September 25, 2019
U. S. Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Ms. Nicholle Braspennickx
NCDOT Coordinator
Dear Madam:
JAMES H.TROGDON, III
SECRETARY
Subject: Revision to Application for an Individual Section 404 and Section 401 Water
Quality Certification for the proposed I-404-77 interchange improvements
including I-40 from west of SR 2003 (Radio Road) to SR 2158 (Old Mocksville
Road) and I-77 from south of SR 2321 (East Broad Street) to south of SR 2171
(Jane Sower Road) in Iredell County. Division 12, TIP No. I-3819B.
Debit $570.00 from WBS 34192.3.2.
Since the permit application dated July 23rd, 2019 there has been a revision to the utility plans to
include <0.01 acre of hand clearing in wetland WH (Utility Site U-3). This activity is not a
permanent impact and does not affect the amount of mitigation required for this project. Please
see revised utility impact summary, site description for Site U-3, and revised Table 4 below as well
as attached revised utility plans.
Summary of Utility Impacts:
There will be a total of 0.02 acre of permanent wetland impacts, 0.27 acre of temporary wetland
fill impacts, and <0.01 acre of hand clearing in wetlands.
Utility Site U-3: There will be <0.01 acre of hand clearing in wetlands to wetland WH where a
utility easement runs through the wetland adjacent to Permit Site 8.
Mailing Address: Telephone: (919) 707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION Fax: (919) 250-4224 1000 BIRCH RIDGE DRIVE
ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598 Website: www.ncdot.gov
Table 4 — Revised Summary of Utility Wetland Impacts for I-3819B
Wetland
Impact
Temporary
Permanent
Mechanized
Hand
Mitigation
Site
ID
Type
Impacts
Fill (ac)
Clearing (ac)
Clearing
Requirement
ac
ac
ac
U-1
WJ
Utility
0.02
--
--
--
--
U-2
WD
Utility
0.25
<0.01
0.02
--
0.02
U-3
WH
Utility
--
--
--
<0.01
--
TOTAL IMPACTS
0.27
<0.01
0.02
<0.01
0.02
Thank you for your assistance with this project. If you have any
additional information, please contact Erin Cheely at ekcheely@ncdot.gov
A copy of this application and distribution list will also be posted on the
http://connect.ncdot.gov/resources/Environmental/Pages.
Sincerely,
Philip S. Harris III, P.E., C.P.M.
Environmental Analysis Unit Head
cc:
NCDOT Permit Application Standard Distribution List
questions or need
or (919) 707-6108.
NCDOT website at:
I-3819B Revision to Individual Permit Application Page 2 of 2
In
E
L
a
r,
C,
0
u,
T7
0
n
CT
T
0
L
0
TOTAL
STATE OF NORTH `lJ d 11 R O L I A V d 11 31'ATB I—W P WWr RBPBRBNCB N0. s NO T HEM
p�
rS,s' 90 z
3819B�U-6039 1
]]
vo�o BEGIN PROJECT
vS M.- P-M.NQ McRIPTION
DIVISION OFHIGHWAYS
O
64 l��R�O
34192.1.2 IMS-40-2 124 P.E.
34192.3.2 WA DESIGN BUILD
STATESVILLE
�.�
IREDELL. COUNTY
70 5? SU RD.
21
F IMIT90
21
10�
LOCATION: I-40/I--77 INTERCHANGE INCLUDING I-40 FROM WEST OF
K
SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & I-77 FROM SOUTH OF
M
x ������°
21 „5
64 pV°�
¢ EBR'o2
SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.)
TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES,
17-
� 7
RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL
L
END PROJECT
Vance
BEGIN TIP PROJECT I-3819B
-L- STA. 7+83,00
y� 1.
c��9Y
,4
V
e
4 END SEGMENT "A"
BEGIN SEGMENT b�
MAP
VICINITY M
S -Y N- STA. 175 + 00 �p0'`
�j
THIS PROJECT IS WITHIN THE MUNICIPAL
6
BOUNDARIES OF THE CITY OF STATESVILLE
AND THE TOWNSHIP OF BETHANY
END CONSTRUCTION
g titi /�0
SO 4S ti� i -Y- POT STA. 205+00.00 �
P4
100 50 0 100 2I BEGIN SEGMENT "A" ��'91
END
SEGMENT "B" tib
—YRPB-
-L- STA. 92 + 00 ' 1 - 5
PLANS ti
LCDWB—
-LCDEB- WETLAND AND SURFACE WATER IMPACT PERMITS
vq
200 100 0 200 400
�o tia
OVERSIZED PLANS
DATE: SEPTEMBER 23, 2019
YRPCA-
(Note: The sites highlighted in RED
SCALE VARIES
-YRPC—-----..-YS
—YRPA— are included in this submittal.)
—YLPC——YRPBD—
INSETS
SITE U-z
BEGIN SEGMENT
_YIo US �`-YRPAC- UTILITY PERMIT
"A" D9IIB AI ? END SEGMENT "A"
END SEGMENT "B" —J'9 s �� o BEGIN SEGMENT "B" D RAW I N G
2
E. BRO9ljzsf
-Y S- STA. 111 + 00
, -I- STA.178 + SO
—
,q 37 SITE #U-30.
�
0 SHEET 1 OF 8
SITE #U-1 B S�j1�
.y15
—YRPD— 59-
BEGIN SEGMENT "B" �D 's END TIP PROJECT I-3819B
iv
-Y S- STA. 2
+ 00.09 �� -L- STA. 219 + 50.00
CLEARING ON THIS PROJECT SHALL BE PERFORMED
1b
N
TO THE LIMITS ESTABLISHED BY METHOD III.
THIS IS A CONTROLLED ACCESS PROJECT
SA�F99
WITH ACCESS BEING LIMITED TO INTERCHANGES
U-6039 LANE
°�°
NO IMPACTS
INCOMPLETE PLANS
MDO
NOT USE FOR RCW ACQUISITION
• •
GRAPHIC SCALES
DESIGN DATA
I-40 I-77
PROJECT LENGTH
Prepared in line Office of:
WSP
HYDRAULICS ENGINEER
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
ADT 2016 = 57,300 62,900
1001 Morehead Square Dr., Suite 610, Charlotte, NC 28203
NC LIC NO. F-0165
of Muery
V
ADT 2040 = 72,500 77,500
—
LENGTH ROADWAY TIP PROJECT 1-3819B 3.885
OF'O
2018 STANDARD SPECIFICATIONS
WDHV
= 5,800 6,200
LENGTH STRUCTURES TIP PROJECT 1-3819B = 0.124
P�
ti!4`
SEE ABOVE
D = 55 % 55 %
TOTAL LENGTH OF TIP PROJECT 1-3819B - 4.009
RIGHT OF WAY DATE:
CHRISTOPHER D. DAVIST.E.
SIGNATURE:
os
ROADWAY DESIGN
PROJECT ENGINEER
_ o /0 * o /o **
T 16 19
OCTOBER 30, 2018
Qe
O
ENGINEER
OF rW RMe'
LETTING DATE:
V = 60 MPH 60 MPH
* TTST 13 + DUAL 3 (1-40)
ERIC W. SECKINGER, P.E.
PROJECT DESIGN ENGINEER
** TTST 16 + DUAL 3 (1-77)
OCTOBER 30, 2018
CLASSIFICATION: INTERSTATE
P.E.
SIGNATURE:
Y.E.
