HomeMy WebLinkAbout20091061 Ver 1_401 Application_20091009- 0 9- 1 U U 1
??F W ATFRO
O G
LM
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PC Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: ? Section 404 Permit ? Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ? No For the record only for Corps Permit:
? Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ANo
P
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No
2. Project Information
2a. Name of project: $ e, ? T C'r-- ?-D ?)2?
2b. County: cI
2c. Nearest municipality / town: Ci?
2d. Subdivision name: w ?vi
2e. NCDOT only, T.I.P. or state
project no: ?r C
I
l?
A?
-
3. Owner Information
3a. Name(s) on Recorded Deed: at'-J C• S'cak__" 009
3b. Deed Book and Page No. DEMR - ynTER'QUAL[Ty
3c. Responsible Party (for LLC if
applicable): 4hRBRAN(
3d. Street address: (?? fo rva CC?1.r ?T
3e. City, state, zip: Cp¢y2 Aj C a s i 9
3f. Telephone no.: f (o - d Z
1/
3g. Fax no.: 11
- 0 Z S _
3h. Email address:
.
_ C14 Z - S 3 ctv
00
Page I of 10
PCN Form -Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): ?Q 2- 0?
1b. Site coordinates (in decimal degrees): Latitude: Longitude: -
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: acres ®? s
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project:
2b. Water Quality Classification of nearest receiving water:
2c. River basin:
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application: -To -,,, of Cf)e" KH-s t+ lr" S?rw= 5 e ' p pc P,a? °(v?4)?7s vv,? o YG?s
DYvktv-cn„. 7'L ,;, I kPAvt VW,yr5 STc7vrn5? fl-t. VDL+1w?? a'IC "?`F7e? ?(ovdS o?c?
1 L l r
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3 v ce ,l e,+, 41-5 -f
3d. Explain the purpose of the proposed project: liVCve_N?e _5 ,, Se? 19-4 9 `'aknd n-? f _AD
_,r.'-vSi &T rtvl-t
3e. Describe the overall project in detail, including the type of equipment to be used:
4. Jurisdictional Determi atlons h??deYS l24c?L
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
? Yes ? No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes No
6b. If yes, explain.
_W,
1
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
? Yes ? Corps
W1 ? P ? T ? No ? DWQ
? Yes ? Corps
W2 ? P ? T ? No ? DWQ
? Yes ? Corps
W3 ? PEI T ? No ? DWQ
? Yes ? Corps
W4 ? P ? T ? No ? DWQ
? Yes ? Corps
W5 ? P ? T ? No ? DWQ
? Yes ? Corps
W6 ? P ? T ? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
? PER ? Corps
S1 ? P ? T ? INT ? DWQ
S2 ? P ? T ? PER
? INT ? Corps
? DWQ
? PER ? Corps
S3 ? P ? T ? INT ? DWQ
? PER ? Corps
S4 ? P ? T ? INT ? DWQ
S5 ? P ? T ? PER
? INT ? Corps
? DWQ
S6 ? P ? T ? PER
? INT ? Corps
? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a_ 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number- (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No if yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer
: Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact re uired. 9
61P ? T
i/}
u ??? ny?rJ El Yes
? No
?Yes
B2 ?P?T ? No
? Yes
B3 ? P ? T ? No
6h. Total buffer impacts
6i. Comments: &- vvr . _
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
FLOOD CERTIFICATION
A O IHE PROPERTY IS NOT LOCATED IN A COMMUNITY PARTICIPATING
IN THE NATIONAL FLOOD INSURANCE PROGRAM AS OF THIS DATE.
P. (X) THE PROPERTY IS NOT LOCATED IN THE 100 YEAR FLOOD
HAZARD AREA.
C O A PORTION OF THIS PROPERTY IS LOCATED WITHIN A 100 YEAR
FLOOD FRINGE AREA AS SHOWN BELOW.
n?
iu
Obi
2a
ub
j
2 1?.
VICINITY MAP
TO SCALE
CURVE TABLE
CURVE DELTA RADIUS ARC CHORD TANGENT CHORD BRG
1 73'21 '09" 50.00' 64.01 ' 59.73' 37.24' N 49'19'20'W
2 44'45'07" 25.00' 19.53' 19.03' 10.29' S 63'37'21 "E
LOT 206 /
h
1
/ 1y
(5
/ GJ
C /
?
