HomeMy WebLinkAboutNCG080775_BIMS Compliance Inspection Report_20181012Compliance Inspection Report
Permit: NCG080775
SOC:
County: Pender
Region: Wilmington
Effective: 11/16/17 Expiration: 10/31/18 owner: AT Williams Oil Company
Effective: Expiration: Facility: WilcoHess #396 - Rocky Point
8221 US Hwy 117 S
Contact Person: Joey Cupp Title:
Directions to Facility:
US Highway 117 & NC Highway 210 in Rocky Point, NC.
System Classifications:
Primary ORC: Certification:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Rocky Point NC 28457
Phone: 336-767-6280 Ext.1005
Phone:
Inspection Date: 10/12/2018 Entry Time: 10:30AM Exit Time: 11:30AM
Primary Inspector: Brian P Lambe Phone:
Secondary Inspector(s):
Reason for Inspection: Complaint Inspection Type: Compliance Evaluation
Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCGO80775 Owner - Facility: A T Williams Oil Company
Inspection Date: 10/12/2018 Inspection Type : Compliance Evaluation Reason for Visit: Complaint
Inspection Summary:
Brian Lambe met with Wayne Randolph of UST section in response to a complaint of a diesel feul spill from the permitted
location. The gas station has a deisel bay that has wastewater collection inlets, leading to a oil water separator. Mr.
Randolph said that the oil water separator has not been maintained. The separator leads to a underground tank adjacenct to
the permitted stormwater infiltration pond (SW8041105). The overflow from the storage tank flows into the infiltration pond.
The secondary containment from the UST fill port area has a drain, presumably leading to the storage tank or the infiltration
pond.
The state stormwater permit does not allow for the infiltration pond to be used to for treatment of petroleum products.
Cleanup of the spill must be coordinated with John Hooks and Wayne Randolph of UST per Notice of Violation dated
October 19, 2018. Schedule a compliance meeting with Brian Lambe to review SPPP and sampling results post 2015.
Page: 2
Permit: NCGO80775 Owner - Facility: A T Williams Oil Company
Inspection Date: 10/12/2018 Inspection Type : Compliance Evaluation Reason for Visit: Complaint
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
❑ ❑
# Does the facility provide all necessary secondary containment?
❑
❑ ❑
# Does the Plan include a BMP summary?
❑
❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
❑ ❑
# Does the facility provide and document Employee Training?
❑
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑
❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
❑ ❑
Comment: Please contact this office for review of the SPPP. You may submit a copy
to this office or meet
inspector on site.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Submit records to this office
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment: Submit records to this office.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment:
Page: 3