Loading...
HomeMy WebLinkAbout20191222 Ver 1_401 Application_20190913Transmittal Letter Date: September 10, 2019 Project Name: Sunset Park ACE Project: 18111 To: NC Division of Water Quality,WBSCP Unit 34 Big Bear Trail Asheville NC 28805 Phone: 828-545-5393 www.aeeas#0il'- com 2 0 1 9 1 2 2 2 1617 Mail Service Center, Raleigh, North Carolina 27699-1650 A�MVEIVXWU R Attn-. Karen Hi ens SEF 13 Z019 cc: Wter Resources Pon-oft.Ing Section Via Mail Overnight Hand Delivered X Pickup @ACE Office ------Copies--------------Date------------------------------------------------ Description ----------------------------------------- 5 09/10/19 PNC Form --------------------------------------------- --- -- -------- ------------------------------------------ ----------------------------- 5 09/10/19 Agent Authorization Form ----------------------------------------- --------------------------------------------------------------------------------------------- 5 09/10/19 11 x17 Reduced Size Plan Sets ----------------------------- ----------- 1 09/10/19 Check for $240.00 ----------------------------------------- --------------------------------------------------------------------------------------------- ---------------------- ------------------ [ REMARKS: - By: - -Kathleen - Periland- - ------------------------------- ot VIAT�9�G Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑X Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes NX No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Sunset Park 2b. County: Buncombe 2c. Nearest municipality / town: Asheville 2d. Subdivision name: Sunset Park 2e. NCDOT only, T.I.P. or state project no: n/a 3. Owner Information 3a. Name(s) on Recorded Deed: AVL Associates, LLC 3b. Deed Book and Page No. 4873/1023 3c. Responsible Party (for LLC if applicable): AVL Associates, LLC 3d. Street address: 12 Sunset Drive 3e. City, state, zip: Asheville, NC 28801 3f. Telephone no.: 828-333-3448 3g. Fax no.: 3h. Email address: carsonchris2@gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: S. Agent(Consultant Information (if applicable) 5a. Name: Mike Lovoy, PE 5b. Business name (if applicable): Advantage Civil Engineering, PA 5c. Street address: 34 Big Bear Trail 5d. City, state, zip: Asheville, North Carolina 28805 5e. Telephone no.: 828-545-5393 5f. Fax no.: 5g. Email address: mlovoy@aceasheville.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 9649-73-3746 1 b. Site coordinates (in decimal degrees): Latitude: 35.605642 Longitude: -82.541569 1c. Property size: 2.7 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Reed Creek Tributary 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing lot is a town -home development with completed build out of infrastructure and homes surrounded by a developed residential community. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 85 d. ExIain th urpose of the ropgsed rojecx: e pume o Mils project Is t8rep ace a original design -build of an open throat inlet with a corps approved storm structure at a location on the property where a stream has developed. 3e. Describe the overall project in detail, including the type of equipment to be used: The project proposes replace an open throat inlet with a frame and grate and extend 20 LF of storm pipe ending with a Flared end section into a stream that has developed on-site since the original development was permitted and built. A small excavator and coffer dam with pump will be used during construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project(including all priorphases) in thepast? ❑ Yes Q No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? 59 Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Flared End Section Reed Creek Tributary PER Corps 3 22 S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 22 3i. Comments: The project proposes replace an open throat inlet with a frame and grate and extend 20 LF of storm pipe ending with a flared end section into a stream that has developed on-site since the original development was permitted and built. A small excavator and coffer dam with pump will be used during construction. Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. 5e. Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other. 