STATE HIGHWAY DESIGN ENGINEER
24" GRAVITY SEWER LINE TRENCH DETAIL
1G%I�GrIN3
0 FT
T :1 SLOP 1:1 SLOP
f
Exuvnrxax
12 FT
PIPE
T
1
g w asg sg•
8a �I .sn W68 B
BODING
BRICIUNING
4 F
li m9I?W s B�SS�
mm m ®
PAGNIO AS
FAB
RE011[REO
a':•:°%.e.e%
CONDITIONING
AS REQUIRED
I.--4 FT---
NTS
P(
-MATCHLINE- SEE SHEET NO. 23
MEMO
�.I ��s 111IIW _ f ICI
inMir. rran,rni ---- •
Mill 9rrlr!@![a1 ■!.;Tll1Rl,F��,�rmaa� �� ,
i®1� lure r
ol�erllrno
Sm! rr l F;lrr■ ■ Orl I .-... I
lirr�c mMlMlMMMI rl■■•rlRrllrrl
�as rr�r�. �rr•rllrlr
�. 21.6
i.1n• rli7: I FL
mmiiiiiiiiiiiiii!c llilm o s nnlrn o®
®r .■Lan■ �RN011WA.�ar.. arum
n�
.11
lip' '' � ® �® �. �s+�.t•�
..1 c
an 1� y
� >`L
rI DENOTES FILL IMPACTS
IN WETLANDS
UTILITY PERMIT
DRAWING
WL SHEET 2 OF 8 0
f•••••••,'rr v �DETAIL 12 z
CHANNEL MANGE
1:.• n
.. Y.. ,.� . SK
\ T—....-/CYueYRlp p Ofi
%# �•• F \\ —YRPAC—FROM STh]7+]4 r 9A.33-50
nnn
nitro n
.
-- /rFron
�.-- /nnronR
llln ll!
® i n/iir r sj� �yofj
/rnmu
� i
•
-----
-------------
o
— --
---------
-- --
— — — — — — — — — —
- --
Via- L �
�� �---
*•r= ___�—
� f -T T �c-.,..
�L� �
�c
"
INSET
FWJI
A PER
FS K
D
t
/ T
TEMPORARY FILL IN WETLANDS
(n
IMPACT
SITE #%-1 L
DENOTES TEMPORARY
® FILL IN WETLAND
GRAPHIC SCALE - INSET
3T�
a
ss cs�ss m
faro
I
J \In
� �3� URTH REEK
7T� \
brr n 0
`��vl�Q QLi
Q 5���
-MATCHLIN - -C
STA.66+90.00 -
cT NO.10
SITE U-2
SEE SHEET 2A ,y
STA. 80+gCHLINE- xG
SEE SHEET YRP
NO. 21
I
'h1.4TCMLlIv
SEE SHE, "5 No
�00E _y RT
5
p&
II
0 0 11
0 1.
Q
�p p 00
o°
UTILITY PERMIT
DRAWING
SHEET 4 OF 8
-YRP08-
Po44 Mr2•/D.S PM Sa P3t7AS0 pSa 21— ps sa 29—ps sa 30�9591
A- Z-VOPJ rRTt gs - 15P'552 252i nD'IRTL gs . 152552 B.s . i5Y 08R
D 035n8 fs - 144,V D 6'/5 SOD' Ls . .,w is •roar
L 39zw LT 960e
7 sT - 4ROT
L 4336i LT 990i LT 9601
T . 22,171 sr 4803' Sr 4aO3'
gMApY
a.
AC
sE • 06
DS = 50 IIPoI
OS • 50 YPR
Y s YRPM-
-YLPC-
qAr
4 S- 522f 161O�.tRi�r Pr 907I+01J2 Pisa iffwm
- ITr53BStRTt A• 232A752.'W)
D 029'S36
L rD1IA3' D - 2'K19B
D . 915'25,
r29V00'
rr R = P97se
R . 5SE -'37'6O,
R .
DS • ur ^f M50 YPN
DS
SE
DS • 08 YPN
PM Sa 39N3& Po Sa 33..80&
Pos 54 2i2�62.52 p Sr# 235sRZJ2
A •
Ms Sa 20025D4 p Sta 21.E6.97 ps Se 28.503
4 - 5037'PISfRTt
Ba - 2'3i49 G • B29'I3Brtir
b P7D00 D f5i355
gs - f5i 35S A70f59TftT1
(s • 200D0 D f50 35S
B.s • 157'OBA' . f57'OBA
Ls • HIDO' D - gym.
LT - tB0D2 L WBZ
5 -soot
LT - 133-w L . 5253!
sr - 6667' ;3faf.
36&71
LT . 98Os' L - 13600 LT O,
ST 18OT
SE -2
05
SE :BUBO.
