Loading...
HomeMy WebLinkAboutNCS000488_Valdese Draft SWMP_20191003Draft Stormwater Management Plan Town of Valdese NCS000488 September 27I 2019 ■- n F LAC IIL.J�i Table of Contents PART1: INTRODUCTION.........................................................................................................:......:....:...1 PART 2: CERTIFICATION.......................................................................................................:................:2 PARTS: MS4 EVFORMATION ........................0 .1...1..4111111.1..00..101110.4,.01..1011.......41.11......41114..................I.I..I.3 3.1 Permitted MS4 Area.,.,.", 11111111111011111114 10 ....... 9 ....... 14 'IV., ... *P" ...... 6*,** ........ * .......... 6,6666"4,4 .... 6,6,63 3.2 Existing MS4 Mapping ...............:.............. ... ............ .....:....:.......... ......... .... .............. 6................ ...4 3.3 Receiving Waters 1.........................15 3AMS4 Interconnection.....................................................................................................................6 3.5 Total Maximum Daily Loads(TMDLs)...........................................................I.............6...6........6.6 3.6 Endangered and Threatened Species and Critical Habitat..,,.,,........ ... IV .... 6 ... I ............. 6 ... * ... 6,666'.6 ... 7 3.7 Industrial Facility Discharges ...........6..........7 3.8 Non-Stormwater Discharges ,..... .....•.,..8 3.9 Target Pollutants and Sources.............................................................................,......,..,...............9 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION....,.:................:...........12 4.1 Organizational Structure.,,, ....... ............... 0"0,13 4.2 Program Funding and Budget.....................,................................................................................14 4.3 Shared Responsibility...................................................................................,..............................15 4ACo-Permittees..............................................................................................................................16 4.5 Measurable Goals for Program Administration . ... .......................................,...,.,.....,,,....,...........16 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM......................................::...:...:.........18 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM..............................27 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM...................................................37 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS ................49 List of Tables Table 1: Summary of M54 Mapping Table 2: Summary of MS4 Receiving Waters Table 3: Summary of Approved TMDLs Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Table 5: NPDES Stormwater Permitted Industrial Facilities Table 6: Non-Stormwater Discharges Table 7: Summary of Target Pollutants and Sources Table 8: Summary of Responsible Parties Table 9: Shared Responsibilities Table 10: Co-Permittee Contact Information Table 11: Program Administration BMPs Table 12: Summary of Target Pollutants & Audiences Table 13: Public Education and Outreach BMPs Table 14: Public Involvement and Participation BMPs Table 15: Illicit Discharge Detection and Elimination BMPs Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Table 17: Construction Site Runoff Control BMPs Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program Table 19: Summary of Existing Post -Construction Program Elements Table 20: Post Construction Site Runoff Control BMPs Table 21: Pollution Prevention and Good Housekeeping BMPs PART 1: INTRODUCTION The purpose of this Stormwater Management Plan (SWMP) is to establish and define the means by which the Town of Valdese will comply with its National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit and the applicable provisions of the Clean Water Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum extent practicable. This SWMP identifies the specific elements and minimum measures that the Town of Valdese will develop, implement, enforce, evaluate, and report to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Minerals and Land Resources (DEMLR) in order to comply with the MS4 Permit number NCS000488, as issued by NCDEQ. This permit covers activities associated with the discharge of stormwater from the MS4 as owned and operated by the Town of Valdese and located within the corporate limits of the Town of Valdese. In preparing this SWMP, the Town of Valdese has evaluated its MS4 and the permit requirements to develop a comprehensive 5-year SWMP that will meet the community's needs, address local water quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will be evaluated and updated annually to ensure that the elements and minimum measures it contains continue to adequately provide for permit compliance and the community's needs. Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along with any approved modifications of the SWMP, are incorporated by reference into the permit and become enforceable parts of the permit. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 1 PART 2: CERTIFICATION By my signature below I hereby certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations, I am also aware that the contents of this document shall become an enforceable part of the NPDES M54 Pernrit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. � I am a principal execufive officer or ranking elected official. ❑ I am a duly authorized representative and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as: ❑ A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Signature: Z14*1� Name: Seth 6Zckdrd Title: Town Manager yy Signed this Z v day of September 20. / . DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 2 PART 3: MS4 INFORMATION 3.1 Permitted MS4 Area This Stormwater Management Plan (SWMP) apphes throughout the corporate limits of the Town of Valdese, including all regulated activities associated with the discharge of stormwater from the MS4. The map below shows the corporate limits of Town of Valdese as of the date of this document. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 3 3.2 Existing MS4 Mapping The current M34 mapping includes outfalls located within the Town of Valdese. In the future, the Town will be adding the following elements to the map: stormwater conveyances, flow directions, and receiving streams. This is addressed in development, funding, and maintenance in Permit Reference 3.4.1 BMP 19, The Town of Valdese has a historic count of 153 outfalls per the GIS layer created; however it is not certain that all of these are major per the definition provided below. The Town will be verifying all elements as mentioned above in the completion of BMP 19.B.1 addresses the verification of the existing data, and BMP 19.B.3-4 addresses the updating of the existing map, as well as, adding additional infrastructure as it comes in. II C: ► 111�:' �/U' Town of Valdese September 27, 2019 Page 4 Table 1: Summary of MS4 Mapping Percent of MS4 Area Mapped 90 % No. of Major Outfalls* Mapped 153 total *An outfall is a point where the MS4 discharges from a pipe or other conveyance (e.g, a ditch) directly into surface waters. Major outfalls are required to be mapped to meet permit requirements. A major outfall is a 36-inch diameter pipe or discharge from a drainage area > 50-acres; and for industrial zoned areas a 12-inch diameterpipe or a drainage area > 2-acres. 3.3 Receiving Waters The Town of Valdese MS4 is located within the Catawba River Basin and discharges directly into receiving waters as listed in Table 2 below. Applicable water quality standards listed below are compiled from the following NCDEQ sources: o Waterbody Classification Map o Impaired Waters and TMDL Map o Most recent NCDEQ Final 303(d) List Table 2: Summary of MS4 Receiviug Waters Receiving Water Name Stream Water 303(d) Listed Parameters) Index / AU Quality of Interest Number Classification Catawba River ll-(37) WS- C N/A IV, B; CA Hoyle Creek 11-45-(2) C N/A WS-IV; CA MCGalliard Creek 11-44-(3) C Fish Community (NAR, AL, FW) WS-IV; CA Dye Branch 11-44-(2) C N/A WS-IV; PA DRAFT NCS000488 5WMP Town of Valdese September 27, 2019 Page 5 3A MS4 Interconnection The Town of Valdese MS4 is interconnected with another regulated MS4 and directly discharges stormwater into the Town of Rutherford College via the hospital property. 300 Total Maximum Daily Loads (TMDLs) The TMDL(s) listed in Table 3 below have been approved within the MS4 area, as determined by the map and list provided on the NCDEO Modeling & Assessment Unit web page. The table also indicates whether the approved TMDL has a specific stormwater Waste Load Allocation (WLA) for any watershed directly receiving discharges from the permitted MS4, and whether a Water Quality Recovery Program has been implemented to address the WLA. Outreach education and stream cleanup helps with the reduction of waste load allocation with approved TMDL municipalities. Table 3: Summary of Approved TMDLs Water Body Name TMDL Pollutant Stormwater Water Waste Quality Load Recovery Allocation Program (Y/N) (Y/N) N/A N/A N N DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 6 16 Endangered and Threatened Species and Critical Habitat Significant populations of threatened or endangered species and/or critical habitat are identified within the regulated MS4 urbanized area, as determined by a review of the Endangered and Threatened Species and Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in North Carolina map as provided by the U.S. Fish and Wildlife Service. Of those species listed, Table 4 summarizes the species that may be significantly impacted by the quality of surface waters within their habitat. Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Scientific Name Common name Species Group Federal Listing Status Glyptemys Bog Turtle Vertebrate Threatened due to muhlenbergii similarity in appearance Glaucomys sabrinus Carolina northern Vertebrate Endangered coloratus flying squirrel Myotis septentrionalis Northern long-eared Vertebrate Threatened bat Corynorhinus Virginiabig-eared bat Vertebrate Endangered townsendii vir inianus Alasmidonta varicosa Brook floater Invertebrate At riskspecies Ophiogomphus Edmons's Snaketail Invertebrate At risk species edmundo Macromia margarita Margarita River Invertebrate At risk species skimmer Microhexura Spruce -fir moss Invertebrate Endangered montiva a spider Hexastylisnaniflora Dwarf -flowered Vascular Plant Threatened heartleaf Liatris helleri Heller's blazing star Vascular Plant Threatened Hedyotis purpurea Roan Mountain Bluet Vascular Plant Endangered var. montana 3.7 Industrial Facility Discharges The Town of Valdese MS4 jurisdictional area includes the following industrial facilities which hold NPDES Industrial Stormwater Permits, as determined from the NCDEQ Active NPDES Stormwater Permit List and/or Active Stormwater Permits Map, DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 7 Table 5: NPDES Stormwater Permitted Industrial Facilities Permit Number Facility Name NCGNE0787 Bimbo Bakeries USA Inc. -Valdese NCG170364 Valdese Weavers Inc. (Crescent Street Plant NCGO80707 Town of Valdese Public Works Facility NCG030235 Saft America, Inc. NCG170073 Valdese Weavers Inc. (Perkins Road) NCG170126 Valdese Weavers Inc. (Lovelad Road) 3.8 Non-stormwater Discharges The water quality impacts of non-stormwater discharges have been evaluated by the Town of Valdese as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do not significantly impact water quality. The Town of Valdese has evaluated residential and charity car washing and street washing for possible significant water quality impacts. Street washing discharges are addressed under the Pavement Management Program in Part 10 of this SWMP. The Division has not required that other non-stormwater flows be specifically controlled by the Town of Valdese. Wash water associated with car washing that does not contain detergents/surfactants or does not discharge directly into the MS4 is considered incidental. However, these types of non-stormwater discharges that do contain detergents/surfactants have been evaluated by the Town of Valdese to determine whether they may significantly impact water quality. The Town of Valdese will address the possibility of the below mentioned water quality impacts through public education and good housekeeping, as outlined in Part 5 BMP 3-7 and Part 10 BMP 45-479 4% 53, 54, 56, 57 and 61 with a focus on the training of good housekeeping practices. Table 6: Non-stormwater Discharges Non-stormwater Discharge Water Quali Im acts Water line and fire hydrant flushing Incidental Landscape irrigation Incidental Diverted stream flows Incidental Rising groundwater Incidental Uncontaminated groundwater infiltration Incidental Uncontaminated pumped groundwater Incidental Uncontaminated potable water sources Incidental Foundation drains Incidental Air conditioning condensate Incidental Irrigation waters Incidental Springs Incidental Water from crawls ace pumps Incidental Footing drains Incidental Lawn watering Incidental Residential and charity car washing Possible Flows from riparian habitats and wetlands Incidental De -chlorinated swimming ool discharges Incidental Street wash water Possible DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 8 Flows from firefighting activities I Incidental 19 Target Pollutants and Sources In addition to those target pollutants identified above, the Town of Valdese is aware of other significant water quality issues within the permitted MS4 area. Target pollutants as listed below are major contributors of the stream impairment. TMDL measures have been put in place to improve water quality. Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP, the likely activities/sourceshargeted audiences attributed to each pollutant, and identifies the associated SWMP program(s) that address. In addition, the Town of Valdese has evaluated schools, homeowners and businesses as target audiences that are likely to have significant stormwater impacts. Within the table below the following target pollutants have been commonly found to be concerns within the community. Litter: A Proliferation of Roadside Litter has been noted by citizens and public officials within the Town. Roadside litter is an ongoing issue for the Town. This litter poses a threat to both our water bodies and the MS4 infrastructure, as the litter can create clogs and backups that damage the pipelines leading back to the stream. Some litter even poses a threat to groundwater if chemical leaching or breakdown of components into heavy metals occurs due to weathering of the litter. Most litter is found on the side of major roads and in select residential areas. Sediment: Previously installed erosion control measures have been removed or fallen Sediment buildup is largely attributed to mismanaged construction sites with fallen or incorrectly installed sediment fences. Citizens and code enforcement officers have noted several cases of erosion control fences failing or being improperly maintained. This has led to sediment buildup near storm drains, onto down slope private properties, and in some cases causing water to build up in nearby properties as the sediment is limiting the drains ability to remove runoff. In all cases code enforcement has responded and had the issue solved, but even being down for a short time can prove to have significant effects. Erosion control fences are required for sediment control permits during construction by the DEQ throughout the entire construction process. Gray Water: Straight piping washing machines out of the house Residents have noted a few homes have had their washing machines straight -piped out of their homes by creating makeshift piping using water hoses exit at windows. Homes are to be connected to the appropriate sewer system. This proves to be a source of detergents/soaps entering our storm drains in residential neighborhoods. In addition: residential, charity, and municipal car washes allow for soaps or waxes to enter the storm drain when vehicles are not being cleaned in the correct areas (such as vegetated patches or in areas that do not have storm drains). This allows for toxic contaminants to enter our waterways via the storm drain system. Fats Oils and Grease: Health Department and Valdese Utilities staff has noted several cases where restaurants do not appropriately maintain grease traps. The Health Department have reported several restaurants in Valdese for not maintaining or properly using grease traps. This has led to cases of the restaurants allowing the grease to drip onto nearby impermeable surface — which would eventually lead to water quality issues. Overflow from a lack of maintenance or throwing out the grease with general waste contributes to this problem. This is a health violation since the grease poses a physical risk, but it also can impair DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 9 water bodies with an influx of water insoluble grease going down the storm drain. In all cases, code enforcement has responded and the issues have been remedied, but some restaurants have been noted as repeat violators. Chemicals: Totes have been noted in industrial areas not properly labeled or stored Town staff, along with some citizens have reported containers of unknown/unmarked chemicals in select industrial sites, leading to potential soil and water contamination, and/or incorrect spill cleanup procedure. In addition to not labeling the containers correctly, the Town has noted that the containers are not being correctly stored in a way to minimize risk to the water bodies from seepage, damage to the containers, or spills. Code enforcement has responded to these reports. Animal Operations: A challenge to ensuring water quality for several factors. Animal operations are agriculture.. operations that raise cows, pigs, chickens, or other livestock as a product, be it from meat or byproducts of the animal, the latter being more problematic as the excess nutrients will lead to eutrophication which can eventually causing hypoxia in the water body. In a similar vein, agricultural runoff often caries excess fertilizer which also will cause eutrophication in streams with its cascading effects. Within the Catawba River Basin roughly 46 streams are/were impacted by fecal coliform, with 10 being listed on the 303(d) list. As this is a non -point source pollutant it is hard to locate the exact source of this runoff, however in much of the watershed there is agricultural zoning that makes it likely for these types of impairments to occur. Roughly 20% of land use within the basin is agricultural. The Town does not permit commercial animal agriculture within the Town limits, but does allow for urban chickens and limited livestock for personal use. Urban farming is a common theme within the Town. Upon meeting appropriate requirements one can obtain a zoning permit to allow farm -like animals. The same holds true as animal operations, but to a lesser scale, the excrement and ground disturbance can impact the water quality. Underground storage tanks: Storage devices installed below ground that contain hazardous materials/waste. These tanks can contain gasoline, fuels such as propane, industrial chemicals/oils, and most often human waste in areas not directly connected to the sanitary sewer. Any underground storage tank must be well maintained/monitored, and correctly installed due to the risk of them leaking. The leaks can cause whatever chemical the tank is storing to leak into the ground, harming the soil, groundwater/water table, and even surface waters as they are being fed from groundwater. If a fuel or industrial chemical tank is leaking, the chemical will leach into the soil — leading to toxic soil, contaminated groundwater, and possibly impairing a stream/water body. Valdese is working with an EPA Brownfield Assessment grant to conduct Phase 1 and Phase 2 environmental assessments to determine the level of contamination (if any) from former industrial sites. Some areas of the Town that were more recently annexed still have homes that utilize septic tanks, but the majority of properties in the Town are served by sanitary sewer, If a septic tank is leaking, it can overwhelm the natural processes of the soil (infiltration) leading to nutrient overload in streams fed by groundwater, or allowing pathogens to enter, increasing the risk of disease. The 10 303(d) fecal coliform impaired streams listed can have some attribution to septic tank leakage. When septic tank failure is noted, the home is required to connect to sanitary sewer where available. Illicit discharges: Originate from a variety of sources, with an equally varied number of effects dependent on the chemical that is released. Typically, illicit discharges come from businesses, residents or municipal facilities who dump chemicals into storm drains either incidentally due to a lack of IDDE education or general carelessness. These chemicals can vary greatly, and can include grease, oils, chemicals, cleaning solutions, paints, metals, etc. This is a recognized problem as we have several DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 10 303(d) streams impaired from causes related to substances or attributions given to unclean discharges into the streams - in addition to reports generated by the municipality. Many of the 303(d) benthos impaired streams can be attributed to IDDE issues, but they are often from inexact/non-point sources that are attributed to illicit discharges Illegal dumping: When residents, businesses, or municipal employees dump waste randomly m non -permitted dumping areas. This waste can widely vary, causing a variety of problems. For example, citizens dumping televisions on the side of the road to avoid dumping fees, which allows for the metals or chemicals inside the tv to leach out as stormwater passes it (mercury, lead, and other metals). It can be a case of businesses dumping waste in watershed areas where runoff passes through the waste, either carrying it, or residuals of the waste into water bodies. It can also be a case of graders dumping sediment into areas without the correct allowances/precautions. The debris and chemicals accumulate over time and lead to chemical impairments, pH issues, turbidity impairments, or debris entering the stream/MS4 system. The Town provides municipal residential solid waste pick-up weekly to all Town residents. Improper disposal of waste: Improper disposal of waste is problematic because it allows chemicals, or difficult to manage waste, to enter the environment in ways that may be hard to track. For example; not giving a car battery to the correct waste management facility can allow for battery acid and lead to enter the soil which drains/collects in the groundwater. These types of problems have been noticed by municipal waste managers and can be difficult to track since the improperly disposed waste is mixed in with the standard refuse. Other examples include grease going down sinks clogging sanitary MS4 systems, chemicals from batteries leaching into the groundwater, oil from oil changes not going to the correct facility, etc. Table 7: Summary of Target Pollutants and Sources Target Pollutant(s) Likely Source(s)/Target Audiences) SWMP Program Addressing Target Pollutant(s)/Audience(s) Litter Residents, Businesses, Schools Public Education & Outreach Public Participation Sediment Construction Activity Public Education & Outreach, Construction Program Post -construction Program Gray water Residential Illicit Discharge Public Education & Outreach Fats, Oils and Grease Businesses (Restaurants) Illicit Discharge Public Education & Outreach Chemicals Industrial, Business and Residential Illicit Discharge Public Education & Outreach Good Housekeeping Animal Operations Urban/Bona fide Farms Elicit Discharge Public Education & Outreach Underground Storage Tanks Business and Residents Illicit Discharge Public Education & Outreach Illicit Discharges General Public, Businesses, Illicit Discharge Municipal Employees Public Education & Outreach Good Housekeeping Illegal Dumping and General Public, Businesses, Illicit Discharge Improper Disposal of Waste Municipal Employees Public Education & Outreach Good Housekeeping DRAFT NC5000488 SWMP Town of Valdese September 27, 2019 Page 11 DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 12 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION 4.1 Organizational Structure The Town of Valdese has contracted Western Piedmont Council of Governments (WKOG) to coordinate Stormwater Management Plan efforts, to ensure the Town is facilitating Best Management Practices (BMPs) to protect water quality. While WPCOG will be the primary operator of the program the Town of Valdese staff will be trained to handle internal procedures and report action/s to WPCOG. The following organizational chart is broken down by the six elements associated with Stormwater Management. Each of the positions under the elements will report back to the primary manager and then on to the Stormwater Administrator. smrmwater Froemm Aeministretor (Town Manager) S[ormwater Management (WP[OG Senior Plan- ner/Natural Resources Administrator) Public Etlucadon Public lrnolvement Illidt Discharge De[ecean Poll Cam[ruction Si[e PoIIWon Prevention( antl OmreaN arstl PorHrlpation ant Elimination RunroR Camrol Gaotl Housekeeping for Municipal imy WPCOG Senior Planner( WPCOG Senior Planner/ WPCOG Code WPCOG WPCOG WPCOG Senior Planner/ Na[ual Resou Natural ResourcesCompliance Stormwa Stormwater Natural Resources AdministratarPS Aeministrztor Program Manager Atlminis[ator Administrator (Municipal Administrator(Good (Enforcement) Facilities Operation& Housekeeping Eduamr) Maintenance Program - fata Collection and WPCOG Senior Planner/ Reporting; TMD1. Natural Resources requirements) Administrator (Educator) Town Employee MS4 Operation & Maintenance Municipal SCM Operation and Maintenance Vehicle & Equipment Geaning Pavement Management Pesticides, Herbicitle& Fer[ifzer Management Table 8: Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department Stormwater Program Town Manager Seth Eckard Administration, Town Administration of Valdese SWMP Management Senior Planner/Natural Johnny Wear WPCOG Resources Administrator Public Education & Senior Planner/Natural Johnny Wear WPCOG Outreach Resources Administrator DRAFT NCS000488 5WMP Town of Valdese September 27, 2019 Page 13 Public Involvement & Senior Planner/Natural Johnny Wear WPCOG Participation Resources Administrator Elicit Discharge Compliance Manager Billy Rickles WPCOG Detection & Elimination Construction Site N/A N/A NCDEQ —Asheville RRegional Office Runoff Control Post -Construction Stormwater Jack Cline WPCOG Administrator Stormwater Management Pollution Senior Planner/Natural Johnny Wear WPCOG Prevention/Good Resources Housekeeping for Administrator Municipal Operations Municipal Facilities Stormwater Jack Cline WPCOG Operation & Administrator Maintenance Program Spill Response Program Stormwater Jack Cline WPCOG, Fire Administrator Department MS4 Operation & Public Works Bryan Duckworth Town of Valdese Maintenance Program Departments Municipal SCM Public Works Bryan Duckworth Town of Valdese Operation & Departments and Maintenance Program Stormwater Jack Cline WPCOG Administrator Pesticide, Herbicide & Public Works Bryan Duckworth Town of Valdese Fertilizer Management Departments and Program Stormwater Jack Cline WPCOG Administrator Vehicle & Equipment Public Works Bryan Duckworth Town of Valdese Cleaning Program Departments Pavement Management Public Works Bryan Duckworth Town of Valdese Program Departments Total Maximum Daily Stormwater N/A N/A Load (TMDL) Administrator Requirements DRAFT NCS000488 SWMP Town of Valdese September 2 rg 2019 Page 14 4.2 Program Funding and Budget In accordance with the issued permit, the Town of Valdese shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES MS4 Permit. The budget includes the permit administration and compliance fee, which is billed by DEQ annually. The Town of Valdese has atwo-year contract (which will need to be modified, adopted, and signed every two years) with Western Piedmont Council of Governments for the following services: Public Education and Outreach Program, Public Involvement and Participation Program, Illicit Discharge Detection and Elimination Program, Post -Construction Site Runoff Control Program, and Pollution Prevention and Good Housekeeping Programs. The current contract amount for the 2-year period (years 1 and 2 of the NPDES permit cycle) is $23,342.00. The Town will be responsible for the cost of the annual NPDES permit renewal, which is to be paid to the state. Any fees charged to the development community for BMP Inspections, Plan Review, and other associated fees will be used to help offset cost. The Town may determine that stormwater utility fees should be implemented; these fees would be collected by the Town through tax or utility bills. Should the Town of Valdese choose not to renew the existing two-year contract, prior to the last month, a revision to the existing NPDES permit and Stormwater Management Plan would need to occur. The Town of Valdese would be required to renew the two-year contract, in years 2021 and 2023, to fully carry out the 5 year NPDES permit cycle. 4.3 Shared Responsibility The Town of Valdese will share the responsibility, with WPCOG (referred to as entity), to implement the following minimum control measures, which are as stringent as the corresponding NPDES MS4 Permit requirement. The Town of Valdese remains responsible for compliance if the other entity fails to perform the permit obligation and may be subject to enforcement action, if neither the Town of Valdese, nor the other entity fully performs the permit obligation. Table 9 below summarizes individual responsibilities for each program. Table 9: Shared Responsibilities Legal SWMP BMP or Implementing Entity & Program Name Agreement Permit Reference (Y/N) General Requirements WPCOG Stormwater Partnership Y Public Education and WPCOG Stormwater Partnership Y Outreach Program Public Involvement and WPCOG Stormwater Partnership Y Participation Program Illicit Discharge Detection WPCOG Stormwater Partnership Y and Elimination Program Construction Site Runoff NCDEQ N/A Control Program Post -Construction Site WPCOG Stormwater Partnership Y Runoff Control Program Pollution Prevention and WPCOG Stormwater Partnership Y Good Housekeeping Programs DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 15 Total Maximum Daily Load WPCOG Stormwater Partnership Y (TMDQ 4A Co-Permittees There are no other entities applying for co-permittee status under the NPDES MS4 permit number NCS000488 for the Town of Valdese. 