Loading...
HomeMy WebLinkAbout20191311 Ver 1_PCN Form Submission_20190930DR 02*10n of Water R"Ourc" Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r Yes r No Is this project a public transportation project?* r Yes r No Charge only if needed. BIMS # Assigned 20191311 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Chad Coburn:eads\cccoburn Information for Initial Review 1a. Name of project: COURTESY COPY - Bellamy Townhomes 1a. Who is the Primary Contact?* Dana A. Lutheran 1b. Primary Contact Email:* dlutheran@segi.us Date Submitted 9/30/2019 Nearest Body of Water Mill Creek (18-77-1-1) Basin Cape Fear Water Classification C;sW Site Coordinates Latitude: 34.25123 A. Processing Information County (or Counties) where the project is located: Brunswick Is this project a public transportation project?* r Yes r No Longitude: -78.03005 1a. Type(s) of approval sought from the Corps: V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable venters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (NWP) F- Regional General Permit (RGP) r- Standard (IP) Version# * 1 Reviewing Office* Wilmington Regional Office - (910) 796-7215 1c. Primary Contact Phone:* (910)228-1841 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: P 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 12 - Utility Lines 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - E)press F Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* f Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 19. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Summerlin Trace, LLC 2b. Deed book and page no.: 3110/1143 2c. Responsible party: Patrick Maaarone 2d. Address Street Address 726 Sawmill Rd. Address Line 2 aty Rocky Point Postal / Zip Code 28457 2e. Telephone Number: (910)520-1388 2g. Email Address:* pmaaarone@gmail.com C. Project Information and Prior Project History State / Rovince / Region NC Country US 2f. Fax Number: r Yes r No rYes rNo 1. Project Information 1b. Subdivision name: (d appropriate) NA 1c. Nearest municipality/town: Leland 2. Project Identification 2a. Property Identification Number: 2b. Property size: 029KA009 14.24 2c. Project Address Street Address Village Road Address Line 2 C7ty State / Rovince / legion Leland NC Fbstal / Zip Code Country US 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Mill Creek (18-77-1-1) 3b. Water Resources Classification of nearest receiving water:* C;sW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12 -digit HUC in which the project is located 0303000505 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The site is undeveloped, wooded and located Within a rapidly growing area of Leland. Residential is the general land use. A Swamp Forest Wetland encroaches into the northwestern portion of the property and into the 30' utility easement, through which the proposed sewer line will be installed. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes F No f Unknown 4d. Attach an 8 1/2 X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Bellamy Place Townhomes LiDAR Map 071019.pdf 422.32KB Bellamy Place Townhomes Topo Map 071019.pdf 787.39KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Bellamy Place Townhomes Soils Map 071019.pdf 234.69KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.07 AC 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:* The purpose of the project is to install a gravity sewer line, which will service the proposed townhouse community. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* A trackhoe will excavate a deep trench and a 6" sewer line will be installed. The excavated dirt will be placed back into the trench and the ground restored to its original grade and contour. The wetland area will be allowed to re -vegetate naturally. 