DS E0 Ypr
DS 60 YPx
Ds • 500m-
-YRPD-
-YRPCA-
Pos Sa RNS35 Pig, -07M
Bs - iSr" A • 22'3036 W)
Pos 5a r6t5& M RJt
9s • /57061 A- 5'0050'2rt
ps Sa P-605 PoSr4.rr3263
gs . 15'" p . 9533•l&3'RTt
Ls - 94w D • cw p
LT 950f L 3272P
u • ,Mar D: a4Y409
LT 960i L • 73047'
is • M4W D • 55TB1
Lr %Di L L58922
57 IBDS T Ai577'
R 83300'
S7 . /803' 7 - 8550'
R - 7670D0
Sr • .gpp T . 9Y93'
R . B33D0
DS 50 YPR
DS- 50 YPN
05- so YPR
INSET
/ ut
O WH / y\
4 \�
DENOTES FILL IN
®
WETLAND
®
E RY
FILL IN WETLAND
SITE#U-3
0
DENOTCSEARINGNIZED
®
DENOTES HAND
CLEARING
HAND
CLEARING
25 12.5 0 25 50
GRAPHIC SCALE - INSET
SITE U-2 INSET
& $
:S:jl
is &
is
/*
lk
'k
lk
lk
lk
T T
TEMPORARY FILL IN
WETLANDS IMPACT
'k k
'k lk
PERMANU4T JMMTS.*@" F,0lJ R
4A*TQW�R`,FOOTINC-S T k
'k
�k
'k
1.4 &
OFTRANS
O
RCPON AdEN T
I A
AREA WITHIN 50'OF BRIDGE
ALSO COUNTED AS HAND —CLEARING
IMPACT IN ROADWAY & DRAINAGE
PERMIT PLANS
LANE I%%til)
PROJECT REFERENCE NO.
SHEET NO.
1-38198
P,W SHEET NO.
ROADWAY DESIGN
—HYDRAULICS
ENGINEER
I
ENGINEER
INC®MPLETE
PLANS
DO NOT USE FOR R/W
ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
UTILITY PERMIT
DRAWING
SHEET 6 OF 8
to
1�
co
0
z
z
DENOTES FILL IN
WETLAND
DENOTES TEMPORARY
FILL IN WETLAND
• DENOTES MECHANIZED
CLEARING
5,0 25 0 25 50
GRAPHIC SCALE — INSETS
SITE U-2 INSET
P111L/`1 YY111 111`I JV VI DI\ILJVL
ALSO COUNTED AS HAND —CLEARING
IMPACT IN ROADWAY & DRAINAGE
PERMIT PLANS
LANE
` ` ■
1
I
PROJECT REFERENCE NO.
SHEET NO.
/-38/9B
22A
RW SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
UTILITY PERMIT
DRAWING
SHEET 7 OF 8
to
co
10
IZ
0
c�
U
Z
F F DENOTES FILL IN
WETLAND
DENOTES TEMPORARY
FILL IN WETLAND
* • DENOTES MECHANIZED
CLEARING
500 25 0� 25 5
GRAPHIC SCALE - INSETS
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand
Existing
Existing
Permanent
Temp.
Excavation
Mechanized
Clearing
Permanent
Temp.
Channel
Channel
Natural
Site
Station
Structure
Fill In
Fill In
in
Clearing
in
SW
SW
Impacts
Impacts
Stream
No.
(From/To)
Size / Type
Wetlands
Wetlands
Wetlands
in Wetlands
Wetlands
impacts
impacts
Permanent
Temp.
Design
(ac)
(ac)
(ac)
(ac)
(ac)
(ac)
(ac)
(ft)
(ft)
(ft)
U-1
31 +50-YRPD-
Utility
0.02
U-2
75+00-YRPAC-**
Utility
< 0.01
0.25
0.02
U-3
18+92-YRPDB-
Utility
I
I
I
I < 0.01
TOTALS*:
< 0.01
1 0.27
1
1 0.02
1 < 0.01
*Rounded totals are sum of actual impacts for entire project area
**Permanent Impacts from four (4) 4-ft x 4-ft concrete foundations for new transmission tower locations.
Revised 2018 Feb