Loading...
HomeMy WebLinkAbout20191248 Ver 1_Shoreline Stabilization_20190917Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center 2 0 1 g 1 2 4 8 REC�'JEUDENRIDW Raleigh, NC 27699-1617 SEP 17 2019 Water Resources I. Applicant Information [15A NCAC 02H .0502(a)] Permii3ng Section 1. Owner Information / Name: -` t orme,s' A fie'c- t1` et Mailing Address: 3 3 L4 Y (3 y-ecks dc? o ` ✓Yl i7 �� e; �w� 4& Telephone Number: �g�Lf. LtO7 lyc(r Fax Number: E-mail Address: m ru s Lu c -c -k fev (� .v%cx" 1. c ci s 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www saw usace army rail/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: 41,eY cco7 deG, - Nearest Town: Subdivision name or site address (include phase/lot number): Directions I1»")e'to site - please include road names and numbers, landmarks, etc.: /'V 0r°I(K1' OL -7, Pt1'7'Jeje_,46-yi L cya_ � JO 01' 'SLI iU, t, Vyi Ly'i( 1A, �t ��=S.S �- Uv► � �tri�.-4t:�'�i L.�v�A : L= Cavi j�.lG�•�l�l S'��r'�_ I� v�'i Latitude (in decimal degrees) 35 S 0SY. j y Longitude (decimal degrees) 0 . 3 -3 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 1c:e,& i Aevv-Ai z ( 6. Property size (acres):. 7 a rc- 7. Lake/ river/ ocean adjacent to property: t-,Cx ke, or+-/ S. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 9. Will work be conducted from land? �Z From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres:. 0 _Y!,U436,�e P -e-,4--- 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): / 1 r" Owner/Agent's Signature* [15A NCAC 02H .0502 2->9 Date `Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ Normal Mater Level W" . E Shoreline 4 Lake (At Full Pond/Normal Water Level) 01-oad Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 Go gle Maps fr Taytmviile jna S14wintj!; Dank In'EsIment-, AT 11`:Ic!FIr Cruise -In Tire & Auto H, FOOD ST Gr"v,ijjou_ &N,irsely NO Music In the Mountains Suzuki molds lii Vi 1 t 1 7 gLa � �dw g -,aw,; D,ut,, Ole Still ColfClub9 Dual ConlrcGoc gle Map data ©2019 500 ft , I c 4�x e s67 N I07 I o_ 6 - Lot Lot 8 Kevin J. Richart Deborah S. Richart Db. 498, Pg. 2374 Lot Pb. 2, Pg. 54A O O O O N Lu d- N 0 z rJ Pbo Q �—O I�S J a� 6Q2/' \ '96" rJA'�e Iq cp 3/4„ --- of Ape Lot 11 Walter T. 2 Meredith R. Db. 482, Pg. Pb. 6, Pg. VIM a � � . • YYY• r _ y T1 � r ON tin,. •fix., i 41 =to f e� es y - r • t . - � .nr. ��R .�'1 � . - a �{...�. r All _ i •�' ..t-` Vv .pa�yy. �/ 'Cl� a � �3R'• '���qp^.� +.y. t..•{/ � i; � .,} .": tir a`�}. r3,e,�'l�r�l: ;rye �f�r ��; �� �._ �..�%I['.�'.. .\j' + - • 'r. �1 �� � • fr'► j-16 T"� t -1 7}�y -■� i ."�,'1 �'s',y' sl:' f *saz � � � i A.,, Nit k. !t� > �.� -_ t g►" r