Loading...
HomeMy WebLinkAboutNCG150024_Inspection Report_20191002ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Avery County Airport Authority Attention: Sam Calvert 202 Little Cow Camp Road Newland, North Carolina 28657 NORTH CAROLINA Environmental Quality October 2, 2019 Subject: Compliance Evaluation Inspection Permit: NCG150000 Certificate of Coverage: NCG1S0024 Avery County, North Carolina Dear Mr. Calvert: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on September 24, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinceyerfy;' Isaiah Reed, CP CEPSCI, S4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ'� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 noam can M 828.296AS00 Compliance Inspection Report Permit: NCG150024 Effective: 01/29/18 Expiration: 08/31/22 Owner: Avery County Airport Authority SOC: Effective: Expiration: Facility: Avery County Airport County: Avery 400 Brushy Creek Rd Region: Asheville Spruce Pine NC 28777 Contact Person: Sam Calvert Title: Phone: 828-260-1701 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09124/2019 Entry Time: 01:OOPM Exit Time: 01:20PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Air Transportation Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG150024 Owner -Facility: Avery County Airport Authority Inspection Date: 09/24/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On September 24, 2019 this facility was visited for the purpose of conducting a compliance inspection. No personnel were available on site. This facility will be re -inspected on or after October 24, 2019. The permittee is directed to make sure facility personnel with knowledge of the facilities stormwater permit and compliance action are present. If no personnel are available, and an inspection cannot be performed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG150024 Owner -Facility: Avery County Airport Authority Inspection Date: 09124/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ N ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ E ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0.❑ ❑ Comment Page 3 of 3