Loading...
HomeMy WebLinkAboutNCS000259_Inspection Report_20191003ROY COOPER Governor MICHAEL S. REGAN Secretuy S. DANIEL SMITH Director Nouryon Surface Chemistry LLC Attention: Christopher Fleming 485 Cedar Springs Road Salisbury, North Carolina 28147 NORTH CAROLINA Environmental Quality October 3, 2019 Subject: Compliance Evaluation Inspection Nouryon Surface Chemistry LLC Permit: NCS000259 Rowan County, North Carolina Dear Mr. Fleming: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on September 24, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Enclosure: Inspection Report Since Isaiah Reed, Q, CEPS I, MS4CECI Environmental Specialist Land Quality Section ox D_EQ�) North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.663.1699 Compliance Inspection Report Permit: NCS000259 SOC: County: Rowan Region: Mooresville Contact Person: Ralph Owen Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 08/01/09 Expiration: 07/31/14 Owner: Nouryon Surface Chemistry LLC Effective: Expiration: Facility: Nouryon Surface Chemistry LLC 485 Cedar Springs Rd Inspection Date: 09/18/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: Entry Time: 01:OOPM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Salisbury NC 28147 Phone: 704-633-1731 Phone: Exit Time: 04:OOPM Phone: 828-296-4614 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000259 Owner -Facility: Nouryon Surface Chemistry LLC Inspection Date: 09/18/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On September 18, 2019 this facility was inspected for compliance. I met with Christopher Flemming and Jerry McMurray on site. During the inspection, the following items were noted: 1) The potential for additional outfalls exists in the area north of the Pump/Storage area. The permittee is directed to evaluate the additional outfall locations and modify the Stormwater Pollution Prevention Plan and monitoring schedule accordingly. 2) At the Henkel warehouse (near outfall 3), liquid materials were observed outside of the containment area. The permittee is directed to relocate the liquid materials to a location where secondary containment is provided. 3) The secondary containment berm was cut in the area near building 123. The permittee is directed to evaluate the effectiveness and potential for modifications to the secondary containment area. 4) The permittee is directed to evaluate the effectiveness and need for repair at the hazardous chemical secondary containment structure. 5) The secondary containment at the flammables shed was observed to be damaged in various locations. The permittee is directed to repair all damages to the secondary containment and evaluate the structure for effectiveness. 6) The annual non-stormwater discharge evaluation had not been documented at the time of the inspection. the permittee is directed to begin annual non-stormwater discharges as required by the permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCS000259 Owner- Facility: Nouryon Surface Chemistry LLC Inspection Date: 09/18/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (I ISGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? M ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? - 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3