HomeMy WebLinkAbout20061376 Ver 1_More Info Received_20090916t), 4- 13 *7 to
(Loaa-t4, o L
MULKEY
EPdG?NEr P5 t. C0NSLtL.TANIS
September 10, 2009
Ms. Cyndi Karoly
NCDENR/Division of Water Quality EP 2009
Wetlands Unit DENR - WATER QUALITY
1650 Mail Service Center WETLA.vtJS AND STORNMATER BRANCH
Raleigh, NC 27699-1650
Re: Annual Inspection of the Reinforced Earthen Slope on the Novartis V&D Campus
in Holly Springs, Wake County, North Carolina
Dear Ms. Karoly:
Mulkey Engineers & Consultants, Inc. (Mulkey) has been retained by Novartis Vaccines and
Diagnostics (Novartis) to prepare an annual report summarizing the inspection and
maintenance events associated with the south reinforced earthen slope structure from May
2008 to May 2009. The annual inspection reports are required by the North Carolina
Division of Water Quality (NCDWQ) Section 401 Water Quality Certification (DWQ
Project # EXP 06-1376) issued for the Novartis project on September 29, 2006. This report
is meant to summarize observations, issues, and maintenance conducted on a weekly basis
since construction. Photos of the reinforced slope are attached to this letter report.
A. Project Description
The south reinforced earthen slope is located on the southern side of the Novartis campus
in Holly Springs, North Carolina (Figure 1 and Drawing C JSK-8). It was built to minimize
jurisdictional stream impacts on the subject property. According to Qore Property Services
(Qore), the slope was constructed utilizing approved fill material placed in 9-inch lifts, with
two rows of lifts comprising each row of metal baskets (Drawing 00-C-60-99-2). At the
completion of each row, the top was dressed with topsoil to ensure acceptable root growth
from the sowed grass seed. This reinforced earthen slope was completed and approved by
Qore on April 3, 2007 (attached).
Per Special Condition # 8 of the NCDWQ water quality certificate issued on September 29,
2006, inspection reports of the reinforced earthen slope are required on an annual basis.
These assessments are to be performed monthly for the first six (6) months and quarterly for
three (3) years thereafter. The reports are to include documentation of any structural
failings, significant mortality of cover vegetation, and the description of any repairs based on
periodic visual assessments.
Weekly visual assessments of the reinforced earthen slope were conducted by Jacobs
Engineering Qacobs) beginning the week of April 16, 2007 and have continued to the
present. This report represents the second inspection report submittal and even though only
quarterly site inspections are required, Jacobs inspections consisted of weekly visual
assessments from May 26, 2008 to May 29, 2009. Also included are photos of the reinforced
earthen slope.
MULKEY INC. 6750 TRYON ROAD CARY, NO 2751 1 PC 80X 33127 RALEIGH, NC 27636 PH: 919-851-1912 FAX: 919-851-1918 WWW.MULKEYINC.COM
September 10, 2009
Page 2
B. Inspections
Below is an outline of minor issues that were observed and noted during the inspection
events for the past year according to inspection documentation provided by Jacobs. No
issues were observed and no significant rain events occurred during the weeks that are not
referenced below.
• June 15, 2008 - no issues following 1 3/4 inches of rain
• July 6, 2008 - no issues following 1 '/4 inches of rain
• September 6, 2008 - no issues following 5 inches of rain (Storm Hanna)
• September 16, 2008 - no issues following 1 inch of rain
• September 25, 2008 - no issues following 1 1/2 inches of rain
• November 15 and November 16, 2008 - no issues following 1 '/4 inches of rain
• November 30, 2008 - no issues following 1 1/2 inches of rain
0 December 11, 2008 - no issues following 3 1/2 inches of rain; cleaned all silt fences
December 12, 2008
• January 20, 2009 - no issues following 4 inches of snow
0 February 28, 2009 - no issues following 2 inches of rain
• March 1 and March 2, 2009 - no issues following 2 '/2 inches of snow
• March 14 and March 15, 2009 - no issues following 1 '/4 inches of rain
• March 28 and March 29, 2009 - no issues following 1 '/2 inches of rain
• May 17 and May 18, 2009 - no issues following 1 '/2 inches of rain
C. Conclusions
The inspection data from May 2008 through May 2009 demonstrates that the south
reinforced earthen slope structure was tested numerous times during this monitoring period
yet there have been no major issues or failings. If you have any questions concerning this
inspection report regarding the south reinforced slope structure on the Novartis campus,
please do not hesitate to call me at (919) 858-1874.
