Loading...
HomeMy WebLinkAbout860028_Inspection_20190912Type of Visit: PCompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: (Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Ic {/ l�/`jlq I Arrival Time: F Departure Time: County: (j Urg Farm Name: ` ���7 I ��r (� CJ Owner Email: Owner Name: G,�• ��1�}^2� Phone: Mailing Address: Physical Address: Facility Contact: owy3k, Title: Onsite Representative: 1 Certified Operator: Phone: Integrator: Certification Number: Region: V � Back-up Operator: v Vm V v /t A Q Certification Number: Location of Farm: Latitude: �{� �'�' �'� Longitude: kx lib° 46` 56" 117her Tv n Da,�S --� i2 �gltf? t law #IIPR Wean to Finish Layer Dairy Cow Wean to Feeder Non -La er Dairy Calf Feeder to Finish DairyHeifer FarrowtoWean Ij{i Dry Cow Farrow to Feeder �f;lt i'sE� Non -Dairy Farrow to Finish Layers Beef Stockeri Gilts j}i Non -La ers Beef Feeder Boars ;' , Pullets Beef Brood Cow' x i Turkeys I�I I} ° Turkey Poults ty'I"f Other y Other it Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes % No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [—]Yes qjNo ❑ NA ❑ NE ❑ Yes rt / " No ❑ NA ❑ NE Page 1 of 3 21412015 Continued Facili Number: Date of Inspection: J Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Ta r Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes M No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes K No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 10 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application w�,� 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes l X� No ❑ NA ❑ NE maintenance or improvement? 7' 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): i I $4LA, Yl 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? - w. ❑ Yes �l No ❑ NA ❑ NE Waste Application Weekly Freeboard A Waste Analysis -Soil Analysis Dwe� Weather Code Rainfall Stocking Crop Yield L,120 Minute Inspections W Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑q NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: j 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 'jW'No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below. 77 ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? 501*15 ofve %dgo- D&,Q,51�AIIC4• oWt ❑ Yes X I No ❑ Yes No ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ Yes 9Q No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 4 No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes [A No ❑ NA ❑ NE bre-f, -rt dut 44;5 �zaC <1) 31Dtic -fie- 3-I ! liVdT SVfde�c�ve {a� (a131'dOIG] all t0 e) A'y Reviewer/Inspector Name: Reviewer/Inspector Page 3 of 3 ki t(il lA6 UaYAW caAI 09'66-35q_,? ` q Phone: / —/1� ` 1 W Date: 2141201