4.5 Measurable Goals for Program Administration In response to the MS4 Inspection Report for the Town of Valdese -Program Implementation, Documentation & Assessment (II.A2, II.A.3, II.A.4, II.A.6, M.A. and III.B.) the following changes are being implemented. Per BMP 1 the SWMP will be reviewed on an annual basis to determine if any updates need to occur. All documents associated to the Stormwater program will be accessible online, either via the Town of Valdese website or the Western Piedmont Council of Governments Stormwater Partnership webpage (reference BMP 14 and 30). Documentation of all actions related to stormwater activities (as mentioned below) will be recorded, so staff can track and evaluate the effectiveness of each program component. The Town of Valdese will manage and report the following Best Management Practices (BMPs) for the administration of the Stormwater Management Program using Public Education & Outreach, Public Involvement & Participation, Illicit Discharge Detection & Elimination, Post -Construction Site Runoff Control, and Pollution Prevention &Good Housekeeping. Table 11: Program Administration BMPs Permit 2.1.2 and Part 4. Annual Self -Assessment Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually. Results shall be used by the permittee to modify the program components as necessary to accomplish the intent of the Stormwater Program. The self -assessment reporting eriod is the fiscal year (Jul 1— June 30). A B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 1. Annual Self -Assessment Perform an annual evaluation of 1. Prepare, certify, and 1. Annually for Permit 1. Annual Self- SWMP implementation, submit the Annual Years 1 — 4 Assessment received suitability of SWMP Self -Assessment to (FY19/20 — FY22/23) by NCDEQ no later commitments and any proposed NCDEQ prior to than August 31 each changes to the SWMP utilizing August 31 each year. year. the NCDEQ Annual Self - Assessment Template. Permit 1.6: Permit Renewal Application Ref. Measures to submit a permit renewal application no later than 180 days prior to the expiration date of the NPDES MS4 permit. A B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 2. Permit Renewal Application DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 16 Table 11: Program Administration BMPs Audit stormwater program 1. Participate in an 1. TBD — Typically 1. N/A implementation for compliance NPDES MS4 Permit Permit Year 4 with the permit and approved Compliance Audit, as SWMP, and utilize the results to scheduled and FY22/23 prepare and submit a permit performed by EPA or renewal application package. NCDEQ. 2. Self -audit and 2. Permit Year 5 2, Submit Self -Audit document any to DEMLR (required stormwater program FY23/24 component of permit components not renewal application audited by EPA or package). NCDEQ utilizing the DEQ Audit Template. 3. Certify and submit 3. Permit Year 5 3. Permit renewal the stormwater permit application package renewal application FY23/24 received by DEQ at (NOI, Self -Audit, and least 180 days prior to Draft SWMP for the permit expiration. next 5-year permit cycle). DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 17 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM The Town of Valdese will implement a Public Education and Outreach Program to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges into water bodies and steps the public can take to reduce pollutants in stormwater runoff. In reference to MS4 Permit Self Auclit Report -Public Educat on and Outreach, Permit Citation II.B.2.b., II.B.2.c, and II.B.2.h: Stormwater impact target audiences and sources will be identified. The Town of Valdese will administer public outreach to educate residence, businesses, schools, industry, employees and the development community. The extent of exposure will be recorded and evaluated (Reference BMP 3-9). The target audiences and identified pollutants. listed in Part 3.9 of this SWMP, which will be addressed by the Public Education and Outreach Program, are summarized in Table 12 below. In addition, the Town of Valdese is required to inform businesses and the general public of the hazards associated with illicit discharges, illegal dumping and improper disposal of waste. Table 12: Summary of Target Pollutants &Audiences Tar et Pollutants/Sources Tax et Audiences) Litter Residents, Businesses, Schools Sediment Construction Activity Gray Water Residential Fats, Oils and Grease Businesses (Restaurants) Animal Operations Bona fide farms/Urban Farming Underground Storage Tanks Businesses and Residents Chemicals Industrial, Business and Residential Illicit Discharges General Public, Businesses, Municipal Employees Illegal Dumping General Public, Businesses, Municipal Employees Improper Disposal of Waste General Public, Businesses, Municipal Employees The Town of Valdese will manage, implement and report the following public education and outreach BMPs. Table 13: Public Education and Outreach BMPs Permit 3.2: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee shall document the extent of exposure of each media, event or activity, including those elements implemented locally or through a cooperative agreement, A B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implement Metric 3. Stormwater Fliers DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 18 Table 13: Public Education and Outreach BMPs Stormwater fliers will be 1. Develop and 1. Permit Year 1 1-5. Document and distributed to Town residences, distribute report the topic and municipal employees, businesses, fliers to create (FY19/20) number of flyers and industrial facilities through stormwater distributed at each stormwater events, in government awareness event, and other buildings, and during training and around best locations where flyers educational opportunities. Five practices. were made available to topics will be addressed over the 2. Develop and 2. Permit Year 2 the public, term of the permit; general distribute stormwater awareness/best fliers for illicit (FY20/21) practices, illicit discharges, illegal discharges. dumping, chemicals and proper 3. Develop and 3. Permit Year 3 disposal of waste. distribute fliers for (FY21/22) illegal dumping. 4. Develop and 4. Permit Year 4 distribute fliers for (FY22/23) chemical awareness. 5. Develop and 5. Permit Year 5 distribute fliers for (FY 23/24) proper waste disposal. 4. Public Event Outreach Provide stormwater educational 1. Staff will have a 1. Annually 1. Number of events information to the general public booth at community held/attended; at community events. events to disperse Permit Years 1-5 Number of attendees; stormwater outreach (FY19/20 — FY23/24) Number of materials materials through the handed out. use of interactive educational games and activities. 5. Studentheacher outreach Provide educational information 1. Staff will provide in 1. Annually 1. Number of classes to students and teachers through class instruction to 7th provided; classrooms, workshops, and and/or 8" grade STEM Permit Years 1-5 Number of students hands-on activities related to students. (FYI 9/20 — FY23/24) present. stormwater BMPs. 2. Staff will conduct 2. Annually 2. Number of stormwater related workshops provided; workshops with Permit Years 1-5 Number of teachers teachers. (FY19/20 — FY23/24) attending, 6. Printed Materials DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 19 Table 13: Public Education and Outreach BMPs Staff will design new printed 1. Staff will create 1. Permit Year 1 1. Number of new materials for target audiences to printed material for materials created for aid stormwater education and will local government (FY19/20) addressing illicit distribute said materials once they distribution addressing discharge and are designed/developed. illicit discharge and stormwater best stormwater best practices. practices. 2. Staff will distribute 2. Annually 2. Number of materials printed materials at distributed. events, school Permit Years 1-5 presentations, and (FY 19/20 — FY23/24) have them on display for public acquisition in Government buildings. Digital educational information/ opportunities will also be provided. 7. Annual Water Quality Conference Sponsor the Western Piedmont 1. Provide one 1. Annually 1. Number of Council of Governments and presentation about one attendees; Lenoir Rhyne University's of the six NPDES Permit Years 1-5 Stormwater topic/s Annual Water Quality Conference Minimum Control (FY19/20 — FY23/24) presented referencing to provide outreach and public Measures at each the minimum control participation. Staff will conduct annual conference. A measures, the annual regional conference for different MCM will be continued education to local presented on each year government officials, staff, educators, and the general public. 8. Evaluate Pollutants Sources and Audiences Evaluate the target pollutants, 1. Evaluate following 1. Annually 1- 2. Evaluate and sources, and associated target target pollutants: document number of audiences likely to have litter, sediment, gray Permit Years 1-5 current and new target significant stormwater impacts water, fats, oils, (FY19/20 — FY23/24) pollutants, sources, and why they were selected. grease, urban farming, and audiences by underground storage identifying them in the tanks, super fund sites, annual report and chemicals, illicit update the plan (when discharges, illegal necessary). This will dumping and improper be carried out by disposal of waste. WPCOG personnel by tracking these pollutants/relevant audiences through GIS DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 20 Table 13: Public Education and Outreach BMPs 2. Evaluate the 2. Annually data and mapping following target tools. audiences: residents, Permit Years 1-5 businesses, schools, (FY 19/20 — FY23/24) commercial, farms, industrial, development community, general public, and municipal employees. 9. Evaluate Public Education and Outreach BMPs. Evaluate the successful 1. Administer a 1. Annually 1. Number of components of outreach through random survey to responses received to interest and feedback. Town residents, Permit Years 1-5 determine if current businesses, schools, (FY19/20 — FY23/24) efforts are beneficial to commercial, farms, the public education industrial, and outreach program. development community, general public, and municipal employees. Permit 2.1.7 and 3.2.3: Web Site Ref. Measures to provide a web site designed to convey the program's message and provide online materials including ordinances, or other regulatory mechanisms, or a list identifying the ordinances or other regulatory mechanisms, providing the legal an ority necessary to implement and enforce the re uirements of the permit A I B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 10. Website Maintain the already established 1. Maintain and update 1. Annually 1. Number of times website designed to convey the stormwater program website material is program's message. The Town information on the Permit Years 1-5 updated per year; what webpage will convey the existing municipal (FY19/20 — FY23/24) changes were made. importance of water quality and a website. 2. WPCOG staff will 2. Annually, beginning 2. Number of times link to the WPCOG Stormwater Partnership will be placed on the maintain and update in Permit Year 2 website material is Town's website. The WPCOG the regional updated per year; Stormwater Partnership webpage stormwater websites; Permit Years 2-5 Number of participants will provide educational resource by posting the MS4 (FY20/21— FY23/24) using the stormwater links, compliant procedures, Annual Self- website, measured stormwater regulations, Assessment, verifying through opening the stormwater permit information all links and contact page link. and good housekeeping information are information. current/active, posting the current year fliers and resetting the view counter. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 21 Table 13: Public Education and Outreach BMPs 11. Education Regarding Illicit Discharges Provide educational information 1. Train municipal 1. Annually 1. Number of to municipal employees, employees in illicit employees trained; businesses, citizens, and schools discharge detection Permit Years 1-5 Number of trainings about the hazards associated with and elimination. (FY19/20—FY23/24) held. 2. Distribute material 2. Annually 2. Amount of material illicit discharges, illegal dumping, and improper disposal to target audiences distributed to each of waste. (municipal employees, Permit Years 1-5 group: schools, businesses, (FY19/20 — FY23/24) Students and citizens). Municipal Employees Businesses Citizens. 3. Provide education 3. Continuous, upon 3. Number of during enforcement violation investigation. corrective enforcement process, actions; number of Permit Years 1-5 citizen interactions. (FY19/20 — FY23/24) Permit 3.2.5: Stormwater Hotline Ref. Measures for a stormwater hotline/helpline for the purpose of public education and outreach. BMP A B I C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 12. Hotline Provide a stormwater 1. Establish a hotline 1. Permit Year 1 1. Yes or No; Phone hotline/helpline for public number for stormwater number. education and outreach. complaints and (FY19/20) information. Establish a "standardized script of questions" for the hotline to make data recording more consistent 2. Identify specific 2. Permit Year 1 2. Yes or No; Staff staff members who name and position. will serve as (FY19/20) stormwater education and hotline contacts. 3. Record number and 3. Annually, after 3. Number of phone type of complaints, establishment of calls received and the concerns, and stormwater hotline. context of the call; information related to Type of call, each call. Permit Years 2-5 information provided (FY20/21 — FY23/24) during the call, date of call, and location of caller. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 22 Table 13: Public Education and Outreach BMPs 4. Train stormwater 4. Annually, beginning 4. Document and education and hotline in Permit Year 1 report number of staff contacts in general trained, training dates, stormwater awareness, (FY19/20) and topics covered. complaint call Number of updates to protocols, and hotlines questions appropriate contacts (script for for referral or typical standardization). stormwater issues. Update the "standardized script" if problems are found after training 5. Publicize contact 5. Continuous from 5. Document and information on the date of first annual report a summary of Town and WPCOG training (see BMP the number of Stormwater 12.13.4. above) in inquiries received, the Partnership webpages. Permit Year 1 general type of inquiry (education, outreach, (FY19/20) complaint), and the contact mechanism used (phone, email, web page, walk-in). DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 23 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM In reference to MS4 Permit Self Audit Report — Public Involvement and Participation, Permit Citation B.C.2.a. Volunteer Community Involvement Program: The Town will begin implementing a community volunteer program to gain citizen participation to complete Stream/lake front clean-ups (BMP 18). The Town of Valdese has an established hotline (main number for the Town Hall), but will now be directed to WPCOG stormwater hotline, as well as, the addition of a webpage reporting form and survey/s, along with the use of the existing WPCOG Water Resource Committee to gather public input. All events, programs, and public forums will be announced through social media and/or printed handouts. This SWMP identifies the minimum elements and implementation of a Public Involvement and Participation Program that complies with applicable State, Tribal, and local public notice requirements. The Town of Valdese will manage, implement, and report on the following public involvement and participation BMPs. Table 14: Public Involvement and Participation BMPs Permit 3.3.1: Public Input Ref. Mechanisms for public involvement that provide for input on stormwater issues and the stormwater program. