HomeMy WebLinkAbout20151229 Ver 1_USACE Jurisdictional Determination_20150619U.S. ARMY CORPS OF ENGINEERS
N.0 D a IVED. .
WILMINGTON DISTRICT JUN Z 4 ""^5
Action Id. SAW -2015-00920 County: Guilford U.S.G.S. Quad: NC -GUILFORD WNSTON•Sh,
REGIONAL OFFICE
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Applicant: Piedmont Triad Airport Authority Agent: Michael Baker International.
attn: Kevin Baker attn: Richard Darling
Address: 1000-A Ted Johnson Parkway Address: 8000 Regency Parkway, Suite 600
Greensboro, NC, 27409 Cary, NC 27518
Size (acres) —113 Nearest Town Greensboro
Nearest Waterway UT to Horsepen Creek River Basin Haw. North Carolina.
USGS HUC 3030002 Coordinates 36.096813 N. -79.931709 W
Location description:: The property is located on the north side of Radar Road, approximately 0.4 mile east of its
intersection with Service Center Drive. at the Piedmont Triad International Airport. in Greensboro. Guilford Countv.
North Carolina.
Indicate Which of the Following A
A. Preliminary Determination
Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area.
We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA)
jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33
CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district
for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the
JD.
B. Approved Determination
There are Navigable Waters of the United States within the above described property subject to the permit requirements of
Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or
our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
X There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of
Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our
present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely
delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps.
X The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been
verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be
relied upon for a period not to exceed five years.
_ The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat
signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
_ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
Page 1 of 2
_ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA). You should contact the Division of Coastal Management to determine their requirements.
Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this
determination and/or the Corps regulatory program, please contact David Bailev at 919-554-4884 ext 30 or
David.E.Bailev2na,usace.a rmy.mil.
C. Basis For Determination:
The project area exhibits water bodies with ordinary high water and wetland criteria as defined in the applicable
regional supplement to the 1987 wetland delineation manual. The water bodies on the site include 4 Unnamed
Tributaries (UTs) to Horsepen Creek, all Relatively Permanent Waters (RPWs), which flow via Horsepen Creek (RPW)
and Reedy Fork (RPW) to the Haw River, a Traditionally Navigable Water— and abuttinE wetlands. This
determination is based on a field verification by Andrew Williams (USACE) on 8/16/2012.
D. Remarks:
The wetlands and other Waters of the US on the property were flagged by Michael Baker Engineering and are
approximated on the attached sheet titled "Jurisdictional Waters of the U.S. Including Wetlands for PTIA TIMCO Site,
Guilford County, NC."
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the
particular site identified in this request. The delineation/determination may not be valid for the wetland conservation
provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation
in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources
Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in
B. above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room IOM15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA form, it must be received at the above address by August 18, 2015.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.**BAILEY.DAVID.E.1379283 Digitally signed by BAILEY.DA%AD.E.1379283736
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI,
ou=USA,cn=BAILEY.DAVID.E.1379283736
Corps Regulatory Official: 736 Date: 2015.06.1916:11:49-04'00'
Date: June 19, 2015
Expiration Date: June 19, 2020
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to
do so, please complete our Customer Satisfaction Survey, located online at http://re ug latory.usacesurvey.com/.
Copy furnished:
Sue Homewood, NCDENR-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Piedmont Triad Airport Authority File Number: SAW-2015-00920 Date: June 19, 2015
Attached is: See Section below
❑ INITIAL PROFFERED PERMIT Standard Permit or Letter of ermission A
❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B
❑ PERMIT DENIAL C
® APPROVED JURISDICTIONAL DETERMINATION D
❑ PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION 11 - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Jason Steele, Administrative Appeal Review Officer
attn: David E. Bailey
CESAD-PDO
Raleigh Regulatory Field Office
U.S. Army Corps of Engineers, South Atlantic Division
3331 Heritage Trade Drive, Suite 105
60 Forsyth Street, Room 1OM15
Wake Forest, North Carolina 27587
Atlanta, Georgia 30303-8801
Phone: 404 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of anv site investigation, and will have the opportuni to varticivate in all site investiations.
Date:
Telephone number:
Signature of appellant oragent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: David Bailey, 69 Darlington Avenue, Wilmington,
North Carolina 28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
WETLANDAAA
HEADWATER FOREST
PF01A
ABUTTING RPW
Y• tt Ij(%/ I// / r ��
wldNroof
PIEDMONT Tf21AD,4lR POJ�
I A�r11
STREAM AAA (PERENNIAL) t,
RPW
(1109' LONG x 10' WIDE,
/A
WETLAND AAB
BOTTOMLAND HARDWOOD FOREST
PF01A
ABUTTING RPW
0.33 AC.
STREAM AAC(PERENNIAL)
RPW
(305' LONG x 5' WIDE, 0.04 AC.) -\
PIEDMONT TRIAD AIRPORT
Fire
f)agement
Pend
60'q
1
v� E
7�1f(j
This certifies that this copy of this plat
accurately depicts the boundary of the
jursidiction of Section 404 of the Clean Water
Act as determined by the undersigned on this
date. Unless there is a change in the law or our
published regulations, this determination of
Section 404 jurisdiction may be relied upon for
a period not to exceed five years from this date.
This determination was made utilizing the 1987
Corps of Engineers Wetlands Delineation
Manual.