PF
IPs
p?.
1 fu
LOT 208 I O I
Imo {
I Rl 320 i
I Iz? I
I -+ " I
s azz1E Ts>.as' I ?o I
LOT 205
0.574 ACRES
20% pRAINA
A
- 5 77'21,1 5"W
BENTBROOK - _ - - ' -
COURT P` °
(50* R ) N. C. GRID COO RL) M "'
N-743.774 .505
£=2, 041, 514. 714
1.0T 204
AWO
Q Al
om?
t q
((
j^ a v
'm
N C C, S. "SEA"
° n NAG 83
L z
A NC . GRID COORDINATES
N=727,634.736
r £2,047.769.193
LOT 205 RIGGSBEE FARAD
PHASE 2 - MAP 2
103 BENTBROOK COURT
MORRISVILLE, WAKE COUNTY, N.C.
REFERENCE.• BOOK OF MAPS 1996 _ PAGE _1 J4 -
1, -MARK E. WOOD- , CERTIFY
THAT THIS MAP 1S TH£ RESULT OF
A FIELD SURVEY MADE UNDER MY
SUPERVISION, THAT THE ERROR OF
CLOSURE IS 1:10,000+ THAT THE
BOUNDARIES NOT SURVEYED ARE
SHOWN AS BROKEN LINES, THAT THIS
MAP WAS PREPARED IN ACCORDANCE
WITH GS 47-30 AS AMENDED
WITNESS MY HAND AND SEAL THIS
5 TH DAY OF_ DECEMBER
AD_ 8796. LAND sumvEYOR 73 -
LOT 207
/ MANHOLE
/
/
NCRErE
N£1 Y 1° °w. o"K
1 STORY BRICK
AND WOW FR
.
AME 61
RESIDENCE 1
o.
E M1?
D ? 1 o
DR
NOTE.'
RAW ER
DISTRIBI
THIS MA
NOTED
LOT 209
I
1d?0 IPF
15,
- -
ASEMENT!
E F-
211.81 - _
- I h
h
Q
/ ,
Q a
6) V
o=
Q
C?
LEGEND
(IPF) IRON PIPE FOUND
(IPS) IRON PIPE SET
(R/W) RIGHT OF WAY
(CL) CENTERLINE OF RIGHT OF WAY
ALL EASEMENTS SHOWN
TAKEN FROM PLAT RECORDED IN
BOOK OF MAPS 1996, PG. 134.
OR OF CLOSURE WAS 10,000+ MISCLOSURE WAS
EO BY THE COMPASS ME7140D. THE DISTANCES ON
ARE ADJUSTED HORIZONTAL GROUND UNLESS
THERWISE, ALL AREAS CALCULATED BY COORDINATE
PROPERTY OF
A LUPERINI
40' 20' 0 40' BO'
GRAPHIC SCALE
%%"itsl#ufn,,,.
????G\S7Eq?9
SEAL
r L- 3773
h ua,?,??. oa
KENNETH CLOSE INC.
LAND SURVEYING
7406-L CHAPEL HILL ROAD
RALEIGH, N.C. 27607
PHONE (919) 851-2344
FAX (919) 233-1923
DATE: 12-4-96 1 SCALE: 1'"= 40'
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
eAr t' r12 ?e?we v 4-l" St Gv 1 w- a vr,ds
1 b. Specifically describe measures taken to avoid or mini Mize the proposed impacts through construction techniques.
???f Ny fecd ?!? ee cr 0ovid. - S v clY',?.Q 1/,car,
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ? No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete If Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ? No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet)
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ? No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? %
2b. Does this project require a Stormwater Management Plan? ? Yes ? No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b . Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a . Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b . Has the approved Stormwater Management Plan with proof of approval been
? Yes ? No
attached?
5. DWQ 401 Unit Stormwater Review
5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes VNo
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes CNo
or Riparian Buffer Rules (15A NCAC 2B.0200)? '
2b. Is this an after-the-fact permit application? ? Yes XNo
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in F1 Yes XNo
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat? ? Yes XNo
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts? ? Yes ? No
5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? T [[::]] Yes ? No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
? Yes ? No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? F1 Yes ? No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Applicant/Agent's Printed Name Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant
is rovided. Date
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version