4j. Please upload project drawings for the proposed project. C6 FOR WETLANDS.pdf 810.77KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No f Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: NA 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): David Scibetta Agency/Consultant Company: SEGi Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR SEGi submitted the PJD request to the USACE in May. The USACE verified David Scibetta's wetland delineation on 9/23/19. A PJD has not been received. 5dl. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? SEGi is not aware of any previously issued NWPs or WQCs for this project and future impacts are not anticipated. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries r Buffers F Open Waters j] Pond Construction 2. Wetland Impacts 2al Reason(?) 2b. Impact type * M 2c. Type of W. 2d. W. name * 2e. Forested* 2f. Type of 2g. Impact Jurisdicition*(?) area* utility line T Headwater Forest 1 Yes Corps 0.003 =Fiity line T Headwater Fores—A 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.008 0.000 2g. Total Wetland Impact 0.008 2h. Comments: Work within wetlands will be restored to its original grade and contour and allowed to re -vegetate naturally. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The Applicant placed the utility line as close to the eastern easement line as possible. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The Applicant will use a trench box, to limit the area of wetlands to be disturbed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes c No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The proposed impacts are temporary and do not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) U t 2 Yes Corps 0.005 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.008 0.000 2g. Total Wetland Impact 0.008 2h. Comments: Work within wetlands will be restored to its original grade and contour and allowed to re -vegetate naturally. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The Applicant placed the utility line as close to the eastern easement line as possible. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The Applicant will use a trench box, to limit the area of wetlands to be disturbed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes c No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The proposed impacts are temporary and do not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) U 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent toprotected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: This project is not located within one of NC's Riparian Buffer River Basins. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No 2d. Which of the following stormwater management program(s) apply: F Local Government W State State Stormwater Programs F Phase II W Coastal Counties F- HWQ or ORW r Other Comments: A high density stormwater permit, for the townhouse community, is being sought through the DEMLR. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project is not part of a Planned Unit Development and Will not provide access to currently landlocked property. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r WA 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Municipal sewer and water will be provided. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r- No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NC Division of Marine Fisheries and USFWS. This site does not abut a water that would support EFH. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC SHPO 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: Only the utility lines will be situated within the flood zone. 8c. What source(s) did you use to make the floodplain determination?