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 13. Hotline for Public Input Provide mechanisms for public 1. Establish a direct 1. Permit Year 1 1. Number of calls input on stormwater issues and Stormwater Hotline for received/issues the stormwater program. public input. Define (FY 19/20) reported. who is in charge of the hotline. Establish a "standardized script of questions" for the hotline to make data recording more consistent. 2. Maintain the hotline 2. Continuously, once 2. Number of updates for public input. established in Year 1 to the hotlines questions (script for Permit Years 2-5 standardization). (FY20/21 — FY23/24) 14. Web based form reporting Provide mechanisms for public 1. Establish a web 1. Permit Year 1 1. Tool established — input via email format for based email complaint/ Yes or No, status. stormwater issues and the reporting tool to be (FY 19/20) stormwater program, housed on the regional website. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 24 Table 14: Public Involvement and Participation BMPs 2. Use the tool to log 2. Continuous, 2. Number of and respond to following the questions asked via the questions regarding the establishment of the tool; Number of public involvement tool in Permit Year 1. responses provided by program. staff. Permit Years 2-5 (FY20/21 — FY23/24) 3. Maintain a web 3. Continuous, 3. Number of updates based email following the completed to the web complaint/reporting establishment of tool, and reason for tool on the regional Permit Year 1. change. website. Permit Years 1-5 (FYI 9/20 — FY23/24) 15. Social Media Outreach — Event Promotion Create and use a social media 1. Establish social 1. Permit Year 1 1. Facebook, or other page to promote stormwater presence on (but not page(s) created — Yes events, projects, and programs. limited to) Facebook (FY 19/20) or No, status. The outreach tool will provide to promote public exposure to a large audience. involvement and participation related to stormwater programs, events, and projects. 2. Use both WPCOG 2. Continuous, after 2. Number and type of and the Towns social Facebook and/or other events, projects and media presences to pages are established programs promoted. promote stormwater in Permit Year 1. events, projects, and programs to engage Permit Years 1-5 public involvement. (FYI 9/20 — FY23/24) 16. Water Resources Committee Provide mechanisms for public 1. Hold quarterly water 1. Quarterly meetings 1. Number of attendees input and participation via resource meetings, at each meeting, topics regional meetings on stormwater open to the public, for Permit Years 1-5 discussed, was any issues and the stormwater participation in (FYI 9/20 — FY23/24) public input program, discussion related to givenirepresented. water quality issues. 17. Public Survey and Evaluation DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 25 Table 14: Public Involvement and Participation BMPs Provide mechanisms for public 1. Create and 1. Annually 1. Number of input by creating a survey to administer a survey to invitations sent, engage the public and gauge be housed on the Permit Years 1-5 surveys collected, public interest in stormwater regional stormwater (FY19/20 — FY23/24) percentage of response issues and the stormwater website once a year, rate and number of program open to feedback for a responses, total of 4 weeks and Completed analysis of shared on both the the data collected. WPCOG and Town's social media a es/websites. Permit 3.3.2: Volunteer Opportunities Ref. Measures to provide volunteer opportunities designed to promote ongoing citizen participation. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 18. Stream Cleanup Provide volunteer opportunities 1. Hold stream cleanup 1. Annually 1. Number of for ongoing citizen participation efforts by engaging events/participants; through stream cleanup activities, groups to conduct Permit Years 1-5 Number of trash bags stream cleanup (FY19/20 — FY23/24) filled. activities in appropriate areas. The events will be promoted by the Town and WPCOG, with a focus towards civic groups, 2. Provide all materials 2. Annually 2. Number of materials for stream cleanup distributed. activities (i.e. gloves, Permit Years 1-5 trash bags, and trash (FY19/20 — FY23/24) pickers) hosted by Town and WPCOG. 3. The Town and 3. Annually 3. Number of WPCOG will market the event (hosted by Permit Years 1-5 attendees; Number of social WPCOG) to the public (FY19/20 — FY23/24) media tags and shares; to obtain volunteers Number of materials for stream cleanup distributed/mailed efforts to assist in public awareness and involvement with the event. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 26 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM Per the MS4 Inspection Report the Town has written procedures for implementing an IDDE Program. To increase efforts the Town will locate priority areas likely to have illicit discharges, conduct routine dry weather outfall inspections, identify illicit discharges and trace sources, eliminate the source(s) of an illicit discharge, and evaluate and assess the IDDE Program. The Town has a stormwater ordinance and other regulatory mechanisms that provide the legal authority to prohibit illicit connections and discharges to the MS4. The documents will be reviewed, and if necessary, updated to maintain the program and enforce IDDE issues effectively. The Town of Valdese has all of the MS4 mapping completed; however as development occurs the map and associated components will be updated accordingly. In the last permit cycle the Town did not conduct dry weather screening or maintain written procedures for dry weather field activity (II.D.2.d. Dry Weather Flow Program). Within the Stormwater Management Plan a schedule is to be created to conduct dry weather screening quarterly. Data such as date screening occurred, location of inspected outfall, and photos of outfall will be recorded in GIS. The Town of Valdese in the past has investigated IDDE complaints; however there is no tracking mechanism for documenting violations and enforcement actions (II.D.2.j.). Within the new permit cycle, the use of a GIS application to track and document IDDE cases will be used. This will allow the Town to identify priority areas based on historical data. Further, the Town will train municipal staff and the general public. to identify illicit discharges and illegal dumping through the use of educational outreach materials and training opportunities. Previously, no training had been administered (II.D.2.g. & h.). Educational material will be available to help educate public employees, businesses, and the general public about hazards associated with illicit discharges and the improper disposal of waste. Public complaints of any kind could be submitted to the Town through point contact on the webpage. A webpage portal will be estabhshed on the WPCOG websue, as well as, linked to on the Town website. The portal will be publicized, as well as, the stormwater hotline phone number, as mentioned in the public education and outreach and public involvement sections of this plan. A citizen can make a complaint via hotline number or through an email tool on the WPCOG webpage. The Town of Valdese will develop, manage, implement, document, report, and enforce an Illicit Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit discharge detection and elimination BMPs. Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.1: MS4 Map Ref. Measures to develop, update and maintain a municipal storm sewer system map including stormwater conveyances, flow direction, major tfalls and waters of the United States receiving stormwater discharges. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 19. MS4 Map DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 27 Table 15: Elicit Discharge Detection and Elimination BMPs Update and maintain a municipal 1. Verify accuracy of 1. Permit Year 1 1. Number of storm sewer system map existing GIS map/data (FY 19/20) corrections needed. including stormwater by comparing current conveyances, flow direction, data to field located major outfalls and waters of the major outfalls. 2. Locate funding 2. Permit Year 2 2. Funding source was United States receiving stormwater discharges. source (such as, but (FY 20/21) located: Yes or No; not limited to grants, status, fees, and fundraisers) for mapping the MS4 area. 3. Update existing map 3. Semi-annually 3. Number of updates; to include open approximately 33.3% channels, storm drain Permit Years 3-5 of MS4 mapping information, flow (FY21/22 - FY23/24) completed each year direction, (miles of pipe, type of conveyances, and pipe, number of major outfalls. This SCMs, number of data will be collected outfalls, flow direction with a mixture of located, number of preexisting GIS data conveyances mapped, (following its were receiving bodies validation), as well as, located/marked) Yes field work based off of or No. the Town Utilities and Planning Departments recommendation and known information. 4. Add new 4. Annually 4. Number of new infrastructure to map miles of pipe, type of as new construction Permit Years 1-5 pipe, number of occurs. (FYI 9/20 — FY23/24) SCMs, number of outfalls, flow direction located, number of conveyances mapped, were receiving bodies located/marked. Permit 3.4.2: Regulatory Mechanism Ref. Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to prohibit, detect, and eliminate illicit connections and discharges, illegal dumping and spills into the MS4, including enforcement procedures and actions. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for ]Implementation Annual Reporting Metric 20. Ordinance Adoption DRAFT NC5000488 SWMP Town of Valdese September 27, 2019 Page 28 Table 15: Illicit Discharge Detection and Elimination BMPs the IDDE ordinance wat provides legal authority to prohibit, detect, and eliminate illicit connections and discharges, illegal dumping and spills into the MS4 - including enforcement procedures and actions. 1. llratt and adopt an updated Illicit Discharge and Elimination ordinance. 2. Tra n staff (field and office) in illicit discharge detection and elimination procedures and 3. Enforcement of the IDDE ordinance to prohibit, detect, and eliminate illicit connections, discharges, illegal dumping and spills in to the MS4. (FY19/20) 2. Permit Year 1 (FY 19/20) 3. Continuous, following the adoption of the updated IDDE Qrdinance. Permit Years 1-5 (FY19/20 — FY23/24) 1. Yes or1io, sl summary; Date ordinance adopted. 2, Number of staff trained; record of staffs name, date, position, and responsibilities. 3. Number of in reported; Number of incidences re in Ned, Number still progress of abatement at time of annual report. Permit 3.4.3: IDDE Plan Ref. Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges, illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. The plan shall provide standard procedures and documentation to: a) Locate priority areas likely to have illicit discharges, b) Conduct routine dry weather outfall inspections, c) Identify illicit discharges and trace sources, d) Eliminate the source(s) of an illicit discharge, and e) Evaluate and assess the IDDE Program. BMP A B No. I Description of BMP I Measurable Goal(s) 21. I IDDE Plan Establishment and Revisions C Schedule for D Reporting DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 27 Table 15: Elicit Discharge Detection and Elimination BMPs Establish, maintain, and 1. Develop a written 1. Permit Year 1 1. Yes or No, status implement written IDDE Plan to IDDE Plan to define summary; date draft detect and address illicit the process of mapping (FY 19/20) plan is developed. discharges, illegal dumping and the MS4 (permit any non-stormwater discharges reference 3.4.1 MS4 Submit IDDE Plan to identified as significant Map), identifying, DEQ for approval. contributors of pollutants to the tracking and MS4, processing illicit discharges, illegal dumping, and other significant contributors of pollutants to the MS4. 2. Train staff on the 2. Permit Year 1 2. Number of processes defined in employees trained, the IDDE Plan (FY 19/20) date of training, and (reference 2I.E.1.) position of employee. 3. Adopt the IDDE 3. Permit Year 1 3. Yes or No, status Plan summary; (FY 19/20) Date procedures adopted. 4. Implement/Enforce 4. Permit Years 2-5 4. Number of IDDE the adopted IDDE Plan complaints resolved (FY 20/21 — 23/24) 5. Maintain and assess 5. Permit Year 5 5. Yes or No; Date the IDDE Plan based plan reviewed and on reporting metrics (FY23/24) findings; Number of from previous year's changes needed, findings. 22. Location of Priority Areas Establish and maintain procedures 1. Use MS4 map to 1. As BMP 19 is being 1. Number and to locate priority areas likely to locate outfalls near completed, priority location of each have illicit discharges. high pollution risk areas will be priority area areas (based on tax established. determined. office data outlining land classification for Continuous, weighting of the risk Permit Years 1-5 areas). To establish (FY19/20 — FY23124) high priority areas. 23. Dry Weather Outfall Inspections DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 30 Table 15: Illicit Discharge Detection and Elimination BMPs 24. 25. Establish procedure to con routine dry weather outfall inspections. 1. Establish a procedure for using a GIS application and create a schedule for dry weather outfall Illicit Discharges and Trace Sources Establish procedures to track and document illicit discharge investigations. IDDE Plan Enforcement and Maintain and implement the IDDE Plan to detect and address illicit discharges, illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. 2. Implement procedure established under BMP 23.B.1 1. Establish procedures to identify illicit discharges and trace 2. Maintain tracking documentation that follows the procedures listed in Permit reference 3.4.3 BMP 24.B.1, 1. Assess the local priority areas likely to have illicit discharges. 2. Conduct routine dry weather outfall inspections — with the goal of inspecting all outfalls over the 5 year 3. Identify illicit discharges and trace sources. 1. Permit Year 1 (FY19/20) 2. Quarterly, Permit Years 1-5 (FY19/20 — FY23/24) 1. Permit Year 1 (FY19/20) 2. Continuous, following establishment in Year 1. Permit Years 1-5 (FY 19/20 — FY23/24) 1. Continuous, after plan is established in Permit Year 1. Permit Years 1-5 (FY19/20 — FY23/24 2, Continuous, after plan is established in Permit Year 1, Permit Years 1-5 (FY19/20 — FY23/24 3. Continuous, after plan is established in Permit Year 1. PertnitYears 1-5 (FY19/20 — FY23/24 1. Yes or No, Status summary, Schedule. 