Regulatory Official
Title
Date
USACE Action ID
WETLAND AAC
SEEP
P01B \
ABUTTING RPW
0.09 AC. ,
r'
_F.JFWQNT-TF AC*AfRMRT `
WABA 393 wFA6z6 As3o
G3 h��/v�T / 03W59 -J. 3z9)1 AgE) 3fi 11
WA
WM
wun.6 r s I I E 1 1 AAA 9 X X=al4 sls
r M 5 CW .397 WAAI,. I. A93J5
0X33 -J 9339X I.IM ..3I A.9
WPAI qgC _
MAA1 °73 ).9333)6 C3 97 7A
STREAM AAB(PERENNIAL) MAA9 7. -> 36 w^><e ssa9w9J n.enJ
6Xvs ms3z�< <9 30:03
RPW wA
11 W 36 WRAC -s -7.93°393
(187' LONG x 5' WIDE, 0.02 AC.) WJAA13 Xo�9 ra9393AI3 WAp<6 3669 -7.930= )
AA PJ196i-)9.n]3 C ]
MA X� 3X ]9.93)4p WRAC B Yb3
WPAA ..Z )9.93=79 WE AP0 36 61
MAA ]6 DAIAI IA 2757 DA. R
7 f Stormwater �)
Management Vt
Pond �U
F
- - - - - - - - -----PIEONfOi77 TRIAD AIRI
` oma. Jim - - - - - - -
_ _Rada Road
1 a ~ E
AAE
L FRESHWATER MARSH
RPW
I, Marshall Wight, certify that this project was completed under
my direct and responsible charge from an actual survey made under
my supervision; that this survey was performed to meet the requirements
for an LIG/GIS survey [21 NCAC 56.1608] to the accuracy of Class B;
method used to evaluate the accuracy was Statistical RMS;
method of measurement was real time kinematic differential GPS;
date(s) of survey July 25"-26", 2012;
and all coordinates are based on NAD83 (NA 2011);
Stream lines were derived from aerial photography and field verified.
Witness my original signature, regristration number and seal this
day of , A.D.,
Marshall Wight, PLS (L-5034)
A.
8
WM0.3
4 �
i
WETLAND sA
! mv�ca I ABUTTING RPW
�P]EDMONTTRIADAIRPORT
STREAM AB (PERENNIAL)
RPW
(1034' LONG x 10' WIDE, 0.24 AC.)
I,
3 W'R<P
WETLAND AAD
PF01B
ABUTTING RPW
0.09 AC.
t
PIEDMONT41LIRPORT
I -
JURISDICTIONAL WATERS OF THE
U.S. INCLUDING WETLANDS FOR
PTIA TIMCO SITE, GUILFORD COUNTY, NC
0 100 200 400 600 Michael Baker Engineering, Inc.
- 7800 Airport Center Drive
Suite 100
Feet Greensboro, North Carolina 27409
1„ _ZOO , Phone: 336.931.1500
Fax: 336.931.1501
M I)
:I A=
1.6 A.9 S59
W6,AAA
A-3
36
{
1
360")83 ]9.93}635
W 3
..1 -7.1.533
PU D
3fi.W 6W ]793318
.1
M.1 -7.9}65
PA1
113369
WAE
16
f
63
93193
WE3-A
35
Y� �'
WM
36.WN0 ]9.931]95
SIPM<
36. HW3
7m
ki;S E'
�3
wMe
..-
v
MAD
wAn° z
A5
3 7.4}sep
[
MAD
Z
36691 ] -N931855
WAA63
360Yk}
;fi
36 9919ID
WAA°9
IXatl'E9 7.9x6913
wM88
89
31}69
WADS
36 DID I. I
WA
9f 793
6
o1�YW��
wA
3603333 ra931]t
wAD7
36°.93 R]
.1
3603 J3 raAl1117
AD -8
..111-..1.3
A 1
9
.9
0775 7 .
w A 19
7 x9.9
O
P Al
11 ]793,40
MAD 11
wMR 6
96 -
o Ix
360938N -Afl397
WM8)
35
w 013
360930)6 )9.9ss83
MA&19
YII 793}03
WME2
360 } n91749
(�
39.0X565 M93 l7
WAAE3
36A9x5699
MA
78}3
.9
.71 7.
_
ss} 773'79
to
{..
M
.9..6
6
6 A
WPAB}4
35.
E
36073}}-A935A}
�
WM
"X3>a A911
7 f Stormwater �)
Management Vt
Pond �U
F
- - - - - - - - -----PIEONfOi77 TRIAD AIRI
` oma. Jim - - - - - - -
_ _Rada Road
1 a ~ E
AAE
L FRESHWATER MARSH
RPW
I, Marshall Wight, certify that this project was completed under
my direct and responsible charge from an actual survey made under
my supervision; that this survey was performed to meet the requirements
for an LIG/GIS survey [21 NCAC 56.1608] to the accuracy of Class B;
method used to evaluate the accuracy was Statistical RMS;
method of measurement was real time kinematic differential GPS;
date(s) of survey July 25"-26", 2012;
and all coordinates are based on NAD83 (NA 2011);
Stream lines were derived from aerial photography and field verified.
Witness my original signature, regristration number and seal this
day of , A.D.,
Marshall Wight, PLS (L-5034)
A.
8
WM0.3
4 �
i
WETLAND sA
! mv�ca I ABUTTING RPW
�P]EDMONTTRIADAIRPORT
STREAM AB (PERENNIAL)
RPW
(1034' LONG x 10' WIDE, 0.24 AC.)
I,
3 W'R<P
WETLAND AAD
PF01B
ABUTTING RPW
0.09 AC.
t
PIEDMONT41LIRPORT
I -
JURISDICTIONAL WATERS OF THE
U.S. INCLUDING WETLANDS FOR
PTIA TIMCO SITE, GUILFORD COUNTY, NC
0 100 200 400 600 Michael Baker Engineering, Inc.
- 7800 Airport Center Drive
Suite 100
Feet Greensboro, North Carolina 27409
1„ _ZOO , Phone: 336.931.1500
Fax: 336.931.1501