* Brunswick County GIS Flood Map Miscellaneous Comments Miscellaneous attachments not previously requested. Bellamy Place Townhomes Vicinity Map 031919.pdf Parcel Map.pdf 169.33KB 134.7KB Signature - R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Dana A. Lutheran Signature Sign Date 9/30/2019 5 E.Gl AGENT AUTHORIZATION FORM: PROPERTY LEGAL DESCRIPTION: 13.87 AC PLAT 26/316 SR 1472 LOT NO. PLAN NO., PARCEL I.D. 029KA009 STREET ADDRESS: Village Road Property Owner (please print): Summerlin Trace LLC c/o Patrick Mazz arone The undersigned, registered property owner of the above noted property, does hereby authorize Southern Environmental Group, Inc. (SEGi) to act on their behalf in matters regarding areas of environmental concern. Property Owner's Address (if different than property above): 726 Saw Mill Road Rocky Point, NC 28457 Telephone: We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. tuthl roperty Owned Signature SEGi Authorized Signature Print Name�11�E'2Liv�2/,�1� LLQ. Date David Scibetta Print Name 5/1/2019 Date Village RdHolly Hills DrSt u r g e o n Dr Cleatwood DrOakmont CtLyn-Marie Dr4LiDAR Map Bellamy Place Townhomes Tract Leland, Brunswick Co., N.C. 7/10/2019 019-031.01 Property Line Approx. Wetlands Map Source: NC Flood Mapping LiDAR Data 1 inch = 250 feet 0 125 250 375 50062.5 Feet Village RdHolly Hills DrSt u r g e o n Dr Cleatwood DrOakmont CtLyn-Marie Dr4USGS Topo Map Bellamy Place Townhomes Tract Leland, Brunswick Co., N.C. 7/10/2019 019-031.01 Property Line Approx. Wetlands Map Source: USGS TopoView Service, 7.5' 2016 Leland quadrangle, 1:24k scale 1 inch = 250 feet 0 125 250 375 50062.5 Feet 0.15 ac. Village RdHolly Hills DrSt u r g e o n Dr Cleatwood DrOakmont CtLyn-Marie DrNoB BaB BDC Mk BaB Mk BaB BDC NoB 4Soils Map Bellamy Place Townhomes Tract Leland, Brunswick Co., N.C. 7/10/2019 019-031.01 Property Line Approx. Wetlands Map Source: 2016 NCOneMaps Orthoimagery, Soil Survey of Brunswick Co. 1 inch = 250 feet 0 125 250 375 50062.5 Feet DATUM ELE -10.00 3„9Z,8Z. L LN 5 0 0 N r - Ln N I r 30N33 1 -IIS ,kHV8Odh31 - 3„ MH#7 SEWER NOTES. 1. CONTRACTOR TO VERIFY SIZE, DEPTH, MATERIAL AND LOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO THE START OF CONSTRUCTION. EXISTING UTILITY INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNERS AND ENGINEERS IMMEDIATELY. 2. CONTRACTOR SHALL REMOVE AND REPLACE/REINSTALL EXISTING DRIVEWAY AND DRIVEWAY PIPES AS REQUIRED TO INSTALL SEWERS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR BRACING/SUPPORTING POWER POLES AS REQUIRED TO FACILITATE CONSTRUCTION OF THE GRAVITY SEWER. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, RESTORING AND/OR REPAINTING ALL PAVEMENT MARKINGS AND STREET ADDRESSES PAINTED ON EXISTING CURB & GUTTER OBLITERATED DURING CONSTRUCTION. THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS AS REQUIRED. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY HORIZONTAL "CONTROL POINTS” DESTROYED DURING CONSTRUCTION. NOTE THAT THESE EXISTING "CONTROL POINTS" ARE NOT SHOWN ON THE CONSTRUCTION PLANS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE, VERIFY, AND REPLACE THESE "CONTROL POINTS". THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS. 6. CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF SEWERS AND LIFT STATIONS WITH RESPECTIVE UTILITIES OWNERS AND RESOLVE ANY CONFLICTS DUE TO THE EXISTING UTILITIES. 7. CONTRACTOR SHALL BE TOTALLY RESPONSIBLE TO REPAIR AND REPLACE THE EXISTING UTILITIES DAMAGED OR INPACTED. 8. CONTRACTOR SHALL REPLACE AND REPAIR ANY LANDSCAPING, FENCES AND OTHER FEATURES DAMAGED OR DESTROYED. WORK AREA SHALL BE RETURNED TO PRE - CONSTRUCTION CONDITION. 9. INSTALL ALL MANHOLES ON THIS SHEET FLUSH WITH THE EXISTING GROUND. 10. CONTRACTOR SHALL NOT INTERRUPT EXISTING SEWER SYSTEMS IN OPERATION. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL DISCONNECT THE EXISTING SEWER WHERE IT WILL INTERFERE WITH THE OPERATION OF THE NEW SYSTEM. 11. MANHOLES AND PIPE LINE LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD LOCATE MANHOLES AND PIPELINES AND GET ENGINEER'S APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION. 12. NCDOT ENCROACHMENT AGREEMENT PROVIDED IN THE SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL NCDOT REQUIREMENTS. 13. CONTRACTOR MUST PROVIDE 1.5 FEET OF CLEARANCE BETWEEN THE SEWER LINES AND WATER MAINS OR SERVICE LINES CONNECTED TO ANY WATER METER. SEPARATION SHALL BE VERIFIED BY OWNER PRIOR TO ACCEPTANCE. