15 7.03 7.03 0.00 534.30 7.33 7.33 0.00 534.45 7.63 7.63 0.00 534.60 7.91 7.91 0.00 534.75 8.19 8.19 0.00 534.90 8.45 8.45 0.00 535.05 8.71 8.71 0.00 535.20 8.96 8.96 0.00 535.35 9.20 9.20 0.00 535.50 9.44 9.44 0.00 535.65 13.47 13.47 0.00 535.80 20.64 20.64 0.00 535.95 29.86 29.86 0.00 536.10 41.74 40.73 1.02 536.25 57.05 53.02 4.03 536.40 74.79 66.59 8.20 536.55 94.53 81.32 13.22 536.70 108.33 89.56 18.76 536.85 114.99 90.19 24.80 537.00 122.37 90.81 31.56 Pond-2-Post Type 11 24-hr Eden 100 year Rainfall=8.21 " Prepared by WSP SELLS Printed 9/10/2009 • HydroCADO 9.00 s/n 04719 0 2009 HydroCAD Software Solutions LLC Page 49 Stage-Area-Storage for Pond 2P: Pond 2 Elevation Surface Storage (feet) (acres) (acre-feet) 525.00 0.101 0.000 525.15 0.123 0.017 525.30 0.145 0.037 525.45 0.167 0.060 525.60 0.189 0.087 525.75 0.210 0.117 525.90 0.232 0.150 526.05 0.249 0.186 526.20 0.256 0.224 526.35 0.263 0.263 526.50 0.271 0.303 526.65 0.278 0.344 526.80 0.285 0.387 526.95 0.292 0.430 527.10 0.307 0.475 527.25 0.325 0.522 527.40 0.343 0.572 527.55 0.362 0.625 527.70 0.380 0.681 527.85 0.399 0.739 528.00 0.417 0.800 528.15 0.424 0.863 528.30 0.430 0.927 528.45 0.437 0.992 528.60 0.444 1.058 528.75 0.450 1.125 528.90 0.457 1.194 529.05 0.464 1.263 529.20 0.470 1.333 529.35 0.477 1.404 529.50 0.484 1.476 529.65 0.491 1.549 529.80 0.498 1.623 529.95 0.505 1.698 530.10 0.520 1.775 530.25 0.539 1.854 530.40 0.559 1.937 530.55 0.579 2.022 530.70 0.599 2.110 530.85 0.620 2.202 531.00 0.640 2.296 531.15 0.648 2.393 531.30 0.656 2.491 531.45 0.664 2.590 531.60 0.672 2.690 531.75 0.680 2.791 531.90 0.688 2.894 532.05 0.695 2.998 532.20 0.703 3.102 532.35 0.711 3.208 532.50 0.718 3.316 532.65 0.726 3.424 Elevation Surface Storage (feet) (acres) (acre-feet) 532.80 0.733 3.533 532.95 0.741 3.644 533.10 0.749 3.756 533.25 0.759 3.869 533.40 0.768 3.983 533.55 0.777 4.099 533.70 0.786 4.216 533.85 0.795 4.335 534.00 0.804 4.455 534.15 0.821 4.576 534.30 0.837 4.701 534.45 0.854 4.828 534.60 0.870 4.957 534.75 0.887 5.089 534.90 0.903 5.223 535.05 0.917 5.359 535.20 0.925 5.498 535.35 0.933 5.637 535.50 0.942 5.778 535.65 0.950 5.920 535.80 0.958 6.063 535.95 0.967 6.207 536.10 0.975 6.353 536.25 0.984 6.500 536.40 0.992 6.648 536.55 1.001 6.797 536.70 1.009 6.948 536.85 1.018 7.100 537.00 1.026 7.253 woo'spasdsm,mmm 0010799110L • Li 18Z ON '811!nsaiooW . 901 apS anu0 II!4iaAO 8Zl einjon.ijsei?ul it uo!je»odsueil S-1 -13S•dSM! Z0Z9Z ON 7 a lS 4 -4 0S 9Z9 a Oll 'SVNIl02HV0 ,k!DHDN3 3>in(i VNIIOHVO HIHON IN343 - a N W NV Id 10bUNOO 1N31NId3S V NOISO?13 w 3?OAO a3N18W0O ?13AI?I Nda Woo O?w ?u~ioa T. 031RIHOtld AK53tld%3 SI'Bll3S dSM rvOMi O O V f W W O 00 yl N O vU O Z O I ? I \ u - <<?? ' rt V<'<, M ti o? ? P it t _ F= U) ILI t?, ? ?? a?? ji ? ,.I .y F xr" 7, \ e 'y Y /` '? U) , C4 . : .: N C4 0 0 0 wOa-spasdsm'mmm 0OWZ991,0L • LIt8Z ON'9pinsaJooy4. 