Sincerely,
Emmett Perdue, El
Project Manager
cc: Lee Willmon, Novartis - Holly Springs
Amer Takieddine, Jacobs - Cincinnati
Bill Jay, Jacobs - Holly Springs
Attachments
• v \V`it
CD C LL
CD
CL i
14
' �.. \�,, =� / r -- A � � � . `�.C.- � .' ra- '• ! E "" � �=..tom " .-. _ � M
• l '
cl-
cz
..
� s,,,> • . • sr•-`� . ' • , ter\ - _ N N 1�
CD CL
070
rr
6-,�T I])
Cf)
9 /l/l/moi. ,� �O l �s�• •�.:a,u ,' 'ir
cz
!.
CL
cz CL 0-
'� :_i / w�^ � � '`� ;• 1 �I S` !+ �_ ` f" to =O �,
F
�/ , % , - - �,� . - . _ , ,,•_' SCK P^'�J {� .
--� Jl ,may �,\\ �, ,� "y�� •. ��rC/��.�� `.• - �\�i""���� w:. _ .�\.,.; �''',��. _. -
VM �✓`� (moi ��
I°
\�\ .✓J� ,� v Fr' nl' _ � j {�,/5") 1•i `1�4�rAr ``1� '. Qi
CL
li Cl
rya `t.� \ ' � S �` t (• ` � ../ ~,�� _ - - :,�.� ; � ...✓ �� `.� � � f">a�Q �1'. is
�� �( lel"✓�� /�`• �` �`'��`� r/�� u�� �--L-' ) ? / � I �� ;,� .--
l�1
_
Ej
I eit,
- - As-
\�. [\/\ \j` - /' � f/ ..../, ice-''.: .•./ \ - �\�" � � ��� �t /�y��` (/"' :_�
lo
0 1 ` /i _ � � \ .1 `.,• 1.
ol
Ak' o`er �% � G //-•/ � '` �"` �
`n 606&S6S-C6S (XVzl)
ZOtil-565-£ 65 t'13 L) 6509-ZS9-065 ?Xdd)
695S-SZ6-069 ('13.0 a
w 5
3NIaa31HV1213WV :1OV.LN00 NHOBHV30 VNV3d UOV1N03
0VZSV HO `IIVNNIONIO
966Z-90M VO `3.191AAH3W3 i "
y
=
c m 'd2t SSOlIOAVM 0$9L 006 ZSW '1S NOAMOH 0991, i
a ? JNiZ133N1JN3
?
SIZ?IVAON (
- yr
1
H S803
I x t
l - t i
0
pp
ie
nn
.aN
-----------
z
r
¦
-e
?g
y? ?
?p
J N
a ')
W C 4 - <
m I
H Z
I
I
1 - 1
---------------
...
... -
C'?
Q O R E
P R O P E R T Y SCIENCES
April 3, 2007
Jacobs Engineering
1880 Waycross Road
Cincinnati, OH 45240
Attention: Mr. Samuel Beach
Subject: Report of South Reinforced Earth Slope
Novartis USFCC Project Site
Jacobs Project No. 22C01 15A
PSA No. 22C01130-S90-0504, Task Order No. 04
Holly Springs, North Carolina
QORE Job No. R-2360-04; Report No. 126630
Dear Mr. Beach,
Representatives of QORE observed the construction of the south reinforced earth slope on a full-
time basis as the work progressed. Our scope of services entailed an evaluation of the soil
subgrades prior to fill placement, observation of the wire-basket placements, observation of the
geogrid placement, and in-place density testing of the fill materials. The structural fill materials were
generally placed in 9-inch lifts (two lifts per row of baskets) and the steps formed by the baskets
were topped with topsoil. Field reports were prepared on a daily basis as the work progressed and
these reports are submitted under separate cover.
In summary, it is our opinion that the work described above complies with the requirements of the
project Drawings and Specifications based on our professional judgment from field observations,
field tests, and limited laboratory tests conducted by QORE. One must not interpret ourfindings as
a guarantee of the entire work product.
Sincerely, \,`\??et??teaalJ+?f`f
d,
QORE INC.
` ?' _eQo
David T. Cunningham PE yt! 2 3 ' 1 ?4
Senior Geotechnical Engineer":,'vG 'C1 `Z
16
???/7111111111
Cc: Mr. Bill Jay
Thomas B. Baird, PE
Geotechnical Engineer
2521 Schieffelin Road, Suite 128 1 Apex, North Carolina 27502 1919.363.9899 (p) 919.363.7916 (f)
Novartis V & D Campus
Annual Inspection of Reinforced Earthen Slope
Holly Springs, Wake County
Page 1 of 3
Novartis V & D Campus
Annual Inspection of Reinforced Earthen Slope
Holly Springs, Wake County
Page 3 of 3