Loading...
HomeMy WebLinkAbout20090940 Ver 1_More Info Received_20091006Amy Euliss DENR -WATER QUALITY North Carolina Division of Water Quality WETLANDS ANDSToRmwATERBRANCH Surface Water Protection Division 585 Waughtown Street Winston Salem, NC 27107 Subject: Duke Energy Carolinas, LLC - Dan River Combined Cycle Combustion Turbine Project, USACE Requested Additional Information, DWQ Project #09-0940 Dear Ms. Euliss: Please find enclosed a copy of the additional information requested by Andy Williams of the United States Army Corps of Engineers concerning the Duke Energy Dan River Combined Cycle Turbine Project. Included in the enclosure are two updated figures, as well as a copy of the cover letter to Mr. Williams. . The first figure (DNROC-DE-C-00-OO.SP-4) is a plan view showing the entire Project boundary, i.e., "Limits of Disturbance". No other areas of the property are proposed to be impacted by the Project and no future projects are planned or proposed on the Project property. Moreover, no ground disturbing activities are proposed beyond the Limits of Disturbance line shown on the figure. Given this additional information and the information provided in the pre-construction notification, submitted August 26, 2009, the Project as shown should be considered a single and complete project for permitting purposes. The second enclosed figure (Figure 3) is an update of a previously submitted figure showing a detail view of the jurisdictional areas proposed to be impacted. As shown, Wetland D (0.13 acre) will be filled to construct the base for the turbine cooling towers;. Wetland C will be partially filled (0.003 acre) by the cooling tower berm. Unavoidable impacts to jurisdictional features associated with the Project total 0.133 acre of permanent wetland fill. Should you have any questions or concerns please do not hesitate to contact either me at (704) 342-7364 or Mr. Scott T. Fletcher at (704) 342-7380. Sincerely, HDRIDTA Jason N. Isbanioly Scientist cott T. Fletcher, CW$, PWS Environmental and Regulatory Manager Enclosures cc: DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604 File HDR DTA 400 S Tryon Street HDR Engineering, Inc. of the Carolinas Suite 2401 Charlotte, NC 28285-0106 Phone: (704) 377-4182 Fax: (704) 377-4185 www.hdrinc.com DTA O a ' O ((? ((??' ?/Jr? ? L5@15? V i5 September 30, 2009 0 C T 6 2009 h_R DTI. September 16, 2009 Andrew Williams United States Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Subject: Duke Energy Carolinas, LLC - Dan River Combined Cycle Combustion Turbine Project, Nationwide Permit Application Package - Additional Information Action ID: SAW-2009-01653 Dear Mr. Williams: Please find enclosed the additional information you requested in your incomplete application notification dated September 3, 2009. Included in the enclosure are two updated figures. The first (DNROC-DE-C-00-OO.SP-4) is a plan view showing the entire Project `boundary, i.e., "Limits of Disturbance", No other areas of the property are proposed to be impacted by the Project and no future projects are planned or proposed on the Project property. Moreover, no ground disturbing activities are proposed beyond the Limits of Disturbance line shown on the figure. Given this additional information and the information provided in the pre-construction notification, submitted August 26, 2009, the Project as shown should be considered a single and complete project for permitting purposes. The second enclosed figure (Figure 3) is an update of a previously submitted figure showing a detail view of the jurisdictional areas proposed -to be impacted. As shown, Wetland D (0.13 acre) will be filled to construct the base for the turbine cooling towers; Wetland C will be partially filled (0.003 acre) by the cooling tower berm. Unavoidable impacts to jurisdictional features associated with the Project total 0.133 acre of permanent wetland fill. Should you have any questions or concerns please do not hesitate to contact either me at (704) 342-7364 or Mr. Scott T. Fletcher, at (704) 342-7380. Sincerely, HDRIDTA Jason N. Isbanioly Scientist JNI/tei Enclosures cc: File HDRI OTA HDR Engineering, Inc. ofthe Carolinas 400 S Tryon Street Suite 2401 . Charlotte, NC 29285.0106 Phone: (704)377.4182 Fax: (704) 377-4185 www.hdrinc.com e Z _ J ? YCyC yyyy tlptl! ? ? U W a? S? G i 8 U _ _ U ? Vl y ?_ ? V 3 o W v In 0- g Wa g y9 o g8 g'" 'S E ? 1 a. \ Wa?_ a: rLC f ? ,Y ? ? LI ?, . f r l Q N 0 0 9 0 o I w 0 I U O ia epgoyy pl. Sul 'I...0 6uisn 6002/90'eouessi,euuoaea Alaij i j - sevnosaa : 'nul 'seugo?e? joedwI J C. 1.1 Ar-a ar,n4-elep avo 90OZ VLSI ON'dIVN -A4de?bologd leuay'.saOJnog uotleoo? ulse8 uolluaIaa sainleaA joafoad ay'fiup°oul6°3 tlOH aa}emwJOIS paaaaIaad Z aleuJGIIV puel}aM ® a uooN `aliG1 41noS? laailS 3S noS 004 auiganl uoilsngwoo aani?l uea -E aanbiA weags 9410-4 aagwnN asuOOII -S-1.3.9'3-N ` 1Janlno U SVNIIOHVO A9H3N3 3>in(i 07 puabal ,OE =., L :31VOS 1:109 OE 0 9 OE Y Al. D r? s;