2. Date hiSpections occurred,location of inspected outfall, and photos of outfall. 1. Was the tracking document established Yes or No; Status. 2. The dates) the illicit discharges were observed, the results of the investigation, follow-up documentation and the date the investigation 1. Provide status summary; number of prior ty areas (location and/or use) determined. 2. Number of outfalls inspected. 3. Number of illicit discharges and non - illicit discharges identified. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 31 i Table 15: Illicit Discharge Detection and Elimination BMPs 4. Eliminate the 4. Continuous, after 4. Number of sources of illicit plan is established in corrective actions discharge. Permit Year 1. completed. Permit Years 1-5 (FYI 9/20 — FY23/24) 5. Evaluate and assess 5. Annually 5. Number of the IDDE program — recommended Identify where Permit Years 1-5 improvements to improvement can be (FY19/20 — FY23/24) achieve best made based on management practices. statistical data collected. Update the Changes must be IDDE plan should the approved by DEQ evaluation find issues from the previously within the program approved IDDE Plan, Permit 14A: IDDE Tracking Ref. Measures for tracking and documenting the date(s) an illicit discharge, illicit connection or illegal dumping was observed, the results of the investigation, any follow-up of the investigation, the date the investigation was closed, the issuance of enforcement actions, and the ability to identify chronic violators. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 26. IDDE Tracking Staff will create a mechanism for 1. Establish a GIS 1. Permit Year 1 1. Yes or No, status tracking and documenting the database application summary; date(s) an illicit discharge, illicit for tracking illicit (FY 19/20) Date application connection or illegal dumping discharge connections created. was observed, the results of the and illegal dumping, investigation, any follow-up of outlining who made the investigation, the date the the complaint, location investigation was closed, the of complaint, note issuance of enforcement actions, prior offenses, status and the ability to identify chronic and action taken. 2. Track illicit 2. Continuous, 2. Number of issues violators will be recorded. discharges/connections following reported by staff; and illegal dumping establishment in Number of issues incidents with the GIS Permit Year 1. reported by citizens; tool (Permit reference Summary of findings. 3.4.4BMP 18.13,1) Permit Years 1-5 Differentiate staff (FYI 9/20 — FY23/24) discovery from citizen reporting to allow for review of outreach Program. DRAFT NC5000488 SWMP Town of Valdese September 27, 2019 Page'32 Table 15: Illicit Discbarge Detection and Elimination BMPs correct Illicit Discharge/connection and Illegal Dumping. 4. Establish and maintain a list of chronic violators, as applicable 5. Evaluate and assess the IDDE tracking application and program — Identify where improvement can be made based on statistical data collected, problems encountered and needs: following establishment in Permit Year 1. Permit Years 1-5 (F(19/20 — FY23/24 4. Continmous, following establishment in Permit Year 1. Permit Years 1-5 5. Continuous, following establishment in Year 1. Permit Years 2-5 (FY20/21— FY23/24) corrective actions taken, documentation of violations. 4. Number of chronic violators identified. 5. Number of recommended improvement to achieve best management practices. Permit 3.4.5: Staff IDDE Training Ref. Measures to provide training for municipal staff and contractors who, as part of their normal job responsibilities; may come into contact with or otherwise observe an illicit discharge, illicit connection or illegal dumping. Training shall include identifying and reporting illicit discharges, illicit connections and illegal dumping. Each staff training event shall be documented, including the agenda/materials, date, and number of staff participating. BMP A No. Description of BMP 27. Staff Training Train municipal staff and contractors to identify and report illicit discharges, illicit connections, illegal dumping and spills. Measurable Goals) 1. Identify staff member or contractors that are likely to observe an illicit discharge, illicit connection and illegal C Schedule for Implementation 1. Annually Permit Years 1-5 (FY19/20 — FY23/24) 1] Annual Reporting Metric 1. Number of employees (contractors included) identified. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 33 Table 15: Illicit Discharge Detection and Elimination BMPs events to educate staff events/personnel and contractors in Permit Years 1-5 trained; provide identifying and (FY19/20 — FY23/24) specific reporting illicit agenda/materials, date discharges, illicit and staff. connections, illegal 28. I IDDE Educator Establish appropriate staff contacts to field inquiries regarding IDDE education, outreach and complaints. This individual will be contactable through an IDDE hotline that will educate the caller on issues that 1. Identify specific staff members/positions who will serve as IDDE education and hotline contacts. 1. Permit Year 1 (FY19/20) 1. Document specific staff positions. 2. Train IDDE 2. Annually, beginning 2. Document and pertain to illicit discharges. education and hotline Permit Year 1 report number of staff contacts in IDDE (position) trained, awareness, complaint Permit Years 1-5 training dates, and call protocols, and (FY19/20 — FY23/24) topic covered. appropriate contacts for referral. 3. Publicize through 3. Continuous, from 3. Document and social media and Town date of first annual report a summary of and WPCOG training (see BMP the number of webpages contact 28.13.2) in Permit Year inquiries received, the information about 1 general type of inquiry IDDE reporting. (educational outreach (FY19/20) or complaint), and the contact mechanism (phone, email, Permit 3.4.6: IDDE Reporting Ref. Measures for the public and staff to report illicit discharges, illegal dumping and spills. The mechanism shall be publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Imulementation Metric 29. I IDDE Reporting Hotline DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 34 Table 15: Illicit Discharge Detection and Elimination BMPs Provide a hotline for the public 1. Create a hotline for 1. Permit Year 1 1. Yes or No, status and municipal employees to reporting IDDE summary; date report illicit discharges, illegal concerns. Designate (FY19/20) application created; list dumping, and spills. which staff are in of staff charged with charge of resolving the resolving the reported issue reported via the issues. hotline. Develop a standard script to enable consistent record keeping. 2, Train hotline staff to 2. Continuous, after 2. Were staff trained — differentiate between hotline is established. Yes or No, status; illicit discharge Names of trained staff complaints and Permit Years 1-5 in list format. stormwater (FYI 9/20—FY23/24) complaints. The staff will also be trained to keep adequate records of the calls for metrics. 3. Maintain the hotline 3. Semi-annually 3. Number of phone as a mechanism for calls received. reporting by updating Permit Years 1-5 the standard script (FY19/20 — FY23/24) with problems recognized by hotline employees. 4. Publicize Hotline by 4. Continuous, 4. Amount of materials including the number following the distributed; Number of in all educational establishment of the shares, likes, materials distributed, hotline. comments, reviews Share the hotlines and responses on number on the Town Permit Years 1-5 relevant social media. and WPCOG websites (FY19/20—FY23/24) and social media accounts. 30. IDDE Reporting Web -based Reporting Form Staff will establish and maintain a 1. Create a form for 1. Permit Year 1 1. Yes or No, status web -based google form where web based reporting. summary; complaints can be entered and (FY19-20) Date form is created. sent to the appropriate reporting 2. Establish links to 2. Permit Year 1 2. Yes or No, status individual. Publicize reporting tool in education outreach reporting form tool on summary; materials. the Town and (FY19-20) Date links are created. WPCOG websites and social media (included, but not limited to, Facebook). DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 35 Table 15: Illicit Discharge Detection and Elimination BMPs 3. Maintain the web 3. Annually, following 3. Number of reports based reporting tool. the creation of BMP made; method of 30.13.1, & 2. publicizing reporting option. Permit Years 1-5 (FY 19120 — FY23/24) 3. Publicize web -based 3. Continuously 3. Amount of materials reporting tool by following distributed. including the URL establishment of the address/location in all web tool. educational materials distributed. Permit Years 1-5 (FYIQ/?() _ FY29/24) 31. � IDDE. Reporting Efficiency Staff will provide a rapid response 1. Utilize the IDDE 1. Permit Year 1 1. Yes or No, status to all complaints received. Staff GIS application to summary; will record the response dates and track time of (FY19/20) Date application summary of results to improve complaint, site visit, created. IDDE program and application. type of complaint and all enforcement/resolution measures. 2. Evaluate response 2. Annually, following 2. High/Low times time. Work to establishment of GIS elapsed, and overall minimize response application. average time between time to reported issues the report and staff and record what is Permit Years 1-5 investigation; goal is causing those issues to (FY19/20 — FY23/24) to improve time to be fixed in later achieve best iterations of the plan. managementpractice! DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 36 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM In accordance with 15A NCAC 02H .0153, the Town of Valdese relies upon the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 and the NCG010000 permit for construction activities as qualifying alternative programs to meet the NPDES MS4 Permit requirements for all construction site runoff control measures to reduce pollutants in stormwater runoff from construction activities that result in land disturbance of greater than or equal to one acre and any construction activity that is part of a larger common plan of development that would disturb one acre or more. Table in: Qualifying Alternative Program Components for Construction Site Runoff Control Program Meets Whole Permit State or Local Program Name Legal Implementing Entity or Part of Reference Authority Requirement 3.5.1 - State Implemented SPCA Program 15A NCAC NCDEQ Whole 3.5A Chapter 04 The Town of Valdese will also implement the following BMPs to meet NPDES MS4 Permit requirements. Table 17: Construction Site Runoff Control BMPs Permit 3.5.6: Public Input Ref. Measures to provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. A I B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 32. Municipal Staff Training Train municipal staff who receive 1. Establish a sheet/list 1. Permit Year 1 1. Number and names calls from the public on the of trained municipal of staff trained; protocols for referral and tracking staff and citizens who (FY19/20) number of responses of construction site runoff control have reported generated by staff. complaints. construction run-off issues. 2. Train municipal 2. Annually, following 2. Document and staff on proper establishment of BMP report number of staff handling of 32.13.1. trained, training construction site runoff date(s), and topics control complaints. Permit Years 1-5 covered. (FY19/20 — FY23/24) DRAFT NCS0004&S SWMP Town of Valdese September 27, 2019 Page 37 Table 17: Construction Site Runoff Control BMPs 33. Means of Public Input 1. Develop a survey to 1. Permit Year 1 1. Was the survey Develop surveys and programs to obtain feedback about developed: Yes or No, give citizens methods of public perspective (FY19/20) Status. responding to how construction about construction runoff is being managed. Ask runoff in the Town. questions regarding: how they view construction runoff in the Town, what they think should be changed to improve upon said problems, and where they believe there should be better focus. 2. Administer the 2. Annually, following 2. Number of surveys survey to be the development of the administered; number distributed through survey, of valid surveys Town utility bills and received. left in municipal Permit Years 2-5 buildings. (FY 20/21 - FY 23/24) 3. Develop a web- 3. Permit Year 1 3. Web -based tool based reporting form developed; Yes or No, that allows citizens (FY19/20) Status, and the development community (separately distinguished) to write concerns and report construction runoff issues. The tool will be accessible on the Town and WPCOG webpages and social media. 4. Administer the web- 4. Continuous, 4. Number of reports based reporting form following the from Citizens; Number in BMP 3333, development of the of reports from web -based tool in development Permit Year 1. community. Permit Years 2-5 (FY 20/21 - FY 23/24) 5. Publicize the ability 5. Continuous, 5. Number of clicks on to report concerns following development the WPCOG website; about construction in Permit Year 1. number of likes and runoff issues via forms shares on WPCOG (BMP 33.13.3) on the Permit Years 2-5 social media Town and WPCOG (FY 20/21 - FY 23/24) platforms. websites and social media. DRAFT NCS000488 5WMP Town of Valdese September 27, 2019 Page 38 Table 17: Construction Site Runoff Control BMPs Permit 3.5.5: Waste Management Ref. Measures to require construction site operators to control waste such as discarded building materials, concrete truck washout; chemicals, litter, and sanitary waste at the construction site that may cause adverse impact to water quality. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 34. Waste Management Require construction site 1. Develop an 1. Permit Year 1 1. Ordinance operators to control waste at the ordinance that developed: Yes or No, construction site that may cause addresses construction (FY19/20) Status. adverse impact to water quality. site waste. 2. Adopt the ordinance 2. Permit Year 1, 2. Ordinance adopted: established in BMP following development Yes or No, Status. 34.13.1. of ordinance (FY19/20) 3. Enforce the adopted 3. Continuous, 3. Number of permits ordinance using a GIS following adoption of issued with erosion application (Permit the ordinance. and sedimentation Reference 3.4.4, BMP control plans; 26.13.1.) to track and Permit Years 1-5 Number of corrective document (FY19/20 — FY23/24) actions construction site taken/violations issued waste concerns and to active construction corrective actions. sites identifying waste management violations. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 39 PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM The Town of Valdese SWMP 2013 has policy language for deed restrictions and protective covenants. In the new S WMP permit cycle the language will also be included in the Stormwater Ordinance. An amendment to the ordinance will allow the language to have legal significance. Contracting WPCOG, an inventory of projects will be established (BMP 35.B,15 2, and 3) for developments within the municipal limits, this is in response to Permit Citation II.F.2.d, of the latest audit (2018). Along with the inventory list, proactive inspections will be administered by Staff semi-annually and the SCM owner will be required to have an inspection done by a certified private engineer annually to ensure SCM functionality (II.F.2.g.). Upon non-compliance, enforcement action will be taken, not a common practice in years past, but now the Town will have a GIS tracking mechanism to proactively enforce to obtain compliance (ILF.2.i.). This SWMP identifies the minimum elements to develop, implement and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb, greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that are located within the Town of Valdese and discharge into the MS4. These elements are designed to minimize water quality impacts utilizing a combination of structural Stormwater Control Measures (SCMs) and/or non-structural BMPs appropriate for the community, and ensure adequate long-term operation and maintenance of SCMs. In accordance with 15A NCAC 02H .0153 and .1017, the Town of Valdese implements the following State construction t- construction program requirements, which satisfy the NPDES Phase II MS4 post -construction site runoff control requirements as Qualifying Alternative Program(s) (QAPs) in the MS4 area(s) where they are implemented. Table 18: Qualifying Alternative Programs) for Post -Construction Site Runoff Control Program Local Ordinance /Regulatory State QAP Name State Requirements Mechanism Reference Water Supply Watershed (WS-IV) 15A NCAC 2B WS-IV Watershed Ordinance (See .0620 - .0624 map) Protected and Critical Areas DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 40 cl Town of Valdese Watersheds G 6 tlorin Be" no D J �teu�W P Rd � ', Q,A w 1.1Y/ amn ' Cuba or LAKERHODHISS - SAstwv^ --- a - e>'c Rmtop WATERSHED N - 3 / A h m� m, "are Dean Rd e5 ytp �j y a O\d OaklantlAv �xl - y�i l9velatlY -L veletlY Rd - e c 1\ Legend _E.d ` ] 3 o VaideseTown Limits I T I7 i- LAKE RHODHISS m (' card WATERSHED. b -- Drexel Town Limits - E uslOf o Rutherford College Town Limits wrr,�'"! M I - -J - e'abad at - £ [ .I County Boundary =4 fo Major Lakes 0 ~+Pu Water Supply Watersheds �. Ilgr sW fl m I s s Critical Area WSIV oP - Spring % Protected Area WS-IV �! ` \ am Tr i s to ❑ — --- Streams/Rivers r -�t1 eb Mayor Roads 0 (rtII I Om rfia. �2 - bG` ; Roads 1tleml jt—r'rtE-`3'Wviv- etaz ro I st s° F] Outfalls fJ i, l e �9 Irda 6 e° .. f'ti . ALDESE ` !.. 9 Via 1 i_ m° 0 0.5 1 Miles ` p I?,j I �/I gym, V - - P s:��l , , . The Town of Valdese is located completely within a water supply watershed and is required to follow those rules to ensure drinking water quality is being maintained. This is known as a Qualifying Alternative Program (QAP). The Town is also subject to the NPDES Phase If MS4 post -construction program requirements. These existing requirements will be codified in local ordinance(s) per BMP 37.13.1 and implementation per BMP 37.13.3-4. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 41 Table 19: Summary of Existing Post -Construction Program Elements Permit Requirements for Plan Review and Approval Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.2(a) Authority Stormwater Ordinance Section 9-3301.2 09,03,13 3.6.3(a) & 15ANCAC 02H.0153(c) Federal, State & Local Projects Stormwater Ordinance Section 9-3301.5 09,03,13 3.6.3(b) Plan Review Stormwater Ordinance Section 9-3302.2 09,03,13 3.6.3(c) O&M Agreement Stormwater Ordinance Section 9-3304.2 09.03,13 3.6.3(d) O&M Plan Currently not present n/a 3.6.3(e) Deed Restrictions/Covenants Stormwater Ordinance Section 9-3004.5 09,03,13 3.6.3(f) Access Easements Stormwater Ordinance Section 9-3004.5 09,03,13 Permit Requirements for Inspections and Enforcement Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.2(b) Documentation Stormwater Ordinance Section 9-3305.1 09,03,13 3.6.2(c) Right of Entry Stormwater Ordinance Section 9-3304.2 (B) 09.03.13 3.6.4(a) Pre -CO Inspections Stormwater Ordinance Section 9-3305.2 09,03,13 3.6.4(b) Compliance with Plans Stormwater Ordinance Section 9-3305.5 (C) 09,03,13 3.6.4(c) Annual SCM Inspections Stormwater Ordinance Section 9-3304.land 9-3304.3 09.03.13 3.6.4(d) Low Density Inspections Stormwater Ordinance Section 9-3304.3 09,03,13 3.6.4(e) Qualified Professional Stormwater Ordinance Section 401 09.03,13 Permit Requirements for Fecal Coliform Reduction Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.6(a) Pet Waste Town Code Section 8-2022 06,04,18 3.6.6(b) On -Site Domestic Wastewater Treatment Town Code Section 5-2003, 9-3502 06.26.95, k 09,03.13 The post construction Stormwater ordinance was adopted in 09.03.2013. It is noted that a new model ordinance has beer endorsed by the State. The Town of Valdese will be adopting the new ordinance within Year One of the NPDES permit cycle. The section numbers above are subject to change. This will be in addition to the States` new model watershed ordinance. The annual reporting metrics for the. post construction program are provided in Table 20: Post Construction Site Runoff Control BMPsbelowI Table 20: Post Construction Site Runoff Control BMPs Permit 4.1.3: Minimum Post -Construction Reporting Requirements Ref. Measures to document activities over the course of the fiscal year (July 1 — June 30) including appropriate information to accurately describe ogress, status, and results. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 35. 1 Standard Reporting DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 42 Table 20: Post Construction Site Runoff Control BMPs Implement standardized tracking, 1. Track number of 1. Continuous 1. Number of plan documentation, inspections and low density and high reviews performed for reporting mechanisms to compile density plan reviews Permit Years 1-5 low density and high appropriate data for the annual performed. (FY19/20 — FY23/24) density. self -assessment process. Data shall be provided for each Post - Construction/ Qualifying Alternative Program being implemented as listed in Tables 18 and 19. 2. Track number of low density and high density plans 2. Continuous Permit Years 1-5 2. Number of plan approvals issued for low density and high approved. (FY19/20 — FY23/24) density. 3. Maintain a current 3. Continuous 3. Summary of number inventory of low and type of SCMs density projects and Permit Years 1-5 added to the inventory; constructed SCMs (FY19/20 — FY23/24) and number and including SCM type or acreage of low density low density acreage, projects constructed; location and last Total number of SCMs inspection date. at time of review 4. Track number of 4. Continuous 4. Number of SCM SCM inspections inspections preformed. performed. Permit Years 1-5 (FYI 9/20 — FY23/24) 5. Track number of 5. Continuous 5. Number of low low density density inspections inspections performed Permit Years 1-5 performed - with the goal of (FY19/20 — FY23/24) inspecting all low density projects over the 5 year permit period. 6. Track number and 6. Continuous 6. Summary of type of enforcement Number and type of actions taken. Permit Years 1-5 enforcement actions (FY19/20 — FY23/24) taken. Permit 2.3 and 3.6: Qualifying Alternative Program(s) Ref. Measures to develop, implement and enforce additional BMPs in order to comply with the QAP state program requirements. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 36. Qualifying Alternative Program The QAP requirements are applicable to the Town of Valdese. DRAFT NCS000488 SWNIP Town of Valdese September 27, 2019 Page 43 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.2: Legal Authority Ref. Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to: (a) review designs and proposals for new development and redevelopment to determine whether adequate stormwater control measures will be installed, implemented, and maintained, (b) request information such as Stormwater plans, inspection reports, monitoring results, and other information deemed necessary to evaluate compliance with the Post -Construction Stormwater Management Program, and (c) enter private property for the purpose of inspecting at reasonable times any facilities, equipment, practices, or operations related to Stormwater discharges to determine whether there is compliance with the Post -Construction Stormwater Management Program. MP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 37. Phase H Post -construction Stormwater Ordinance This permit requirement will be 1. Develop the Phase 1. Permit Year 1 1. Phase II Post - met once the new, compliant, II Post -construction construction Phase II Post -Construction Stormwater (FY19/20) Stormwater Ordinance Stormwater Ordinance is adopted, Ordinance. is developed: Yes or see references provided in Table No, Status, 2. Adopt the Phase II 2. Permit Year 1 2. Phase II Post - 19, The Town will adopt and Post -construction construction maintain in effect the Phase II Stormwater (FY19/20) Stormwater Ordinance Stormwater Ordinance, which Ordinance. adopted: Yes or No, will give the Town legal authority status summary; to review designs for new Date ordinance development and redevelopment, adopted. 3. Train staff (field 3. Permit Year 1 3. Number of staff to ensure adequate stormwater controls, to request information, and office) in trained; to perform inspections on private Stormwater Ordinance (FY 19/20) property, and to perform other procedures and compliance activities related to enforcement actions. this measure. 4. Enforcement of the 4. Continuous, 4. Number of notices The ordinance shall reference the Phase 11 Post- following the adoption of violations issued; DEQ Design Manual as the construction and training of staff Number of Civil source of standards to be used in Stormwater Ordinance Citations issued; selecting, designing, evaluating, to ensure compliance. Permit Years 2-5 Number still in and maintaining structural and progress of abatement non-structural BMPs. (FY20/21 - FY23/24) at time of annual report, DRAFT NCS000488 SVJMP Town of Valdese September 27, 2019 Page 44 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.3: Plan Review and Approval Ref. Measures to maintain plan review and approval authority, standards and procedures to: (a) Require Federal, State, and local government projects to comply with Post -Construction Program requirements throughout the entire MS4 permitted area, unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative program, (b) Conduct site plan reviews of all new development and redeveloped sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of development or sale for compliance with 15A NCAC 02H . 10 17 and the qualifying alternative programs that apply within your jurisdiction, (c) Ensure that each project has an Operation and Maintenance Agreement that complies with 15A NCAC 02H. 1050(12), (d) Ensure that each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H .1050(13), (e) Ensure that each project has recorded deed restrictions and protective covenants, that require the project to be maintained consistent with approved plans, and (f) Ensure that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A NCAC 02H 1050 (9) and (10). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Metric 38. —Implementation Plan Review and Approval This permit requirement will be 1. Establish a post 1. To be completed in 1. Plan review achieved once the post- construction plan Permit Year 1, checklist was construction ordinance is adopted review checklist to established: Yes or (Permit Reference 3.6.2 BMP include all items (FY19/20) No, Status. 37.13.2) needing to be completed prior to Review plans for all new Certificate of development and redevelopment Occupancies. 2. Review plans for all 2. Continuous, 2. Number of projects sites that will disturb greater than or equal to one acre (including new development and following the adopted reviewed; Number of projects less than one acre that are redevelopment sites of the Post- projects approved. part of a larger common plan of that will disturb greater construction development or sale), than or equal to one stormwater ordinance, (To be documented by acre. This is to referenced in BMP listing type - Non - including projects less 37.13.2. governmental, than one acre that are Federal, State or Local part of a larger Permit Years 1-5 Government) common plan of (FYI 9120 — FY23/24) development or sale. This requirement also applies to Federal, State, and Local Government projects. 3. Review checklist 3. Annually, following 3. Number of updates annually to determine if establishment of the made and summary of items need to be added checklist referenced in reason needed. or modified. BMP 38.13.1. Permit Years 1-5 (FY19/20 — FY23/24) DRAFT NC5000488 SWMP Town of Valdese September 27, 2019 Page 45 Table 20: Post Construction Site Runoff Control BMWs 40. The Operation and Maintenance (O&M) agreement requires owners of structural BMPs to perpetually maintain and operate SCMs according to the O&M pIan submitted during the plan review process, and require submission of annual inspection reports written by a qualified professional. Recordation The plan review process shall include verification that permanent legal mechanisms are in effect that will ensure development activities will maintain the project consistent with approved plans. A recorded deed or protective covenants, along with an accesses easement is established through recordation. 1. Ensure that each project has an approved O & M Agreement prior to CO. To be included in the project checklist and required prior to CO. 2. Ensure that each project has an O & M Plan to require annual inspections to be completed by a qualified professional. 1. Ensure each project has recorded deed restrictions and protective covenants in efFeet to ensure development activities will stay consistent with the approved plans (low and high density 2. Ensure that each SCM and the associated maintenance access are recorded in a permanent easement to allow access for inspection and maintenance of the 1. Continuous Permit Years 1-5 (FY 19/20 — 23/24) 2. Continuous, to be included in the project checklist and required prior to CO. Permit Years 1-5 1. Continuously, to be included in the project checklist and required prior to CO. Permit Years 1-5 (FY19/20 — FY 23/24) 2. Continuously, to be ncluded in the project checklist and required prior to CO. Permit Years 1-5 (FY 19/20 — FY 23/24) 1. Number of approved O & M Agreements. 2. Number of O & M it received and approved. 1. Number of deed restrictions and protective covenants recorded. Document high density versus low density projects. 2. Number of access easements recorded. Permit 3.6.4: Inspections and Enforcement Ref. Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct construction t- construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy. Alternatively, the project owner may provide a surety bond to guarantee compliance with the approved plan(s), (b) Ensure that the project has been constructed in accordance with the approved plan(s), (c) Ensure annual inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance Agreement, (d) Ensure inspection of low density projects at least once during the permit term, and (e) Require that inspections be conducted by a qualified professional. 