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed impacts are designed to mitigate a stream which has developed since the development was designed and built. Impacts will be limited to installing a corps -approved structure to replace the existing open throat inlet. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction will be done in a timely manner and follow all erosion control measures required to minimize and avoid impacts where possible. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In4leu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 16% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The culvert extension will be included under the previous Stromwater Management Plan for the development. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? Mike Anderson, PE 828-582-8970 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Asheville ❑ Phase II ❑ NSW 3b. Which of the following locally-implemented stormwater management programs USMP apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been []Yes © No attached? 4. DWQ Stormwater Program Review []Coastal counties ❑HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes © No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Q Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes © No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from theproposed project, or available capacity of the subject facility. by Metropolitan Sewerage District Wastewater from the protect will be collected in a public sewer extension to be owned and operated the of Buncombe County. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife Online Mapping 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC DENR Mapping 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC Historic Preservation Office website B. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Risk Information System website. Mike Anderson, PE 112 ((( Applicant/Agent's Printed Name App ant/Agent's Si nature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Department of the Army Wilmington District, Corps of Engineers Atm: Scott McLendon, Chief Regulatory Division PO Box 1890 Wilmington, NC 28402-1890 -and- NC DWR, 401 and Buffer Permitting Unit Atm: Karen Higgins 512 North Salisbury Street Raleigh, North Carolina 27604 1, the current landowner/managing partner of the property identified below, hereby authorize Advantage Civil Engineering, PA to act on my behalf as my agent during the processing of jurisdictional determination requests and permits to impact Wetlands and Water of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Mike LoVW, PE is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of conducting onsite investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. One property owner of record must accompany any said representative when the onsite investigation is conducted. Property Owner of Record: AVL Associates LLC Property Owner Address: 92 Middlemont Ave Asheville, NC 28806 Phone Number: 828-333-3448 Email address: carsonchris2@gmail.com Property Location: 12 SunselDr. Asheville, NC Owner/Managing partner Signature: K� �Ctf Owner/Managing printed name: C r;,5 -� P ke-dr Cf'--� o -'J Dater - g V- 2 c � � EXISTING OPEN THROAT INLET TO BE REPLACED WITH FRAME & GRATE / EXISTING 18" HDPE STORM PIPE (TYP) OPEN THROA NLET TOP: 23 .53' 232 .,WRENCE AI's' EXISTING PROPERTY LINE (TYP) -- - - i 2'x3' YARD INLET i TOP: 2319.23' . - i T ) A H 08 T P: 2317.5dy INV. O 2311.50' IN .OUT: 2311.70- OUTFALL 311.70'OUTFALL/ i_ INV.: 2308.49' CURB INLET TOP: 2298.60' INj-22 !� / SVIH 07 TOP: 2299.56 -- / INV.IN�22t32.14' 15�YO: 2291.94' CURB INLET // �\ S H 06 _ - _SOL: 2285.09' � \ ''' TOP: 296.73' INV.: 228i:1J9' -�-- \ _INV. 0 :22 93' PREPARED FOR: APPROXfIVIATE.J`OCATION OF \ I 11 INV. Ory; :228 .93' STORMTECH CHAMBERS �l �� \(n AVL ASSOCIATES, LLC 92 MIDDLEMONT AVE ASHEVILLE, NC 28806 CHRISTOPHER C. CARSON GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. STORM AMENDMENT BULLETIN FOR: �SUNSET PARK STREAM DATE: AUGUST 12, 2019 NOTE: CONTRACTOR TO FOLLOW ALL USACE PERMIT REQUIREMENTS APPROXIMATE LOCATION OF EXISTING STREAM PROPOSED FES INVERT TO BE RECESSED 6" BELOW STREAM BED OR 20% OF PIPE DIAMETER, WHICHEVER IS GREATER INV: 2330.31' PROPOSED 20LF EXTENSION OF 18" HDPE STORM PIPE ® 40% EXISTING EDGE OF PAVEMENT (TYP) EXISTING BUILDING (TYP) NORTH CAROLINA FIRM NUMBER C-2849 kc ITh Know whar:below. MICHAEL LOVOV, P.E. callnerororo ala 34 BIG BEAR TRAIL ASHEVILLE, NC 28805 (828)