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 MAIN LINE GRAPHIC SCALE 30 15 0 60 120 1"=60' REV NO. DESCRIPTION DATE REVISIONS DATUM ELM 5.00 W W Z Z J J Z Z m I 2 1 I U-) LOU*) CID O ^ U n O ^ H OC) 0+I,:ZZO r� mNZEzzz m 0 EX. GROUNE8 LIFT STATION 8' �', / o p 30' UTILITY o.0 1+00 EASEMENT 2+00 3+00+ O N n N 600 284.43 M 0.40 8N. TO LIFT STATION H 2 SS MAIN LINE ` MH#1 .5 0.40% �s �S �s �3 4o4\wF ZONA o \-114 235 SF VNf A �J�E SF WETLAND qNo WETLAND — — _Acj IMPACT IMPACT i i i DATUM ELE -10.00 3„9Z,8Z. L LN 5 0 0 N r - Ln N I r 30N33 1 -IIS ,kHV8Odh31 - 3„ MH#7 SEWER NOTES. 1. CONTRACTOR TO VERIFY SIZE, DEPTH, MATERIAL AND LOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO THE START OF CONSTRUCTION. EXISTING UTILITY INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNERS AND ENGINEERS IMMEDIATELY. 2. CONTRACTOR SHALL REMOVE AND REPLACE/REINSTALL EXISTING DRIVEWAY AND DRIVEWAY PIPES AS REQUIRED TO INSTALL SEWERS. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR BRACING/SUPPORTING POWER POLES AS REQUIRED TO FACILITATE CONSTRUCTION OF THE GRAVITY SEWER. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, RESTORING AND/OR REPAINTING ALL PAVEMENT MARKINGS AND STREET ADDRESSES PAINTED ON EXISTING CURB & GUTTER OBLITERATED DURING CONSTRUCTION. THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS AS REQUIRED. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY HORIZONTAL "CONTROL POINTS” DESTROYED DURING CONSTRUCTION. NOTE THAT THESE EXISTING "CONTROL POINTS" ARE NOT SHOWN ON THE CONSTRUCTION PLANS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE, VERIFY, AND REPLACE THESE "CONTROL POINTS". THE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIALS. 6. CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF SEWERS AND LIFT STATIONS WITH RESPECTIVE UTILITIES OWNERS AND RESOLVE ANY CONFLICTS DUE TO THE EXISTING UTILITIES. 7. CONTRACTOR SHALL BE TOTALLY RESPONSIBLE TO REPAIR AND REPLACE THE EXISTING UTILITIES DAMAGED OR INPACTED. 8. CONTRACTOR SHALL REPLACE AND REPAIR ANY LANDSCAPING, FENCES AND OTHER FEATURES DAMAGED OR DESTROYED. WORK AREA SHALL BE RETURNED TO PRE - CONSTRUCTION CONDITION. 9. INSTALL ALL MANHOLES ON THIS SHEET FLUSH WITH THE EXISTING GROUND. 10. CONTRACTOR SHALL NOT INTERRUPT EXISTING SEWER SYSTEMS IN OPERATION. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL DISCONNECT THE EXISTING SEWER WHERE IT WILL INTERFERE WITH THE OPERATION OF THE NEW SYSTEM. 11. MANHOLES AND PIPE LINE LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL FIELD LOCATE MANHOLES AND PIPELINES AND GET ENGINEER'S APPROVAL PRIOR TO PROCEEDING WITH CONSTRUCTION. 12. NCDOT ENCROACHMENT AGREEMENT PROVIDED IN THE SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL NCDOT REQUIREMENTS. 13. CONTRACTOR MUST PROVIDE 1.5 FEET OF CLEARANCE BETWEEN THE SEWER LINES AND WATER MAINS OR SERVICE LINES CONNECTED TO ANY WATER METER. SEPARATION SHALL BE VERIFIED BY OWNER PRIOR TO ACCEPTANCE. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 MAIN LINE GRAPHIC SCALE 30 15 0 60 120 1"=60' REV NO. DESCRIPTION DATE REVISIONS DATUM ELM 5.00 W W Z Z J J Z Z m I 2 1 I U-) LOU*) CID O ^ U n O ^ H OC) 0+I,:ZZO r� mNZEzzz m 0 EX. GROUNE8 8' s O N n N 0+00 LINE A 1+00 0 0 CV C u1� 1r T^O r � �m> nFr? PROJECT COLLECTS SEWER FROM 78 2 -BEDROOM TOWNHOUSE UNITS. FOR REGULATORY REVIEW ONLY. NOT FOR CONSTRUCTION. BELLAMY PLACE TOWNHOMES TOWN OF LELAND BRUNSWICK COUNTY NORTH CAROLINA SEWER PLAN / PROFILE [RIGHT ANGLE EN(31NEERINC3, P.C. 212 PRINCESS STREET WILMINGTON, NC 28401 RAEPCSLOBELLSOUTH. NET (910) 251-8544 FAX (910) 251-2208 FIRM: C-0829 DATE: 07/17/19 Scale: As Shown Drawn: NNC Checked: WSL Project No: SS0119 Sheet No: C 6 4Vicinity Map Bellamy Place Townhomes Tract Leland, Brunswick Co., N.C. 3/19/2019 019-031.01 Property Line Map Source: ESRI Street Maps 1 inch = 1,500 feet 0 750 1,500 2,250 3,000375 Feet