93 L DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 46 Table 20: Post Construction Site Runoff Control BMPs BMP Description of BMP Measurable Goal(s) Schedule for Annual Reporting No. Implementation Metric 41. Inspection and Enforcement This permit requirement will be 1. Prior to issuance of a 1. Continuously, 1. Number of Pre -CO achieved upon the adoption of the CO a qualified inspections completed; Stormwater Post -construction professional shall Permit Years 1-5 Number of duplicate Ordinance, reference Table 19. perform an inspection (FY19/20-FY23/24) inspections required. After project completion, but on all project SCMs to prior to issuance of a certificate of ensure compliance occupancy, an inspection will be unless corrections are completed by a qualified needed. If corrections professional to ensure the project are required, then has been constructed according to follow up inspections plan. Following approval, annual will be required until inspections by a qualified the SCM and project professional will be completed. site is compliant prior Low density projects will be to the issuance of CO. 2. Staff will pet -form 2. Semi -Annual 2. Number of inspected once in a permit tern. inspections of all SCMs inspections completed. (both government and Permit Years 1-5 Findings reported in non -government), (FYI9/20 — FY23/24) chart form. 3. Owner shall have a 3. Annually 3. Number of certified professional inspections completed engineer perform SCM Permit Years 1-5 and documentation inspeetion/s in (FY19/20 — FY23/24) received. Number of accordance with the O SCM/s not compliant. & M Agreement and Document required DEQ SCM manuals. corrective action. 4. 20% or more of the 4. Continuously 4. Number of low inventoried low density density projects; sites will be inspected Permit Years 1-5. Number of inspection each year to ensure (FY19/20-23/24) completed and impervious has not findings. been added producing a high density situation creating the need for an SCM. Permit 3.6.5: Documentation Ref. Measures to maintain adequate documentation and standardized inspection and tracking mechanisms to: (a) Maintain an inventory of post -construction SCMs and low density projects, (b) Document, track and maintain records of inspections and enforcement actions. Tracking shall include the ability to identify chronic violators, and (c) Make available to developers all relevant ordinances, post -construction requirements, design standards, checklists, and/or other materials. A I B C D BMP No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 42. Documentation — Low Density 1 :. \ 111 a :: Wj/kTJ_ Town of Valdese September 27, 2019 Page 47 Table 20: Post Construction Site Runoff Control BMPs This permit requirement will be 1. Establish a low 1. Once during the 1. In House: List of achieved upon the adopted of the density project list to permit cycle. low -density permitted Stormwater Post -construction include existing sites. projects: Status to Ordinance, reference Table 19. Upon the issuing a Permit Years 1-5 include location, Ensure tracking and records are zoning permit record (FYI 9/20 — FY23/24) impervious maintained on low density the project calculations, projects to ensure that upon demographics on the enforcement action, inspection impervious overages low density list for chronic violators, date can be determined and corrective future reference. of last inspection and actions taken. Ensure findings. Apply informational materials are corrective action with available to guarantee impervious overages. accessibility outside of office A summary will be hours. Through tracking and report each year to inspections chronic violators will DEQ, 2. Once established 2. Annually 2. Number of projects be identified. monitor the low in violation and density projects to Permit Years 1-5 remedy established. ensure the projects (FY 19/20 — FY23/24) have not expanded into a high density classification thus needing a SCM. 3. Provide educational 3. Continuously 3. Number of material to the general materials handed out public about low Permit Years 1-5 density development, (FY19/20—FY23/24) such as, but not limited to, during the issuance of zoning permits, distributed through mailings, social media, and at events. 43. Documentation — High Density Ensure tracking and records are 1. Maintain an 1. Continuous 1. Inventory of high maintained on projects to ensure inventory of all density projects that upon granting of final CO developments and Permit Years 1-5 completed: Yes or No, and follow-up inspection redevelopments (FYI 9/20 — FY23/24) status. impervious overages can be (public and private) determined and corrective actions with SCMs. Update taken. Ensure informational inventory as sites are materials are available to reviewed, approved, guarantee accessibility outside of and constructed, office hours. Through tracking DRAFT NCS000488 SWNIP Town of Valdese September 27, 2019 Page 48 Table 20: Post Construction Site Runoff Control BMPs and inspections, chronic violators 2. Prior to Certificate 2. Once prior to CO. 2. Number of recorded will be identified. of Occupancy is plats and deeds to granted deed Permit Years 1-5 include name of restrictions and an (FYI 9/20 — FY23/24) project, type of access easement plat Depends on when document, and shall specify project is nearing impervious limits. impervious limitations completion. and be recorded. 3. Provide educational 3. Continuous, such as, 3. Number of material to developers but not limited to, informational about high density during the issuance of materials are handed development. At a zoning permits, out. minimum, hyperlinks distributed through will be maintained on mails, social media, and the Town's web page at events, directed to the Ordinance and to the Permit Years 1-5 BMP Design Manual. (FY19/20 — FY23/24) 4. Establish links to all 4. Annually 4. Items placed on the ordinances, manuals, webpage: Yes or No, policies, checklist, Permit Years 1-5 Status, design standards, (FY19/20 — FY23/24) and/or other materials. Permit 3.6.6: Fecal Coliform Reduction Ref. Measures to control, to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H .1017(7). At a minimum,. the program shall include: (a) A pet waste management component, which may be achieved by revising an existing litter ordinance, and (b) An on -site domestic wastewater treatment system component, if applicable, which may be coordinated with local county health department, to ensure proper operation and maintenance of such systems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 44. Fecal Coliform Reduction This permit requirement will be 1. Establish a Pet 1. Permit Year 1 1. Pet Waste met once the Post -Construction Waste Ordinance to Ordinance established: Stormwater Ordinance is adopted, address fecal (FY19/20) Yes or No, Status. see references provided in Table coliform stressors 19. Fecal Coliform is a water from pet waste quality stressor. Protective runoff. 2. Establish a Waste- 2. Permit Year 1 2. Waste water measures will be established through adoption of pet waste and water treatment treatment system waste water treatment system ordinance to address (FY19/20) Ordinance was ordinances. The control of Pet environmental established: Yes or Waste and the waste -water stressors related to No, Status. treatment system will be mandated waste water in the NPDES Phase II Stormwater management. Ordinance. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 49 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the Town of Valdese municipal facilities and operations. Pollution prevention and good housekeeping is accomplished through the implementation of seven required programs, which collectively address the ultimate goal of preventing or reducing pollutant runoff from municipal operations such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and municipal storm sewer system maintenance. Pollution prevent on and good housekeep ng for municipal operations includes the fallowing programs 1. Municipal Facilities Operat on and Ma ntenance Program (O & M) 2. Spill Response Program 3. MS4 Operation and Maintenance Program 4. Municipal SCM Operation and Maintenance Program 5. Pesticide, Herbicide and Fertilizer Management Program 6. Vehicle and Equipment Cleaning Program 7. Pavement Management Program The Town of Valdese will manage, implement and report the pollution prevention and good housekeeping BMPs as specified in Table 21 below for each required program. In response to the inefficiencies identified in the MS4 Inspection Report, municipal facilities were not being inspected, as required per DEQ (H.G.2.b. and g.). Per BMPs 45-61, municipal facilities and the practices at those facilities will be inspected on an annual basis. Upon the latest audit (H:G.2.d.) in reference to streets; roads, and public parking lot maintenance, the Town provided a verbal estimate of the quantity of material removed; however no documentation was available at the time of the inspection. Several of the BMPs below address this issue by developing, adopting, and maintaining procedures that focus on pollutant removal in these impervious areas. Permit ref: 3.7.7 BMP's 58-61 address this prior lack of evaluation and program implementation. BMP 58 focuses on setting schedules and requirements for street/parking lot sweeping. BMPs 59 and BMP 60 focuses on minimizing and collecting litter/debris, with BMP 59.13.2 working in part as a community outreach program. BMP 61 addresses procedures for cleaning the oils, fluids, and debris that can come from car accidents by utilizing the developed standard spill procedures as necessary according to II.G.2.c. The Town of Valdese uses a vac -truck to clean the storm sewer conveyance system. There was a lack of documentation addressing when the cleanings occurred; therefore a more abundant effort will be made documenting activities associated with maintenance of the MS4. Permit Ref: 3.7.3 BMP's 48-51 focus on the training, inspection, and maintenance of said system. BMP 48 develops the required O&M plan which defines procedures/schedules for each facility, BMP 49 trains staff to perform maintenance using correct procedures, and BMP 50 focuses on inspection of the MS4 and documentation. Within the Town of Valdese only employees who are certified are allowed to administer herbicides and fertilizers. Contracted personnel administer pesticides. BMP 54 focuses to ensure all staff using pesticides (if staff decides to change practice), herbicides, and fertilizers are officially certified and following appropriate (minimal) usage. BMP 55 focuses on tracking certification, as well as, the copies of permits of both municipal staff and contractors. The Town of Valdese has a small fleet of vehicles and equipment. BMP 56 focuses on the washing side of the problem, addressing training, protocol, requirements, and options for municipal vehicle operators. BMP 57 focuses on the other side of the issue, ensuring that vehicle maintenance facilities are correctly disposing of waste and that permitting is correctly followed to ensure MS4 compliance DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 50 H.G.2.i addresses inconstant/lacking training for municipal employees in regards to good housekeeping and pollution practices. This is addressed in: 46.13.5, 47.13.4, 49.13.1 BMP 53.13.5, 54.13.1, 56.13.2, 57.b.3, 61.b.1, and 45.b.1. Each of these BMPs focusing on each of the 7 programs required by the permit. Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.1: Municipal Facilities Operation and Maintenance Program Ref. Measures to manage facilities that are owned and operated by the permittee and have the potential for generating polluted stormwater runoff. The permittee shall maintain a current inventory of municipal facilities; perform facility inspections and routine maintenance; establish specific frequencies, schedules, and standard documentation; provide staff training on general stormwater awareness and implementing pollution prevention and good housekeeping ractices. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 45. Municipal Facilities Operation & Maintenance (O & M) Plan An O & M Plan must be 1. Develop an O & M 1. Permit Year 1 1. Was the O & M developed, adopted and plan. The plan will Plan developed, Yes or maintained to define the define required (FY19/20) No, Status, expectations of the municipal procedures per facility facilities which are subject to to inspect, maintain stormwater/MS4 regulations. The and evaluate. 2. Adopt the written O 2, Permit Year 1 2. Was the O & M O & M plan will provide reference to the expected & M Plan as Plan adopted, Yes or documents to correctly permit developed in Permit (FY19/20) No, Status, municipal facilities. Each Reference 3.7.1, BMP municipal facility in which this is 45.13.1. applicable will adopt an O&M 3. Administer the O & 3. Continuous, 3. Number of plan. The adoption of a plan M Plan as referenced following development municipal facilities entails signing a legally binding in BMP 45.13.1, and adoption of the O inspected; Note any document that defines the party & M Plan location in plan changes that are charged with ensuring that the BMP 45.B.1 and 2. needed. All facility is correctly maintained amendments are to be and documentation of the Permit Years 2-5 approved by DEQ. maintenance is adequate. The (FY20/21 — FY23/24) documents will also define the procedures in how the facility will be maintained. 46. Municipal Facilities DRAI'T NCS000488 SWMP Town of Valdese September 27, 2019 Page 51 Table 21: Pollution Prevention and Good Housekeeping BMPs The municipal facilities operation 1. Verify the existing 1. Permit Year 1 1. Is the facility list and maintenance program will list of facilities is complete: Yes or No, ensure the facilities are being correct by using tax (FY19/20) Status. managed/maintained in a way that records and Town does not negatively impact water data. Field visits may quality. The facilities will be be needed if data is not maintained in a scheduled and clear, 2. Use tax data and 2. Permit Year 1 2. Number of potential well defined manner by preforming routine inspections. If facility visits to pollutant/spill risk a facility is subject to SPCC determine if the (FY19/20) facilities. requirements, then specific facility has a potential inspection procedures will be pollutant and/or spill completed per the SPCC risk. requirements. 3. Perform facility 3. Annually 3. Number of facilities inspections to insure inspected and dates the municipality is Permit Years 1-5 inspected; performing good MS4 (FY19/20-FY23/24) Number of SPCC housekeeping permitted facilities measures, inspected. 4. Document and 4. Annually 4. Number of issues correct issues found identified/recorded; during inspections. If Permit Years 1-5 Number of corrective a facility is subject to (FY19/20-FY23/24) actions taken SPCC requirements, (SPCC permitted then ensure the correct facilities and non - documentation is in SPCC facilities). place for compliance with the regulation/ requirements. 5. Train municipal 5. Permit Years 1-5 5. Document and facility staff on proper report number of staff stormwater awareness FY 19-20 trained and good FY 20-21 housekeeping FY 21-22 methods. FY 22-23 FY 23-24 Permit 3.7.2: Spill Response Program Ref. Measures for facilities and operations that store and/or use materials that have the potential to contaminate storrawater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill response procedures. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 47. 