HomeMy WebLinkAbout310502_Plan of Action_20190910PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31 - 502
Facility Name:
County: Duplin
ER Kennedy - Whitney Farm
Certified Operator Name: ER Kennedy
Operator #: 17234
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Whitney 2
No
19
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s); number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/11/2019
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
ER Kennedy Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature) -
Cover Page ER Kennedy- (31-502) Whitney (PoA30day) 9-10-2019
9/10/2019
Page 1 of 1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1 ER Kennedy 2 Whitney 31-502
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 0.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 31775 ft2
e. line c/12 x line d x 7.48 gallons/ft3 9903 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 40353 ft3
h. current herd # 1224 certified herd # 1224
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/15/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
40353 ft3
Oft,
1960 ft3
52750 gallons
2.00 Ibs/1000 gal.
125.3 Ibs. PAN
Structure 2 ER Kennedy- (31-502) Whitney (PoA30day) 9-10-2019 Page 1 of 1
11
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID:
line m =
lb PAN
2.
Structure ID: ER Kennedy 2 (Whitney) 31-502
line m = 125.3
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 125.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
pFRinn nn WIT I ICT mm nS TO WHICH PAN CANNOT RF APPI IFn MIRING THIS 30 DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
71203
B
Bermuda
3.85
141.73
545.7
3/1 - 9/31
712031
C
Bermuda
3.64
128.52
467.8
3/1 - 9/31
71203
1A
Bermuda
3.53
175.42
619.2
3/1 - 9/31
71203
2A
Bermuda
3.47
172.41
598.3
3/1 - 9/31
71203
3A
Bermuda
3.09
168.40
520.4
3/1 - 9/31
71203
4A
Bermuda
2.64
152.27
402.0
3/1 - 9/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3153.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 125.3 lb. PAN
x. Crop's remaining PAN balance (line v from section: III) = 3153.3 lb. PAN
y. Overall PAN balance (w - x) = -3028 lb. PAN
SUMMARY ER Kennedy - (31-502) Whitney (PoA30day) 9-10-2019 Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
SUMMARY ER Kennedy - (31-502) Whitney (PoA30day) 9-10-2019 Page 2 of 2