HomeMy WebLinkAboutNCC192033_Payment Verification_20191002Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 9/23/2019 9:35:21 AM (NCG01 NOI Submission)
Approve by McCoy, Suzanne 9/24/2019 12:59:55 PM (Review- Construction NOI 16164)
• The task was assigned to McCoy, Suzanne by round robin distribution 9/23/2019 9:35 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 25, 2019 5:00
PM 9/23/2019 9:35 AM
Submit by McCoy, Suzanne 10/2/2019 1:22:22 PM (Payment Verification for NCC192033)
* Malpass Engineering and Surveying
• McCoy, Suzanne assigned the task to McCoy, Suzanne 10/2/2019 1:21 PM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 5, 2019 5:00
PM 9/24/2019 1:00 PM
NORTH CAROLINA
Envtr"mmWiQvuAty
Project Tracking ID*
NCC-BRUNS-2019-Bridge of Life Community Church
NC Reference No.*
NCG01-2019-2033
Certificate of
NCC192033
Coverage (COC)
No. *
Important: If you change the choice below to Payment NOT RECEIVED, the application will be rejected, and a COC will
not be issued. This is the ONLY way to reject an eNOI at this step.
Payment Received* r Payment Received.
f Payment NOT RECEIVED.
Date Payment
10/2/2019
Received*
Method of Payment*
r electronic
r check
r NO PAYMENT RECEIVED
r Other
Check Number*
7755
NOI Tracking No.
16164
Tracking ID referenced upon suba ttal
This is an Express
r No
Review Project
r Yes