90L el!nS anup piyi9n0 8Z[ einlanilseijul T uoileljodsuejl S??3S•dS M¦ 0 0 a w O .0 O w ? vU o Z o Z0Z8Z ON'-UOP-40 hails 4=43 'S 9Z9 071 'SVNI-1MJV0 ,kS2]3N3 3>1f1Q VNI108VO HiHON 'N303 Nbld 102UNOO 1N3W1a3S'R NOISO?13 310/kO a3NOVV00 ?13A N NVG \ \ p? SF w b ?w < a Ww0 a 'w o o aioa VJ 0 13- I \ I ? r? ?---__ \ 1\ 3 \\ \ ?a .t 3 10? 0 v 'a< \ • ME August 28, 2009 North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 ATTN: Information Management Reference: NON-RESIDENTIAL WELL CONSTRUCTION RECORDS - SUBMITTAL #1 Duke Energy Dan River Generating Facility 900 S. Edgewood Road Eden, North Carolina S&ME Project No. 1261-08-515 (Phase 300) Ladies and Gentlemen: • On behalf of Duke Energy, S&ME, Inc. (S&ME) is submitting the enclosed completed and signed Non-Residential Well Construction Records for the following two (2) groundwater monitoring wells installed at the Dan River Generating Facility (DRGF) site in Eden, North Carolina. The following table contains the ID and coordinates for the installed wells. Table 1: Well Coardinntna Well [D Northing Easting PZ-1 998282.26 9788678.90 PZ-2 997544.23 9787592.72 Note: Northing and fasting coordinates and ground surface elevations were provided by Chas. H. Sells. Inc. based on the North Carolina State Plane Coordinate System (NAD 83/2001). Dube Energy is voluntarily installing groundwater monitoring wells and/or piezometers at DRGF as part of a geotechnical evaluation for the proposed Combined Cycle project. r? U S&ME, INC. 1301 Zima Park Drive / Spartanburg, SC 29301 /p 864,574.2360 f 864.576,8730 One Marcus Drive, Suite 301 / Greenville, SC 2961.5 I P 864-232-8987/ www.smeinc.com • • • Non-Residential Well Construction Records - Submittal #1 S&ME Project No. 1261-08-515 Duke Energy Buck 6eneratina Facilifiv August 28 20D9 On behalf of Duke Energy, S&ME thanks you for your receipt of these records. Should you have any questions or treed additional information, please contact us. Sincerely, S&ME, Inc. V Michael Revis, PE Senior Engineer cc: Mr. Bobby Pratt, Duke Energy Mr. George Tolbert, Duke Energy Mr. Tim Russell, The Shaw Group S;IGEOTECf!{2ppHlb10S31 S (Gorr River CTCC/ISlornr i{'aler PondriM 1Ye1! FomrrlncAerrr nrll recrords ruGrulua! (lhri Rivrr Nl).doc ct 2 . STAT£, `r ; '. ??(7? v 1 ? ,+? ((((?'?yy771p1pS NONRESIDENTIAL WELL CONSTRUCTION RECORD North Carolina Department of Flivironmew and Natural Resources- Division of Water Quality IV L L CONTRACTOR CERTIFICATION # 2626 1, WELL CONTRACTOR: Ted Miller Well Contractor (Individual} Name SWE Inc. Well Contractor Company Name 301 Zima Park Drive Street Address Spartanburg SC 29301 City or Town State Zip Code (864 ) 574-2360 Area code Phone number 2. WELL INFORMATION: WELL CONSTRUCTION PERMIT#'NlA OTHER ASSOCIATED PERMIT#(it applicable)NIA - SITE WELL ID #(it applicable) PZ-1 3. WELL USE (Check One Box) Monitoring V Municipal/Public C1 Industrial/Commercial r1 Agricultural n Recovery F Injection IrrigationLI Other I7 (list