1 Spill Response DRAFT NCS000488 SWNIP Town of Valdese September 27, 2019 Page 52 Table 21: Pollution Prevention and Good Housekeeping BMPs Spill response program for 1. Develop a written 1. Permit Year 1 1. Were the procedures facilities and operations that store spill response created: Yes or No, and/or use materials. The program procedures plan (FY19/20) status summary. will be designed in a way that according to the tracks likely polluters, as well as, Permit Citation in designate the procedures/materials NPDES MS4 audit. required for spill response in 2. Adopt the spill 2. Permit Year 1 2. Plan adopted: Yes those facilities. The spill response response procedures or No, status summary plan is an internal policy plan as defined by (FY19/20) Date of adoption. document; therefore would need Permit Reference to be put in place once completed. 33,2, BMP 47.13.1. 3. Maintain spill 3. Annually 3. Number of updates response procedures in to the plan and reason response to problems Permit Years 1-5 for update, that may arise from (FY19/20-FY23/24) implementation of spill procedures. 4. Train staff on spill 4. Annually 4. Document and response procedures. report number of staff Permit Years 1-5 trained; Number of (FY19/20-FY23/24) facilities trained 5. Respond in a timely 5. Continuous, 5. Number of issues manner to spills as following the identified — document they occur and manage establishment of the when and where; the spiE/s following plan in Permit Year 1. Number of corrective established spill actions taken, procedures, Permit Years 1-5 documenting type of (FY19/20-FY23/24) spill. Permit 3.7.3: MS4 Operation and Maintenance Program Ref. Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and maintenance staff training on stormwater awareness and pollution prevention, perform MS4 inspections, maintain the collection system including catch basins and conveyances; and establish specific frequencies, schedules, and standard documentation. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 48. MS4 Operation & Maintenance (O & M) Plan An O & M Plan must be 1. Develop an O & M 1. Permit Year 1 1. Was the O & M developed, adopted, and plan to define required Plan developed: Yes maintained following the procedures to schedule (FY19/20) or No, status. requirements of the MS4 NPDES inspections, perform Phase lI Stormwater collection maintenance and system permit. The O&M plan evaluations of the must also be submitted to the stormwater collection DEQ for approval. system. DRAFT NCS0004$$ SWMP Town of Valdese September 27, 2019 Page 53 Table 21: Pollution Prevention and Good Housekeeping BMPs 2. Submit the 2. Permit Year 1 2. Was the O&M plan developed O&M plan approved by DEQ: to DEQ for approval. (FY19/20) Yes or No, Status, 3. Adopted the 3. Permit Year 1 3. Was the O & M approved written O & Plan adopted, Yes or M Plan as developed (FY19/20) No, Status. in Permit Reference 3.7.31 BMP 48.13.1, 4. Administer the O & 4. Continuously, 4. Number of MS4 M Plan as references following development inspections completed; in BMP 48.13.1. and adoption of the O Number of corrections & M Plan location in needed based on BMP 48.13.1 and 2. inspection findings; Note any plan changes Permit Years 2-5 that are needed. (FY20/21- FY23/24) 49. MS4 Training Provide MS4 training to 1. Hold MS4 training 1. Annually 1. Number of municipal and contracted staff to events to educate staff events/personnel minimize pollutants in the on stormwater Permit Years 1-5 trained; provide stormwater collection system and awareness and (FY19/20-FY23/24) summary of topics prevent unnecessary damage and pollution prevention. covered during wear on the system. training. 50. MS4 Inspection MS4 inspections to ensure 1. Inspect and maintain 1. Continuous 1. Number of catch clogged lines, non-functioning the MS4 infrastructure basins, outfalls, and SCMs, and drainage inadequacies such as pipes, major Permit Years 1-5 conveyances are identified. outfalls, stormwater (FY19/20-FY23/24) inspected; Number of conveyances, and issues report. basins to ensure functionality. 51. MS4 Maintenance MS4 inspections to ensure 1. Catch basin and 1. Continuous, as 1. Number of catch clogged lines, non-functioning conveyance system problems are basins and conveyance basins, and drainage inadequacies maintenance activities identified. systems cleaned. are repaired. If the municipality are performed cannot reasonably maintain issues periodically or as Permit Years 1-5 with MS4 infrastructure found needed. (FY19/20-FY23/24) that year, it can be contracted out to licensed engineers if the Town chooses to do so. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 54 Table 21: Pollution Prevention and Good Housekeeping BMPs 2. Maintenance 2. Continuous 2. Number of Records are to be completed work order maintained in Public Permit Years 1-5 tickets and/or GIS map Works' automated (FY19/20-FY23/24) updates. work order system and/or by the WPCOG GIS application Permit Reference 3.4.4, BMP 26, Permit 3.7.4: Municipal SCM Operation and Maintenance Program Ref. Measures to manage municipally -owned, operated, and/or maintained structural SCMs that are installed for compliance with the permittee's post -construction program. The permittee shall maintain a current inventory of SCMs, perform SCM inspections and maintenance, and shall establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Implement Annual Reporting Metric 52. Municipal SCMs Operation & Maintenance (O & M) Plan Measures to manage (inspect 1. Develop an O & M 1. Year 1 1. Was the O & M and/or clean) municipally -owned, plan that will define Plan developed, Yes or operated, and/or maintained required procedures to (FY19/20) No, Status. structural SCMs. This will entail inspect, maintain and following the schedule and evaluate stormwater procedures defined in the O & M structures/practices. 2. Adopted the written 2. Year 1 2. Was the O & M Plan once developed and adopted. O & M Plan as Plan adopted, Yes or developed in Permit (FY19/20) No, Status, Reference 3.7.4, BMP 52,13,1. 3. Administer the O & 3. Continuous, 3. Number of M Plan as referenced following development municipal SCMs in BMP 52.13.1. and adoption of the O inspected; Note any & M Plan location in plan changes that are BMP 52.13.1 and BMP needed. All 52.13.2 amendments are to be approved by DEQ. Permit Years 2-5 (FY20/21-FY23/24) 53. Municipal SCMs DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 55 Table 21: Pollution Prevention and Good Housekeeping BMPs The municipal SCM operation 1. Verify the existing 1. Permit Year 1 1. Is the SCM list and maintenance program will list of municipal SCMs complete: Yes or No, ensure the structures are being is correct by visiting (FY19/20) Status managed/maintained in a way that the sites to determine (Location and type to does not negatively impact water type and condition. be documented). quality. The SCMs will be Use aerial photography maintained in a scheduled and in conjunction with well defined manner as written in Town records to the O & M. determine SCM location/ ownership. 2. Maintain Inventory 2. Continuous 2. Number of SCMs of municipally owned added with type of SCMs. Add all new Permit Years 1-5 each SCM, date, SCMs as they are (FY19/20-FY23/24) location documented constructed. 3. Perform annual 3. Annually 3. Number of SCMs inspections and inspected maintenance of Permit Years 1-5 municipally owned (FY19/20-FY23/24) SCMs to ensure the operation and maintenance agreements are being followed. 4. Document and 4. Annually 4. Number of issues correct issues found identified/recorded; during inspections. Permit Years 1-5 Number of corrective (FY19/20-FY23124) actions taken. 5. Train municipal 5. Annually 5. Document and staff on SCM report number of staff housekeeping. Permit Years 1-5 trained, training (FY19/20-FY23/24) date(s) and topics covered. Permit 3.7.5: Pesticide, Herbicide and Fertilizer Management Program Ref. Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine pollution prevention and chemical use, storage and handling training, and shall ensure compliance with permits and applicator certifications. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 54. Pesticide, Herbicide and Fertilizer Training to Staff DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Table 21: Pollution Prevention and Good Housekeeping BMPs Measures to minimize water 1. Provide training to 1. Annually 1. Number of quality impacts from the use of staff on the use, events/personnel landscaping chemicals. The only storage and handling Permit Years 1-5 certified. staff who will be allowed to to get officially (FY19/20-FY23/24) utilize pesticides, herbicides, or certified. The training fertilizers will be certified will/should include individuals who must use methods methods of using to minimize the amounts used. minimal chemicals to reduce harmful effects, especially around SCM maintenance. 55. Pesticide, Herbicide and Fertilizer Compliance Ensure compliance with permits 1. Maintaining copies 1. Annually 1. Report Number of and certifications for the of licenses and certified personnel. administering of pesticides, certifications of all Permit Years 1-5 herbicides, and fertilizers to staff and contractors (FY19/20-FY23/24) ensure application of the who use landscaping chemicals is less impactful to chemicals. stormwater runoff. Only certified landscapers/sprayers are the ones applying pesticides, herbicides, and fertilizers. Permit 3.7.6: Vehicle and Equipment Cleaning Program Ref. Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicle and equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to NPDES industrial permitting comply with those permit requirements, provide routine pollution prevention training to staff, perform routine inspections, and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 56. Vehicle and Equipment Cleaning DRAFT NCS000488 S WMP Town of Valdese September 27, 2019 Page 57 Table 21: Pollution Prevention and Good Housekeeping BMPs Prevent or Minimize 1. Establish 1, Permit Year 1 1. Was the protocol Contamination of Stormwater appropriate protocol established: Yes or No, Runoff from all areas used for for containing and (FY19/20) status. Vehicle and Equipment Cleaning. disposing of vehicle and equipment wash water. Wash water can be directed to the sanitary sewer or to vegetated areas. Where cleaning operations cannot be performed as described above and when operations are performed in the vicinity of a storm drainage collection system, the drain is to be covered with a portable drain cover during cleaning activities. Any excess standing water shall be removed and properly handled prior to removing the drain cover. OR another acceptable method is installation of a SCM to capture and treat the wash water runoff. 2. Provide routine 2. Continuously, 2. Number of training pollution prevention following the events/personnel training to staff. establishment of the trained protocol located in BMP 56.13.1, Permit Years 1-5 (FY19/20-FY23/24) I I ; : ► 111 .A/ Town of Valdese September 27, 2019 Page 58 Table 21: Pollution Prevention and Good Housekeeping BMPs 3. Wash all municipal 3. Continuous 3. Method of vehicle light vehicles, Town and equipment emergency vehicles, Permit Yeats 1-5 washing documented and equipment using (FY19/20-FY23/24) to include one of the an appropriate method methods listed in BMP established in BMP 56.13.1. Provide 56.13.1, or utilize a quarterly invoices commercial carwash from commercial facility contains and carwash if utilized. treats wash water where applicable. 57. Vehicle and Equipment Maintenance Measures to ensure that vehicles 1. Ensure the Town 1. Permit Years 1 1. Log of industrial maintained at municipal facilities has obtained a NPDES permits and status. have waste (included, but not industrial permit for all (FY19/20) limited to, oils, any running subject municipal fluids, batteries, belts and other facilities/operations non -fluid vehicle waste) must be 2. Perform waste 2. Annually 2. Number of disposed of following DEQ inspections. inspections and requirements. Permit Years 1-5 maintenance actions to (FY19/20-FY23/24) include date and location. 3. Provide routine 3. Annually 3. Number of training pollution prevention events; number of and waste management Permit Years 1-5 personnel trained. training to staff. (FY19/20-FY23/24) Permit 3.7.7: Pavement Management Program Ref. Measures to reduce pollutants in stormwater runoff from municipally -owned streets, roads, and parking lots within the permittee's corporate limits. The permittee shall implement measures to control litter, leaves, debris, particulate and fluid pollutants associated with vehicles, and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 58. Street and Parking Lot Sweeping Measures to reduce pollutants in 1. Street/curb and 1. Continuous 1. Total number of stormwater runoff from gutter sweeping is a lane miles ran by the municipally -owned streets, roads, regular operational Permit Years 1-5 street sweeper, and parking lots within the task that is performed. (FY19/20-FY23/24) ennittee's corporate limits. 59. 1 Litter Management DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 59 Table 21: Pollution Prevention and Good Housekeeping BMPs Collect litter in public areas and 1. Remove litter from 1. Continuous 1. Number of full time parking lots to reduce negative Downtown employees impacts on water quality. streets/sidewalks and Permit Years 1-5 responsible; empty public waste (FY19/20-FY23/24) Number of trash bags receptacles three times used. per week or as needed. 2. Collect litter from 2. Annually 2. Number of public right-of-ways collection events and outside of Downtown Permit Years 1-5 amount of trash on an as -needed basis (FY19/20-FY23/24) collected/disposed of utilizing available staff for each event or community (pounds); volunteers. Number of staff and/or volunteers. 60, Leaf Collection Implement measures to control Collect leaves with 1. Semi -Annually 1. Number of cubic leaves and debris within the vacuum -style yards collected. municipal Town limits (to include equipment from Permit Years 1-5 all properties). October 15 through (FY19/20-FY23124) January 15, with each street collected twice during this period. 61. Vehicle Pollutant Management Measures to prevent and minimize ze 1. Train first 1. Annually 1. Number of first contamination of stormwater responders for responders (staff) runoff from vehicle pollutants minimizing, Permit Years 1-5 trained and date of following an accident. collecting/disposing of (FY19/20-FY23/24) training, fluids and other vehicular pollutants following an accident. 2. Continue equipping 2. Annually 2. Amount of materials the first responder used/replaced in kits, vehicles with spill kits Permit Years 1-5 and material (FY19/20-FY23/24) containment tools. 3. Public Education to 3, Annually 3. Number of materials include information handed out. about vehicle leaks in Permit Years 1-5 distributed materials (FY19/20-FY23/24) and other educational resources. Following BMP Permit Reference 3.2 outreach to target audiences for guidance. DRAFT NCS000488 SWMP Town of Valdese September 27, 2019 Page 60 Table 21: Pollution Prevention and Good Housekeeping BMPs 4. Illicit Discharge 4. Annually 4. Number of issues enforcement for documented; number significant vehicle Permit Years 1-5 corrected. leaks from parked cars. (FY19/20-FY23/24) Reference Permit Reference 3.4.2 & 3.4.3 Town of Valdese September 27, 2019 Page 61