HomeMy WebLinkAbout20170887 Ver 1_Year 0 As-Built Review_20191001Site Information
Site Information
Date: *
Prepared By:
Meeting Type:*
USACE AID:
NCDWR ID:
NCDWR Version
Weather:
Coordinates:
Attendees
10/1/2019
Project Name:*
Bethel Branch
Mac Haupt
Type of Site:*
Bank Stream and Wetland Site
Year 0 As -Built Review
Sponsor/Prov ider:*Bank
Stream and Wetland Site
County:*
Chatham
20170887
HUC and Basin:*
Cape Fear - 03030002
1
Over cast 78
COE- Todd, Sam
DWR- Katie, Erin
WEI- jell, John, Jason L
Degrees North Degrees West
UT2 -E2 section, ok
UT2-rch 2- R, stream dry, has been dry
UT3- pond stream dry, some veg bare
areas, will need to watch flow and veg for
this reach
Ut1-did not walk downstream of crossing,
Erin had questions about the gray shaded
areas at end of this reach, as depicted on
the record drawings, WEI said it was
bedrock
Walked upstream through high herbaceous
layer. Looked at soils, a number of cores
looked more upland however it has been
dry. Will need to watch areas next to
stream. Recommended they do some
profiles now and compare to profiles in
future. May need to place a couple of extra
gauges.
Privet in UT2, they said they would remove.
Project Review Checklist
(provide additional detail in notes section on next page)
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
General Site Issues/Concerns
Stream Issues/Concerns
Wetland Issues/Concerns:
r Vegetation Composition or
Density
r Planted Stem Vigor (due to soil,
browsing)
r Invasive/Exotic Species
r Beaver/Feral Hogs
(management plan)
I— Soil (manipulation, compaction,
fertility)
r Livestock Present/Evidence of
Livestock Access
f- Crossings or Utility Lines
r BMPs or Alternate Approaches
r Fencing Issues or Fencing
Needed
r Ponds Within Project Area
r Incised/Entrenched
r Headcuts Present/Forming
r Stream Structures
Failing/Piping
r Excess Sediment/Aggradation
r CrosslSections
Missing/Indicate Problems
r Bank Instability/Failure
r- Bench Rills/Erosion
(constructed bench or P2 valley)
r Excess Sinuosity (lack of flow)
r Braided/Anabranch Channel
r Evidence of Excessive
Hydrology
r Evidence of Insufficient
Hydrology
r Hydric Soil Indicators/Soil
Series
r Surface Roughness or Bedding
r Channel Relocation/Riparian
Connectivity
r- Hydroperiod Length or
Start/Stop Date
r Inappropriate Credit Ratio
Proposed
r JD Needed to Confirm
Approach
r Continuity/Fragmentation
r Easement Issues (existing farm,
CE, NRCS funding)
r Easement Encroachments
(livestock, clearing)
r Easement Marking/Signage
r- Insufficient Project Size
r Adjacent Property Owner
r- T&E Species
r Section 106 (historic
listing/tribal issues)
r Insufficient Stream Drainage
Area
r Insufficient Hydrology (if raising
channel bed)
r Vegetation in Channel (stream
vs wetland)
r Flow Obstructions (undersized
pipes, fords)
f- Substrate Concerns
(embeddedness, particle size)
r Live Stakes Absent/Failing
r- Evidence of Water Quality
Issues
r Inlstream Habitat Weak/Missing
I— Stream Buffer Width Inadequate
r Missing Gauge Data
(preconstruction or monitoring)
I— Gauge Location/Placement
r Gauge Maintenance
r Drainage Ditches/Swales
Present
r Field Tiles/Subsurface
Drainage
r- Continued Ag Use Adjacent to
Wetland
Page 2 --
Notes and Sketches, etc
Credit Release/Site Closeout Information
or closeout review
Stream Credits
Warm Cool Cold
Requested
Approved*
Wetland Credits
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
Approved*
`The updated credit ledger for the project, which includes this release, rust be approved by the Roject Ivhnager.
Result of Monitoring Report or Closeout
Signature
Date 10/1/2019