use) - DATE DRILLED 8/19/09 4. WELL LOCATION: S Edoewood Road. 900, 27288 _ _ (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code) • CITY: Eden COUNTY Rockingham TOPOGRAPHIC / LAND SETTING: (check appropriate box) Alope L7 Valley ? Flat FiRidge n Other LATITUDE 35 - °_' _" DMS OR 36.49062704 DO LONGITUDE 80 "DMS OR 793187$502 DD Latitude/longitude source: VGPS Oropographic map (location of well must be shown on a USGS logo map andatlached to this form if nor using GPS) 5, FACILITY (Name of the business where the well is located.) Dan River C?eneratina Fay Facility Name Facility ID# (if applicable) 900 dnewood Road Street Address Eden N 27288 City or Town State Zip Code -Duke. Enemy Contact Name 900 S dclewootl Road Mailing Address Eden Nf'?7i3 City or Town State Zip Code (33-6-b -U3--D2.Q.2.___.___- _ Area code Phone number 6. WELL DETAILS: a. TOTAL DEPTH: et b. DOES WELL REPLACE EXISTING WELL? YES 1-} NOG / • c. WATER LEVEL Below Top of Casing: Ja 2 FT, (Use "+" if Above Top of Casing) d. TOP OF CASING IS 2.5 FT Above Land Surface' 'Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C 0118, ' e. YIELD (gpm): N/A METHOD OF TEST N/A 'f. DISINFECTION: Type_ NIA Amount _N/A g. WATER ZONES (depth): Top_11.5 Bottom 21.5 Top _ Bottom ' TO P_...___,_. - Bottom__.,_.__. -- Top-- ._._ ._._,__. - Bottom_ __.._ ._...__ Top Bottorn Top Bottom Thickness/ 7. CASING: Depth Diameter Weight Material : Top +2.5 Bottom 11.5 Fl. 2 in. S 40 PVC Toll Bottom Ft. Top Bottom Ft. 8. GROUT: Depth Material Method Top 0 Bottom 0.5 Ft. Cement Hand Place ;Top 0.5 Bottom 8,5 Ft. Bentonite Pour 1-op Bottom Ft. 9. SCREEN: Depth Diameter Slat Size . Material Top 11.5 Bottom 21.5 Ft. 2 in, 0.01 in. S 40 PVC Top Bottom Ft. in, in. Top Bottom Ft. in, in. 10. SAND/GRAVEL PACK: Depth Size Material Top 8.5 _Botiorn_21.5 . Ft. #2-._-_ _Sand Top Bottom Fl. Top Bottom Fl. 11. DRILLING LOG Top Bottom Formation Description 0 / 9.5 Residual -Fine sandy SILT 9.5 ! 13.5 SWR - Silty fine to med. SAND 13.5 /21.5 _SWIR - Silty fine to med SAND 1 / 12. REMARKS: I DO HERESY CERTIFY TI 147 THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH • 15A NCAC 2C, WELL C014STRUCTION STANDARDS. AND THAT A COPY OF THIS RECORD HAS BEEN OVIDED TO THE W - OWNER, SIGNATURE OF CERTIFIED WELL CONTRACTOR DATE PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days: Attn: Information Mgt., Form 1/08 1617 Mail Service Center Raleigh, NC 27699-1617 Phone No. (919) 807µ630t} Rev. 11108 a 5TAiF?-' r,a r 4 1. WELL CONTRACTOR: Ted Miller NONRESIDENTIAL WELL CONS-1-RUCTION RECORD :Mortal Csirnlina Department or t:nvironmcnt and Natural Resources- Division of Water Quality WELL CONTRACTOR CI R'TIBICrt+TION # 2626 Well Contractor (Individual) Name S&ME. Inc. Well Contractor Company Narne ~?