Loading...
HomeMy WebLinkAboutNCG020755_BIMS Inspection Report_20191001Permit: NCG020755 SOC: County: Onslow Region: Wilmington Contact Person: Tim Morton Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/25/2019 Primary Inspector: Brian P U Secondary Inspector(s): Compliance Inspection Report Effective: 03/17/16 Expiration: 09/30/20 owner: Morton Trucking Inc Effective: Expiration: Facility: Morton Mine- Jacksonville 121 Garnet Ln Entry Title: C' Certification: Jacksonville NC 28546 Phone: 910-346-9068 Phone: Exit Time: 12:OOPM Phone: Reason for Inspection: FolloS�u� Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: N Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit. NCG020755 Owner- Facility: Morton Trucking Inc Inspection Date: 09/25/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: Met with Ernest Lynch, Morton; and Dave Wasiela, Wasiela Engineering regarding prior inspection. While loss of key personnel has made previous records inaccessable, Morton has and will set up programs to manage permit requirements. Key issues that need consideration: 1. The permit should be an individual permit considering the asphalt plant, vegetative debris, concrete debris, and mining. Vehicle maintenance is currently considered under the mining permit. However, the company must consider submitting an individual permit application. (The permit was issued under Ken Pickle as a mining permit even though Morton submitted an individual (returned app)). 2. The wetlands must be monitored according to Joanne Steenhuis, DWQ. You must consult with DWQ regarding this decision. Failure to comply is a mining permit and NPDES permit violation. Submit documentation of monitoring to this office. Page 2 of 3 Permit: NCG020755 Owner -Facility: Morton Trucking Inc Inspection Data: 09/25/2019 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? M ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? M ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? M ❑ ❑ ❑ Comment: Analytical Monitoring Yea No NA NE Has the facility conducted its Analytical monitoring? M ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? M ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page 3 of 3