- 301 Zima Park Drive Street Address Spartanbura SC 29301 City or Town State Zip Cade &-Q4-) 574-2360 ._ Area code Phone number 2. WELL INFORMATION: WELL CONSTRUCTION PERMIT# N/A OTHER ASSOCIATED PERMIT#(if applicablo) N/A SITE WELL I D #(ir applicable) PZ-2 3. WELL USE (Check One Box) Monitoring L? Municipal/Public D Industrial/Commercial CI Agricultural p Recovery D Injection D Irrigation? Other D (list use) ___._. ____ DATE DRILLED 8/18/09 4. WELL LOCATION: S Edaewood Road. 900, 27288 (Street Name, Numbers, Community, Subdivision, Lot No., Parcel, Zip Code) • CITY: Eder! COUNTY Rockingham TOPOGRAPHIC ! LAND SETTING: (check appropriate box) [Slope DValley DFlat DRidge DOther LATITUDE 35 DMS OR 36.4.8857849 DD LONGITUDE 80 "DMS OR 79.72246113 DO Latitudeflongitude source: MPS Qropographic map (location of well must be shown on a USGS topo map andettached to this form if not using GPS) 5. FACILITY (Name of the business where the well is located.) D?11 _f3lv.?L.G?1?3111]f?._ F._ 1G?_ Facility Name Facility ID# (if applicable) 900 S. Fdo .wood Road Street Address Eden N ..?7 City or Town State Zip Code Duke EnP.rmz Contact Name ...900 S EdN?Qd Road Mailing Address Eel . n N City or Town State Zip Code (- _flL0202 Area code Phone number 6. WELL DETAILS: a. TOTAL DEPTH:_ 33 Feel b. DOES WELL REPLACE EXISTING WELL? YES D NO IV • c. WATER LEVEL Below Top of Casing: _ `( 7.8 FT. (Use "+" if Above Top of Casing) d. TOP OF CASING IS 2.5 1--T. Above Land Surface` 'Top of casing terminated at/or below land surface may require a variance in accordance with 15A NCAC 2C .0118. e. YIELD (gpm): N/_ METHOD OF TEST N/A f. DISINFECTION: Type NIA Amount N/A g. WATER ZONES (depth): Top. 15___- Bottom 33 Top Bottom Top Bottom Top„_,_ - Bottom Top Bottom Top Botlom Thickness/ 7. CASING: Depth Diameter Weight Material Top--!L2 5 . Bottom 23 Ft. 2 in. S 40 PVC Top Bottom Ft. Top Bottom Ft. 8. GROUT: Depth Material Method Top 0 Bottom 0.5 Ft. Cement Hand Place Top 0.5 __ Bottom 18.7 Ft. Bentonite Pour Top Bottom Ft. 9. SCREEN: Depth Diameter Slot Size Material Top 23 Bottom 33 Ft. 2 in. 0.01 in. S 40 PVC Top Bottom FL_ in. in. Top Bottom Ft. in. in. : 10. SAND/GRAVEL PACK: Depth Size Material Top 18.7 Bottom 31 _ Ft._#2.....___....__.. Sand Top Bottom Ft. Top Bottom Ft, 11. DRILLING LOG Top Bottom 0 /6 6 / 8.5 8.5 r 14 1_/ 23.5 23.5 / 28.5 28.5 / 33.5 3.5534.3 Formation Description Fill - Fine Sandy Clavev SILT Fill - Fine Sandy Clayey Silt Residual - Clayey fine Sandy SIL' ?WR - Fine Sandy Silt Residual - Fine Sandy Silt Residual - Fine Sandy Silt w/ Roc SWR - Fine Sandy Silt 12. REMARKS: 1 DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH ' I $A.NC,AC 2C. WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS RECORD HAS BEEN P OVIDED TO THE WELL WNER SIGNATURE OF CERTIFIED WELL C RACTOR DATE Ted Miller PRINTED NAME OF PERSON CONSTRUCTING THE WELL Submit the original to the Division of Water Quality within 30 days. Attn: information Mgt., Form CW-1b 1617 Mail Service Center- Raleigh, NC 27699-1617 Phone No. (919) 807-6300 Rev. 11/08